US Army Corps

of Engineers

Honolulu District









Future Work



Presented by

James Bersson, P.E.



Deputy District Engineer

For Programs and Project Management









1

US Army Corps

of Engineers

Honolulu District

Briefing Agenda

• Area of Operations

• Major Programs

• Projected Workload

• Major Construction Projects to be Awarded in FY07

• Major Construction Projects to be Awarded in FY08

• Potential Outyear Projects

• Challenges

• Questions







2

The Corps of Engineers is a

US Army Corps

of Engineers Worldwide Organization

Honolulu District









9 Divisions,

45 Districts,

8 Laboratories

http://www.usace.army.mil

3

US Army Corps

of Engineers

Honolulu District

Area of Operations





Honolulu District

Area of Operations









CNMI

Guam Office

District Headquarters

Fort Shafter Resident Office

Schofield Barracks Resident Office

Guam Office Oahu, Hawaii



Kwajalein Resident Office

Kwajalein Atoll

Palau Resident Office

Palau Resident Office Equator

Republic Palau

Republic ofof Palau









American Samoa

American Samoa

4

US Army Corps

Major Programs

of Engineers

Honolulu District

($ in Millions)

Approx.

No. Program

Military Projects Value

FY95-11 MCA/BUP Whole Barracks Renewal 26 $1B

FY04-09 MCA Army Transformation 21 $372M

FY04-11 MCAF, C-17 Beddown Facilities 14 $127M

FY03-15 FUDS, Waikoloa UXO Cleanup 1 $600M

Civil Works

Construction General (CG) 4 $90M

Continuing Authorities Program (CAP) 9 $11M

Operations & Maintenance 4 $6M

Flood Control & Coastal Emergency 3 $1M 5

US Army Corps

Major Programs

of Engineers

Honolulu District

($ in Millions)



Approx.

Interagency and No. Program

International Services (IIS) Projects Value

Palau Compact Road (DOI) 1 $120M

Guam Shore Protection 3 $9M

American Samoa Shore Protection 5 $12M









6

US Army Corps

Projected Workload

of Engineers (FY06 - FY09)

Honolulu District









7

US Army Corps

Major Military Construction Projects

of Engineers

Honolulu District To Be Awarded In FY07



Air Force:

Expand Strat Airlift Ramp, HAFB (Awarded Feb 07) Over $10M

C-17 Clear Rinse Facility, HAFB (Awarded Feb 07) $5 - $10M

C-17 Alt Mnt/Supply Areas, HAFB (Awarded Feb 07) Over $10M

C-17 Road Restoration, HAFB (Awarded Mar 07) Under $5M

C-17 Fuel Cell Nose Dock, HAFB (Awarded Mar 07) Over $10M

DCGS Const Intel Squad Ops Facility, HAFB Over $10M

Army:

Whole Barracks Battalion HQs, SB $50 - $60M

Drum Road Upgrade, Ph 2, HMR Over $10M

Bldg 1547 SCIF Addition, Ft Shafter Under $2M





8

US Army Corps

Major Civil Works/IIS Construction Projects

of Engineers

Honolulu District To Be Awarded In FY07



Ofu/Tau SBH, Am Samoa (Awarded Nov 06) Under $5M

Talofofo/Inarajan Shore Protection, Guam

(Awarded Feb 07) Under $5M

Kikialoa Harbor, Kauai Over $10M

Kaunakakai Stream Restoration, Molokai Under $1M

Poloa Shore Protection, Am Samoa Under $1M

Rota Harbor Dredging, CNMI Under $5M

Various American Samoa Projects Under $10M









9

US Army Corps

Major Construction Projects

of Engineers

Honolulu District To Be Awarded In FY07





Small Business Administration (8a)

Projected 5 to 10 FY07 Projects $10 - $50M



Multiple Award Task Order Contracts (MATOC)

Projected 5 to 15 FY07 Projects $ 5 - $20M









10

US Army Corps

Possible DPW Projects

of Engineers

Honolulu District To Be Awarded In FY07





Repair MP HQ Bldg 3010, SB $1 - $5M

Repair Bldg 123, FS $1 - $5M

Chapel HVAC Installation, SB $500K - $1M

Airfield Mooring Points Repl, WAAF $500K - $1M

Rockfall Mitigation, TAMC Under $500K

Demo Bldgs (Shop 5), SB $500K - $1M

Repair Bldg 405, FS Under $2M

Various Bldg Repairs, FS $3 - $8M









11

US Army Corps

Tentative MEDCOM Projects

of Engineers

Honolulu District To Be Awarded In FY07



Veterinary Clinic Renv, TAMC (Awarded Mar 07) $500K - $2M

2C Eye Clinic, TAMC (Awarded Mar 07) $500K - $2M

OR Elec & Medgas Upgr – Phase 4, TAMC $500K - $2M

Electrical Panels, Wing D, TAMC $500K - $2M

ATS C1 C2 L Circuits, TAMC $500K - $2M

Bathroom Renovation to ADA, TAMC $500K - $2M

Standby Generator, B161, TAMC $500K - $2M

Army Public Health Nursing, TAMC $500K - $2M

Generator Rpr/Rpl Exhaust/Rpr Roof B137, TAMC $500K - $2M

Improve HVAC System 1A, TAMC $100K - $500K







12

US Army Corps

Major Construction Projects

of Engineers

Honolulu District To Be Awarded In FY08



Army:

Barracks, Fort Shafter $20 - $30M

Barracks, Wheeler AAF $35 - $45M

Barracks Complex, Schofield Bks $70 - $80M

Child Development Center, Schofield Bks $10 - $15M



Air Force/Other DoD:

C-17 Aircraft Parking Ramp, HAFB Over $10M

Replace Phillips Hydrant Fuel System, HAFB Over $20M



Civil Works:

Hawaii Water Management, Kunia Under $5M

Launiupoko Shore Protection, Maui Under $5M

13

US Army Corps

of Engineers

Honolulu District

Current MATOC Contracts



$45M 8(a) MATOC:

- 5-year contract (base year + 4 option periods)

- 3 contractors are in the 3rd option period



$24M MEDCOM MATOC:

- 4-year contract (base year + 3 option periods)

- 2 contractors are in the 3rd option period



$14.5M Kwajalein MATOC:

- 5-year contract (base year + 4 option periods)

- 2 contractors are in the 1st option period





14

US Army Corps

of Engineers

Honolulu District

Current MATOC Contracts

$250M D-B/D-B-B MATOC:

- 5-year contract (2 year base + 3 option periods)

- 4 contractors are in the 2nd option period

$175M MATOC:

- 5-year contract (2 year base + 3 option periods)

- 5 contractors are in the 1st option period

$25M 8(a) MATOC:

- 5-year contract (2 year base + 3 option periods)

- 3 contractors are in the 1st option period

$65M 8(a) MATOC:

- 5-year contract (base year + 4 option periods)

- 7 contractors are in the base year

15

US Army Corps

of Engineers

Honolulu District FY07 A-E Contracts

A-E Indefinite Delivery Contracts

Planned

Active Pending for FY07

Architectural 2 0 0

Civil 3 4 0

Structural 1 0 0

Electrical 1 0 1

Mechanical 0 0 1*

Survey & Mapping 1 0 0

Master Planning 2 0 0

Engrg/Env 0 0 3*

*Pre-Selection Stage



16

US Army Corps

of Engineers

Honolulu District

Potential Out Year Projects



• Whole Barracks Renewal -

4 projects scheduled through FY11 ($150+M)

•Revitalization -

3-5 projects scheduled each year ($50M - $150M)

•Modularity -

Over $1B scheduled from FY11

•Air Force -

3-6 projects scheduled each year ($13M - $80M)

•Civil Works/IIS -

3-6 projects scheduled for FY09/10 ($30M-$60M)







17

US Army Corps

of Engineers

Honolulu District

Challenges



• MILCON Transformation



• SBCT Litigation



• Cost Escalation









18

US Army Corps

of Engineers

Questions

Honolulu District









Honolulu District is committed to serving the Nation

http://www.poh.usace.army.mil

19


Related docs
Other docs by HC11120411384
Supplemental Specification # 8
Views: 0  |  Downloads: 0
anexa6
Views: 7  |  Downloads: 0
STATEMENT OF WORK
Views: 0  |  Downloads: 0
Obnoviteln� a Alternativn� zdroje energie
Views: 6  |  Downloads: 0
MUNICIPALIDAD PROVINCIAL DE EL COLLAO ILAVE
Views: 0  |  Downloads: 0
DIGITAL QPSK NIM
Views: 1  |  Downloads: 0
CALENDARIO MANIFESTAZIONI ANNO 2010
Views: 1  |  Downloads: 0
COMO GANHAR
Views: 16  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!