Overview of Key Milestones (last milestone for each program only) Congressional Report ETP, Appendix C: Transition Timeline (Plan of Record)
FY05 FY06 Deploy standard method
for reporting contract
FY07 FY08 FY09 FY15
activity
FPDS-NG FOC (Registry
Development,
Note: Limited data
Initial
Services begin
implementation
Maintenance, & Component available beyond FY09
IOC Integration) Implementation
ELRV&RR Monitor trading partner Identify goals & strategy
(Phase 2) (06/10) (12/09)
Initial migration performance and for integrating stand- RPUID
CC-SF44 FOC (Incr 2) HMPC&IMR
Final Policy IOC Policy BEA FOC BEA BEA BEA provide assistance Milestone C FOC alone modules
BEA
DoD EPLS eSRS SFIS Release USXPORTS Release Release Release MILS to EDI or XML Release DIMHRS DAMIR DCPDS MEV
Enterprise FOC Assist & support components’
No Defined Future FOC Develop identified
FOC DCAS implementation of RP inventory
Milestone Dates: Final Policy IOC DTS requirements & deploy
IUID FOC (Block III)
Federal IAE WAWF requirements (Implementation)
(v4.2.2) EDA (09/11)
Finalize FAR Provide enterprise-wide RPIR FOC (Incr. 3)
SPS v6.0 initial AHLTA
Changes standard reporting Deploy authoritative source for (09/14)
functional testing interface directly with all Initial Operating Capability (or Policy)
FedTeDS Commence Full Deployment BEIS suppler representations & DBSE
completed component contract
transition to follow- to DoD Complete certifications info enterprise-wide
(v6.0) writing systems Final Operating Capability (or Policy)
on system re-design WDOL implementatipn of ORCA
DoD EMALL CCR
FBO revised UFC 1-300-08 Capability to read/write passive
Initial production FDDR (or Other Standard Milestone) FOC (Incr 4)
RPAR RFID of final 1/4 OCONUS DLA FOC (Block 5)
deployment distribution centers (09/10)
End Migration or Deployment (10/12)
ASAS DLS
RFID TC-AIMS II
Integration with CCR
FedReg Deploy standard
Merge PPIMS PPIRS-SR DoD directive Other (Non-Standard Milestones) FOC (Incr 1)
IOC (Block 3) into CPARS as PPIRS Milestone C (03/10)
Determine preferred solution for method for reporting single feed to
ACBIS Determine Authoritative Data Sources VISION GCSS-ARMY
intragovernmental reimbursables contract activity PPIRS (Phase 1)
IGT FPDS-NG
Army CPARS PB Framework
Version 2.0 Populate core & 3rd Deployment FOC FOC Acq Domain
FOC
STEM interim systems Go Live PPBE BI/BW (04/10) Support
MIRS FOC FOC (Incr 1)
requirements v5.0 Schedule LMP GFEBS (Firedog
PPBE BOS (01/14)
VIS Release Blockpoint 26-28: develop Evolution)
eMILPO FBS
Continue COCOM & field latest COTS version (09/18)
FOC Support for RFID FCS-ACE FOC AIM
TFAS AIT Navy Cash
Navy
No Defined Future
Milestone Dates: Retire SMART FOC Retire Execute application- Retire SIGMA & FOC (LCM Block 1) FOC FOC (Financial & regional
NTCSS Pilot NMCI NEMAIS Pilot programming enhancements CABRILLO Pilots GCSS-MC (Discovery & Correction) maintenance release) Maintain
Navy ERP Navy ERP as agreed to by the UI IPT Navy ERP MC FII (12/11) Info to
EA-21 Navy ERP
FOC Support
Integrated Re- FOC SMART evolved to FOC UAO (Incr 3)
FM SDM
engineering + I-CRRA (Spiral 2 OS 5) Acq Portal (09/10) (11/16)
OSMP ELR PM&O FIRST AFIR&I
Air Force
FOC AFMC AF DIMHRS FOC (v 1.4) FOC FOC FOC IOC (Incr 2) FOC
MPES Selection of Assessment B EESOH-MIS AFRISS EBS (Phase 3) DEAMS-AF (Phase 4)
FOC
Preferred PersTrans ACES (09/15)
(09/12)
Modules NAF-T
ConWrite Replaced ECSS
T&E FOC FOC Learning mgmt system
by SPS v 4.2.3
(Deploy WAWF to Army) (Spiral 3) software refresh
Sourcing
EC/EDI ETIMS (09/12)
AETC ADLS
DFAS
FOC
(Eliminate CDS)
DDHPO (ADS)
P3I Initiatives to FOC FOC
be Formalized (Reverse Logistics) (06/11)
P3I DPMS CFMS
DLA
FOC FOC FOC FOC
BSM BSM-Energy CRM RMP FOC
FOC (08/11)
(07/11) IDE
PDMI
USTRANS-
COM FOC (Incr 1)
DEAMS
Annual Budget: $4,238.8M $4,431.6M 15 March 2006 C-4