					WBS                 Task_Name                                 Lead Duration
1                   Project Management                        UM     1478 days
  1.1                 Management                                     1478 days
    1.1.1               Change Control Board                         1478 days
      1.1.1.1            GSFC FSW Change Control Board               1478 days
      1.1.1.2            SwRI FSW Change Control Board               1478 days
2                   Science Planning                          UM     1478 days
  2.1                 Science Observation Analysis                   1478 days
  2.2                 DWG, TWT, SOST, TOST, PSG support              1435 days
  2.3                 ECARS input for SOP development                1405 days
  2.4                 ECARS review for SOP development               1423 days
  2.5                 ECARS resolution for SOP development           1435 days
  2.6                 Observation Skeleton Design                    1478 days
  2.7                 CIMS inputs to SOP                             1457 days
  2.8                 Student Support                                1478 days
3                   Science Analysis                          UM     1600 days
  3.1                 Analysis Software                       TEAM   1542 days
    3.1.1               CAPS Instrument Handbook - DRAFT                58 days
    3.1.2               CAPS Instrument Handbook - FINAL              249 days
    3.1.3               CAPS data analysis handbook                   404 days
    3.1.4               Level 2 Analysis S/W for ELS Sensor   MSSL    134 days
      3.1.4.1            Requirements Definition                        16 days
        3.1.4.1.1           Define Software Requirements                10 days
        3.1.4.1.2           Prepare SRD                                  3 days
        3.1.4.1.3           Review SRD                                    1 day
        3.1.4.1.4           Revise SRD                                    1 day
        3.1.4.1.5           SRD Complete                                  1 day
      3.1.4.2            Detailed Design                                21 days
        3.1.4.2.1           Design Analysis                             15 days
        3.1.4.2.2     Prepare SDD                                        3 days
        3.1.4.2.3           Detailed Design Review                        1 day
        3.1.4.2.4           Revise Detailed Design                        1 day
        3.1.4.2.5           Design Complete                               1 day
      3.1.4.3            Implement                                      90 days
        3.1.4.3.1           Code & Debug                                90 days
      3.1.4.4            Test                                            7 days
        3.1.4.4.1           Prepare ATP                                  5 days
        3.1.4.4.2           Review ATP                                    1 day
        3.1.4.4.3           Execute ATP                                   1 day
    3.1.5               Level 2 Analysis S/W for IBS Sensor   LANL    134 days
      3.1.5.1            Requirements Definition                        16 days
        3.1.5.1.1           Define Software Requirements                10 days
        3.1.5.1.2           Prepare SRD                                  3 days
        3.1.5.1.3           Review SRD                                    1 day
        3.1.5.1.4           Revise SRD                                    1 day
        3.1.5.1.5           SRD Complete                                  1 day
      3.1.5.2            Detailed Design                                21 days
        3.1.5.2.1           Design Analysis                             15 days
        3.1.5.2.2           Prepare SDD                                  3 days
        3.1.5.2.3           Detailed Design Review                        1 day
        3.1.5.2.4           Revise Detailed Design                        1 day
        3.1.5.2.5           Design Complete                               1 day
  3.1.5.3         Implement                                           90 days
    3.1.5.3.1       Code & Debug                                      90 days
  3.1.5.4         Test                                                 7 days
    3.1.5.4.1       Prepare ATP                                        5 days
    3.1.5.4.2       Review ATP                                          1 day
    3.1.5.4.3       Execute ATP                                         1 day
3.1.6            Level 2 Analysis S/W for IMS Sensor         UM      134 days
  3.1.6.1         Requirements Definition                             16 days
    3.1.6.1.1       Define Software Requirements                      10 days
    3.1.6.1.2       Prepare SRD                                        3 days
    3.1.6.1.3       Review SRD                                          1 day
    3.1.6.1.4       Revise SRD                                          1 day
    3.1.6.1.5       SRD Complete                                        1 day
  3.1.6.2         Detailed Design                                     21 days
    3.1.6.2.1       Design Analysis                                   15 days
    3.1.6.2.2       Prepare SDD                                        3 days
    3.1.6.2.3       Detailed Design Review                              1 day
    3.1.6.2.4       Revise Detailed Design                              1 day
    3.1.6.2.5       Design Complete                                     1 day
  3.1.6.3         Implement                                           90 days
    3.1.6.3.1       Code & Debug                                      90 days
  3.1.6.4         Test                                                 7 days
    3.1.6.4.1       Prepare ATP                                        5 days
    3.1.6.4.2       Review ATP                                          1 day
    3.1.6.4.3       Execute ATP                                         1 day
3.1.7            Level 3 Analysis S/W from Goddard           GSFC   1478 days
  3.1.7.1         GSFC Resident Software                            1478 days
  3.1.7.2         CAPS Deliverable                                   522 days
    3.1.7.2.1       Delivery 1.0                                       0 days
    3.1.7.2.2       Delivery 2.0                                       0 days
    3.1.7.2.3       Delivery 3.0                                       0 days
3.1.8            Level 3 Analysis S/W from Rice University   Rice   1478 days
  3.1.8.1         Rice University Resident Software                 1478 days
  3.1.8.2         CAPS Deliverable                                   522 days
    3.1.8.2.1       Delivery 1.0                                       0 days
    3.1.8.2.2       Delivery 2.0                                       0 days
    3.1.8.2.3       Delivery 3.0                                       0 days
3.1.9            Level 3 Analysis S/W from U. of Virginia    Uva    1478 days
  3.1.9.1         U. of Virginia Resident Software                  1478 days
  3.1.9.2         CAPS Deliverable                                   522 days
    3.1.9.2.1       Delivery 1.0                                       0 days
    3.1.9.2.2       Delivery 2.0                                       0 days
    3.1.9.2.3       Delivery 3.0                                       0 days
3.1.10           Level 3 Analysis S/W from SwRI              SwRI   1210 days
  3.1.10.1        SwRI Resident Software                              30 days
    3.1.10.1.1      Requirements Definition                           10 days
    3.1.10.1.2      Implement, Design, & Test                         20 days
  3.1.10.2        CAPS Deliverable                                   522 days
    3.1.10.2.1      Delivery 1.0                                       0 days
    3.1.10.2.2      Delivery 2.0                                       0 days
    3.1.10.2.3      Delivery 3.0                                       0 days
3.1.11           Level 3 Analysis S/W from LANL              LANL   1478 days
  3.1.11.1        LANL Resident Software                 1478 days
  3.1.11.2        CAPS Deliverable                        522 days
    3.1.11.2.1      Delivery 1.0                            0 days
    3.1.11.2.2      Delivery 2.0                            0 days
    3.1.11.2.3      Delivery 3.0                            0 days
3.1.12           Level 3 Analysis S/W from UM     UM     1542 days
  3.1.12.1        UM Resident Software                   1542 days
  3.1.12.2        CAPS Deliverable                        522 days
    3.1.12.2.1      Delivery 1.0                            0 days
    3.1.12.2.2      Delivery 2.0                            0 days
    3.1.12.2.3      Delivery 3.0                            0 days
3.1.13           Level 3 Analysis S/W from JPL    JPL    1478 days
  3.1.13.1        JPL Resident Software                  1478 days
  3.1.13.2        CAPS Deliverable                        522 days
    3.1.13.2.1      Delivery 1.0                            0 days
    3.1.13.2.2      Delivery 2.0                            0 days
    3.1.13.2.3      Delivery 3.0                            0 days
3.1.14           Level 3 Analysis S/W from CETP   CETP   1478 days
  3.1.14.1        CETP Resident Software                 1478 days
  3.1.14.2        CAPS Deliverable                        522 days
    3.1.14.2.1      Delivery 1.0                            0 days
    3.1.14.2.2      Delivery 2.0                            0 days
    3.1.14.2.3      Delivery 3.0                            0 days
3.1.15           Level 3 Analysis S/W from OMP    OMP    1478 days
  3.1.15.1        OMP Resident Software                  1478 days
  3.1.15.2        CAPS Deliverable                        522 days
    3.1.15.2.1      Delivery 1.0                            0 days
    3.1.15.2.2      Delivery 2.0                            0 days
    3.1.15.2.3      Delivery 3.0                            0 days
3.1.16           Level 3 Analysis S/W from MSSL   MSSL   1478 days
  3.1.16.1        MSSL Resident Software                 1478 days
  3.1.16.2        CAPS Deliverable                        522 days
    3.1.16.2.1      Delivery 1.0                            0 days
    3.1.16.2.2      Delivery 2.0                            0 days
    3.1.16.2.3      Delivery 3.0                            0 days
3.1.17           Level 3 Analysis S/W from NDRE   NDRE   1478 days
  3.1.17.1        NDRE Resident Software                 1478 days
  3.1.17.2        CAPS Deliverable                        522 days
    3.1.17.2.1      Delivery 1.0                            0 days
    3.1.17.2.2      Delivery 2.0                            0 days
    3.1.17.2.3      Delivery 3.0                            0 days
3.1.18           Level 3 Analysis S/W from RAL    RAL    1478 days
  3.1.18.1        RAL Resident Software                  1478 days
  3.1.18.2        CAPS Deliverable                        522 days
    3.1.18.2.1      Delivery 1.0                            0 days
    3.1.18.2.2      Delivery 2.0                            0 days
    3.1.18.2.3      Delivery 3.0                            0 days
3.1.19           Level 3 Analysis S/W from OULU   OULU   1478 days
  3.1.19.1        OULU Resident Software                 1478 days
  3.1.19.2        CAPS Deliverable                        522 days
    3.1.19.2.1      Delivery 1.0                            0 days
    3.1.19.2.2      Delivery 2.0                            0 days
          3.1.19.2.3           Delivery 3.0                                          0 days
      3.1.20               Level 3 Analysis S/W from RMKI-KFKI             KFKI   1478 days
        3.1.20.1             RMKI-KFKI Resident Software                          1478 days
        3.1.20.2             CAPS Deliverable                                      522 days
          3.1.20.2.1           Delivery 1.0                                          0 days
          3.1.20.2.2           Delivery 2.0                                          0 days
          3.1.20.2.3           Delivery 3.0                                          0 days
      3.1.21               Analysis Software Training                      UM       12 days
        3.1.21.1             Develop Training Materials                             10 days
        3.1.21.2             User Training                                           2 days
    3.2                  Analysis                                                 1600 days
      3.2.1                Science Data Validation                         UM     1542 days
      3.2.2                Quicklook Analysis                                     1293 days
        3.2.2.1              Identify events for detailed analysis         UM     1127 days
        3.2.2.2              Identify additional calibration needs         UM     1127 days
        3.2.2.3              Quicklook Results Coordination (inter-team)   UM     1127 days
        3.2.2.4              Feedback to Science Planning (short-term)     UM     1127 days
        3.2.2.5              Cassini Press Release                         UM     1127 days
        3.2.2.6              Scientific Conferences and Publications       UM     1249 days
      3.2.3                Detailed analysis                               UM     1293 days
        3.2.3.1              Identify additional calibration needs         UM     1249 days
        3.2.3.2              Quicklook Events                              UM     1249 days
        3.2.3.3              Coordinated Events                            UM     1255 days
        3.2.3.4              Feedback to Science Planning (long-term)      UM     1255 days
        3.2.3.5              Synoptic Studies                              UM     1255 days
        3.2.3.6              Lab data in support of measurements           Uva    1084 days
        3.2.3.7              Cassini Press Release                         UM     1255 days
        3.2.3.8              Scientific Conferences and Publications       UM     1255 days
4                      Calibration                                         SwRI   1585 days
    4.1                  Calibration Activities                                   1524 days
      4.1.1                Ground Calibration                                      878 days
        4.1.1.1              EM Refurbish                                  SwRI     90 days
        4.1.1.2              EM Re-Calibrate & Validate                    SwRI     30 days
        4.1.1.3              Prototype TOF Calibration                     GSFC     90 days
        4.1.1.4              EM TOF Calibration                            SwRI     30 days
        4.1.1.5              EM TITAN TOF Calibration                      SwRI     30 days
        4.1.1.6              Prototype TITAN TOF Calibration               GSFC     90 days
      4.1.2                Flight Calibration                                     1524 days
        4.1.2.1        Planning (Internal & Cross-calibrate)                        10 days
        4.1.2.2              FM Calibration                                       1524 days
    4.2                  Software Development                                      307 days
      4.2.1                IMS Sensor                                      SwRI    307 days
        4.2.1.1              SAM                                           GSFC    307 days
        4.2.1.2              MCP/FEE/TDC                                   LANL    307 days
        4.2.1.3              System Cal                                    SwRI    307 days
        4.2.1.4              Foil Cal                                      UM      307 days
      4.2.2                IBS Sensor                                      LANL    307 days
      4.2.3                ELS Sensor                                      MSSL    307 days
    4.3                  Calibration Analysis                              SwRI   1585 days
      4.3.1                IMS Sensor                                      SwRI    391 days
        4.3.1.1              Verify CDT Software Function, Clear Bugs               15 days
        4.3.1.2              Reduce & Analyze Azimuth                               58 days
       4.3.1.3                 Reduce & Analyze Elevation                                     16 days
       4.3.1.4                 Reduce & Analyze Energy                                        14 days
       4.3.1.5                 Reduce & Analyze TOF data                                      21 days
       4.3.1.6                 Reduce & Analyze PT data                              GSFC     60 days
       4.3.1.7                 Reduce & Analyze EM data                                       60 days
       4.3.1.8                 Validate Calibration Data (tie to data tables)                 30 days
       4.3.1.9                 Calculate G-Factors                                            14 days
     4.3.2                   IBS Sensor                                                      307 days
     4.3.3                   ELS Sensor                                                      307 days
     4.3.4                   Calibration Analyses Reports & Updates                          136 days
     4.3.5                   In-Flight Calibration Analysis (& Cal. Coeff. Maint.)          1478 days
     4.3.6                   Cross Calibration w/other instruments                   UM      120 days
5                         Ground System                                              UM     1365 days
    5.1                    Development                                                       489 days
      5.1.1                  System Definition                                       UM       50 days
        5.1.1.1                Ground System Requirements Specification                       10 days
        5.1.1.2                Ground System Operations Concept                               10 days
        5.1.1.3                Ground System Migration Concept                                10 days
          5.1.1.3.1              QuickLook program                                            10 days
          5.1.1.3.2              Data Processing programs                                     10 days
          5.1.1.3.3              CAPS websites                                                10 days
          5.1.1.3.4              Instrument Simulator                                         10 days
          5.1.1.3.5              SASF Interpreter                                             10 days
          5.1.1.3.6              CCSDS Converters                                             10 days
          5.1.1.3.7              IEB Generator                                                10 days
        5.1.1.4                Data Processing Concept                                        10 days
        5.1.1.5                Command Generation Concept                                     20 days
        5.1.1.6                System Design Specification                                    10 days
        5.1.1.7              Software Coding Standards                                        20 days
      5.1.2                  Planning Tool Development                               UM       57 days
        5.1.2.1                Requirements analysis and definition                            5 days
        5.1.2.2                ECARS Update and Planning Tool                        SwRI     57 days
          5.1.2.2.1              Review Rev 1 of ECARS                                         2 days
          5.1.2.2.2              Detailed Design                                              26 days
            5.1.2.2.2.1             HTML/GUI                                                  10 days
            5.1.2.2.2.2             Java/JSP                                                  10 days
            5.1.2.2.2.3             Database                                                   5 days
            5.1.2.2.2.4             Detailed Design Review                                      1 day
            5.1.2.2.2.5             Detailed Design Complete                                   0 days
          5.1.2.2.3              Implement                                                    22 days
            5.1.2.2.3.1             Revise ECARS Rev 1                                         5 days
            5.1.2.2.3.2             Code and Debug HTML                                        5 days
            5.1.2.2.3.3             Code and Debug Java                                       10 days
            5.1.2.2.3.4             Implement Database                                         2 days
            5.1.2.2.3.5             Implementation Complete                                    0 days
          5.1.2.2.4              Test, Prepare, & Execute ATP                                  7 days
            5.1.2.2.4.1             Prepare ATP                                                5 days
            5.1.2.2.4.2             Review ATP                                                  1 day
            5.1.2.2.4.3             Execute ATP                                                 1 day
          5.1.2.2.5              ECARS Complete                                                0 days
      5.1.3                  Data Base Implementation                                         50 days
        5.1.3.1                Requirements analysis and design specification        UM       25 days
    5.1.3.1.1          Command Generation Tables                      5 days
    5.1.3.1.2          Flight Operations Tables                       5 days
    5.1.3.1.3          Raw Data Tables                                5 days
    5.1.3.1.4          Housekeeping L0b Tables                        5 days
    5.1.3.1.5          Science L0b Tables                             5 days
  5.1.3.2            Adapt INMS Architecture to CAPS        UM       25 days
    5.1.3.2.1          Data Base                                     18 days
      5.1.3.2.1.1        Add Cycle Reconstruction                    10 days
      5.1.3.2.1.2        Add Sensor Tables                            5 days
      5.1.3.2.1.3        Command Generation Tables                    2 days
      5.1.3.2.1.4        Flight Operations Tables                     2 days
      5.1.3.2.1.5        Raw Data Tables                              2 days
      5.1.3.2.1.6        Housekeeping L0b Tables                      2 days
      5.1.3.2.1.7        Science L0b Tables                           2 days
      5.1.3.2.1.8        SAM Table Library                            3 days
    5.1.3.2.2          Java Access Layer Adaptations                 25 days
    5.1.3.2.3          Initial Web Pages                           12.5 days
    5.1.3.2.4          Structural tasks                               8 days
      5.1.3.2.4.1        Page Layout                                  3 days
      5.1.3.2.4.2        Authentication                                1 day
      5.1.3.2.4.3        Table Management                              1 day
      5.1.3.2.4.4        System Administration Tools                   1 day
      5.1.3.2.4.5        Audit Tools                                   1 day
      5.1.3.2.4.6        Messaging System                              1 day
  5.1.3.3            Acceptance Review                                0 days
5.1.4               Downlink Functions                               55 days
  5.1.4.1            Requirements analysis and definition            15 days
  5.1.4.2            Data Base Component                             20 days
    5.1.4.2.1          Status and Control Pages                       5 days
    5.1.4.2.2          Realtime communications component             10 days
    5.1.4.2.3          telemetry display pages                        5 days
  5.1.4.3            Level 0 Data Manager                   UM       40 days
    5.1.4.3.1          Telemetry Management System                   20 days
    5.1.4.3.2          Data Dictionary                               40 days
    5.1.4.3.3          Automatic Packet Expansion                    20 days
  5.1.4.4            Support Facilities                              38 days
    5.1.4.4.1          Help System                                   35 days
    5.1.4.4.2          Test Programs                                 35 days
    5.1.4.4.3          Test Plans                                     3 days
  5.1.4.5            Instrument State Retrieval                       6 days
  5.1.4.6            Memory Image Retrieval                           5 days
  5.1.4.7            Acceptance Review                                0 days
5.1.5               Health & Safety Functions                        45 days
  5.1.5.1            Requirements analysis and definition            10 days
  5.1.5.2            Alarm Management                                 5 days
  5.1.5.3            Event Management                                 5 days
  5.1.5.4            State/Memory Comparator                          5 days
  5.1.5.5            Trend Analysis & Display               UM       15 days
    5.1.5.5.1          Design display pages                           5 days
    5.1.5.5.2          Specify data base queries                     10 days
  5.1.5.6            Consumables Manager                    SwRI     35 days
    5.1.5.6.1          Design display pages                           5 days
    5.1.5.6.2              Specify data base queries                    30 days
      5.1.5.6.2.1            Actuator Cycles                             6 days
      5.1.5.6.2.2            On/Off Cycles                               6 days
      5.1.5.6.2.3            Total Detector Charge                      18 days
        5.1.5.6.2.3.1          IMS                                       6 days
        5.1.5.6.2.3.2          IBS                                       6 days
        5.1.5.6.2.3.3          ELS                                       6 days
  5.1.5.7                NERT & QL Displays                     UM      15 days
    5.1.5.7.1              Design display pages                          5 days
    5.1.5.7.2              Specify data base queries                    10 days
  5.1.5.8                Support Facilities                             27 days
    5.1.5.8.1              Database updates                             10 days
    5.1.5.8.2              Java access layer updates                    10 days
    5.1.5.8.3              Help system updates                           8 days
    5.1.5.8.4              Test plan updates                             2 days
  5.1.5.9                Acceptance Review                               0 days
5.1.6                   Command Generation Functions            SwRI   401 days
  5.1.6.1                Requirements analysis and definition           10 days
  5.1.6.2                Sequence Generation                    SwRI    20 days
    5.1.6.2.1              IEB generator                        UM       5 days
    5.1.6.2.2              SASF generator                       SwRI     5 days
    5.1.6.2.3              Survey Parameter Generator                    5 days
    5.1.6.2.4              SAM Library Manager                           5 days
  5.1.6.3                SAM Table generator & simulator        GSFC   340 days
    5.1.6.3.1              Review Completed SRD and ICD                 32 days
    5.1.6.3.2              Detailed Design                      GSFC   120 days
      5.1.6.3.2.1            Design Analysis                            91 days
      5.1.6.3.2.2            Define Database                            91 days
      5.1.6.3.2.3            Prepare SDD                                24 days
      5.1.6.3.2.4            Detailed Design Review                       1 day
      5.1.6.3.2.5            Revise Detailed Design                      4 days
      5.1.6.3.2.6            Design Complete                             0 days
    5.1.6.3.3              Implementation                       GSFC   147 days
      5.1.6.3.3.1            Code & Debug                              147 days
    5.1.6.3.4              Test, Prepare, & Execute ATP         GSFC    41 days
      5.1.6.3.4.1            Prepare ATP                                25 days
      5.1.6.3.4.2            Review ATP                                   1 day
      5.1.6.3.4.3            Revise ATP                                  4 days
      5.1.6.3.4.4            Execute ATP                                11 days
    5.1.6.3.5              Acceptance Review                             0 days
  5.1.6.4                Instrument Simulator                   SwRI    30 days
    5.1.6.4.1              Read & Parse Merged SASF                      5 days
    5.1.6.4.2              State Vector Generator/Predictor             20 days
    5.1.6.4.3              Resource Estimator                            5 days
  5.1.6.5                Support Facilities                     SwRI     6 days
    5.1.6.5.1              Database updates                               1 day
    5.1.6.5.2              Java access layer updates                      1 day
    5.1.6.5.3              Help system updates                           2 days
    5.1.6.5.4              Test plan updates                             2 days
  5.1.6.6                Acceptance Review                               0 days
5.1.7                   Data Production Function                       324 days
  5.1.7.1                Requirements analysis and definition           10 days
   5.1.7.2           Data Access Utilities                                 UM        10 days
     5.1.7.2.1         Database Output Interface                                      5 days
     5.1.7.2.2         Database Input Interface                                       5 days
   5.1.7.3           User Data Access                                                20 days
     5.1.7.3.1         Design display pages                                           5 days
     5.1.7.3.2         Specify data base queries                                      5 days
     5.1.7.3.3         Output format modules                                         10 days
   5.1.7.4           Compute Geophysical Quantities (PDS L1B - CAPS L2)             160 days
     5.1.7.4.1         Instrumental Effects                                MSSL      40 days
     5.1.7.4.2         Distribution Functions                                        40 days
     5.1.7.4.3         Moments of Distributions                            UM        40 days
     5.1.7.4.4         Fits to Distributions                               UM        40 days
   5.1.7.5           Higher Level Data Products (CAPS L3)                  UM        12 days
     5.1.7.5.1         Higher Level Data Requirement Definition                      10 days
     5.1.7.5.2         Developer Training                                             2 days
   5.1.7.6           Global Models (Velocity, Neutral Gas, Titan, Magnetosphere)     12 days
     5.1.7.6.1         Global Models Requirement Definition                          10 days
     5.1.7.6.2         Developer Training                                             2 days
   5.1.7.7           Event Kernel Generation                               UM        20 days
   5.1.7.8           C-Kernel Generation                                   UM        20 days
   5.1.7.9           Experimenters Notebook (web-based)                    UM        20 days
   5.1.7.10          Support Facilities                                               6 days
     5.1.7.10.1        Database updates                                                1 day
     5.1.7.10.2        Java access layer updates                                       1 day
     5.1.7.10.3        Help system updates                                            2 days
     5.1.7.10.4        Test plan updates                                              2 days
   5.1.7.11          Acceptance Review                                                0 days
5.2               Ground System Integration                                UM      1180 days
  5.2.1            Develop Detailed Integration Plan                                 15 days
  5.2.2            Integrate Downlink Function                             UM        19 days
    5.2.2.1          Data Base Component                                              5 days
    5.2.2.2          Level 0 Data Manager                                             5 days
    5.2.2.3          Instrument State Retrieval                                       2 days
    5.2.2.4          Memory Image Retrieval                                           2 days
    5.2.2.5          Regression Test                                                  5 days
  5.2.3            Integrate Health & Safety Assesment Functions                     17 days
    5.2.3.1          Alarm Management                                                 2 days
    5.2.3.2          Event Management                                                 2 days
    5.2.3.3          State and Memory Comparator                                      2 days
    5.2.3.4          Trend Analysis and Display                                       2 days
    5.2.3.5          Consumables Manager                                              2 days
    5.2.3.6          NERT & QL Displays                                               2 days
    5.2.3.7          Regression Test                                                  5 days
  5.2.4            Integrate Command Generation Functions                            22 days
    5.2.4.1          Sequence Generator                                               8 days
      5.2.4.1.1        IEB Generator                                                  2 days
      5.2.4.1.2        SASF Generator                                                 2 days
      5.2.4.1.3        Survey Parameter Generator                                     2 days
      5.2.4.1.4        SAM Table Library & Library Manager                            2 days
    5.2.4.2          SAM Table Generator                                              5 days
    5.2.4.3          Instrument Simulator                                             4 days
      5.2.4.3.1        State Vector generator/predictor                               2 days
          5.2.4.3.2           Telemetry generator                                     2 days
        5.2.4.4             Regression Test                                           5 days
      5.2.5               Integrate Data Production Functions                        18 days
        5.2.5.1             Data Access utilities                                     2 days
        5.2.5.2             Data Publication                                          2 days
        5.2.5.3             Geophysical Quantities Generator (Level 1-B)             10 days
        5.2.5.4             Event Kernel Generator                                    2 days
        5.2.5.5             C-Kernel Generator                                        2 days
        5.2.5.6             Experimentor's Notebook                                   2 days
        5.2.5.7             Regression Test                                           5 days
      5.2.6               Integrate Archive Volume Generator                          7 days
        5.2.6.1             CDF Generator                                             2 days
        5.2.6.2             Geophysical Data Archive Generator                        2 days
        5.2.6.3             Regression Test                                           5 days
      5.2.7               Integrate Higher Level Products & Global Models           530 days
        5.2.7.1             Integrate Higher Level Products 1                        10 days
        5.2.7.2             Integrate Higher Level Products 2                        10 days
        5.2.7.3             Integrate Higher Level Products 3                        10 days
    5.3                 Ground System Documentation & Training              UM      210 days
      5.3.1               Operations Procedures                             UM      109 days
      5.3.2               Training Syllabus                                 UM      109 days
      5.3.3               Operations Handbook                               UM      195 days
      5.3.4               Co-I and Operator Training                        UM        2 days
6                     Flight Software System                                SwRI   1410 days
    6.1                 Revision 4.0 (Tour version)                                  83 days
      6.1.1               Finalize concept, review, & approve               UM        4 days
      6.1.2               CPU1 and System Flight Software                   SwRI     50 days
        6.1.2.1             Correct known anomalies                                  10 days
        6.1.2.2             Telemetry Modes                                           8 days
          6.1.2.2.1           Detailed Design                                         4 days
          6.1.2.2.2           Code and Debug                                          4 days
        6.1.2.3             IBS Search And Track                            LANL      6 days
          6.1.2.3.1           Detailed Design                                         3 days
          6.1.2.3.2           Code and Debug                                          3 days
        6.1.2.4             New IEB Processing                                        6 days
          6.1.2.4.1           Detailed Design                                         3 days
          6.1.2.4.2           Code and Debug                                          3 days
        6.1.2.5             New Actuator Mode                                         6 days
          6.1.2.5.1           Detailed Design                                         3 days
          6.1.2.5.2           Code and Debug                                          3 days
        6.1.2.6             CPU2/SAM Integration                                      3 days
        6.1.2.7             CCB                                                      39 days
        6.1.2.8             Test & Validate (on Ground)                               7 days
          6.1.2.8.1           Prepare Test Procedure                                  5 days
          6.1.2.8.2           Execute Test Procedure                                  2 days
      6.1.3               CPU2 & SAM Flight Software                        GSFC     76 days
        6.1.3.1             Correct known anomalies                                  24 days
        6.1.3.2             Telemetry Modes                                          23 days
          6.1.3.2.1           Detailed Design                                        18 days
          6.1.3.2.2           Code and Debug                                         18 days
        6.1.3.3             SAM Processing                                           18 days
          6.1.3.3.1           Detailed Design                                        16 days
          6.1.3.3.2           Code and Debug                                     13 days
        6.1.3.4             Event Mode                                           25 days
          6.1.3.4.1           Detailed Design                                    22 days
          6.1.3.4.2           Code and Debug                                     10 days
        6.1.3.5             Command Processing                                    7 days
          6.1.3.5.1           Detailed Design                                     3 days
          6.1.3.5.2           Code and Debug                                      4 days
        6.1.3.6             Test & Validate (on Ground)                          18 days
          6.1.3.6.1           Prepare Test Procedure                             12 days
          6.1.3.6.2           Execute Test Procedure                              6 days
      6.1.4               CAPS Test and Validate                                  7 days
        6.1.4.1             Prepare Test Procedure                                5 days
        6.1.4.2             Execute Test Procedure                                2 days
    6.2                 Revision 4.1                                    SwRI     60 days
    6.3                 Revision 4.2                                    SwRI     60 days
    6.4                 Revision 4.3                                    SwRI     60 days
    6.5                 Revision 4.4                                    SwRI     60 days
    6.6                 Flight Software Checkouts                       UM     1329 days
      6.6.1               Rev 4.0                                                94 days
        6.6.1.1             Checkout Window                                      46 days
        6.6.1.2             Check-out Sequence Design                            15 days
        6.6.1.3             Real-time Support During Check-out Period             5 days
        6.6.1.4             Results Validation                                   15 days
      6.6.2               Rev 4.1                                                41 days
        6.6.2.1             Check-out Sequence Design                             5 days
        6.6.2.2             Real-time Support During Check-out Period             5 days
        6.6.2.3             Results Validation                                   15 days
      6.6.3               Rev 4.2                                                40 days
        6.6.3.1             Check-out Sequence Design                             5 days
        6.6.3.2             Real-time Support During Check-out Period             5 days
        6.6.3.3             Results Validation                                   15 days
      6.6.4               Rev 4.3                                                42 days
        6.6.4.1             Check-out Sequence Design                             5 days
        6.6.4.2             Real-time Support During Check-out Period             5 days
        6.6.4.3             Results Validation                                   15 days
      6.6.5               Rev 4.4                                                44 days
        6.6.5.1             Check-out Sequence Design                             5 days
        6.6.5.2             Real-time Support During Check-out Period             5 days
        6.6.5.3             Results Validation                                   15 days
7                     Flight Operations                                 UM     1499 days
    7.1                 Train OTL2 and backup OTL                                40 days
    7.2                 Science Cruise Phase (Current - May 15, 2004)   UM      398 days
      7.2.1               Cruise Sequence C36                           UM      122 days
        7.2.1.1             Science Design                              UM       38 days
          7.2.1.1.1           Start of the SPVT                                    1 day
          7.2.1.1.2           Collect Resolved ECARS inputs (2.1.5)     UM        2 days
          7.2.1.1.3           Further Resolution of ECARS                          1 day
          7.2.1.1.4           CIMS input                                           1 day
          7.2.1.1.5           Detailed Design - Pointing                         33 days
        7.2.1.2             Sequence Design & Generation                UM       45 days
          7.2.1.2.1           Design for SPVT                                    33 days
          7.2.1.2.2           Detailed Design                                    10 days
    7.2.1.2.3      Code and Debug                                  1 day
    7.2.1.2.4      Sequence "Delta" Review                         1 day
  7.2.1.3        SPVT/SVT Developmnet Support              UM    80 days
    7.2.1.3.1      Meetings                                      80 days
    7.2.1.3.2      Response to Meeting Actions                   80 days
  7.2.1.4        Test & Validate Sequence                  UM     5 days
    7.2.1.4.1      Prepare Test Procedure                         2 days
    7.2.1.4.2      Execute Test Procedure                         2 days
    7.2.1.4.3      Final Review                                    1 day
  7.2.1.5        Sequence Execution                              41 days
    7.2.1.5.1      Meetings                                      41 days
7.2.2           Cruise Sequence C37                             128 days
  7.2.2.1        Science Design                            UM    43 days
    7.2.2.1.1      Start of the SPVT                               1 day
    7.2.2.1.2      Collect Resolved ECARS inputs (2.1.5)   UM     2 days
    7.2.2.1.3      Further Resolution of ECARS                     1 day
    7.2.2.1.4      CIMS input                                      1 day
    7.2.2.1.5      Detailed Design - Pointing                    38 days
  7.2.2.2        Sequence Design & Generation              UM    54 days
    7.2.2.2.1      Design for SPVT                               38 days
    7.2.2.2.2      Detailed Design                               10 days
    7.2.2.2.3      Code and Debug                                 5 days
    7.2.2.2.4      Sequence "Delta" Review                         1 day
  7.2.2.3        SPVT/SVT support                          UM    82 days
    7.2.2.3.1      Meetings                                      82 days
    7.2.2.3.2      Response to Meeting Actions                   82 days
  7.2.2.4        Test & Validate Sequence                  UM     5 days
    7.2.2.4.1      Prepare Test Procedure                         2 days
    7.2.2.4.2      Execute Test Procedure                         2 days
    7.2.2.4.3      Final Review                                    1 day
  7.2.2.5        Sequence Execution                              45 days
    7.2.2.5.1      Meetings                                      45 days
7.2.3           Cruise Sequence C38                             114 days
  7.2.3.1        Science Design                            UM    25 days
  7.2.3.1.1      Start of the SPVT                                 1 day
    7.2.3.1.2      Collect Resolved ECARS inputs (2.1.5)   UM     2 days
    7.2.3.1.3      Further Resolution of ECARS                     1 day
    7.2.3.1.4      CIMS input                                      1 day
    7.2.3.1.5      Detailed Design - Pointing                    20 days
  7.2.3.2        Sequence Design & Generation              UM    36 days
    7.2.3.2.1      Design for SPVT                               20 days
    7.2.3.2.2      Detailed Design                               10 days
    7.2.3.2.3      Code and Debug                                 5 days
    7.2.3.2.4      Sequence "Delta" Review                         1 day
  7.2.3.3        SPVT/SVT support                          UM    69 days
    7.2.3.3.1      Meetings                                      69 days
    7.2.3.3.2      Response to Meeting Actions                   69 days
  7.2.3.4        Test & Validate Sequence                  UM     5 days
    7.2.3.4.1      Prepare Test Procedure                         2 days
    7.2.3.4.2      Execute Test Procedure                         2 days
    7.2.3.4.3      Final Review                                    1 day
  7.2.3.5        Sequence Execution                              40 days
    7.2.3.5.1      Meetings                                      40 days
7.2.4           Cruise Sequence C39                             128 days
  7.2.4.1        Science Design                            UM    39 days
    7.2.4.1.1      Start of the SPVT                               1 day
    7.2.4.1.2      Collect Resolved ECARS inputs (2.1.5)   UM     2 days
    7.2.4.1.3      Further Resolution of ECARS                     1 day
    7.2.4.1.4      CIMS input                                      1 day
    7.2.4.1.5      Detailed Design - Pointing                    34 days
  7.2.4.2        Sequence Design & Generation              UM    50 days
    7.2.4.2.1      Design for SPVT                               34 days
    7.2.4.2.2      Detailed Design                               10 days
    7.2.4.2.3      Code and Debug                                 5 days
    7.2.4.2.4      Sequence "Delta" Review                         1 day
  7.2.4.3        SPVT/SVT support                          UM    77 days
    7.2.4.3.1      Meetings                                      77 days
    7.2.4.3.2      Response to Meeting Actions                   77 days
  7.2.4.4        Test & Validate Sequence                  UM     5 days
    7.2.4.4.1      Prepare Test Procedure                         2 days
    7.2.4.4.2      Execute Test Procedure                         2 days
    7.2.4.4.3      Final Review                                    1 day
  7.2.4.5        Sequence Execution                              50 days
    7.2.4.5.1      Meetings                                      50 days
7.2.5           Cruise Sequence C40                             130 days
  7.2.5.1        Science Design                            UM    39 days
    7.2.5.1.1      Start of the SPVT                               1 day
    7.2.5.1.2      Collect Resolved ECARS inputs (2.1.5)   UM     2 days
    7.2.5.1.3      Further Resolution of ECARS                     1 day
    7.2.5.1.4      CIMS input                                      1 day
    7.2.5.1.5      Detailed Design - Pointing                    34 days
  7.2.5.2        Sequence Design & Generation              UM    50 days
    7.2.5.2.1      Design for SPVT                               34 days
    7.2.5.2.2      Detailed Design                               10 days
    7.2.5.2.3      Code and Debug                                 5 days
    7.2.5.2.4      Sequence "Delta" Review                         1 day
  7.2.5.3        SPVT/SVT support                          UM    76 days
    7.2.5.3.1      Meetings                                      76 days
    7.2.5.3.2      Response to Meeting Actions                   76 days
  7.2.5.4        Test & Validate Sequence                  UM     5 days
    7.2.5.4.1      Prepare Test Procedure                         2 days
    7.2.5.4.2      Execute Test Procedure                         2 days
    7.2.5.4.3      Final Review                                    1 day
  7.2.5.5        Sequence Execution                              52 days
    7.2.5.5.1      Meetings                                      52 days
7.2.6           Approach Science Sequence C42                   122 days
  7.2.6.1        Science Design                            UM    39 days
    7.2.6.1.1      Start of the SPVT                               1 day
    7.2.6.1.2      Collect Resolved ECARS inputs (2.1.5)   UM     2 days
    7.2.6.1.3      Further Resolution of ECARS                     1 day
    7.2.6.1.4      CIMS input                                      1 day
    7.2.6.1.5      Detailed Design - Pointing                    34 days
  7.2.6.2        Sequence Design & Generation              UM    50 days
    7.2.6.2.1      Design for SPVT                               34 days
    7.2.6.2.2      Detailed Design                               10 days
    7.2.6.2.3      Code and Debug                                 5 days
    7.2.6.2.4      Sequence "Delta" Review                         1 day
  7.2.6.3        SPVT/SVT support                          UM    89 days
    7.2.6.3.1      Meetings                                      89 days
    7.2.6.3.2      Response to Meeting Actions                   89 days
  7.2.6.4        Test & Validate Sequence                  UM     5 days
    7.2.6.4.1      Prepare Test Procedure                         2 days
    7.2.6.4.2      Execute Test Procedure                         2 days
    7.2.6.4.3      Final Review                                    1 day
  7.2.6.5        Sequence Execution                              32 days
    7.2.6.5.1      Meetings                                      32 days
7.2.7           Approach Science Sequence C43                   124 days
  7.2.7.1        Science Design                            UM    39 days
    7.2.7.1.1      Start of the SPVT                               1 day
    7.2.7.1.2      Collect Resolved ECARS inputs (2.1.5)   UM     2 days
    7.2.7.1.3      Further Resolution of ECARS                     1 day
    7.2.7.1.4      CIMS input                                      1 day
    7.2.7.1.5      Detailed Design - Pointing                    34 days
  7.2.7.2        Sequence Design & Generation              UM    48 days
    7.2.7.2.1      Design for SPVT                               34 days
    7.2.7.2.2      Detailed Design                                8 days
    7.2.7.2.3      Code and Debug                                 5 days
    7.2.7.2.4      Sequence "Delta" Review                         1 day
  7.2.7.3        SPVT/SVT support                          UM    79 days
    7.2.7.3.1      Meetings                                      79 days
    7.2.7.3.2      Response to Meeting Actions                   79 days
  7.2.7.4        Test & Validate Sequence                  UM     5 days
    7.2.7.4.1      Prepare Test Procedure                         2 days
    7.2.7.4.2      Execute Test Procedure                         2 days
    7.2.7.4.3      Final Review                                    1 day
  7.2.7.5        Sequence Execution                              32 days
    7.2.7.5.1      Meetings                                      32 days
7.2.8           Approach Science Sequence C44                   125 days
  7.2.8.1        Science Design                            UM    42 days
    7.2.8.1.1      Start of the SPVT                               1 day
    7.2.8.1.2      Collect Resolved ECARS inputs (2.1.5)   UM     2 days
    7.2.8.1.3      Further Resolution of ECARS                     1 day
    7.2.8.1.4      CIMS input                                      1 day
    7.2.8.1.5      Detailed Design - Pointing                    35 days
  7.2.8.2        Sequence Design & Generation              UM    51 days
    7.2.8.2.1      Design for SPVT                               35 days
    7.2.8.2.2      Detailed Design                               10 days
    7.2.8.2.3      Code and Debug                                 5 days
    7.2.8.2.4      Sequence "Delta" Review                         1 day
  7.2.8.3        SPVT/SVT support                          UM    92 days
    7.2.8.3.1      Meetings                                      92 days
    7.2.8.3.2      Response to Meeting Actions                   92 days
  7.2.8.4        Test & Validate Sequence                  UM     5 days
    7.2.8.4.1      Prepare Test Procedure                         2 days
    7.2.8.4.2      Execute Test Procedure                         2 days
    7.2.8.4.3      Final Review                                    1 day
   7.2.8.5               Sequence Execution                                   32 days
     7.2.8.5.1             Meetings                                           32 days
7.3                   Tour Phase (5/15/04 - 6/30/08)                        1149 days
  7.3.1                S01                                                   102 days
    7.3.1.1              Aftermarket/SOP/SSUP Begin                            0 days
    7.3.1.2              Aftermarket Process                         UM       10 days
      7.3.1.2.1            Collect Resolved ECARS inputs                        1 day
      7.3.1.2.2            Work Final Sequence Trades & Changes                6 days
      7.3.1.2.3            Submit SCRs                                         6 days
      7.3.1.2.4            SCR Approval & Update SOP/CIMS                      3 days
      7.3.1.2.5            Project Briefing                                    0 days
    7.3.1.3              SOP Update                                  UM       15 days
      7.3.1.3.1            Update Detailed Design (Internal & PDT)             9 days
      7.3.1.3.2            Submit SCRs                                         3 days
      7.3.1.3.3            Final SASF due                                      0 days
      7.3.1.3.4            Sequence Review                                      1 day
      7.3.1.3.5            Power Profiles                                       1 day
      7.3.1.3.6            Flight Rules & Constraints Checks                    1 day
      7.3.1.3.7            Lag in Process                                      2 days
    7.3.1.4              Sequence Generation                         UM       52 days
      7.3.1.4.1            Detailed Design Update                             20 days
      7.3.1.4.2            IEB Generation                                     20 days
      7.3.1.4.3            Sequence "Delta" Review                             5 days
      7.3.1.4.4            State vector generation & prediction      UM        5 days
      7.3.1.4.5            SAM Group Table Production                GSFC     20 days
        7.3.1.4.5.1          Group Table Design                               20 days
        7.3.1.4.5.2          Group Table Generation                           20 days
        7.3.1.4.5.3          Test & Validate                                  20 days
      7.3.1.4.6            Remaining of SSUP Process Support                  26 days
    7.3.1.5              SPVT & SSUP support                         UM       76 days
      7.3.1.5.1            Meeting Support                                    76 days
      7.3.1.5.2            Response to Meeting Actions                        76 days
    7.3.1.6              Sequence Execution                                   26 days
      7.3.1.6.1            Meetings                                           26 days
      7.3.2                S02                                               102 days
    7.3.2.1              Aftermarket/SOP/SSUP Begin                            0 days
    7.3.2.2              Aftermarket Process                         UM       10 days
      7.3.2.2.1            Collect Resolved ECARS inputs                        1 day
      7.3.2.2.2            Work Final Sequence Trades & Changes                6 days
      7.3.2.2.3            Submit SCRs                                         6 days
      7.3.2.2.4            SCR Approval & Update SOP/CIMS                      3 days
      7.3.2.2.5            Project Briefing                                     1 day
    7.3.2.3              SOP Update                                  UM       15 days
      7.3.2.3.1            Update Detailed Design (Internal & PDT)             9 days
      7.3.2.3.2            Submit SCRs                                         3 days
      7.3.2.3.3            Final SASF due                                      0 days
      7.3.2.3.4            Sequence Review                                      1 day
      7.3.2.3.5            Power Profiles                                       1 day
      7.3.2.3.6            Flight Rules & Constraints Checks                    1 day
      7.3.2.3.7            Lag in Process                                      3 days
    7.3.2.4              Sequence Generation                         UM       47 days
      7.3.2.4.1            Detailed Design Update                             20 days
    7.3.2.4.2          IEB Generation                                    20 days
    7.3.2.4.3          Sequence "Delta" Review                            5 days
    7.3.2.4.4          State vector generation & prediction      UM       6 days
    7.3.2.4.5          SAM Group Table Production                GSFC    20 days
      7.3.2.4.5.1        Group Table Design                              20 days
      7.3.2.4.5.2        Group Table Generation                          20 days
      7.3.2.4.5.3        Test & Validate                                 20 days
    7.3.2.4.6          Remaining of SSUP Process Support                 21 days
  7.3.2.5            SPVT & SSUP support                         UM      76 days
    7.3.2.5.1          Meeting Support                                   76 days
    7.3.2.5.2          Response to Meeting Actions                       76 days
  7.3.2.6            Sequence Execution                                  31 days
    7.3.2.6.1          Meetings                                          31 days
7.3.3               S03                                                 102 days
  7.3.3.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.3.2            Aftermarket Process                         UM      10 days
    7.3.3.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.3.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.3.2.3          Submit SCRs                                        6 days
    7.3.3.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.3.2.5          Project Briefing                                    1 day
  7.3.3.3            SOP Update                                  UM      15 days
    7.3.3.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.3.3.2          Submit SCRs                                        3 days
    7.3.3.3.3          Final SASF due                                     0 days
    7.3.3.3.4          Sequence Review                                     1 day
    7.3.3.3.5          Power Profiles                                      1 day
    7.3.3.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.3.3.7          Lag in Process                                     3 days
  7.3.3.4            Sequence Generation                         UM      46 days
    7.3.3.4.1          Detailed Design Update                            20 days
    7.3.3.4.2          IEB Generation                                    20 days
    7.3.3.4.3          Sequence "Delta" Review                            5 days
    7.3.3.4.4          State vector generation & prediction      UM       5 days
    7.3.3.4.5          SAM Group Table Production                GSFC    20 days
      7.3.3.4.5.1        Group Table Design                              20 days
      7.3.3.4.5.2        Group Table Generation                          20 days
      7.3.3.4.5.3        Test & Validate                                 20 days
    7.3.3.4.6          Remaining of SSUP Process Support                 21 days
  7.3.3.5            SPVT & SSUP support                         UM      76 days
    7.3.3.5.1          Meeting Support                                   76 days
    7.3.3.5.2          Response to Meeting Actions                       76 days
  7.3.3.6            Sequence Execution                                  31 days
    7.3.3.6.1          Meetings                                          31 days
7.3.4               S04                                                 102 days
  7.3.4.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.4.2            Aftermarket Process                         UM      10 days
    7.3.4.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.4.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.4.2.3          Submit SCRs                                        6 days
    7.3.4.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.4.2.5          Project Briefing                                    1 day
  7.3.4.3            SOP Update                                  UM      15 days
    7.3.4.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.4.3.2          Submit SCRs                                        3 days
    7.3.4.3.3          Final SASF due                                     0 days
    7.3.4.3.4          Sequence Review                                     1 day
    7.3.4.3.5          Power Profiles                                      1 day
    7.3.4.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.4.3.7          Lag in Process                                     3 days
  7.3.4.4            Sequence Generation                         UM      51 days
    7.3.4.4.1          Detailed Design Update                            20 days
    7.3.4.4.2          IEB Generation                                    20 days
    7.3.4.4.3          Sequence "Delta" Review                            5 days
    7.3.4.4.4          State vector generation & prediction      UM       5 days
    7.3.4.4.5          SAM Group Table Production                GSFC    20 days
      7.3.4.4.5.1        Group Table Design                              20 days
      7.3.4.4.5.2        Group Table Generation                          20 days
      7.3.4.4.5.3        Test & Validate                                 20 days
    7.3.4.4.6          Remaining of SSUP Process Support                 26 days
  7.3.4.5            SPVT & SSUP support                         UM      76 days
    7.3.4.5.1          Meeting Support                                   76 days
    7.3.4.5.2          Response to Meeting Actions                       76 days
  7.3.4.6            Sequence Execution                                  26 days
    7.3.4.6.1          Meetings                                          26 days
7.3.5               S05                                                 102 days
  7.3.5.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.5.2            Aftermarket Process                         UM      10 days
    7.3.5.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.5.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.5.2.3          Submit SCRs                                        6 days
    7.3.5.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.5.2.5          Project Briefing                                    1 day
  7.3.5.3            SOP Update                                  UM      15 days
    7.3.5.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.5.3.2          Submit SCRs                                        3 days
    7.3.5.3.3          Final SASF due                                     0 days
    7.3.5.3.4          Sequence Review                                     1 day
    7.3.5.3.5          Power Profiles                                      1 day
    7.3.5.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.5.3.7          Lag in Process                                     3 days
  7.3.5.4            Sequence Generation                         UM      46 days
    7.3.5.4.1          Detailed Design Update                            20 days
    7.3.5.4.2          IEB Generation                                    20 days
    7.3.5.4.3          Sequence "Delta" Review                            5 days
    7.3.5.4.4          State vector generation & prediction      UM       5 days
    7.3.5.4.5          SAM Group Table Production                GSFC    20 days
      7.3.5.4.5.1        Group Table Design                              20 days
      7.3.5.4.5.2        Group Table Generation                          20 days
      7.3.5.4.5.3        Test & Validate                                 20 days
    7.3.5.4.6          Remaining of SSUP Process Support                 21 days
  7.3.5.5            SPVT & SSUP support                         UM      76 days
    7.3.5.5.1          Meeting Support                                   76 days
    7.3.5.5.2          Response to Meeting Actions                       76 days
  7.3.5.6            Sequence Execution                                  31 days
    7.3.5.6.1          Meetings                                          31 days
7.3.6               S06                                                 102 days
  7.3.6.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.6.2            Aftermarket Process                         UM      10 days
    7.3.6.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.6.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.6.2.3          Submit SCRs                                        6 days
    7.3.6.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.6.2.5          Project Briefing                                    1 day
  7.3.6.3            SOP Update                                  UM      15 days
    7.3.6.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.6.3.2          Submit SCRs                                        3 days
    7.3.6.3.3          Final SASF due                                     0 days
    7.3.6.3.4          Sequence Review                                     1 day
    7.3.6.3.5          Power Profiles                                      1 day
    7.3.6.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.6.3.7          Lag in Process                                     3 days
  7.3.6.4            Sequence Generation                         UM      51 days
    7.3.6.4.1          Detailed Design Update                            20 days
    7.3.6.4.2          IEB Generation                                    20 days
    7.3.6.4.3          Sequence "Delta" Review                            5 days
    7.3.6.4.4          State vector generation & prediction      UM       5 days
    7.3.6.4.5          SAM Group Table Production                GSFC    20 days
      7.3.6.4.5.1        Group Table Design                              20 days
      7.3.6.4.5.2        Group Table Generation                          20 days
      7.3.6.4.5.3        Test & Validate                                 20 days
    7.3.6.4.6          Remaining of SSUP Process Support                 26 days
  7.3.6.5            SPVT & SSUP support                         UM      76 days
    7.3.6.5.1          Meeting Support                                   76 days
    7.3.6.5.2          Response to Meeting Actions                       76 days
  7.3.6.6            Sequence Execution                                  26 days
    7.3.6.6.1          Meetings                                          26 days
7.3.7               S07                                                 102 days
  7.3.7.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.7.2            Aftermarket Process                         UM       9 days
    7.3.7.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.7.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.7.2.3          Submit SCRs                                        6 days
    7.3.7.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.7.2.5          Project Briefing                                   0 days
  7.3.7.3            SOP Update                                  UM      14 days
    7.3.7.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.7.3.2          Submit SCRs                                        3 days
    7.3.7.3.3          Final SASF due                                     0 days
    7.3.7.3.4          Sequence Review                                     1 day
    7.3.7.3.5          Power Profiles                                      1 day
    7.3.7.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.7.3.7          Lag in Process                                     2 days
  7.3.7.4            Sequence Generation                         UM      51 days
    7.3.7.4.1          Detailed Design Update                            20 days
    7.3.7.4.2          IEB Generation                                    20 days
    7.3.7.4.3          Sequence "Delta" Review                            5 days
    7.3.7.4.4          State vector generation & prediction      UM       5 days
    7.3.7.4.5          SAM Group Table Production                GSFC    20 days
      7.3.7.4.5.1        Group Table Design                              20 days
      7.3.7.4.5.2        Group Table Generation                          20 days
      7.3.7.4.5.3        Test & Validate                                 20 days
    7.3.7.4.6          Remaining of SSUP Process Support                 26 days
  7.3.7.5            SPVT & SSUP support                         UM      76 days
    7.3.7.5.1          Meeting Support                                   76 days
    7.3.7.5.2          Response to Meeting Actions                       76 days
  7.3.7.6            Sequence Execution                                  26 days
    7.3.7.6.1          Meetings                                          26 days
7.3.8               S08                                                 102 days
  7.3.8.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.8.2            Aftermarket Process                         UM       9 days
    7.3.8.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.8.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.8.2.3          Submit SCRs                                        6 days
    7.3.8.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.8.2.5          Project Briefing                                   0 days
  7.3.8.3            SOP Update                                  UM      14 days
    7.3.8.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.8.3.2          Submit SCRs                                        3 days
    7.3.8.3.3          Final SASF due                                     0 days
    7.3.8.3.4          Sequence Review                                     1 day
    7.3.8.3.5          Power Profiles                                      1 day
    7.3.8.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.8.3.7          Lag in Process                                     2 days
  7.3.8.4            Sequence Generation                         UM      51 days
    7.3.8.4.1          Detailed Design Update                            20 days
    7.3.8.4.2          IEB Generation                                    20 days
    7.3.8.4.3          Sequence "Delta" Review                            5 days
    7.3.8.4.4          State vector generation & prediction      UM       5 days
    7.3.8.4.5          SAM Group Table Production                GSFC    20 days
      7.3.8.4.5.1        Group Table Design                              20 days
      7.3.8.4.5.2        Group Table Generation                          20 days
      7.3.8.4.5.3        Test & Validate                                 20 days
    7.3.8.4.6          Remaining of SSUP Process Support                 26 days
  7.3.8.5            SPVT & SSUP support                         UM      76 days
    7.3.8.5.1          Meeting Support                                   76 days
    7.3.8.5.2          Response to Meeting Actions                       76 days
  7.3.8.6            Sequence Execution                                  21 days
    7.3.8.6.1          Meetings                                          21 days
7.3.9               S09                                                 102 days
  7.3.9.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.9.2            Aftermarket Process                         UM       9 days
    7.3.9.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.9.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.9.2.3          Submit SCRs                                        6 days
    7.3.9.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.9.2.5          Project Briefing                                   0 days
  7.3.9.3            SOP Update                                  UM      14 days
    7.3.9.3.1           Update Detailed Design (Internal & PDT)            9 days
    7.3.9.3.2           Submit SCRs                                        3 days
    7.3.9.3.3           Final SASF due                                     0 days
    7.3.9.3.4           Sequence Review                                     1 day
    7.3.9.3.5           Power Profiles                                      1 day
    7.3.9.3.6           Flight Rules & Constraints Checks                   1 day
    7.3.9.3.7           Lag in Process                                     2 days
  7.3.9.4             Sequence Generation                         UM      51 days
    7.3.9.4.1           Detailed Design Update                            20 days
    7.3.9.4.2           IEB Generation                                    20 days
    7.3.9.4.3           Sequence "Delta" Review                            5 days
    7.3.9.4.4           State vector generation & prediction      UM       5 days
    7.3.9.4.5           SAM Group Table Production                GSFC    20 days
      7.3.9.4.5.1         Group Table Design                              20 days
      7.3.9.4.5.2         Group Table Generation                          20 days
      7.3.9.4.5.3         Test & Validate                                 20 days
    7.3.9.4.6           Remaining of SSUP Process Support                 26 days
  7.3.9.5             SPVT & SSUP support                         UM      76 days
    7.3.9.5.1           Meeting Support                                   76 days
    7.3.9.5.2           Response to Meeting Actions                       76 days
  7.3.9.6             Sequence Execution                                  26 days
    7.3.9.6.1           Meetings                                          26 days
7.3.10               S10                                                 102 days
  7.3.10.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.10.2            Aftermarket Process                         UM       9 days
    7.3.10.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.10.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.10.2.3          Submit SCRs                                        6 days
    7.3.10.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.10.2.5          Project Briefing                                   0 days
  7.3.10.3            SOP Update                                  UM      14 days
    7.3.10.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.10.3.2          Submit SCRs                                        3 days
    7.3.10.3.3          Final SASF due                                     0 days
    7.3.10.3.4          Sequence Review                                     1 day
    7.3.10.3.5          Power Profiles                                      1 day
    7.3.10.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.10.3.7          Lag in Process                                     2 days
  7.3.10.4            Sequence Generation                         UM      51 days
    7.3.10.4.1          Detailed Design Update                            20 days
    7.3.10.4.2          IEB Generation                                    20 days
    7.3.10.4.3          Sequence "Delta" Review                            5 days
    7.3.10.4.4          State vector generation & prediction      UM       5 days
    7.3.10.4.5          SAM Group Table Production                GSFC    20 days
      7.3.10.4.5.1        Group Table Design                              20 days
      7.3.10.4.5.2        Group Table Generation                          20 days
      7.3.10.4.5.3        Test & Validate                                 20 days
    7.3.10.4.6          Remaingin of SSUP Process Support                 26 days
  7.3.10.5            SPVT & SSUP support                         UM      76 days
    7.3.10.5.1          Meeting Support                                   76 days
    7.3.10.5.2          Response to Meeting Actions                       76 days
  7.3.10.6            Sequence Execution                                  26 days
    7.3.10.6.1          Meetings                                          26 days
7.3.11               S11                                                 102 days
  7.3.11.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.11.2            Aftermarket Process                         UM       9 days
    7.3.11.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.11.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.11.2.3          Submit SCRs                                        6 days
    7.3.11.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.11.2.5          Project Briefing                                   0 days
  7.3.11.3            SOP Update                                  UM      14 days
    7.3.11.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.11.3.2          Submit SCRs                                        3 days
    7.3.11.3.3          Final SASF due                                     0 days
    7.3.11.3.4          Sequence Review                                     1 day
    7.3.11.3.5          Power Profiles                                      1 day
    7.3.11.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.11.3.7          Lag in Process                                     2 days
  7.3.11.4            Sequence Generation                         UM      51 days
    7.3.11.4.1          Detailed Design Update                            20 days
    7.3.11.4.2          IEB Generation                                    20 days
    7.3.11.4.3          Sequence "Delta" Review                            5 days
    7.3.11.4.4          State vector generation & prediction      UM       5 days
    7.3.11.4.5          SAM Group Table Production                GSFC    20 days
      7.3.11.4.5.1        Group Table Design                              20 days
      7.3.11.4.5.2        Group Table Generation                          20 days
      7.3.11.4.5.3        Test & Validate                                 20 days
    7.3.11.4.6          Remaining of SSUP Process Support                 26 days
  7.3.11.5            SPVT & SSUP support                         UM      76 days
    7.3.11.5.1          Meeting Support                                   76 days
    7.3.11.5.2          Response to Meeting Actions                       76 days
  7.3.11.6            Sequence Execution                                  26 days
    7.3.11.6.1          Meetings                                          26 days
7.3.12               S12                                                 102 days
  7.3.12.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.12.2            Aftermarket Process                         UM      10 days
    7.3.12.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.12.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.12.2.3          Submit SCRs                                        6 days
    7.3.12.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.12.2.5          Project Briefing                                    1 day
  7.3.12.3            SOP Update                                  UM      15 days
    7.3.12.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.12.3.2          Submit SCRs                                        3 days
    7.3.12.3.3          Final SASF due                                     0 days
    7.3.12.3.4          Sequence Review                                     1 day
    7.3.12.3.5          Power Profiles                                      1 day
    7.3.12.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.12.3.7          Lag in Process                                     3 days
  7.3.12.4            Sequence Generation                         UM      47 days
    7.3.12.4.1          Detailed Design Update                            20 days
    7.3.12.4.2          IEB Generation                                    20 days
    7.3.12.4.3          Sequence "Delta" Review                            6 days
    7.3.12.4.4          State vector generation & prediction      UM       6 days
    7.3.12.4.5          SAM Group Table Production                GSFC    20 days
      7.3.12.4.5.1        Group Table Design                              20 days
      7.3.12.4.5.2        Group Table Generation                          20 days
      7.3.12.4.5.3        Test & Validate                                 20 days
    7.3.12.4.6          Remaining of SSUP Process Support                 21 days
  7.3.12.5            SPVT & SSUP support                         UM      76 days
    7.3.12.5.1          Meeting Support                                   76 days
    7.3.12.5.2          Response to Meeting Actions                       76 days
  7.3.12.6            Sequence Execution                                  31 days
    7.3.12.6.1          Meetings                                          31 days
7.3.13               S13                                                 102 days
  7.3.13.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.13.2            Aftermarket Process                         UM      10 days
    7.3.13.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.13.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.13.2.3          Submit SCRs                                        6 days
    7.3.13.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.13.2.5          Project Briefing                                    1 day
  7.3.13.3            SOP Update                                  UM      15 days
    7.3.13.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.13.3.2          Submit SCRs                                        3 days
    7.3.13.3.3          Final SASF due                                     0 days
    7.3.13.3.4          Sequence Review                                     1 day
    7.3.13.3.5          Power Profiles                                      1 day
    7.3.13.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.13.3.7          Lag in Process                                     3 days
  7.3.13.4            Sequence Generation                         UM      56 days
    7.3.13.4.1          Detailed Design Update                            20 days
    7.3.13.4.2          IEB Generation                                    20 days
    7.3.13.4.3          Sequence "Delta" Review                            5 days
    7.3.13.4.4          State vector generation & prediction      UM       5 days
    7.3.13.4.5          SAM Group Table Production                GSFC    20 days
      7.3.13.4.5.1        Group Table Design                              20 days
      7.3.13.4.5.2        Group Table Generation                          20 days
      7.3.13.4.5.3        Test & Validate                                 20 days
    7.3.13.4.6          Remaining of SSUP Process Support                 31 days
  7.3.13.5            SPVT & SSUP support                         UM      76 days
    7.3.13.5.1          Meeting Support                                   76 days
    7.3.13.5.2          Response to Meeting Actions                       76 days
  7.3.13.6            Sequence Execution                                  21 days
    7.3.13.6.1          Meetings                                          21 days
7.3.14               S14                                                 102 days
  7.3.14.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.14.2            Aftermarket Process                         UM      10 days
    7.3.14.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.14.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.14.2.3          Submit SCRs                                        6 days
    7.3.14.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.14.2.5          Project Briefing                                    1 day
  7.3.14.3            SOP Update                                  UM      15 days
    7.3.14.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.14.3.2          Submit SCRs                                        3 days
    7.3.14.3.3          Final SASF due                                     0 days
    7.3.14.3.4          Sequence Review                                     1 day
    7.3.14.3.5          Power Profiles                                      1 day
    7.3.14.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.14.3.7          Lag in Process                                     3 days
  7.3.14.4            Sequence Generation                         UM      51 days
    7.3.14.4.1          Detailed Design Update                            20 days
    7.3.14.4.2          IEB Generation                                    20 days
    7.3.14.4.3          Sequence "Delta" Review                            5 days
    7.3.14.4.4          State vector generation & prediction      UM       5 days
    7.3.14.4.5          SAM Group Table Production                GSFC    20 days
      7.3.14.4.5.1        Group Table Design                              20 days
      7.3.14.4.5.2        Group Table Generation                          20 days
      7.3.14.4.5.3        Test & Validate                                 20 days
    7.3.14.4.6          Remaining of SSUP Process Support                 26 days
  7.3.14.5            SPVT & SSUP support                         UM      76 days
    7.3.14.5.1          Meeting Support                                   76 days
    7.3.14.5.2          Response to Meeting Actions                       76 days
  7.3.14.6            Sequence Execution                                  26 days
    7.3.14.6.1          Meetings                                          26 days
7.3.15               S15                                                 102 days
  7.3.15.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.15.2            Aftermarket Process                         UM      10 days
    7.3.15.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.15.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.15.2.3          Submit SCRs                                        6 days
    7.3.15.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.15.2.5          Project Briefing                                    1 day
  7.3.15.3            SOP Update                                  UM      15 days
    7.3.15.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.15.3.2          Submit SCRs                                        3 days
    7.3.15.3.3          Final SASF due                                     0 days
    7.3.15.3.4          Sequence Review                                     1 day
    7.3.15.3.5          Power Profiles                                      1 day
    7.3.15.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.15.3.7          Lag in Process                                     3 days
  7.3.15.4            Sequence Generation                         UM      46 days
    7.3.15.4.1          Detailed Design Update                            20 days
    7.3.15.4.2          IEB Generation                                    20 days
    7.3.15.4.3          Sequence "Delta" Review                            5 days
    7.3.15.4.4          State vector generation & prediction      UM       5 days
    7.3.15.4.5          SAM Group Table Production                GSFC    20 days
      7.3.15.4.5.1        Group Table Design                              20 days
      7.3.15.4.5.2        Group Table Generation                          20 days
      7.3.15.4.5.3        Test & Validate                                 20 days
    7.3.15.4.6          Remaining of SSUP Process Support                 21 days
  7.3.15.5            SPVT & SSUP support                         UM      76 days
    7.3.15.5.1          Meeting Support                                   76 days
    7.3.15.5.2          Response to Meeting Actions                       76 days
  7.3.15.6            Sequence Execution                                  31 days
    7.3.15.6.1          Meetings                                          31 days
7.3.16               S16                                                 102 days
  7.3.16.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.16.2            Aftermarket Process                         UM      10 days
    7.3.16.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.16.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.16.2.3          Submit SCRs                                        6 days
    7.3.16.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.16.2.5          Project Briefing                                    1 day
  7.3.16.3            SOP Update                                  UM      15 days
    7.3.16.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.16.3.2          Submit SCRs                                        3 days
    7.3.16.3.3          Final SASF due                                     0 days
    7.3.16.3.4          Sequence Review                                     1 day
    7.3.16.3.5          Power Profiles                                      1 day
    7.3.16.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.16.3.7          Lag in Process                                     3 days
  7.3.16.4            Sequence Generation                         UM      51 days
    7.3.16.4.1          Detailed Design Update                            20 days
    7.3.16.4.2          IEB Generation                                    20 days
    7.3.16.4.3          Sequence "Delta" Review                            5 days
    7.3.16.4.4          State vector generation & prediction      UM       5 days
    7.3.16.4.5          SAM Group Table Production                GSFC    20 days
      7.3.16.4.5.1        Group Table Design                              20 days
      7.3.16.4.5.2        Group Table Generation                          20 days
      7.3.16.4.5.3        Test & Validate                                 20 days
    7.3.16.4.6          Remaining of SSUP Process Support                 26 days
  7.3.16.5            SPVT & SSUP support                         UM      76 days
    7.3.16.5.1          Meeting Support                                   76 days
    7.3.16.5.2          Response to Meeting Actions                       76 days
  7.3.16.6            Sequence Execution                                  26 days
    7.3.16.6.1          Meetings                                          26 days
7.3.17               S17                                                 102 days
  7.3.17.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.17.2            Aftermarket Process                         UM       9 days
    7.3.17.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.17.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.17.2.3          Submit SCRs                                        6 days
    7.3.17.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.17.2.5          Project Briefing                                   0 days
  7.3.17.3            SOP Update                                  UM      14 days
    7.3.17.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.17.3.2          Submit SCRs                                        3 days
    7.3.17.3.3          Final SASF due                                     0 days
    7.3.17.3.4          Sequence Review                                     1 day
    7.3.17.3.5          Power Profiles                                      1 day
    7.3.17.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.17.3.7          Lag in Process                                     2 days
  7.3.17.4            Sequence Generation                         UM      51 days
    7.3.17.4.1          Detailed Design Update                            20 days
    7.3.17.4.2          IEB Generation                                    20 days
    7.3.17.4.3          Sequence "Delta" Review                            5 days
    7.3.17.4.4          State vector generation & prediction      UM       5 days
    7.3.17.4.5          SAM Group Table Production                GSFC    20 days
      7.3.17.4.5.1        Group Table Design                              20 days
      7.3.17.4.5.2        Group Table Generation                          20 days
      7.3.17.4.5.3        Test & Validate                                 20 days
    7.3.17.4.6          Remaining of SSUP Process Support                 26 days
  7.3.17.5            SPVT & SSUP support                         UM      76 days
    7.3.17.5.1          Meeting Support                                   76 days
    7.3.17.5.2          Response to Meeting Actions                       76 days
  7.3.17.6            Sequence Execution                                  31 days
    7.3.17.6.1          Meetings                                          31 days
7.3.18               S18                                                 102 days
  7.3.18.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.18.2            Aftermarket Process                         UM       9 days
    7.3.18.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.18.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.18.2.3          Submit SCRs                                        6 days
    7.3.18.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.18.2.5          Project Briefing                                   0 days
  7.3.18.3            SOP Update                                  UM      14 days
    7.3.18.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.18.3.2          Submit SCRs                                        3 days
    7.3.18.3.3          Final SASF due                                     0 days
    7.3.18.3.4          Sequence Review                                     1 day
    7.3.18.3.5          Power Profiles                                      1 day
    7.3.18.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.18.3.7          Lag in Process                                     2 days
  7.3.18.4            Sequence Generation                         UM      51 days
    7.3.18.4.1          Detailed Design Update                            20 days
    7.3.18.4.2          IEB Generation                                    20 days
    7.3.18.4.3          Sequence "Delta" Review                            5 days
    7.3.18.4.4          State vector generation & prediction      UM       5 days
    7.3.18.4.5          SAM Group Table Production                GSFC    20 days
      7.3.18.4.5.1        Group Table Design                              20 days
      7.3.18.4.5.2        Group Table Generation                          20 days
      7.3.18.4.5.3        Test & Validate                                 20 days
    7.3.18.4.6          Remaining of SSUP Process Support                 26 days
  7.3.18.5            SPVT & SSUP support                         UM      76 days
    7.3.18.5.1          Meeting Support                                   76 days
    7.3.18.5.2          Response to Meeting Actions                       76 days
  7.3.18.6            Sequence Execution                                  31 days
    7.3.18.6.1          Meetings                                          31 days
7.3.19               S19                                                 102 days
  7.3.19.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.19.2            Aftermarket Process                         UM       9 days
    7.3.19.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.19.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.19.2.3          Submit SCRs                                        6 days
    7.3.19.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.19.2.5          Project Briefing                                   0 days
  7.3.19.3            SOP Update                                  UM      14 days
    7.3.19.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.19.3.2          Submit SCRs                                        3 days
    7.3.19.3.3          Final SASF due                                     0 days
    7.3.19.3.4          Sequence Review                                     1 day
    7.3.19.3.5          Power Profiles                                      1 day
    7.3.19.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.19.3.7          Lag in Process                                     2 days
  7.3.19.4            Sequence Generation                         UM      51 days
    7.3.19.4.1          Detailed Design Update                            20 days
    7.3.19.4.2          IEB Generation                                    20 days
    7.3.19.4.3          Sequence "Delta" Review                            5 days
    7.3.19.4.4          State vector generation & prediction      UM       5 days
    7.3.19.4.5          SAM Group Table Production                GSFC    20 days
      7.3.19.4.5.1        Group Table Design                              20 days
      7.3.19.4.5.2        Group Table Generation                          20 days
      7.3.19.4.5.3        Test & Validate                                 20 days
    7.3.19.4.6          Remaining of SSUP Process Support                 26 days
  7.3.19.5            SPVT & SSUP support                         UM      76 days
    7.3.19.5.1          Meeting Support                                   76 days
    7.3.19.5.2          Response to Meeting Actions                       76 days
  7.3.19.6            Sequence Execution                                  31 days
    7.3.19.6.1          Meetings                                          31 days
7.3.20               S20                                                 102 days
  7.3.20.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.20.2            Aftermarket Process                         UM       9 days
    7.3.20.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.20.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.20.2.3          Submit SCRs                                        6 days
    7.3.20.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.20.2.5          Project Briefing                                   0 days
  7.3.20.3            SOP Update                                  UM      14 days
    7.3.20.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.20.3.2          Submit SCRs                                        3 days
    7.3.20.3.3          Final SASF due                                     0 days
    7.3.20.3.4          Sequence Review                                     1 day
    7.3.20.3.5          Power Profiles                                      1 day
    7.3.20.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.20.3.7          Lag in Process                                     2 days
  7.3.20.4            Sequence Generation                         UM      51 days
    7.3.20.4.1          Detailed Design Update                            20 days
    7.3.20.4.2          IEB Generation                                    20 days
    7.3.20.4.3          Sequence "Delta" Review                            5 days
    7.3.20.4.4          State vector generation & prediction      UM       5 days
    7.3.20.4.5          SAM Group Table Production                GSFC    20 days
      7.3.20.4.5.1        Group Table Design                              20 days
      7.3.20.4.5.2        Group Table Generation                          20 days
      7.3.20.4.5.3        Test & Validate                                 20 days
    7.3.20.4.6          Remaining of SSUP Process Support                 26 days
  7.3.20.5            SPVT & SSUP support                         UM      76 days
    7.3.20.5.1          Meeting Support                                   76 days
    7.3.20.5.2          Response to Meeting Actions                       76 days
  7.3.20.6            Sequence Execution                                  32 days
    7.3.20.6.1          Meetings                                          32 days
7.3.21               S21                                                 102 days
  7.3.21.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.21.2            Aftermarket Process                         UM       9 days
    7.3.21.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.21.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.21.2.3          Submit SCRs                                        6 days
    7.3.21.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.21.2.5          Project Briefing                                   0 days
  7.3.21.3            SOP Update                                  UM      14 days
    7.3.21.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.21.3.2          Submit SCRs                                        3 days
    7.3.21.3.3          Final SASF due                                     0 days
    7.3.21.3.4          Sequence Review                                     1 day
    7.3.21.3.5          Power Profiles                                      1 day
    7.3.21.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.21.3.7          Lag in Process                                     2 days
  7.3.21.4            Sequence Generation                         UM      51 days
    7.3.21.4.1          Detailed Design Update                            20 days
    7.3.21.4.2          IEB Generation                                    20 days
    7.3.21.4.3          Sequence "Delta" Review                            5 days
    7.3.21.4.4          State vector generation & prediction      UM       5 days
    7.3.21.4.5          SAM Group Table Production                GSFC    20 days
      7.3.21.4.5.1        Group Table Design                              20 days
      7.3.21.4.5.2        Group Table Generation                          20 days
      7.3.21.4.5.3        Test & Validate                                 20 days
    7.3.21.4.6          Remaining of SSUP Process Support                 26 days
  7.3.21.5            SPVT & SSUP support                         UM      76 days
    7.3.21.5.1          Meeting Support                                   76 days
    7.3.21.5.2          Response to Meeting Actions                       76 days
  7.3.21.6            Sequence Execution                                  31 days
    7.3.21.6.1          Meetings                                          31 days
7.3.22               S22                                                 102 days
  7.3.22.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.22.2            Aftermarket Process                         UM      10 days
    7.3.22.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.22.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.22.2.3          Submit SCRs                                        6 days
    7.3.22.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.22.2.5          Project Briefing                                    1 day
  7.3.22.3            SOP Update                                  UM      15 days
    7.3.22.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.22.3.2          Submit SCRs                                        3 days
    7.3.22.3.3          Final SASF due                                     0 days
    7.3.22.3.4          Sequence Review                                     1 day
    7.3.22.3.5          Power Profiles                                      1 day
    7.3.22.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.22.3.7          Lag in Process                                     3 days
  7.3.22.4            Sequence Generation                         UM      52 days
    7.3.22.4.1          Detailed Design Update                            20 days
    7.3.22.4.2          IEB Generation                                    20 days
    7.3.22.4.3          Sequence "Delta" Review                            6 days
    7.3.22.4.4          State vector generation & prediction      UM       6 days
    7.3.22.4.5          SAM Group Table Production                GSFC    20 days
      7.3.22.4.5.1        Group Table Design                              20 days
      7.3.22.4.5.2        Group Table Generation                          20 days
      7.3.22.4.5.3        Test & Validate                                 20 days
    7.3.22.4.6          Remaining of SSUP Process Support                 26 days
  7.3.22.5            SPVT & SSUP support                         UM      76 days
    7.3.22.5.1          Meeting Support                                   76 days
    7.3.22.5.2          Response to Meeting Actions                       76 days
  7.3.22.6            Sequence Execution                                  26 days
    7.3.22.6.1          Meetings                                          26 days
7.3.23               S23                                                 102 days
  7.3.23.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.23.2            Aftermarket Process                         UM      10 days
    7.3.23.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.23.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.23.2.3          Submit SCRs                                        6 days
    7.3.23.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.23.2.5          Project Briefing                                    1 day
  7.3.23.3            SOP Update                                  UM      15 days
    7.3.23.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.23.3.2          Submit SCRs                                        3 days
    7.3.23.3.3          Final SASF due                                     0 days
    7.3.23.3.4          Sequence Review                                     1 day
    7.3.23.3.5          Power Profiles                                      1 day
    7.3.23.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.23.3.7          Lag in Process                                     3 days
  7.3.23.4            Sequence Generation                         UM      51 days
    7.3.23.4.1          Detailed Design Update                            20 days
    7.3.23.4.2          IEB Generation                                    20 days
    7.3.23.4.3          Sequence "Delta" Review                            5 days
    7.3.23.4.4          State vector generation & prediction      UM       5 days
    7.3.23.4.5          SAM Group Table Production                GSFC    20 days
      7.3.23.4.5.1        Group Table Design                              20 days
      7.3.23.4.5.2        Group Table Generation                          20 days
      7.3.23.4.5.3        Test & Validate                                 20 days
    7.3.23.4.6          Remaining of SSUP Process Support                 26 days
  7.3.23.5            SPVT & SSUP support                         UM      76 days
    7.3.23.5.1          Meeting Support                                   76 days
    7.3.23.5.2          Response to Meeting Actions                       76 days
  7.3.23.6            Sequence Execution                                  20 days
    7.3.23.6.1          Meetings                                          20 days
7.3.24               S24                                                 102 days
  7.3.24.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.24.2            Aftermarket Process                         UM      10 days
    7.3.24.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.24.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.24.2.3          Submit SCRs                                        6 days
    7.3.24.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.24.2.5          Project Briefing                                    1 day
  7.3.24.3            SOP Update                                  UM      15 days
    7.3.24.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.24.3.2          Submit SCRs                                        3 days
    7.3.24.3.3          Final SASF due                                     0 days
    7.3.24.3.4          Sequence Review                                     1 day
    7.3.24.3.5          Power Profiles                                      1 day
    7.3.24.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.24.3.7          Lag in Process                                     3 days
  7.3.24.4            Sequence Generation                         UM      51 days
    7.3.24.4.1          Detailed Design Update                            20 days
    7.3.24.4.2          IEB Generation                                    20 days
    7.3.24.4.3          Sequence "Delta" Review                            5 days
    7.3.24.4.4          State vector generation & prediction      UM       5 days
    7.3.24.4.5          SAM Group Table Production                GSFC    20 days
      7.3.24.4.5.1        Group Table Design                              20 days
      7.3.24.4.5.2        Group Table Generation                          20 days
      7.3.24.4.5.3        Test & Validate                                 20 days
    7.3.24.4.6          Remaining of SSUP Process Support                 26 days
  7.3.24.5            SPVT & SSUP support                         UM      76 days
    7.3.24.5.1          Meeting Support                                   76 days
    7.3.24.5.2          Response to Meeting Actions                       76 days
  7.3.24.6            Sequence Execution                                  26 days
    7.3.24.6.1          Meetings                                          26 days
7.3.25               S25                                                 102 days
  7.3.25.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.25.2            Aftermarket Process                         UM      10 days
    7.3.25.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.25.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.25.2.3          Submit SCRs                                        6 days
    7.3.25.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.25.2.5          Project Briefing                                    1 day
  7.3.25.3            SOP Update                                  UM      15 days
    7.3.25.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.25.3.2          Submit SCRs                                        3 days
    7.3.25.3.3          Final SASF due                                     0 days
    7.3.25.3.4          Sequence Review                                     1 day
    7.3.25.3.5          Power Profiles                                      1 day
    7.3.25.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.25.3.7          Lag in Process                                     3 days
  7.3.25.4            Sequence Generation                         UM      46 days
    7.3.25.4.1          Detailed Design Update                            20 days
    7.3.25.4.2          IEB Generation                                    20 days
    7.3.25.4.3          Sequence "Delta" Review                            5 days
    7.3.25.4.4          State vector generation & prediction      UM       5 days
    7.3.25.4.5          SAM Group Table Production                GSFC    20 days
      7.3.25.4.5.1        Group Table Design                              20 days
      7.3.25.4.5.2        Group Table Generation                          20 days
      7.3.25.4.5.3        Test & Validate                                 20 days
    7.3.25.4.6          Remaining of SSUP Process Support                 21 days
  7.3.25.5            SPVT & SSUP support                         UM      76 days
    7.3.25.5.1          Meeting Support                                   76 days
    7.3.25.5.2          Response to Meeting Actions                       76 days
  7.3.25.6            Sequence Execution                                  26 days
    7.3.25.6.1          Meetings                                          26 days
7.3.26               S26                                                 102 days
  7.3.26.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.26.2            Aftermarket Process                         UM      10 days
    7.3.26.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.26.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.26.2.3          Submit SCRs                                        6 days
    7.3.26.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.26.2.5          Project Briefing                                    1 day
  7.3.26.3            SOP Update                                  UM      15 days
    7.3.26.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.26.3.2          Submit SCRs                                        3 days
    7.3.26.3.3          Final SASF due                                     0 days
    7.3.26.3.4          Sequence Review                                     1 day
    7.3.26.3.5          Power Profiles                                      1 day
    7.3.26.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.26.3.7          Lag in Process                                     3 days
  7.3.26.4            Sequence Generation                         UM      51 days
    7.3.26.4.1          Detailed Design Update                            20 days
    7.3.26.4.2          IEB Generation                                    20 days
    7.3.26.4.3          Sequence "Delta" Review                            5 days
    7.3.26.4.4          State vector generation & prediction      UM       5 days
    7.3.26.4.5          SAM Group Table Production                GSFC    20 days
      7.3.26.4.5.1        Group Table Design                              20 days
      7.3.26.4.5.2        Group Table Generation                          20 days
      7.3.26.4.5.3        Test & Validate                                 20 days
    7.3.26.4.6          Remaining of SSUP Process Support                 26 days
  7.3.26.5            SPVT & SSUP support                         UM      76 days
    7.3.26.5.1          Meeting Support                                   76 days
    7.3.26.5.2          Response to Meeting Actions                       76 days
  7.3.26.6            Sequence Execution                                  31 days
    7.3.26.6.1          Meetings                                          31 days
7.3.27               S27                                                 102 days
  7.3.27.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.27.2            Aftermarket Process                         UM       9 days
    7.3.27.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.27.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.27.2.3          Submit SCRs                                        6 days
    7.3.27.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.27.2.5          Project Briefing                                   0 days
  7.3.27.3            SOP Update                                  UM      14 days
    7.3.27.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.27.3.2          Submit SCRs                                        3 days
    7.3.27.3.3          Final SASF due                                     0 days
    7.3.27.3.4          Sequence Review                                     1 day
    7.3.27.3.5          Power Profiles                                      1 day
    7.3.27.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.27.3.7          Lag in Process                                     2 days
  7.3.27.4            Sequence Generation                         UM      51 days
    7.3.27.4.1          Detailed Design Update                            20 days
    7.3.27.4.2          IEB Generation                                    20 days
    7.3.27.4.3          Sequence "Delta" Review                            5 days
    7.3.27.4.4          State vector generation & prediction      UM       5 days
    7.3.27.4.5          SAM Group Table Production                GSFC    20 days
      7.3.27.4.5.1        Group Table Design                              20 days
      7.3.27.4.5.2        Group Table Generation                          20 days
      7.3.27.4.5.3        Test & Validate                                 20 days
    7.3.27.4.6          Remaining of SSUP Process Support                 26 days
  7.3.27.5            SPVT & SSUP support                         UM      76 days
    7.3.27.5.1          Meeting Support                                   76 days
    7.3.27.5.2          Response to Meeting Actions                       76 days
  7.3.27.6            Sequence Execution                                  31 days
    7.3.27.6.1          Meetings                                          31 days
7.3.28               S28                                                 102 days
  7.3.28.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.28.2            Aftermarket Process                         UM       9 days
    7.3.28.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.28.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.28.2.3          Submit SCRs                                        6 days
    7.3.28.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.28.2.5          Project Briefing                                   0 days
  7.3.28.3            SOP Update                                  UM      14 days
    7.3.28.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.28.3.2          Submit SCRs                                        3 days
    7.3.28.3.3          Final SASF due                                     0 days
    7.3.28.3.4          Sequence Review                                     1 day
    7.3.28.3.5          Power Profiles                                      1 day
    7.3.28.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.28.3.7          Lag in Process                                     2 days
  7.3.28.4            Sequence Generation                         UM      51 days
    7.3.28.4.1          Detailed Design Update                            20 days
    7.3.28.4.2          IEB Generation                                    20 days
    7.3.28.4.3          Sequence "Delta" Review                            5 days
    7.3.28.4.4          State vector generation & prediction      UM       5 days
    7.3.28.4.5          SAM Group Table Production                GSFC    20 days
      7.3.28.4.5.1        Group Table Design                              20 days
      7.3.28.4.5.2        Group Table Generation                          20 days
      7.3.28.4.5.3        Test & Validate                                 20 days
    7.3.28.4.6          Remaining of SSUP Process Support                 26 days
  7.3.28.5            SPVT & SSUP support                         UM      76 days
    7.3.28.5.1          Meeting Support                                   76 days
    7.3.28.5.2          Response to Meeting Actions                       76 days
  7.3.28.6            Sequence Execution                                  31 days
    7.3.28.6.1          Meetings                                          31 days
7.3.29               S29                                                 102 days
  7.3.29.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.29.2            Aftermarket Process                         UM       9 days
    7.3.29.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.29.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.29.2.3          Submit SCRs                                        6 days
    7.3.29.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.29.2.5          Project Briefing                                   0 days
  7.3.29.3            SOP Update                                  UM      14 days
    7.3.29.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.29.3.2          Submit SCRs                                        3 days
    7.3.29.3.3          Final SASF due                                     0 days
    7.3.29.3.4          Sequence Review                                     1 day
    7.3.29.3.5          Power Profiles                                      1 day
    7.3.29.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.29.3.7          Lag in Process                                     2 days
  7.3.29.4            Sequence Generation                         UM      51 days
    7.3.29.4.1          Detailed Design Update                            20 days
    7.3.29.4.2          IEB Generation                                    20 days
    7.3.29.4.3          Sequence "Delta" Review                            5 days
    7.3.29.4.4          State vector generation & prediction      UM       5 days
    7.3.29.4.5          SAM Group Table Production                GSFC    20 days
      7.3.29.4.5.1        Group Table Design                              20 days
      7.3.29.4.5.2        Group Table Generation                          20 days
      7.3.29.4.5.3        Test & Validate                                 20 days
    7.3.29.4.6          Remaining of SSUP Process Support                 26 days
  7.3.29.5            SPVT & SSUP support                         UM      76 days
    7.3.29.5.1          Meeting Support                                   76 days
    7.3.29.5.2          Response to Meeting Actions                       76 days
  7.3.29.6            Sequence Execution                                  26 days
    7.3.29.6.1          Meetings                                          26 days
7.3.30               S30                                                 102 days
  7.3.30.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.30.2            Aftermarket Process                         UM       9 days
    7.3.30.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.30.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.30.2.3          Submit SCRs                                        6 days
    7.3.30.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.30.2.5          Project Briefing                                   0 days
  7.3.30.3            SOP Update                                  UM      14 days
    7.3.30.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.30.3.2          Submit SCRs                                        3 days
    7.3.30.3.3          Final SASF due                                     0 days
    7.3.30.3.4          Sequence Review                                     1 day
    7.3.30.3.5          Power Profiles                                      1 day
    7.3.30.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.30.3.7          Lag in Process                                     2 days
  7.3.30.4            Sequence Generation                         UM      51 days
    7.3.30.4.1          Detailed Design Update                            20 days
    7.3.30.4.2          IEB Generation                                    20 days
    7.3.30.4.3          Sequence "Delta" Review                            5 days
    7.3.30.4.4          State vector generation & prediction      UM       5 days
    7.3.30.4.5          SAM Group Table Production                GSFC    20 days
      7.3.30.4.5.1        Group Table Design                              20 days
      7.3.30.4.5.2        Group Table Generation                          20 days
      7.3.30.4.5.3        Test & Validate                                 20 days
    7.3.30.4.6          Remaining of SSUP Process Support                 26 days
  7.3.30.5            SPVT & SSUP support                         UM      76 days
    7.3.30.5.1          Meeting Support                                   76 days
    7.3.30.5.2          Response to Meeting Actions                       76 days
  7.3.30.6            Sequence Execution                                  26 days
    7.3.30.6.1          Meetings                                          26 days
7.3.31               S31                                                 102 days
  7.3.31.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.31.2            Aftermarket Process                         UM       9 days
    7.3.31.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.31.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.31.2.3          Submit SCRs                                        6 days
    7.3.31.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.31.2.5          Project Briefing                                   0 days
  7.3.31.3            SOP Update                                  UM      14 days
    7.3.31.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.31.3.2          Submit SCRs                                        3 days
    7.3.31.3.3          Final SASF due                                     0 days
    7.3.31.3.4          Sequence Review                                     1 day
    7.3.31.3.5          Power Profiles                                      1 day
    7.3.31.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.31.3.7          Lag in Process                                     2 days
  7.3.31.4            Sequence Generation                         UM      51 days
    7.3.31.4.1          Detailed Design Update                            20 days
    7.3.31.4.2          IEB Generation                                    20 days
    7.3.31.4.3          Sequence "Delta" Review                            5 days
    7.3.31.4.4          State vector generation & prediction      UM       5 days
    7.3.31.4.5          SAM Group Table Production                GSFC    20 days
      7.3.31.4.5.1        Group Table Design                              20 days
      7.3.31.4.5.2        Group Table Generation                          20 days
      7.3.31.4.5.3        Test & Validate                                 20 days
    7.3.31.4.6          Remaining of SSUP Process Support                 26 days
  7.3.31.5            SPVT & SSUP support                         UM      76 days
    7.3.31.5.1          Meeting Support                                   76 days
    7.3.31.5.2          Response to Meeting Actions                       76 days
  7.3.31.6            Sequence Execution                                  26 days
    7.3.31.6.1          Meetings                                          26 days
7.3.32               S32                                                 102 days
  7.3.32.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.32.2            Aftermarket Process                         UM      10 days
    7.3.32.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.32.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.32.2.3          Submit SCRs                                        6 days
    7.3.32.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.32.2.5          Project Briefing                                    1 day
  7.3.32.3            SOP Update                                  UM      15 days
    7.3.32.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.32.3.2          Submit SCRs                                        3 days
    7.3.32.3.3          Final SASF due                                     0 days
    7.3.32.3.4          Sequence Review                                     1 day
    7.3.32.3.5          Power Profiles                                      1 day
    7.3.32.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.32.3.7          Lag in Process                                     3 days
  7.3.32.4            Sequence Generation                         UM      47 days
    7.3.32.4.1          Detailed Design Update                            20 days
    7.3.32.4.2          IEB Generation                                    20 days
    7.3.32.4.3          Sequence "Delta" Review                            6 days
    7.3.32.4.4          State vector generation & prediction      UM       6 days
    7.3.32.4.5          SAM Group Table Production                GSFC    20 days
      7.3.32.4.5.1        Group Table Design                              20 days
      7.3.32.4.5.2        Group Table Generation                          20 days
      7.3.32.4.5.3        Test & Validate                                 20 days
    7.3.32.4.6          Remaining of SSUP Process Support                 21 days
  7.3.32.5            SPVT & SSUP support                         UM      76 days
    7.3.32.5.1          Meeting Support                                   76 days
    7.3.32.5.2          Response to Meeting Actions                       76 days
  7.3.32.6            Sequence Execution                                  21 days
    7.3.32.6.1          Meetings                                          21 days
7.3.33               S33                                                 102 days
  7.3.33.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.33.2            Aftermarket Process                         UM      10 days
    7.3.33.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.33.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.33.2.3          Submit SCRs                                        6 days
    7.3.33.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.33.2.5          Project Briefing                                    1 day
  7.3.33.3            SOP Update                                  UM      15 days
    7.3.33.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.33.3.2          Submit SCRs                                        3 days
    7.3.33.3.3          Final SASF due                                     0 days
    7.3.33.3.4          Sequence Review                                     1 day
    7.3.33.3.5          Power Profiles                                      1 day
    7.3.33.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.33.3.7          Lag in Process                                     3 days
  7.3.33.4            Sequence Generation                         UM      56 days
    7.3.33.4.1          Detailed Design Update                            20 days
    7.3.33.4.2          IEB Generation                                    20 days
    7.3.33.4.3          Sequence "Delta" Review                            5 days
    7.3.33.4.4          State vector generation & prediction      UM       5 days
    7.3.33.4.5          SAM Group Table Production                GSFC    20 days
      7.3.33.4.5.1        Group Table Design                              20 days
      7.3.33.4.5.2        Group Table Generation                          20 days
      7.3.33.4.5.3        Test & Validate                                 20 days
    7.3.33.4.6          Remaining of SSUP Process Support                 31 days
  7.3.33.5            SPVT & SSUP support                         UM      76 days
    7.3.33.5.1          Meeting Support                                   76 days
    7.3.33.5.2          Response to Meeting Actions                       76 days
  7.3.33.6            Sequence Execution                                  31 days
    7.3.33.6.1          Meetings                                          31 days
7.3.34               S34                                                 102 days
  7.3.34.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.34.2            Aftermarket Process                         UM      10 days
    7.3.34.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.34.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.34.2.3          Submit SCRs                                        6 days
    7.3.34.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.34.2.5          Project Briefing                                    1 day
  7.3.34.3            SOP Update                                  UM      15 days
    7.3.34.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.34.3.2          Submit SCRs                                        3 days
    7.3.34.3.3          Final SASF due                                     0 days
    7.3.34.3.4          Sequence Review                                     1 day
    7.3.34.3.5          Power Profiles                                      1 day
    7.3.34.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.34.3.7          Lag in Process                                     3 days
  7.3.34.4            Sequence Generation                         UM      51 days
    7.3.34.4.1          Detailed Design Update                            20 days
    7.3.34.4.2          IEB Generation                                    20 days
    7.3.34.4.3          Sequence "Delta" Review                            5 days
    7.3.34.4.4          State vector generation & prediction      UM       5 days
    7.3.34.4.5          SAM Group Table Production                GSFC    20 days
      7.3.34.4.5.1        Group Table Design                              20 days
      7.3.34.4.5.2        Group Table Generation                          20 days
      7.3.34.4.5.3        Test & Validate                                 20 days
    7.3.34.4.6          Remaining of SSUP Process Support                 26 days
  7.3.34.5            SPVT & SSUP support                         UM      76 days
    7.3.34.5.1          Meeting Support                                   76 days
    7.3.34.5.2          Response to Meeting Actions                       76 days
  7.3.34.6            Sequence Execution                                  31 days
    7.3.34.6.1          Meetings                                          31 days
7.3.35               S35                                                 102 days
  7.3.35.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.35.2            Aftermarket Process                         UM      10 days
    7.3.35.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.35.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.35.2.3          Submit SCRs                                        6 days
    7.3.35.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.35.2.5          Project Briefing                                    1 day
  7.3.35.3            SOP Update                                  UM      15 days
    7.3.35.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.35.3.2          Submit SCRs                                        3 days
    7.3.35.3.3          Final SASF due                                     0 days
    7.3.35.3.4          Sequence Review                                     1 day
    7.3.35.3.5          Power Profiles                                      1 day
    7.3.35.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.35.3.7          Lag in Process                                     3 days
  7.3.35.4            Sequence Generation                         UM      46 days
    7.3.35.4.1          Detailed Design Update                            20 days
    7.3.35.4.2          IEB Generation                                    20 days
    7.3.35.4.3          Sequence "Delta" Review                            5 days
    7.3.35.4.4          State vector generation & prediction      UM       5 days
    7.3.35.4.5          SAM Group Table Production                GSFC    20 days
      7.3.35.4.5.1        Group Table Design                              20 days
      7.3.35.4.5.2        Group Table Generation                          20 days
      7.3.35.4.5.3        Test & Validate                                 20 days
    7.3.35.4.6          Remaining of SSUP Process Support                 21 days
  7.3.35.5            SPVT & SSUP support                         UM      76 days
    7.3.35.5.1          Meeting Support                                   76 days
    7.3.35.5.2          Response to Meeting Actions                       76 days
  7.3.35.6            Sequence Execution                                  31 days
    7.3.35.6.1          Meetings                                          31 days
7.3.36               S36                                                 102 days
  7.3.36.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.36.2            Aftermarket Process                         UM      10 days
    7.3.36.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.36.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.36.2.3          Submit SCRs                                        6 days
    7.3.36.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.36.2.5          Project Briefing                                    1 day
  7.3.36.3            SOP Update                                  UM      15 days
    7.3.36.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.36.3.2          Submit SCRs                                        3 days
    7.3.36.3.3          Final SASF due                                     0 days
    7.3.36.3.4          Sequence Review                                     1 day
    7.3.36.3.5          Power Profiles                                      1 day
    7.3.36.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.36.3.7          Lag in Process                                     3 days
  7.3.36.4            Sequence Generation                         UM      51 days
    7.3.36.4.1          Detailed Design Update                            20 days
    7.3.36.4.2          IEB Generation                                    20 days
    7.3.36.4.3          Sequence "Delta" Review                            5 days
    7.3.36.4.4          State vector generation & prediction      UM       5 days
    7.3.36.4.5          SAM Group Table Production                GSFC    20 days
      7.3.36.4.5.1        Group Table Design                              20 days
      7.3.36.4.5.2        Group Table Generation                          20 days
      7.3.36.4.5.3        Test & Validate                                 20 days
    7.3.36.4.6          Remaining of SSUP Process Support                 26 days
  7.3.36.5            SPVT & SSUP support                         UM      76 days
    7.3.36.5.1          Meeting Support                                   76 days
    7.3.36.5.2          Response to Meeting Actions                       76 days
  7.3.36.6            Sequence Execution                                  26 days
    7.3.36.6.1          Meetings                                          26 days
7.3.37               S37                                                 102 days
  7.3.37.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.37.2            Aftermarket Process                         UM       9 days
    7.3.37.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.37.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.37.2.3          Submit SCRs                                        6 days
    7.3.37.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.37.2.5          Project Briefing                                   0 days
  7.3.37.3            SOP Update                                  UM      14 days
    7.3.37.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.37.3.2          Submit SCRs                                        3 days
    7.3.37.3.3          Final SASF due                                     0 days
    7.3.37.3.4          Sequence Review                                     1 day
    7.3.37.3.5          Power Profiles                                      1 day
    7.3.37.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.37.3.7          Lag in Process                                     2 days
  7.3.37.4            Sequence Generation                         UM      51 days
    7.3.37.4.1          Detailed Design Update                            20 days
    7.3.37.4.2          IEB Generation                                    20 days
    7.3.37.4.3          Sequence "Delta" Review                            5 days
    7.3.37.4.4          State vector generation & prediction      UM       5 days
    7.3.37.4.5          SAM Group Table Production                GSFC    20 days
      7.3.37.4.5.1        Group Table Design                              20 days
      7.3.37.4.5.2        Group Table Generation                          20 days
      7.3.37.4.5.3        Test & Validate                                 20 days
    7.3.37.4.6          Remaining of SSUP Process Support                 26 days
  7.3.37.5            SPVT & SSUP support                         UM      76 days
    7.3.37.5.1          Meeting Support                                   76 days
    7.3.37.5.2          Response to Meeting Actions                       76 days
  7.3.37.6            Sequence Execution                                  11 days
    7.3.37.6.1          Meetings                                          11 days
7.3.38               S38                                                 102 days
  7.3.38.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.38.2            Aftermarket Process                         UM       9 days
    7.3.38.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.38.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.38.2.3          Submit SCRs                                        6 days
    7.3.38.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.38.2.5          Project Briefing                                   0 days
  7.3.38.3            SOP Update                                  UM      14 days
    7.3.38.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.38.3.2          Submit SCRs                                        3 days
    7.3.38.3.3          Final SASF due                                     0 days
    7.3.38.3.4          Sequence Review                                     1 day
    7.3.38.3.5          Power Profiles                                      1 day
    7.3.38.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.38.3.7          Lag in Process                                     2 days
  7.3.38.4            Sequence Generation                         UM      51 days
    7.3.38.4.1          Detailed Design Update                            20 days
    7.3.38.4.2          IEB Generation                                    20 days
    7.3.38.4.3          Sequence "Delta" Review                            5 days
    7.3.38.4.4          State vector generation & prediction      UM       5 days
    7.3.38.4.5          SAM Group Table Production                GSFC    20 days
      7.3.38.4.5.1        Group Table Design                              20 days
      7.3.38.4.5.2        Group Table Generation                          20 days
      7.3.38.4.5.3        Test & Validate                                 20 days
    7.3.38.4.6          Remaining of SSUP Process Support                 26 days
  7.3.38.5            SPVT & SSUP support                         UM      76 days
    7.3.38.5.1          Meeting Support                                   76 days
    7.3.38.5.2          Response to Meeting Actions                       76 days
  7.3.38.6            Sequence Execution                                  31 days
    7.3.38.6.1          Meetings                                          31 days
7.3.39               S39                                                 102 days
  7.3.39.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.39.2            Aftermarket Process                         UM       9 days
    7.3.39.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.39.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.39.2.3          Submit SCRs                                        6 days
    7.3.39.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.39.2.5          Project Briefing                                   0 days
  7.3.39.3            SOP Update                                  UM      14 days
    7.3.39.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.39.3.2          Submit SCRs                                        3 days
    7.3.39.3.3          Final SASF due                                     0 days
    7.3.39.3.4          Sequence Review                                     1 day
    7.3.39.3.5          Power Profiles                                      1 day
    7.3.39.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.39.3.7          Lag in Process                                     2 days
  7.3.39.4            Sequence Generation                         UM      51 days
    7.3.39.4.1          Detailed Design Update                            20 days
    7.3.39.4.2          IEB Generation                                    20 days
    7.3.39.4.3          Sequence "Delta" Review                            5 days
    7.3.39.4.4          State vector generation & prediction      UM       5 days
    7.3.39.4.5          SAM Group Table Production                GSFC    20 days
      7.3.39.4.5.1        Group Table Design                              20 days
      7.3.39.4.5.2        Group Table Generation                          20 days
      7.3.39.4.5.3        Test & Validate                                 20 days
    7.3.39.4.6          Remaining of SSUP Process Support                 26 days
  7.3.39.5            SPVT & SSUP support                         UM      76 days
    7.3.39.5.1          Meeting Support                                   76 days
    7.3.39.5.2          Response to Meeting Actions                       76 days
  7.3.39.6            Sequence Execution                                  26 days
    7.3.39.6.1          Meetings                                          26 days
7.3.40               S40                                                 102 days
  7.3.40.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.40.2            Aftermarket Process                         UM       9 days
    7.3.40.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.40.2.2          Work Final Sequence Trades & Changes               6 days
    7.3.40.2.3          Submit SCRs                                        6 days
    7.3.40.2.4          SCR Approval & Update SOP/CIMS                     3 days
    7.3.40.2.5          Project Briefing                                   0 days
  7.3.40.3            SOP Update                                  UM      14 days
    7.3.40.3.1          Update Detailed Design (Internal & PDT)            9 days
    7.3.40.3.2          Submit SCRs                                        3 days
    7.3.40.3.3          Final SASF due                                     0 days
    7.3.40.3.4          Sequence Review                                     1 day
    7.3.40.3.5          Power Profiles                                      1 day
    7.3.40.3.6          Flight Rules & Constraints Checks                   1 day
    7.3.40.3.7          Lag in Process                                     2 days
  7.3.40.4            Sequence Generation                         UM      51 days
    7.3.40.4.1          Detailed Design Update                            20 days
    7.3.40.4.2          IEB Generation                                    20 days
    7.3.40.4.3          Sequence "Delta" Review                            5 days
    7.3.40.4.4          State vector generation & prediction      UM       5 days
    7.3.40.4.5          SAM Group Table Production                GSFC    20 days
      7.3.40.4.5.1        Group Table Design                              20 days
      7.3.40.4.5.2        Group Table Generation                          20 days
      7.3.40.4.5.3        Test & Validate                                 20 days
    7.3.40.4.6          Remaining of SSUP Process Support                 26 days
  7.3.40.5            SPVT & SSUP support                         UM      76 days
    7.3.40.5.1          Meeting Support                                   76 days
    7.3.40.5.2          Response to Meeting Actions                       76 days
  7.3.40.6            Sequence Execution                                  26 days
    7.3.40.6.1          Meetings                                          26 days
7.3.41               S41                                                 102 days
  7.3.41.1            Aftermarket/SOP/SSUP Begin                           0 days
  7.3.41.2            Aftermarket Process                         UM       9 days
    7.3.41.2.1          Collect Resolved ECARS inputs                       1 day
    7.3.41.2.2          Work Final Sequence Trades & Changes               6 days
         7.3.41.2.3             Submit SCRs                                         6 days
         7.3.41.2.4             SCR Approval & Update SOP/CIMS                      3 days
         7.3.41.2.5             Project Briefing                                    0 days
       7.3.41.3               SOP Update                                  UM       14 days
         7.3.41.3.1             Update Detailed Design (Internal & PDT)             9 days
         7.3.41.3.2             Submit SCRs                                         3 days
         7.3.41.3.3             Final SASF due                                      0 days
         7.3.41.3.4             Sequence Review                                      1 day
         7.3.41.3.5             Power Profiles                                       1 day
         7.3.41.3.6             Flight Rules & Constraints Checks                    1 day
         7.3.41.3.7             Lag in Process                                      2 days
       7.3.41.4               Sequence Generation                         UM       51 days
         7.3.41.4.1             Detailed Design Update                             20 days
         7.3.41.4.2             IEB Generation                                     20 days
         7.3.41.4.3             Sequence "Delta" Review                             5 days
         7.3.41.4.4             State vector generation & prediction      UM        5 days
         7.3.41.4.5             SAM Group Table Production                GSFC     20 days
           7.3.41.4.5.1           Group Table Design                               20 days
           7.3.41.4.5.2           Group Table Generation                           20 days
           7.3.41.4.5.3           Test & Validate                                  20 days
         7.3.41.4.6             Remaining of SSUP Process Support                  26 days
       7.3.41.5               SPVT & SSUP support                         UM       76 days
         7.3.41.5.1             Meeting Support                                    76 days
         7.3.41.5.2             Response to Meeting Actions                        76 days
       7.3.41.6               Sequence Execution                                   27 days
         7.3.41.6.1             Meetings                                           27 days
    7.4                    Health & Safety Operations                            1499 days
      7.4.1                 Cruise Health & Safety monitoring             UM      366 days
      7.4.2                 Cruise Anomaly response                       UM      448 days
        7.4.2.1               TOF system                                  LANL    427 days
        7.4.2.2               SAM, CPU2                                   GSFC    427 days
        7.4.2.3               CPU1, System                                SwRI    427 days
        7.4.2.4               ELS                                         MSSL    427 days
        7.4.2.5               IBS                                         LANL    427 days
        7.4.2.6               IMS                                         UM      427 days
      7.4.3                 Tour Health & Safety monitoring               UM     1072 days
      7.4.4                 Tour Anomaly response                         UM     1118 days
        7.4.4.1               TOF system                                  LANL   1118 days
        7.4.4.2               SAM, CPU2                                   GSFC   1118 days
        7.4.4.3               CPU1, System                                SwRI   1118 days
        7.4.4.4                 ELS                                       MSSL   1118 days
        7.4.4.5               IBS                                         LANL   1118 days
        7.4.4.6               IMS                                         UM     1118 days
8                         SOP Implementation                              UM      586 days
    8.1                    S09 & S10                                               55 days
      8.1.1                 Science Design                                UM        5 days
        8.1.1.1             Start of Implementation                                 0 days
        8.1.1.2               Retrieve Attitude Strategy (from Kickoff)              1 day
        8.1.1.3               Collect Resolved ECARS inputs               UM         1 day
        8.1.1.4               Further Resolution of ECARS                           4 days
      8.1.2                 Port 1 Activities                                      20 days
        8.1.2.1               Detailed Design of Internal Commands                 12 days
    8.1.2.2      Detailed Pointing Design in PDT                  12 days
    8.1.2.3      Testing & Validation                             12 days
    8.1.2.4      Final SASFs Due                                   0 days
    8.1.2.5      Power Profile                                     0 days
    8.1.2.6      Review of Port 1 Activities                       5 days
    8.1.2.7      Lag in Process                                     1 day
  8.1.3        Port 2 Activities                                  15 days
    8.1.3.1      Update Design of Internal Commands                7 days
    8.1.3.2      Update Pointing Design                            7 days
    8.1.3.3      Testing & Validation                              7 days
    8.1.3.4      Final SASFs Due                                   0 days
    8.1.3.5      Update Power Profile                              0 days
    8.1.3.6      Review of Port 2 Activities                       4 days
    8.1.3.7      Lag in Process                                    2 days
  8.1.4        Port 3 Activities                                  15 days
    8.1.4.1      Update Design of Internal Commands                5 days
    8.1.4.2      Update Pointing Design                            5 days
    8.1.4.3      Testing & Validation                              5 days
    8.1.4.4      Final SASFs Due                                   0 days
    8.1.4.5      Update Power Profile                              0 days
    8.1.4.6      Review of Port 3 Activities                       2 days
    8.1.4.7      Lag in Process                                    6 days
  8.1.5        SPVT/SVT support                              UM   55 days
    8.1.5.1      Meeting Support                                  55 days
    8.1.5.2      Response to Meeting Actions                      55 days
8.2           S11 & S12                                           55 days
  8.2.1        Science Design                                UM    5 days
    8.2.1.1      Start of Implementation                           0 days
    8.2.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.2.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.2.1.4      Further Resolution of ECARS                       4 days
  8.2.2        Port 1 Activities                                  20 days
    8.2.2.1      Detailed Design of Internal Commands             12 days
    8.2.2.2      Detailed Pointing Design in PDT                  12 days
    8.2.2.3      Testing & Validation                             12 days
    8.2.2.4      Final SASFs Due                                   0 days
    8.2.2.5      Power Profile                                     0 days
    8.2.2.6      Review of Port 1 Activities                       5 days
    8.2.2.7      Lag in Process                                     1 day
  8.2.3        Port 2 Activities                                  15 days
    8.2.3.1      Update Design of Internal Commands                7 days
    8.2.3.2      Update Pointing Design                            7 days
    8.2.3.3      Testing & Validation                              7 days
    8.2.3.4      Final SASFs Due                                   0 days
    8.2.3.5      Update Power Profile                              0 days
    8.2.3.6      Review of Port 2 Activities                       4 days
    8.2.3.7      Lag in Process                                    2 days
  8.2.4        Port 3 Activities                                  15 days
    8.2.4.1      Update Design of Internal Commands                5 days
    8.2.4.2      Update Pointing Design                            5 days
    8.2.4.3      Testing & Validation                              5 days
    8.2.4.4      Final SASFs Due                                   0 days
    8.2.4.5      Update Power Profile                              0 days
    8.2.4.6      Review of Port 3 Activities                       2 days
    8.2.4.7      Lag in Process                                    6 days
  8.2.5        SPVT/SVT support                              UM   55 days
    8.2.5.1      Meeting Support                                  55 days
    8.2.5.2      Response to Meeting Actions                      55 days
8.3           S13 & S14                                           55 days
  8.3.1        Science Design                                UM    5 days
    8.3.1.1      Start of Implementation                           0 days
    8.3.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.3.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.3.1.4      Further Resolution of ECARS                       4 days
  8.3.2        Port 1 Activities                                  20 days
    8.3.2.1      Detailed Design of Internal Commands             12 days
    8.3.2.2      Detailed Pointing Design in PDT                  12 days
    8.3.2.3      Testing & Validation                             12 days
    8.3.2.4      Final SASFs Due                                   0 days
    8.3.2.5      Power Profile                                     0 days
    8.3.2.6      Review of Port 1 Activities                       5 days
    8.3.2.7      Lag in Process                                     1 day
  8.3.3        Port 2 Activities                                  15 days
    8.3.3.1      Update Design of Internal Commands                7 days
    8.3.3.2      Update Pointing Design                            7 days
    8.3.3.3      Testing & Validation                              7 days
    8.3.3.4      Final SASFs Due                                   0 days
    8.3.3.5      Update Power Profile                              0 days
    8.3.3.6      Review of Port 2 Activities                       4 days
    8.3.3.7      Lag in Process                                    2 days
  8.3.4        Port 3 Activities                                  15 days
    8.3.4.1      Update Design of Internal Commands                5 days
    8.3.4.2      Update Pointing Design                            5 days
    8.3.4.3      Testing & Validation                              5 days
    8.3.4.4      Final SASFs Due                                   0 days
    8.3.4.5      Update Power Profile                              0 days
    8.3.4.6      Review of Port 3 Activities                       2 days
    8.3.4.7      Lag in Process                                    6 days
    8.3.5        SPVT/SVT support                            UM   55 days
    8.3.5.1      Meeting Support                                  55 days
    8.3.5.2      Response to Meeting Actions                      55 days
8.4           S15 & S16                                           55 days
  8.4.1        Science Design                                UM    5 days
    8.4.1.1      Start of Implementation                           0 days
    8.4.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.4.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.4.1.4      Further Resolution of ECARS                       4 days
  8.4.2        Port 1 Activities                                  20 days
    8.4.2.1      Detailed Design of Internal Commands             12 days
    8.4.2.2      Detailed Pointing Design in PDT                  12 days
    8.4.2.3      Testing & Validation                             12 days
    8.4.2.4      Final SASFs Due                                   0 days
    8.4.2.5      Power Profile                                     0 days
    8.4.2.6      Review of Port 1 Activities                       5 days
    8.4.2.7      Lag in Process                                     1 day
  8.4.3        Port 2 Activities                                  15 days
    8.4.3.1      Update Design of Internal Commands                7 days
    8.4.3.2      Update Pointing Design                            7 days
    8.4.3.3      Testing & Validation                              7 days
    8.4.3.4      Final SASFs Due                                   0 days
    8.4.3.5      Update Power Profile                              0 days
    8.4.3.6      Review of Port 2 Activities                       4 days
    8.4.3.7      Lag in Process                                    2 days
  8.4.4        Port 3 Activities                                  15 days
    8.4.4.1      Update Design of Internal Commands                5 days
    8.4.4.2      Update Pointing Design                            5 days
    8.4.4.3      Testing & Validation                              5 days
    8.4.4.4      Final SASFs Due                                   0 days
    8.4.4.5      Update Power Profile                              0 days
    8.4.4.6      Review of Port 3 Activities                       2 days
    8.4.4.7      Lag in Process                                    6 days
  8.4.5        SPVT/SVT support                              UM   55 days
    8.4.5.1      Meeting Support                                  55 days
    8.4.5.2      Response to Meeting Actions                      55 days
8.5           S17 & S01                                           55 days
  8.5.1        Science Design                                UM    5 days
    8.5.1.1      Start of Implementation                           0 days
    8.5.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.5.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.5.1.4      Further Resolution of ECARS                       4 days
  8.5.2        Port 1 Activities                                  20 days
    8.5.2.1      Detailed Design of Internal Commands             12 days
    8.5.2.2      Detailed Pointing Design in PDT                  12 days
    8.5.2.3      Testing & Validation                             12 days
    8.5.2.4      Final SASFs Due                                   0 days
    8.5.2.5      Power Profile                                     0 days
    8.5.2.6      Review of Port 1 Activities                       5 days
    8.5.2.7      Lag in Process                                     1 day
  8.5.3        Port 2 Activities                                  15 days
    8.5.3.1      Update Design of Internal Commands                7 days
    8.5.3.2      Update Pointing Design                            7 days
    8.5.3.3      Testing & Validation                              7 days
    8.5.3.4      Final SASFs Due                                   0 days
    8.5.3.5      Update Power Profile                              0 days
    8.5.3.6      Review of Port 2 Activities                       4 days
    8.5.3.7      Lag in Process                                    2 days
  8.5.4        Port 3 Activities                                  15 days
    8.5.4.1      Update Design of Internal Commands                5 days
    8.5.4.2      Update Pointing Design                            5 days
    8.5.4.3      Testing & Validation                              5 days
    8.5.4.4      Final SASFs Due                                   0 days
    8.5.4.5      Update Power Profile                              0 days
    8.5.4.6      Review of Port 3 Activities                       2 days
    8.5.4.7      Lag in Process                                    6 days
  8.5.5        SPVT/SVT support                              UM   55 days
    8.5.5.1      Meeting Support                                  55 days
    8.5.5.2      Response to Meeting Actions                      55 days
8.6           S02 & S03                                           55 days
  8.6.1        Science Design                                UM    5 days
    8.6.1.1      Start of Implementation                           0 days
    8.6.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.6.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.6.1.4      Further Resolution of ECARS                       4 days
  8.6.2        Port 1 Activities                                  20 days
    8.6.2.1      Detailed Design of Internal Commands             12 days
    8.6.2.2      Detailed Pointing Design in PDT                  12 days
    8.6.2.3      Testing & Validation                             12 days
    8.6.2.4      Final SASFs Due                                   0 days
    8.6.2.5      Power Profile                                     0 days
    8.6.2.6      Review of Port 1 Activities                       5 days
    8.6.2.7      Lag in Process                                     1 day
  8.6.3        Port 2 Activities                                  15 days
    8.6.3.1      Update Design of Internal Commands                7 days
    8.6.3.2      Update Pointing Design                            7 days
    8.6.3.3      Testing & Validation                              7 days
    8.6.3.4      Final SASFs Due                                   0 days
    8.6.3.5      Update Power Profile                              0 days
    8.6.3.6      Review of Port 2 Activities                       4 days
    8.6.3.7      Lag in Process                                    2 days
  8.6.4        Port 3 Activities                                  15 days
    8.6.4.1      Update Design of Internal Commands                5 days
    8.6.4.2      Update Pointing Design                            5 days
    8.6.4.3      Testing & Validation                              5 days
    8.6.4.4      Final SASFs Due                                   0 days
    8.6.4.5      Update Power Profile                              0 days
    8.6.4.6      Review of Port 3 Activities                       2 days
    8.6.4.7      Lag in Process                                    6 days
  8.6.5        SPVT/SVT support                              UM   55 days
    8.6.5.1      Meeting Support                                  55 days
    8.6.5.2      Response to Meeting Actions                      55 days
8.7           S04 & S05                                           55 days
  8.7.1        Science Design                                UM    5 days
    8.7.1.1      Start of Implementation                           0 days
    8.7.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.7.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.7.1.4      Further Resolution of ECARS                       4 days
  8.7.2        Port 1 Activities                                  20 days
    8.7.2.1      Detailed Design of Internal Commands             12 days
    8.7.2.2      Detailed Pointing Design in PDT                  12 days
    8.7.2.3      Testing & Validation                             12 days
    8.7.2.4      Final SASFs Due                                   0 days
    8.7.2.5      Power Profile                                     0 days
    8.7.2.6      Review of Port 1 Activities                       5 days
    8.7.2.7      Lag in Process                                     1 day
  8.7.3        Port 2 Activities                                  15 days
    8.7.3.1      Update Design of Internal Commands                7 days
    8.7.3.2      Update Pointing Design                            7 days
    8.7.3.3      Testing & Validation                              7 days
    8.7.3.4      Final SASFs Due                                   0 days
    8.7.3.5      Update Power Profile                              0 days
    8.7.3.6      Review of Port 2 Activities                       4 days
    8.7.3.7      Lag in Process                                    2 days
  8.7.4        Port 3 Activities                                  15 days
    8.7.4.1      Update Design of Internal Commands                5 days
    8.7.4.2      Update Pointing Design                            5 days
    8.7.4.3      Testing & Validation                              5 days
    8.7.4.4      Final SASFs Due                                   0 days
    8.7.4.5      Update Power Profile                              0 days
    8.7.4.6      Review of Port 3 Activities                       2 days
    8.7.4.7      Lag in Process                                    6 days
  8.7.5        SPVT/SVT support                              UM   55 days
    8.7.5.1      Meeting Support                                  55 days
    8.7.5.2      Response to Meeting Actions                      55 days
8.8           S06 & S07                                           55 days
  8.8.1        Science Design                                UM    5 days
    8.8.1.1      Start of Implementation                           0 days
    8.8.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.8.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.8.1.4      Further Resolution of ECARS                       4 days
  8.8.2        Port 1 Activities                                  20 days
    8.8.2.1      Detailed Design of Internal Commands             12 days
    8.8.2.2      Detailed Pointing Design in PDT                  12 days
    8.8.2.3      Testing & Validation                             12 days
    8.8.2.4      Final SASFs Due                                   0 days
    8.8.2.5      Power Profile                                     0 days
    8.8.2.6      Review of Port 1 Activities                       5 days
    8.8.2.7      Lag in Process                                     1 day
  8.8.3        Port 2 Activities                                  15 days
    8.8.3.1      Update Design of Internal Commands                7 days
    8.8.3.2      Update Pointing Design                            7 days
    8.8.3.3      Testing & Validation                              7 days
    8.8.3.4      Final SASFs Due                                   0 days
    8.8.3.5      Update Power Profile                              0 days
    8.8.3.6      Review of Port 2 Activities                       4 days
    8.8.3.7      Lag in Process                                    2 days
  8.8.4        Port 3 Activities                                  15 days
    8.8.4.1      Update Design of Internal Commands                5 days
    8.8.4.2      Update Pointing Design                            5 days
    8.8.4.3      Testing & Validation                              5 days
    8.8.4.4      Final SASFs Due                                   0 days
    8.8.4.5      Update Power Profile                              0 days
    8.8.4.6      Review of Port 3 Activities                       2 days
    8.8.4.7      Lag in Process                                    6 days
  8.8.5        SPVT/SVT support                              UM   55 days
    8.8.5.1      Meeting Support                                  55 days
    8.8.5.2      Response to Meeting Actions                      55 days
8.9           S08 & S18                                           55 days
  8.9.1        Science Design                                UM    5 days
    8.9.1.1      Start of Implementation                           0 days
    8.9.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.9.1.3       Collect Resolved ECARS inputs               UM     1 day
    8.9.1.4       Further Resolution of ECARS                       4 days
  8.9.2         Port 1 Activities                                  20 days
    8.9.2.1       Detailed Design of Internal Commands             12 days
    8.9.2.2       Detailed Pointing Design in PDT                  12 days
    8.9.2.3       Testing & Validation                             12 days
    8.9.2.4       Final SASFs Due                                   0 days
    8.9.2.5       Power Profile                                     0 days
    8.9.2.6       Review of Port 1 Activities                       5 days
    8.9.2.7       Lag in Process                                     1 day
  8.9.3         Port 2 Activities                                  15 days
    8.9.3.1       Update Design of Internal Commands                7 days
    8.9.3.2       Update Pointing Design                            7 days
    8.9.3.3       Testing & Validation                              7 days
    8.9.3.4       Final SASFs Due                                   0 days
    8.9.3.5       Update Power Profile                              0 days
    8.9.3.6       Review of Port 2 Activities                       4 days
    8.9.3.7       Lag in Process                                    2 days
  8.9.4         Port 3 Activities                                  15 days
    8.9.4.1       Update Design of Internal Commands                5 days
    8.9.4.2       Update Pointing Design                            5 days
    8.9.4.3       Testing & Validation                              5 days
    8.9.4.4       Final SASFs Due                                   0 days
    8.9.4.5       Update Power Profile                              0 days
    8.9.4.6       Review of Port 3 Activities                       2 days
    8.9.4.7       Lag in Process                                    6 days
  8.9.5         SPVT/SVT support                              UM   55 days
    8.9.5.1       Meeting Support                                  55 days
    8.9.5.2       Response to Meeting Actions                      55 days
8.10           S19 & S20                                           55 days
  8.10.1        Science Design                                UM    5 days
    8.10.1.1      Start of Implementation                           0 days
    8.10.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.10.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.10.1.4      Further Resolution of ECARS                       4 days
  8.10.2        Port 1 Activities                                  20 days
    8.10.2.1      Detailed Design of Internal Commands             12 days
    8.10.2.2      Detailed Pointing Design in PDT                  12 days
    8.10.2.3      Testing & Validation                             12 days
    8.10.2.4      Final SASFs Due                                   0 days
    8.10.2.5      Power Profile                                     0 days
    8.10.2.6      Review of Port 1 Activities                       5 days
    8.10.2.7      Lag in Process                                     1 day
  8.10.3        Port 2 Activities                                  15 days
    8.10.3.1      Update Design of Internal Commands                7 days
    8.10.3.2      Update Pointing Design                            7 days
    8.10.3.3      Testing & Validation                              7 days
    8.10.3.4      Final SASFs Due                                   0 days
    8.10.3.5      Update Power Profile                              0 days
    8.10.3.6      Review of Port 2 Activities                       4 days
    8.10.3.7      Lag in Process                                    2 days
  8.10.4        Port 3 Activities                                  15 days
    8.10.4.1      Update Design of Internal Commands                5 days
    8.10.4.2      Update Pointing Design                            5 days
    8.10.4.3      Testing & Validation                              5 days
    8.10.4.4      Final SASFs Due                                   0 days
    8.10.4.5      Update Power Profile                              0 days
    8.10.4.6      Review of Port 3 Activities                       2 days
    8.10.4.7      Lag in Process                                    6 days
  8.10.5        SPVT/SVT support                              UM   55 days
    8.10.5.1      Meeting Support                                  55 days
    8.10.5.2      Response to Meeting Actions                      55 days
8.11           S21 & S22                                           55 days
  8.11.1        Science Design                                UM    5 days
    8.11.1.1      Start of Implementation                           0 days
    8.11.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.11.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.11.1.4      Further Resolution of ECARS                       4 days
  8.11.2        Port 1 Activities                                  20 days
    8.11.2.1      Detailed Design of Internal Commands             12 days
    8.11.2.2      Detailed Pointing Design in PDT                  12 days
    8.11.2.3      Testing & Validation                             12 days
    8.11.2.4      Final SASFs Due                                   0 days
    8.11.2.5      Power Profile                                     0 days
    8.11.2.6      Review of Port 1 Activities                       5 days
    8.11.2.7      Lag in Process                                     1 day
  8.11.3        Port 2 Activities                                  15 days
    8.11.3.1      Update Design of Internal Commands                7 days
    8.11.3.2      Update Pointing Design                            7 days
    8.11.3.3      Testing & Validation                              7 days
    8.11.3.4      Final SASFs Due                                   0 days
    8.11.3.5      Update Power Profile                              0 days
    8.11.3.6      Review of Port 2 Activities                       4 days
    8.11.3.7      Lag in Process                                    2 days
  8.11.4        Port 3 Activities                                  15 days
    8.11.4.1      Update Design of Internal Commands                5 days
    8.11.4.2      Update Pointing Design                            5 days
    8.11.4.3      Testing & Validation                              5 days
    8.11.4.4      Final SASFs Due                                   0 days
    8.11.4.5      Update Power Profile                              0 days
    8.11.4.6      Review of Port 3 Activities                       2 days
    8.11.4.7      Lag in Process                                    6 days
  8.11.5        SPVT/SVT support                              UM   55 days
    8.11.5.1      Meeting Support                                  55 days
    8.11.5.2      Response to Meeting Actions                      55 days
8.12           S23 & S24                                           55 days
  8.12.1        Science Design                                UM    5 days
    8.12.1.1      Start of Implementation                           0 days
    8.12.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.12.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.12.1.4      Further Resolution of ECARS                       4 days
  8.12.2        Port 1 Activities                                  20 days
    8.12.2.1      Detailed Design of Internal Commands             12 days
    8.12.2.2      Detailed Pointing Design in PDT                  12 days
    8.12.2.3      Testing & Validation                             12 days
    8.12.2.4      Final SASFs Due                                   0 days
    8.12.2.5      Power Profile                                     0 days
    8.12.2.6      Review of Port 1 Activities                       5 days
    8.12.2.7      Lag in Process                                     1 day
  8.12.3        Port 2 Activities                                  15 days
    8.12.3.1      Update Design of Internal Commands                7 days
    8.12.3.2      Update Pointing Design                            7 days
    8.12.3.3      Testing & Validation                              7 days
    8.12.3.4      Final SASFs Due                                   0 days
    8.12.3.5      Update Power Profile                              0 days
    8.12.3.6      Review of Port 2 Activities                       4 days
    8.12.3.7      Lag in Process                                    2 days
  8.12.4        Port 3 Activities                                  15 days
    8.12.4.1      Update Design of Internal Commands                5 days
    8.12.4.2      Update Pointing Design                            5 days
    8.12.4.3      Testing & Validation                              5 days
    8.12.4.4      Final SASFs Due                                   0 days
    8.12.4.5      Update Power Profile                              0 days
    8.12.4.6      Review of Port 3 Activities                       2 days
    8.12.4.7      Lag in Process                                    6 days
  8.12.5        SPVT/SVT support                              UM   55 days
    8.12.5.1      Meeting Support                                  55 days
    8.12.5.2      Response to Meeting Actions                      55 days
8.13           S25 & S26                                           55 days
  8.13.1        Science Design                                UM    5 days
    8.13.1.1      Start of Implementation                           0 days
    8.13.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.13.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.13.1.4      Further Resolution of ECARS                       4 days
  8.13.2        Port 1 Activities                                  20 days
    8.13.2.1      Detailed Design of Internal Commands             12 days
    8.13.2.2      Detailed Pointing Design in PDT                  12 days
    8.13.2.3      Testing & Validation                             12 days
    8.13.2.4      Final SASFs Due                                   0 days
    8.13.2.5      Power Profile                                     0 days
    8.13.2.6      Review of Port 1 Activities                       5 days
    8.13.2.7      Lag in Process                                     1 day
  8.13.3        Port 2 Activities                                  15 days
    8.13.3.1      Update Design of Internal Commands                7 days
    8.13.3.2      Update Pointing Design                            7 days
    8.13.3.3      Testing & Validation                              7 days
    8.13.3.4      Final SASFs Due                                   0 days
    8.13.3.5      Update Power Profile                              0 days
    8.13.3.6      Review of Port 2 Activities                       4 days
    8.13.3.7      Lag in Process                                    2 days
  8.13.4        Port 3 Activities                                  15 days
    8.13.4.1      Update Design of Internal Commands                5 days
    8.13.4.2      Update Pointing Design                            5 days
    8.13.4.3      Testing & Validation                              5 days
    8.13.4.4      Final SASFs Due                                   0 days
    8.13.4.5      Update Power Profile                              0 days
    8.13.4.6      Review of Port 3 Activities                       2 days
    8.13.4.7      Lag in Process                                    6 days
  8.13.5        SPVT/SVT support                              UM   55 days
    8.13.5.1      Meeting Support                                  55 days
    8.13.5.2      Response to Meeting Actions                      55 days
8.14           S27 & S28                                           55 days
  8.14.1        Science Design                                UM    5 days
    8.14.1.1      Start of Implementation                           0 days
    8.14.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.14.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.14.1.4      Further Resolution of ECARS                       4 days
  8.14.2        Port 1 Activities                                  20 days
    8.14.2.1      Detailed Design of Internal Commands             12 days
    8.14.2.2      Detailed Pointing Design in PDT                  12 days
    8.14.2.3      Testing & Validation                             12 days
    8.14.2.4      Final SASFs Due                                   0 days
    8.14.2.5      Power Profile                                     0 days
    8.14.2.6      Review of Port 1 Activities                       5 days
    8.14.2.7      Lag in Process                                     1 day
  8.14.3        Port 2 Activities                                  15 days
    8.14.3.1      Update Design of Internal Commands                7 days
    8.14.3.2      Update Pointing Design                            7 days
    8.14.3.3      Testing & Validation                              7 days
    8.14.3.4      Final SASFs Due                                   0 days
    8.14.3.5      Update Power Profile                              0 days
    8.14.3.6      Review of Port 2 Activities                       4 days
    8.14.3.7      Lag in Process                                    2 days
  8.14.4        Port 3 Activities                                  15 days
    8.14.4.1      Update Design of Internal Commands                5 days
    8.14.4.2      Update Pointing Design                            5 days
    8.14.4.3      Testing & Validation                              5 days
    8.14.4.4      Final SASFs Due                                   0 days
    8.14.4.5      Update Power Profile                              0 days
    8.14.4.6      Review of Port 3 Activities                       2 days
    8.14.4.7      Lag in Process                                    6 days
  8.14.5        SPVT/SVT support                              UM   55 days
    8.14.5.1      Meeting Support                                  55 days
    8.14.5.2      Response to Meeting Actions                      55 days
8.15           S29 & S30                                           56 days
  8.15.1        Science Design                                UM    5 days
    8.15.1.1      Start of Implementation                           0 days
    8.15.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.15.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.15.1.4      Further Resolution of ECARS                       4 days
  8.15.2        Port 1 Activities                                  20 days
    8.15.2.1      Detailed Design of Internal Commands             12 days
    8.15.2.2      Detailed Pointing Design in PDT                  12 days
    8.15.2.3      Testing & Validation                             12 days
    8.15.2.4      Final SASFs Due                                   0 days
    8.15.2.5      Power Profile                                     0 days
    8.15.2.6      Review of Port 1 Activities                       5 days
    8.15.2.7      Lag in Process                                     1 day
  8.15.3        Port 2 Activities                                  15 days
    8.15.3.1      Update Design of Internal Commands                7 days
    8.15.3.2      Update Pointing Design                            7 days
    8.15.3.3      Testing & Validation                              7 days
    8.15.3.4      Final SASFs Due                                   0 days
    8.15.3.5      Update Power Profile                              0 days
    8.15.3.6      Review of Port 2 Activities                       4 days
    8.15.3.7      Lag in Process                                    2 days
  8.15.4        Port 3 Activities                                  16 days
    8.15.4.1      Update Design of Internal Commands                5 days
    8.15.4.2      Update Pointing Design                            5 days
    8.15.4.3      Testing & Validation                              5 days
    8.15.4.4      Final SASFs Due                                   0 days
    8.15.4.5      Update Power Profile                              0 days
    8.15.4.6      Review of Port 3 Activities                       2 days
    8.15.4.7      Lag in Process                                    7 days
  8.15.5        SPVT/SVT support                              UM   56 days
    8.15.5.1      Meeting Support                                  56 days
    8.15.5.2      Response to Meeting Actions                      56 days
8.16           S31 & S32                                           56 days
  8.16.1        Science Design                                UM    5 days
    8.16.1.1      Start of Implementation                           0 days
    8.16.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.16.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.16.1.4      Further Resolution of ECARS                       4 days
  8.16.2        Port 1 Activities                                  20 days
    8.16.2.1      Detailed Design of Internal Commands             12 days
    8.16.2.2      Detailed Pointing Design in PDT                  12 days
    8.16.2.3      Testing & Validation                             12 days
    8.16.2.4      Final SASFs Due                                   0 days
    8.16.2.5      Power Profile                                     0 days
    8.16.2.6      Review of Port 1 Activities                       5 days
    8.16.2.7      Lag in Process                                     1 day
  8.16.3        Port 2 Activities                                  15 days
    8.16.3.1      Update Design of Internal Commands                7 days
    8.16.3.2      Update Pointing Design                            7 days
    8.16.3.3      Testing & Validation                              7 days
    8.16.3.4      Final SASFs Due                                   0 days
    8.16.3.5      Update Power Profile                              0 days
    8.16.3.6      Review of Port 2 Activities                       4 days
    8.16.3.7      Lag in Process                                    2 days
  8.16.4        Port 3 Activities                                  16 days
    8.16.4.1      Update Design of Internal Commands                5 days
    8.16.4.2      Update Pointing Design                            5 days
    8.16.4.3      Testing & Validation                              5 days
    8.16.4.4      Final SASFs Due                                   0 days
    8.16.4.5      Update Power Profile                              0 days
    8.16.4.6      Review of Port 3 Activities                       2 days
    8.16.4.7      Lag in Process                                    7 days
  8.16.5        SPVT/SVT support                              UM   56 days
    8.16.5.1      Meeting Support                                  56 days
    8.16.5.2      Response to Meeting Actions                      56 days
8.17           S33 & S34                                           56 days
  8.17.1        Science Design                                UM    5 days
    8.17.1.1      Start of Implementation                           0 days
    8.17.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.17.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.17.1.4      Further Resolution of ECARS                       4 days
  8.17.2        Port 1 Activities                                  20 days
    8.17.2.1      Detailed Design of Internal Commands             12 days
    8.17.2.2      Detailed Pointing Design in PDT                  12 days
    8.17.2.3      Testing & Validation                             12 days
    8.17.2.4      Final SASFs Due                                   0 days
    8.17.2.5      Power Profile                                     0 days
    8.17.2.6      Review of Port 1 Activities                       5 days
    8.17.2.7      Lag in Process                                     1 day
  8.17.3        Port 2 Activities                                  16 days
    8.17.3.1      Update Design of Internal Commands                7 days
    8.17.3.2      Update Pointing Design                            7 days
    8.17.3.3      Testing & Validation                              7 days
    8.17.3.4      Final SASFs Due                                   0 days
    8.17.3.5      Update Power Profile                              0 days
    8.17.3.6      Review of Port 2 Activities                       4 days
    8.17.3.7      Lag in Process                                    3 days
  8.17.4        Port 3 Activities                                  15 days
    8.17.4.1      Update Design of Internal Commands                5 days
    8.17.4.2      Update Pointing Design                            5 days
    8.17.4.3      Testing & Validation                              5 days
    8.17.4.4      Final SASFs Due                                   0 days
    8.17.4.5      Update Power Profile                              0 days
    8.17.4.6      Review of Port 3 Activities                       2 days
    8.17.4.7      Lag in Process                                    6 days
  8.17.5        SPVT/SVT support                              UM   56 days
    8.17.5.1      Meeting Support                                  56 days
    8.17.5.2      Response to Meeting Actions                      56 days
8.18           S35 & S36                                           56 days
  8.18.1        Science Design                                UM    5 days
    8.18.1.1      Start of Implementation                           0 days
    8.18.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.18.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.18.1.4      Further Resolution of ECARS                       4 days
  8.18.2        Port 1 Activities                                  20 days
    8.18.2.1      Detailed Design of Internal Commands             12 days
    8.18.2.2      Detailed Pointing Design in PDT                  12 days
    8.18.2.3      Testing & Validation                             12 days
    8.18.2.4      Final SASFs Due                                   0 days
    8.18.2.5      Power Profile                                     0 days
    8.18.2.6      Review of Port 1 Activities                       5 days
    8.18.2.7      Lag in Process                                     1 day
  8.18.3        Port 2 Activities                                  16 days
    8.18.3.1      Update Design of Internal Commands                7 days
    8.18.3.2      Update Pointing Design                            7 days
    8.18.3.3      Testing & Validation                              7 days
    8.18.3.4      Final SASFs Due                                   0 days
    8.18.3.5      Update Power Profile                              0 days
    8.18.3.6      Review of Port 2 Activities                       4 days
    8.18.3.7      Lag in Process                                    3 days
  8.18.4        Port 3 Activities                                  15 days
    8.18.4.1      Update Design of Internal Commands                5 days
    8.18.4.2      Update Pointing Design                            5 days
    8.18.4.3      Testing & Validation                              5 days
    8.18.4.4      Final SASFs Due                                   0 days
    8.18.4.5      Update Power Profile                              0 days
    8.18.4.6      Review of Port 3 Activities                       2 days
    8.18.4.7      Lag in Process                                    6 days
  8.18.5        SPVT/SVT support                              UM   56 days
    8.18.5.1      Meeting Support                                  56 days
    8.18.5.2      Response to Meeting Actions                      56 days
8.19           S37 & S38                                           56 days
  8.19.1        Science Design                                UM    5 days
    8.19.1.1      Start of Implementation                           0 days
    8.19.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.19.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.19.1.4      Further Resolution of ECARS                       4 days
  8.19.2        Port 1 Activities                                  20 days
    8.19.2.1      Detailed Design of Internal Commands             12 days
    8.19.2.2      Detailed Pointing Design in PDT                  12 days
    8.19.2.3      Testing & Validation                             12 days
    8.19.2.4      Final SASFs Due                                   0 days
    8.19.2.5      Power Profile                                     0 days
    8.19.2.6      Review of Port 1 Activities                       5 days
    8.19.2.7      Lag in Process                                     1 day
  8.19.3        Port 2 Activities                                  16 days
    8.19.3.1      Update Design of Internal Commands                7 days
    8.19.3.2      Update Pointing Design                            7 days
    8.19.3.3      Testing & Validation                              7 days
    8.19.3.4      Final SASFs Due                                   0 days
    8.19.3.5      Update Power Profile                              0 days
    8.19.3.6      Review of Port 2 Activities                       4 days
    8.19.3.7      Lag in Process                                    3 days
  8.19.4        Port 3 Activities                                  15 days
    8.19.4.1      Update Design of Internal Commands                5 days
    8.19.4.2      Update Pointing Design                            5 days
    8.19.4.3      Testing & Validation                              5 days
    8.19.4.4      Final SASFs Due                                   0 days
    8.19.4.5      Update Power Profile                              0 days
    8.19.4.6      Review of Port 3 Activities                       2 days
    8.19.4.7      Lag in Process                                    6 days
  8.19.5        SPVT/SVT support                              UM   56 days
    8.19.5.1      Meeting Support                                  56 days
    8.19.5.2      Response to Meeting Actions                      56 days
8.20           S39 & S40                                           56 days
  8.20.1        Science Design                                UM    5 days
    8.20.1.1      Start of Implementation                           0 days
    8.20.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.20.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.20.1.4      Further Resolution of ECARS                       4 days
  8.20.2        Port 1 Activities                                  20 days
    8.20.2.1      Detailed Design of Internal Commands             12 days
    8.20.2.2      Detailed Pointing Design in PDT                  12 days
    8.20.2.3      Testing & Validation                             12 days
    8.20.2.4      Final SASFs Due                                   0 days
    8.20.2.5      Power Profile                                     0 days
    8.20.2.6      Review of Port 1 Activities                       5 days
    8.20.2.7      Lag in Process                                     1 day
  8.20.3        Port 2 Activities                                  16 days
    8.20.3.1      Update Design of Internal Commands                7 days
    8.20.3.2      Update Pointing Design                            7 days
    8.20.3.3      Testing & Validation                              7 days
    8.20.3.4      Final SASFs Due                                   0 days
    8.20.3.5      Update Power Profile                              0 days
    8.20.3.6      Review of Port 2 Activities                       4 days
    8.20.3.7      Lag in Process                                    3 days
  8.20.4        Port 3 Activities                                  15 days
    8.20.4.1      Update Design of Internal Commands                5 days
    8.20.4.2      Update Pointing Design                            5 days
    8.20.4.3      Testing & Validation                              5 days
    8.20.4.4      Final SASFs Due                                   0 days
    8.20.4.5      Update Power Profile                              0 days
    8.20.4.6      Review of Port 3 Activities                       2 days
    8.20.4.7      Lag in Process                                    6 days
  8.20.5        SPVT/SVT support                              UM   56 days
    8.20.5.1      Meeting Support                                  56 days
    8.20.5.2      Response to Meeting Actions                      56 days
8.21           S41                                                 55 days
  8.21.1        Science Design                                UM    5 days
    8.21.1.1      Start of Implementation                           0 days
    8.21.1.2      Retrieve Attitude Strategy (from Kickoff)          1 day
    8.21.1.3      Collect Resolved ECARS inputs               UM     1 day
    8.21.1.4      Further Resolution of ECARS                       4 days
  8.21.2        Port 1 Activities                                  20 days
    8.21.2.1      Detailed Design of Internal Commands             12 days
    8.21.2.2      Detailed Pointing Design in PDT                  12 days
    8.21.2.3      Testing & Validation                             12 days
    8.21.2.4      Final SASFs Due                                   0 days
    8.21.2.5      Power Profile                                     0 days
    8.21.2.6      Review of Port 1 Activities                       5 days
    8.21.2.7      Lag in Process                                     1 day
  8.21.3        Port 2 Activities                                  15 days
    8.21.3.1      Update Design of Internal Commands                7 days
    8.21.3.2      Update Pointing Design                            7 days
    8.21.3.3      Testing & Validation                              7 days
    8.21.3.4      Final SASFs Due                                   0 days
    8.21.3.5      Update Power Profile                              0 days
    8.21.3.6      Review of Port 2 Activities                       4 days
    8.21.3.7      Lag in Process                                    2 days
  8.21.4        Port 3 Activities                                  15 days
    8.21.4.1      Update Design of Internal Commands                5 days
      8.21.4.2           Update Pointing Design                                 5 days
      8.21.4.3           Testing & Validation                                   5 days
      8.21.4.4           Final SASFs Due                                        0 days
      8.21.4.5           Update Power Profile                                   0 days
      8.21.4.6           Review of Port 3 Activities                            2 days
      8.21.4.7           Lag in Process                                         6 days
    8.21.5             SPVT/SVT support                               UM       55 days
      8.21.5.1           Meeting Support                                       55 days
      8.21.5.2           Response to Meeting Actions                           55 days
9                   Ground System Operations                          UM     1492 days
 9.1                 Ground System Management                                1478 days
   9.1.1               Configuration Control                                 1436 days
   9.1.2               Document Control                                      1436 days
 9.2                 Equipment & Facilities Maintenance               UM     1492 days
   9.2.1               EM & Vacuum Facilities                         SwRI   1449 days
   9.2.2               Calibration Facility at SwRI                   SwRI   1449 days
   9.2.3               Calibration Facility at Goddard                GSFC   1449 days
   9.2.4               GSFC EM Test Facility Maintenance              GSFC   1449 days
   9.2.5               Lab Facilities at University of Virginia       Uva    1449 days
   9.2.6               Lab Facility at NDRE                           NDRE   1449 days
   9.2.7               Foil Facility at University of Michigan        UM     1449 days
   9.2.8               Foil Facility & IMS Parts                      CETP   1449 days
   9.2.9               EGSE Hardware                                  SwRI   1478 days
     9.2.9.1             RTIU Suppport                                       1478 days
     9.2.9.2             SAM/CPU2                                     GSFC   1449 days
     9.2.9.3             Prototype, IMS parts, FEE, ….                LANL   1449 days
     9.2.9.4             ELS prototype                                MSSL   1449 days
   9.2.10              EGSE Software                                         1478 days
     9.2.10.1            RTIU Interface CAPS/GSE Development                   20 days
     9.2.10.2            EGSE Software Maintenance                           1478 days
     9.2.10.3            EM Flight Software maintenance               SwRI   1449 days
     9.2.10.4            CPU1 & System Flight Software maintenance    SwRI   1449 days
     9.2.10.5            CPU2 & SAM Flight Software maintenance       GSFC   1449 days
 9.3                 Production Data Processing                              1478 days
   9.3.1               Security                                       UM     1449 days
   9.3.2               Software System Operations                            1478 days
     9.3.2.1             Data Accounting                                     1478 days
     9.3.2.2             Data Quality Assessment                             1478 days
   9.3.3               Software Maintenance                                  1128 days
     9.3.3.1             Integrate Algorithm Updates                         1128 days
   9.3.4               Computer System Administration                        1478 days
   9.3.5               Computer System Maintenance                           1478 days
     9.3.5.1             Operating System Upgrades                           1478 days
     9.3.5.2             Hardware preventative maintenance                   1478 days
10                  Data Archive Operations                           UM     1683 days
 10.1                Archive Volume Development                       UM      270 days
   10.1.1              Reuirements analysis and specification                  20 days
   10.1.2              Data Product Definition                        UM      240 days
     10.1.2.1            Specify contents of archival data products           135 days
       10.1.2.1.1          Design archive sets                                 25 days
       10.1.2.1.2          Design Volumes                                      25 days
       10.1.2.1.3          Design Labels                                       25 days
       10.1.2.1.4           Preliminary Contents                               0 days
       10.1.2.1.5           Update Contents Specification                    110 days
       10.1.2.1.6           Final Contents                                     0 days
     10.1.2.2             Produce prototype data volumes                      46 days
     10.1.2.3             Submit Archive Package to peer review                0 days
     10.1.2.4             Update Archive Package                              40 days
     10.1.2.5             Re-Submit Archive Package to Peer Review             0 days
   10.1.3               CDF Generator (Level 1-A)                            235 days
     10.1.3.1             CDF generation development                         175 days
     10.1.3.2             Release to Support Prototype                         0 days
     10.1.3.3             CDF generation final updates                        35 days
     10.1.3.4             Final Release                                        0 days
   10.1.4               Geophysical Data Archive Generator (GDA)             235 days
     10.1.4.1             GDA development                                    175 days
     10.1.4.2             Release to Support Prototype                         0 days
     10.1.4.3             GDA final updates                                   35 days
     10.1.4.4             Final Release                                        0 days
   10.1.5               Ready To Integrate                                     0 days
 10.2                 PDS Volume Generation                          UM      929 days
   10.2.1               Aggregate file creation                              929 days
   10.2.2               Form volume labels                                   929 days
   10.2.3               Create archive volumes                               929 days
   10.2.4               Transmit to PDS                                      929 days
   10.2.5               Coordinate science validation                        929 days
   10.2.6               Update PDS files (as necessary)                      929 days
   10.2.7               Deliveries                                           882 days
     10.2.7.1             Deliver pre-SOI data                                 0 days
     10.2.7.2             Deliver SOI Through Probe                            0 days
     10.2.7.3             Staged Tour Deliveries                             689 days
       10.2.7.3.1           April 2006 Delivery                                0 days
       10.2.7.3.2           August 2006 Delivery                               0 days
       10.2.7.3.3           December 2006 Delivery                             0 days
       10.2.7.3.4           April 2007 Delivery                                0 days
       10.2.7.3.5           August 2007 Delivery                               0 days
       10.2.7.3.6           December 2007 Delivery                             0 days
       10.2.7.3.7           April 2008 Delivery                                0 days
       10.2.7.3.8           August 2008 Delivery                               0 days
       10.2.7.3.9           December 2008 Delivery                             0 days
11                  Procurements                                     UM      135 days
 11.1                 Purchase Parts for EM Refurbish (4.1.1.1)      SwRI      0 days
 11.2                 Computers for 2 OTLs and 4 programmers                   0 days
 11.3                 Computers for students (3)                               0 days
 11.4                 Production Server for Ground System                    135 days
   11.4.1               Sun FIRE 280R                                          0 days
   11.4.2               Monitor 18" LCD                                        0 days
   11.4.3               Keyboard/Mouse                                         0 days
   11.4.4               Storage Array                                          0 days
   11.4.5               Tape Backup                                            0 days
   11.4.6               UPS                                                    0 days
   11.4.7               Software Licenses                                      0 days
   11.4.8               Hardware Maintenance                                   0 days
12                  Travel                                           TEAM   1607 days
12.1        Team Meetings                                 1397 days
  12.1.1        Team Meeting #25 (Jan '03)       Europe      2 days
  12.1.2      Team Meeting #26 (Aug '03)         US          2 days
  12.1.3      Team Meeting #27 (Feb '04)         Europe      2 days
  12.1.4      Team Meeting #28 (July '04)        US          2 days
  12.1.5      Team Meeting #29 (Nov '04)         Europe      2 days
  12.1.6      Team Meeting #30 (Feb '05)         US          2 days
  12.1.7      Team Meeting #31 (July '05)        Europe      2 days
  12.1.8      Team Meeting #32 (Nov '05)         US          2 days
  12.1.9      Team Meeting #33 (Feb '06)         Europe      2 days
  12.1.10     Team Meeting #34 (July '06)        US          2 days
  12.1.11     Team Meeting #35 (Nov '06)         Europe      2 days
  12.1.12     Team Meeting #36 (Feb '07)         US          2 days
  12.1.13     Team Meeting #37 (July '07)        Europe      2 days
  12.1.14     Team Meeting #38 (Nov '07)         US          2 days
  12.1.15     Team Meeting #39 (March '08)       Europe      2 days
  12.1.16     Team Meeting #40 (June '08)        US          2 days
12.2        Joint MAPS Meetings                           1260 days
  12.2.1      Joint MAPS meeting #2 (Aug '03)    US          2 days
  12.2.2      Joint MAPS meeting #3 (Feb '04)    Eurpoe      2 days
  12.2.3      Joint MAPS meeting #4 (July '05)   US          2 days
  12.2.4      Joint MAPS meeting #5 (July '06)   US          2 days
  12.2.5      Joint MAPS meeting #6 (July '07)   Europe      2 days
  12.2.6      Joint MAPS meeting #7 (June '08)   US          2 days
12.3        PSG Meetings                                  1438 days
  12.3.1      PSG Meeting (Oct '02)              US          5 days
  12.3.2      PSG Meeting (Jan '03)              US          5 days
  12.3.3      PSG Meeting (May '03)              Europe      5 days
  12.3.4      PSG Meeting (Oct '03)              US          5 days
  12.3.5      PSG Meeting (Jan '04)              US          5 days
  12.3.6      PSG Meeting (May '04)              Europe      5 days
  12.3.7      PSG Meeting (Oct '04)              US          5 days
  12.3.8      PSG Meeting (Jan '05)              US          5 days
  12.3.9      PSG Meeting (May '05)              Europe      5 days
  12.3.10     PSG Meeting (Oct '05)              US          5 days
  12.3.11     PSG Meeting (Jan '06)              US          5 days
  12.3.12     PSG Meeting (May '06)              Europe      5 days
  12.3.13     PSG Meeting (Oct '06)              US          5 days
  12.3.14     PSG Meeting (Jan '07)              US          5 days
  12.3.15     PSG Meeting (May '07)              Europe      5 days
  12.3.16     PSG Meeting (Oct '07)              US          5 days
  12.3.17     PSG Meeting (Jan '08)              US          5 days
  12.3.18     PSG Meeting (May '08)              Europe      5 days
12.4        OTL Trainings                                    5 days
  12.4.1      OTL Training Travel (Trip 1)       JPL         5 days
  12.4.2      OTL Training Travel (Trip 2)       JPL         5 days
12.5        Additional Travel to JPL                      1028 days
  12.5.1      General Meeting (Jan '03)          JPL         2 days
  12.5.2      General Meeting (Jan '04)          JPL         2 days
  12.5.3      General Meeting (Jan '05)          JPL         2 days
  12.5.4      General Meeting (Jan '06)          JPL         2 days
  12.5.5      General Meeting (Jan '07)          JPL         2 days
12.6        Scientific Conferences            4 days
  12.6.1     Conference AGU ('03)    US       4 days
  12.6.2     Conference EGS ('03)    Europe   4 days
  12.6.3     Conference MOP ('03)    US       4 days
  12.6.4     Conference AGU ('04)    US       4 days
  12.6.5     Conference EGS ('04)    Europe   4 days
  12.6.6     Conference MOP ('04)    Europe   4 days
  12.6.7     Conference AGU ('05)    US       4 days
  12.6.8     Conference EGS ('05)    Europe   4 days
  12.6.9     Conference MOP ('05)    US       4 days
  12.6.10    Conference AGU ('06)    US       4 days
  12.6.11    Conference EGS ('06)    Europe   4 days
  12.6.12    Conference MOP ('06)    Europe   4 days
  12.6.13    Conference AGU ('07)    US       4 days
  12.6.14    Conference EGS ('07)    Europe   4 days
  12.6.15    Conference MOP ('07)    US       4 days
  12.6.16    Conference AGU ('08)    US       4 days
  12.6.17    Conference EGS ('08)    Europe   4 days
  12.6.18    Conference MOP ('08)    Europe   4 days
Start_Date Finish_Date Predecessors    Resource_Names
   10/01/02     06/30/08
   10/01/02     06/30/08
   10/01/02     06/30/08               Dyoung[1%],Jfurman[1%],SwRIpl2[1%],Dglenn[1%]
   10/01/02     06/30/08
   10/01/02     06/30/08
   10/01/02     06/30/08               TEAM,SwRIpl3[5%],SwRIpl4[5%]
   10/01/02     06/30/08               Dyoung[5%],Fcrary[10%],Esittler[5%]
   10/01/02     04/30/08               Fcrary[45%],Jfurman[5%]
   10/01/02     03/20/08               Fcrary[2%],Dyoung[2%],LANLsci[5%]
   10/01/02     04/15/08               Dyoung[2%],Fcrary[2%]
   10/01/02     04/30/08               Dyoung[2%],Fcrary[2%],TEAM[3%]
   10/01/02     06/30/08               Fcrary[2%],TEAM
   10/01/02     05/29/08               student[15%]
   10/01/02     06/30/08               student[15%]
   10/01/02     12/23/08
   10/01/02     09/30/08
   10/01/02     12/23/02               Dyoung[15%],Fcrary[5%],Jfurman[1%],Dgell[5%]
   01/02/03     12/23/03       17      Dyoung[15%],Fcrary[5%],Jfurman[1%],Dgell[5%]
   10/21/02     06/01/04               Fcrary[10%],Dgell[10%]
   11/26/02     06/13/03     233,234   UM,MSSL,NDRE,RAL,GSFC
   11/26/02     12/19/02               SwRIpl3[15%],SwRIpl4[5%]
   11/26/02     12/11/02
   12/12/02     12/16/02       22
   12/17/02     12/17/02       23
   12/18/02     12/18/02       24
   12/19/02     12/19/02       25
   12/20/02     01/28/03               SwRIpl3[15%],SwRIpl4[5%]
   12/20/02     01/20/03       26
   01/21/03     01/23/03       28
   01/24/03     01/24/03       29
   01/27/03     01/27/03       30
   01/28/03     01/28/03       31
   01/29/03     06/04/03
   01/29/03     06/04/03       32
   06/05/03     06/13/03
   06/05/03     06/11/03       34
   06/12/03     06/12/03       36
   06/13/03     06/13/03       37
   11/26/02     06/13/03     234,233   UM,LANLprog[7%],OULU,GSFC,OTLbkup/prog4[10%]
   11/26/02     12/19/02
   11/26/02     12/11/02
   12/12/02     12/16/02       41
   12/17/02     12/17/02       42
   12/18/02     12/18/02       43
   12/19/02     12/19/02       44
   12/20/02     01/28/03
   12/20/02     01/20/03       45
   01/21/03     01/23/03       47
   01/24/03     01/24/03       48
   01/27/03     01/27/03       49
   01/28/03     01/28/03       50
01/29/03   06/04/03
01/29/03   06/04/03     51
06/05/03   06/13/03
06/05/03   06/11/03     53
06/12/03   06/12/03     55
06/13/03   06/13/03    53,56
11/26/02   06/13/03   234,233   UM,LANLprog[7%],CETP,Uva,GSFC,OTLbkup/prog4[10%]
11/26/02   12/19/02
11/26/02   12/11/02
12/12/02   12/16/02     60
12/17/02   12/17/02     61
12/18/02   12/18/02     62
12/19/02   12/19/02     63
12/20/02   01/28/03
12/20/02   01/20/03     64
01/21/03   01/23/03     66
01/24/03   01/24/03     67
01/27/03   01/27/03     68
01/28/03   01/28/03     69
01/29/03   06/04/03
01/29/03   06/04/03     70
06/05/03   06/13/03
06/05/03   06/11/03     72
06/12/03   06/12/03     74
06/13/03   06/13/03    72,75
10/01/02   06/30/08             Esittler,Sbakshi,Dsimpson,Evaughan
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/15/07
10/01/02   11/11/02
10/01/02   10/14/02             SwRIpl4[30%],SwRIpl3[30%],SwRIpl2
10/15/02   11/11/02     97      SwRIpl2[25%],SwRIpl1
06/15/05   06/15/07             SwRIpl1[2%]
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08             LANLprog[10%],LANLsci[6%]
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   09/30/08
10/01/02   09/30/08   Fcrary[2%],OTLbkup/prog4[80%]
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
10/01/02   06/30/08
10/01/02   06/30/08
06/15/05   06/15/07
06/15/05   06/15/05
06/15/06   06/15/06
06/15/07   06/15/07
07/18/05   08/01/05         TEAM,Dsimpson,Sbakshi,Evaughan
07/18/05   07/29/05   431   SwRIpl2[50%]
07/30/05   08/01/05   164   SwRIpl2
10/01/02   12/23/08         TEAM
10/01/02   09/30/08         Esittler
01/02/04   12/23/08         LANLsci[4%],Esittler,Dsimpson,SwRIpl3[10%],Dyoung[10%],Fcrary[5%]
03/02/04   06/30/08         TEAM
03/02/04   06/30/08         TEAM
01/02/04   04/29/08         TEAM
01/02/04   04/29/08         TEAM
01/02/04   04/29/08         TEAM
03/02/04   12/23/08         TEAM
01/02/04   12/23/08         LANLsci[37%],LANLpdoc[83%],Esittler,Dsimpson,SwRIpl3[20%],SwRIpl4[20%
03/02/04   12/23/08         TEAM
03/02/04   12/23/08         TEAM
01/02/04   10/28/08         TEAM
01/02/04   10/28/08         TEAM
01/02/04   10/28/08         TEAM
01/02/04   03/03/08         Uva,TEAM
01/02/04   10/28/08         TEAM
01/02/04   10/28/08         TEAM
05/01/02   06/30/08
06/26/02   05/30/08         LANLsci[3%],CETP,MSSL
10/01/02   03/10/06
10/01/02   02/14/03         SwRIpl3[25%],SwRIpl2[10%],SwRIsrt[60%],UM,GSFC,Dyoung[2%]
02/17/03   03/28/03   187   SwRIpl4[15%],SwRIpl3[25%],SwRIpl2[25%],SwRIsrt,UM,GSFC
02/17/03   06/23/03   187   SwRIpl3[10%],GSFC
03/31/03   05/09/03   188   SwRIpl4[15%],SwRIpl3[25%],SwRIpl2[25%],SwRIsrt,UM,GSFC
11/01/05   12/13/05         SwRIpl4[15%],SwRIpl3[25%],SwRIpl2[25%],SwRIsrt,UM,GSFC
11/01/05   03/10/06         SwRIpl3[10%],GSFC
06/26/02   05/30/08
10/01/02   10/14/02         Fcrary[26%],Jfurman[30%],Dyoung[3%]
06/26/02   05/30/08         (approx. once per 50 days)
10/01/02   12/23/03
10/01/02   12/23/03         LANLsci[3%]
10/01/02   12/23/03         UM,SwRI,CETP,Uva,GSFC
10/01/02   12/23/03         UM,SwRI,CETP,Uva,GSFC
10/01/02   12/23/03         UM,SwRI,CETP,Uva,GSFC
10/01/02   12/23/03         UM,SwRI,CETP,Uva,GSFC
10/01/02   12/23/03         UM,OULU
10/01/02   12/23/03         MSSL,NDRE
05/01/02   06/30/08         UM,SwRI,CETP,MSSL,GSFC
05/01/02   11/18/03
05/01/02   05/21/02         SwRIpl3[25%],SwRIpl1
05/22/02   08/12/02   206   SwRIpl3[50%],Esittler[10%],Dchorney[10%],LANLsci[3%]
08/13/02   09/04/02     207     SwRIpl3[50%],Esittler[10%],Dchorney[10%],LANLsci[3%]
09/05/02   09/24/02     208     SwRIpl3[50%],Esittler[10%],Dchorney[10%],LANLsci[3%]
09/25/02   10/23/02     209     SwRIpl3[50%],Esittler[10%],Dchorney[10%],LANLsci[3%]
06/24/03   09/17/03     189     SwRIpl3[4%],Esittler,Dchorney,LANLsci[3%]
10/24/02   01/28/03     210     SwRIpl3[50%],Esittler[10%],Dchorney[10%],LANLsci[3%]
09/18/03   10/29/03   212,211   SwRIpl3[50%],Esittler[10%],Dchorney[10%],LANLsci[3%]
10/30/03   11/18/03     213     SwRIpl3[50%],Esittler[10%],Dchorney[10%],LANLsci[3%]
10/01/02   12/23/03             LANL
10/01/02   12/23/03             MSSL
02/24/04   08/27/04             TEAM,SwRIpl3[10%]
10/01/02   06/30/08             TEAM,SwRIpl3[5%],GSFC,LANLsci[2%],MSSL,Fcrary[2%]
02/16/05   07/29/05             TEAM,SwRIpl3[5%],GSFC,LANLsci[2%],MSSL,Fcrary[2%]
03/22/02   07/16/07
03/22/02   03/04/04
10/01/02   12/11/02
10/01/02   10/14/02             Dgell[67%]
10/15/02   10/28/02    223      Dgell[67%]
10/15/02   10/28/02             Dgell[33%],SwRIpl2[33%]
10/15/02   10/28/02     223
10/15/02   10/28/02     223
10/15/02   10/28/02     223
10/15/02   10/28/02     223
10/15/02   10/28/02     223
10/15/02   10/28/02     223
10/15/02   10/28/02     223
10/29/02   11/11/02     224     Dgell[75%]
10/29/02   11/25/02     224     Jfurman[25%],SwRIpl2[25%]
11/26/02   12/11/02   234,233   Dgell[75%]
10/29/02   11/25/02     224     Dgell[25%]
03/22/02   06/10/02
03/22/02   03/28/02             Dgell
03/22/02   06/10/02             SwRI
03/22/02   03/25/02
03/26/02   04/30/02
03/26/02   04/08/02    240
04/09/02   04/22/02    242
04/23/02   04/29/02    243
04/30/02   04/30/02    244
04/30/02   04/30/02    245
05/01/02   05/30/02
05/01/02   05/07/02    246
05/08/02   05/14/02    248
05/15/02   05/28/02    249
05/29/02   05/30/02    250
05/30/02   05/30/02    251
05/31/02   06/10/02
05/31/02   06/06/02    252
06/07/02   06/07/02    254
06/10/02   06/10/02    255
06/10/02   06/10/02    256
12/12/02   02/28/03
12/12/02   01/24/03             SwRIpl2[50%],Dgell[25%]
12/12/02   12/18/02      235
12/19/02   01/03/03      260
01/06/03   01/10/03      261
01/13/03   01/17/03      262
01/20/03   01/24/03      263
01/27/03   02/28/03
01/27/03   02/19/03
01/27/03   02/07/03      264        prog1
02/10/03   02/14/03      267        prog1
01/27/03   01/28/03      264        SwRIpl1
01/29/03   01/30/03      269        SwRIpl1
01/31/03   02/03/03      270        SwRIpl1
02/04/03   02/05/03      271        SwRIpl1
02/06/03   02/07/03      272        SwRIpl1
02/17/03   02/19/03      268        prog1
01/27/03   02/28/03      264        prog2[40%]
01/27/03   02/12/03      264        prog2[40%]
01/27/03   02/05/03                 prog2[20%]
01/27/03   01/29/03      264
01/30/03   01/30/03      278
01/31/03   01/31/03      279
02/03/03   02/03/03      280
02/04/03   02/04/03      281
02/05/03   02/05/03      282
02/19/03   02/19/03    266,277
02/20/03   05/07/03
02/20/03   03/12/03      284        Dgell[75%]
03/13/03   04/09/03                 prog1[95%]
03/13/03   03/19/03      286
03/20/03   04/02/03      288
04/03/03   04/09/03      289
03/13/03   05/07/03
03/13/03   04/09/03      286        prog2[95%]
03/13/03   05/07/03      286        student[25%],student2[25%]
04/10/03   05/07/03      292        prog2[95%]
03/13/03   05/05/03
03/13/03   04/30/03       286       prog2[5%]
03/13/03   04/30/03       286       prog1[5%]
05/01/03   05/05/03       297       prog1
04/10/03   04/17/03       290       prog1[95%]
04/18/03   04/24/03       299       prog1[95%]
05/07/03   05/07/03   300,294,290
06/05/03   08/07/03
06/05/03   06/18/03    301,398      Dgell[75%]
06/19/03   06/25/03      303        prog1[90%]
06/19/03   06/25/03      303        prog2[90%]
06/26/03   07/02/03    304,305      prog1[90%]
07/03/03   07/24/03                 prog1
07/03/03   07/10/03   306,305,304
07/11/03   07/24/03       308
06/19/03   08/07/03                 SwRIpl2[75%],SwRIpl1
06/19/03   06/25/03      303
06/26/03   08/07/03        311
06/26/03   07/03/03
07/07/03   07/14/03        313
07/15/03   08/07/03
07/15/03   07/22/03        314
07/23/03   07/30/03        316
07/31/03   08/07/03        317
07/03/03   07/24/03                     prog2
07/03/03   07/10/03    306,305,304
07/11/03   07/24/03        320
06/19/03   07/28/03
06/19/03   07/02/03         303         prog1[10%]
06/19/03   07/02/03         303         prog2[10%]
06/19/03   06/30/03         303         student2[25%]
07/25/03   07/28/03       325,309       prog1
08/07/03   08/07/03   307,310,319,322
04/01/02   10/31/03
08/08/03   08/21/03        327          Dgell[75%],SwRIpl2[50%]
08/22/03   09/19/03                     SwRIpl2[25%],SwRIpl1[200%]
08/22/03   08/28/03        329
08/29/03   09/04/03        331
09/05/03   09/12/03        332
09/15/03   09/19/03        333
04/01/02   08/06/03                     Esittler,Sbakshi,Evaughan,Dsimpson
04/01/02   05/14/02                     Esittler,Sbakshi,Evaughan,Dsimpson
05/15/02   10/31/02                     Esittler,Sbakshi,Evaughan,Dsimpson
05/15/02   09/20/02        336          Esittler,Sbakshi,Evaughan,Dsimpson
05/15/02   09/20/02        336          Esittler,Sbakshi,Evaughan,Dsimpson,Dgell[10%]
09/23/02   10/24/02      339,338        Esittler,Sbakshi,Evaughan,Dsimpson
10/25/02   10/25/02        340          Dyoung[13%],Dgell[13%],Fcrary[10%],Jfurman[10%],Esittler,Sbakshi,Evaugh
10/28/02   10/31/02        341          Esittler,Sbakshi,Evaughan,Dsimpson
10/31/02   10/31/02        342
11/01/02   06/09/03                     Esittler,Sbakshi,Evaughan,Dsimpson
11/01/02   06/09/03        343          Sbakshi,Evaughan,Dsimpson
06/10/03   08/06/03                     GSFC
06/10/03   07/15/03        345          Evaughan,Sbakshi,Dsimpson
07/16/03   07/16/03        347          Dgell[13%],Fcrary[10%],Jfurman[10%],Sbakshi,Evaughan,Dsimpson,Esittler,D
07/17/03   07/22/03        348          Evaughan,Sbakshi,Dsimpson
07/23/03   08/06/03        349          Sbakshi,Evaughan,Dsimpson
08/06/03   08/06/03        346
09/22/03   10/31/03        330          SwRIpl2[25%],SwRIpl1[200%]
09/22/03   09/26/03        329
09/29/03   10/24/03        353
10/27/03   10/31/03        354
08/22/03   08/29/03                     SwRIpl2[25%],SwRIpl1
08/22/03   08/22/03         329         prog2
08/25/03   08/25/03         357         prog2
08/26/03   08/27/03         358         prog2
08/28/03   08/29/03         359         prog2
10/31/03   10/31/03   330,335,352,356
11/12/02   03/04/04
12/05/03   12/18/03      361,417        Dgell[75%]
12/19/03   01/10/04                     prog1
12/19/03   01/05/04       233,363
01/06/04   01/10/04         365
12/19/03   01/23/04                     prog2
12/19/03   01/05/04         363
01/06/04   01/10/04         368
01/12/04   01/23/04         369
11/12/02   07/08/03                     science teams
11/12/02   01/17/03         233
01/20/03   03/14/03         372         GSFC,TEAM,SwRIpl3[10%]
03/17/03   05/09/03         373         GSFC,TEAM,SwRIpl3[10%]
05/12/03   07/08/03         374         GSFC,TEAM,SwRIpl3[10%]
12/19/03   01/13/04                     science teams,SwRIpl3[10%]
12/19/03   01/10/04         363
01/12/04   01/13/04         377
12/19/03   01/13/04                     GSFC,TEAM,SwRIpl3[10%]
12/19/03   01/10/04         363
01/12/04   01/13/04         380         UM
01/12/04   02/06/04         364         prog1
01/26/04   02/20/04         370         prog2
02/09/04   03/04/04         382         prog1
02/21/04   02/27/04
02/21/04   02/21/04         383         prog2
02/23/04   02/23/04         386         prog2
02/24/04   02/25/04         387         prog2
02/26/04   02/27/04         388         prog2
03/04/04      385,376,371,364,367,382,383,384
           03/04/04
12/12/02   07/16/07
12/12/02   01/10/03         222         Dgell[50%]
05/08/03   06/04/03         301         Dgell[25%],prog2[15%],prog1[15%]
05/08/03   05/14/03       287,301
05/15/03   05/21/03     291,301,394
05/22/03   05/23/03     299,301,395
05/26/03   05/27/03     300,301,396
05/28/03   06/04/03         397
08/08/03   09/01/03         327         prog1
08/08/03   08/11/03       304,327
08/12/03   08/13/03     400,305,327
08/14/03   08/15/03     401,306,327
08/18/03   08/19/03     402,307,327
08/20/03   08/21/03     403,310,327
08/22/03   08/25/03     404,319,327
08/26/03   09/01/03         405
11/03/03   12/04/03         361         prog1
11/03/03   11/12/03       330,361
11/03/03   11/04/03       330,361
11/05/03   11/06/03     330,361,409
11/07/03   11/10/03     330,361,410
11/11/03   11/12/03     330,361,411
11/13/03   11/19/03     361,335,408
11/20/03   11/25/03     352,361,413
11/20/03   11/21/03       352,361
11/24/03   11/25/03   352,361,415
11/26/03   12/04/03       414
03/05/04   03/30/04       390       prog1
03/05/04   03/08/04     364,390
03/09/04   03/10/04       419
03/11/04   03/24/04   371,390,420
03/25/04   03/26/04   382,390,421
03/29/04   03/30/04   383,390,422
03/05/04   03/08/04     384,390
03/09/04   03/15/04       424
06/11/03   06/19/03                 prog1
06/11/03   06/12/03     2721
06/11/03   06/12/03     2721
06/13/03   06/19/03    427,428
07/01/05   07/16/07                 prog1[30%]
07/01/05   07/15/05
07/05/06   07/17/06
07/02/07   07/16/07
10/01/02   08/05/03
10/01/02   03/13/03                 MSSL,LANL[5%],Dgell[5%],SwRIpl2[20%]
10/01/02   03/13/03                 MSSL,UM,SwRIpl2[15%]
10/01/02   07/15/03                 MSSL,LANL,UM,SwRIpl2[15%]
08/04/03   08/05/03                 TEAM,UM
10/01/02   03/27/08
10/01/02   02/05/03
11/06/02   11/11/02                 TEAM,SwRIpl3[50%],SwRIpl2
11/06/02   01/27/03                 SwRI,UM
11/12/02   11/25/02      441        SwRIpl2
11/26/02   12/09/02
11/26/02   12/03/02      443        SwRIpl2
12/04/02   12/09/02      445        SwRIpl2
12/10/02   12/17/02                 LANLsci[5%],UM,TEAM
12/10/02   12/12/02      446        SwRIpl2
12/13/02   12/17/02      448        SwRIpl2
12/18/02   01/03/03                 UM
12/18/02   12/20/02      449        SwRIpl2
12/23/02   01/03/03      451        SwRIpl2
01/06/03   01/13/03                 UM
01/06/03   01/08/03      452        SwRIpl2
01/09/03   01/13/03      454        SwRIpl2
01/14/03   01/16/03      455        SwRIpl2,Dglenn,Sbakshi,Mjohnson
11/06/02   01/10/03      441        Moben,Dglenn,Esittler,Sbakshi,UM
01/17/03   01/27/03                 Dglenn
01/17/03   01/23/03      456        SwRIpl2
01/24/03   01/27/03      459        SwRIpl2
10/01/02   01/27/03                 GSFC,SwRI,UM,SwRIpl3[5%],SwRIpl2[10%]
10/01/02   11/01/02                 Dglenn,Sbakshi,Mjohnson
11/04/02   12/06/02                 SwRI,UM,TEAM,GSFC
11/04/02   11/27/02      462        Dglenn,Sbakshi
11/11/02   12/06/02                 Dglenn
12/02/02   01/03/03                 Dglenn
12/02/02   12/23/02                 Dglenn
12/09/02   01/03/03             Dglenn
12/03/02   01/15/03             Dglenn,Mjohnson
12/03/02   01/10/03             Dglenn
01/02/03   01/15/03             Dglenn
01/13/03   01/21/03             Dglenn
01/13/03   01/15/03    470      Dglenn
01/16/03   01/21/03    473      Dglenn
01/02/03   01/27/03             GSFC,SwRI
01/02/03   01/17/03             Dglenn,Sbakshi
01/20/03   01/27/03    476      Dglenn,Sbakshi
01/28/03   02/05/03             GSFC,SwRI
01/28/03   02/03/03   477,460   Dglenn,Sbakshi,SwRIpl2
02/04/03   02/05/03     479     Dglenn,Sbakshi,SwRIpl2
11/17/04   02/15/05             TEAM,SwRIpl2,SwRIpl3[25%]
11/17/05   02/15/06             TEAM,SwRIpl2,SwRIpl3[25%]
11/17/06   02/16/07             TEAM,SwRIpl2,SwRIpl3[25%]
11/16/07   02/15/08             TEAM,SwRIpl2,SwRIpl3[25%]
02/04/03   03/27/08             GSFC
02/04/03   06/16/03
04/11/03   06/16/03
02/04/03   02/24/03    479      SwRIpl2[25%],UM,Dglenn
05/01/03   05/07/03             SwRIpl2[25%],UM,Dglenn
05/08/03   05/28/03    489      TEAM,SwRIpl2[25%],SwRIpl3[25%]
02/07/05   04/01/05
02/07/05   02/11/05             SwRIpl2[25%],UM,Dglenn
03/07/05   03/11/05             SwRIpl2[25%],UM,Dglenn
03/14/05   04/01/05    493      TEAM,SwRIpl2[25%],SwRIpl3[25%]
02/06/06   03/30/06
02/06/06   02/10/06             SwRIpl2[25%],UM,Dglenn
03/06/06   03/10/06             SwRIpl2[25%],UM,Dglenn
03/11/06   03/30/06    497      TEAM,SwRIpl2[25%],SwRIpl3[25%]
02/05/07   03/30/07
02/05/07   02/09/07             SwRIpl2[25%],UM,Dglenn
03/05/07   03/09/07             SwRIpl2[25%],UM,Dglenn
03/12/07   03/30/07    501      TEAM,SwRIpl2[25%],SwRIpl3[25%]
01/30/08   03/27/08
01/30/08   02/04/08             SwRIpl2[25%],UM,Dglenn
03/03/08   03/07/08             SwRIpl2[25%],UM,Dglenn
03/10/08   03/27/08    505      TEAM,SwRIpl2[25%],SwRIpl3[25%]
08/30/02   06/30/08
10/01/02   11/25/02             OTL2,OTLbkup/prog4
10/14/02   05/15/04
10/14/02   04/14/03
10/14/02   12/06/02             UM,TEAM,LANLsci[2%]
10/14/02   10/14/02
10/15/02   10/16/02    512      Jfurman[13%]
10/17/02   10/17/02    513      TEAM,Jfurman[13%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
10/18/02   10/18/02    514      Jfurman[20%]
10/21/02   12/06/02    515      Jfurman[10%]
10/21/02   01/02/03             GSFC,SwRI,UM
10/21/02   12/06/02    515      Jfurman[10%]
12/09/02   12/20/02    518      Jfurman[8%],SwRIpl2[10%]
12/23/02   12/23/02   519   Jfurman[5%]
01/02/03   01/02/03   520   Fcrary[13%],Dyoung[13%],Dglenn[13%]
10/15/02   02/14/03         Jfurman[5%]
10/15/02   02/14/03   512
10/15/02   02/14/03   512   Jfurman[2%]
01/02/03   01/08/03         UM,SwRIpl2[50%],GSFC
01/02/03   01/03/03   520   Jfurman[13%]
01/06/03   01/07/03   526   Jfurman[13%]
01/08/03   01/08/03   527   Fcrary[13%],Dyoung[13%],Dglenn[13%]
02/17/03   04/14/03
02/17/03   04/14/03   524   Jfurman[3%]
12/09/02   06/16/03
12/09/02   02/14/03         UM,TEAM,LANLsci[2%]
12/09/02   12/09/02
12/10/02   12/11/02   533   OTL2[25%]
12/12/02   12/12/02   534   TEAM,OTL2[20%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
12/13/02   12/13/02   535   OTL2[20%]
12/16/02   02/14/03   536   OTL2[10%]
12/16/02   03/10/03         GSFC,UM
12/16/02   02/14/03   536   OTL2[10%]
02/17/03   02/28/03   539   OTL2[10%],SwRIpl2[10%]
03/03/03   03/07/03   540   OTL2[5%]
03/10/03   03/10/03   541   Fcrary[13%],Dyoung[13%],Dglenn[13%]
12/10/02   04/11/03
12/10/02   04/11/03   533   OTL2[5%]
12/10/02   04/11/03   533   OTL2[5%]
03/10/03   03/14/03         UM,SwRIpl2[50%],GSFC
03/10/03   03/11/03   541   OTL2[25%]
03/12/03   03/13/03   547   OTL2[25%]
03/14/03   03/14/03   548   Fcrary[13%],Dyoung[13%],Dglenn[13%]
04/14/03   06/16/03
04/14/03   06/16/03   545   OTL2[3%]
03/03/03   08/11/03
03/03/03   04/04/03         UM,TEAM,LANLsci[2%]
03/03/03   03/03/03
03/04/03   03/05/03   554   Jfurman[25%]
03/06/03   03/06/03   555   TEAM,Jfurman[20%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
03/07/03   03/07/03   556   Jfurman[20%]
03/10/03   04/04/03   557   Jfurman[10%]
03/10/03   04/28/03         GSFC,UM
03/10/03   04/04/03   557   Jfurman[10%]
04/07/03   04/18/03   560   Jfurman[10%],SwRIpl2[10%]
04/21/03   04/25/03   561   Jfurman[5%]
04/28/03   04/28/03   562   Fcrary[13%],Dyoung[13%],Dglenn[13%]
03/10/03   06/13/03
03/10/03   06/13/03   554   Jfurman[5%]
03/10/03   06/13/03   554   Jfurman[5%]
04/28/03   05/02/03         UM,SwRIpl2[25%],GSFC
04/28/03   04/29/03   562   Jfurman[5%]
04/30/03   05/01/03   568   Jfurman[5%]
05/02/03   05/02/03   569   Fcrary[13%],Dyoung[13%],Dglenn[13%]
06/16/03   08/11/03
06/16/03   08/11/03   566   Jfurman[3%]
04/21/03   10/20/03
04/21/03   06/13/03         UM,TEAM,LANLsci[2%]
04/21/03   04/21/03
04/22/03   04/23/03   575   OTL2[25%]
04/24/03   04/24/03   576   TEAM,OTL2[20%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
04/25/03   04/25/03   577   OTL2[20%]
04/28/03   06/13/03   578   OTL2[10%]
04/28/03   07/08/03         GSFC,UM
04/28/03   06/13/03   578   OTL2[10%]
06/16/03   06/27/03   581   OTL2[10%],SwRIpl2[10%]
06/30/03   07/07/03   582   OTL2[5%]
07/08/03   07/08/03   583   Fcrary[13%],Dyoung[13%],Dglenn[13%]
04/22/03   08/08/03
04/22/03   08/08/03   575   OTL2[5%]
04/22/03   08/08/03   575   OTL2[5%]
07/08/03   07/14/03         UM,SwRIpl2[50%],GSFC
07/08/03   07/09/03   583   OTL2[5%]
07/10/03   07/11/03   589   OTL2[5%]
07/14/03   07/14/03   590   Fcrary[13%],Dyoung[13%],Dglenn[13%]
08/11/03   10/20/03
08/11/03   10/20/03   587   OTL2[3%]
06/30/03   01/10/04
06/30/03   08/22/03         UM,TEAM,LANLsci[2%]
06/30/03   06/30/03
07/01/03   07/02/03   596   Jfurman[25%]
07/03/03   07/03/03   597   TEAM,Jfurman[20%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
07/07/03   07/07/03   598   Jfurman[20%]
07/08/03   08/22/03   599   Jfurman[10%]
07/08/03   09/16/03         GSFC,UM
07/08/03   08/22/03   599   Jfurman[10%]
08/25/03   09/05/03   602   Jfurman[10%],SwRIpl2[10%]
09/09/03   09/15/03   603   Jfurman[5%]
09/16/03   09/16/03   604   Fcrary[13%],Dyoung[13%],Dglenn[13%]
07/02/03   10/17/03
07/02/03   10/17/03   596   Jfurman[10%]
07/02/03   10/17/03   596   Jfurman[5%]
09/16/03   09/22/03         UM,SwRIpl2[50%],GSFC
09/16/03   09/17/03   604   Jfurman[5%]
09/18/03   09/19/03   610   Jfurman[5%]
09/22/03   09/22/03   611   Fcrary[13%],Dyoung[13%],Dglenn[13%]
10/20/03   01/10/04
10/20/03   01/10/04   608   Jfurman[3%]
08/25/03   02/21/04
08/25/03   10/17/03         TEAM,LANLsci[2%],UM
08/25/03   08/25/03
08/26/03   08/27/03   617   OTL2[25%]
08/28/03   08/28/03   618   TEAM,OTL2[20%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
08/29/03   08/29/03   619   OTL2[20%]
09/01/03   10/17/03   620   OTL2[10%]
09/01/03   11/10/03         UM,GSFC
09/01/03   10/17/03   620   OTL2[10%]
10/20/03   10/31/03   623   OTL2[10%],SwRIpl2[10%]
11/03/03   11/07/03   624   OTL2[5%]
11/10/03   11/10/03   625   Fcrary[13%],Dyoung[13%],Dglenn[13%]
08/26/03   01/09/04
08/26/03   01/09/04   617   OTL2[5%]
08/26/03   01/09/04   617   OTL2[5%]
11/10/03   11/14/03         SwRIpl2[50%],GSFC,UM
11/10/03   11/11/03   625   OTL2[5%]
11/12/03   11/13/03   631   OTL2[5%]
11/14/03   11/14/03   632   Fcrary[13%],Dyoung[13%],Dglenn[13%]
01/10/04   02/21/04
01/10/04   02/21/04   629   OTL2[3%]
10/06/03   04/03/04
10/06/03   12/01/03         UM,TEAM,LANLsci[2%]
10/06/03   10/06/03
10/07/03   10/08/03   638   Jfurman[25%]
10/09/03   10/09/03   639   TEAM,Jfurman[20%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
10/10/03   10/10/03   640   Jfurman[20%]
10/13/03   12/01/03   641   Jfurman[10%]
10/13/03   12/19/03         GSFC,UM
10/13/03   12/01/03   641   Jfurman[10%]
12/02/03   12/11/03   644   Jfurman[10%],SwRIpl2[10%]
12/12/03   12/18/03   645   Jfurman[5%]
12/19/03   12/19/03   646   Fcrary[13%],Dyoung[13%],Dglenn[13%]
10/23/03   02/20/04
10/23/03   02/20/04   638   Jfurman[10%]
10/23/03   02/20/04   638   Jfurman[5%]
12/19/03   01/05/04         UM,SwRIpl2[50%],GSFC
12/19/03   12/22/03   646   Jfurman[5%]
12/23/03   01/02/04   652   Jfurman[5%]
01/05/04   01/05/04   653   Fcrary[13%],Dyoung[13%],Dglenn[13%]
02/21/04   04/03/04
02/21/04   04/03/04   650   Jfurman[3%]
11/17/03   05/15/04
11/17/03   01/23/04         TEAM,LANLsci[2%],UM
11/17/03   11/17/03
11/18/03   11/19/03   659   OTL2[19%]
11/20/03   11/20/03   660   TEAM,OTL2[20%],SwRIpl3[25%],SwRIpl4[25%],Dyoung[13%]
11/21/03   11/21/03   661   OTL2[20%]
11/26/03   01/23/04   662   OTL2[10%]
11/26/03   02/16/04         UM,GSFC
11/26/03   01/23/04   662   OTL2[10%]
01/26/04   02/06/04   665   OTL2[10%],SwRIpl2[10%]
02/09/04   02/13/04   666   OTL2[5%]
02/16/04   02/16/04   667   Fcrary[13%],Dyoung[13%],Dglenn[13%]
11/18/03   04/02/04
11/18/03   04/02/04   659   OTL2[5%]
11/18/03   04/02/04   659   OTL2[5%]
02/16/04   02/20/04         SwRIpl2[50%],GSFC,UM
02/16/04   02/17/04   667   OTL2[5%]
02/18/04   02/19/04   673   OTL2[5%]
02/20/04   02/20/04   674   Fcrary[13%],Dyoung[13%],Dglenn[13%]
04/03/04   05/15/04
04/03/04   05/15/04        671         OTL2[3%]
02/02/04   06/30/08
02/02/04   06/18/04
02/02/04   02/02/04   709FF-102 days
02/02/04   02/13/04                    Jfurman[28%],Dyoung[5%],Fcrary[5%]
02/02/04   02/02/04        680
02/02/04   02/09/04        680
02/02/04   02/09/04        680
02/11/04   02/13/04        684
02/13/04   02/13/04        685
02/17/04   03/05/04                    Jfurman[35%]
02/17/04   02/26/04        686
02/17/04   02/19/04        686
02/26/04   02/26/04        688
02/27/04   02/27/04        690         Dyoung[13%],Fcrary[13%]
03/01/04   03/01/04        691
03/03/04   03/03/04        692         SwRIpl2
03/04/04   03/05/04        693
03/08/04   05/15/04
03/08/04   04/02/04        694         Jfurman[26%]
03/08/04   04/02/04        694
04/05/04   04/09/04      696,697       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
04/05/04   04/09/04      696,697
03/08/04   04/02/04        694         SwRIpl3[5%]
03/08/04   04/02/04                    Sbakshi,Esittler,Evaughan
03/08/04   04/02/04                    Sbakshi,Esittler,Evaughan
03/08/04   04/02/04                    Sbakshi,Esittler,Evaughan
04/12/04   05/15/04        699         Jfurman[10%]
02/03/04   05/14/04                    Jfurman[8%]
02/03/04   05/14/04        680
02/03/04   05/14/04        680
05/14/04   06/18/04                    Jfurman[3%]
05/14/04   06/18/04
03/11/04   07/30/04
03/11/04   03/11/04   740FF-102 days
03/12/04   03/25/04                    OTL2[28%],Dyoung[5%],Fcrary[5%]
03/12/04   03/12/04        711
03/12/04   03/19/04        711
03/12/04   03/19/04        711
03/22/04   03/24/04        715
03/25/04   03/25/04        716
03/26/04   04/14/04                    OTL2[35%]
03/26/04   04/06/04        717
03/26/04   03/30/04        717
04/06/04   04/06/04        719
04/07/04   04/07/04        721         Dyoung[13%],Fcrary[13%]
04/08/04   04/08/04        722
04/09/04   04/09/04        723         SwRIpl2
04/12/04   04/14/04        724
04/15/04   06/18/04
04/15/04   05/12/04        725         OTL2[26%]
04/15/04   05/12/04        725
05/13/04   05/18/04      727,728       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
05/13/04   05/19/04      727,728
04/15/04   05/12/04        725         SwRIpl3[5%]
04/15/04   05/12/04                    Sbakshi,Esittler,Evaughan
04/15/04   05/12/04                    Sbakshi,Esittler,Evaughan
04/15/04   05/12/04                    Sbakshi,Esittler,Evaughan
05/20/04   06/18/04        730         OTL2[10%]
03/12/04   06/23/04                    OTL2[8%]
03/12/04   06/23/04        711
03/12/04   06/23/04        711
06/18/04   07/30/04                    OTL2[3%]
06/18/04   07/30/04
04/21/04   09/10/04
04/21/04   04/21/04   771FF-102 days
04/22/04   05/05/04                    Jfurman[28%],Dyoung[5%],Fcrary[5%]
04/22/04   04/22/04        742
04/22/04   04/29/04        742
04/22/04   04/29/04        742
04/30/04   05/04/04        746
05/05/04   05/05/04        747
05/06/04   05/25/04                    Jfurman[35%]
05/06/04   05/17/04        748
05/06/04   05/10/04        748
05/17/04   05/17/04        750
05/18/04   05/18/04        752         Dyoung[13%],Fcrary[13%]
05/19/04   05/19/04        753
05/20/04   05/20/04        754         SwRIpl2
05/21/04   05/25/04        755
05/26/04   07/29/04
05/26/04   06/22/04        756         Jfurman[26%]
05/26/04   06/22/04        756
06/23/04   06/29/04      758,759       Jfurman[15%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
06/23/04   06/29/04      758,759
05/26/04   06/22/04        756         SwRIpl3[5%]
05/26/04   06/22/04                    Sbakshi,Esittler,Evaughan
05/26/04   06/22/04                    Sbakshi,Esittler,Evaughan
05/26/04   06/22/04                    Sbakshi,Esittler,Evaughan
06/30/04   07/29/04        761         Jfurman[10%]
04/22/04   08/04/04                    Jfurman[8%]
04/22/04   08/04/04        742
04/22/04   08/04/04        742
07/30/04   09/10/04                    Jfurman[3%]
07/30/04   09/10/04
05/26/04   10/15/04
05/26/04   05/26/04   802FF-102 days
05/27/04   06/10/04                    Dyoung[5%],Fcrary[5%],OTL2[28%]
05/27/04   05/27/04        773
05/27/04   06/04/04        773
05/27/04   06/04/04        773
06/07/04   06/09/04        777
06/10/04   06/10/04        778
06/11/04   06/30/04                    OTL2[35%]
06/11/04   06/22/04        779
06/11/04   06/15/04        779
06/22/04   06/22/04        781
06/23/04   06/23/04        783         Dyoung[13%],Fcrary[13%]
06/24/04   06/24/04        784
06/25/04   06/25/04        785         SwRIpl2
06/28/04   06/30/04        786
07/01/04   09/10/04
07/01/04   07/29/04        787         OTL2[26%]
07/01/04   07/29/04        787
07/30/04   08/04/04      789,790       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
07/30/04   08/04/04      789,790
07/01/04   07/29/04        787         SwRIpl3[5%]
07/01/04   07/29/04                    Sbakshi,Esittler,Evaughan
07/01/04   07/29/04                    Sbakshi,Esittler,Evaughan
07/01/04   07/29/04                    Sbakshi,Esittler,Evaughan
08/05/04   09/10/04        792         OTL2[10%]
05/27/04   09/10/04                    OTL2[8%]
05/27/04   09/10/04        773
05/27/04   09/10/04        773
09/11/04   10/15/04                    OTL2[3%]
09/11/04   10/15/04
07/07/04   11/26/04
07/07/04   07/07/04   833FF-102 days
07/08/04   07/21/04                    OTL2[28%],Dyoung[5%],Fcrary[5%]
07/08/04   07/08/04        804
07/08/04   07/15/04        804
07/08/04   07/15/04        804
07/16/04   07/20/04        808
07/21/04   07/21/04        809
07/22/04   08/10/04                    Jfurman[20%],OTL2[15%]
07/22/04   08/02/04        810
07/22/04   07/26/04        810
08/02/04   08/02/04        812
08/03/04   08/03/04        814         Dyoung[13%],Fcrary[13%]
08/04/04   08/04/04        815
08/05/04   08/05/04        816         SwRIpl2
08/06/04   08/10/04        817
08/11/04   10/13/04
08/11/04   09/08/04        818         Jfurman[26%]
08/11/04   09/08/04        818
09/09/04   09/14/04      820,821       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
09/09/04   09/14/04      820,821
08/11/04   09/08/04        818         SwRIpl3[5%]
08/11/04   09/08/04                    Sbakshi,Esittler,Evaughan
08/11/04   09/08/04                    Sbakshi,Esittler,Evaughan
08/11/04   09/08/04                    Sbakshi,Esittler,Evaughan
09/15/04   10/13/04        823         Jfurman[10%]
07/08/04   10/19/04                    Jfurman[8%]
07/08/04   10/19/04        804
07/08/04   10/19/04        804
10/14/04   11/26/04                    Jfurman[3%]
10/14/04   11/26/04
08/11/04   01/07/05
08/11/04   08/11/04   864FF-102 days
08/12/04   08/25/04                    Dyoung[5%],Fcrary[5%],OTL2[28%]
08/12/04   08/12/04        835
08/12/04   08/19/04        835
08/12/04   08/19/04        835
08/20/04   08/24/04        839
08/25/04   08/25/04        840
08/26/04   09/15/04                    OTL2[35%]
08/26/04   09/08/04        841
08/26/04   08/30/04        841
09/08/04   09/08/04        843
09/09/04   09/09/04        845         Dyoung[13%],Fcrary[13%]
09/10/04   09/10/04        846
09/11/04   09/11/04        847         SwRIpl2
09/13/04   09/15/04        848
09/16/04   11/24/04
09/16/04   10/13/04        849         OTL2[26%]
09/16/04   10/13/04        849
10/14/04   10/19/04      851,852       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
10/14/04   10/19/04      851,852
09/16/04   10/13/04        849         SwRIpl3[5%]
09/16/04   10/13/04                    Sbakshi,Esittler,Evaughan
09/16/04   10/13/04                    Sbakshi,Esittler,Evaughan
09/16/04   10/13/04                    Sbakshi,Esittler,Evaughan
10/20/04   11/24/04        854         OTL2[10%]
08/12/04   11/24/04                    OTL2[8%]
08/12/04   11/24/04        835
08/12/04   11/24/04        835
11/27/04   01/07/05                    OTL2[3%]
11/27/04   01/07/05
09/09/04   02/04/05
09/09/04   09/09/04   895FF-102 days
09/10/04   09/21/04                    Jfurman[28%],Dyoung[5%],Fcrary[5%]
09/10/04   09/10/04        866
09/10/04   09/16/04        866
09/10/04   09/16/04        866
09/17/04   09/21/04        870
09/21/04   09/21/04        871
09/22/04   10/11/04                    Jfurman[35%]
09/22/04   10/04/04        872
09/22/04   09/24/04        872
10/04/04   10/04/04        874
10/05/04   10/05/04        876         Dyoung[13%],Fcrary[13%]
10/06/04   10/06/04        877
10/07/04   10/07/04        878         SwRIpl2
10/08/04   10/11/04        879
10/12/04   12/21/04
10/12/04   11/05/04        880         Jfurman[26%]
10/12/04   11/05/04        880
11/08/04   11/12/04      882,883       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
11/08/04   11/12/04      882,883
10/12/04   11/05/04        880         SwRIpl3[5%]
10/12/04   11/05/04                    Sbakshi,Esittler,Evaughan
10/12/04   11/05/04                    Sbakshi,Esittler,Evaughan
10/12/04   11/05/04                    Sbakshi,Esittler,Evaughan
11/15/04   12/21/04        885         Jfurman[10%]
09/10/04   12/23/04                    Jfurman[8%]
09/10/04   12/23/04        866
09/10/04   12/23/04        866
01/01/05   02/04/05                    Jfurman[3%]
01/01/05   02/04/05
10/07/04   03/04/05
10/07/04   10/07/04   926FF-102 days
10/08/04   10/19/04                    Dyoung[5%],Fcrary[5%],OTL2[28%]
10/08/04   10/08/04        897
10/08/04   10/15/04        897
10/08/04   10/15/04        897
10/16/04   10/19/04        901
10/19/04   10/19/04        902
10/20/04   11/08/04                    OTL2[35%]
10/20/04   11/01/04        903
10/20/04   10/22/04        903
11/01/04   11/01/04        905
11/02/04   11/02/04        907         Dyoung[13%],Fcrary[13%]
11/03/04   11/03/04        908
11/04/04   11/04/04        909         SwRIpl2
11/05/04   11/08/04        910
11/09/04   01/26/05
11/09/04   12/07/04        911         OTL2[26%]
11/09/04   12/07/04        911
12/08/04   12/14/04      913,914       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
12/08/04   12/14/04      913,914
11/09/04   12/07/04        911         SwRIpl3[5%]
11/09/04   12/07/04                    Sbakshi,Esittler,Evaughan
11/09/04   12/07/04                    Sbakshi,Esittler,Evaughan
11/09/04   12/07/04                    Sbakshi,Esittler,Evaughan
12/15/04   01/26/05        916         OTL2[10%]
10/08/04   01/28/05                    OTL2[8%]
10/08/04   01/28/05        897
10/08/04   01/28/05        897
02/05/05   03/04/05                    OTL2[3%]
02/05/05   03/04/05
11/11/04   04/08/05
11/11/04   11/11/04   957FF-102 days
11/12/04   11/24/04                    Jfurman[28%],Dyoung[5%],Fcrary[5%]
11/12/04   11/12/04        928
11/12/04   11/19/04        928
11/12/04   11/19/04        928
11/22/04   11/24/04        932
11/24/04   11/24/04        933
11/27/04   12/15/04                    Jfurman[35%]
11/27/04   12/08/04        934
11/27/04   11/30/04        934
12/08/04   12/08/04        936
12/09/04   12/09/04        938         Dyoung[13%],Fcrary[13%]
12/10/04   12/10/04        939
12/13/04   12/13/04        940         SwRIpl2
12/14/04   12/15/04        941
12/16/04   03/02/05
12/16/04   01/19/05        942         Jfurman[26%]
12/16/04   01/19/05        942
01/20/05   01/26/05      944,945       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
01/20/05   01/26/05      944,945
12/16/04   01/19/05        942         SwRIpl3[5%]
12/16/04   01/19/05                    Sbakshi,Esittler,Evaughan
12/16/04   01/19/05                    Sbakshi,Esittler,Evaughan
12/16/04   01/19/05                    Sbakshi,Esittler,Evaughan
01/27/05   03/02/05        947         Jfurman[10%]
11/12/04   03/04/05                    Jfurman[8%]
11/12/04   03/04/05        928
11/12/04   03/04/05        928
03/05/05   04/08/05                    Jfurman[3%]
03/05/05   04/08/05
12/20/04   05/13/05
12/20/04   12/20/04   988FF-102 days
12/21/04   01/07/05                    Dyoung[5%],Fcrary[5%],OTL2[28%]
12/21/04   12/21/04        959
12/21/04   01/04/05        959
12/21/04   01/04/05        959
01/05/05   01/07/05        963
01/07/05   01/07/05        964
01/10/05   01/27/05                    OTL2[35%]
01/10/05   01/20/05        965
01/10/05   01/12/05        965
01/20/05   01/20/05        967
01/21/05   01/21/05        969         Dyoung[13%],Fcrary[13%]
01/24/05   01/24/05        970
01/25/05   01/25/05        971         SwRIpl2
01/26/05   01/27/05        972
01/28/05   04/06/05
01/28/05   02/23/05        973         OTL2[26%]
01/28/05   02/23/05        973
02/24/05   03/02/05      975,976       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
02/24/05   03/02/05      975,976
01/28/05   02/23/05        973         SwRIpl3[5%]
01/28/05   02/23/05                    Sbakshi,Esittler,Evaughan
01/28/05   02/23/05                    Sbakshi,Esittler,Evaughan
01/28/05   02/23/05                    Sbakshi,Esittler,Evaughan
03/03/05   04/06/05        978         OTL2[10%]
12/21/04   04/08/05                    OTL2[8%]
12/21/04   04/08/05        959
12/21/04   04/08/05        959
04/09/05   05/13/05                    OTL2[3%]
04/09/05   05/13/05
02/01/05   06/18/05
02/01/05   02/01/05   1019FF-102 days
02/02/05   02/11/05                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
02/02/05   02/02/05        990
02/02/05   02/08/05        990
02/02/05   02/08/05        990
02/09/05   02/11/05        994
02/11/05   02/11/05        995
02/14/05   03/03/05                     Jfurman[35%]
02/14/05   02/24/05         996
02/14/05   02/16/05         996
02/24/05   02/24/05         998
02/25/05   02/25/05        1000         Dyoung[13%],Fcrary[13%]
02/28/05   02/28/05        1001
03/01/05   03/01/05        1002         SwRIpl2
03/02/05   03/03/05        1003
03/04/05   05/11/05
03/04/05   03/30/05       1004          Jfurman[26%]
03/04/05   03/30/05       1004
03/31/05   04/06/05     1006,1007       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
03/31/05   04/06/05     1006,1007
03/04/05   03/30/05       1004          SwRIpl3[5%]
03/04/05   03/30/05                     Sbakshi,Esittler,Evaughan
03/04/05   03/30/05                     Sbakshi,Esittler,Evaughan
03/04/05   03/30/05                     Sbakshi,Esittler,Evaughan
04/07/05   05/11/05        1009         Jfurman[10%]
02/02/05   05/13/05                     Jfurman[8%]
02/02/05   05/13/05        990
02/02/05   05/13/05        990
05/14/05   06/18/05                     Jfurman[3%]
05/14/05   06/18/05
03/11/05   07/30/05
03/11/05   03/11/05   1050FF-102 days
03/14/05   03/25/05                     Dyoung[5%],Fcrary[5%],OTL2[28%]
03/14/05   03/14/05        1021
03/14/05   03/21/05        1021
03/14/05   03/21/05        1021
03/22/05   03/24/05        1025
03/25/05   03/25/05        1026
03/28/05   04/14/05                     OTL2[35%]
03/28/05   04/07/05        1027
03/28/05   03/30/05        1027
04/07/05   04/07/05        1029
04/08/05   04/08/05        1031         Dyoung[13%],Fcrary[13%]
04/09/05   04/09/05        1032
04/11/05   04/11/05        1033         SwRIpl2
04/12/05   04/14/05        1034
04/15/05   06/18/05
04/15/05   05/12/05       1035          OTL2[26%]
04/15/05   05/12/05       1035
05/13/05   05/19/05     1037,1038       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
05/13/05   05/19/05     1037,1038
04/15/05   05/12/05       1035          SwRIpl3[5%]
04/15/05   05/12/05                     Sbakshi,Esittler,Evaughan
04/15/05   05/12/05                     Sbakshi,Esittler,Evaughan
04/15/05   05/12/05                     Sbakshi,Esittler,Evaughan
05/20/05   06/18/05        1040         OTL2[10%]
03/14/05   06/23/05                     OTL2[8%]
03/14/05   06/23/05        1021
03/14/05   06/23/05        1021
06/18/05   07/30/05                     OTL2[3%]
06/18/05   07/30/05
04/08/05   08/26/05
04/08/05   04/08/05   1081FF-102 days
04/09/05   04/21/05                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
04/09/05   04/09/05        1052
04/09/05   04/15/05        1052
04/09/05   04/15/05        1052
04/18/05   04/20/05        1056
04/21/05   04/21/05        1057
04/22/05   05/12/05                     Jfurman[35%]
04/22/05   05/04/05        1058
04/22/05   04/26/05        1058
05/04/05   05/04/05        1060
05/05/05   05/05/05        1062         Dyoung[13%],Fcrary[13%]
05/06/05   05/06/05        1063
05/09/05   05/09/05        1064         SwRIpl2
05/10/05   05/12/05        1065
05/13/05   07/29/05
05/13/05   06/09/05       1066          Jfurman[26%]
05/13/05   06/09/05       1066
06/10/05   06/16/05     1068,1069       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
06/10/05   06/16/05     1068,1069
05/13/05   06/09/05       1066          SwRIpl3[5%]
05/13/05   06/09/05                     Sbakshi,Esittler,Evaughan
05/13/05   06/09/05                     Sbakshi,Esittler,Evaughan
05/13/05   06/09/05                     Sbakshi,Esittler,Evaughan
06/17/05   07/29/05        1071         Jfurman[10%]
04/09/05   07/22/05                     Jfurman[8%]
04/09/05   07/22/05        1052
04/09/05   07/22/05        1052
07/30/05   08/26/05                     Jfurman[3%]
07/30/05   08/26/05
05/13/05   10/01/05
05/13/05   05/13/05   1112FF-102 days
05/14/05   05/26/05                     Dyoung[5%],Fcrary[5%],OTL2[28%]
05/14/05   05/14/05        1083
05/14/05   05/20/05        1083
05/14/05   05/20/05        1083
05/23/05   05/25/05        1087
05/26/05   05/26/05        1088
05/27/05   06/17/05                     OTL2[35%]
05/27/05   06/09/05        1089
05/27/05   06/01/05        1089
06/09/05   06/09/05        1091
06/10/05   06/10/05        1093         Dyoung[13%],Fcrary[13%]
06/13/05   06/13/05        1094
06/14/05   06/14/05        1095         SwRIpl2
06/15/05   06/17/05        1096
06/18/05   08/26/05
06/18/05   07/15/05       1097          OTL2[26%]
06/18/05   07/15/05       1097
07/18/05   07/22/05     1099,1100       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
07/18/05   07/22/05     1099,1100
06/18/05   07/15/05       1097          SwRIpl3[5%]
06/18/05   07/15/05                     Sbakshi,Esittler,Evaughan
06/18/05   07/15/05                     Sbakshi,Esittler,Evaughan
06/18/05   07/15/05                     Sbakshi,Esittler,Evaughan
07/25/05   08/26/05        1102         OTL2[10%]
05/14/05   08/26/05                     OTL2[8%]
05/14/05   08/26/05        1083
05/14/05   08/26/05        1083
08/27/05   10/01/05                     OTL2[3%]
08/27/05   10/01/05
06/23/05   11/11/05
06/23/05   06/23/05   1143FF-102 days
06/24/05   07/08/05                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
06/24/05   06/24/05        1114
06/24/05   07/01/05        1114
06/24/05   07/01/05        1114
07/05/05   07/07/05        1118
07/08/05   07/08/05        1119
07/11/05   07/29/05                     Jfurman[35%]
07/11/05   07/21/05        1120
07/11/05   07/13/05        1120
07/21/05   07/21/05        1122
07/22/05   07/22/05        1124         Dyoung[13%],Fcrary[13%]
07/25/05   07/25/05        1125
07/26/05   07/26/05        1126         SwRIpl2
07/27/05   07/29/05        1127
07/30/05   09/30/05
07/30/05   08/25/05       1128          Jfurman[26%]
07/30/05   08/25/05       1128
08/26/05   08/31/05     1130,1131       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
08/26/05   08/31/05     1130,1131
07/30/05   08/25/05       1128          SwRIpl3[5%]
07/30/05   08/25/05                     Sbakshi,Esittler,Evaughan
07/30/05   08/25/05                     Sbakshi,Esittler,Evaughan
07/30/05   08/25/05                     Sbakshi,Esittler,Evaughan
09/01/05   09/30/05        1133         Jfurman[10%]
06/24/05   10/06/05                     Jfurman[8%]
06/24/05   10/06/05        1114
06/24/05   10/06/05        1114
10/01/05   11/11/05                     Jfurman[3%]
10/01/05   11/11/05
07/30/05   12/19/05
07/30/05   07/30/05   1174FF-102 days
08/01/05   08/12/05                     Dyoung[5%],Fcrary[5%],OTL2[28%]
08/01/05   08/01/05        1145
08/01/05   08/08/05        1145
08/01/05   08/08/05        1145
08/09/05   08/11/05        1149
08/12/05   08/12/05        1150
08/15/05   09/01/05                     OTL2[35%]
08/15/05   08/25/05        1151
08/15/05   08/17/05        1151
08/25/05   08/25/05        1153
08/26/05   08/26/05        1155         Dyoung[13%],Fcrary[13%]
08/27/05   08/27/05        1156
08/29/05   08/29/05        1157         SwRIpl2
08/30/05   09/01/05        1158
09/02/05   11/11/05
09/02/05   09/30/05       1159          OTL2[26%]
09/02/05   09/30/05       1159
10/01/05   10/06/05     1161,1162       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
10/01/05   10/06/05     1161,1162
09/02/05   09/30/05       1159          SwRIpl3[5%]
09/02/05   09/30/05                     Sbakshi,Esittler,Evaughan
09/02/05   09/30/05                     Sbakshi,Esittler,Evaughan
09/02/05   09/30/05                     Sbakshi,Esittler,Evaughan
10/07/05   11/11/05        1164         OTL2[10%]
08/01/05   11/11/05                     OTL2[8%]
08/01/05   11/11/05        1145
08/01/05   11/11/05        1145
11/12/05   12/19/05                     OTL2[3%]
11/12/05   12/19/05
08/31/05   01/27/06
08/31/05   08/31/05   1205FF-102 days
09/01/05   09/14/05                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
09/01/05   09/01/05        1176
09/01/05   09/09/05        1176
09/01/05   09/09/05        1176
09/12/05   09/14/05        1180
09/14/05   09/14/05        1181
09/15/05   10/03/05                     Jfurman[35%]
09/15/05   09/27/05        1182
09/15/05   09/19/05        1182
09/27/05   09/27/05        1184
09/28/05   09/28/05        1186         Dyoung[13%],Fcrary[13%]
09/29/05   09/29/05        1187
09/30/05   09/30/05        1188         SwRIpl2
10/01/05   10/03/05        1189
10/04/05   12/14/05
10/04/05   10/31/05       1190          Jfurman[26%]
10/04/05   10/31/05       1190
11/01/05   11/07/05     1192,1193       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
11/01/05   11/07/05     1192,1193
10/04/05   10/31/05        1190         SwRIpl3[5%]
10/04/05   10/31/05                     Sbakshi,Esittler,Evaughan
10/04/05   10/31/05                     Sbakshi,Esittler,Evaughan
10/04/05   10/31/05                     Sbakshi,Esittler,Evaughan
11/08/05   12/14/05        1195         Jfurman[10%]
09/01/05   12/16/05                     Jfurman[8%]
09/01/05   12/16/05        1176
09/01/05   12/16/05        1176
12/12/05   01/27/06                     Jfurman[3%]
12/12/05   01/27/06
10/13/05   03/10/06
10/13/05   10/13/05   1236FF-102 days
10/14/05   10/26/05                     Dyoung[5%],Fcrary[5%],OTL2[28%]
10/14/05   10/14/05        1207
10/14/05   10/21/05        1207
10/14/05   10/21/05        1207
10/24/05   10/26/05        1211
10/26/05   10/26/05        1212
10/27/05   11/14/05                     OTL2[35%]
10/27/05   11/08/05        1213
10/27/05   10/31/05        1213
11/08/05   11/08/05        1215
11/09/05   11/09/05        1217         Dyoung[13%],Fcrary[13%]
11/10/05   11/10/05        1218
11/11/05   11/11/05        1219         SwRIpl2
11/12/05   11/14/05        1220
11/15/05   01/31/06
11/15/05   12/14/05       1221          OTL2[26%]
11/15/05   12/14/05       1221
12/15/05   12/20/05     1223,1224       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
12/15/05   12/20/05     1223,1224
11/15/05   12/14/05       1221          SwRIpl3[5%]
11/15/05   12/14/05                     Sbakshi,Esittler,Evaughan
11/15/05   12/14/05                     Sbakshi,Esittler,Evaughan
11/15/05   12/14/05                     Sbakshi,Esittler,Evaughan
12/21/05   01/31/06        1226         OTL2[10%]
10/14/05   02/02/06                     OTL2[8%]
10/14/05   02/02/06        1207
10/14/05   02/02/06        1207
01/28/06   03/10/06                     OTL2[3%]
01/28/06   03/10/06
11/28/05   04/21/06
11/28/05   11/28/05   1267FF-102 days
11/29/05   12/09/05                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
11/29/05   11/29/05        1238
11/29/05   12/06/05        1238
11/29/05   12/06/05        1238
12/07/05   12/09/05        1242
12/09/05   12/09/05        1243
12/12/05   01/04/06                     Jfurman[35%]
12/12/05   12/21/05        1244
12/12/05   12/14/05        1244
12/21/05   12/21/05        1246
12/22/05   12/22/05        1248         Dyoung[13%],Fcrary[13%]
12/23/05   12/23/05        1249
01/02/06   01/02/06        1250         SwRIpl2
01/03/06   01/04/06        1251
01/05/06   03/14/06
01/05/06   01/31/06       1252          Jfurman[26%]
01/05/06   01/31/06       1252
02/01/06   02/07/06     1254,1255       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
02/01/06   02/07/06     1254,1255
01/05/06   01/31/06       1252          SwRIpl3[5%]
01/05/06   01/31/06                     Sbakshi,Esittler,Evaughan
01/05/06   01/31/06                     Sbakshi,Esittler,Evaughan
01/05/06   01/31/06                     Sbakshi,Esittler,Evaughan
02/08/06   03/14/06        1257         Jfurman[10%]
11/29/05   03/16/06                     Jfurman[8%]
11/29/05   03/16/06        1238
11/29/05   03/16/06        1238
03/11/06   04/21/06                     Jfurman[3%]
03/11/06   04/21/06
01/16/06   06/02/06
01/16/06   01/16/06   1298FF-102 days
01/17/06   01/27/06                     Dyoung[5%],Fcrary[5%],OTL2[28%]
01/17/06   01/17/06        1269
01/17/06   01/24/06        1269
01/17/06   01/24/06        1269
01/25/06   01/27/06        1273
01/27/06   01/27/06        1274
01/28/06   02/15/06                     OTL2[35%]
01/28/06   02/08/06        1275
01/28/06   01/31/06        1275
02/08/06   02/08/06        1277
02/09/06   02/09/06        1279         Dyoung[13%],Fcrary[13%]
02/10/06   02/10/06        1280
02/13/06   02/13/06        1281         SwRIpl2
02/14/06   02/15/06        1282
02/16/06   04/25/06
02/16/06   03/14/06       1283          OTL2[26%]
02/16/06   03/14/06       1283
03/15/06   03/21/06     1285,1286       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
03/15/06   03/21/06     1285,1286
02/16/06   03/14/06       1283          SwRIpl3[5%]
02/16/06   03/14/06                     Sbakshi,Esittler,Evaughan
02/16/06   03/14/06                     Sbakshi,Esittler,Evaughan
02/16/06   03/14/06                     Sbakshi,Esittler,Evaughan
03/22/06   04/25/06        1288         OTL2[10%]
01/17/06   04/27/06                     OTL2[8%]
01/17/06   04/27/06        1269
01/17/06   04/27/06        1269
04/21/06   06/02/06                     OTL2[3%]
04/21/06   06/02/06
02/27/06   07/17/06
02/27/06   02/27/06   1329FF-102 days
02/28/06   03/10/06                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
02/28/06   02/28/06        1300
02/28/06   03/07/06        1300
02/28/06   03/07/06        1300
03/08/06   03/10/06        1304
03/10/06   03/10/06        1305
03/11/06   03/29/06                     Jfurman[35%]
03/11/06   03/22/06        1306
03/11/06   03/14/06        1306
03/22/06   03/22/06        1308
03/23/06   03/23/06        1310         Dyoung[13%],Fcrary[13%]
03/24/06   03/24/06        1311
03/27/06   03/27/06        1312         SwRIpl2
03/28/06   03/29/06        1313
03/30/06   06/06/06
03/30/06   04/25/06       1314          Jfurman[26%]
03/30/06   04/25/06       1314
04/26/06   05/02/06     1316,1317       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
04/26/06   05/02/06     1316,1317
03/30/06   04/25/06       1314          SwRIpl3[5%]
03/30/06   04/25/06                     Sbakshi,Esittler,Evaughan
03/30/06   04/25/06                     Sbakshi,Esittler,Evaughan
03/30/06   04/25/06                     Sbakshi,Esittler,Evaughan
05/03/06   06/06/06        1319         Jfurman[10%]
02/28/06   06/08/06                     Jfurman[8%]
02/28/06   06/08/06        1300
02/28/06   06/08/06        1300
06/03/06   07/17/06                     Jfurman[3%]
06/03/06   07/17/06
03/30/06   08/18/06
03/30/06   03/30/06   1360FF-102 days
03/31/06   04/13/06                     Dyoung[5%],Fcrary[5%],OTL2[28%]
03/31/06   03/31/06        1331
03/31/06   04/07/06        1331
03/31/06   04/07/06        1331
04/10/06   04/12/06        1335
04/13/06   04/13/06        1336
04/14/06   05/03/06                     OTL2[35%]
04/14/06   04/25/06        1337
04/14/06   04/18/06        1337
04/25/06   04/25/06        1339
04/26/06   04/26/06        1341         Dyoung[13%],Fcrary[13%]
04/27/06   04/27/06        1342
04/28/06   04/28/06        1343         SwRIpl2
05/01/06   05/03/06        1344
05/04/06   07/15/06
05/04/06   05/31/06       1345          OTL2[26%]
05/04/06   05/31/06       1345
06/01/06   06/07/06     1347,1348       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
06/01/06   06/07/06     1347,1348
05/04/06   05/31/06       1345          SwRIpl3[5%]
05/04/06   05/31/06                     Sbakshi,Esittler,Evaughan
05/04/06   05/31/06                     Sbakshi,Esittler,Evaughan
05/04/06   05/31/06                     Sbakshi,Esittler,Evaughan
06/08/06   07/15/06        1350         OTL2[10%]
03/31/06   07/14/06                     OTL2[8%]
03/31/06   07/14/06        1331
03/31/06   07/14/06        1331
07/15/06   08/18/06                     OTL2[3%]
07/15/06   08/18/06
04/26/06   09/15/06
04/26/06   04/26/06   1391FF-102 days
04/27/06   05/10/06                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
04/27/06   04/27/06        1362
04/27/06   05/04/06        1362
04/27/06   05/04/06        1362
05/05/06   05/09/06        1366
05/10/06   05/10/06        1367
05/11/06   05/31/06                     Jfurman[35%]
05/11/06   05/22/06        1368
05/11/06   05/14/06        1368
05/22/06   05/22/06        1370
05/23/06   05/23/06        1372         Dyoung[13%],Fcrary[13%]
05/24/06   05/24/06        1373
05/25/06   05/25/06        1374         SwRIpl2
05/26/06   05/31/06        1375
06/01/06   08/10/06
06/01/06   06/27/06       1376          Jfurman[26%]
06/01/06   06/27/06       1376
06/28/06   07/06/06     1378,1379       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
06/28/06   07/06/06     1378,1379
06/01/06   06/27/06       1376          SwRIpl3[5%]
06/01/06   06/27/06                     Sbakshi,Esittler,Evaughan
06/01/06   06/27/06                     Sbakshi,Esittler,Evaughan
06/01/06   06/27/06                     Sbakshi,Esittler,Evaughan
07/07/06   08/10/06        1381         Jfurman[10%]
04/27/06   08/10/06                     Jfurman[8%]
04/27/06   08/10/06        1362
04/27/06   08/10/06        1362
08/19/06   09/15/06                     Jfurman[3%]
08/19/06   09/15/06
06/01/06   10/20/06
06/01/06   06/01/06   1422FF-102 days
06/02/06   06/14/06                     Dyoung[5%],Fcrary[5%],OTL2[28%]
06/02/06   06/02/06        1393
06/02/06   06/08/06        1393
06/02/06   06/08/06        1393
06/09/06   06/13/06        1397
06/14/06   06/14/06        1398
06/15/06   07/07/06                     OTL2[35%]
06/15/06   06/27/06        1399
06/15/06   06/19/06        1399
06/27/06   06/27/06        1401
06/28/06   06/28/06        1403         Dyoung[13%],Fcrary[13%]
06/29/06   06/29/06        1404
06/30/06   06/30/06        1405         SwRIpl2
07/05/06   07/07/06        1406
07/10/06   09/15/06
07/10/06   08/03/06       1407          OTL2[26%]
07/10/06   08/03/06       1407
08/04/06   08/10/06     1409,1410       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
08/04/06   08/10/06     1409,1410
07/10/06   08/03/06       1407          SwRIpl3[5%]
07/10/06   08/03/06                     Sbakshi,Esittler,Evaughan
07/10/06   08/03/06                     Sbakshi,Esittler,Evaughan
07/10/06   08/03/06                     Sbakshi,Esittler,Evaughan
08/11/06   09/15/06        1412         OTL2[10%]
06/02/06   09/15/06                     OTL2[8%]
06/02/06   09/15/06        1393
06/02/06   09/15/06        1393
09/16/06   10/20/06                     OTL2[3%]
09/16/06   10/20/06
07/06/06   11/24/06
07/06/06   07/06/06   1453FF-102 days
07/07/06   07/19/06                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
07/07/06   07/07/06        1424
07/07/06   07/14/06        1424
07/07/06   07/14/06        1424
07/15/06   07/18/06        1428
07/19/06   07/19/06        1429
07/20/06   08/09/06                     Jfurman[35%]
07/20/06   08/01/06        1430
07/20/06   07/24/06        1430
08/01/06   08/01/06        1432
08/02/06   08/02/06        1434         Dyoung[13%],Fcrary[13%]
08/03/06   08/03/06        1435
08/04/06   08/04/06        1436         SwRIpl2
08/07/06   08/09/06        1437
08/10/06   10/11/06
08/10/06   09/06/06       1438          Jfurman[26%]
08/10/06   09/06/06       1438
09/07/06   09/13/06     1440,1441       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
09/07/06   09/13/06     1440,1441
08/10/06   09/06/06       1438          SwRIpl3[5%]
08/10/06   09/06/06                     Sbakshi,Esittler,Evaughan
08/10/06   09/06/06                     Sbakshi,Esittler,Evaughan
08/10/06   09/06/06                     Sbakshi,Esittler,Evaughan
09/14/06   10/11/06        1443         Jfurman[10%]
07/07/06   10/18/06                     Jfurman[8%]
07/07/06   10/18/06        1424
07/07/06   10/18/06        1424
10/19/06   11/24/06                     Jfurman[3%]
10/19/06   11/24/06
08/09/06   01/05/07
08/09/06   08/09/06   1484FF-102 days
08/10/06   08/22/06                     Dyoung[5%],Fcrary[5%],OTL2[28%]
08/10/06   08/10/06        1455
08/10/06   08/17/06        1455
08/10/06   08/17/06        1455
08/18/06   08/21/06        1459
08/22/06   08/22/06        1460
08/23/06   09/13/06                     OTL2[35%]
08/23/06   09/05/06        1461
08/23/06   08/25/06        1461
09/05/06   09/05/06        1463
09/06/06   09/06/06        1465         Dyoung[13%],Fcrary[13%]
09/07/06   09/07/06        1466
09/08/06   09/08/06        1467         SwRIpl2
09/11/06   09/13/06        1468
09/14/06   11/21/06
09/14/06   10/10/06       1469          OTL2[26%]
09/14/06   10/10/06       1469
10/11/06   10/17/06     1471,1472       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
10/11/06   10/17/06     1471,1472
09/14/06   10/10/06       1469          SwRIpl3[5%]
09/14/06   10/10/06                     Sbakshi,Esittler,Evaughan
09/14/06   10/10/06                     Sbakshi,Esittler,Evaughan
09/14/06   10/10/06                     Sbakshi,Esittler,Evaughan
10/18/06   11/21/06        1474         OTL2[10%]
08/10/06   11/21/06                     OTL2[8%]
08/10/06   11/21/06        1455
08/10/06   11/21/06        1455
11/15/06   01/05/07                     OTL2[3%]
11/15/06   01/05/07
09/20/06   02/16/07
09/20/06   09/20/06   1515FF-102 days
09/21/06   10/03/06                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
09/21/06   09/21/06        1486
09/21/06   09/28/06        1486
09/21/06   09/28/06        1486
09/29/06   10/03/06        1490
10/03/06   10/03/06        1491
10/04/06   10/21/06                     Jfurman[35%]
10/04/06   10/16/06        1492
10/04/06   10/06/06        1492
10/16/06   10/16/06        1494
10/17/06   10/17/06        1496         Dyoung[13%],Fcrary[13%]
10/18/06   10/18/06        1497
10/19/06   10/19/06        1498         SwRIpl2
10/20/06   10/21/06        1499
10/23/06   01/09/07
10/23/06   11/17/06       1500          Jfurman[26%]
10/23/06   11/17/06       1500
11/20/06   11/27/06     1502,1503       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
11/20/06   11/27/06     1502,1503
10/23/06   11/17/06       1500          SwRIpl3[5%]
10/23/06   11/17/06                     Sbakshi,Esittler,Evaughan
10/23/06   11/17/06                     Sbakshi,Esittler,Evaughan
10/23/06   11/17/06                     Sbakshi,Esittler,Evaughan
11/28/06   01/09/07        1505         Jfurman[10%]
09/21/06   01/11/07                     Jfurman[8%]
09/21/06   01/11/07        1486
09/21/06   01/11/07        1486
01/06/07   02/16/07                     Jfurman[3%]
01/06/07   02/16/07
11/02/06   03/30/07
11/02/06   11/02/06   1546FF-102 days
11/03/06   11/15/06                     Dyoung[5%],Fcrary[5%],OTL2[28%]
11/03/06   11/03/06        1517
11/03/06   11/10/06        1517
11/03/06   11/10/06        1517
11/13/06   11/15/06        1521
11/15/06   11/15/06        1522
11/16/06   12/06/06                     OTL2[35%]
11/16/06   11/29/06        1523
11/16/06   11/20/06        1523
11/29/06   11/29/06        1525
11/30/06   11/30/06        1527         Dyoung[13%],Fcrary[13%]
12/01/06   12/01/06        1528
12/04/06   12/04/06        1529         SwRIpl2
12/05/06   12/06/06        1530
12/07/06   02/21/07
12/07/06   01/10/07       1531          OTL2[26%]
12/07/06   01/10/07       1531
01/11/07   01/17/07     1533,1534       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
01/11/07   01/17/07     1533,1534
12/07/06   01/10/07       1531          SwRIpl3[5%]
12/07/06   01/10/07                     Sbakshi,Esittler,Evaughan
12/07/06   01/10/07                     Sbakshi,Esittler,Evaughan
12/07/06   01/10/07                     Sbakshi,Esittler,Evaughan
01/18/07   02/21/07        1536         OTL2[10%]
11/03/06   02/23/07                     OTL2[8%]
11/03/06   02/23/07        1517
11/03/06   02/23/07        1517
02/19/07   03/30/07                     OTL2[3%]
02/19/07   03/30/07
12/11/06   05/04/07
12/11/06   12/11/06   1577FF-102 days
12/12/06   12/22/06                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
12/12/06   12/12/06        1548
12/12/06   12/19/06        1548
12/12/06   12/19/06        1548
12/20/06   12/22/06        1552
12/22/06   12/22/06        1553
01/02/07   01/18/07                     Jfurman[35%]
01/02/07   01/11/07        1554
01/02/07   01/04/07        1554
01/11/07   01/11/07        1556
01/12/07   01/12/07        1558         Dyoung[13%],Fcrary[13%]
01/15/07   01/15/07        1559
01/16/07   01/16/07        1560         SwRIpl2
01/17/07   01/18/07        1561
01/19/07   03/28/07
01/19/07   02/15/07       1562          Jfurman[26%]
01/19/07   02/15/07       1562
02/16/07   02/21/07     1564,1565       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
02/16/07   02/21/07     1564,1565
01/19/07   02/15/07       1562          SwRIpl3[5%]
01/19/07   02/15/07                     Sbakshi,Esittler,Evaughan
01/19/07   02/15/07                     Sbakshi,Esittler,Evaughan
01/19/07   02/15/07                     Sbakshi,Esittler,Evaughan
02/22/07   03/28/07        1567         Jfurman[10%]
12/12/06   03/30/07                     Jfurman[8%]
12/12/06   03/30/07        1548
12/12/06   03/30/07        1548
03/31/07   05/04/07                     Jfurman[3%]
03/31/07   05/04/07
01/23/07   06/09/07
01/23/07   01/23/07   1608FF-102 days
01/24/07   02/05/07                     Dyoung[5%],Fcrary[5%],OTL2[28%]
01/24/07   01/24/07        1579
01/24/07   01/31/07        1579
01/24/07   01/31/07        1579
02/01/07   02/05/07        1583
02/05/07   02/05/07        1584
02/06/07   02/22/07                     OTL2[35%]
02/06/07   02/16/07        1585
02/06/07   02/08/07        1585
02/16/07   02/16/07        1587
02/17/07   02/17/07        1589         Dyoung[13%],Fcrary[13%]
02/19/07   02/19/07        1590
02/20/07   02/20/07        1591         SwRIpl2
02/21/07   02/22/07        1592
02/23/07   05/02/07
02/23/07   03/21/07       1593          OTL2[26%]
02/23/07   03/21/07       1593
03/22/07   03/28/07     1595,1596       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
03/22/07   03/28/07     1595,1596
02/23/07   03/21/07       1593          SwRIpl3[5%]
02/23/07   03/21/07                     Sbakshi,Esittler,Evaughan
02/23/07   03/21/07                     Sbakshi,Esittler,Evaughan
02/23/07   03/21/07                     Sbakshi,Esittler,Evaughan
03/29/07   05/02/07        1598         OTL2[10%]
01/24/07   05/04/07                     OTL2[8%]
01/24/07   05/04/07        1579
01/24/07   05/04/07        1579
05/05/07   06/09/07                     OTL2[3%]
05/05/07   06/09/07
02/26/07   07/16/07
02/26/07   02/26/07   1639FF-102 days
02/27/07   03/08/07                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
02/27/07   02/27/07        1610
02/27/07   03/05/07        1610
02/27/07   03/05/07        1610
03/06/07   03/08/07        1614
03/08/07   03/08/07        1615
03/09/07   03/28/07                     Jfurman[35%]
03/09/07   03/21/07        1616
03/09/07   03/13/07        1616
03/21/07   03/21/07        1618
03/22/07   03/22/07        1620         Dyoung[13%],Fcrary[13%]
03/23/07   03/23/07        1621
03/26/07   03/26/07        1622         SwRIpl2
03/27/07   03/28/07        1623
03/29/07   06/06/07
03/29/07   04/24/07       1624          Jfurman[26%]
03/29/07   04/24/07       1624
04/25/07   05/01/07     1626,1627       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
04/25/07   05/01/07     1626,1627
03/29/07   04/24/07       1624          SwRIpl3[5%]
03/29/07   04/24/07                     Sbakshi,Esittler,Evaughan
03/29/07   04/24/07                     Sbakshi,Esittler,Evaughan
03/29/07   04/24/07                     Sbakshi,Esittler,Evaughan
05/02/07   06/06/07        1629         Jfurman[10%]
02/27/07   06/08/07                     Jfurman[8%]
02/27/07   06/08/07        1610
02/27/07   06/08/07        1610
06/09/07   07/16/07                     Jfurman[3%]
06/09/07   07/16/07
03/22/07   08/10/07
03/22/07   03/22/07   1670FF-102 days
03/23/07   04/04/07                     Dyoung[5%],Fcrary[5%],OTL2[28%]
03/23/07   03/23/07        1641
03/23/07   03/30/07        1641
03/23/07   03/30/07        1641
03/31/07   04/03/07        1645
04/04/07   04/04/07        1646
04/05/07   04/25/07                     OTL2[35%]
04/05/07   04/17/07        1647
04/05/07   04/09/07        1647
04/17/07   04/17/07        1649
04/18/07   04/18/07        1651         Dyoung[13%],Fcrary[13%]
04/19/07   04/19/07        1652
04/20/07   04/20/07        1653         SwRIpl2
04/23/07   04/25/07        1654
04/26/07   06/28/07
04/26/07   05/22/07       1655          OTL2[26%]
04/26/07   05/22/07       1655
05/23/07   05/31/07     1657,1658       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
05/23/07   05/31/07     1657,1658
04/26/07   05/22/07       1655          SwRIpl3[5%]
04/26/07   05/22/07                     Sbakshi,Esittler,Evaughan
04/26/07   05/22/07                     Sbakshi,Esittler,Evaughan
04/26/07   05/22/07                     Sbakshi,Esittler,Evaughan
06/01/07   06/28/07        1660         OTL2[10%]
03/23/07   07/05/07                     OTL2[8%]
03/23/07   07/05/07        1641
03/23/07   07/05/07        1641
07/13/07   08/10/07                     OTL2[3%]
07/13/07   08/10/07
05/02/07   09/21/07
05/02/07   05/02/07   1701FF-102 days
05/03/07   05/15/07                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
05/03/07   05/03/07        1672
05/03/07   05/09/07        1672
05/03/07   05/09/07        1672
05/10/07   05/14/07        1676
05/15/07   05/15/07        1677
05/16/07   06/06/07                     Jfurman[35%]
05/16/07   05/29/07        1678
05/16/07   05/18/07        1678
05/29/07   05/29/07        1680
05/30/07   05/30/07        1682         Dyoung[13%],Fcrary[13%]
05/31/07   05/31/07        1683
06/01/07   06/01/07        1684         SwRIpl2
06/04/07   06/06/07        1685
06/07/07   08/22/07
06/07/07   07/03/07       1686          Jfurman[26%]
06/07/07   07/03/07       1686
07/05/07   07/11/07     1688,1689       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
07/05/07   07/11/07     1688,1689
06/07/07   07/03/07       1686          SwRIpl3[5%]
06/07/07   07/03/07                     Sbakshi,Esittler,Evaughan
06/07/07   07/03/07                     Sbakshi,Esittler,Evaughan
06/07/07   07/03/07                     Sbakshi,Esittler,Evaughan
07/12/07   08/22/07        1691         Jfurman[10%]
05/03/07   08/15/07                     Jfurman[8%]
05/03/07   08/15/07        1672
05/03/07   08/15/07        1672
08/10/07   09/21/07                     Jfurman[3%]
08/10/07   09/21/07
06/13/07   11/02/07
06/13/07   06/13/07   1732FF-102 days
06/14/07   06/27/07                     Dyoung[5%],Fcrary[5%],OTL2[28%]
06/14/07   06/14/07        1703
06/14/07   06/21/07        1703
06/14/07   06/21/07        1703
06/22/07   06/26/07        1707
06/27/07   06/27/07        1708
06/28/07   07/19/07                     OTL2[35%]
06/28/07   07/11/07        1709
06/28/07   07/02/07        1709
07/11/07   07/11/07        1711
07/12/07   07/12/07        1713         Dyoung[13%],Fcrary[13%]
07/13/07   07/13/07        1714
07/16/07   07/16/07        1715         SwRIpl2
07/17/07   07/19/07        1716
07/20/07   09/27/07
07/20/07   08/15/07       1717          OTL2[26%]
07/20/07   08/15/07       1717
08/16/07   08/22/07     1719,1720       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
08/16/07   08/22/07     1719,1720
07/20/07   08/15/07       1717          SwRIpl3[5%]
07/20/07   08/15/07                     Sbakshi,Esittler,Evaughan
07/20/07   08/15/07                     Sbakshi,Esittler,Evaughan
07/20/07   08/15/07                     Sbakshi,Esittler,Evaughan
08/23/07   09/27/07        1722         OTL2[10%]
06/14/07   09/27/07                     OTL2[8%]
06/14/07   09/27/07        1703
06/14/07   09/27/07        1703
09/22/07   11/02/07                     OTL2[3%]
09/22/07   11/02/07
07/27/07   12/17/07
07/27/07   07/27/07   1763FF-102 days
07/30/07   08/10/07                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
07/30/07   07/30/07        1734
07/30/07   08/06/07        1734
07/30/07   08/06/07        1734
08/07/07   08/09/07        1738
08/10/07   08/10/07        1739
08/11/07   08/30/07                     Jfurman[35%]
08/11/07   08/22/07        1740
08/11/07   08/14/07        1740
08/22/07   08/22/07        1742
08/23/07   08/23/07        1744         Dyoung[13%],Fcrary[13%]
08/24/07   08/24/07        1745
08/27/07   08/27/07        1746         SwRIpl2
08/28/07   08/30/07        1747
08/31/07   11/02/07
08/31/07   09/27/07       1748          Jfurman[26%]
08/31/07   09/27/07       1748
09/28/07   10/04/07     1750,1751       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
09/28/07   10/04/07     1750,1751
08/31/07   09/27/07       1748          SwRIpl3[5%]
08/31/07   09/27/07                     Sbakshi,Esittler,Evaughan
08/31/07   09/27/07                     Sbakshi,Esittler,Evaughan
08/31/07   09/27/07                     Sbakshi,Esittler,Evaughan
10/05/07   11/02/07        1753         Jfurman[10%]
07/30/07   11/08/07                     Jfurman[8%]
07/30/07   11/08/07        1734
07/30/07   11/08/07        1734
11/03/07   12/17/07                     Jfurman[3%]
11/03/07   12/17/07
08/29/07   01/28/08
08/29/07   08/29/07   1794FF-102 days
08/30/07   09/13/07                     Dyoung[5%],Fcrary[5%],OTL2[28%]
08/30/07   08/30/07        1765
08/30/07   09/07/07        1765
08/30/07   09/07/07        1765
09/10/07   09/12/07        1769
09/13/07   09/13/07        1770
09/14/07   10/03/07                     OTL2[35%]
09/14/07   09/25/07        1771
09/14/07   09/18/07        1771
09/25/07   09/25/07        1773
09/26/07   09/26/07        1775         Dyoung[13%],Fcrary[13%]
09/27/07   09/27/07        1776
09/28/07   09/28/07        1777         SwRIpl2
10/01/07   10/03/07        1778
10/04/07   12/14/07
10/04/07   10/31/07       1779          OTL2[26%]
10/04/07   10/31/07       1779
11/01/07   11/06/07     1781,1782       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
11/01/07   11/06/07     1781,1782
10/04/07   10/31/07       1779          SwRIpl3[5%]
10/04/07   10/31/07                     Sbakshi,Esittler,Evaughan
10/04/07   10/31/07                     Sbakshi,Esittler,Evaughan
10/04/07   10/31/07                     Sbakshi,Esittler,Evaughan
11/07/07   12/14/07        1784         OTL2[10%]
08/30/07   12/14/07                     OTL2[8%]
08/30/07   12/14/07        1765
08/30/07   12/14/07        1765
12/15/07   01/28/08                     OTL2[3%]
12/15/07   01/28/08
09/05/07   02/01/08
09/05/07   09/05/07   1825FF-102 days
09/06/07   09/18/07                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
09/06/07   09/06/07        1796
09/06/07   09/13/07        1796
09/06/07   09/13/07        1796
09/14/07   09/18/07        1800
09/18/07   09/18/07        1801
09/19/07   10/05/07                     Jfurman[35%]
09/19/07   09/28/07        1802
09/19/07   09/21/07        1802
09/28/07   09/28/07        1804
10/01/07   10/01/07        1806         Dyoung[13%],Fcrary[13%]
10/02/07   10/02/07        1807
10/03/07   10/03/07        1808         SwRIpl2
10/04/07   10/05/07        1809
10/08/07   12/17/07
10/08/07   11/02/07       1810          Jfurman[26%]
10/08/07   11/02/07       1810
11/03/07   11/08/07     1812,1813       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
11/03/07   11/08/07     1812,1813
10/08/07   11/02/07       1810          SwRIpl3[5%]
10/08/07   11/02/07                     Sbakshi,Esittler,Evaughan
10/08/07   11/02/07                     Sbakshi,Esittler,Evaughan
10/08/07   11/02/07                     Sbakshi,Esittler,Evaughan
11/09/07   12/17/07        1815         Jfurman[10%]
09/06/07   12/19/07                     Jfurman[8%]
09/06/07   12/19/07        1796
09/06/07   12/19/07        1796
01/19/08   02/01/08                     Jfurman[3%]
01/19/08   02/01/08
10/17/07   03/14/08
10/17/07   10/17/07   1856FF-102 days
10/18/07   10/30/07                     Dyoung[5%],Fcrary[5%],OTL2[28%]
10/18/07   10/18/07        1827
10/18/07   10/25/07        1827
10/18/07   10/25/07        1827
10/26/07   10/30/07        1831
10/30/07   10/30/07        1832
10/31/07   11/16/07                     OTL2[35%]
10/31/07   11/09/07        1833
10/31/07   11/02/07        1833
11/09/07   11/09/07        1835
11/12/07   11/12/07        1837         Dyoung[13%],Fcrary[13%]
11/13/07   11/13/07        1838
11/14/07   11/14/07        1839         SwRIpl2
11/15/07   11/16/07        1840
11/19/07   02/05/08
11/19/07   12/17/07       1841          OTL2[26%]
11/19/07   12/17/07       1841
12/18/07   01/02/08     1843,1844       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
12/18/07   01/02/08     1843,1844
11/19/07   12/17/07       1841          SwRIpl3[5%]
11/19/07   12/17/07                     Sbakshi,Esittler,Evaughan
11/19/07   12/17/07                     Sbakshi,Esittler,Evaughan
11/19/07   12/17/07                     Sbakshi,Esittler,Evaughan
01/03/08   02/05/08        1846         OTL2[10%]
10/18/07   02/07/08                     OTL2[8%]
10/18/07   02/07/08        1827
10/18/07   02/07/08        1827
02/02/08   03/14/08                     OTL2[3%]
02/02/08   03/14/08
11/21/07   04/18/08
11/21/07   11/21/07   1887FF-102 days
11/26/07   12/06/07                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
11/26/07   11/26/07        1858
11/26/07   12/03/07        1858
11/26/07   12/03/07        1858
12/04/07   12/06/07        1862
12/06/07   12/06/07        1863
12/07/07   01/03/08                     Jfurman[35%]
12/07/07   12/18/07        1864
12/07/07   12/11/07        1864
12/18/07   12/18/07        1866
12/19/07   12/19/07        1868         Dyoung[13%],Fcrary[13%]
12/20/07   12/20/07        1869
12/21/07   12/21/07        1870         SwRIpl2
01/02/08   01/03/08        1871
01/04/08   03/12/08
01/04/08   01/30/08       1872          Jfurman[26%]
01/04/08   01/30/08       1872
01/31/08   02/05/08     1874,1875       Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
01/31/08   02/05/08     1874,1875
01/04/08   01/30/08       1872          SwRIpl3[5%]
01/04/08   01/30/08                     Sbakshi,Esittler,Evaughan
01/04/08   01/30/08                     Sbakshi,Esittler,Evaughan
01/04/08   01/30/08                     Sbakshi,Esittler,Evaughan
02/06/08   03/12/08        1877         Jfurman[10%]
11/26/07   03/14/08                     Jfurman[8%]
11/26/07   03/14/08        1858
11/26/07   03/14/08        1858
03/15/08   04/18/08                     Jfurman[3%]
03/15/08   04/18/08
01/08/08   05/23/08
01/08/08   01/08/08   1918FF-102 days
01/09/08   01/19/08                     Dyoung[5%],Fcrary[5%],OTL2[28%]
01/09/08   01/09/08        1889
01/09/08   01/16/08        1889
01/09/08   01/16/08        1889
01/17/08   01/19/08        1893
01/19/08   01/19/08        1894
01/21/08   02/06/08                     OTL2[35%]
01/21/08   01/31/08        1895
01/21/08   01/23/08        1895
01/31/08   01/31/08        1897
02/01/08   02/01/08        1899         Dyoung[13%],Fcrary[13%]
02/02/08   02/02/08        1900
02/04/08   02/04/08        1901         SwRIpl2
02/05/08   02/06/08        1902
02/07/08   04/16/08
02/07/08   03/05/08       1903          OTL2[26%]
02/07/08   03/05/08       1903
03/06/08   03/12/08     1905,1906       OTL2[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
03/06/08   03/12/08     1905,1906
02/07/08   03/05/08       1903          SwRIpl3[5%]
02/07/08   03/05/08                     Sbakshi,Esittler,Evaughan
02/07/08   03/05/08                     Sbakshi,Esittler,Evaughan
02/07/08   03/05/08                     Sbakshi,Esittler,Evaughan
03/13/08   04/16/08        1908         OTL2[10%]
01/09/08   04/18/08                     OTL2[8%]
01/09/08   04/18/08        1889
01/09/08   04/18/08        1889
04/19/08   05/23/08                     OTL2[3%]
04/19/08   05/23/08
02/11/08   06/30/08
02/11/08   02/11/08   1949FF-102 days
02/12/08   02/22/08                     Jfurman[28%],Dyoung[5%],Fcrary[5%]
02/12/08   02/12/08        1920
02/12/08   02/19/08        1920
02/12/08   02/19/08     1920
02/20/08   02/22/08     1924
02/22/08   02/22/08     1925
02/25/08   03/13/08               Jfurman[35%]
02/25/08   03/06/08     1926
02/25/08   02/27/08     1926
03/06/08   03/06/08     1928
03/07/08   03/07/08     1930      Dyoung[13%],Fcrary[13%]
03/10/08   03/10/08     1931
03/11/08   03/11/08     1932      SwRIpl2
03/12/08   03/13/08     1933
03/14/08   05/21/08
03/14/08   04/09/08     1934      Jfurman[26%]
03/14/08   04/09/08     1934
04/10/08   04/16/08   1936,1937   Jfurman[26%],Dyoung[5%],SwRIpl2[50%],Dglenn[5%],Fcrary[5%]
04/10/08   04/16/08   1936,1937
03/14/08   04/09/08     1934      SwRIpl3[5%]
03/14/08   04/09/08               Sbakshi,Esittler,Evaughan
03/14/08   04/09/08               Sbakshi,Esittler,Evaughan
03/14/08   04/09/08               Sbakshi,Esittler,Evaughan
04/17/08   05/21/08     1939      Jfurman[10%]
02/12/08   05/23/08               Jfurman[8%]
02/12/08   05/23/08     1920
02/12/08   05/23/08     1920
05/23/08   06/30/08               Jfurman[3%]
05/23/08   06/30/08
08/30/02   06/30/08
10/01/02   05/14/04               OTLbkup/prog4[5%]
08/30/02   06/14/04               Dyoung[3%],SwRIpl2[5%],GSFC[5%],Jfurman[5%]
08/30/02   05/14/04
10/01/02   06/14/04               Dglenn,Sbakshi,Mjohnson
10/01/02   06/14/04
10/01/02   06/14/04               MSSL,RAL
10/01/02   06/14/04
10/01/02   06/14/04               Esittler
05/15/04   06/30/08     1951      Jfurman[10%]
03/15/04   06/30/08               Dyoung[3%],SwRIpl2[5%],GSFC[5%],Jfurman[5%]
03/15/04   06/30/08               LANLsci[5%],Aruitberg,Mjohnson
03/15/04   06/30/08               Dglenn,Sbakshi,Mjohnson
03/15/04   06/30/08
03/15/04   06/30/08               MSSL,RAL
03/15/04   06/30/08
03/15/04   06/30/08               Esittler
05/13/02   09/03/04
05/13/02   07/29/02
05/13/02   05/17/02               TEAM,LANL[2%],Jfurman[38%],SwRIpl3[5%]
05/13/02   05/13/02
05/13/02   05/13/02     1970
05/13/02   05/13/02     1970
05/14/02   05/17/02     1972      Fcrary[3%],Dyoung[3%]
05/20/02   06/14/02
05/20/02   06/04/02     1973      Jfurman[13%]
05/20/02   06/04/02       1973        Jfurman[18%]
05/20/02   06/04/02       1973        Jfurman[5%]
06/04/02   06/04/02     1975,1977
06/06/02   06/06/02   1978FS+2 days
06/07/02   06/13/02       1979        Jfurman[10%]
06/14/02   06/14/02       1980
06/17/02   07/08/02
06/17/02   06/25/02       1981        Jfurman[13%]
06/17/02   06/25/02       1981        Jfurman[18%]
06/17/02   06/25/02       1981        Jfurman[5%]
06/25/02   06/25/02     1983,1985
06/27/02   06/27/02   1986FS+2 days
06/28/02   07/03/02       1987        Jfurman[10%]
07/05/02   07/08/02       1988
07/09/02   07/29/02
07/09/02   07/15/02       1989        Jfurman[10%]
07/09/02   07/15/02       1989        Jfurman[13%]
07/09/02   07/15/02       1989        Jfurman[5%]
07/15/02   07/15/02     1991,1993
07/17/02   07/17/02   1994FS+2 days
07/18/02   07/19/02       1995        Jfurman[10%]
07/22/02   07/29/02       1996
05/13/02   07/29/02                   Jfurman[5%],Fcrary[5%]
05/13/02   07/29/02       1970
05/13/02   07/29/02       1970
05/13/02   07/29/02
05/13/02   05/17/02                   Jfurman[38%],TEAM,LANL[2%],SwRIpl3[5%]
05/13/02   05/13/02
05/13/02   05/13/02       2003
05/13/02   05/13/02       2003
05/14/02   05/17/02       2005        Fcrary[3%],Dyoung[3%]
05/20/02   06/14/02
05/20/02   06/04/02       2006        Jfurman[13%]
05/20/02   06/04/02       2006        Jfurman[18%]
05/20/02   06/04/02       2006        Jfurman[5%]
06/04/02   06/04/02     2008,2010
06/06/02   06/06/02   2011FS+2 days
06/07/02   06/13/02       2012        Jfurman[10%]
06/14/02   06/14/02       2013
06/17/02   07/08/02
06/17/02   06/25/02       2014        Jfurman[13%]
06/17/02   06/25/02       2014        Jfurman[18%]
06/17/02   06/25/02       2014        Jfurman[5%]
06/25/02   06/25/02     2016,2018
06/27/02   06/27/02   2019FS+2 days
06/28/02   07/03/02       2020        Jfurman[10%]
07/05/02   07/08/02       2021
07/09/02   07/29/02
07/09/02   07/15/02       2022        Jfurman[10%]
07/09/02   07/15/02       2022        Jfurman[13%]
07/09/02   07/15/02       2022        Jfurman[5%]
07/15/02   07/15/02     2024,2026
07/17/02   07/17/02   2027FS+2 days
07/18/02   07/19/02       2028        Jfurman[10%]
07/22/02   07/29/02       2029
05/13/02   07/29/02                   Jfurman[5%],Fcrary[5%]
05/13/02   07/29/02       2003
05/13/02   07/29/02       2003
07/29/02   10/14/02
07/29/02   08/02/02                   Jfurman[35%],TEAM,LANL[2%],Fcrary[10%],SwRIpl3[5%]
07/29/02   07/29/02
07/29/02   07/29/02       2036
07/29/02   07/29/02       2036
07/30/02   08/02/02       2038        Fcrary[3%],Dyoung[3%]
08/05/02   08/30/02
08/05/02   08/20/02       2039        Jfurman[13%]
08/05/02   08/20/02       2039        Jfurman[18%]
08/05/02   08/20/02       2039        Jfurman[5%]
08/20/02   08/20/02     2041,2043
08/22/02   08/22/02   2044FS+2 days
08/23/02   08/29/02       2045        Jfurman[10%]
08/30/02   08/30/02       2046
09/03/02   09/23/02
09/03/02   09/11/02       2047        Jfurman[13%]
09/03/02   09/11/02       2047        Jfurman[18%]
09/03/02   09/11/02       2047        Jfurman[5%]
09/11/02   09/11/02     2049,2051
09/13/02   09/13/02   2052FS+2 days
09/16/02   09/19/02       2053        Jfurman[10%]
09/20/02   09/23/02       2054
09/24/02   10/14/02
09/24/02   09/30/02       2055        Jfurman[10%]
09/24/02   09/30/02       2055        Jfurman[13%]
09/24/02   09/30/02       2055        Jfurman[5%]
09/30/02   09/30/02     2057,2059
10/02/02   10/02/02   2060FS+2 days
10/03/02   10/04/02       2061        Jfurman[10%]
10/07/02   10/14/02       2062
07/29/02   10/14/02                   Jfurman[5%],Fcrary[5%]
07/29/02   10/14/02       2036
07/29/02   10/14/02       2036
07/29/02   10/14/02
07/29/02   08/02/02                   Jfurman[35%],TEAM,LANL[2%],Fcrary[10%],SwRIpl3[5%]
07/29/02   07/29/02
07/29/02   07/29/02       2069
07/29/02   07/29/02       2069
07/30/02   08/02/02       2071        Fcrary[3%],Dyoung[3%]
08/05/02   08/30/02
08/05/02   08/20/02       2072        Jfurman[13%]
08/05/02   08/20/02       2072        Jfurman[18%]
08/05/02   08/20/02       2072        Jfurman[5%]
08/20/02   08/20/02     2074,2076
08/22/02   08/22/02   2077FS+2 days
08/23/02   08/29/02       2078        Jfurman[10%]
08/30/02   08/30/02       2079
09/03/02   09/23/02
09/03/02   09/11/02       2080        Jfurman[13%]
09/03/02   09/11/02       2080        Jfurman[18%]
09/03/02   09/11/02       2080        Jfurman[5%]
09/11/02   09/11/02     2082,2084
09/13/02   09/13/02   2085FS+2 days
09/16/02   09/19/02       2086        Jfurman[10%]
09/20/02   09/23/02       2087
09/24/02   10/14/02
09/24/02   09/30/02       2088        Jfurman[10%]
09/24/02   09/30/02       2088        Jfurman[13%]
09/24/02   09/30/02       2088        Jfurman[5%]
09/30/02   09/30/02     2090,2092
10/02/02   10/02/02   2093FS+2 days
10/03/02   10/04/02       2094        Jfurman[10%]
10/07/02   10/14/02       2095
07/29/02   10/14/02                   Jfurman[5%],Fcrary[5%]
07/29/02   10/14/02       2069
07/29/02   10/14/02       2069
10/14/02   01/09/03
10/14/02   10/18/02                   Jfurman[35%],TEAM,LANL[2%],Fcrary[10%],SwRIpl3[5%]
10/14/02   10/14/02
10/14/02   10/14/02       2102
10/14/02   10/14/02       2102
10/15/02   10/18/02       2104        Fcrary[3%],Dyoung[3%]
10/21/02   11/15/02
10/21/02   11/05/02       2105        Jfurman[13%]
10/21/02   11/05/02       2105        Jfurman[18%]
10/21/02   11/05/02       2105        Jfurman[5%]
11/05/02   11/05/02     2107,2109
11/07/02   11/07/02   2110FS+2 days
11/08/02   11/14/02       2111        Jfurman[10%]
11/15/02   11/15/02       2112
11/18/02   12/10/02
11/18/02   11/26/02       2113        Jfurman[13%]
11/18/02   11/26/02       2113        Jfurman[18%]
11/18/02   11/26/02       2113        Jfurman[5%]
11/26/02   11/26/02     2115,2117
12/02/02   12/02/02   2118FS+2 days
12/03/02   12/06/02       2119        Jfurman[10%]
12/09/02   12/10/02       2120
12/11/02   01/09/03
12/11/02   12/17/02       2121        Jfurman[10%]
12/11/02   12/17/02       2121        Jfurman[13%]
12/11/02   12/17/02       2121        Jfurman[5%]
12/17/02   12/17/02     2123,2125
12/19/02   12/19/02   2126FS+2 days
12/20/02   12/23/02       2127        Jfurman[10%]
01/02/03   01/09/03       2128
10/14/02   01/09/03                   Jfurman[5%],Fcrary[5%]
10/14/02   01/09/03       2102
10/14/02   01/09/03       2102
10/14/02   01/09/03
10/14/02   10/18/02                   TEAM,LANL[2%],Jfurman[35%],Fcrary[10%],SwRIpl3[5%]
10/14/02   10/14/02
10/14/02   10/14/02       2135
10/14/02   10/14/02       2135
10/15/02   10/18/02       2137        Fcrary[3%],Dyoung[3%]
10/21/02   11/15/02
10/21/02   11/05/02       2138        Jfurman[13%]
10/21/02   11/05/02       2138        Jfurman[18%]
10/21/02   11/05/02       2138        Jfurman[5%]
11/05/02   11/05/02     2140,2142
11/07/02   11/07/02   2143FS+2 days
11/08/02   11/14/02       2144        Jfurman[10%]
11/15/02   11/15/02       2145
11/18/02   12/10/02
11/18/02   11/26/02       2146        Jfurman[13%]
11/18/02   11/26/02       2146        Jfurman[18%]
11/18/02   11/26/02       2146        Jfurman[5%]
11/26/02   11/26/02     2148,2150
12/02/02   12/02/02   2151FS+2 days
12/03/02   12/06/02       2152        Jfurman[10%]
12/09/02   12/10/02       2153
12/11/02   01/09/03
12/11/02   12/17/02       2154        Jfurman[10%]
12/11/02   12/17/02       2154        Jfurman[13%]
12/11/02   12/17/02       2154        Jfurman[5%]
12/17/02   12/17/02     2156,2158
12/19/02   12/19/02   2159FS+2 days
12/20/02   12/23/02       2160        Jfurman[10%]
01/02/03   01/09/03       2161
10/14/02   01/09/03                   Fcrary[5%],Jfurman[5%]
10/14/02   01/09/03       2135
10/14/02   01/09/03       2135
12/30/02   03/19/03
12/30/02   01/08/03                   Jfurman[40%],TEAM,LANL[2%],Fcrary[10%],SwRIpl3[5%]
12/30/02   12/30/02
01/02/03   01/02/03       2168
01/02/03   01/02/03       2168
01/03/03   01/08/03       2170        Fcrary[3%],Dyoung[3%]
01/09/03   02/05/03
01/09/03   01/24/03       2171        Jfurman[17%]
01/09/03   01/24/03       2171        Jfurman[25%]
01/09/03   01/24/03       2171        Jfurman[5%]
01/24/03   01/24/03     2173,2175
01/28/03   01/28/03   2176FS+2 days
01/29/03   02/04/03       2177        Jfurman[25%]
02/05/03   02/05/03       2178
02/06/03   02/26/03
02/06/03   02/14/03       2179        Jfurman[17%]
02/06/03   02/14/03       2179        Jfurman[25%]
02/06/03   02/14/03       2179        Jfurman[5%]
02/14/03   02/14/03     2181,2183
02/18/03   02/18/03   2184FS+2 days
02/19/03   02/24/03       2185        Jfurman[25%]
02/25/03   02/26/03       2186
02/27/03   03/19/03
02/27/03   03/05/03       2187        Jfurman[17%]
02/27/03   03/05/03       2187        Jfurman[25%]
02/27/03   03/05/03       2187        Jfurman[5%]
03/05/03   03/05/03     2189,2191
03/07/03   03/07/03   2192FS+2 days
03/10/03   03/11/03       2193        Jfurman[25%]
03/12/03   03/19/03       2194
01/02/03   03/19/03                   Jfurman[5%],Fcrary[5%]
01/02/03   03/19/03       2168
01/02/03   03/19/03       2168
12/30/02   03/19/03
12/30/02   01/08/03                   OTL2[50%],TEAM,LANL[2%],SwRIpl3[5%]
12/30/02   12/30/02
01/02/03   01/02/03       2201
01/02/03   01/02/03       2201
01/03/03   01/08/03       2203        Fcrary[3%],Dyoung[3%]
01/09/03   02/05/03
01/09/03   01/24/03       2204        OTL2[17%]
01/09/03   01/24/03       2204        OTL2[25%]
01/09/03   01/24/03       2204        OTL2[10%]
01/24/03   01/24/03     2206,2208
01/28/03   01/28/03   2209FS+2 days
01/29/03   02/04/03       2210        OTL2[25%]
02/05/03   02/05/03       2211
02/06/03   02/26/03
02/06/03   02/14/03       2212        OTL2[17%]
02/06/03   02/14/03       2212        OTL2[25%]
02/06/03   02/14/03       2212        OTL2[10%]
02/14/03   02/14/03     2214,2216
02/18/03   02/18/03   2217FS+2 days
02/19/03   02/24/03       2218        OTL2[25%]
02/25/03   02/26/03       2219
02/27/03   03/19/03
02/27/03   03/05/03       2220        OTL2[17%]
02/27/03   03/05/03       2220        OTL2[25%]
02/27/03   03/05/03       2220        OTL2[10%]
03/05/03   03/05/03     2222,2224
03/07/03   03/07/03   2225FS+2 days
03/10/03   03/11/03       2226        OTL2[25%]
03/12/03   03/19/03       2227
01/02/03   03/19/03                   OTL2[5%],Fcrary[5%]
01/02/03   03/19/03       2201
01/02/03   03/19/03       2201
03/17/03   06/02/03
03/17/03   03/21/03                   Jfurman[50%],TEAM,LANL[2%],SwRIpl3[5%]
03/17/03   03/17/03
03/17/03   03/17/03       2234
03/17/03   03/17/03       2234
03/18/03   03/21/03       2236        Fcrary[3%],Dyoung[3%]
03/24/03   04/18/03
03/24/03   04/08/03       2237        Jfurman[17%]
03/24/03   04/08/03       2237        Jfurman[25%]
03/24/03   04/08/03       2237        Jfurman[8%]
04/08/03   04/08/03     2239,2241
04/10/03   04/10/03   2242FS+2 days
04/11/03   04/17/03       2243        Jfurman[25%]
04/18/03   04/18/03       2244
04/21/03   05/09/03
04/21/03   04/29/03       2245        Jfurman[17%]
04/21/03   04/29/03       2245        Jfurman[25%]
04/21/03   04/29/03       2245        Jfurman[8%]
04/29/03   04/29/03     2247,2249
05/01/03   05/01/03   2250FS+2 days
05/02/03   05/07/03       2251        Jfurman[25%]
05/08/03   05/09/03       2252
05/12/03   06/02/03
05/12/03   05/16/03       2253        Jfurman[17%]
05/12/03   05/16/03       2253        Jfurman[25%]
05/12/03   05/16/03       2253        Jfurman[8%]
05/16/03   05/16/03     2255,2257
05/20/03   05/20/03   2258FS+2 days
05/21/03   05/22/03       2259        Jfurman[25%]
05/23/03   06/02/03       2260
03/17/03   06/02/03                   Jfurman[5%],Fcrary[5%]
03/17/03   06/02/03       2234
03/17/03   06/02/03       2234
03/17/03   06/02/03
03/17/03   03/21/03                   OTL2[50%],TEAM,LANL[2%],SwRIpl3[5%]
03/17/03   03/17/03
03/17/03   03/17/03       2267
03/17/03   03/17/03       2267
03/18/03   03/21/03       2269        Fcrary[3%],Dyoung[3%]
03/24/03   04/18/03
03/24/03   04/08/03       2270        OTL2[17%]
03/24/03   04/08/03       2270        OTL2[25%]
03/24/03   04/08/03       2270        OTL2[10%]
04/08/03   04/08/03     2272,2274
04/10/03   04/10/03   2275FS+2 days
04/11/03   04/17/03       2276        OTL2[25%]
04/18/03   04/18/03       2277
04/21/03   05/09/03
04/21/03   04/29/03       2278        OTL2[17%]
04/21/03   04/29/03       2278        OTL2[25%]
04/21/03   04/29/03       2278        OTL2[10%]
04/29/03   04/29/03     2280,2282
05/01/03   05/01/03   2283FS+2 days
05/02/03   05/07/03       2284        OTL2[25%]
05/08/03   05/09/03       2285
05/12/03   06/02/03
05/12/03   05/16/03       2286        OTL2[17%]
05/12/03   05/16/03       2286        OTL2[25%]
05/12/03   05/16/03       2286        OTL2[10%]
05/16/03   05/16/03     2288,2290
05/20/03   05/20/03   2291FS+2 days
05/21/03   05/22/03       2292        OTL2[25%]
05/23/03   06/02/03       2293
03/17/03   06/02/03                   OTL2[5%],Fcrary[5%]
03/17/03   06/02/03       2267
03/17/03   06/02/03       2267
06/02/03   08/18/03
06/02/03   06/06/03                   Jfurman[50%],TEAM,LANL[2%],SwRIpl3[5%]
06/02/03   06/02/03
06/02/03   06/02/03       2300
06/02/03   06/02/03       2300
06/03/03   06/06/03       2302        Fcrary[3%],Dyoung[3%]
06/09/03   07/07/03
06/09/03   06/24/03       2303        Jfurman[17%]
06/09/03   06/24/03       2303        Jfurman[25%]
06/09/03   06/24/03       2303        Jfurman[8%]
06/24/03   06/24/03     2305,2307
06/26/03   06/26/03   2308FS+2 days
06/27/03   07/03/03       2309        Jfurman[25%]
07/07/03   07/07/03       2310
07/08/03   07/28/03
07/08/03   07/16/03       2311        Jfurman[17%]
07/08/03   07/16/03       2311        Jfurman[25%]
07/08/03   07/16/03       2311        Jfurman[8%]
07/16/03   07/16/03     2313,2315
07/18/03   07/18/03   2316FS+2 days
07/21/03   07/24/03       2317        Jfurman[25%]
07/25/03   07/28/03       2318
07/29/03   08/18/03
07/29/03   08/04/03       2319        Jfurman[17%]
07/29/03   08/04/03       2319        Jfurman[25%]
07/29/03   08/04/03       2319        Jfurman[8%]
08/04/03   08/04/03     2321,2323
08/06/03   08/06/03   2324FS+2 days
08/07/03   08/08/03       2325        Jfurman[25%]
08/11/03   08/18/03       2326
06/02/03   08/18/03                   Jfurman[5%],Fcrary[5%]
06/02/03   08/18/03       2300
06/02/03   08/18/03       2300
06/02/03   08/18/03
06/02/03   06/06/03                   OTL2[50%],TEAM,LANL[2%],SwRIpl3[5%]
06/02/03   06/02/03
06/02/03   06/02/03       2333
06/02/03   06/02/03       2333
06/03/03   06/06/03       2335        Fcrary[3%],Dyoung[3%]
06/09/03   07/07/03
06/09/03   06/24/03       2336        OTL2[17%]
06/09/03   06/24/03       2336        OTL2[25%]
06/09/03   06/24/03       2336        OTL2[10%]
06/24/03   06/24/03     2338,2340
06/26/03   06/26/03   2341FS+2 days
06/27/03   07/03/03       2342        OTL2[25%]
07/07/03   07/07/03       2343
07/08/03   07/28/03
07/08/03   07/16/03       2344        OTL2[17%]
07/08/03   07/16/03       2344        OTL2[25%]
07/08/03   07/16/03       2344        OTL2[10%]
07/16/03   07/16/03     2346,2348
07/18/03   07/18/03   2349FS+2 days
07/21/03   07/24/03       2350        OTL2[25%]
07/25/03   07/28/03       2351
07/29/03   08/18/03
07/29/03   08/04/03       2352        OTL2[17%]
07/29/03   08/04/03       2352        OTL2[25%]
07/29/03   08/04/03       2352        OTL2[10%]
08/04/03   08/04/03     2354,2356
08/06/03   08/06/03   2357FS+2 days
08/07/03   08/08/03       2358        OTL2[25%]
08/11/03   08/18/03       2359
06/02/03   08/18/03                   OTL2[5%],Fcrary[5%]
06/02/03   08/18/03       2333
06/02/03   08/18/03       2333
08/18/03   11/03/03
08/18/03   08/22/03                   Jfurman[50%],TEAM,LANL[2%],SwRIpl3[5%]
08/18/03   08/18/03
08/18/03   08/18/03       2366
08/18/03   08/18/03       2366
08/19/03   08/22/03       2368        Fcrary[3%],Dyoung[3%]
08/25/03   09/22/03
08/25/03   09/10/03       2369        Jfurman[17%]
08/25/03   09/10/03       2369        Jfurman[25%]
08/25/03   09/10/03       2369        Jfurman[8%]
09/10/03   09/10/03     2371,2373
09/12/03   09/12/03   2374FS+2 days
09/15/03   09/19/03       2375        Jfurman[25%]
09/22/03   09/22/03       2376
09/23/03   10/13/03
09/23/03   10/01/03       2377        Jfurman[17%]
09/23/03   10/01/03       2377        Jfurman[25%]
09/23/03   10/01/03       2377        Jfurman[8%]
10/01/03   10/01/03     2379,2381
10/03/03   10/03/03   2382FS+2 days
10/06/03   10/09/03       2383        Jfurman[25%]
10/10/03   10/13/03       2384
10/14/03   11/03/03
10/14/03   10/20/03       2385        Jfurman[17%]
10/14/03   10/20/03       2385        Jfurman[25%]
10/14/03   10/20/03       2385        Jfurman[8%]
10/20/03   10/20/03     2387,2389
10/22/03   10/22/03   2390FS+2 days
10/23/03   10/24/03       2391        Jfurman[25%]
10/27/03   11/03/03       2392
08/18/03   11/03/03                   Jfurman[5%],Fcrary[5%]
08/18/03   11/03/03       2366
08/18/03   11/03/03       2366
08/18/03   11/03/03
08/18/03   08/22/03                   OTL2[50%],TEAM,LANL[2%],SwRIpl3[5%]
08/18/03   08/18/03
08/18/03   08/18/03       2399
08/18/03   08/18/03       2399
08/19/03   08/22/03       2401        Fcrary[3%],Dyoung[3%]
08/25/03   09/22/03
08/25/03   09/10/03       2402        OTL2[17%]
08/25/03   09/10/03       2402        OTL2[25%]
08/25/03   09/10/03       2402        OTL2[10%]
09/10/03   09/10/03     2404,2406
09/12/03   09/12/03   2407FS+2 days
09/15/03   09/19/03       2408        OTL2[25%]
09/22/03   09/22/03       2409
09/23/03   10/13/03
09/23/03   10/01/03       2410        OTL2[17%]
09/23/03   10/01/03       2410        OTL2[25%]
09/23/03   10/01/03       2410        OTL2[10%]
10/01/03   10/01/03     2412,2414
10/03/03   10/03/03   2415FS+2 days
10/06/03   10/09/03       2416        OTL2[25%]
10/10/03   10/13/03       2417
10/14/03   11/03/03
10/14/03   10/20/03       2418        OTL2[17%]
10/14/03   10/20/03       2418        OTL2[25%]
10/14/03   10/20/03       2418        OTL2[10%]
10/20/03   10/20/03     2420,2422
10/22/03   10/22/03   2423FS+2 days
10/23/03   10/24/03       2424        OTL2[25%]
10/27/03   11/03/03       2425
08/18/03   11/03/03                   OTL2[5%],Fcrary[5%]
08/18/03   11/03/03       2399
08/18/03   11/03/03       2399
11/03/03   01/29/04
11/03/03   11/07/03                   Jfurman[50%],TEAM,LANL[2%],SwRIpl3[5%]
11/03/03   11/03/03
11/03/03   11/03/03       2432
11/03/03   11/03/03       2432
11/04/03   11/07/03       2434        Fcrary[3%],Dyoung[3%]
11/10/03   12/09/03
11/10/03   11/25/03       2435        Jfurman[17%]
11/10/03   11/25/03       2435        Jfurman[25%]
11/10/03   11/25/03       2435        Jfurman[8%]
11/25/03   11/25/03     2437,2439
12/01/03   12/01/03   2440FS+2 days
12/02/03   12/08/03       2441        Jfurman[25%]
12/09/03   12/09/03       2442
12/10/03   01/08/04
12/10/03   12/18/03       2443        Jfurman[17%]
12/10/03   12/18/03       2443        Jfurman[25%]
12/10/03   12/18/03       2443        Jfurman[8%]
12/18/03   12/18/03     2445,2447
12/22/03   12/22/03   2448FS+2 days
12/23/03   01/06/04       2449        Jfurman[25%]
01/07/04   01/08/04       2450
01/09/04   01/29/04
01/09/04   01/14/04       2451        Jfurman[17%]
01/09/04   01/14/04       2451        Jfurman[25%]
01/09/04   01/14/04       2451        Jfurman[8%]
01/14/04   01/14/04     2453,2455
01/16/04   01/16/04   2456FS+2 days
01/19/04   01/20/04       2457        Jfurman[25%]
01/21/04   01/29/04       2458
11/03/03   01/29/04                   Jfurman[5%],Fcrary[5%]
11/03/03   01/29/04       2432
11/03/03   01/29/04       2432
11/03/03   01/29/04
11/03/03   11/07/03                   OTL2[50%],TEAM,LANL[2%],SwRIpl3[5%]
11/03/03   11/03/03
11/03/03   11/03/03       2465
11/03/03   11/03/03       2465
11/04/03   11/07/03       2467        Fcrary[3%],Dyoung[3%]
11/10/03   12/09/03
11/10/03   11/25/03       2468        OTL2[17%]
11/10/03   11/25/03       2468        OTL2[25%]
11/10/03   11/25/03       2468        OTL2[10%]
11/25/03   11/25/03     2470,2472
12/01/03   12/01/03   2473FS+2 days
12/02/03   12/08/03       2474        OTL2[25%]
12/09/03   12/09/03       2475
12/10/03   01/08/04
12/10/03   12/18/03       2476        OTL2[17%]
12/10/03   12/18/03       2476        OTL2[25%]
12/10/03   12/18/03       2476        OTL2[8%]
12/18/03   12/18/03     2478,2480
12/22/03   12/22/03   2481FS+2 days
12/23/03   01/06/04       2482        OTL2[25%]
01/07/04   01/08/04       2483
01/09/04   01/29/04
01/09/04   01/14/04       2484        OTL2[17%]
01/09/04   01/14/04       2484        OTL2[25%]
01/09/04   01/14/04       2484        OTL2[10%]
01/14/04   01/14/04     2486,2488
01/16/04   01/16/04   2489FS+2 days
01/19/04   01/20/04       2490        OTL2[25%]
01/21/04   01/29/04       2491
11/03/03   01/29/04                   OTL2[5%],Fcrary[5%]
11/03/03   01/29/04       2465
11/03/03   01/29/04       2465
01/19/04   04/02/04
01/19/04   01/23/04                   Jfurman[50%],TEAM,LANL[2%],OTLbkup/prog4[25%],SwRIpl3[5%]
01/19/04   01/19/04
01/19/04   01/19/04       2498
01/19/04   01/19/04       2498
01/20/04   01/23/04       2500        Fcrary[3%],Dyoung[3%]
01/26/04   02/20/04
01/26/04   02/10/04       2501        OTLbkup/prog4[17%]
01/26/04   02/10/04       2501        Jfurman[25%]
01/26/04   02/10/04       2501        Jfurman[8%]
02/10/04   02/10/04     2503,2505
02/12/04   02/12/04   2506FS+2 days
02/13/04   02/19/04       2507        Jfurman[25%]
02/20/04   02/20/04       2508
02/21/04   03/12/04
02/21/04   03/01/04       2509        OTLbkup/prog4[17%]
02/21/04   03/01/04       2509        Jfurman[25%]
02/21/04   03/01/04       2509        Jfurman[8%]
03/01/04   03/01/04     2511,2513
03/03/04   03/03/04   2514FS+2 days
03/04/04   03/09/04       2515        Jfurman[25%]
03/10/04   03/12/04       2516
03/15/04   04/02/04
03/15/04   03/19/04       2517        Jfurman[17%]
03/15/04   03/19/04       2517        Jfurman[25%]
03/15/04   03/19/04       2517        Jfurman[8%]
03/19/04   03/19/04     2519,2521
03/23/04   03/23/04   2522FS+2 days
03/24/04   03/25/04       2523        Jfurman[25%]
03/26/04   04/02/04       2524
01/19/04   04/02/04                   Jfurman[5%],Fcrary[5%]
01/19/04   04/02/04       2498
01/19/04   04/02/04       2498
01/19/04   04/02/04
01/19/04   01/23/04                   OTL2[25%],TEAM,LANL[2%],OTLbkup/prog4[25%],SwRIpl3[5%]
01/19/04   01/19/04
01/19/04   01/19/04       2531
01/19/04   01/19/04       2531
01/20/04   01/23/04       2533        Fcrary[3%],Dyoung[3%]
01/26/04   02/20/04
01/26/04   02/10/04       2534        OTL2[17%]
01/26/04   02/10/04       2534        OTL2[25%]
01/26/04   02/10/04       2534        OTL2[10%]
02/10/04   02/10/04     2536,2538
02/12/04   02/12/04   2539FS+2 days
02/13/04   02/19/04       2540        OTL2[25%]
02/20/04   02/20/04       2541
02/21/04   03/12/04
02/21/04   03/01/04       2542        OTL2[17%]
02/21/04   03/01/04       2542        OTL2[25%]
02/21/04   03/01/04       2542        OTL2[10%]
03/01/04   03/01/04     2544,2546
03/03/04   03/03/04   2547FS+2 days
03/04/04   03/09/04       2548        OTL2[25%]
03/10/04   03/12/04       2549
03/15/04   04/02/04
03/15/04   03/19/04       2550        OTL2[17%]
03/15/04   03/19/04       2550        OTL2[25%]
03/15/04   03/19/04       2550        OTL2[6%]
03/19/04   03/19/04     2552,2554
03/23/04   03/23/04   2555FS+2 days
03/24/04   03/25/04       2556        OTL2[25%]
03/26/04   04/02/04       2557
01/19/04   04/02/04                   OTL2[5%],Fcrary[5%]
01/19/04   04/02/04       2531
01/19/04   04/02/04       2531
04/05/04   06/19/04
04/05/04   04/09/04                   Jfurman[50%],TEAM,LANL[2%],SwRIpl3[5%]
04/05/04   04/05/04
04/05/04   04/05/04       2564
04/05/04   04/05/04       2564
04/06/04   04/09/04       2566        Fcrary[3%],Dyoung[3%]
04/12/04   05/07/04
04/12/04   04/27/04       2567        OTLbkup/prog4[17%]
04/12/04   04/27/04       2567        Jfurman[25%]
04/12/04   04/27/04       2567        Jfurman[5%]
04/27/04   04/27/04     2569,2571
04/29/04   04/29/04   2572FS+2 days
04/30/04   05/06/04       2573        Jfurman[25%]
05/07/04   05/07/04       2574
05/10/04   05/28/04
05/10/04   05/17/04       2575        OTLbkup/prog4[17%]
05/10/04   05/17/04       2575        OTLbkup/prog4[25%]
05/10/04   05/17/04       2575        Jfurman[5%]
05/17/04   05/17/04     2577,2579
05/19/04   05/19/04   2580FS+2 days
05/20/04   05/25/04       2581        Jfurman[25%]
05/26/04   05/28/04       2582
06/01/04   06/19/04
06/01/04   06/07/04       2583        OTLbkup/prog4[17%]
06/01/04   06/07/04       2583        Jfurman[25%]
06/01/04   06/07/04       2583        Jfurman[5%]
06/07/04   06/07/04     2585,2587
06/09/04   06/09/04   2588FS+2 days
06/10/04   06/11/04       2589        Jfurman[25%]
06/14/04   06/19/04       2590
04/05/04   06/19/04                   Jfurman[5%],Fcrary[5%]
04/05/04   06/19/04       2564
04/05/04   06/19/04       2564
04/05/04   06/19/04
04/05/04   04/09/04                   OTL2[25%],TEAM,LANL[2%],OTLbkup/prog4[25%],SwRIpl3[5%]
04/05/04   04/05/04
04/05/04   04/05/04       2597
04/05/04   04/05/04       2597
04/06/04   04/09/04       2599        Fcrary[3%],Dyoung[3%]
04/12/04   05/07/04
04/12/04   04/27/04       2600        OTL2[17%]
04/12/04   04/27/04       2600        OTL2[15%],OTLbkup/prog4[10%]
04/12/04   04/27/04       2600        OTL2[10%]
04/27/04   04/27/04     2602,2604
04/29/04   04/29/04   2605FS+2 days
04/30/04   05/06/04       2606        OTL2[25%]
05/07/04   05/07/04       2607
05/10/04   05/28/04
05/10/04   05/17/04       2608        OTL2[17%]
05/10/04   05/17/04       2608        OTL2[25%]
05/10/04   05/17/04       2608        OTL2[10%]
05/17/04   05/17/04     2610,2612
05/19/04   05/19/04   2613FS+2 days
05/20/04   05/25/04       2614        OTL2[25%]
05/26/04   05/28/04       2615
06/01/04   06/19/04
06/01/04   06/07/04       2616        OTL2[17%]
06/01/04   06/07/04       2616        OTL2[13%]
06/01/04   06/07/04       2616        OTL2[6%]
06/07/04   06/07/04     2618,2620
06/09/04   06/09/04   2621FS+2 days
06/10/04   06/11/04       2622        OTL2[25%]
06/14/04   06/19/04       2623
04/05/04   06/19/04                   OTL2[5%],Fcrary[5%]
04/05/04   06/19/04       2597
04/05/04   06/19/04       2597
06/21/04   09/03/04
06/21/04   06/25/04                   Jfurman[50%],TEAM,LANL[2%],OTL2[25%],SwRIpl3[5%]
06/21/04   06/21/04
06/21/04   06/21/04       2630
06/21/04   06/21/04       2630
06/22/04   06/25/04       2632        Fcrary[3%],Dyoung[3%]
06/28/04   07/26/04
06/28/04   07/14/04       2633        Jfurman[17%]
06/28/04   07/14/04       2633        Jfurman[25%]
06/28/04   07/14/04       2633        Jfurman[5%]
07/14/04   07/14/04     2635,2637
07/16/04   07/16/04   2638FS+2 days
07/19/04   07/23/04       2639        Jfurman[25%]
07/26/04   07/26/04       2640
07/27/04   08/13/04
07/27/04   08/03/04       2641        OTLbkup/prog4[17%]
07/27/04   08/03/04       2641        Jfurman[25%]
07/27/04   08/03/04       2641        Jfurman[5%]
08/03/04   08/03/04     2643,2645
08/05/04   08/05/04   2646FS+2 days
08/06/04   08/11/04       2647        Jfurman[25%]
08/12/04   08/13/04       2648
08/16/04   09/03/04
08/16/04   08/20/04       2649        OTLbkup/prog4[17%]
08/16/04   08/20/04       2649        Jfurman[25%]
08/16/04   08/20/04       2649        Jfurman[5%]
08/20/04   08/20/04     2651,2653
08/24/04   08/24/04   2654FS+2 days
08/25/04   08/26/04       2655        Jfurman[25%]
08/27/04   09/03/04       2656
06/21/04   09/03/04                   Jfurman[5%],Fcrary[5%]
06/21/04   09/03/04       2630
06/21/04   09/03/04       2630
10/01/02   07/21/08
10/01/02   06/30/08
10/01/02   06/30/08                   Dgell[5%]
10/01/02   06/30/08                   Dgell[5%]
10/01/02   07/21/08                   TEAM
10/01/02   05/20/08                   SwRIsrt[1%],SwRIpl2[1%]
12/03/02   07/21/08                   SwRIsrt[1%],SwRIpl2[1%]
12/03/02   07/21/08
10/01/02   05/20/08                   Dglenn,Sbakshi,Mjohnson
10/01/02   05/20/08
10/01/02   05/20/08
10/01/02   05/20/08                   UMtech1[3%]
10/01/02   05/20/08
10/01/02   06/30/08
10/01/02   06/30/08                   SwRIpl2[1%],SwRIpl1[1%]
10/01/02   05/20/08                   Esittler,Evaughan,Sbakshi,Dglenn
10/01/02   05/20/08
10/01/02   05/20/08
10/01/02   06/30/08
10/01/02   10/28/02                   SwRIpl1,SwRIpl2[25%]
10/01/02   06/30/08                   SwRIpl2[1%],SwRIpl1[1%]
10/01/02   05/20/08                   GSFC
10/01/02   05/20/08                   SwRIpl2[1%]
10/01/02   05/20/08                   Dglenn,Sbakshi
10/01/02   06/30/08
10/01/02   05/20/08                   Jfurman[1%]
10/01/02   06/30/08
10/01/02   06/30/08                   student2[30%]
10/01/02   06/30/08                   student2[30%]
03/01/04   06/30/08
03/01/04   06/30/08                   prog1[50%]
10/01/02   06/30/08                   SysAdmin[15%]
10/01/02   06/30/08                   SysAdmin[10%]
10/01/02   06/30/08
10/01/02   06/30/08
05/13/02   12/01/08
05/13/02   06/10/03
05/13/02   06/07/02                   Dgell
06/10/02   05/26/03
06/10/02   12/19/02
06/10/02   07/15/02       2698
06/10/02   07/15/02       2698
06/10/02   07/15/02       2698
07/15/02   07/15/02   2701,2702,2703 LANLsci[2%]
07/16/02   12/19/02        2704
12/19/02   12/19/02        2705        LANLsci[2%]
12/19/02   03/03/03        2706
03/03/03   03/03/03        2707
04/01/03   05/26/03    2708FS+4 wks
05/26/03   05/26/03        2709
06/10/02   05/19/03                    prog2[50%]
06/10/02   02/24/03        2698
02/25/03   02/25/03 2707FS-5 days,2712
04/01/03   05/19/03    2708FS+4 wks
05/19/03   05/19/03        2714
06/10/02   05/19/03                    prog1[50%]
06/10/02   02/24/03        2698
02/25/03   02/25/03 2707FS-5 days,2717
04/01/03   05/19/03    2708FS+4 wks
05/19/03   05/19/03        2719
06/10/03   06/10/03    2710FS+2 wks
05/02/05   12/01/08                    Dgell[10%],student[30%]
05/02/05   12/01/08
05/02/05   12/01/08
05/02/05   12/01/08
05/02/05   12/01/08
05/02/05   12/01/08                    TEAM,LANL,GSFC,SwRIpl3[1%],SwRIpl4[1%]
05/02/05   12/01/08
07/01/05   12/01/08
07/01/05   07/01/05
03/30/06   03/30/06
04/03/06   12/01/08
04/03/06   04/03/06
08/01/06   08/01/06
12/01/06   12/01/06
03/30/07   03/30/07
08/01/07   08/01/07
11/30/07   11/30/07
04/01/08   04/01/08
08/01/08   08/01/08
12/01/08   12/01/08
03/22/02   10/01/02
10/01/02   10/01/02                    $5000
10/01/02   10/01/02                    ~$20,000
10/01/02   10/01/02                    $3500
03/22/02   10/01/02
10/01/02   10/01/02                    $5457
10/01/02   10/01/02                    $945
10/01/02   10/01/02                    $36
10/01/02   10/01/02                    $9800
10/01/02   10/01/02                    $5600
10/01/02   10/01/02                    $875
03/22/02   03/22/02                    $2270
03/22/02   03/22/02                    $4500
03/22/02   06/20/08
01/27/03   06/20/08
01/27/03   01/28/03   TEAM
08/04/03   08/05/03   TEAM
02/23/04   02/24/04   TEAM
07/26/04   07/27/04   TEAM
11/08/04   11/09/04   TEAM
02/24/05   02/25/05   TEAM
07/28/05   07/29/05   TEAM
11/14/05   11/15/05   TEAM
02/23/06   02/24/06   TEAM
07/24/06   07/25/06   TEAM
11/06/06   11/07/06   TEAM
02/12/07   02/13/07   TEAM
07/12/07   07/13/07   TEAM
11/05/07   11/06/07   TEAM
03/03/08   03/04/08   TEAM
06/19/08   06/20/08   TEAM
08/06/03   06/18/08
08/06/03   08/07/03   TEAM
02/25/04   02/26/04   TEAM
07/26/05   07/27/05   TEAM
07/26/06   07/27/06   TEAM
07/10/07   07/11/07   TEAM
06/17/08   06/18/08   TEAM
10/21/02   05/23/08
10/21/02   10/25/02
01/27/03   01/31/03
05/19/03   05/23/03
10/13/03   10/17/03
01/26/04   01/30/04
05/17/04   05/21/04
10/25/04   10/29/04
01/24/05   01/28/05
05/23/05   05/27/05
10/17/05   10/21/05
01/23/06   01/27/06
05/22/06   05/26/06
10/16/06   10/20/06
01/29/07   02/02/07
05/21/07   05/25/07
10/15/07   10/19/07
01/21/08   01/25/08
05/19/08   05/23/08
03/22/02   03/28/02   Two Persons each trip
03/22/02   03/28/02
03/22/02   03/28/02
01/27/03   01/23/07   Four Persons each trip
01/27/03   01/28/03
01/26/04   01/27/04
01/24/05   01/25/05
01/23/06   01/24/06
01/22/07   01/23/07
03/22/02   03/27/02   2 persons per trip
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
03/22/02   03/27/02
kup/prog4[10%]
%],Dyoung[10%],Fcrary[5%]




 pson,SwRIpl3[20%],SwRIpl4[20%],Dyoung[10%],Fcrary[10%]




UM,GSFC,Dyoung[2%]
SwRIsrt,UM,GSFC

SwRIsrt,UM,GSFC
SwRIsrt,UM,GSFC




LANLsci[3%]
LANLsci[3%]
LANLsci[3%]
LANLsci[3%]

LANLsci[3%]
LANLsci[3%]
LANLsci[3%]



SL,Fcrary[2%]
SL,Fcrary[2%]
an[10%],Esittler,Sbakshi,Evaughan,Dsimpson




shi,Evaughan,Dsimpson,Esittler,Dyoung[13%],SwRIpl2[25%]
4[25%],Dyoung[13%]
5%],Dyoung[13%]




4[25%],Dyoung[13%]
5%],Dyoung[13%]




4[25%],Dyoung[13%]




5%],Dyoung[13%]
4[25%],Dyoung[13%]




5%],Dyoung[13%]
glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]




glenn[5%],Fcrary[5%]
nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]




nn[5%],Fcrary[5%]
glenn[5%],Fcrary[5%]
],SwRIpl3[5%]




],SwRIpl3[5%]
],SwRIpl3[5%]
],SwRIpl3[5%]




],SwRIpl3[5%]
og4[25%],SwRIpl3[5%]




4[25%],SwRIpl3[5%]
4[25%],SwRIpl3[5%]
SwRIpl3[5%]

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:8
posted:12/4/2011
language:English
pages:161
liamei12345 liamei12345 http://
About