Phase 1



Temporary Gym & Open Space

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031







1 Relocate playground in Washington Square Village above garage (Estimated construction time, 9 months)

2 Create temporary play area and plaza on LaGuardia Place (9 months)

3 Relocate dog run to University Village (9 months)

4 Create new seating area along Bleecker Street south (9 months)

5 Construct temporary gym facility at location of former Washington Square Village Playground (9 months)

6 Create new plazas at the north and south end of block and renovate Mercer Playground (9 months)









West 3rd Street









WSV 1 WSV 2









Adrienne’s

Garden

6

5

WSV

Temporary

Retail Gym





1

LaGuardia Place









2 Mercer Street







WSV 3 WSV 4









Bleecker Street





4



Morton

Williams









Silver

Tower 2



Coles

Athletic Center



505

LaGuardia









Silver

Tower 1







3

West Houston Street









Existing Buildings New Public Space Private Spaces

(Current Phase)

New Buildings Entry Points

New Public Space

(Current Phase)

(Previous Phase)

New Building

(Previous Phase)

Phase 2



Zipper Building & Open Space

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031







1 Construct Zipper Building (gym, academic, retail, dorm, faculty housing, hotel, and

supermarket relocation) (Estimated construction time, 54 months)

2 Create new 11,000 sf publicly accessible playground in University Village (9 months)

3 Create a new esplanade along former Greene Street to access new playground, dog run,

and zipper building (9 months)









West 3rd Street









WSV 1 WSV 2









Adrienne’s

Garden









WSV

Temporary

Retail Gym

LaGuardia Place









Mercer Street







WSV 3 WSV 4









Bleecker Street









Morton

Williams 3

1

Silver

Tower 2 Zipper

Building

505

LaGuardia

2



Silver

Tower 1









West Houston Street









Existing Buildings New Public Space Private Spaces

(Current Phase)

New Buildings Entry Points

New Public Space

(Current Phase)

(Previous Phase)

New Building

(Previous Phase)

Phase 3



Bleecker School

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031







1 Construction of Bleecker Building with Public School and NYU academic and

dormitory space (timing of building dependent on DOE and SCA time table)

(Estimated construction time, 36 Months)



2 Temporary interim open space to be provided if Phase 4 project delayed (9 months)









West 3rd Street









WSV 1 WSV 2









Adrienne’s

Garden





2

WSV

Temporary

Retail Gym

Site

LaGuardia Place









Mercer Street







WSV 3 WSV 4









Bleecker Street









Bleecker

School



1

Silver

Tower 2 Zipper

Building

505

LaGuardia









Silver

Tower 1









West Houston Street









Existing Buildings New Public Space Private Spaces

(Current Phase)

New Buildings Entry Points

New Public Space

(Current Phase)

(Previous Phase)

New Building

(Previous Phase)

Phase 4



Mercer Building & Open Space

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031







1 Create new seating and landscape areas along West 3rd and Bleecker streets (Estimated construction time, 9 months)

2 Construct new parking garage on Washington Square Village in northeast portion of the block (21 months)

3 Construct new Mercer Building and below grade space on middle and eastern portion of the block (63 months)

4 Create new plazas and play areas along Mercer Street (9 months)

5 Create new publicly accessible open space and playground in Washington Square Village (12 months)









West 3rd Street





1

WSV 1 WSV 2









Adrienne’s Public Lawn

2

Garden Tricycle Garden





Mercer Building

WSV Philosophy

Retail Garden 4

5 3

LaGuardia Place









Mercer Street

WSV 3

WSV Playground WSV 4

Mercer Plaza



WSV 3 WSV 4









1

Bleecker Street









Bleecker

School





Silver

Tower 2 Zipper

Building

505

LaGuardia









Silver

Tower 1









West Houston Street









Existing Buildings New Public Space Private Spaces

(Current Phase)

New Buildings Entry Points

New Public Space

(Current Phase)

(Previous Phase)

New Building

(Previous Phase)

Phase 5



LaGuardia Building & Open Space

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031







1 Construct new LaGuardia Building and below grade space (Estimated construction time, 39 months)

2 Rebuild LaGuardia and Adrienne’s gardens and public plazas along LaGuardia Place and

around building, statue of Fiorella LaGuardia retains prominence in the newly designed site

(12 months)









2



1

Mercer Building





LaGuardia Building







WSV 3 WSV 4









Bleecker

School







Zipper

Building









Existing Buildings New Public Space Private Spaces

(Current Phase)

New Buildings Entry Points

New Public Space

(Current Phase)

(Previous Phase)

New Building

(Previous Phase)



Related docs
Other docs by linxiaoqin
Volume 9 Issue 1- Winter 2-4-2004 _Read-Only_
Views: 13  |  Downloads: 0
VOLUME 35_ NUMBER 5 DECEMBER 10_ 2007
Views: 8  |  Downloads: 0
Volmer Axel-Antero
Views: 12  |  Downloads: 0
Voices for Change
Views: 7  |  Downloads: 0
Vocation Vacation
Views: 8  |  Downloads: 0
VISIT OUR SHOP CONTACT US
Views: 8  |  Downloads: 0
Visit of cellars
Views: 7  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!