Joinery and Building Trades Award 2010—Wages comparison—Division 2B State Awards
Note: This document (consisting of two sheets) contains the following information:
• Modern award wages and allowances as at 01 Jan 2010
• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009
• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied
Federal SA NSW
Joinery and Building Trades Fibrous Plasterers (Factory) Award Plasterers, Shop Hands and Casters (State) Consolidated Award
Award 2010
MA000029 Link to Division 2B State AN150052 Link to Division AN120420
Award 2B State Award
Classifications Modern award Classifications Div 2B NAPSA Classifications Div 2B NAPSA
cl 18 Schedule 1 Schedule 1 cl 3 cl 3
$ $ $ $ $
Level 1 543.90 All Other 618.95 600.60 All Others 568.25 526.80
Level 2 560.50 Caster 632.65 614.30 Cornice Machine Attendant 568.25 526.80
Level 3 583.00 Fibrous Plasterer 674.35 656.00 Mechanical Cornice Attendant & Operator 568.25 526.80
Level 4 603.90 Modeller 679.35 661.00 Caster 569.70 535.30
Level 5 637.60 Shop Hand 661.00 620.70
Level 6 658.50
Level 7 679.30 Rates as per the 9
December 2009
Order published
by the NSW IRC
which provides
rates to be
effective ppc 26
November 2010
Joinery and Building Trades Award 2010—Wages comparison—Div 2B State Awards - Spreadsheet as at 31 January 2011 Page 1 of 4
Joinery and Building Trades Award 2010—Allowances comparison—Division 2B State Awards
Note: This document (consisting of two sheets) contains the following information:
• Modern award wages and allowances as at 01 Jan 2010
• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009
• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied
Federal SA NSW
Joinery and Building Trades Award Fibrous Plasterers (Factory) Award Plasterers, Shop Hands and Casters (State)
2010 Consolidated Award
Link MA000029 Link to Division 2B AN150052 Link to Division 2B AN120420
State Award State Award
Instrument Modern Award Div 2B NAPSA Div 2B NAPSA
Allowance Type Standard rate (SR)
$16.78
cl 24 cl 5.3; Schedule 1 cl 5.3; Schedule 1 cl 3; 6; 10; 18 cl 3; 6; 10; 18
First aid allowance 75.6% SR ($12.69) per week $11.85 per week $10.45 per week $0.61 per day
Leading hands, per week
In charge of not more than 1 person 91.2% SR ($15.30) $15.70 $13.90
In charge of 2 and not more than 5 employees 200.2% SR ($33.59) $34.60 $30.60
In charge of more than 2, up to and including 5 employees $17.20 $14.85
In charge of 6 and not more than 10 persons 256.3% SR ($43.01) $44.10 $39.00
more than 5 and up to and including 10 employees $21.70 $18.77
more than 10 employees $58.90 $52.00 $30.50 $26.43
11 or more employees 340.9% SR ($57.20)
Overtime meal allowance
first meal after overtime $2.30 per meal $2.05 per meal
Where working more than 1.5 hours after usual ceasing time $11.90 per meal $8.00 $8.00
Distant work, per week of 7 days $57.00 $51.00
Transfers, travelling and working away from usual place of
work
Employee directed to work at a distant job $57.00 per day or $398.40 per full week
Return journey $19.70
Employee who is provided full board and lodging, who works $33.40 for each occasion
the day before and the day after a weekend, and who notifies
employer no later than Tuesday of their intention to return
home.
Disability allowance, per week $12.90 $11.30
payable to all employees
Industry allowance
Employees engaged on joinery work, shopfitting, stonemasonry 142.4% SR per week ($23.89)
or outside work
Glazier/apprentice glazier engaged other than on factory 3.8% SR ($0.64) per hour
glazing
Tool allowance
Shop hand $3.50 $3.20
Caster $1.40 $1.30
Modellers, fibrous plasterers and apprentices who supply own $7.10 $7.10
tools
Carpenter and/or joiner, Carver, Joiner special class, Joiner- $25.80 per week
setter out, Letter cutter, Prefab setter, Prefab tradesperson,
Shopfitter, Stonemason
Joinery and Building Trades Award 2010—Allowances comparison—Div 2B State Awards - Spreadsheet as at 31 May 2010 Page 2 of 4
Joinery and Building Trades Award 2010—Allowances comparison—Division 2B State Awards
Note: This document (consisting of two sheets) contains the following information:
• Modern award wages and allowances as at 01 Jan 2010
• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009
• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied
Federal SA NSW
Joinery and Building Trades Award Fibrous Plasterers (Factory) Award Plasterers, Shop Hands and Casters (State)
2010 Consolidated Award
Link MA000029 Link to Division 2B AN150052 Link to Division 2B AN120420
State Award State Award
Instrument Modern Award Div 2B NAPSA Div 2B NAPSA
Allowance Type Standard rate (SR)
$16.78
Plasterer $21.30 per week
Glazier $9.05 per week
Assembler A $7.70 per week
Glass worker $6.25 per week
Painter $6.20 per week
Stonemasonry tools and equipment $0.05 per hour extra
Compensation for clothing and tools max. $1495.00
Motor vehicle allowance
Employees engaged on glass and glazing work $0.74 per km
Special rates
When required to wear protective equipment when using 4% SR ($0.67) per hour while wearing
materials containing asbestos/in close proximity thereof such equipment
Bagging brick or concrete structures 2.9% SR ($0.49) per hour
Cold work - working more than 1 hour in a place where 3.2% SR ($0.54) per hour or part thereof
temperature reduced by artificial means
Computing quantities - for employees that are not classified and 23.3% SR ($3.91) per day or part thereof
paid as a leading hand or setter-out, when regularly required to
estimate quantities of materials
Confined space 4% SR ($0.67) per hour or part thereof
Dirty work 3.2% SR ($0.54) per hour
Explosive powered tools 7.6% SR ($1.28) per day on which such
tool is used
Grindstone allowance 34.3% SR ($5.76) per week
Handling, lifting and placing heavy blocks
Over 5.5kg and under 9kg 3.2% SR ($0.54) per hour
9kg or over, up to 18kg 5.8% SR ($0.97) per hour
Over 18kg 8.2% SR ($1.38) per hour
Handling hot bitumen or asphalt or dipping materials in 4% SR ($0.67) per hour
creosote
Hot places
46 - 54 degrees Celsius 3.2% SR ($0.54) per hour or part thereof
In excess of 54 degrees Celsius 4% SR ($0.67) per hour or part thereof
Handling/working in immediate vicinity of charcoal, pumice, 4% SR ($0.67) per hour or part thereof
granulated cork, silicate of cotton, insulwool, slag wool or other
like recognised insulating material
Wet work
Where water is continually dripping/there is water underfoot 3.2% SR ($0.54) per hour so engaged
Where engaged on stonemasonry work in a cemetery in 3.8% SR ($0.64) per hour so engaged
unusually muddy or sloppy conditions (instead of the allowance of 3.2% per
hour above)
Joinery and Building Trades Award 2010—Allowances comparison—Div 2B State Awards - Spreadsheet as at 31 May 2010 Page 3 of 4
Joinery and Building Trades Award 2010—Allowances comparison—Division 2B State Awards
Note: This document (consisting of two sheets) contains the following information:
• Modern award wages and allowances as at 01 Jan 2010
• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009
• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied
Federal SA NSW
Joinery and Building Trades Award Fibrous Plasterers (Factory) Award Plasterers, Shop Hands and Casters (State)
2010 Consolidated Award
Link MA000029 Link to Division 2B AN150052 Link to Division 2B AN120420
State Award State Award
Instrument Modern Award Div 2B NAPSA Div 2B NAPSA
Allowance Type Standard rate (SR)
$16.78
Tower allowance - where the construction exceeds 15 metres 3.2% SR ($0.54) per hour
in height Plus a further 3.2% SR ($0.54) per hour
for work above each additional 15m
Roof repairs 4% SR ($0.67) per hour
Where required to act on scaffolding/rigging certificate 3.2% SR ($0.54) per hour
Where tools damaged by foreign matter in second hand timber 12.6% SR ($2.11) per day each day the
employee's tools are damaged (if
reported)
Slushing 3.2% SR ($0.54) per hour
Spray application 3.2% SR ($0.54) per hour
Swing scaffold 23.2% SR ($3.89) per hour for first 4
hours or an part thereof
4.8% SR ($0.81) each hour thereafter
extra
Toxic substances
Using toxic substances etc 4% SR ($0.67) per hour $0.68 per hour $0.61 per hour
In close proximity to employees using toxic substances 3.2% SR ($0.54) per hour $0.56 per hour $0.49 per hour
Collection of monies - employees engaged on glass and 29.3% SR ($4.92) per week
glazing work
Joinery and Building Trades Award 2010—Allowances comparison—Div 2B State Awards - Spreadsheet as at 31 May 2010 Page 4 of 4