STATE OF LOUISIANA

OFFICE OF CONSERVATION

"LAFAYETTE DISTRICT" - WEEKLY PROGRESS OR DRILL REPORT



This report is to be filed WEEKLY, by the operator, on all new wells from the time a Permit to Drill is issued until the well is either

Completed or Plugged and Abandoned, whichever comes first. When a work permit is issued to sidetrack an existing well (LST) or

to deepen an existing well (LDW) a report is required to be filled WEEKLY, by the operator, until the well is either Recompleted or

Plugged and Abandoned, whichever comes first. Show the present condition and all significant activities during the previous seven

days. A report may be called into the office (337) 262-5777 or Faxed to (225) 242-3328 or Emailed to (laf-drill@dnr.state.la.us)

each MONDAY.



Date Of Report: Operator Name:

Serial Number: Well Name & No.:

Parish: Field:

S/T Existing Well: LST # DPN Existing Well: LDW #



Rig Name: Rig Phone: Contact Person:

Spud Date: Rig Arrival Date: Rig Departure Date:

Casing/Packers/Tubing/Liners

(All of the Following must be reported to this office)

DP/CP Size: Depth: Feet of Penetration:

Csg Size: Depth: Total sacks of cement used:

Liner Size: TOL: BOL: Total SXS cmt:

Tubing Size: Depth: Packer Size: Depth:

Diverter type: Diverter Size Diverter Man. Press. Rating:

Annular Type: Annular Size Annular Man. Press. Rating:

Ram Preventers: Ram Size: Ram Man. Press. Rating:

BOP Test Data: Last BOP Test Date:

Changes to BOP Stack/Retesting of Stack:

On directional drilling or sidetracking operations a kick-off point is required.

Normal drilling activities: Drilling and a total depth

Examples of significant activities: * Fishing/depth * stuck pipe/depth * K/O point/depth * Set whipstock/depth

*Logged

*wash and ream * Circulating and Conditioning mud * Set plugs / depth / total sacks of cement used */ depth * Test casing

* Test BOPs * Milling * Sidetracking around junk / depth * Released Rig / Date * Current measured depth

* Current total vertical depth - if applicable



Significant Weekly Activity:









MD: TVD:



IMPORTANT:

When the ri g released a FINAL REPORT is required to be submitted stating the condition of the well at that time. A status

must be given on the final report (i.e. waitin g on completion ri g, temporary abandoned, plu gged and abandoned, plu g back,

operations suspended, waitin g on orders, evaluatin g well, etc.)



Person to contact for additional information: Phone:

(Type or Print name here)



Signature: Email address:


Related docs
Other docs by HC111204214929
AHOP Word Studies
Views: 0  |  Downloads: 0
AGENDA
Views: 0  |  Downloads: 0
Statistics for Microarray Analysis (sma)
Views: 0  |  Downloads: 0
????????? ????????
Views: 6  |  Downloads: 0
Full deltakelse for alle
Views: 1  |  Downloads: 0
computo
Views: 4  |  Downloads: 0
Class 3 A&B
Views: 13  |  Downloads: 0
REGULA��O EM SA�DE NO SUS
Views: 2  |  Downloads: 0
THE AMBASSADOR
Views: 11  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!