WORKBOOK FOR THE CALCULATION OF CONSULTING ENGINEER'S FEES IN TERMS OF

THE GUIDELINE FOR SERVICES AND FEES PUBLISHED BY ECSA AS AMENDED BY DPW





NOTES PERTAINING TO THE COMPLETION OF THE WORKBOOK.



GROUND RULES



One has to refer to the Letter of Invitation and the relevant published Guidelines for Engineering

1 fees as amended , and use a copy of the relevant Guidelines which has been marked up to show

the revised Fee scale to ensure that the correct fee scale is used.



Engineers deal with work contained in two main types of projects: Engineering and Building. Ensure

that you select the correct fee calculator for the type of contract you are dealing with. Select only the

2 "Engineering project" as the type of project if no principal agent and/or quantity surveyor is appointed

on the project. Quantity surveyors are responsible for all bills of quantities for all disciplines on

building projects.



The value of the works relating to a particular part of the project will have to include the relevant

3 portions of the Preliminaries and CPA extracted from the project value and then allocated to each

category value



In practice, the calculator calculates a Basic fee for a consultant based on the value of the works

4

relating to that particular discipline



The Basic fee for a consultant is proportioned between the different categories of work and then the

5

relevant fee factors applied to those types of the work.



The first portion of the fee calculator contains the amounts relating to a given discipline which have

6

been extracted from a project and which is not subject to any factors.



If the project or contract consists entirely of the work comprising one discipline, then you use the

entire cost of the contract, allocating portions of the value to the relevant categories, otherwise, one

7

must extract from the project values, the value of the works relating to a particular discipline, and

then allocate portions of that value to the various categories which will attract different fee factors.



In some cases more than one of the fee factor multipliers may have to be applied to the same

8

portion of the works, and these factors have to be dealt with separately in the fee calculations.



Principal Agent: A separate fee will be calculated for such an appointment, because the fee is based

9 on the value of the works (1% of the total value of the works). This procedure is NOT a fee factor

multiplier to be applied to the basic fee. N/A



Only in case of engineering projects an amount not exceeding 6% of the basic fee and

calculated on a time basis is allowed for the responsibilities of the "agent of the client" in

10

accordance with the OHSA. Only if the motivation of the consulting engineer for a larger fee

is approved, may he be paid more.



Only in case of engineering projects an amount of 7% of the basic fee is allowed for the

11

execution of targeted procurement.



Electronic engineering work is not a separate discipline but one combined with Electrical engineering

12

work.



13 The dates must be typed in as follows: dmmmyy i.e. "25aug05"



14 When typing amounts only type the value. No "R" in front and no spaces between the numbers.

PROCEDURE TO FOLLOW IN POPULATING THE WORKBOOK:



1 Start by opening the worksheet "Input Data"



Some comments or notes with arrows pointing to certain cells are displayed to guide the user, but

2

they will not be printed.



3 Only coloured cells require input from the Consulting Engineer/Project manager



Access to any cells within the workbook, which do not require to be populated, have been protected -

4

do not try to access/open any uncoloured cells on any of the worksheets.



Populate all yellow coloured cells. Arrows, tab- or enter keys or mouse can be used to move around

5

the worksheet (i.e. to cells to which access are possible).



Certain cells will reflect Error-message in red bold type or #Div/0-messages. These will start to

disappear once the required cells have been populated with correct information. If such cells have

6

been populated with incorrect information, the Error-messages will remain. The #Div/0 will equally

disappear as the worksheets are populated - except in unused fields.



Open the disbursement worksheets one by one and populate them with the correct information.

Please note that the amounts previously claimed for disbursements must be added by hand at the

7

end of each table. The total previous payment must also be added by hand on the "Previous

Payment" worksheet.



After all information has been entered into the workbook, set the print areas in each of the

worksheets (File: Set Print Area). Print Areas to cover all the data which is required to be printed for

8 the purposes of the fee invoice submission in each of the worksheets. Empty rows may be hided for

the purpose of saving paper (otherwise a host of empty rows and columns will be unnecessarily

printed).



Finally open the relevant "invoice" worksheet, go to the "File" command on toolbar, choose "Print" -

9 this will print the final invoice. Do the same with the other data sheets which are then required to be

appended to the invoice to be presented to the Project manager.



This workbook makes provision for 36 payments. From experience this should be enough. If not,

10 the matter must be reported to the Firm, who can take same up with the designer/compiler of the

workbook.



The sheets and formula fields in the calculators are protected so that one should just be able to

11

enter the data and assume that the results are correct



Project managers are advised to re-enter the data (at least for the Schedules) into their personal

12 copies of the spreadsheets to check the fee accounts, because the calculators used by other person

might have been changed inadvertently!



13 NOTE:

For any information, clarification or assistance please phone Ms Magda van Es at 012 452 0446 or

082 887 1705 - E-mail: magda@virtualconsulting.co.za

seb10

INPUT DATA: COMPLETE ALL YELLOW CELLS PLEASE !!!

STRUCTURAL ENGINEERING

BUILDING PROJECT: 2011 NDPW FEES

Version: 1.1 2011-06

DPW FILE NUMBER: DPW PROJECT MANAGER

WCS NUMBER TEL NO

WCS CONTRACT NO CELL

DRAWING NUMBER FAX

TYPE OF PROJECT: BUILDING PROJECT B E-MAIL ADDRESS

PENALTY APPLIED Yes NO OF DAYS 1 RATE R -

SERVICE: DESCRIPTION

CONSULTANT NAME

POSTAL ADDRESS: CODE

CONSULTANT OFFICE ADDRESS CODE

TELEPHONE & FACSIMILE NUMBERS CELL PHONE NO FACSIMILE NO:

E-MAIL ADDRESS

VAT REGISTRATION NO: 1

NATIONAL DEPARTMENT OF

COMPANY REGISTRATION NUMBER <--ERROR CLIENT

PUBLIC WORKS

DATE APPOINTED :

FEES CODE (YEAR) 2011 1 POSTAL ADDRESS

POST OFFICE

Fee in accordance with the National Department of Public Works Scope of Engineering CODE

Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession Act, VAT REGISTRATION NO: NOT REGISTERED

2000 (Act No. 46 of 2000) dated 1 March 2011 OFFICE ADDRESS/

BUILDING NAME

TARIFF OF FEES TO APPLY : USE TIME BASED FEES STREET & NO

PERCENTAGE OF FEE TENDERED 100 % TOWN/CITY

DATE OF INVOICE CODE

PAYMENT CERTIFICATE NO: TEL NO

CONSULTANT'S REF. NUMBER : FAX NO

INVOICE NO FAX-TO-EMAIL

STAGE COMPLETED INCEPTION 1

PERCENTAGE OF STAGE COMPLETED 100%

CONSTRUCTION MONITORING ONLY N R 490,000.00

(A) ESTIMATED OR (B) ESTIMATED VALUE (D) FINAL VALUE FOR

INCEPTION, PRELIMINARY DESIGN: CONCEPT AND VIABILITY, CALCULATION

TENDER VALUES FOR DESIGN FEES MEASURED VALUES

DETAIL DESIGN, DOCUMENTATION AND PROCUREMENT STAGES, PURPOSES

(STAGES 1 TO 4) DURING INCL. CPA & P&G

ALL VALUES MUST INCLUDE RELEVANT PROPORTION OF P&G AND

CONSTRUCTION (STAGE 6 ONLY)

CPA DURING CONSTRUCTION STAGE.

(STAGE 5)

1

ESTIMATES OR TENDER VALUES? ESTIMATES ONLY





1. VALUE OF WORK NOT AFFECTED BY ANY FACTORS R -



2. VALUE OF ALL ALTERATIONS TO EXISTING FACILITIES NOT AFFECTED BY

R -

ANY FACTOR OTHER THAN 1.25.

3. VALUE OF DUPLICATES NOT AFFECTED BY ANY FACTOR OTHER THAN

R -

0.25.

4. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND CLADDING

R -

NOT AFFECTED BY ANY FACTOR OTHER THAN 0.33.



5. VALUE OF WORK IN DUPLICATED EXISTING FACILITIES NOT AFFECTED BY

R -

ANY FACTORS OTHER THAN 0.25 AND 1.25 FACTORS.



6. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND CLADDING

R -

IN EXISTING FACILITIES AFFECTED BY 0.33 AND 1.25 FACTORS ONLY



7. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND CLADDING

R -

IN DUPLICATES AFFECTED BY 0.33 AND 0.25 FACTORS ONLY.

8. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND CLADDING

IN DUPLICATED EXISTING FACILITIES AFFECTED BY 0.33, 0.25, AND 1.25 R -

FACTORS.

TOTAL VALUE OF ALL WORK BY THE ENGINEER APPROPRIATE TO CLAUSE

R - R - R - R -

4.2.3 OF THE GAZETTE







(C) VALUE OF VALUE FOR

CONTRACT ADMINISTRATION & INSPECTION AND CLOSE-OUT STAGES (INTERIM PAYMENTS) COMPLETED WORK CALCULATION

ALL VALUES MUST INCLUDE RELEVANT PROPORTION OF P&G AND CPA (STAGE 5 & 6) PURPOSES



1. VALUE OF ALL WORK COMPLETED, EXCLUDING VALUE OF WORK TO EXISTING FACILITIES R -



2. VALUE OF ALL ALTERATIONS TO EXISTING FACILITIES COMPLETED, AFFECTED BY THE 1.25 FACTOR. R -



TOTAL VALUE OF ALL WORK COMPLETED APPROPRIATE TO CLAUSE 4.2.3.(1) OF THE GAZETTE R - R -









89ed5097-7362-4b88-b121-adb314eb2bfd.xls: Input Data 4 12/3/2011

INPUT DATA: COMPLETE ALL YELLOW CELLS PLEASE !!!

STRUCTURAL ENGINEERING

BUILDING PROJECT: 2011 NDPW FEES

Version: 1.1 2011-06

DPW FILE NUMBER: DPW PROJECT MANAGER

WCS NUMBER TEL NO









89ed5097-7362-4b88-b121-adb314eb2bfd.xls: Input Data 5 12/3/2011

INPUT DATA: COMPLETE ALL YELLOW CELLS PLEASE !!!

STRUCTURAL ENGINEERING

BUILDING PROJECT: 2011 NDPW FEES

Version: 1.1 2011-06

DPW FILE NUMBER: A6089/002/9 DPW PROJECT MANAGER Paul Mashinga

WCS NUMBER 079867 TEL 012 337 2345

WCS CONTRACT NO 0002 CELL 082 699 3459

DRAWING NUMBER CE 56789/001/6 FAX 086 610 0300

TYPE OF PROJECT: BUILDING PROJECT B E-MAIL ADDRESS paul.mashinga@dpw.gov.za

PENALTY APPLIED Yes NO OF DAYS 30 RATE R 500.00

SERVICE: DESCRIPTION NELSPRUIT: New Police Station

CONSULTANT NAME John Engineer CC

POSTAL ADDRESS: P O Box 11111, Boksburg CODE 1034

CONSULTANT OFFICE ADDRESS Brightstar building 214, Peach str 1023, Boksburg CODE 1002

TELEPHONE & FACSIMILE NUMBERS 011 769 3456 CELL PHONE NO 082 344 6756 FACSIMILE NO: 011 769 3011

E-MAIL ADDRESS je@telkom.net

VAT REGISTRATION NO: 1245603865 1

NATIONAL DEPARTMENT OF

COMPANY REGISTRATION NUMBER 400-45678-10 CLIENT

PUBLIC WORKS

DATE APPOINTED : 03-Jun-2010

FEES CODE (YEAR) 2011 1 POSTAL ADDRESS Private Bag X65

POST OFFICE PRETORIA

Fee in accordance with the National Department of Public Works Scope of Engineering CODE 0001

Services and Tariff of Fees for Persons Registered in terms of the Engineering Profession VAT REGISTRATION NO: NOT REGISTERED

Act, 2000 (Act No. 46 of 2000) dated 1 February 2011 OFFICE ADDRESS/ Public Works House

BUILDING NAME

TARIFF OF FEES TO APPLY : PERCENTAGE BASED FEES STREET & NO Pretorius Street 445

PERCENTAGE OF FEE TENDERED 100 % TOWN/CITY PRETORIA

DATE OF INVOICE 30-Aug-2010 CODE 0002

PAYMENT CERTIFICATE NO: 0001 TEL NO 012 337 2000

CONSULTANT'S REF. NUMBER : ServiceDPW567/102 FAX NO 012 337 3276

INVOICE NO DPW/001 FAX-TO-EMAIL 086 666 0000

STAGE COMPLETED CLOSE OUT 6

PERCENTAGE OF STAGE COMPLETED 100%

CONSTRUCTION MONITORING ONLY N R 490,000.00

(A) ESTIMATED OR (B) ESTIMATED VALUE (D) FINAL VALUE FOR

INCEPTION, PRELIMINARY DESIGN: CONCEPT AND VIABILITY, CALCULATION

TENDER VALUES FOR DESIGN FEES MEASURED VALUES

DETAIL DESIGN, DOCUMENTATION AND PROCUREMENT STAGES, PURPOSES

(STAGES 1 TO 4) DURING INCL. CPA & P&G

ALL VALUES MUST INCLUDE RELEVANT PROPORTION OF P&G AND

CONSTRUCTION (STAGE 6 ONLY)

CPA DURING CONSTRUCTION STAGE.

(STAGE 5)

2

ESTIMATES OR TENDER VALUES? TENDER VALUES





1. VALUE OF WORK NOT AFFECTED BY ANY FACTORS R 5,400,000.00 R 5,400,000.00 R 5,400,000.00 R 5,400,000.00



2. VALUE OF ALL ALTERATIONS TO EXISTING FACILITIES NOT AFFECTED

R 1,500,000.00 R 1,500,000.00 R 1,500,000.00 R 1,500,000.00

BY ANY FACTOR OTHER THAN 1.25.

3. VALUE OF DUPLICATES NOT AFFECTED BY ANY FACTOR OTHER THAN

R 500,000.00 R 500,000.00 R 500,000.00 R 500,000.00

0.25.

4. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND

R 200,000.00 R 200,000.00 R 200,000.00 R 200,000.00

CLADDING NOT AFFECTED BY ANY FACTOR OTHER THAN 0.33.



5. VALUE OF WORK IN DUPLICATED EXISTING FACILITIES NOT AFFECTED

R 100,000.00 R 100,000.00 R 100,000.00 R 100,000.00

BY ANY FACTORS OTHER THAN 0.25 AND 1.25 FACTORS.



6. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND

CLADDING IN EXISTING FACILITIES AFFECTED BY 0.33 AND 1.25 FACTORS R 150,000.00 R 150,000.00 R 150,000.00 R 150,000.00

ONLY

7. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND

R 50,000.00 R 50,000.00 R 50,000.00 R 50,000.00

CLADDING IN DUPLICATES AFFECTED BY 0.33 AND 0.25 FACTORS ONLY.

8. VALUE OF MASS CONCRETE FOUNDATIONS, BRICKWORK AND

CLADDING IN DUPLICATED EXISTING FACILITIES AFFECTED BY 0.33, 0.25, R 100,000.00 R 100,000.00 R 100,000.00 R 100,000.00

AND 1.25 FACTORS.

TOTAL VALUE OF ALL WORK BY THE ENGINEER APPROPRIATE TO

R 8,000,000.00 R 8,000,000.00 R 8,000,000.00 R 8,000,000.00

CLAUSE 4.2.3 OF THE GAZETTE









89ed5097-7362-4b88-b121-adb314eb2bfd.xls: Worked Example 6 12/3/2011

INPUT DATA: COMPLETE ALL YELLOW CELLS PLEASE !!!

STRUCTURAL ENGINEERING

BUILDING PROJECT: 2011 NDPW FEES

Version: 1.1 2011-06

DPW FILE NUMBER: A6089/002/9 DPW PROJECT MANAGER Paul Mashinga

WCS NUMBER 079867 TEL 012 337 2345



PAGE II OF INPUT DATA

(C) VALUE OF VALUE FOR

CONTRACT ADMINISTRATION & INSPECTION AND CLOSE-OUT STAGES (INTERIM PAYMENTS) COMPLETED WORK CALCULATION

ALL VALUES MUST INCLUDE RELEVANT PROPORTION OF P&G AND CPA (STAGE 5 & 6) PURPOSES





1. VALUE OF ALL WORK COMPLETED, EXCLUDING VALUE OF WORK TO EXISTING FACILITIES R 6,500,000.00 R 6,500,000.00



2. VALUE OF ALL ALTERATIONS TO EXISTING FACILITIES COMPLETED, AFFECTED BY THE 1.25 FACTOR. R 1,500,000.00 R 1,500,000.00



TOTAL VALUE OF ALL WORK COMPLETED APPROPRIATE TO CLAUSE 4.2.3.(1) OF THE GAZETTE R 8,000,000.00 R 8,000,000.00









89ed5097-7362-4b88-b121-adb314eb2bfd.xls: Worked Example 7 12/3/2011

TAX INVOICE

TO STRUCTURAL ENGINEERING BUILDING PROJECT: 2011 NDPW FEES

Version: 1.1 2011-06

PAYMENT CERTIFICATE NO: 0000 DATE OF INVOICE 00 January 1900

DPW WCS NO: 000000 WCS CONTRACT NO 0000 DRAWING NO: 0

SERVICE: 0

CLIENT NATIONAL DEPARTMENT OF PUBLIC WORKS FILE NUMBER: 0 VAT REGISTRATION NO: NOT REGISTERED

ADDRESS 0 POST OFFICE 0 CODE 0

OFFICE ADDRESS 0 TOWN 0 CODE 0

BUILDING NAME 0 TEL 0 FAX 0 FAX 2 0

PROJECT MAN: 0 Tel 0 Cell 0 E-MAIL 0

FROM:

CONSULTING ENG: 0 INVOICE NO 000

POSTAL ADDRESS: 0 CODE 0

OFFICE ADDRESS 0 CODE 0

VAT REGISTRATION NO: 0

COMPANY REGISTRATION NUMBER 0 TEL 0

DATE APPOINTED : 00-Jan-1900 CELL 0

CONSULTANT REF: 0 FAX 0

TARIFF OF FEES TO APPLY : USE TIME BASED FEES E-MAIL 0

STAGE COMPLETED: INCEPTION ESTIMATED TOTAL VALUE OF ENGINEERING WORK R -

R 0.00 + 12.50% x R 0 )}= R -

TOTAL BASIC FEE R -





WORK NOT AFFECTED BY ANY FACTORS R -



ALTERATIONS TO EXISTING FACILITIES NOT AFFECTED BY ANY FACTOR OTHER THAN 1.25. R -



DUPLICATES NOT AFFECTED BY ANY FACTOR OTHER THAN .25. R -



MASS CONCRETE FOUNDATIONS, BRICKWORK AND CLADDING NOT AFFECTED BY ANY FACTOR OTHER THAN 0.33. R -



DUPLICATED EXISTING FACILITIES AFFECTED BY 0.25 & 1.25 FACTORS ONLY. R -



MASS CONCRETE FOUNDATIONS, BRICKWORK & CLADDING IN EXISTING FACILITIES AFFECTED BY 0.33 & 1.25 FACTORS ONLY. R -



MASS CONCRETE FOUNDATIONS, BRICKWORK & CLADDING IN DUPLICATES AFFECTED BY 0.33 & .25 FACTORS ONLY. R -



MASS CONCRETE FOUNDATIONS, BRICKWORK & CLADDING IN DUPLICATED EXISTING FACILITIES AFFECTED BY 0.33, 0.25 & 1.25 FACTORS. R -

TOTAL PERCENTAGE BASED FEES FOR INCEPTION, PRELIMINARY DESIGN: DETAIL DESIGN, DOCUMENTATION AND PROCUREMENT STAGES (a) R -

FEES (b) CONTRACT ADMINISTRATION & INSPECTION AND CLOSE OUT STAGES

WORK NOT AFFECTED BY ANY FACTORS R -



ALTERATIONS TO EXISTING FACILITIES NOT AFFECTED BY ANY FACTOR OTHER THAN 1.25. R -



TOTAL PERCENTAGE BASED FEES FOR CONTRACT ADMINISTRATION & INSPECTION AND CLOSE OUT STAGES (b) R -

TOTAL PROFESSIONAL FEES DUE (a) + (b) R -



% OF STANDARD FEES TENDERED FOR PROFESSIONAL SERVICES 100.00% DUE R -

LESS PENALTY R -



FEES (c ): TIME BASED

REPORT STAGE (If specifically appointed for this stage only ) Report: Time Based fees Total = R -

TRAVELLING TIME (Not applicable in case of a tender for professional services) Travelling Time Total CLAIM = R -

CONSTRUCTION MONITORING & OTHER Time Based fees: Other Total CLAIM = R -

TOTAL FEES TIME BASED (c) R -



FEES (d): EXPENSES AND COSTS (DISBURSEMENTS)

TRAVELLING & SUBSISTENCE CHARGES (Not applicable in case of a tender for professional services) R -

TYPING, DUPLICATING, COVERS & BINDERS & PRINTS R -

SITE STAFF AND OTHER CHARGES R -

TOTAL FEES, EXPENSES AND COSTS (DISBURSEMENTS) (d) R -

TOTAL FEES DUE (EXCL VAT) R -

LESS TOTAL PREVIOUS PAYMENTS (EXCL VAT) R -

R -

PLUS VAT @ 14% OF R 0.00 R -

PLUS NON TAXABLE EXPENSES R -

AMOUNT DUE R -



CONSULTING ENGINEER NAME: __________________________________________





SIGNATURE: DATE:





for OFFICE use only: ACCOUNTANT: ___________________________





CERTIFIED CORRECT: DIRECTOR:



DATE: DATE:

COMMENTS









89ed5097-7362-4b88-b121-adb314eb2bfd.xls:

Stuct Eng Build Tax Invoice 8 12/3/2011

TAX INVOICE

TO STRUCTURAL ENGINEERING BUILDING PROJECT: 2011 NDPW FEES

Version: 1.1 2011-06

PAYMENT CERTIFICATE NO: 0000 DATE OF INVOICE 00 January 1900

DPW WCS NO: 000000 WCS CONTRACT NO 0000 DRAWING NO: 0

SERVICE: 0

CLIENT NATIONAL DEPARTMENT OF PUBLIC WORKS FILE NUMBER: 0 VAT REGISTRATION NO: NOT REGISTERED

PAGE 2

for OFFICE use only:

Budget Payment categories

Calculated fees, Other Travelling, Typing, Site Staff & Other

Payments Time Based Fees VAT Non-Taxable Total R c

fees & Add Services transport, duplicating, charges

Previous - - - - - - - -

Current - - - - - - - -

Gross - - - - - - - -

Budget -





CALCULATIONS

FEES (a) INCEPTION, PRELIMINARY DESIGN: CONCEPT AND VIABILITY, DETAIL DESIGN, DOCUMENTATION AND PROCUREMENT STAGES



5.0% x { - x - R -

WORK NOT AFFECTED BY ANY FACTORS

-





ALTERATIONS TO EXISTING FACILITIES NOT AFFECTED BY 0.00 x 5.0% x { - x - R -

ANY FACTOR OTHER THAN 1.25. -





DUPLICATES NOT AFFECTED BY ANY FACTOR OTHER 0.00 x 5.0% - x - R -

THAN .25. -



MASS CONCRETE FOUNDATIONS, BRICKWORK AND 0.00 x 5.0% x { - x - R -

CLADDING NOT AFFECTED BY ANY FACTOR OTHER THAN

-

0.33.



DUPLICATED EXISTING FACILITIES AFFECTED BY 0.25 & 0.00 x 0.00 x 5.0% x { - x - R -

1.25 FACTORS ONLY. -



MASS CONCRETE FOUNDATIONS, BRICKWORK & 0.00 x 0.00 x 5.0% x { - x - R -

CLADDING IN EXISTING FACILITIES AFFECTED BY 0.33 &

-

1.25 FACTORS ONLY.



MASS CONCRETE FOUNDATIONS, BRICKWORK & 0.00 x 0.00 x 5.0% x { - x - R -

CLADDING IN DUPLICATES AFFECTED BY 0.33 & .25 -

FACTORS ONLY.

MASS CONCRETE FOUNDATIONS, BRICKWORK & 0.00 x 0.00 x 0.00 x 5.0% x { - x - R -

CLADDING IN DUPLICATED EXISTING FACILITIES AFFECTED

-

BY 0.33, 0.25 & 1.25 FACTORS.



TOTAL PERCENTAGE BASED FEES FOR INCEPTION, PRELIMINARY DESIGN: DETAIL DESIGN, DOCUMENTATION AND PROCUREMENT STAGES (a) R -

FEES (b) CONTRACT ADMINISTRATION & INSPECTION AND CLOSE OUT STAGES

0% x { - x - R -

WORK NOT AFFECTED BY ANY FACTORS

-





ALTERATIONS TO EXISTING FACILITIES NOT 0.00 x 0% x { - x - R -

AFFECTED BY ANY FACTOR OTHER THAN 1.25. -





TOTAL PERCENTAGE BASED FEES FOR CONTRACT ADMINISTRATION & INSPECTION AND CLOSE OUT STAGES (b) R -

TOTAL PROFESSIONAL FEES DUE (a) + (b) R -









89ed5097-7362-4b88-b121-adb314eb2bfd.xls:

Stuct Eng Build Tax Invoice 9 12/3/2011

2011 Scales

SCALE_2011SB STRUCTURAL ENGINEERS' BUILDING PROJECTS



R0 R 490,000 R0 12.50%

R 490,000 R 1,225,000 R 61,250 12.50%

R 1,225,000 R 6,000,000 R 153,125 10.00%

R 6,000,000 R 12,250,000 R 630,625 9.00%

R 12,250,000 R 30,500,000 R 1,193,125 8.00%

R 30,500,000 R 61,250,000 R 2,653,125 7.00%

R 61,250,000 R 367,500,000 R 4,805,625 7.00%

R 367,500,000 R 1,000,000,000 R 26,243,125 7.00%

APPORTIONMENT OF THE DESIGN STAGE

Apportion

Stage Description ment Progress Factor

Stage 1 Inception 5% x 100% 5.00%

Stage 2 Preliminary Design: Concept and Viability 0% x 100% 5.00%

Stage 3 Design Development 0% x 100% 5.00%

Stage 4 Documentation and Procurement 0% x 100% 5.00%





1 Inception 5

2 Preliminary Design: Concept and Viability 20

3 Detail Design 30

4 Documentation and Procurement 15



5 Contract Administration and Inspection 25

6 Close-Out 5

PREVIOUS PAYMENTS INPUT ALL INFORMATION FOR THE WHOLE PROJECT

ATTACHED TO CLAIM NO 0 WCS NO 0 VAT REGISTRATION Y



TOTAL

AMOUNT PAID, TOTAL NON- TOTAL TOTAL AMOUNT TOTAL NON-

PAYMEN TOTAL AMOUNT (Excl VAT, TAXABLE PAYMENT AMOUNT PAID, PAID, (Excl VAT, TAXABLE

DATE DATE

T NO PAID, (Incl VAT Excl Non AMOUNT TOTAL AMOUNT NO (Incl VAT & Non Excl Non AMOUNT TOTAL AMOUNT

& Non Taxable) Taxable) PAID PAID (Excl VAT) Taxable) Taxable) PAID PAID (Excl VAT)

CARRIED

1 R - R - R - R - R - R - R - R -

OVER

2 R - R - R - R - 38 R - R - R - R -

3 R - R - R - R - 39 R - R - R - R -

4 R - R - R - R - 40 R - R - R - R -

5 R - R - R - R - 41 R - R - R - R -

6 R - R - R - R - 42 R - R - R - R -

7 R - R - R - R - 43 R - R - R - R -

8 R - R - R - R - 44 R - R - R - R -

9 R - R - R - R - 45 R - R - R - R -

10 R - R - R - R - 46 R - R - R - R -

11 R - R - R - R - 47 R - R - R - R -

12 R - R - R - R - 48 R - R - R - R -

13 R - R - R - R - 49 R - R - R - R -

14 R - R - R - R - 50 R - R - R - R -

15 R - R - R - R - 51 R - R - R - R -

16 R - R - R - R - 52 R - R - R - R -

17 R - R - R - R - 53 R - R - R - R -

18 R - R - R - R - 54 R - R - R - R -

19 R - R - R - R - 55 R - R - R - R -

20 R - R - R - R - 56 R - R - R - R -

21 R - R - R - R - 57 R - R - R - R -

22 R - R - R - R - 58 R - R - R - R -

23 R - R - R - R - 59 R - R - R - R -

24 R - R - R - R - 60 R - R - R - R -

25 R - R - R - R - 61 R - R - R - R -

26 R - R - R - R - 62 R - R - R - R -

27 R - R - R - R - 63 R - R - R - R -

28 R - R - R - R - 64 R - R - R - R -

29 R - R - R - R - 65 R - R - R - R -

30 R - R - R - R - 66 R - R - R - R -

31 R - R - R - R - 67 R - R - R - R -

32 R - R - R - R - 68 R - R - R - R -

33 R - R - R - R - 69 R - R - R - R -

34 R - R - R - R - 70 R - R - R - R -

35 R - R - R - R - 71 R - R - R - R -

36 R - R - R - R - 72 R - R - R - R -

37 R - R - R - R - 73 R - R - R - R -

Total R - R - R - R - Total R 0.00 R - R - R - R -

SCHEDULE V: TIME BASED FEES

INPUT ALL INFORMATION FOR THE WHOLE PROJECT NOTE: ALL ITEMS MUST EXCLUDE VAT

Attached to Claim No 0 WCS NO 0

Approval Date Describe Approval Date Describe

A D

B E

C F







1. Time Based fees: Report stage (Only if specifically appointed for this stage only)

Amount

Date Name Designation Task Reason Hours Rate (R)

Claimed

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Report: Time Based fees Total Excl VAT R -

Previously claimed



2. Time Based fees: AGENT OF THE CLIENT

Amount

Date Name Designation Task Reason Hours Rate (R)

Claimed

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Agent of the client: Time Based fees Total Excl VAT R -

Previously claimed



3. Time Based fees: Construction monitoring (only after written approval)

Amount

Date Name Designation Task Reason Hours Rate (R)

Claimed

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Construction monitoring: Time Based fees Total Excl VAT R -

Previously claimed

4. Time Based fees: Other

Amount

Date Name Designation Task Reason Hours Rate (R)

Claimed

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Other: Time Based fees Total Excl VAT R -

Previously claimed

Construction monitoring & Other Time Based Fees Total Excl VAT R -

Previously claimed R -

SCHEDULE W: TRAVELLING TIME & TRANSPORT EXPENSES

INPUT ALL INFORMATION FOR THE WHOLE PROJECT NOTE: ALL ITEMS MUST EXCLUDE VAT

Attached to Claim No 0 WCS NO 0



1. Travelling Time

Total Hours Amount

Date Name Designation From To Rate (R)

Hours claimed Claimed

-2.000 R -

-2.000 R -

-2.000 R -

-2.000 R -

-2.000 R -

-2.000 R -

-2.000 R -

-2.000 R -

-2.000 R -

-2.000 R -

Travelling Time Total Excl VAT R -

Previously claimed

2. Motor Vehicle Expenses [Up to 3000 cc engine capacity]

Vehicle A Make: Engine Capacity:

B Make: Engine Capacity:

C Make: Engine Capacity:

Total Amount

Date Name Designation Vehicle From - To Toll Gate Rate (R)

Distance Claimed

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Motor Vehicle Expenses Total R -

Previously claimed

3. Subsistence Charges [See your letter of appointment. Use either Table 3 or Table 4, not both]

Hotel Amount

Date Name Designation Total Days Invoice No. Hours

Name Claimed









Subsistence Charges Total R -

Previously claimed

4. Public Transport

Invoice Invoice Amount

Date Name Designation From To

Number Date Claimed









Public Transport Total R -

Previously claimed





Travelling & Public Transport Total Excl VAT R -

R -

SCHEDULE X: TYPING, DUPLICATING & PRINTING

INPUT ALL INFORMATION FOR THE WHOLE PROJECT NOTE: ALL ITEMS MUST EXCLUDE VAT

Attached to Claim No 0 WCS NO 0





1. Typing

Amount

Description of Document: Pages Rate (R)

Claimed

R -

R -

R -

R -

R -

R -

R -

Typing Total R -

Previously claimed

2. Duplicating

Amount

Description of Document Pages Copies Rate (R)

Claimed

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Duplicating Total R -

Previously claimed

3. Covers and Binders

No of Amount

Description of Document Rate (R)

Documents Claimed

R -

R -

R -

R -

R -

R -

R -

Covers & Binders Total R -

Previously claimed

4. Printing Costs

No of Amount

Date Delivered to Drawing Numbers Size Type Rate (R)

Prints Claimed

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Printing Total R -

Previously claimed

TOTAL FOR: Typing Duplicating & Printing TOTAL Excl VAT R -

Previously claimed R -

SCHEDULE Y: SITE STAFF & OTHER CHARGES

INPUT ALL INFORMATION FOR THE WHOLE PROJECT NOTE: ALL ITEMS MUST INCLUDE VAT

Attached to Claim No 0 WCS NO 0



A: Part Time Supervision

Approved Claimed

Month Name Designation Rate (R) Amount

Hours Hours

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Part Time Supervision Total R -

Previously claimed

B: Full Time Supervision

Approved

Portion

Date Name Designation Remuneratio Amount

claimed %

n

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Full Time Supervision Total R -

Previously claimed

C: Travelling expenses

Distance

Distance

Date Name approved Vehicle cc Tariff (R) Amount

km

km

R -

R -

R -

R -

R -

R -

R -

R -

R -

R -

Travelling expenses Total R -

Previously claimed

D: Other Charges

Invoice or

Laboratory Number of Approved Amount

Date Describe TMB

/ Place tests rate (R) Claimed

Number

R -

R -

R -

R -

R -

R -

R -

Other Charges Total R -

Previously claimed

Site Staff & Other Charges Total Incl. VAT R -



Site Staff & Other Charges Total Excl VAT R -

Previously claimed R -

SCHEDULE Z: NON-TAXABLE EXPENSES

INPUT ALL INFORMATION FOR THE WHOLE PROJECT

Attached to Claim No 0 WCS NO 0





1. Non Taxable Services

Amount

Date Centre Reference No Describe

Claimed









Non Taxable Expenses Total R -

Total Previous Payments Received for this item R -

Non-taxable Expenses Total for this invoice R -

Non Taxable Expenses could include any of the following [This list is not exclusive]:

A. Airport tax C. Hotel levy E.

B. Re-Fuel charges D. Other F.


Related docs
Other docs by HC11120407367
LOGO
Views: 0  |  Downloads: 0
SUB-BRAND APPROVAL GUIDANCE FOR DH
Views: 2  |  Downloads: 0
Notes
Views: 0  |  Downloads: 0
Kildemoes
Views: 33  |  Downloads: 0
Site Operating Hours
Views: 0  |  Downloads: 0
Techno-Push
Views: 1  |  Downloads: 0
April 23, 2003
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!