        WO #                  Repair Notes                                              Problem                            Date     Serial #        Description
        12204 Replaced the Epson Projector on site. CF012.       Epson Projector powers down by itself and will        7/1/2010      C-036     CFFT 1:4
                                                                 not project an image.
         12205 Replaced the Battlefield IG #2 with one from ASL. Battlefield IG #2 will not boot. The computer         7/1/2010     C30-012    CFFT 1:30
               CF108.                                            states that it can not find a proper boot device.

         12206 Reset BIOS, Reset time and date. Re-installed   This is a follow-up to 11896. Student Control will      7/1/2010       null
               Fidview software. No parts used. Returned to    not boot.
               ASL.
         12207 Reloaded Operating System, Drivers and Fidelity Battlefield IG CH1 fails to boot to desktop.            7/1/2010       null
               Software. Tested and returned to ASL.

         12208 7-1-2010 Prepped Projector for shipment to          Epson Projector is showing rainbow colors. This     7/1/2010       null
               vendor for repair 7/13/2010 Returned the            is a follow-up to 12144.
               Projector back from vendor. Tests good.
               Returned to ASL.
         12209 Reconfigured the SATA port on the Hard Drive to     This is a follow-up to 12205. Battlefield IG #2 will 7/1/2010      null
               resolve issue. No parts used. Returned to ASL.      not boot. The computer states that it can not find
                                                                   a proper boot device.
         12210 Repaired handstion using Potentiometer from         [Handstation] Azimuth not responding.Need to         7/1/2010      null
               ASL.Tested Good. Job Complete.                      order Potentiometer BI-6187-R5K L1.0.(line# not
                                                                   available )5ea. Need Floppy disketts 1pk.

         12211 Repaired loose wires with solder.Returning to [Handstaion] loose wire on potentiometer. 7/1/2010                       null
               ASL. Job Complete.
         12212 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12213 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12214 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12215 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12216 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12217 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12218 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12219 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12220 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12221 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 7/6/2010                                  406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12222 Could not duplicate error. No parts used.           This is a follow-up to 11321. Battlefield IG will not 7/6/2010     null
               Returned back to ASL.                               power on. Fidview version 2.8.0.1.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 1
        WO #                    Repair Notes                                     Problem                                 Date       Serial #           Description
        12223 PR 362 submitted 8/23/2010 PO 85526 received This is a follow-up to 12197. Row 6 Bino is               7/6/2010         null
              8/24/2010 Sent to Vendor on 8/24/2010 Returned broken.
              from vendor. tested. returned to ASL

         12224 Replaced the Epson Projector Lamp with one          This is a follow-up to 12204. Epson Projector     7/6/2010         null
               from ASL. CF015. Tested, Returned to ASL.           powers down by itself and will not project an
                                                                   image.
         12225 Rebooted System.                                    System not responding to input.                   7/6/2010    E110012V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12226                                                     A/C in the building was out from 5/20/10 until    7/6/2010        FOX1        NBCRS FOX
                                                                   6/28/10 and due to the extreme heat, was not                                  SIMULATOR
                                                                   able to turn on the system. Suggested
                                                                   temperature for the systems is stated to be run
                                                                   between 68F(20C) and 75F(24C). Max out
                                                                   temperature is for any sustainable time is
                                                                   84F(29C). Building temperature consistently
                                                                   exceeded 95F(35C) plus.
         12227 Replaced Instructor chair with parts from           Instructor station chair seat cover torn,line# not 7/7/2010   ISB0004/STA 5   ICOFT Instructor Station
               ASL,line#IC067. Job Complete.                       available. Parts Needed: Ribbed shank nylon
                                                                   rivets "McMaster-Carr Cat#115 pg 3256
                                                                   p/n:90227A119;Staple Gun "Lowes" item#
                                                                   242246 model#JT21CM;Staples: Arrow no.21424
                                                                   1/4" item#:24250
         12228 replaced bottom monitor with line item # RT006      bottom monitor has a pink screen with black       7/7/2010         8-4        RT3
                                                                   stripes
         12229 Rebooted system                                     System Locked up                                  7/7/2010    E110003V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12230 Rebooted system                                     KeyBoard Locked up                                7/7/2010    E110003V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12231 Replaced internal 1/4 amp fuse.                     Huntron Tracker 2000 test equipment doesn't       7/7/2010       910005       IMTS
                                                                   power on.
         12232 Replaced Stealth IG (ASL CF063)                     Stealth IG has issue with Video Card overheating. 7/7/2010        C-033       CFFT 1:4

         12233 hooked up to our test bed, issue is still persistant bottom monitor has a pink screen with black      7/7/2010         null
               monitor shows multiple colors when turning on in stripes
               lines... return to vendor for repair. PR339
               submitted 7/20/2010 PO 85483 received
               7/27/2010 recieved item from shipping. test good.
               return to ASL. ASL LINE #RT006.

         12234 Parts Needed: Ribbed shank nylon rivets             Instructor station chair seat cover torn,line# not 7/7/2010        null
               "McMaster-Carr Cat#115 pg 3256                      available. Parts Needed: Ribbed shank nylon
               p/n:90227A119;Staple Gun "Lowes" item#              rivets "McMaster-Carr Cat#115 pg 3256
               242246 model#JT21CM;Staples: Arrow no.21424         p/n:90227A119;Staple Gun "Lowes" item#
               1/4" item#:24250.Recieved all parts,chair           242246 model#JT21CM;Staples: Arrow no.21424
               repaired.Job Complete.                              1/4" item#:24250
         12235 Replaced Motherboard (CF053), Processor            This is a follow-up to 12232. Stealth IG has an    7/7/2010         null
               (CF067), RAM (CF092), PCI Riser Card (CF083), issue with video card overheating.
               Hard Drive (CF055), DVD Drive (CF110), and
               Video Card (CF116). Reinstalled Operating
               System, drivers and all Fidelity Software. Tested,
               returned to ASL.
         12236 replaced VME from a working RT3 in the pomt.        VME board was not receiving power                 7/8/2010         4-5        RT3

         12237 tried a different power cable and unit was still not VME was not receiving power.                     7/8/2010         null
               receiving power to the unit send back to vendor
               for repair. PR 356 submitted 8/16/2010 PO 85514
               received 8/17/2010 Received tested good.
               Returning to ASL line item #RT012.

         12238 replaced VME with ASL line item # RT012             missing a VME board                              7/8/2010        134-10       RT3
         12239 Cat 5 coupler installed.                            System needed cat 5 coupler concerning inability 7/8/2010      0005V8M36      FFOMT AN/TPQ-36
                                                                   to sync radar processor                                                       (V8)
         12240 BY DIRECT SUBSTITUTION IT WAS                       SIMULATED STINGER WEAPON #1 HAVING               7/8/2010          301        IMTS
               DETERMINED THAT THE TRACKER CARD                    PROBLEMS TRACKING
               WAS DEFECTIVE. IT WILL BE SENT TO
               INTERSENSE, INC. FOR REPAIR. S/N: ESM-
               0209312-D RMA: 1007082217 RECEIVED BACK
               FROM INTERSENSE ON 8/19/10. INSTALLED
               IN WEAPON S/N 364907, SYSTEM CHECKED
               GOOD 8/24/10
         12241                                                                                                       7/8/2010                    AT3 Instructor Station
         12242                                                     The FLIR level would not adjust between 0 VDC     7/8/2010         71         AT3 (STC)
                                                                   and 5 VDC. The touch screen did not work. The
                                                                   student software was version 2.0.7

         12243 Replaced the I/O CCA PN 777744-01 or PCI              The FLIR level would not go between 0 VDC and 7/8/2010           71         AT3 (STC)
               6025E, that corrected the FLIR level. Found that 5 VDC. The touch screen did not work. The
               the touch screen on COM 3. Changed the touch student software was 2.0.7
               screen to COM 2, that corrected the touch
               screen. Found that the install .bat file did not load
               version 2.0.9, copied the Student Station folder to
               C:\ student station folder. S/N: 101607E
               RECEIVED REPLACEMENT CARD 7/28/10 S/N:
               1012C5E




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 2
        WO #                     Repair Notes                                         Problem                          Date        Serial #           Description
        12244 Gave verbal instructions over the phone to the      Recieved a phone call July 08,2010 @ 11:15       7/9/2010          78          STPT Instructor Station
              customer to resett password,customer was able       from customer located at Ft.Hood that was
              to access system software;Issue resolved.Job        unable to run system software.
              Complete.
        12245 The date was off by one day. Set the correct date   Battlefield #2 displays licensing error.         7/9/2010        C30-026       CFFT 1:30
              and it worked fine.
        12246 Removed Floppy Disk out of the A:drive restarted    Will not Boot. Recieved from shipping 7/21/10 @ 7/9/2010       SEDX00004       ATGM BST
              the system and it Loaded to the Desktop. System     11:00. On Boot error message "None System
              Tested Good. Job Complete.                          Disk error"

         12247                                             System power strip intermittent.                        7/9/2010                      AT3 Instructor Station
         12248 Modified Case and upgraded all              Recieved from storage/Depot.Will be upgraded            7/9/2010          84          STPT Instructor Station
               components.System tested Good.Job Complete. w/Mod kit. [Student Station:92-199A]

         12249 Repaired S&A switch.System tested good.Job         Recieved from storage/Depot.Will be upgraded     7/9/2010        92-199A       STPT Student
               Complete.                                          w/Mod kit.Belongs w/[Instructor Station:84]

         12250 1. THE HCT WAS RELOCATED 2. THE PHASE 1. HCT RELOCATION 2. AFTER RELOCATION                         7/9/2010          404         FSCATT M109A6
               SEQUENCE RELAY WAS REPLACED, PART      THE HCT WOULD NOT POWERUP
               USED: HT0724, 1EA. TOTAL MAN HOURS: 24

         12251 Recieved Instructor station Monitor from           No Power from Instructor station Monitor.        7/9/2010     ISB0005/STA 6    ICOFT Instructor Station
               ASL,line#IC058. Issue resolved.Job Complete.

         12252 Replaced power cord with used off shelf.           System power cord intermittent.                  7/9/2010                      AT3 Instructor Station
         12253 Replaced surge suppressor with one from bench      Surge suppressor providing intermittent power    7/9/2010          71          AT3 (STC)
               stock.
         12254 Reinstalled System Software and installed          Will Not Boot.Bad Hard Disk Drive, Need HDD      7/9/2010    SSB0021/STA 6/6   ICOFT Student Station
               Operating System.Job Complete.                     250GB LINE#IC084
         12255 Tightened Cannon plug,adjusted front sights.       Recieved from storage/Depot.Will be upgraded     7/9/2010        0141A         STPT Student
               System tested Good. Job Complete.                  w/Mod kit.Belongs w/[Instructor Station:69]

         12256 Upgraded System with Mod kit.Updated OS to           Recieved from storage/Depot.Will be upgraded   7/9/2010          69          STPT Instructor Station
               WINXP and installed STPT software                    w/Mod kit.Belongs w/[Student Station:0141A]
               ver.2.0.9..System tested in STPT software
               changes screen fresh rate which causes the
               display to flicker. In Windows with the refresh rate
               set @ 60 mhz the display does not flicker. The
               STPT software may need to be edited to adjust
               the refresh rate. Recieved upgraded software to
               resolve display screen refresh rate.Software
               upgraded and tested Good. Job Complete.


         12257 Powered system off, discharged capacitors and      System not responding                            7/9/2010     E110007V8OP      FFROT AN/TPQ-36 (V8)
               re-initialized system.                                                                                                            Instructor Station
         12258                                                                                                     7/11/2010      ISB0001        ICOFT Instructor Station

         12259   null                                                                                              7/11/2010      SSB0002        ICOFT Student Station
         12260   null                                                                                              7/11/2010      SSB0003        ICOFT Student Station
         12261   null                                                                                              7/11/2010      SSB0004        ICOFT Student Station
         12262   null                                                                                              7/11/2010      SSB0028        ICOFT Student Station
         12263   PMCS                                                                                              7/11/2010                     FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12264                                                                                                     7/11/2010      ETIOS1         SMT ETRAC
         12265                                                                                                     7/11/2010      ETSS9          SMT ETRAC
         12266                                                                                                     7/11/2010      ETSS1          SMT ETRAC
         12267                                                                                                     7/11/2010      ETSS2          SMT ETRAC
         12268                                                                                                     7/11/2010      ETSS3          SMT ETRAC
         12269                                                                                                     7/11/2010      ETSS4          SMT ETRAC
         12270                                                                                                     7/11/2010      ETSS5          SMT ETRAC
         12271                                                                                                     7/11/2010      ETSS6          SMT ETRAC
         12272                                                                                                     7/11/2010      ETSS7          SMT ETRAC
         12273                                                                                                     7/11/2010      ETSS8          SMT ETRAC
         12274                                                                                                     7/11/2010      ETSS9          SMT ETRAC
         12275 null                                                                                                7/11/2010    E110001V8IS      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12276 null                                                                                                7/11/2010    E110002V8IS      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12277 null                                                                                                7/11/2010    E110003V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12278 null                                                                                                7/11/2010    E110004V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12279 null                                                                                                7/11/2010    E110005V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12280 null                                                                                                7/11/2010    E110006V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12281 null                                                                                                7/11/2010    E110007V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12282 null                                                                                                7/11/2010    E110008V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12283 null                                                                                                7/11/2010    E110009V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12284 null                                                                                                7/11/2010    E110010V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12285 null                                                                                                7/11/2010    E110011V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12286 null                                                                                                7/11/2010    E110012V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 3
        WO #                     Repair Notes                  Problem       Date        Serial #             Description
        12287 null                                                       7/11/2010    E110013V8OP       FFROT AN/TPQ-36 (V8)
                                                                                                        Instructor Station
         12288 null                                                      7/11/2010    E110014V8OP       FFROT AN/TPQ-36 (V8)
                                                                                                        Instructor Station
         12289                                                           7/11/2010      114B0001IS      FIMT
         12290                                                           7/11/2010     114B0009SSC      FIMT
         12291                                                           7/11/2010     114B0001M37      FIMT
         12292                                                           7/11/2010     114B0002M37      FIMT
         12293                                                           7/11/2010     114B0003M37      FIMT
         12294                                                           7/11/2010     114B0004M37      FIMT
         12295   In storage.                                             7/11/2010     114B0005M36      FIMT
         12296   IN STORAGE                                              7/11/2010     114B0006M36      FIMT
         12297   IN STORAGE                                              7/11/2010     114B0007M36      FIMT
         12298   IN STORAGE                                              7/11/2010     114B0008M36      FIMT
         12299                                                           7/11/2010    114D0001SMTIS     SMT Student Station
         12300                                                           7/11/2010   114D0006SMTSSC     SMT Student Station
         12301                                                           7/11/2010     114D0002SMT      SMT Student Station
         12302                                                           7/11/2010     114D0003SMT      SMT Student Station
         12303                                                           7/11/2010     114D0004SMT      SMT Student Station
         12304                                                           7/11/2010     114D0005SMT      SMT Student Station
         12305   System checked and tested good.Job Complete             7/11/2010         IS001        SOT

         12306 System checked and tested good.Job Complete               7/11/2010        IS002         SOT

         12307 System checked and tested good.Job Complete               7/11/2010        SS001         SOT

         12308 System checked and tested good.Job Complete               7/11/2010        SS002         SOT

         12309 System checked and tested good.Job Complete               7/11/2010        SS003         SOT

         12310 System checked and tested good.Job Complete               7/11/2010        SS004         SOT

         12311 System checked and tested good.Job Complete               7/11/2010        SS005         SOT

         12312 System checked and tested good.Job Complete               7/11/2010        SS006         SOT

         12313 null                                                      7/11/2010      SSB0005         ICOFT Student Station
         12314 System checked and tested good.Job Complete               7/11/2010       IS001          JTIDS

         12315 System checked and tested good.Job Complete               7/11/2010        SS-1          JTIDS

         12316 System check and tested good.Job Complete.                7/11/2010        SS-2          JTIDS

         12317 System check and tested good.Job Complete.                7/11/2010        SS-3          JTIDS

         12318 System check and tested good.Job Complete.                7/11/2010        SS-4          JTIDS

         12319 System check and tested good.Job Complete.                7/11/2010        SS-5          JTIDS

         12320   null                                                    7/11/2010                      JTIDS
         12321   null                                                    7/11/2010                      JTIDS
         12322   null                                                    7/11/2010                      JTIDS
         12323   null                                                    7/11/2010                      JTIDS
         12324   null                                                    7/11/2010                      JTIDS
         12325   null                                                    7/11/2010                      JTIDS
         12326   System check and tested good.Job Complete.              7/11/2010        SS-6          JTIDS

         12327 System check and tested good.Job Complete.                7/11/2010        SS-7          JTIDS

         12328 null                                                      7/11/2010                      JTIDS
         12329 null                                                      7/11/2010                      JTIDS
         12330 System check and tested good.Job Complete.                7/11/2010    ISB0004/STA 5     ICOFT Instructor Station

         12331 System check and tested good.Job Complete.                7/11/2010    ISB0005/STA 6     ICOFT Instructor Station

         12332 System check and tested good.Job Complete.                7/11/2010    ISB0006/STA 7     ICOFT Instructor Station

         12333 System check and tested good.Job Complete.                7/11/2010   SSA0001/STA 7/1    ICOFT Student Station

         12334 System check and tested good.Job Complete.                7/11/2010   SSB0008/STA 5/6    ICOFT Student Station

         12335 System check and tested good.Job Complete.                7/11/2010   SSB0009/ STA 5/5   ICOFT Student Station

         12336 System check and tested good.Job Complete.                7/11/2010   SSB0010/STA 5/4    ICOFT Student Station

         12337 System check and tested good.Job Complete.                7/11/2010   SSB0011/STA 5/3    ICOFT Student Station

         12338 System check and tested good.Job Complete.                7/11/2010   SSB0012/STA 5/2    ICOFT Student Station

         12339 System check and tested good.Job Complete.                7/11/2010   SSB0013/STA 5/1    ICOFT Student Station

         12340 System check and tested good.Job Complete.                7/11/2010   SSB0016/STA 6/1    ICOFT Student Station

         12341 System check and tested good.Job Complete.                7/11/2010   SSB0017/STA 6/2    ICOFT Student Station

         12342 System check and tested good.Job Complete.                7/11/2010   SSB0018/STA 6/3    ICOFT Student Station




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                        Page 4
        WO #                  Repair Notes                                           Problem                          Date       Serial #            Description
        12343 System check and tested good.Job Complete.                                                          7/11/2010   SSB0019/STA 6/4   ICOFT Student Station

         12344 System check and tested good.Job Complete.                                                         7/11/2010   SSB0020/STA 6/5   ICOFT Student Station

         12345 System check and tested good.Job Complete.                                                         7/11/2010   SSB0021/STA 6/6   ICOFT Student Station

         12346 System check and tested good.Job Complete.                                                         7/11/2010   SSB0022/STA 7/2   ICOFT Student Station

         12347 System check and tested good.Job Complete.                                                         7/11/2010   SSB0023/STA 7/3   ICOFT Student Station

         12348 System check and tested good.Job Complete.                                                         7/11/2010   SSB0024/STA 7/4   ICOFT Student Station

         12349 System check and tested good.Job Complete.                                                         7/11/2010   SSB0025/STA 7/5   ICOFT Student Station

         12350 System check and tested good.Job Complete.                                                         7/11/2010   SSB0026/STA 7/6   ICOFT Student Station

         12351 null                                                                                               7/11/2010      ISB0007        ICOFT Instructor Station

         12352 null                                                                                               7/11/2010                     ICOFT Instructor Station

         12353   null                                                                                             7/11/2010      SSB0001        ICOFT Student Station
         12354   null                                                                                             7/11/2010      SSB0027        ICOFT Student Station
         12355                                                                                                    7/11/2010         3           HIMARS DT
         12356   pre startup                                                                                      7/11/2010                     HIMARS DT
         12357   pre startup                                                                                      7/11/2010         null        HIMARS DT
         12358   pre startup correction null                                                                      7/11/2010         null        HIMARS DT
         12359   pre startup                                                                                      7/11/2010         null        HIMARS DT
         12360   pre startup correction null                                                                      7/11/2010         null        HIMARS DT
         12361   pre startup correction null                                                                      7/11/2010         null        HIMARS DT
         12362   pre startup                                                                                      7/11/2010         null        HIMARS DT
         12363   pre startup                                                                                      7/11/2010         null        HIMARS DT
         12364   pre startup                                                                                      7/11/2010         null        HIMARS DT
         12365   pre startup correction null                                                                      7/11/2010         null        HIMARS DT
         12366   pre startup correction null                                                                      7/11/2010         null        HIMARS DT
         12367   pre startup correction null                                                                      7/11/2010         null        HIMARS DT
         12368                                                                                                    7/11/2010          2          MLRS DT
         12369                                                                                                    7/11/2010          1          MLRS DT
         12370   pre startup correction null                                                                      7/11/2010                     MLRS DT
         12371   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12372   pre startup                                                                                      7/11/2010         null        MLRS DT
         12373   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12374   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12375   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12376   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12377   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12378   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12379   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12380   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12381   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12382   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12383   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12384   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12385   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12386   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12387   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12388   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12389   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12390   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12391   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12392   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12393   pre startup correction null                                                                      7/11/2010         null        MLRS DT
         12394   Entered in error.                                                                                7/11/2010       910005        IMTS
         12395   Entered in error.                                                                                7/11/2010       910005        IMTS
         12396   System checked and tested good.Job Complete                                                      7/11/2010       ETIOS1        SOT ETRAC Instructor
                                                                                                                                                Station
         12397 System check. Job Complete.                                                                        7/11/2010       ETSS1         SOT ETRAC STUDENT
                                                                                                                                                STATION
         12398 Items needed to perform PMCS:Windex,Paper                                                          7/11/2010       ETSS2         SOT ETRAC STUDENT
               towels,Cans of compressed Air,Zip Ties and WD-                                                                                   STATION
               40.
         12399 System checked and tested Good. Job Complete.                                                      7/11/2010       ETSS3         SOT ETRAC STUDENT
                                                                                                                                                STATION
         12400 System checked and tested good.Job Complete.                                                       7/11/2010       ETSS4         SOT ETRAC STUDENT
                                                                                                                                                STATION
         12401 System checked and tested good. Job Complete.                                                      7/11/2010       ETSS5         SOT ETRAC STUDENT
                                                                                                                                                STATION
         12402 System checked and tested good.Job Complete.                                                       7/11/2010       ETSS6         SOT ETRAC STUDENT
                                                                                                                                                STATION
         12403 System checked and tested good.Job Complete                                                        7/11/2010       ETSS7         SOT ETRAC STUDENT
                                                                                                                                                STATION
         12404                                                    Needs capacitor replaced and some LED lights    7/12/2010          2          HIMARS Mockup
                                                                  replaced.
         12405                                                    Monthly                                         7/12/2010          1          MLRS DT
         12406                                                    Monthly                                         7/12/2010          2          MLRS DT
         12407                                                    Monthly                                         7/12/2010          3          HIMARS DT
         12408 Cloned the Hard Drive from the other funcitoning   This is a follow-up to 12093. Student IG Hard   7/12/2010         null
               HDD. No parts used. Tested, Returned to ASL.       Drive will not boot.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 5
        WO #                     Repair Notes                                        Problem                             Date         Serial #            Description
        12409 Re-initialized system                               System not responding                              7/12/2010     E110004V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12410 Recieved from ASL S&A switch                       Recieved from storage/Depot.Will be upgraded       7/12/2010        92-155A       STPT Student
               line#:ST161.Repaired and tested Good. Job          w/Mod kit. S&A switch will not initiate.
               Complete.
         12411 Adjusted and aligned sights, tightened loosed      Recieved from storage/Depot.Will be upgraded       7/12/2010        92-261A       STPT Student
               cannon plug.Tested Good.Job Complete.              w/Mod kit.

         12412 Replaced KVM Switch/Monitor/Mouse/Keyboard         IOS KVM Switch Monitor not displaying.             7/13/2010           3          HIMARS Mockup
               combo.
         12413 Adjusted Front sights,repaired S&A switch and      Recieved from storage/Depot.Will be upgraded       7/13/2010        92-246A       STPT Student
               adjusted cannon plug connector on tube. Tested     w/Mod kit.
               Good.Job Complete.
         12414 Power circuit breaker not functioning. Repaired    No power to the RCT                                7/13/2010        SS004         SOT
               Power supply.Test Good.Job Complete.

         12415 Software Issue,Resolved,tested good.Job            Will not sync with Instructor station.             7/13/2010         SS-4         JTIDS
               Complete.
         12416 Recieved from ASL CDT line#IC061.Reinstalled       CDT not responding,Slew to Cue not                 7/13/2010    SSB0019/STA 6/4   ICOFT Student Station
               OS and system software. System tested Good.        responding.Computer B blue screening after
               Job Complete.                                      reloading sceniro software.

         12417                                                 replaced cmos battery in the battlefield IG.          7/13/2010         C-044        CFFT 1:12
         12418                                                 resecured gas peddle to floor of MUT and              7/13/2010         FOX2         NBCRS FOX
                                                               grounded.                                                                            SIMULATOR
         12419   Replaced both Breech Open/Closed switches. No The trainer will not initialize.                      7/14/2010         408          FSCATT M109A6
                 other problems found.
         12420   Shipped a replacement SAF.                    SAF will not boot.                                    7/14/2010         C-142        CFFT 1:12
         12421   1. THE LVDT WAS REPLACED, PART USED:          THE HCT WOULD NOT RECOIL, LVDT WAS                    7/14/2010          406         FSCATT M109A6
                 HT1117, 1EA. 2. NEW LVDT ON ORDER             BROKEN BEYOND REPAIR.
                 RECEIVED ORDER: 7/28/2010.
         12422   8 hours total repair time Replaced radar      Shelter powers up upon turning on ATG                 7/14/2010      0001V8M36       FFOMT AN/TPQ-36
                 processor                                                                                                                          (V8)
         12423   Reinitialized System.                         System not responding to input.                       7/14/2010     E110014V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12424 Reinitialized System.                              System not responding to input.                    7/14/2010     E110010V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12425 Reinitiated System.                                System not responding to input.                    7/14/2010     E110011V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12426 14 Jul: The system was moved by the users         Instructor control station licensing server does not 7/14/2010        C-049        CFFT 1:12
               yesterday. It worked before the move. Checked     work. Both IGs will not acquire a license.
               for misconnected cables but couldn't find any.
               Ensured that the date and time on the systems
               were all the same. There are several error
               messages in device manager and in the licensing
               log. Had to stop troubleshooting because the
               building closed for the day at 4pm and everyone
               had to leave. Will return to the site tomorow
               morning. 15 July: Replaced BIOS batteries in the
               Battlefield IG and the Stealth IG. Replaced the
               Instructor Control Computer. The spare Instructor
               Control Computer had a dead BIOS battery.
               Replaced that battery, too. System checked out
               fine. Ft. Sill technicians assisted with the
               troubleshooting process.



         12427 Audio Phone Jack Ring Reads Open. Wire And    Audio Phone Jack creating a humming noise.              7/14/2010         C-088        CFFT 1:12
               Solder Connections Are Good. Audio Phone Jack
               Needs To Be Replaced. Replaced Audio Phone
               Jack. Tested for good sound.

         12428 Found that DIS 5 was not connected between the     The Student Control did not talk to the Instructor 7/14/2010         C-088        CFFT 1:12
               Instructor Control and the Student Control,        Control. The Stealth IG did not talk to the
               connected DIS 5 to the DIS HUB. Found that DIS     Instructor Control. The Joystick did not move the
               3 was not connected between the Instructor         Battlefield video and Stealth video independently,
               Control and the Stealth IG, connected DIS 3 to     only the SAF indicators would move.
               the DIS HUB. Found that the IG control default
               was COMBINED set the control to
               INDEPENDENT both IGs could be controled with
               F2 and F4 independently.


         12429 Awaiting on site to let us know about the          Battlefield IG does not have the SIM Network       7/15/2010         C-139        CFFT 1:12
               shipment of a full system to Ft. Sill. 8-3-2010    Connection. (Probably due to faulty Network
               Received Shipment from Ft. Drumm, NY. 8-5-         Card). Multiple System Issues. Multiple
               2010 After 8 hours of work and testing, the        Computers will not boot.
               Stealth IG was replaced (CF063), Network Card
               was replaced in the Battlefield IG (CF029), BIOS
               was reset in the Student Control, time and date
               was reset in all computers, System was tested
               numerous times with all terrains. Prepped for
               shipment back to Ft. Drumm, NY.


         12430 REPLACED CART.                                     PRINTER REQUIRES BLACK INK CART.                   7/15/2010          null
         12431 AFTER REMOVED AND RESEATED THE                     COMPUTER WILL NOT BOOT UP                          7/15/2010           2          AT3 (STC)
               MEMORY, TWO PROCESSORS, AND THE
               VIDEO CARD THE COMPUTER BOOTED
               NORMALLY.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 6
        WO #                    Repair Notes                                            Problem                              Date       Serial #         Description
        12432 Monitor is bad, replaced with Monitor from ASL.       Student Station 5 3D Monitor not displaying a        7/15/2010         1         MLRS DT
                                                                    picture.
         12433 Replaced Stealth from ASL Line#063.                  Stealth Image Generator will not display target      7/15/2010     C30-011       CFFT 1:30
                                                                    images. Contains error message "inconsistant
                                                                    license".
         12434 Reinitialized System.                                System not responding to input.                      7/15/2010   E110006V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                     Instructor Station
         12435 Reinitialized System.                                System not responding to input.                      7/15/2010   E110009V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                     Instructor Station
         12436 Reinitialized System.                                System not responding to input.                      7/15/2010   E110012V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                     Instructor Station
         12437 Reinitialized System.                                System not responding to input.                      7/15/2010   E110013V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                     Instructor Station
         12438 Reinitialized System.                                System not responding to input.                      7/15/2010   E110010V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                     Instructor Station
         12439 Powered system down, verified cable             Map Light not working                                     7/15/2010   E110012V8OP     FFROT AN/TPQ-36 (V8)
               connections and re-applied pwr.                                                                                                       Instructor Station
         12440 Connector: D38999/26WE99PN / with pins (4ea) Fabricate 4 Interconnect to return supply back to            7/15/2010        null
               (ASL Item) Connector: D38999/26WE99SN / with authorized stockage.
               pins (4ea) (ASL Item) Cable clamp: MS85049/39-
               17W (8ea) (ASL Item)[recieved] Alpha Wire:
               7055/19 WH001-Hook-up Wire( 2-1000ft spools)
               (NEWARK) [recieved] Expandable mesh:
               9196k15 2ea (50 Ft) (McMaster-Carr) Recieved
               all parts.Cables tested Good. Actual work hours
               16 hrs for all 4 cables.Job complete. Wire
               stripper. Line #SP0075


         12441 Replaced the Student IG.                             The Student Image Generator (IG) has sporadic        7/16/2010       C-144       CFFT 1:12
                                                                    boot failures.
         12442                                                      Annual                                               7/16/2010        1          HIMARS Mockup
         12443                                                      Monthly                                              7/16/2010        2          HIMARS Mockup
         12444                                                      Monthly                                              7/16/2010        3          HIMARS Mockup
         12445 Re-intialized system.                                System not responding to inputs.                     7/16/2010   E110008V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                     Instructor Station
         12446 Re-intialized system.                                System not responding to inputs.                     7/16/2010   E110012V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                     Instructor Station
         12447 Chair repaired with using staple gun and new         Instructor station chair seat cover torn,line# not   7/16/2010   ISB0005/STA 6   ICOFT Instructor Station
               linen.Job Complete.                                  available.
         12448 Uninstalled all Fidelity software, reinstalled all   This is a follow-up to 12433. Stealth IG will not    7/16/2010        null
               Fidelity software. Tested, returned to ASL.Used      display target images. Contains error message
               CMOS Battery (CF075)                                 "inconsistent license".
         12449 pre startup                                                                                               7/18/2010       FOX1        NBCRS FOX
                                                                                                                                                     SIMULATOR
         12450 pre startup                                                                                               7/18/2010       FOX1        NBCRS FOX
                                                                                                                                                     SIMULATOR
         12451 pre startup                                                                                               7/18/2010       FOX2        NBCRS FOX
                                                                                                                                                     SIMULATOR
         12452 pre startup                                                                                               7/18/2010       FOX2        NBCRS FOX
                                                                                                                                                     SIMULATOR
         12453 pre startup correction null                                                                               7/18/2010      FOXIS1       NBCRS FOX
                                                                                                                                                     SIMULATOR
         12454 pre startup correction null                                                                               7/18/2010      FOXIS1       NBCRS FOX
                                                                                                                                                     SIMULATOR
         12455 Monthly Pmcs                                                                                              7/18/2010                   FFOMT AN/TPQ-36
                                                                                                                                                     (V8)
         12456                                                                                                           7/18/2010    0002V8M36      FFOMT AN/TPQ-36
                                                                                                                                                     (V8)
         12457 Pmcs Complete                                                                                             7/18/2010    0001V8M36      FFOMT AN/TPQ-36
                                                                                                                                                     (V8)
         12458 null                                                                                                      7/18/2010    0003V8M36      FFOMT AN/TPQ-36
                                                                                                                                                     (V8)
         12459 Pmcs Complete                                                                                             7/18/2010    0004V8M36      FFOMT AN/TPQ-36
                                                                                                                                                     (V8)
         12460 Pmcs Complete                                                                                             7/18/2010    0005V8M36      FFOMT AN/TPQ-36
                                                                                                                                                     (V8)
         12461   pre startup correction null                                                                             7/18/2010        1          HIMARS Mockup
         12462   pre startup correction null                                                                             7/18/2010        2          HIMARS Mockup
         12463   pre startup correction null                                                                             7/18/2010        3          HIMARS Mockup
         12464   Replaced projector lamp (CF015).                   Epson Projector Lamp has burnt out.                  7/19/2010     C30-023       CFFT 1:30
         12465   REseated CMOS BTRY and Reseated RAM.               PS/2 ports not responding will not pass post.        7/19/2010       null
                 System Tested Good. Job Complete.                  Possible bad MB.
         12466   Upgraded system w/Mod kit.Loaded WINXP             Recieved from storage/Depot.Will be upgraded         7/20/2010        62         STPT Instructor Station
                 SVC4 and installed STPT software ver.2.0.9.        w/Mod kit.
                 System tested Good.Job Complete.
         12467   Upgraded case and installed                        Recieved from storage/Depot.Will be upgraded         7/20/2010        73         STPT Instructor Station
                 components,updated to WinXP and updated            w/Mod kit.
                 STPT software to 2.0.9.Sytem tested Good.Job
                 Complete.
         12468   Adjusted front sights,adjusted Display screen,     Recieved from storage/Depot.Will be upgraded         7/20/2010     92-258A       STPT Student
                 and tightened grip stock.System tested Good.Job    w/Mod kit.
                 Complete.
         12469   Replaced lamp                                      Run/Stop light out                                   7/20/2010        null
         12470   Replaced shelter control panel                     Spot light shuts down system                         7/20/2010    0003V8M36      FFOMT AN/TPQ-36
                                                                                                                                                     (V8)
         12471 Inserted new lamp into test button                   Test lamp missing from generator control panel       7/20/2010        null




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                    Page 7
        WO #                     Repair Notes                                              Problem                          Date        Serial #          Description
        12472 Shipped Replacement Battlefield IG #2 to site.        Battlefield IG #2 will not boot. (Cycles on and off 7/20/2010        C-045       CFFT 1:12
              CF078. Shipped Replacement Battlefield IG #1 to       through bootup process). Battlefield IG #1 has
              site. CF107. 7-21-2010 Shipped another                incorrect date and time (requires new CMOS
              Battlefield IG #2 to the site due the the first one   Battery), but due to "stripped" screws the site is
              not operating correctly.                              requesting that we send a replacement computer.

         12473 Upgraded OS to WINXP,installed STPT software Recieved from storage/Depot.Will be upgraded                 7/20/2010        66         STPT Instructor Station
               version 2.0.9.Sytem tested Good.Job Complete. w/Mod kit.

         12474 Upgraded OS to WINXP,installed STPT software Recieved from storage/Depot.Will be upgraded                 7/20/2010        67         STPT Instructor Station
               version 2.0.9. System Tested Good.Job        w/Mod kit.
               Complete.
         12475 TROUBLESHOOTING REVEALED THAT THE            COMPUTER WILL NOT TURN ON                                    7/20/2010        21         AT3 (STC)
               CMOS BATTERY WAS DEAD, IT WAS
               REPLACE WITH A NEW ONE FROM ASL. THE
               ESC KEY ON THE KEYBOARD WAS MISSING;
               IT WAS REPLACED WITH A NEW ONE FROM
               ASL. THE SOFTWARE WAS UPGRADED
               FROM VER 2.0.7 TO 2.0.9 AND NEW
               SCENARIOS 44 THRU 75 WERE LOADED.

         12476 TROUBLESHOOTING REVEALED THAT THE                    COMPUTER WILL NOT TURN ON                            7/20/2010        115        AT3 (STC)
               CMOS BATTERY WAS DEAD, IT WAS
               REPLACED WITH A NEW ONE FROM ASL.
               THE SOFTWARE WAS UPGRADED FROM
               VER 2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.
         12477 THE COMPUTER BOOTED UP NORMALLY                      PERFORMED SYSTEM CHECK (PMCS)                        7/20/2010        44         AT3 (STC)
               AND ALL SYSTEMS CHECKED OUT GOOD.
               THE SOFTWARE WAS UPGRADED FROM
               VER 2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.
         12478 Replaced Battlefield #1 computer.                    Battlefield #1 computer displays licensing error.    7/21/2010     C30-026       CFFT 1:30

         12479 Adjusted screen geometry of projector #1         Battlefield scenes are misaligned                        7/21/2010     C30-026       CFFT 1:30
         12480 PR 363 submitted 8/24/2010 PO 85528 received This a follow-up to 12420. SAF will not boot.                7/21/2010       null
               8/24/2010 Sent to vendor on 8/24/2010 Returned
               9/7/2010. Reinstalled Linux OS, drivers and
               Fidelity software. Tested good. Returned to ASL.

         12481 Shipped Replacement Hard Drive and Battlefield       Battlefield IG#2 will not show a display. Site has   7/21/2010     C30-305       CFFT 1:30 Increment 2
               IG #2 to site. 2CF018 and 2CF028                     tried both Hard Drives with the same error.

         12482 Chair repaired with using staple gun and new         Instructor station chair seat cover torn,line# not   7/21/2010   ISB0006/STA 7   ICOFT Instructor Station
               linen.Job Complete.                                  available.
         12483 TROUBLESHOOTING REVEALED THAT THE                    COMPUTER WILL NOT TURN ON                            7/21/2010        114        AT3 (STC)
               CMOS BATTERY WAS DEAD, IT WAS
               REPLACED WITH A NEW ONE FROM ASL.
               MISSING ONE HEADSET; REPLACED WITH
               NEW ONE FROM ASL. THE SOFTWARE WAS
               UPGRADED FROM VER 2.0.7 TO 2.0.9 AND
               NEW SCENARIOS 44 THRU 75 WERE
               LOADED.
         12484 COMPUTER BOOTED UP NORMALLY. FOUND PERFORMED SYSTEM CHECK (PMCS)                                          7/21/2010        48         AT3 (STC)
               A BAD COMMANDERS PUSH TO TALK
               SWITCH, WILL REQUEST A NEW ONE FROM
               FT. SILL. ONE HEADSET HAS A BROKEN
               LEFT EAR PIECE.
         12485 THE COMPUTER BOOTED UP NORMALLY,                     PERFORMED SYSTEM CHECK (PMCS)                        7/22/2010        41         AT3 (STC)
               BUT DURING A SYSTEM CHECK ONE BAD
               HEADSET WAS FOUND. THE SOFTWARE
               WAS UPGRADED FROM VER 2.0.7 TO 2.0.9
               AND NEW SCENARIOS 44 THRU 75 WERE
               LOADED.
         12486 TROUBLESHOOTING REVEALED THAT THE                    COMPUTER WILL NOT TURN ON                            7/22/2010        116        AT3 (STC)
               CMOS BATTERY WAS DEAD, IT WAS
               REPLACED WITH A NEW ONE FROM ASL.
               ONE BROKEN HEADSET; REPLACED WITH
               NEW ONE FROM ASL. THE SOFTWARE WAS
               UPGRADED FROM VER 2.0.7 TO 2.0.9 AND
               NEW SCENARIOS 44 THRU 75 WERE
               LOADED.
         12487 TROUBLESHOOTING REVEALED THAT THE                    COMPUTER WILL NOT TURN ON                            7/22/2010        66         AT3 (STC)
               CMOS BATTERY WAS DEAD, IT WAS
               REPLACED WITH A NEW ONE FROM ASL.
               ONE BROKEN HEADSET; REPLACED WITH
               NEW ONE FROM ASL. THE SOFTWARE WAS
               UPGRADED FROM VER 2.0.7 TO 2.0.9 AND
               NEW SCENARIOS 44 THRU 75 WERE
               LOADED.
         12488 TROUBLESHOOTING REVEALED THAT THE                    COMPUTER WILL NOT TURN ON                            7/22/2010        67         AT3 (STC)
               CMOS BATTERY WAS DEAD, IT WAS
               REPLACED WITH A NEW ONE FROM ASL.
               ONE BROKEN HEADSET; REPLACED WITH
               NEW ONE FROM ASL. THE SOFTWARE WAS
               UPGRADED FROM VER 2.0.7 TO 2.0.9 AND
               NEW SCENARIOS 44 THRU 75 WERE
               LOADED.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                    Page 8
        WO #                  Repair Notes                                         Problem                               Date      Serial #         Description
        12489 TROUBLESHOOTING REVEALED THAT THE                      COMPUTER WILL NOT TURN ON                       7/22/2010       113       AT3 (STC)
              CMOS BATTERY WAS DEAD, IT WAS
              REPLACED WITH A NEW ONE FROM ASL.
              THE SOFTWARE WAS UPGRADED FROM
              VER 2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
              THRU 75 WERE LOADED.
         12490 Recieved all parts.Repaired Bone Vibrator assy.       Broken Bone Vibrator.Need Bone Vibrator Assy. 7/22/2010       92-088A     STPT Student Station
               Job Complete.                                         line#ST005.Need to order minature nuts for STPT
                                                                     Bone Vibrator McMaster-Carr catalog #115 pg
                                                                     3151 Machine Screw hex Nuts p/n:91841A003;pg
                                                                     3190 Spring lock washers p/n:92147A410; pg
                                                                     3181 Flat washers p/n:92141A003

         12491 This work order is closed due to error.               Battlefield will not display an image           7/22/2010                 AT3 Instructor Station
         12492 Shipped a replacement Battlefield IG. CF061.          The Battlefield IG will not display an image.   7/22/2010      C-068      CFFT 1:12

         12493 Shipped replacement Projector Lamp (CF100).           Projector lamp burned out.                      7/22/2010      C-148      CFFT 1:12

         12494 Replaced LLDR Cable.                                  LLDR Cable will not transfer data.              7/22/2010     C30-014     CFFT 1:30
         12495 Repaired Power supply cable connection to LLDR        LLDR cable will not transfer data.              7/22/2010      C-014      CFFT 1:4
               Cable.
         12496 - Licensing server doesn't work because the MAC       CFFT Instructor Control computer s/n 0418       7/23/2010       null
               address on the motherboard got corrupted.             licensing service does not work.
               Computer also reboots by itself and has memory
               errors. - Discovered that the power supply was
               going bad and it caused the motherboard to go
               bad also. A power surge could have caused this. -
               Replaced the motherboard and memory with
               parts from stock. Ordered, received and installed
               a power supply. - After parts were replaced, ran
               diagnostics to test the system. Computer
               diagnostics ran fine for several days but then
               started having memory errors. Saw that the
               memory that I previously installed from stock was
               the incorrect speed. Borrowed a memory module
               from a different spare computer and installed it. -
               Running computer diagnostics. If everything
               passes after several days of testing I'll order a
               replacement memory module. - Memory
               diagnostics passed. Memory module on order PR
               BRAGG-013. Returned borrowed memory module
               back to spare computer. Also returned the
               memory module that was taken from supply. -
               Received and installed memory. Running memory
               diagnostics to burn it in. - Computer checks out
               fine. Puting the computer into supply.



         12497 Replaced radiate on/off button.Connector for       Radiate on/off button non-op.                      7/23/2010   114D0005SMT   SMT Student Station
               radiate on/off switch also needed due to wire
               breaking during switch removal process.
               Connector part number: m22885/10818200. This
               part will have to be ordered due to not being
               carried in ASL. Received part 8/30/2010. Installed
               new connector. Tested system.

         12498 Used two pmd ribbon cables Line #FV0043               Paper map display light inop                    7/23/2010    0003V8M36    FFOMT AN/TPQ-36
                                                                                                                                               (V8)
         12499 TROUBLESHOOTING REVEALED THAT THE                     COMPUTER WOULD NOT BOOT UP                      7/23/2010       58        AT3 (STC)
               CMOS BATTERY WAS DEAD, IT WAS
               REPLACED WITH A NEW ONE FROM ASL.
               THE SOFTWARE WAS UPGRADED FROM
               VER 2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.
         12500 pre startup                                                                                           7/25/2010      FOX1       NBCRS FOX
                                                                                                                                               SIMULATOR
         12501 pre startup                                                                                           7/25/2010      FOX2       NBCRS FOX
                                                                                                                                               SIMULATOR
         12502 pre startup correction null                                                                           7/25/2010     FOXIS1      NBCRS FOX
                                                                                                                                               SIMULATOR
         12503 null                                                                                                  7/25/2010                 FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12504 null                                                                                                  7/25/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12505 null                                                                                                  7/25/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12506 null                                                                                                  7/25/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12507 null                                                                                                  7/25/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12508 null                                                                                                  7/25/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12509 null                                                                                                  7/25/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12510 null                                                                                                  7/25/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12511 null                                                                                                  7/25/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                    Page 9
        WO #                      Repair Notes                                           Problem                              Date       Serial #         Description
        12512 null                                                                                                        7/25/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12513 null                                                                                                       7/25/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12514 null                                                                                                       7/25/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12515 null                                                                                                       7/25/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12516 null                                                                                                       7/25/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12517 null                                                                                                       7/25/2010   E110014V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                    Instructor Station
         12518 pre startup correction null                                                                                7/25/2010        1        MLRS Mockup
         12519 pre startup correction null                                                                                7/25/2010        2        MLRS Mockup
         12520 pre startup                                                                                                7/25/2010        3        MLRS Mockup
         12521 pre startup correction null                                                                                7/25/2010        4        MLRS Mockup
         12522 recalibrated screen, could not recreate issue. job bottom touch panel on student station is not            7/26/2010       1-8       RT3
               complete                                              working correctly.
         12523 Replaced LLDR with one from ASL (CF051).              LLDR does not provide any display. Unit will         7/26/2010      C-014      CFFT 1:4
                                                                     power up but has no image.
         12524 Completed                                             Monthly IMTS inspection due.                         7/26/2010     910005      IMTS
         12525 Completed                                             IMTS Quarterly Inspection due.                       7/26/2010     910005      IMTS
         12526 PR 346 submitted 7/28/2010 PO 85494 received This is a follow-up to 12523. LLDR will not                   7/26/2010       null
               7/29/2010 part received back at ft. sill, ok. tested. provide a display image.
               returned to ASL.
         12527 THE PINS WERE REPLACED, PARTS USED:                   LIMIT SWITCH CONNECTOR PINS WERE                     7/26/2010       202       FSCATT M109A5
               HT0950, 2EA.                                          BROKEN
         12528 Replaced the hard drive. Reloaded the operating Battlefield IG #2 will not boot. (Cycles on and off        7/26/2010       null
               system. Reloaded the Fidview software. Returned through bootup process). Battlefield IG #1 has
               to ASL.                                               incorrect date and time (requires new CMOS
                                                                     Battery), but due to "stripped" screws the site is
                                                                     requesting that we send a replacement computer.

         12529 Repaired the Video Card. No parts used. Tested       Battlefield IG #2 will not boot. (Cycles on and off 7/26/2010         null
               returned to ASL.                                     through bootup process).
         12530 Installed a new CMOS Battery to resolve issue.       This is a follow-up to 12472. Battlefield IG #2 will 7/26/2010        null
               CF075. Returned to ASL.                              not boot. (Cycles on and off through bootup
                                                                    process). Battlefield IG #1 has incorrect date and
                                                                    time (requires new CMOS Battery), but due to
                                                                    "stripped" screws the site is requesting that we
                                                                    send a replacement computer.

         12531 Unable to duplicate issue. Tested, returned to This is a follow-up to 11769. Stealth Ig will not           7/26/2010       null
               ASL.                                           show a display.
         12532 Performed trouble shooting and replaced SS0002 No Display.                                                 7/26/2010    SSB0002      ICOFT Student Station
               A & B computers with A & B computers from on
               site spares. System tested good. Job complete.

         12533 Shipped replacment Battlefield Image Generator       Battlefield IG crashes when running Urban             7/27/2010      C-045      CFFT 1:12
               (CF107).                                             Mideast.
         12534                                                                                                            7/27/2010     CFFT1       CFFT 1:30
         12535                                                                                                            7/27/2010      IW1        MM1
         12536                                                                                                            7/27/2010      IW2        MM1
         12537                                                                                                            7/27/2010      IW3        MM1
         12538                                                                                                            7/27/2010      OW1        MM1
         12539                                                                                                            7/27/2010     OW10        MM1
         12540                                                                                                            7/27/2010     OW11        MM1
         12541                                                                                                            7/27/2010     OW12        MM1
         12542                                                                                                            7/27/2010      OW2        MM1
         12543                                                                                                            7/27/2010      OW3        MM1
         12544                                                                                                            7/27/2010      OW4        MM1
         12545                                                                                                            7/27/2010      OW5        MM1
         12546                                                                                                            7/27/2010      OW6        MM1
         12547                                                                                                            7/27/2010      OW7        MM1
         12548                                                                                                            7/27/2010      OW8        MM1
         12549                                                                                                            7/27/2010      OW9        MM1
         12550                                                                                                            7/27/2010      BD2        BIDS Mockup
         12551                                                                                                            7/27/2010      BD1        BIDS Mockup
         12552                                                                                                            7/27/2010    FOX-MF-1     NBCRS FOX
                                                                                                                                                    SIMULATOR
         12553                                                                                                            7/27/2010    FOX-MF-2     NBCRS FOX
                                                                                                                                                    SIMULATOR
         12554 Prepared an Increment 2 Stealth IG and spare         Increment 2 CFFT is having an issue where the         7/27/2010     C30-301     CFFT 1:30
               Hard Drive for shipment to site. (ASL 2CF024,        Stealth IG is unable to load any terrains.
               2CF018).
         12555 Replaced Stealth Image Generator will one from       Stealh Image Generator will not boot.                 7/27/2010      C-033      CFFT 1:4
               ASL (CF063).
         12556 Reloaded the O.S. and Fidview software.              Stealth Image Generator will not boot. CF063.         7/27/2010       null
               Returned to ASL. No parts used.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 10
        WO #                Repair Notes                             Problem              Date      Serial #        Description
        12557 COMPUTER WILL NOT BOOT UP, DISPLAYS     SYSTEM CHECK (PMCS)             7/27/2010       215      STPT Instructor Station
              HARD DRIVE ERROR. TROUBLESHOOTING
              REVEALED THAT THE SATA CABLE
              BETWEEN THE HARD DRIVE AND THE
              MOTHERBOARD WAS LOOSE. AFTER
              SECURITY IT PROPERLY THE COMPUTER
              BOOTED NORMALLY. THE SOFTWARE WAS
              UPGRADED FROM VER 2.0.7 TO 2.0.9 AND
              NEW SCENARIOS 44 THRU 75 WERE
              LOADED. 0730 TO 0830
         12558 SYSTEM BOOTED UP NORMALLY AND          SYSTEM CHECK (PMCS)             7/27/2010       205      STPT Instructor Station
               PASSED THE DAILY READINESS TEST. THE
               SOFTWARE WAS UPGRADED FROM VER
               2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.
         12559 SYSTEM BOOTED UP NORMALLY AND          SYSTEM CHECK (PMCS)             7/27/2010       216      STPT Instructor Station
               PASSED THE DAILY READINESS TEST. THE
               SOFTWARE WAS UPGRADED FROM VER
               2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.
         12560 SYSTEM BOOTED UP NORMALLY AND          SYSTEM CHECK (PMCS)             7/27/2010       201      STPT Instructor Station
               PASSED THE DAILY READINESS TEST. THE
               SOFTWARE WAS UPGRADED FROM VER
               2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.
         12561 EVERY OTHER TIME THE COMPUTER IS        SYSTEM CHECK (PMCS)            7/27/2010       203      STPT Instructor Station
               TURNED ON IT FREEZES AND LOCKS UP
               BEFORE THE STPT SOFTWARE CAN LOAD.
               REPLACED THE HARD DRIVE WITH A NEW
               ONE FROM ASL TO CORRECT THE
               PROBLEM. SYSTEM BOOTED UP NORMALLY
               AND PASSED THE DAILY READINESS TEST.
               THE SOFTWARE WAS UPGRADED FROM
               VER 2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.


         12562 WHEN THE COMPUTER WAS TURNED ON      SYSTEM CHECK (PMCS)               7/27/2010       204      STPT Instructor Station
               THERE WAS NO VIDEO ON THE MONITOR.
               TROUBLESHOOTING REVEALED THAT THE
               VIDEO CABLE WAS LOOSE AND NOT
               MAKING PROPER CONTACT. AFTER
               SCREWING THE CABLE IN THE COMPUTER
               BOOTED UP NORMALLY AND PASSED DAILY
               READINESS TEST. THE SOFTWARE WAS
               UPGRADED FROM VER 2.0.7 TO 2.0.9 AND
               NEW SCENARIOS 44 THRU 75 WERE
               LOADED.
         12563 SYSTEM BOOTED UP NORMALLY AND          SYSTEM CHECK (PMCS)             7/27/2010       202      STPT Instructor Station
               PASSED THE DAILY READINESS TEST. THE
               SOFTWARE WAS UPGRADED FROM VER
               2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.
         12564 WHEN THE COMPUTER BOOTED UP IT WAS     SYSTEM CHECK (PMCS) UNABLE TO   7/27/2010    02-0005A    STPT Instructor Station
               DETERMINED THAT THE USER HAD           ACCESS SOFTWARE BECAUSE
               CHANGED THE ADMINISTRATOR'S            PASSWORDS HAVE EXPIRED
               PASSWORD AND THAT IT HAD EXPIRED,
               REPLACED THE HARD DRIVE WITH A FULLY
               LOADED ONE FROM BENCH STOCK. AFTER
               REPLACING THE HARD DRIVE THE
               COMPUTER BOOTED UP NORMALLY AND
               PASSED DAILY READINESS TEST. THE
               SOFTWARE WAS UPGRADED FROM VER
               2.0.7 TO 2.0.9 AND NEW SCENARIOS 44
               THRU 75 WERE LOADED.


         12565 WHEN THE WEAPON WAS CHECKED FOR     SYSTEM CHECK (PMCS)                7/28/2010     92-241     STPT Student Station
               THE DRIFT TEST IT FAILED BOTH IN
               AZIMUTH AND ELEVATION. AFTER
               REMOVING THE GRIPSTOCK A VISUAL
               INSPECTION REVEALED THAT THE CABLES
               GOING TO THE PROCESSOR AND THE
               INTERFACE BOARD WERE DISCONNECTED.
               THE WEAPON PASSED THE DRIFT TEST
               AFTER CONNECTING THE TWO CABLES.
               UPON REATTACHING THE ANTENNA IT WAS
               NOTED THAT THE SHORT PIVOT PIN WAS
               BROKEN, IT WAS REPLACED WITH A NEW
               ONE FROM ASL.

         12566 WHEN THE WEAPON WAS CHECKED FOR     SYSTEM CHECK (PMCS)                7/28/2010   92-263USMC   STPT Student Station
               THE DRIFT TEST IT FAILED BOTH IN
               AZIMUTH AND ELEVATION. AFTER
               REMOVING THE GRIPSTOCK A VISUAL
               INSPECTION REVEALED THAT THE CABLE
               GOING TO THE PROCESSOR WAS
               DISCONNECTED. THE WEAPON PASSED THE
               DRIFT TEST AFTER CONNECTING THE
               CABLE.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                              Page 11
        WO #                Repair Notes                                           Problem                           Date       Serial #            Description
        12567 WHEN THE WEAPON WAS CHECKED FOR                       SYSTEM CHECK (PMCS)                          7/28/2010    92-262USMC       STPT Student Station
              THE DRIFT TEST IT FAILED BOTH IN
              AZIMUTH AND ELEVATION. AFTER
              REMOVING THE GRIPSTOCK A VISUAL
              INSPECTION REVEALED THAT THE TWO
              CABLES GOING TO PORT 1 & 2 OF THE
              PROCESSOR WERE REVERSED. THE
              WEAPON PASSED THE DRIFT TEST AFTER
              THE CABLES WERE CORRECTLY
              CONNECTED.
         12568 WHEN THE WEAPON WAS CHECKED FOR                      SYSTEM CHECK (PMCS)                          7/28/2010    92-227USMC       STPT Student Station
               THE DRIFT TEST IT FAILED BOTH IN
               AZIMUTH AND ELEVATION. AFTER
               REMOVING THE GRIPSTOCK A VISUAL
               INSPECTION REVEALED THAT THE CABLE
               GOING TO THE PROCESSOR WAS LOOSE.
               THE WEAPON PASSED THE DRIFT TEST
               AFTER CONNECTING THE CABLE.
         12569 Recieved from ASL:MotherBoard line#AT067,       Recieved Tower from ASL. Populating with          7/28/2010         null
               AMD PHENOM II line#AT066,RAM DDR3 (2ea) components needed to test numerous training
               line#AT065,floppy drive line#AT046,Power Supply systems.
               850watt line#AT069,PCIex Graphics card line#
               AT070. NEED TO ORDER (2)EA. EZ SWAP
               removable Hard Drive Rack(not listed in ASL).
               Recieved all parts. Job Complete.



         12570 Removed the jammed Charge Bag. Ran Ammo              Charge bag jam.                              7/29/2010        409          FSCATT M109A6
               Non-Extraction procedures to return the trainer to
               normal operations. No other problems were
               found.
         12571 Restored power to the trainer. Removed the           Trainer lost power after a Charge bag jam.   7/29/2010        409          FSCATT M109A6
               jammed Charge bag. Reinitialized the entire
               system to restore proper operation. No other
               problems were found.
         12572 Reseated power cable. Issue resolved. No parts       Battlefield IG #2 has a no power issue.      7/29/2010       C30-010       CFFT 1:30
               used.
         12573 Recieved from ASL line#IC051. Replaced CVC           No commo from Gunners CVC Helmet.            7/29/2010   SSB0017/STA 6/2   ICOFT Student Station
               Helmet.Tested Good.Job Complete.
         12574 Repaired wireing.Tested Good.Job Complete.           [CVC HELMET]Has sound but not Mic.           7/29/2010         null
               Returning to ASL.
         12575                                                      Semi-Annual                                  7/30/2010         1           HIMARS HPU
         12576 Re-initialized system                                System locked up                             7/30/2010    E110009V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         12577 REMOVE DEFECTIVE CARDS AND REPLACE                   TRANSOURCE RACKMOUNT COMPUTER SN             7/30/2010         null
               WITH SPARE NETWORK CARDS SUPPLIED                    1027266, EXCIS 233 HAS DEFECTIVE
               BY FSTD.                                             NETWORK CARDS.
         12578 REMOVED DEFECTIVE ZIP DRIVE AND                      RACKMOUNT COMPUTER SN 82AA112250             7/30/2010         null
               REPLACED WITH SPARE DRIVE.                           LOCKS UP WHEN RUNNING EXCIS.
         12579 REMOVED 4 PORT ETHERNET CARD AND                     TRANSOURCE RACKMOUNT COMPUTER SN             7/30/2010         null
               REPLACED WITH A 2 PORT ETHERNET CARD                 1027272 REQUIRES RE-CONFIGURATION.
               FROM FSTD SPARES.
         12580 Repaired wireing.Tested Good.Job Complete.           Commo issue,Has Audio but not Mic.           7/30/2010         null
               Returning to ASL.
         12581 Replaced S&A Switch from ASL line# ST115.            Broken S&A switch. Need line# ST115.         7/30/2010       91-003        STPT Student Station
         12582 Replaced Grip stock Assy from ASL                    Uncage Boot switch failed in DRC.Need        7/30/2010       91-043        STPT Student Station
               line#ST069.Job Complete.                             line#st059
         12583 pre startup correction null                                                                       8/1/2010          1           HIMARS HPU
         12584                                                                                                   8/1/2010          2           HIMARS HPU
         12585 pre startup                                                                                       8/1/2010          3           HIMARS HPU
         12586 pre startup correction null                                                                       8/1/2010          7           HIMARS HPU
         12587 pre startup correction null                                                                       8/1/2010          8           HIMARS HPU
         12588 pre startup correction null                                                                       8/1/2010          9           HIMARS HPU
         12589 1. THE HCT WAS ENERGIZED AND VERIFIED                1. SYSTEM STARTUP 2. SENSOR                  8/2/2010         201          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND                 OPERATION CHECK 3. SYSTEM SHUTDOWN
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL. 3. DE-ENERGIZING
               PROCEDURES WERE CONDUCTED.

         12590 1. THE HCT WAS ENERGIZED AND VERIFIED 1. SYSTEM STARTUP 2. SENSOR                                 8/2/2010         202          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND OPERATION CHECK 3. SYSTEM SHUTDOWN
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL. 3. DE-ENERGIZING
               PROCEDURES WERE CONDUCTED.

         12591 1. THE HCT WAS ENERGIZED AND VERIFIED 1. SYSTEM STARTUP 2. SENSOR                                 8/2/2010         203          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND OPERATION CHECK 3. SYSTEM SHUTDOWN
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL. 3. DE-ENERGIZING
               PROCEDURES WERE CONDUCTED.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 12
        WO #                Repair Notes                           Problem                                               Date       Serial #       Description
        12592 1. THE HCT WAS ENERGIZED AND VERIFIED 1. SYSTEM STARTUP 2. SENSOR                                      8/2/2010         204      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND OPERATION CHECK 3. SYSTEM SHUTDOWN
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL. 3. DE-ENERGIZING
              PROCEDURES WERE CONDUCTED.

         12593 1. THE HCT WAS ENERGIZED AND VERIFIED 1. SYSTEM STARTUP 2. SENSOR                                     8/2/2010         205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND OPERATION CHECK 3. SYSTEM SHUTDOWN
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL. 3. DE-ENERGIZING
               PROCEDURES WERE CONDUCTED.

         12594 1. THE HCT WAS ENERGIZED AND VERIFIED 1. SYSTEM STARTUP 2. SENSOR                                     8/2/2010         206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND OPERATION CHECK 3. SYSTEM SHUTDOWN
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL. 3. DE-ENERGIZING
               PROCEDURES WERE CONDUCTED.

         12595 THE DEFLECTOR SHIELD WAS REPLACED,                THE CHARGE BAG DEFLECTOR SHIELD WAS 8/2/2010                         206      FSCATT M109A5
               PART USED: HT0989, 1EA.                           CRACKED
         12596 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/2/2010                      401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED             AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS             OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12597 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/2/2010                                  402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12598 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/2/2010                                  403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12599 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/2/2010                                  406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12600 Replaced the Video Card with one from ASL.        This is a follow-up to 12492. The Battlefield IG will 8/2/2010       null
               CF114.                                            not display an image.
         12601 Recieved 1 7/16 wrench for cannon plug            Need to repair Uncage Boot switch.Need to order 8/2/2010             null
               connector. Recieved all parts.Job Complete.       Roll pins (1.6mm or .065 inch Diameter/ 1 1/8
                                                                 lenght ) and Punch tool. Need to order 1 7/16
                                                                 wrench for cannon plug connector.

         12602 Replaced Netcard for Instructor Computer SIM 1.   No TACCOM                                           8/2/2010        C-088     CFFT 1:12
               Checked Commo all was good
         12603 Replaced Netcard for SIM1 in Instructor           No TACCOM                                           8/2/2010        C-088     CFFT 1:12
               Computer. Checked commo and there was
               TACCOM
         12604 Found that the cable on port 1 of the processor   Weapon not tracking, didn't pass the Drift Test     8/2/2010     92-599USMC   STPT Student Station
               was not securely attached. Passed Daily
               Readiness Test. Ran Scenario to check for
               proper performance.
         12605 The background would drift. Replaced Tracker      No AZ no EL                                         8/2/2010         143      STPT Student Station
               PN 100-IMU00-0210 and InertiaCube3
               Processor. The drift problem was corrected.

         12606 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                  8/2/2010         401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         12607 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE                   8/2/2010         403      FSCATT M109A6
               BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                       FIRE MISSION.
         12608 THE SWITCH WAS REPLACED, PART USED:               THE REAR LIMIT SWITCH WAS BROKEN                    8/2/2010         201      FSCATT M109A5
               HT0739, 1EA.
         12609 THE IOS AND AFCS COMPUTERS WERE                 A STUDENT PUSHED THE CHECK FIRE                       8/2/2010         402      FSCATT M109A6
               REINITIALIZED, SYSTEM WAS TEST FIRED            BUTTON ON THE AFCS CAUSING THE
                                                               SYSTEM TO LOCKUP
         12610 THE PROJECTILE AND CHARGE BAG WAS               DUE TO STUDENT ERROR, A PROJECTILE                    8/2/2010         406      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                      AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                       GUNTUBE.
         12611 Re-loaded Fidview and Urban Mideast terrain. No Battlefield IG crashes when running Urban             8/2/2010         null
               parts used. Tested, returned to ASL.            Mideast.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 13
        WO #                    Repair Notes                                         Problem                             Date   Serial #       Description
        12612 Unable to duplicate error. Tested, returned to   This is a follow-up to 12481. Battlefield IG#2 will   8/2/2010     null
              ASL.                                             not show a display. Site has tried both Hard
                                                               Drives with the same error.
         12613 Repaired Computer to be configured as an        Recieved Computer Tower in non-operational            8/2/2010     null
               ICOFT Student Staion A computer. Adding to      condition from Ft.Bliss by way of Marc Jackson.
               ASL.System tested Good.Job Complete.
         12614                                                 defective antennae                                    8/2/2010     null
         12615 Repaired Computer to be configured as an        Recieved Computer Tower in non-operational            8/2/2010     null
               ICOFT Instructor Staion C computer. Adding to   condition from Ft.Bliss by way of Marc Jackson.
               ASL.System tested Good.Job Complete.
         12616                                                 antennae problem                       8/2/2010                    null
         12617 1. THE HCT WAS ENERGIZED AND VERIFIED           STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                    201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND            SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12618 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12619 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12620 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12621 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12622 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12623 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12624 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12625 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12626 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/3/2010                              406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12627 THE PROJECTILE AND CHARGE BAG WAS               DUE TO STUDENT ERROR, A PROJECTILE                    8/3/2010     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                      AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                       GUNTUBE.
         12628 THE PROJECTILE AND CHARGE BAG WAS               DUE TO STUDENT ERROR, A PROJECTILE                    8/3/2010     204      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                      AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                       GUNTUBE.
         12629 THE RAMMER CYLINDER WAS PUT BACK IN             DUE TO STUDENT ERROR, THE RAMMER                      8/3/2010     206      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                 CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                        POSITION.
         12630 THE PROJECTILE AND CHARGE BAG WAS               DUE TO STUDENT ERROR, A PROJECTILE                    8/3/2010     201      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                      AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                       GUNTUBE.
         12631 THE PROJECTILE AND CHARGE BAG WAS               DUE TO STUDENT ERROR, A PROJECTILE                    8/3/2010     203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                      AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                       GUNTUBE.
         12632 THE RAMMER CYLINDER WAS PUT BACK IN             DUE TO STUDENT ERROR, THE RAMMER                      8/3/2010     205      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                 CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                        POSITION.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 14
        WO #                   Repair Notes                                      Problem                            Date   Serial #       Description
        12633 THE GUNTUBE WAS PUT BACK INTO                  DUE TO STUDENT ERROR, THE GUNTUBE                  8/3/2010     403      FSCATT M109A6
              BATTERY, SYSTEM WAS REBOOTED AND               DID NOT RETURN INTO BATTERY AFTER
              TEST FIRED.                                    FIRE MISSION.
        12634 THE GUNTUBE WAS PUT BACK INTO                  DUE TO STUDENT ERROR, THE GUNTUBE                  8/3/2010     402      FSCATT M109A6
              BATTERY, SYSTEM WAS REBOOTED AND               DID NOT RETURN INTO BATTERY AFTER
              TEST FIRED.                                    FIRE MISSION.
        12635 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                 8/3/2010     401      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                      GUNTUBE.
        12636 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                 8/3/2010     401      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                      GUNTUBE.
        12637 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                 8/3/2010     402      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                      GUNTUBE.
        12638 THE RAMMER CYLINDER WAS PUT BACK IN            DUE TO STUDENT ERROR, THE RAMMER                   8/3/2010     203      FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                       POSITION.
        12639 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                 8/3/2010     205      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                      GUNTUBE.
        12640 Shipped Replaced Epson Projector to site.      Epson Projector is not powering on. 2 Red lights   8/3/2010    C-020     CFFT 1:12
              CF012. and New Epson Projector Lamp. (faulty   are blinking.
              lamp off ASL Shelf).
        12641 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                 8/3/2010     206      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                      GUNTUBE.
        12642                                                PROTECTIVE PLEXIGLAS PLATE ON                      8/3/2010     null
                                                             MONITOR LOOSE
         12643 USED EPOXY TO SECURE IT TO THE METAL          PROTECTIVE PLEXIGLAS PLATE ON                      8/3/2010     null
               FRAME.                                        MONITOR LOOSE
         12644                                                                                                  8/3/2010   CFFT1      CFFT 1:30
         12645 THE GUNTUBE WAS PUT BACK INTO                 DUE TO STUDENT ERROR, THE GUNTUBE                  8/3/2010    401       FSCATT M109A6
               BATTERY, SYSTEM WAS REBOOTED AND              DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                   FIRE MISSION.
         12646 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                 8/3/2010     403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         12647 THE RAMMER CYLINDER WAS PUT BACK IN           DUE TO STUDENT ERROR, THE RAMMER                   8/3/2010     406      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS               CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                      POSITION.
         12648 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     201      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         12649 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     202      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         12650 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     203      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         12651 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     204      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         12652 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     205      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         12653 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     206      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         12654 THE RUBBER PAD WAS CLEANED AND RE-            DURING STUDENT TRAINING A RUBBER PAD               8/3/2010     202      FSCATT M109A5
               GLUED                                         CAME OFF THE AMMUNITION INDEXER ARM.

         12655 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     401      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         12656 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     402      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         12657 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     403      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         12658 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                     8/3/2010     406      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         12659 1. THE HCT WAS ENERGIZED AND VERIFIED         STUDENT TRAINING: 1. SYSTEM STARTUP 2.             8/4/2010     201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND          SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12660 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                         202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12661 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                         203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12662 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                         204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                          Page 15
        WO #                Repair Notes                           Problem                     Date                                 Serial #          Description
        12663 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                                   205         FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         12664 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                                  206         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12665 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                                  401         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12666 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                                  402         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12667 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                                  403         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12668 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/4/2010                                  406         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12669 1. THE FIRING MECHANISM ASSEMBLY WAS            1. THE FIRING MECHANISM ASSEMBLY WAS                  8/4/2010         204         FSCATT M109A5
               REPLACED, PART USED: HT0130, 1EA 2. F/O         NOT OPERATIONAL 2. ITEM #1 UNDER
               W/O #M12670                                     REPAIR
         12670 THE INTERNAL COMPONENTS WERE                    FSCATT: A FIRING MECHANISM ASSEMBLY                   8/4/2010         null
               CLEANED AND THE ASSEMBLY WAS                    IS NOT OPERATIONAL. THE WIRING WAS
               REWIRED.                                        PULLED FROM INTERNAL COMPONENTS
                                                               DURING STUDENT TRAINING.
         12671   THE GUNTUBE WAS PUT BACK INTO                 DUE TO STUDENT ERROR, THE GUNTUBE                     8/4/2010         202         FSCATT M109A5
                 BATTERY, SYSTEM WAS REBOOTED AND              DID NOT RETURN INTO BATTERY AFTER
                 TEST FIRED.                                   FIRE MISSION.
         12672   THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                    8/4/2010         201         FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                     GUNTUBE.
         12673   THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                    8/4/2010         205         FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                     GUNTUBE.
         12674   1. THE UPS WAS REPLACED, PART USED:           1. THE UNIVERSAL POWER SUPPLY (UPS)                   8/4/2010       203B-12       HIMARS OMT Student
                 HM0008, 1EA. 2. RECEIVED BATTERIES,           BATTERIES WILL NOT HOLD A CHARGE. 2.                                               Station
                 TOTAL COST $85.98                             ITEM #1 ORDERED NEW BATTERIES
         12675   RECEIVED BATTERIES, TOTAL COST $85.98 THE UNIVERSAL POWER SUPPLY (UPS) WILL                         8/4/2010       203B-5        HIMARS OMT Student
                                                               NOT HOLD A CHARGE, BATTERIES ON                                                    Station
                                                               ORDER.
         12676   RECEIVED BATTERIES, TOTAL COST $85.98 THE UNIVERSAL POWER SUPPLY (UPS) WILL                         8/4/2010       203B-2        HIMARS OMT Student
                                                               NOT HOLD A CHARGE, ORDERED NEW                                                     Station
                                                               BATTERIES
         12677   Shipped replacement Instructor Control and    Instructor Control will intermittently cause system   8/4/2010       C30-024       CFFT 1:30
                 Student IG. (ASL CF064 and CF077).            to lock up, not load terrains. Student IG will not
                                                               power on. CFFT Version 1.1.0.4.
         12678   Recieved 3 v btry and CDT from ASL. Replaced No Azimuth or Elevation on Slew to Que. CDT            8/4/2010   SSB0026/STA 7/6   ICOFT Student Station
                 battery and reconfigured BIOS settings.System not responding."B" Computer CMOS wont hold
                 tested Good.Job Complete.CDT reconfigured and correct date and time. Need Cmos Btry from ASL
                 tested fine returning to ASL.                 line#IC082 and CDT line#IC061 .

         12679 Recieved 3 v btry from ASL. Replaced battery       "B" Computer;CMOS will not hold Date and Time. 8/4/2010       SSB0011/STA 5/3   ICOFT Student Station
               and reconfigured BIOS settings.System tested       Need 3 V btry from ASL line#IC082.
               Good.Job Complete.
         12680 Recieved 3 v btry from ASL. Replaced battery       "B" Computer;CMOS will not hold current Date       8/4/2010   SSB0013/STA 5/1   ICOFT Student Station
               and reconfigured BIOS settings.System tested       and time. Need 3 V btry from ASL line#IC082.
               Good.Job Complete.
         12681 Replaced handstation from ASL on Student           Azimuth not responding.Need Handstation from       8/4/2010         161         AT3 (STC)
               station.System tested Good.Repaired                ASL line# AT022.
               Handstation in Maintenance office .Returning to
               ASL. Tested Good.Job Complete.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 16
        WO #                 Repair Notes                      Problem                                           Date       Serial #           Description
        12682 TROUBLESHOOTING REVEALED THAT ONE TRIGGER NOT WORKING PROPERLY &                               8/4/2010         null
              OF THE WIRES CONNECTED TO THE      UNCAGE SWITCH RUBBER BOOT TORN
              TRIGGER SWITCH WAS DISCONNECTED.
              THE WIRE WAS RE-SOLDERED AND A
              CONTINUITY CHECK WAS PERFORMED.
              RECEIVED UNCAGE SWITCH RUBBER BOOT
              FROM FT SILL 8/17/10
         12683 No parts needed to repair Handstation. Adjusted   Left Palm Grip on Handstation stuck. Need   8/4/2010         154         AT3 (STC)
               set screw,System tested Good. Job Complete.       Handstation from ASL line#AT022.

         12684 Software settings properly configured.System      No Azimuth or Elevation on FLIR.            8/4/2010   SSB0025/STA 7/5   ICOFT Student Station
               tested Good. Job Complete.

         12685 Reseatted all connections. System tested Good.    Restart Button INOP.                        8/4/2010         160         AT3 (STC)
               Job Complete.
         12686 Reseatted all connections. System Tested Good.    Alarm upon boot up,System running slow.     8/4/2010          4          AT3 (STC)
               Job Complete.
         12687 Recieved Handstation line#AT022 replaced          Azimuth and elevation on Handstation not    8/4/2010         149         AT3 (STC)
               Handstation on Student station,system tested      responding.
               good. Repaired repaired handstation in
               Maintenance office.Tested good.Returning to
               ASL. Job Complete.
         12688 REQUESTED PART FROM FT SILL ASL.        MONITOR MISSING RETAINING NUT ON                      8/4/2010       91-055A       STPT Student
               RECEIVED PART FROM FT SILL ON 8/12/2010 VIDEO CONNECTOR

         12689 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER            8/4/2010         402         FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         12690 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE          8/4/2010         403         FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         12691 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE          8/4/2010         203         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         12692 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE          8/4/2010         205         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         12693 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE           8/4/2010         201         FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                       FIRE MISSION.
         12694 Shipped replacement Battlefield IG and Hard       Hard Drive on Battlefield IG has become     8/4/2010       C12-306       CFFT 1:12 Increment 2
               Drive (ASL 2CF028, 2CF018)                        corrupted.
         12695 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         201         FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         12696 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         202         FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         12697 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         203         FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         12698 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         204         FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         12699 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         205         FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         12700 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         206         FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         12701 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         401         FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         12702 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         402         FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         12703 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         403         FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         12704 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM              8/4/2010         406         FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         12705 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2.      8/5/2010         201         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND              SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12706 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/5/2010                          202         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12707 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/5/2010                          203         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12708 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/5/2010                          204         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12709 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/5/2010                          205         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 17
        WO #                Repair Notes                           Problem                     Date                                  Serial #        Description
        12710 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/5/2010                                    206       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         12711 Reloaded windows, Fidview, and tested the         The Stealth IG would fail to load Windows XP and       8/5/2010       null
               computer multiple times. Tests good. Returned to restart randomly. Terrains also could not be found
               ASL.                                              after proper terrain reloads. This is follow-up work
                                                                 order too 12429.
         12712 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                     8/5/2010       203       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         12713 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                     8/5/2010       205       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         12714 THE RAMMER CYLINDER WAS PUT BACK IN DUE TO STUDENT ERROR, THE RAMMER                                     8/5/2010       204       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         12715 Replaced LLDR CF051 PR 355 submitted              LLDR has a 3 second delay when moved                   8/5/2010      AFSM       CFFT 1:30
               8/5/2010 PO 85502 received 8/6/2010 4/25/10-      vertically. no delay in the side to side movement.
               came back from vendor repair. tested. returned to
               ASL.
         12716 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                     8/5/2010       202       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         12717 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE                      8/5/2010       206       FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                       FIRE MISSION.
         12718 took to ASL line item # RT011                     Recieved 2 journey (x86) from repair that              8/5/2010       null
                                                                 raytheon had sent off, before we took over ASL

         12719 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/5/2010       201       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12720 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/5/2010       202       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12721 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/5/2010       203       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12722 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/5/2010       204       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12723 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/5/2010       205       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12724 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/5/2010       206       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12725 Radar Trainer is down to degraded performance.      Radiate on lamp is lit. Faulty radar processor       8/5/2010    0001V8M36    FFOMT AN/TPQ-36
               Radiate on light is not stopping other training.                                                                                  (V8)
               Awaiting radar processor from maintanace
               shop/vendor. 08-06-2010 Radar processor
               replaced
         12726 1. THE HARNESS WAS REPLACED, PART                   1. THE RAMMER WIRING HARNESS HAD A     8/6/2010                     400       FSCATT M109A6
               USED: HT0157, 1EA. 2. THE SWITCH WAS                BROKEN SWITCH. 2. A FIRING LOCK SWITCH
               REPLACED, PART USED: HT0734, 1EA. 3. THE            WAS DAMAGED. 3. THE CHARGE BAG
               DEFLECTOR SHIELD WAS REPLACED, PART                 DEFLECTOR SHIELD WAS CRACKED. 4.
               USED: HT0989, 1EA. 4. CONDUCTED PMCS                PMCS/LO WAS DUE
               TOTAL MAN HOURS: 24

         12727 8-6-2010 Prepped for shipment to vendor for         This is a follow-up to 12715. LLDR has a 3           8/6/2010       null
               repair. 11-10-2010 Tested, Returned to aSL.         second delay when panning up and down. Issue
                                                                   persists when tested with a different computer.

         12728 Replaced burnt out bulb                             1 skylamp Bulb was burnt out                         8/6/2010       301       IMTS
         12729 Used a different video card and the issue           The Student IG does not have a display. This         8/6/2010       null
               persists. (08-06-10).Sending it into vendor for     component was faulty out of ASL.
               repairs. PR 363 submitted 8/24/2010 PO 85528
               received 8/24/2010 Sent to vendor on 8/24/2010
               Received from Vendor 9/7/2010. Vendor notes
               state replaced motherboard. Tested, returned to
               ASL.
         12730 Reinitialized system                                System not responding to inputs                      8/6/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12731 Turrent Movement Pressure Low at 950psi.            Turret Right,Left Slow To Start.                     8/6/2010       407       FSCATT M109A6
               Turrent Slow to start Right and Left. Adjusted to
               1000psi.Tested with Maintenance M comands.
               Tested Good movement Right and Left. Tested
               Gun Tube Movement up and down for good
               operation. Reintialized HCT for opperation.

         12732 Lanyard Pull Switch would not activate. Found       Lanyard Pull Switch Error                            8/6/2010       407       FSCATT M109A6
               Broken Wire to Lanyard Pull Switch. Soldered
               connection. Tested both Lanyard Switches for
               Good Recoil operation.
         12733 null                                                                                                     8/8/2010                 FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         12734   PMCS - Inspect and clean system.                                                                       8/8/2010     ETIOS1      SMT ETRAC
         12735   PMCS - Inspect and clean system.                                                                       8/8/2010     ETSS9       SMT ETRAC
         12736   PMCS - Inspect and clean system.                                                                       8/8/2010     ETSS1       SMT ETRAC
         12737   PMCS - Inspect and clean system.                                                                       8/8/2010     ETSS2       SMT ETRAC
         12738   PMCS - Inspect and clean system.                                                                       8/8/2010     ETSS3       SMT ETRAC
         12739   PMCS - Inspect and clean system.                                                                       8/8/2010     ETSS4       SMT ETRAC


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 18
        WO #                     Repair Notes                      Problem        Date       Serial #           Description
        12740    PMCS - Inspect and clean system.                             8/8/2010       ETSS5        SMT ETRAC
        12741    PMCS - Inspect and clean system.                             8/8/2010       ETSS6        SMT ETRAC
        12742    PMCS - Inspect and clean system.                             8/8/2010       ETSS7        SMT ETRAC
        12743    PMCS - Inspect and clean system.                             8/8/2010       ETSS8        SMT ETRAC
        12744    PMCS - Inspect and clean system.                             8/8/2010       ETSS9        SMT ETRAC
        12745    null                                                         8/8/2010     E110001V8IS    FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12746 null                                                           8/8/2010     E110002V8IS    FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12747 null                                                           8/8/2010    E110003V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12748 null                                                           8/8/2010    E110004V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12749 null                                                           8/8/2010    E110005V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12750 null                                                           8/8/2010    E110006V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12751 null                                                           8/8/2010    E110007V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12752 null                                                           8/8/2010    E110008V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12753 null                                                           8/8/2010    E110009V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12754 null                                                           8/8/2010    E110010V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12755 null                                                           8/8/2010    E110011V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12756 null                                                           8/8/2010    E110012V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12757 null                                                           8/8/2010    E110013V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12758 null                                                           8/8/2010    E110014V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                          Instructor Station
         12759   PMCS - Clean, Inspect and Test.                              8/8/2010     114B0001IS     FIMT
         12760   PMCS - Clean, Inspect and Test.                              8/8/2010    114B0009SSC     FIMT
         12761   PMCS - Clean, Inspect and Test.                              8/8/2010    114B0001M37     FIMT
         12762   PMCS - Clean, Inspect and Test.                              8/8/2010    114B0002M37     FIMT
         12763   PMCS - Clean, Inspect and Test.                              8/8/2010    114B0003M37     FIMT
         12764   PMCS - Clean, Inspect and Test.                              8/8/2010    114B0004M37     FIMT
         12765   PMCS - Not required due to being placed in                   8/8/2010    114B0005M36     FIMT
                 storage.
         12766   PMCS - Not required due to being placed in                   8/8/2010    114B0006M36     FIMT
                 storage.
         12767   PMCS - Not required due to being placed in                   8/8/2010    114B0007M36     FIMT
                 storage.
         12768   PMCS - Not required due to being placed in                   8/8/2010    114B0008M36     FIMT
                 storage.
         12769   PMCS - Clean, Inspect and Test.                              8/8/2010    114D0001SMTIS   SMT Student Station
         12770   PMCS - Clean, Inspect and Test.                              8/8/2010   114D0006SMTSSC   SMT Student Station
         12771   PMCS - Clean, Inspect and Test.                              8/8/2010     114D0002SMT    SMT Student Station
         12772   PMCS - Clean, Inspect and Test.                              8/8/2010     114D0003SMT    SMT Student Station
         12773   PMCS - Clean, Inspect and Test.                              8/8/2010     114D0004SMT    SMT Student Station
         12774   PMCS - Unable to complete due to awaiting parts              8/8/2010     114D0005SMT    SMT Student Station
                 to repair system
         12775   pre startup                                                  8/8/2010          3         HIMARS DT
         12776   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12777   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12778   pre startup                                                  8/8/2010         null       HIMARS DT
         12779   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12780   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12781   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12782   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12783   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12784   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12785   pre startup correction null                                  8/8/2010         null       HIMARS DT
         12786   pre startup                                                  8/8/2010          2         MLRS DT
         12787   pre startup                                                  8/8/2010          1         MLRS DT
         12788   pre startup correction null                                  8/8/2010                    MLRS DT
         12789   pre startup                                                  8/8/2010         null       MLRS DT
         12790   null                                                         8/8/2010         null       MLRS DT
         12791   pre startup                                                  8/8/2010         null       MLRS DT
         12792   pre startup                                                  8/8/2010         null       MLRS DT
         12793   pre startup correction null                                  8/8/2010         null       MLRS DT
         12794   pre startup                                                  8/8/2010         null       MLRS DT
         12795   pre startup correction null                                  8/8/2010         null       MLRS DT
         12796   pre startup                                                  8/8/2010         null       MLRS DT
         12797   pre startup                                                  8/8/2010         null       MLRS DT
         12798   pre startup                                                  8/8/2010         null       MLRS DT
         12799   pre startup                                                  8/8/2010         null       MLRS DT
         12800   pre startup                                                  8/8/2010         null       MLRS DT
         12801   pre startup                                                  8/8/2010         null       MLRS DT
         12802   pre startup                                                  8/8/2010         null       MLRS DT
         12803   pre startup                                                  8/8/2010         null       MLRS DT
         12804   pre startup                                                  8/8/2010         null       MLRS DT
         12805   pre startup                                                  8/8/2010         null       MLRS DT
         12806   pre startup                                                  8/8/2010         null       MLRS DT
         12807   pre startup correction null                                  8/8/2010         null       MLRS DT
         12808   pre startup correction null                                  8/8/2010         null       MLRS DT


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                            Page 19
        WO #                       Repair Notes                                           Problem                           Date        Serial #            Description
        12809    pre startup                                                                                            8/8/2010          null        MLRS DT
        12810    pre startup                                                                                            8/8/2010          null        MLRS DT
        12811    pre startup                                                                                            8/8/2010          null        MLRS DT
        12812    Completed.                                                                                             8/8/2010        910005        IMTS
        12813    pmcs completed.                                                                                        8/8/2010        ETIOS1        SOT ETRAC Instructor
                                                                                                                                                      Station
         12814 pmcs complete.                                                                                           8/8/2010        ETSS1         SOT ETRAC STUDENT
                                                                                                                                                      STATION
         12815 pmcs completed.                                                                                          8/8/2010        ETSS2         SOT ETRAC STUDENT
                                                                                                                                                      STATION
         12816 null                                                                                                     8/8/2010        ETSS3         SOT ETRAC STUDENT
                                                                                                                                                      STATION
         12817 pmcs completed.                                                                                          8/8/2010        ETSS4         SOT ETRAC STUDENT
                                                                                                                                                      STATION
         12818 pmcs completed                                                                                           8/8/2010        ETSS5         SOT ETRAC STUDENT
                                                                                                                                                      STATION
         12819 pmcs completed                                                                                           8/8/2010        ETSS6         SOT ETRAC STUDENT
                                                                                                                                                      STATION
         12820 pmcs completed                                                                                           8/8/2010        ETSS7         SOT ETRAC STUDENT
                                                                                                                                                      STATION
         12821   CONDUCTED PMCS/LO, 5 MAN HOURS                      PMCS/LO DUE                                        8/9/2010         201          FSCATT M109A5
         12822   CONDUCTED PMCS/LO, 5 MAN HOURS                      PMCS/LO DUE                                        8/9/2010         203          FSCATT M109A5
         12823   CONDUCTED PMCS/LO, 5 MAN HOURS                      PMCS/LO DUE                                        8/9/2010         204          FSCATT M109A5
         12824   CONDUCTED PMCS/LO, 5 MAN HOURS                      PMCS/LO DUE                                        8/9/2010         205          FSCATT M109A5
         12825   Replaced CMOS Btry and replaced touchscreen         Comm1 on "A"computer. not responding. 3v           8/9/2010    SSB0021/STA 6/6   ICOFT Student Station
                 monitor using ASL parts.                            battery line#IC082 MFR#CRV2032. Touchscreen
                                                                     not accurately responding to touch. TFT-LCD
                                                                     touch screen monitor line#IC057 MFR#PT-1212N

         12826 THE HCT WAS ENERGIZED AND VERIFIED                    UNSCHEDULED STUDENT TRAINING:         8/9/2010                       206         FSCATT M109A5
               OPERATIONAL READINESS                                 SYSTEM STARTUP
         12827 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE    8/9/2010                       206         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                             GUNTUBE.
         12828 1. THE GAUGE WAS REPLACED, PART USED:                 1. ONE OF THE HIGH PRESSURE HYDRAULIC 8/9/2010                       201         FSCATT M109A5
               HT1083, 1EA. 2. THE O-RING WAS                        GAUGES WAS NOT OPERATIONAL. 2. THE
               REPLACED, PART USED: HT1005, 1EA.                     TURRET ENCODER O-RING WAS CRACKED

         12829 THE EYE SHIELD WAS REPLACED, PART                     THE PANTEL EYE SHIELD WAS DRY          8/9/2010                      205         FSCATT M109A5
               USED: HT0125, 1EA.                                    ROTTED.
         12830 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM         8/9/2010                      206         FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         12831 1. THE HCT WAS ENERGIZED AND VERIFIED                 STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/10/2010                     201         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND                  SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12832 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/10/2010                                     203         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12833 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/10/2010                                     204         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12834 CONDUCTED PMCS/LO, 5 MAN HOURS                        PMCS/LO DUE                                        8/10/2010         202         FSCATT M109A5
         12835 CONDUCTED PMCS/LO, 5 MAN HOURS                        PMCS/LO DUE                                        8/10/2010         206         FSCATT M109A5
         12836 Replaced Battlefield IG #2. with one from ASL.        Battlefield IG #2 will not power on.               8/10/2010       C30-010       CFFT 1:30
               CF108
         12837 Reinitialized system.                                 System not responding to command inputs            8/10/2010    E110009V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                      Instructor Station
         12838 Replaced the CMOS BAttery and Reset BIOS.             Battlefield IG #2 will not power on.               8/10/2010         null
               CF075. Tested Computer and returned to ASL.

         12839 Updated software to 1.1.1.8 and FidView 2.8.0.1.      System software is 1.1.0.4. Projectors are not     8/10/2010       C30-024       CFFT 1:30
               Replaced Student IG. Adjusted projectors to line      lined up correctly, compass does not line up,
               up correctly. Reconfigured software controlling       Stealth Image Generator and Battlefield
               Joystick hotkeys. Corrected Urban-Mideast.ini file    Generator will not seperate on joystick, Student
               on all IG's to correct issue with Urban-Mideast       IG is not displaying a cloned image, Student
               loading with a night sky in place of a daytime sky.   Control is not turning on.
               Edited Fidelity.ini on all IG's to keep IG's from
               crashing to the desktop when artillery was
               dropped on Urba-Mideast terrain. Corrected date
               and time for each component of CFFT system.
               Tested numerous times, through each terrain.
               Total repair time of 12 hours.


         12840 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE  8/10/2010                        203         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                             GUNTUBE.
         12841 THE RAMMER CYLINDER WAS PUT BACK IN                   DUE TO STUDENT ERROR, THE RAMMER    8/10/2010                        201         FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                       CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                              POSITION.
         12842 THE HARDWARE WAS REPLACED, PARTS                      THE RAMMER ASSEMBLY HAD MISSING AND 8/10/2010                        206         FSCATT M109A5
               USED: HT0407, 2EA / HT0611 1EA / HT0685               WORN HARDWARE
               1EA / HT0984 1EA.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                    Page 20
        WO #                  Repair Notes                                               Problem                         Date      Serial #         Description
        12843 Replaced Epson Lamp. CF015.                          This is a follow-up to 12640. Shipped Replaced    8/10/2010       null
                                                                   Epson Projector to site. CF012. and New Epson
                                                                   Projector Lamp. (faulty lamp off ASL Shelf).

         12844 Shipped Replacement Wide Angle Lens to site.        Site requires a wide angle lens for their Epson   8/10/2010      C-020      CFFT 1:12
               CF105.                                              Projector. The Replacement Projector that was
                                                                   recently sent out did not include a wide angle
                                                                   lens.
         12845 Recieved from ASL Line#IC074 Interfaceboard         FOWO#12038.Recieved from Camp                     8/10/2010       null
               MFR#18876-13481678.Replaced interfaceboard          Blanding,Gunners Console.Inop ports on main
               in Gunners Console and with testing determined      board to CDT and Handstation.
               the U3 IC Chip was bad.Need to order IC074
               Interfaceboard, to replenish ASL. Need to order
               IC chip P87C51FB (4ea) to add as an ASL item.
               Recieved IC Chip and tested w/interfaceboard,no
               change with new chip,still IN-OP. IC chip
               discontinued closeing work order. non-repairable.



         12846 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    8/10/2010       201       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12847 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    8/10/2010       203       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12848 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    8/10/2010       204       FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         12849 1. THE HCT WAS ENERGIZED AND VERIFIED               STUDENT TRAINING: 1. SYSTEM STARTUP 2.            8/11/2010       201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND                SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12850 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12851 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12852 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12853 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12854 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12855 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12856 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12857 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12858 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/11/2010                                406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12859 Performed troubleshooting on printer and            RCC Printer not printing.                         8/11/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
               reinitialized the RCC.                                                                                                          Instructor Station
         12860 THE RAMMER CYLINDER WAS PUT BACK IN                 DUE TO STUDENT ERROR, THE RAMMER                  8/11/2010       202       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                            POSITION.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 21
        WO #                     Repair Notes                                             Problem                           Date        Serial #           Description
        12861 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                  8/11/2010         206          FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                             GUNTUBE.
        12862 Video input for the projector was improperly set.     No battlefield video.                               8/11/2010        C-137         CFFT 1:12
              Corrected the setting on the projector. Works
              fine.
        12863 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE                   8/11/2010         204          FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                            GUNTUBE.
        12864 THE IOS AND AFCS COMPUTERS WERE                      A STUDENT PUSHED THE CHECK FIRE                      8/11/2010         403          FSCATT M109A6
              REINITIALIZED, SYSTEM WAS TEST FIRED                 BUTTON ON THE AFCS CAUSING THE
                                                                   SYSTEM TO LOCKUP
         12865   THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                   8/11/2010         402          FSCATT M109A6
                 REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                         GUNTUBE.
         12866   THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                   8/11/2010         201          FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                         GUNTUBE.
         12867   THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                   8/11/2010         205          FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                         GUNTUBE.
         12868   THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                   8/11/2010         401          FSCATT M109A6
                 REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                         GUNTUBE.
         12869   THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                   8/11/2010         403          FSCATT M109A6
                 REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                         GUNTUBE.
         12870   Created in error. Duplicate work order done.Refer Power lamp missing on 1780 commo box.Need            8/11/2010   SSB0024/STA 7/4    ICOFT Student Station
                 to wo#12871                                       line#IC068 MFR#327
         12871   Recieved bulb from ASL. Job Complete.             Power lamp missing on 1780 commo box.Need            8/11/2010   SSB0024/STA 7/4    ICOFT Student Station
                                                                   line#IC068 MFR#327
         12872   DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                       8/11/2010         201          FSCATT M109A5
                 CONDUCTED.                                        SHUTDOWN
         12873   DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                       8/11/2010         202          FSCATT M109A5
                 CONDUCTED.                                        SHUTDOWN
         12874   DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                       8/11/2010         203          FSCATT M109A5
                 CONDUCTED.                                        SHUTDOWN
         12875   DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                       8/11/2010         204          FSCATT M109A5
                 CONDUCTED.                                        SHUTDOWN
         12876   Shipped replacement Logitech Joystick (ASL        Student Control Joystick will not successfully re-   8/11/2010        C-148         CFFT 1:12
                 CF112).                                           init, and the screen keeps panning with no input.

         12877 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                      8/11/2010         205          FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         12878 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                      8/11/2010         206          FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         12879 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                      8/11/2010         401          FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         12880 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                      8/11/2010         402          FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         12881 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                      8/11/2010         403          FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         12882 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                      8/11/2010         406          FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         12883 Deleted scenarios from local common folder and       Not able to transfer scenarios to 7/6.              8/11/2010   SSB0026/STA 7/6    ICOFT Student Station
               reloaded scenarios from Instructor station 7.Job
               Complete.
         12884 Repaired using super glue and tightened screw.       Loose Emergency Stop guard.                         8/11/2010   SSB0012/STA 5/2    ICOFT Student Station
               Job Complete.
         12885 Repaired with glueing and tightened screw. Job       Loose Emergency Stop guard.                         8/11/2010   SSB0009/ STA 5/5   ICOFT Student Station
               Complete.
         12886 Repaired with glue and tightened screw.Job           Loose Emergency Stop guard.                         8/11/2010   SSB0008/STA 5/6    ICOFT Student Station
               Complete.
         12887 Contacted Microsoft and reactivated operating        Operating system required reactivation.             8/11/2010   SSB0021/STA 6/6    ICOFT Student Station
               system. Job complete.
         12888 1. THE HCT WAS ENERGIZED AND VERIFIED                STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                      201          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND                 SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12889 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                     202          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12890 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                     203          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12891 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                     204          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 22
        WO #                Repair Notes                           Problem                     Date                                   Serial #         Description
        12892 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                    205        FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         12893 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                   206        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12894 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                   401        FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12895 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                   402        FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12896 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                   403        FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12897 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/12/2010                                   406        FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12898 Operator Error. Parts were not used and were     Instructor Control Monitor will not display an         8/12/2010      C30-023      CFFT 1:30
               returned back to ASL. Guided Operator through    image. Stealth Image Generator has an "LM
               correct start up procedures.                     license" error message.
         12899 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                     8/12/2010        205        FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         12900 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                     8/12/2010        202        FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         12901 THE FIRING LOCK WAS REPLACED, PART               DURING STUDENT TRAINING, A WELD ON                     8/12/2010        202        FSCATT M109A5
               USED: HT0130, 1EA.                               THE FIRING LOCK BROKE
         12902 REPAIRED AT LOCAL FACILITY FOR $20.00,           FSCATT: FIRING MECHANISM HAS A                         8/12/2010        null
               COST SAVINGS: $2,751.08.                         BROKEN WELD, WILL BE REPAIRED A LOCAL
                                                                FACILITY
         12903 Aquired 4 "AAA" batteries from supply.           All 4 pen lights need new batteries. Battery size is   8/12/2010   114D0001SMTIS   SMT Student Station
                                                                AAA.
         12904 Received 5 back plain connectors from supply.    All student stations need new back place               8/12/2010    114B0001IS     FIMT
                                                                connectors.
         12905 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        201        FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         12906 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        202        FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         12907 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        203        FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         12908 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        204        FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         12909 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        205        FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         12910 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        206        FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         12911 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        401        FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         12912 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        402        FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         12913 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        403        FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         12914 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         8/12/2010        406        FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         12915 Reset digital I/O board,Removed Map Display to   Map Light not functioning properly                     8/13/2010                   FFROT AN/TPQ-36 (V8)
               verify cable connections, Performed Map                                                                                             Instructor Station
               Registration and reinitialized system.

         12916 Reinitialized system.                            Map display not responding                             8/13/2010   E110009V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                   Instructor Station
         12917 Restored system                                  Map Display not responding                             8/13/2010   E110011V8OP     FFROT AN/TPQ-36 (V8)
                                                                                                                                                   Instructor Station
         12918 Need to ship to Vendor for repair. PR 359      TFT Touchscreen Monitor.No touch screen                  8/13/2010        null
               submitted 8/18/2010 PO 85522                   action.
               received8/19/2010 Received from vendor. Tested
               good. Returned to ASL Line# IC057.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 23
        WO #                     Repair Notes                                      Problem                                  Date       Serial #         Description
        12919 Reinitialized system                              System not responding to input                          8/13/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                  Instructor Station
         12920 pre startup correction null                                                                              8/15/2010      FOX1       NBCRS FOX
                                                                                                                                                  SIMULATOR
         12921 pre startup                                                                                              8/15/2010      FOX1       NBCRS FOX
                                                                                                                                                  SIMULATOR
         12922 pre startup correction null                                                                              8/15/2010      FOX2       NBCRS FOX
                                                                                                                                                  SIMULATOR
         12923 pre startup correction null                                                                              8/15/2010      FOX2       NBCRS FOX
                                                                                                                                                  SIMULATOR
         12924 pre startup                                                                                              8/15/2010     FOXIS1      NBCRS FOX
                                                                                                                                                  SIMULATOR
         12925 pre startup                                                                                              8/15/2010     FOXIS1      NBCRS FOX
                                                                                                                                                  SIMULATOR
         12926   pre startup                                                                                            8/15/2010      C-062      CFFT 1:12
         12927   pre startup                                                                                            8/15/2010      C-083      CFFT 1:12
         12928   pre startup correction null                                                                            8/15/2010      C-087      CFFT 1:12
         12929   pre startup correction null                                                                            8/15/2010      C-088      CFFT 1:12
         12930   null                                                                                                   8/15/2010                 FFOMT AN/TPQ-36
                                                                                                                                                  (V8)
         12931 null                                                                                                     8/15/2010    0002V8M36    FFOMT AN/TPQ-36
                                                                                                                                                  (V8)
         12932 null                                                                                                     8/15/2010    0001V8M36    FFOMT AN/TPQ-36
                                                                                                                                                  (V8)
         12933 null                                                                                                     8/15/2010    0003V8M36    FFOMT AN/TPQ-36
                                                                                                                                                  (V8)
         12934 null                                                                                                     8/15/2010    0004V8M36    FFOMT AN/TPQ-36
                                                                                                                                                  (V8)
         12935 null                                                                                                     8/15/2010    0005V8M36    FFOMT AN/TPQ-36
                                                                                                                                                  (V8)
         12936 pre startup correction null                                                                              8/15/2010      C-030      CFFT 1:12
         12937                                                                                                          8/15/2010        1        HIMARS Mockup
         12938                                                                                                          8/15/2010        2        HIMARS Mockup
         12939 pre startup correction null                                                                              8/15/2010      C-150      CFFT 1:12
         12940                                                                                                          8/15/2010        3        HIMARS Mockup
         12941 Cloned the necessary software to overwrite the   This is a follow-up to 12694. Hard Drive on             8/16/2010       null
               corrupted operating system. No parts needed.     Battlefield IG has become corrupted.
               Returned to ASL. 2CF028
         12942 replaced UPS Line item #RT007                    The UPS is not working correctly.                       8/16/2010     SGG-1       RT3
         12943 Ran Chkdsk, defrag, disk cleanup. Set date and   This is a follow-up to 12677. Instructor Control will   8/16/2010      null
               time. no parts used. Returned back to ASL.       intermittently cause system to lock up, not load
                                                                terrains. Student IG will not power on. CFFT
                                                                Version 1.1.0.4.
         12944 Replaced power Supply (CF081),tested,returned    This is a follow-up to 12677. Instructor Control will   8/16/2010       null
               to ASL.                                          intermittently cause system to lock up, not load
                                                                terrains. Student IG will not power on. CFFT
                                                                Version 1.1.0.4.
         12945 Shipped out the Sony Projector (CF096) and       The Sony Projector has spots in the display even        8/16/2010      C-081      CFFT 1:12
               Student IG (CF077).                              after cleaning the bulb. The Student IG has a
                                                                discoloration in the video. The cable has to be
                                                                manipulated to get the correct color.

         12946 Could not recreate the issue. unit tested good   The UPS is not working correctly. was not holding 8/16/2010             null
               returning to ASL line item # RT007               a charge at 120v
         12947 Shipping a replacement Student IG. CF077.        Recieving a disk boot error on the Student IG.    8/16/2010           C30-005     CFFT 1:30

         12948 REPLACED TRACKER AND PROCESSOR,                  No Az or El                                             8/16/2010   92-399USMC    STPT Student Station
               PROBLEM STILL PERSISTS. SHIPPED
               TRACKER TO INTERSENSE, SC2-0604505,
               FOR REPAIR/CALIBRATION RECEVIED
               TRACKER BACK FROM INTERSENSE 8/31/10
               TRAINER RETURNED TO TSC
         12949 UPDATED THE CONFIGURATION FILE TO                WEAPON WILL NOT PASS THE DRIFT TEST                     8/16/2010     92-241      STPT Student Station
               REFLECT THE CONTINUOUS MODE,
               WEAPON NOW PASSES THE DRIFT TEST
               SHIPPED TRACKER TO INTERSENSE FOR
               REPAIR SC2-0604507 FOR
               REPAIR/CALIBRATION
         12950 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                   201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12951 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                   202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12952 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                   203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12953 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                   204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 24
        WO #                Repair Notes                           Problem                     Date                                Serial #       Description
        12954 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                 205      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         12955 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12956 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12957 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12958 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12959 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/17/2010                                406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         12960 THE PROJECTILE AND CHARGE BAG WAS                       DUE TO STUDENT ERROR, A PROJECTILE              8/17/2010     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                              AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                               GUNTUBE.
         12961 THE PROJECTILE AND CHARGE BAG WAS                       DUE TO STUDENT ERROR, A PROJECTILE              8/17/2010     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                              AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                               GUNTUBE.
         12962 THE PROJECTILE AND CHARGE BAG WAS                       DUE TO STUDENT ERROR, A PROJECTILE              8/17/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                              AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                               GUNTUBE.
         12963 THE GUNTUBE WAS PUT BACK INTO                           DUE TO STUDENT ERROR, THE GUNTUBE               8/17/2010     203      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                        DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                             FIRE MISSION.
         12964 On the first day after our arrival, we first verified   Site is preparing to move the system from one   8/17/2010   C30-004    CFFT 1:30
               that both CFFT Systems were fully operational.          buidling to another.
               We scouted the new building and moved our
               tools from the new building to the old building.
               Then, we disassembled all of the CFFT
               Equipment including the Screens, Lamps,
               Computers, and Wiring. The first Screen is an
               aftermarket screen purchased from Stewart
               Filmscreen Corporation, while the second screen
               seemed to be homemade out of wood, electrical
               conduit, and twine rope. The second screen
               frame was disassembled into ten separate
               pieces. Then we prepped all of the equipment for
               movement to the new building. On the second
               day, we moved all the CFFT Equipment from the
               old building to the new building with help from
               local soldiers and a flatbed truck. Next, the team
               setup the first System for a test run to verify that
               the System was still operational. The same
               procedure was done for the second System as
               well. Inventory of all the Raceway that was
               currently at the site was done too. On the third
               day, the Wiring for the first System was run. The
               Screen for the first System was installed using
               drywall anchors and screws. We tried installing
               brackets and couplers for the second screen, but
               found it was not an option due to the size of the
               frame. Next, Fred Rodriguez returned the




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                    Page 25
        WO #                      Repair Notes                                            Problem                         Date    Serial #        Description
        12965 On the first day after our arrival, we first verified Site is preparing the system to move from one     8/17/2010   C30-030    CFFT 1:30
              that both CFFT Systems were fully operational.        building to another.
              We scouted the new building and moved our
              tools from the new building to the old building.
              Then, we disassembled all of the CFFT
              Equipment including the Screens, Lamps,
              Computers, and Wiring. The first Screen is an
              aftermarket screen purchased from Stewart
              Filmscreen Corporation, while the second screen
              seemed to be homemade out of wood, electrical
              conduit, and twine rope. The second screen
              frame was disassembled into ten separate
              pieces. Then we prepped all of the equipment for
              movement to the new building. On the second
              day, we moved all the CFFT Equipment from the
              old building to the new building with help from
              local soldiers and a flatbed truck. Next, the team
              setup the first System for a test run to verify that
              the System was still operational. The same
              procedure was done for the second System as
              well. Inventory of all the Raceway that was
              currently at the site was done too. On the third
              day, the Wiring for the first System was run. The
              Screen for the first System was installed using
              drywall anchors and screws. We tried installing
              brackets and couplers for the second screen, but
              found it was not an option due to the size of the
        12966 frame. Next, Fred Rodriguez returned the
              THE GUNTUBE WAS PUT BACK INTO                         DUE TO STUDENT ERROR, THE GUNTUBE                 8/17/2010     402      FSCATT M109A6
              BATTERY, SYSTEM WAS REBOOTED AND                      DID NOT RETURN INTO BATTERY AFTER
              TEST FIRED.                                           FIRE MISSION.
        12967 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                8/17/2010     403      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                             GUNTUBE.
        12968 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                8/17/2010     401      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                             GUNTUBE.
        12969 THE RAMMER CYLINDER WAS PUT BACK IN DUE TO STUDENT ERROR, THE RAMMER                                    8/17/2010     401      FSCATT M109A6
              THE STOWED POSITION, SYSTEM WAS                       CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                              POSITION.
        12970 Replaced motherboard battery holder. Checks out Battlefield IG s/n 1102 CMOS battery holder is          8/17/2010     null
              fine.                                                 broken.
        12971 Reseated all internal components. Checked it          Battlefield IG s/n 1219 intermittantly will not   8/17/2010     null
              several times and it worked fine.                     perform POST.
        12972                                                                                                         8/17/2010    IW1       MM1
        12973                                                                                                         8/17/2010    IW2       MM1
        12974                                                                                                         8/17/2010    IW3       MM1
        12975                                                                                                         8/17/2010   OW1        MM1
        12976                                                                                                         8/17/2010   OW10       MM1
        12977                                                                                                         8/17/2010   OW11       MM1
        12978                                                                                                         8/17/2010   OW12       MM1
        12979                                                                                                         8/17/2010   OW2        MM1
        12980                                                                                                         8/17/2010   OW3        MM1
        12981                                                                                                         8/17/2010   OW4        MM1
        12982                                                                                                         8/17/2010   OW5        MM1
        12983                                                                                                         8/17/2010   OW6        MM1
        12984                                                                                                         8/17/2010   OW7        MM1
        12985                                                                                                         8/17/2010   OW8        MM1
        12986                                                                                                         8/17/2010   OW9        MM1
        12987 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010    201       FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        12988 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     202      FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        12989 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     203      FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        12990 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     204      FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        12991 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     205      FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        12992 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     206      FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        12993 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     401      FSCATT M109A6
              CONDUCTED.                                            SHUTDOWN
        12994 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     402      FSCATT M109A6
              CONDUCTED.                                            SHUTDOWN
        12995 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     403      FSCATT M109A6
              CONDUCTED.                                            SHUTDOWN
        12996 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                    8/17/2010     406      FSCATT M109A6
              CONDUCTED.                                            SHUTDOWN
        12997 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                            8/18/2010     201      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         12998 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                               202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 26
        WO #                Repair Notes                           Problem                     Date                          Serial #       Description
        12999 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                           203      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13000 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13001 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13002 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13003 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13004 WRONG SYSTEM WO DELETED               STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          403      FSCATT M109A6
                                                     AFCS OPERATION CHECK 3. SENSOR
                                                     OPERATION CHECK
         13005 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13006 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13007 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/18/2010                          402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13008 Recieved Handstation from ASL                    No Elevation action on Handstation.             8/18/2010      161      AT3 (STC)
               line#AT022.Installed on Student station.System
               tested Good.Job Complete.
         13009 Parts orderd refer to WO#'s:13156 & 13157.       Handstation, no response to Elevation. Gear      8/18/2010     null
               (Azimuth and Elevation Gears). Need one          wheel both big and small teeth are worn. Need to
               Helping Hands with Magnifier (Radio Shack)       locate a vendor to order replacement parts.
               $15.99 and a 301 Standard Pansive All-Purpose
               Holding Unit (Frys electronics) PN# 3775936
               $42.99, to complee job. Replaced main gear
               Line# AT074 MFN# A1-51-0002-001 $276.00.
               Replaced azimuth gear Line# AT075 MFN# A1-
               0004-001 $56.00. Replaced potentiometer Line#
               AT068 MFN# 6187R5KL1.0. Performed DRC.
               Passed DRC. return to ASL


         13010 Replaced EVO lamp. (ASL CF058).                  EVO Lamp has burnt out.                         8/18/2010     C-033     CFFT 1:4
         13011 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE              8/18/2010      203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13012 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE              8/18/2010      206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13013 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                8/18/2010      205      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         13014 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE              8/18/2010      201      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13015 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE              8/18/2010      206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13016 Replaced system with line#AT003 from ASL.        Contacted by Timothy Welder NG NDARNG Aug       8/18/2010      139      AT3 (STC) c
               Replaced headsets line# AT008. Job Complete.     17,2010 14:00,1521 S. 48st.,Grand ND 58201.
                                                                Will not come up to an operational status.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 27
        WO #                  Repair Notes                                             Problem                              Date    Serial #        Description
        13017 Replaced system with line#AT003 from ASL.            Contacted by Timothy Welder NG NDARNG Aug            8/18/2010     141      AT3 (STC) c
              Replaced 2(ea) Headsets Line#008. Job                17,2010 14:00,1521 S. 48st.,Grand ND 58201.
              Complete.                                            Will not come up to an operational status.
                                                                   Recieved from customer.
         13018 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                   8/18/2010     403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13019 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                   8/18/2010     401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13020 Shipped replacement Sim Network Switch              Sim Network Switch will not communicate.             8/18/2010    C-142     CFFT 1:12
               (CF082)on 8/18/2010. Received call from
               operator on 8/19/2010, the system is now working
               and they do not need the switch that was sent.
               They will send switch back to Fort Sill.

         13021 Reset the configuration for the Joystick via phone Sony projector did not show a display. Battlefield    8/18/2010    C-082     CFFT 1:12
               with the site to resolve joystick issue. Reset     IG and Student IG will not boot. Student Station
               Projector configuration via phone with the site to Joystick is randomly rotating the screen by itself.
               resolve Projector problems. Shipped replacement
               Battlefield Image Generator (CF061). Shipped
               replacment Student Image Generator to site
               (CF077).
         13022 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     201      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13023 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     202      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13024 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     203      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13025 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     204      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13026 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     205      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13027 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     206      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13028 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     401      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13029 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     402      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13030 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     403      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13031 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       8/18/2010     406      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13032 1. THE HCT WAS ENERGIZED AND VERIFIED               STUDENT TRAINING: 1. SYSTEM STARTUP 2.               8/19/2010     201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND                SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13033 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                 202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13034 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                 203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13035 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                 204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13036 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                 205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13037 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                 206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13038 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                 401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13039 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                 402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 28
        WO #                Repair Notes                           Problem                     Date                                  Serial #          Description
        13040 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                   403         FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13041 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/19/2010                                  406         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13042 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 8/19/2010         204         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13043 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 8/19/2010         203         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13044 Powered system down,restarted system and           Map Display not responding to input commands       8/19/2010    E110009V8OP      FFROT AN/TPQ-36 (V8)
               verified BIOS settings. Reinitialized system and                                                                                    Instructor Station
               performed Map Registration.
         13045 Shipped Replacement Student Ig and HArd Drive      Student Ig will not boot.                          8/19/2010       C30-305       CFFT 1:30 Increment 2
               to site. 2cf027 and 2cf018 and 2cf031.
         13046 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 8/19/2010         205         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13047 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 8/19/2010         201         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13048 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 8/19/2010         402         FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13049 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 8/19/2010         403         FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13050 Reseatted connection on the switch/router.         No Network connection to Instructor station. RJ-   8/19/2010   SSB0021/STA 6/6   ICOFT Student Station
               System opertational for training purposes. RJ-45   45 connection retention clip broke,makeing a
               Modular plug needs to be replaced.                 unsecure connection.
         13051 Reconnected all connections and attached all       All cables disconnected from Interface case to     8/19/2010          5          AT3 (STC)
               peripherals.(i.e,interconnect cable,power          Base and peripherals stored in rear of Interface
               cables(2),mouse,keyboard,headphones,foot           Case.
               pedal(2).
         13052 Reconnected all connections and attached all       All cables disconnected from Interface case to     8/19/2010         18          AT3 (STC)
               peripherals.(i.e,interconnect cable,power          Base and peripherals stored in rear of Interface
               cables(2),mouse,keyboard,headphones,foot           Case.
               pedal(2).
         13053 Reconnected Interconnect cable,mouse and           All Components disconnected from Student           8/19/2010         28          STPT Instructor Station
               keyboard.Initalized system Daily readiness         Station.
               Test.Job Complete.
         13054 Recieved all Parts from ASL. Replaced              S&A Switch Spring broken.MFR#37466400010  8/19/2010                92-138A       STPT Student Station
               Spring,Uncage boot and Trigger Boot.Job            Line#ST002. Torn Uncage Boot MFR#11488109
               Complete.                                          Line#ST055 and torn Trigger Boot
                                                                  MFR#13012497 Line#ST059.

         13055 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         201         FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13056 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         202         FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13057 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         203         FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13058 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         204         FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13059 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         205         FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13060 DE-ENERGIZING PROCEDURES WERE                                                                         8/19/2010         206         FSCATT M109A5
               CONDUCTED.
         13061 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         401         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         13062 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         402         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         13063 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         403         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         13064 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     8/19/2010         406         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         13065 Replaced bulb in projector.                        Projector turns off after a minute of operation.   8/20/2010          3          HIMARS DT

         13066 Rammer tray Up/Down SW Loose. Adjusted             Rammer will not extend when actuated               8/20/2010         407         FSCATT M109A6
               Switch for proper operation. Rammer retured to
               good operation . Reconfigured and Reintialized
               system for opperation.
         13067 Preparing shipment of Stealth IG and Secondary     Stealth IG will not login into the CFFTUser     8/20/2010          C30-309       CFFT 1:30 Increment 2
               Hard Drive to site. 2CF024 and 2CF018. and         account. Through telephone support, we verified
               hard drive enclosure 2CF031.                       that the CFFTUser was not available through the
                                                                  xAdministrator account. The only accounts that
                                                                  showed were the xAdmin and the
                                                                  CFFTMaintenance accounts.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 29
        WO #                    Repair Notes                                       Problem                              Date      Serial #        Description
        13068 Disconected Switch connections to Fire Lock      With Primer Inserted One of Two Primer               8/20/2010       407       FSCATT M109A6
              Assembly and Primer switches. Removed Firing Switches Will not activate
              Block Assembly. Removed Mushroom Assembly
              from breach Block. Replaced 1 Primer Switch
              HT0735. Adjusted Both Primer Switches for
              proper operation with Primer Insert. Reassembled
              and Reconnected switches. Tested or proper
              Primer Operation. Reconfigered and Reinitialized
              FSCATT for Trainning. Complete.



         13069 null                                                                                                 8/22/2010                 FFROT AN/TPQ-36 (V8)
                                                                                                                                              Instructor Station
         13070 null                                                                                                 8/22/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
                                                                                                                                              Instructor Station
         13071 null                                                                                                 8/22/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
                                                                                                                                              Instructor Station
         13072 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13073 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13074 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13075 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13076 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13077 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13078 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13079 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13080 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13081 null                                                                                                 8/22/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                              Instructor Station
         13082 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13083 Performed monthly PMCS-cleaned station--                                                             8/22/2010   E110014V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                       Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13084                                                                                                      8/22/2010        1        MLRS Mockup
         13085                                                                                                      8/22/2010        2        MLRS Mockup
         13086                                                                                                      8/22/2010        3        MLRS Mockup
         13087                                                                                                      8/22/2010        4        MLRS Mockup
         13088 Recieved From ASL LINE ITEM# AT001. System LCD touchscreen not working properly.Need to              8/23/2010        5        AT3 (STC)
               repaired,tested Good.Job Complete.              replace with monitor from ASL LINE ITEM#
                                                               AT001.
         13089 8-23-2010 Prepped Items for vendor repair       This is a follow-up to 11483. Row 1 (qty 2), Row 2   8/23/2010       null
               shipment. PR 362 submitted 8/23/2010 PO 85526 (qty 6), Row 3 (qty 6), and Row 4 (qty 2) have
               received 8/24/2010 Sent to Vendor on 8/24/2010 bad rubber and deteriorating eye cups.
               Received from Vendor 03.09.11
         13090 8-23-2010 Prepped item for vendor repair        This is a follow-up to 12945. The Sony Projector     8/23/2010       null
               shipment. 8-24-2010 Item can not be             has spots in the display even after cleaning the
               economically repaired. (per Glenn Hyde)         bulb.
         13091 Could not duplicate error. Tested computer      This is a follow-up to 12945. The Student IG has     8/23/2010       null
               multiple times. No parts used. Returned to ASL. a discoloration in the video. The cable has to be
                                                               manipulated to get the correct color.

         13092 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                               201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 30
        WO #                Repair Notes                           Problem                     Date                                   Serial #       Description
        13093 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                    202      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13094 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13095 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13096 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13097 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13098 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13099 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13100 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13101 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 8/24/2010                                   406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13102 Will be shipped to vendor for repair. Returned  LCD Touchscreen MFR#: L05-1812-10-5A-1.No                  8/24/2010     null
               from vendor unable to repair. Troubleshooting   Display. Blank Screen.
               determined the need to replace circuit board
               p/n:00.56901.001 Rev:e Vendor unable to repair.
               Closing work order. Screen unrepairable.

         13103 Reconfigured the CFFT Software to "see" the        Stealth IG Joystick will not zoom.                      8/24/2010   C30-023    CFFT 1:30
               joystick. No parts used.
         13104 Powered the computer on and it booted correctly.   Student IG is not able to boot. this is a follow up     8/24/2010     null
               Noticed that one of the Network adapters was not   to 13021.
               showing. Reseated the card. Test good.
               Returned to asl.
         13105 Received the computer and it tests good. the       Disk boot error on the Student IG. This is a follow 8/24/2010         null
               issue was unable to be replicated. Returned to     up to 12947.
               ASL.
         13106 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     201      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13107 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     202      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13108 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     203      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13109 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     204      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13110 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     205      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13111 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     206      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         13112 Reloaded the FidView software. Computer tests      This is a follow-up to 13021. Battlefield IG will not   8/24/2010     null
               good. Returned to ASL.                             boot. CF061.
         13113 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     401      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         13114 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     402      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         13115 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                          8/24/2010     403      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 31
        WO #                   Repair Notes                                             Problem                          Date        Serial #          Description
        13116 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    8/24/2010         406         FSCATT M109A6
              CONDUCTED.                                           SHUTDOWN
        13117 Replaced the video card (CF116) and reseated         Student Control was bad from ASL Shelf. This      8/24/2010         null
              the CMOS battery. Tests good. Returned to ASL.       computer will not boot. This part was orginally
                                                                   pulled out of ASL for work order 12839.

         13118 BY DIRECT SUBSTITUTION IT WAS                       WEAPON NOT TRACKING PROPERLY                      8/24/2010         301         IMTS
               DETERMINED THAT THE TRACKER CARD
               WAS DEFECTIVE. IT WILL BE SENT TO
               INTERSENSE, INC. FOR REPAIR. TRACKER
               CARD S/N: ESM0209313-D RMA:
               RA1008252272 RECEIVED TRACKER CARD
               BACK FRO INTERSENSE ON 9/21/10 AFTER
               INSTALLING IT IN A WEAPON IT TESTED
               GOOD IN THE SYSTEM.
         13119 THE LINEAR VARIABLE DIFFERENTIAL                    DURING STUDENT TRAINING THE HCT                   8/25/2010         203         FSCATT M109A5
               TRANSDUCER (LVDT) WAS REPLACED, PART                STOPPED RECOILING
               USED: HT1117, 1EA.
         13120 PR 364 submitted 8/25/2010 PO 85532 received        FSCATT: LINEAR VARIABLE DIFFERENTIAL              8/25/2010         null
               8/25/2010 ITEM RECEIVED: 9/23/2010                  TRANSDUCER (LVDT) IS NOT REPAIRABLE,
                                                                   NEW LVDT ON ORDER
         13121 Replaced Flir Monitor.System Tested Good.Job        No power to Flir Monitor. Part needed from ASL    8/25/2010   SSB0011/STA 5/3   ICOFT Student Station
               Complete.                                           Line#IC076 MFR#13481712.
         13122 Cleared errors and reprogrammed. Replaced 3         Will not clear out after reading.                 8/25/2010       0408-18       CAMSIMDOHS
               filters: Camsim Simulation Nozzle Filter 1-F-13

         13123 Replaced Nose Assembly: Camsim Nose            Does not respond correctly.                            8/25/2010       0306-11       CAMSIMDOHS
               Assembly (Green) 1-G-1 Glued Nozzle Sealing
               Ring Replaced 1 latch Replaced Rear End Cap
               Assembly 1-H-5 Repaired H Air Source: H Source
               Transducer 1-F-1
         13124 Replaced Missing Magnets: Camsim Mag. Pack          Does not respond correctly.                       8/25/2010       0401-07       CAMSIMDOHS
               Low G Small 1-D-13 Camsim Mag. Pack Low G
               Large 1-D-9 Replaced Motherboard: Camsim
               Motherboard (No TIRIS) 1-G-10 Replaced
               LCD/Buttons Assembly: Camsim LCD Module
               (Modified) 1-H-9 3 filters missing: Camsim
               Simulation Nozzle Filter 1-F-13

         13125 Replaced Nose Assembly: Camsim Nose              Deos not respond correctly.                          8/25/2010       0401-10       CAMSIMDOHS
               Assembly (Green) 1-G-1 Glued Nozzle Sealing
               Ring Repaired H Air Source Replace small errors
               card 4 filters missing: Camsim Simulation Nozzle
               Filter 1-F-13
         13126 Replaced and glued Nozzle Sealing Ring Glued      Does not respond correctly.                         8/25/2010       0710-01       CAMSIMDOHS
               Battery Retaining ring Replaced small errors card
               Replaced Tape Replaced Missing Magnet:
               Camsim Mag. Pack Low H Small 1-D-17
               Repaired H Air Source: H Source Transducer 1-F-
               1 1 filters missing: Camsim Simulation Nozzle
               Filter 1-F-13
         13127                                                     xx                                                8/25/2010       203A-8        HIMARS OMT Student
                                                                                                                                                   Station
         13128 BY DIRECT SUBSTITUTION IT WAS                       WEAPON TRACKING ERRATICALLY                       8/25/2010         301         IMTS
               DETERMINED THAT THE TRACKER CARD
               WAS DEFECTIVE. IT WILL BE SENT TO
               INTERSENSE, INC. FOR REPAIR. TRACKER
               CARD S/N: ESM0304165-E RECEIVED BACK
               REPAIRED 9/20/10
         13129 Showed them how to move the files.                  Operators need assistance moving SAF scenario 8/25/2010            C-137        CFFT 1:12
                                                                   files.
         13130 THE BLOCK WAS REMOVED FROM THE                      TWO BOLTS WERE BROKEN OFF IN THE              8/25/2010             201         FSCATT M109A5
               GUNTUBE ASSEMBLY IN ASL (HT0026), AND               SCREW DRIVE MOUNTING BLOCK
               REPLACED SEE FO WO #M13131 FOR
               MOUNTING BLOCK
         13131 ITEM WAS REPAIRED AT LOCAL FACILITY                 FSCATT: SCREW DRIVE MOUNTING BLOCK 8/25/2010                        null
               FOR $30.00                                          NEEDS TO BE DRILLED A TAPPED BY LOCAL
                                                                   FACILITY
         13132 Recieved from customer.Non system disk              SSB0002 Contacted by Cecil Hess MSG FL-  8/26/2010                  null
               error.Failing power supply and failing PCIe video   ARNG.Recieved email with status:Will not
               card. Installed Operating system and upgaded        boot.Will ship "A" computer for repair.
               training software.Recieved and replaced all
               components. Job complete. Returning to
               customer.
         13133 Troubleshooting determined Failing MB,CPU and SSB0002 Contacted by Cecil Hess MSG FL-                 8/26/2010         null
               Ram. Parts needed 1ea MB,1ea CPU w/heatsync ARNG.Recieved email with status:Will not boot.
               and 2ea Ram. Recieved and replaced all        Will ship "B" computer for repair.
               components, updated software. System tested
               good. Job complete. Returning to customer.

         13134 Recieved from customer "B" computer and             SSB0004 Contacted by Cecil Hess MSG FL-           8/26/2010         null
               Gunners Console.Repaired Gunners Console.           ARNG.Recieved email with status:Will not boot.
               Troubleshooting determined Failing Hard drive.      Will ship "B" computer for repair.
               Parts needed: Hard drive.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 32
        WO #                     Repair Notes                                       Problem                            Date            Serial #           Description
        13135 Recieved from customer "B" computer and           SSB0005 Contacted by Cecil Hess MSG FL-            8/26/2010             null
              Handstation for repair. Non system disk           ARNG.Recieved email with status:Will not boot.
              error.Failing power supply and failing PCIe video Will ship "B" computer and Handstation for repair.
              card.Parts needed: Power supply and PCIe video
              card. Installed Operating system and upgaded
              training software. Recieved from ASL line#
              AT022 SIM Handstation.
         13136 Troubleshooting determined multiple bad sectors     Contacted by Cecil Hess MSG FL-                      8/26/2010        78         AT3 (STC) c
               on HDD.Replaced Complete Hardware system            ARNG.Recieved email with status:Will not boot.
               upgrade. Upgraded operatiing system and             Recieved from customer.No boot device
               updated training software.                          detected.

         13137 Troubleshooting determined multiple bad sectors     Contacted by Cecil Hess MSG FL-                      8/26/2010        142        AT3 (STC) c
               on HDD.Replaced Complete Hardware system            ARNG.Recieved email with status:Will not boot.
               upgrade. Upgraded operatiing system and             Recieved from customer.No boot device
               updated training software.                          detected.

         13138 Assisted the Class Instructor with updating         Software support for Instructor station class        8/26/2010   ISB0004/STA 5   ICOFT Instructor Station
               Software upgrade and File Transfer to all Student   training scenarios.
               Station 5/1-5/6.
         13139 Assisted the Class Instructor with updating         Software support for Instructor station class        8/26/2010   ISB0005/STA 6   ICOFT Instructor Station
               Software upgrade and File Transfer to all Student   training scenarios.
               Station 6/1-6/6.
         13140 Assisted the Class Instructor with updating         Software support for Instructor station class        8/26/2010   ISB0006/STA 7   ICOFT Instructor Station
               Software upgrade and File Transfer to all Student   training scenarios.
               Station 7/1-7/6.
         13141 Replaced Student IG with one from ASL. CF077.       Student IG does not have video and also no           8/27/2010       C-012       CFFT 1:4
                                                                   network communication.
         13142 recreated issue. tried replacing journey, VME,      had an error msg on screen stating max reboot        8/27/2010        8-3        RT3
               and power pc board. replaced all hardware           time of 50 seconds was exceed.
               components, issue was still present. refered to
               Ratheon for software resolution. A total of 6 hours
               was spent in the elimination of bad parts.

         13143 Will ship (1)Heatset to requesting party. Shipping Contacted by SFC Powell C 2/263 ADA NG via            8/27/2010         9         AT3 (STC) c
               address 5270 Duke st. Alexandria,VA 22304          email requesting Headset for training system.
                                                                  Line#AT008 MFR#HP-259.
         13144 sending into vendor for repairs. PR 366 submitted Student IG does not have video and also no             8/27/2010        null
               8/30/2010 PO 85540 received 8/30/2010 Sent to network communication.
               vendor on 8/30/2010 Received from vendor
               9.13.10. Replaced video card CF049. Tested unit
               and returned to ASL. Replaced video card
               (CF049). Tested, returned to ASL.

         13145 Will ship (1)Heatset to requesting party. Shipping Contacted by SFC Powell C 2/263 ADA NG via            8/27/2010        49         AT3 (STC) c
               address 5270 Duke st. Alexandria,VA 22304          email requesting Headset for training system.
                                                                  Line#AT008 MFR#HP-259.
         13146 Will ship (1)Heatset to requesting party.Shipping Contacted by SFC Powell C 2/263 ADA NG via             8/27/2010        85         AT3 (STC) c
               address 5270 Duke st. Alexandria,VA 22304.         email requesting Headset for training system.
                                                                  Line#AT008 MFR#HP-259.
         13147 SAF NTC database files were missing. Installed NTC database doesn't work on the SAF. Ft. Sill            8/27/2010     C30-026       CFFT 1:30
               NTC database files and it worked fine.             and Middle East work fine.

         13148 Shipped replacement Battlefield IG. CF061.        Battlefield IG is not receiving any power.             8/27/2010       C-091       CFFT 1:12
         13149 Unable to duplicate the errors. Returning to ASL. Increment 2 CFFT is having an issue where the          8/27/2010        null
                                                                 Stealth IG is unable to load any terrains.(this is a
                                                                 follow up to 12554)
         13150                                                                                                          8/30/2010       BD2         BIDS Mockup
         13151                                                                                                          8/30/2010       BD1         BIDS Mockup
         13152                                                                                                          8/30/2010     FOX-MF-1      NBCRS FOX
                                                                                                                                                    SIMULATOR
         13153                                                                                                          8/30/2010     FOX-MF-1      NBCRS FOX
                                                                                                                                                    SIMULATOR
         13154 Performed Preventive Maintenance. Performed         Schedule PMCS Aug                                    8/30/2010        407        FSCATT M109A6
               Service Checks and Lubercation points.
               Performed test Manual Action Commands for
               proper operations.
         13155 Reseated all cables in the GDU and                  Menu key on GDU would not respond.                   8/30/2010         3         HIMARS Mockup
               reprogrammed 1770 card.
         13156 Parts needed for purposes of bringing ASL           Handstation SIM Avenger-Need to order: 5ea.     8/30/2010             null
               Stockage to authorized level. Handstation SIM       Azimuth gear 5ea. Elevation gear 5ea. Main gear
               Avenger-Need to order: 5ea. Azimuth gear 5ea.
               Elevation gear 5ea. Main gear PR 367 submitted
               8/30/2010 PO 85541 received 9/1/2010 received
               parts turned into ASL.
         13157 Parts needed for purposes of bringing ASL      Handstation SIM Avenger-Need to order: 5ea.     8/30/2010                  null
               Stockage to authorized level. Handstation SIM  Azimuth gear 5ea. Elevation gear 5ea. Main gear
               Avenger-Need to order: 5ea. Azimuth gear 5ea.
               Elevation gear 5ea. Main gear PR 368 submitted
               8/30/2010 PO 85541 received 9/1/2010 received
               parts turned into ASL.
         13158                                                     Ethernet Switch Inop                                 8/30/2010    0005V8M36      FFOMT AN/TPQ-36
                                                                                                                                                    (V8)
         13159 Configured Student IG computer for clone mode. No video on LLDR                                          8/30/2010     C12-305       CFFT 1:12 Increment 2

         13160 Need 2 toggle switch PR 369 submitted               Toggle switch bad                                    8/30/2010    0005V8M36      FFOMT AN/TPQ-36
               8/31/2010 PO 85546 received 9/2/2010                                                                                                 (V8)
         13161 Performed PMCS.                                     S/M PMCS Due.                                        8/30/2010        405        FSCATT M109A6


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 33
        WO #                     Repair Notes                                        Problem                                Date        Serial #            Description
        13162 Discharged capacitors. Converted Student Image       Student Image Generator will not POST.               8/31/2010         null
              Generator to Student Control to replace one
              taken from ASL on previous work order. Tested,
              returned to ASL.
        13163 Ordered 8 Hard Drives and 3 SLeeves. 2CF018          8 Increment 2 Computers require removable Hard 8/31/2010               null
              and 2CF031.These are needed to provide backup        Drives for ASL and 3 Hard Drive Sleeves.
              hard drives for the eight ASL chassis on hand.       2CF018 and 2CF031/
              The carriers are needed to encase the backup
              hard drives. PR 370 and PR 371 submitted
              8/31/2010. PO 85547 and PO 85548 received
              9/2/2010.
         13164 Repaired CVC Helmet Mic swivel.Job Complete.        CVC Helment Mic swivel Broken.                       8/31/2010   SSA0001/STA 7/1   ICOFT Student Station

         13165 Reinstalled Touchscreen software,changed USB No Data tranfer from Computer "A".                          8/31/2010   SSB0023/STA 7/3   ICOFT Student Station
               port and configured Com Ports.Job Complete.

         13166 Reseated connections,enabled network adapters No Data communication thru COM1.                 8/31/2010             SSB0017/STA 6/2   ICOFT Student Station
               in device manager.Job complete.
         13167 Unlocked Both Accounts on both Hard Drives. No Stealth IG will not login into the CFFTUser     8/31/2010                   null
               parts used. Returned to ASL.                   account. Through telephone support, we verified
                                                              that the CFFTUser was not available through the
                                                              xAdministrator account. The only accounts that
                                                              showed were the xAdmin and the
                                                              CFFTMaintenance accounts.
         13168 Reinstalled OS.Job Complete.                        Error messages:Software issues.                      8/31/2010    ISB0004/STA 5    ICOFT Instructor Station

         13169 Recieved from ASL "C" computer line#IC062           computer continously reboots.                        9/1/2010     ISB0006/STA 7    ICOFT Instructor Station
               MFR#XITOWER_PCIE.Imaged hard
               drive,Changed trainer name and IP
               Address.System tested good. Job Complete.
         13170 REMOVED A SMALL FERROUS METAL LOCK                  STUDENT STATION HAS A DRIFT PROBLEM                  9/1/2010        92-241        STPT Student Station
               WASHER FROM THE BATTERY SWITCH. IT                  WHEN A SCENARIO IS PLAYED
               WAS EFFECTING THE TRACKER (IC2)
               CAUSING IT TO HAVE AN AZIMUTH DRIFT.
               AFTER THE WASHER WAS REMOVED THE
               DRIFT PROBLEM DISAPPEARED.

         13171 Repaired Computer "C",Imaged hard drive,tested FOWO#13169.Continously reboots.                           9/1/2010          null
               good.Returning to ASL.
         13172 Repaired, reseated connections.                Continously reboots.                                      9/1/2010    SSB0017/STA 6/2   ICOFT Student Station
         13173 Need to order p/n: 0105028 BHD 500 Mircomedic No power to Flir Monitor.                                  9/2/2010         null
               sys.(www.dotronix.com) parts are discontinued.
               closing work order. non-repairable.

         13174 THE SOLENOID VALVE WAS REPLACED,                    THE GUNNERS SIDE ELEVATION CONTROL 9/2/2010                            202         FSCATT M109A5
               PART USED: HT0220, 1EA.                             NOT WORKING
         13175 1. THE GUNNERS SELECTOR SWITCH BOX                  1. THE CAB POWER WAS SHORTING OUT. 2. 9/2/2010                         206         FSCATT M109A5
               WAS REPLACED, PART USED: HT0233, 1EA.               15 AMP FUSES NEEDED REPLACEMENT.
               2. THE FUSES WERE REPLACED, PARTS
               USED: HT0659, 6EA.
         13176 Reloaded OS and CFFT software.                      Stealth computer s/n 0398 has corrupt file           9/2/2010          null
                                                                   system.
         13177 FOUR SOLDER POINTS WERE REPAIRED,                   FSCATT: GUNNERS SELECTOR SWITCH BOX                  9/2/2010          null
               TESTED GOOD.                                        UNDER REPAIR, HT0233
         13178 RECEIVED NEW BATTERIES                              THE UNIVERSAL POWER SUPPLY (UPS)                     9/2/2010          203         FSCATT M109A5
                                                                   BATTERIES NOT HOLDING CHARGE.
                                                                   BATTERIES ON ORDER
         13179 Replaced Instructor Control file named              Instructor control is displaying the error message   9/2/2010        C30-020       CFFT 1:30
               "instructorconfig.ini" wiht a working .ini file,    "unable to load asset file".
               retested. System is now fully operational.
         13180 bag jam caused re-coil time out error. Removed      trainer will not recoil                              9/2/2010          201         FSCATT M109A5
               bag jam, re-intilized system and fired a prepared
               round. System operational
         13181 THE HARDWARE WAS REPLACED, THE                      THE CHARGE BAG SCREW ASSEMBLY WAS                    9/2/2010          201         FSCATT M109A5
               FOLLOWING PARTS WERE USED: HT0409,                  REMOVED TO REPLACE WORN AND
               2EA. / HT0412, 1EA. / HT0552, 1EA. / HT0562,        BROKEN HARDWARE.
               2EA. / HT0569, 1EA. / HT0671, 2EA. / HT0739,
               1EA. / HT0883, 2EA.
         13182 THE PRIMERS WERE REPLACED, PARTS                    FOUR PRIMERS WERE DAMAGED BEYOND                     9/2/2010          204         FSCATT M109A5
               USED: HT0088, 4EA.                                  USABILITY
         13183 Power supply fuze blown, replaced fuze PN# 123-     system will not power up                             9/2/2010         C-057        CFFT 1:12
               789
         13184 Shipped Replacement Instructor Control to site      Instructor Control will not show a display.          9/2/2010        C30-310       CFFT 1:30 Increment 2
               with a secondary Hard Drive and Hard Drive
               enclosure. 2CF023, 2CF018, and 2CF031.

         13185 After testing system found that cable connecting    CM - TES multimeter not working.                     9/2/2010     114D0005SMT      SMT Student Station
               TES to ATG had broken connectors. Replaced
               cable.
         13186 Completed.                                          IMTS Monthly PMCS is due.              9/3/2010                      910005        IMTS
         13187 1. THE HCT WAS ENERGIZED AND VERIFIED               STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                       201          FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND                SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                     Page 34
        WO #                Repair Notes                           Problem                     Date                               Serial #       Description
        13188 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                 202      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13189 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13190 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13191 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13192 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13193 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13194 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13195 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13196 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/7/2010                                406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13197 Ran "fschk" linux command and repaired linux      SAF is displaying "inconsistant file" error           9/7/2010   C30-012    CFFT 1:30
               operating system and file structure. Retested.    message.
               System is now operational.
         13198 Power Supply Fuze blown, replaced fuze PN#        system will not power up                              9/7/2010    C-057     CFFT 1:12
               123-789
         13199 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                    9/7/2010     204      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         13200 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                    9/7/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         13201 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER                      9/7/2010     203      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         13202 Replaced Stealth and Battlefield Generator        Stealth Image Generator and Battlefield Image         9/7/2010   C30-011    CFFT 1:30
               CMOS batteries (CF075. Reset date and times,      Generator#1 will not retain time and date settings.
               retested system. System is now operational.

         13203 Repaired Speak Audio Cable. Replaced CMOS         Battlefield Image Generator #1 is not providing       9/7/2010   C30-001    CFFT 1:30
               battery in Instructor Control (CF075). Retested   audio to the system. Instructor control CMOS
               System. System is now operational.                battery is dead.

         13204 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                    9/7/2010     402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         13205 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                    9/7/2010     401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         13206 THE DEFLECTOR SHIELDS WERE                        FSCATT: SUPPLY REQUESTED FABRICATION                  9/7/2010     null
               FABRICATED BY LOCAL FACILITY AND                  OF TWO DEFLECTOR SHIELDS (HT0980) FOR
               ADDED TO ASL, COST $100.00                        ASL STOCKAGE
         13207 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                    9/7/2010     203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 35
        WO #                   Repair Notes                                         Problem                 Date   Serial #       Description
        13208 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE      9/7/2010     205      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                         GUNTUBE.
        13209 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER        9/7/2010     206      FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                          POSITION.
        13210 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     201      FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        13211 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     202      FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        13212 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     203      FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        13213 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     204      FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        13214 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     205      FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        13215 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     206      FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        13216 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     401      FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        13217 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     402      FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        13218 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     403      FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        13219 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM          9/7/2010     406      FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        13220 power supply fuze blown, replaced fuze PN# 123-   system will not power up                9/7/2010    C-057     CFFT 1:12
              789
        13221 TROUBLESHOOTING REVEALED THAT THE                 THE IOS COMPUTER KEEPS LOOSING IT       9/7/2010     407      FSCATT M109A6
              CMOS BATTERY NEEDED REPLACING. S/N:               CMOS SETUP
              HAXCL Received Battary 9/15/10

         13222 TROUBLESHOOTING REVEALED THAT THE                CD ROM DRIVE NOT WORKING ON IOS         9/7/2010     407      FSCATT M109A6
               CD ROM DRIVE WAS DEFECTIVE AND                   COMPUTER
               NEEDED REPLACING. REPLACED IT WITH
               ONE FROM BENCH STOCK.
         13223 1. THE HCT WAS ENERGIZED AND VERIFIED            STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010      201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND             SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13224 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13225 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13226 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13227 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13228 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13229 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13230 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13231 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                 403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                         Page 36
        WO #                Repair Notes                           Problem                     Date                            Serial #       Description
        13232 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/8/2010                              406      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13233 THE SWITCH WAS REPLACED, PART USED:                 FSCATT: RAMMER HIRING HARNESS HAS A              9/8/2010     null
               HT0142, 1EA.                                        BROKEN SWITCH
         13234 Unable to duplicate error. Unit tested correctly.   Battlefield Image Generator will not power on.   9/8/2010     null
               Returned to ASL.
         13235 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               9/8/2010     201      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13236 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               9/8/2010     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13237 THE RAMMER CYLINDER WAS PUT BACK IN                 DUE TO STUDENT ERROR, THE RAMMER                 9/8/2010     205      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                            POSITION.
         13238 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               9/8/2010     403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13239 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               9/8/2010     406      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13240 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     201      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13241 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     202      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13242 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     203      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13243 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     204      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13244 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     205      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13245 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     206      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13246 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     401      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13247 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     402      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13248 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     403      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13249 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                   9/8/2010     406      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13250 (2ea)Headsets shipped to customer.                  Missing Headsets. Customer requesting 2ea.       9/8/2010     143      AT3 (STC) c

         13251 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                             201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13252 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                             202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13253 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                             203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13254 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                             204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13255 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                             205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13256 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                             206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13257 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                             401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 37
        WO #                Repair Notes                           Problem                     Date                                  Serial #          Description
        13258 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                                    402         FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13259 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                                   403         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13260 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/9/2010                                   406         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13261 THE HOSE WAS REMOVED AND NEW                     A HOSE ON THE CHARGE BAG CLAMP                        9/9/2010         205         FSCATT M109A5
               THREAD TAPE WAS ADDED                            CYLINDER WAS LEAKING
         13262 THE GUNTUBE WAS PUT BACK INTO                    DUE TO STUDENT ERROR, THE GUNTUBE                     9/9/2010         204         FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                 DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                      FIRE MISSION.
         13263 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                      9/9/2010         202         FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         13264 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                      9/9/2010         201         FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         13265 A 15 AMP FUSE WAS REPLACED, PART                 THE HCT LOST CAB POWER                                9/9/2010         203         FSCATT M109A5
               USED: HT0659, 1EA.
         13266 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    9/9/2010         205         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13267 Reinstalled drivers and configured BIOS,issue    No Audio.                                             9/9/2010         75          STPT Instructor Station
               persist. Replaced Instructor station with
               (computer,386) line#ST015,mfr#71012544001.

         13268 Observed the "B" computer                        Reboots intermittenly.                                9/9/2010   SSB0017/STA 6/2   ICOFT Student Station
               reboot/restart.Replaced with computer from ASL
               line#IC062,MFR#xi mtower_pcie.
         13269 Frayed wires on CVC helmet. Replaced from ASL    CVC Helmet shorting out.                              9/9/2010   SSB0022/STA 7/2   ICOFT Student Station
               line#IC054,MFR#MK-1697G CVC helmet kit
               headset.
         13270 THE FIRING MECHANISM WAS REPLACED,               A WELD ON THE FIRING MECHANISM                        9/9/2010         203         FSCATT M109A5
               PART USED: HT0130, 1EA.                          CRACKED
         13271 ITEM REPAIRED BY LOCAL FACILITY, COST:           FSCATT: FIRING MECHANISM HAS BROKEN                   9/9/2010         null
               $50.00                                           WELD
         13272 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                      9/9/2010         402         FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         13273 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    9/9/2010         406         FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13274 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    9/9/2010         401         FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13275 Installed new screws.                            Receiver/Exciter Right Bay Component Simulator        9/9/2010    114B0004M37      FIMT
                                                                door interlock missing screws that attach interlock
                                                                to door.
         13276 Talked operator through Video control software   LLDR will not display an image.                       9/9/2010        C-007        CFFT 1:4
               setting adjustments.
         13277 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         201         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13278 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         202         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13279 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         203         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13280 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         204         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13281 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         205         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13282 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         206         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13283 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         401         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         13284 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         402         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         13285 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         403         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         13286 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        9/9/2010         406         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         13287 Repaired RCT,using spare parts from Ft.Bliss.    RCT,no display,FOWO#11504                             9/9/2010         null
               Job Complete.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 38
        WO #                     Repair Notes                                         Problem                      Date      Serial #           Description
        13288 Repaired RCT,using spare parts from Ft.Bliss.     RCT,no display.                                9/9/2010        null
              Job Complete.
        13289 Repaired RCT,using spare parts from Ft.Bliss.     RCT,no display.                                9/9/2010        null
              Job Complete.
        13290 Received Instructor Control, one hard drive would Instructor Control will display an image.      9/10/2010       null
              not boot to desktop. Other hard drive required
              Video Drivers reinstalled and Windows to be
              reactivated. Cloned good working hard drive,
              tested, returned to ASL.
         13291 Restarted system                                   Map display light not responding to inputs   9/11/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13292 null                                                                                            9/12/2010                 FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13293   null                                                                                          9/12/2010     ETIOS1      SMT ETRAC
         13294   null                                                                                          9/12/2010     ETSS9       SMT ETRAC
         13295   null                                                                                          9/12/2010     ETSS1       SMT ETRAC
         13296   null                                                                                          9/12/2010     ETSS2       SMT ETRAC
         13297   null                                                                                          9/12/2010     ETSS3       SMT ETRAC
         13298   null                                                                                          9/12/2010     ETSS4       SMT ETRAC
         13299   null                                                                                          9/12/2010     ETSS5       SMT ETRAC
         13300   null                                                                                          9/12/2010     ETSS6       SMT ETRAC
         13301   null                                                                                          9/12/2010     ETSS7       SMT ETRAC
         13302   null                                                                                          9/12/2010     ETSS8       SMT ETRAC
         13303   null                                                                                          9/12/2010     ETSS9       SMT ETRAC
         13304   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13305   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13306   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13307   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13308   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13309   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13310   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13311   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13312   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13313   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13314   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13315   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13316   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13317   Performed monthly PMCS -cleaned station--                                                     9/12/2010   E110014V8OP   FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                                                                Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13318   PMCS - Inspect and clean.                                                                     9/12/2010    114B0001IS   FIMT
         13319   PMCS - Do not touch. Terrel's desk.                                                           9/12/2010   114B0009SSC   FIMT
         13320   PMCS - Clean, inspect and run month test.                                                     9/12/2010   114B0001M37   FIMT
         13321   PMCS - Clean, inspect and run month test.                                                     9/12/2010   114B0002M37   FIMT
         13322   PMCS - Clean, inspect and run month test.                                                     9/12/2010   114B0003M37   FIMT
         13323   PMCS - Clean, inspect and run month test.                                                     9/12/2010   114B0004M37   FIMT
         13324   In storage                                                                                    9/12/2010   114B0005M36   FIMT
         13325   In storage                                                                                    9/12/2010   114B0006M36   FIMT


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 39
        WO #                      Repair Notes                       Problem                     Date         Serial #          Description
        13326   In storage                                                                   9/12/2010     114B0007M36    FIMT
        13327   In storage                                                                   9/12/2010     114B0008M36    FIMT
        13328   PMCS - Clean and inspect.                                                    9/12/2010    114D0001SMTIS   SMT Student Station
        13329   Do not touch. Terrel's desk.                                                 9/12/2010   114D0006SMTSSC   SMT Student Station
        13330   PMCS - Clean, inspect and test.                                              9/12/2010     114D0002SMT    SMT Student Station
        13331   PMCS - Clean, Inspect and test.                                              9/12/2010     114D0003SMT    SMT Student Station
        13332   PMCS - Clean, inspect and test.                                              9/12/2010     114D0004SMT    SMT Student Station
        13333   PMCS - Clean, inspect and test.                                              9/12/2010     114D0005SMT    SMT Student Station
        13334                                                                                9/12/2010           3        HIMARS DT
        13335   pre startup                                                                  9/12/2010          null      HIMARS DT
        13336   pre startup                                                                  9/12/2010          null      HIMARS DT
        13337   pre startup                                                                  9/12/2010          null      HIMARS DT
        13338   pre startup                                                                  9/12/2010          null      HIMARS DT
        13339   pre startup                                                                  9/12/2010          null      HIMARS DT
        13340   pre startup                                                                  9/12/2010          null      HIMARS DT
        13341   pre startup                                                                  9/12/2010          null      HIMARS DT
        13342   pre startup                                                                  9/12/2010          null      HIMARS DT
        13343   pre startup                                                                  9/12/2010          null      HIMARS DT
        13344   pre startup                                                                  9/12/2010          null      HIMARS DT
        13345                                                                                9/12/2010           2        MLRS DT
        13346                                                                                9/12/2010           1        MLRS DT
        13347   pre startup                                                                  9/12/2010                    MLRS DT
        13348   pre startup                                                                  9/12/2010         null       MLRS DT
        13349   pre startup                                                                  9/12/2010         null       MLRS DT
        13350   pre startup                                                                  9/12/2010         null       MLRS DT
        13351   pre startup                                                                  9/12/2010         null       MLRS DT
        13352   pre startup                                                                  9/12/2010         null       MLRS DT
        13353   pre startup                                                                  9/12/2010         null       MLRS DT
        13354   pre startup                                                                  9/12/2010         null       MLRS DT
        13355   pre startup                                                                  9/12/2010         null       MLRS DT
        13356   pre startup                                                                  9/12/2010         null       MLRS DT
        13357   null                                                                         9/12/2010         null       MLRS DT
        13358   pre startup                                                                  9/12/2010         null       MLRS DT
        13359   pre startup                                                                  9/12/2010         null       MLRS DT
        13360   pre startup                                                                  9/12/2010         null       MLRS DT
        13361   pre startup                                                                  9/12/2010         null       MLRS DT
        13362   pre startup                                                                  9/12/2010         null       MLRS DT
        13363   pre startup                                                                  9/12/2010         null       MLRS DT
        13364   pre startup                                                                  9/12/2010         null       MLRS DT
        13365   pre startup                                                                  9/12/2010         null       MLRS DT
        13366   pre startup                                                                  9/12/2010         null       MLRS DT
        13367   pre startup                                                                  9/12/2010         null       MLRS DT
        13368   null                                                                         9/12/2010         null       MLRS DT
        13369   pre startup                                                                  9/12/2010         null       MLRS DT
        13370   pre startup                                                                  9/12/2010         null       MLRS DT
        13371                                                                                9/12/2010       910005       IMTS
        13372   null                                                                         9/12/2010       ETIOS1       SOT ETRAC Instructor
                                                                                                                          Station
         13373 null                                                                          9/12/2010       ETSS1        SOT ETRAC STUDENT
                                                                                                                          STATION
         13374 null                                                                          9/12/2010       ETSS2        SOT ETRAC STUDENT
                                                                                                                          STATION
         13375 null                                                                          9/12/2010       ETSS3        SOT ETRAC STUDENT
                                                                                                                          STATION
         13376 null                                                                          9/12/2010       ETSS4        SOT ETRAC STUDENT
                                                                                                                          STATION
         13377 null                                                                          9/12/2010       ETSS5        SOT ETRAC STUDENT
                                                                                                                          STATION
         13378 null                                                                          9/12/2010       ETSS6        SOT ETRAC STUDENT
                                                                                                                          STATION
         13379 null                                                                          9/12/2010       ETSS7        SOT ETRAC STUDENT
                                                                                                                          STATION
         13380 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/13/2010         201         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13381 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/13/2010         202         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13382 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/13/2010         203         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13383 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/13/2010         204         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13384 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/13/2010         205         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                              Page 40
        WO #                Repair Notes                           Problem                     Date                                  Serial #        Description
        13385 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/13/2010                                   206       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13386 Restored system.                                   System not responding to command inputs.             9/13/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         13387 Restored system.                                   System not responding to command inputs.             9/13/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         13388 Restored system.                                   System not responding to command inputs.             9/13/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         13389 Restored system.                                   System will not respond to command inputs.           9/13/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                                 Instructor Station
         13390 Reseated circuit card, checked cabling and         Map display light not operating properly.            9/13/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
               restored system.                                                                                                                  Instructor Station
         13391 Received monitor from Ft. Bliss. Replaced          Instructor monitor is starting to go bad. It takes   9/13/2010     910005      IMTS
               monitor. Works great.                              about 5 minutes for the screen to display
                                                                  something.
         13392 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                     9/13/2010       202       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                           POSITION.
         13393 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                   9/13/2010       204       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13394 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                   9/13/2010       205       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13395 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                   9/13/2010       203       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13396 WT340-2 Card in LIU had a burnt circuit.           Left boom does not respond to commands.              9/13/2010        2        MLRS Mockup
               Repaired card and Mockup responded correctly.

         13397 Shipped replacement Epson Lamp (ASL CF015). Epson lamp on Battlefield IG Channel 1 requires             9/13/2010     C30-005     CFFT 1:30
                                                                replacement.
         13398 Unable to duplicate error. Returned to ASL.      Battlefield IG#2 (shuttle chassis) will not display    9/13/2010      C-036      CFFT 1:4
                                                                an image.
         13399 Due to possible power issues, performed a        Map display light not responding to inputs             9/13/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
               complete system shutdown and initialization on                                                                                    Instructor Station
               side B of trainer. Rebooted the system and
               performed Map Registration.
         13400 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         9/13/2010       201       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13401 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         9/13/2010       202       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13402 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         9/13/2010       203       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13403 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         9/13/2010       204       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13404 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         9/13/2010       205       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13405 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         9/13/2010       206       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         13406 replaced monitor line item # RT006               touch screen was not working properly.                 9/13/2010       1-8       RT3
         13407 recalibrated screen issue still present. send to Screen does not respond to location. Flickering        9/13/2010       null
               vendor for repair. PO 85745 Recieved from
               vendor from repair returning to asl line item
               #RT006
         13408 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                            9/14/2010       201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13409 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                                  202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13410 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                                  203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13411 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                                  204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13412 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                                  205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13413 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                                  206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 41
        WO #                Repair Notes                           Problem                     Date                          Serial #        Description
        13414 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                           401       FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13415 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                          402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13416 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                          403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13417 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/14/2010                          406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13418 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE             9/14/2010       201       FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                       FIRE MISSION.
         13419 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER              9/14/2010       204       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         13420 Rebooted system.                                  Map Display light not responding. Ser#        9/14/2010                 FFROT AN/TPQ-36 (V8)
                                                                 E110009V8OP                                                             Instructor Station
         13421 Rebooted system.                                  Map Display light not responding.             9/14/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13422 Reseated cables and rebooted system.              Map display light not responding              9/14/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13423 Reinitialized system.                             System not responding to command inputs.      9/14/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13424 Reinitialized system.                             System not responding to command inputs.      9/14/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13425 Reintialized system.                              System not responding to command inputs.      9/14/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13426 Replaced Tower computer and Mother                Map display light not working properly        9/14/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
               board(belongs to School house), performed                                                                                 Instructor Station
               system check and map registration.
         13427 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER              9/14/2010       406       FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         13428 the journey(x86) will not power on. replaced      not receiving power to the student station.   9/14/2010       6-6       RT3
               journey line item# RT011
         13429 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE            9/14/2010       402       FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         13430 duplicated issue. will not power on. return to    the journey(x86) will not power on.           9/14/2010       null
               vendor for repair PO 85743 Sent to vendor
               3/25/2011 Received from vendor returning to ASL
               line item # RT011
         13431 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       201       FSCATT M109A5
               CONDUCTED.                              SHUTDOWN
         13432 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       202       FSCATT M109A5
               CONDUCTED.                              SHUTDOWN
         13433 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       203       FSCATT M109A5
               CONDUCTED.                              SHUTDOWN
         13434 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       204       FSCATT M109A5
               CONDUCTED.                              SHUTDOWN
         13435 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       205       FSCATT M109A5
               CONDUCTED.                              SHUTDOWN
         13436 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       206       FSCATT M109A5
               CONDUCTED.                              SHUTDOWN
                                                       Enhanced Student Student Station #3 will not
         13437 Shipped replacement Student IG #3 (ASL CF125)                                                   9/14/2010     Y-001B      CFFT-SOF 1:12
                                                       display an image.
         13438   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       401       FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         13439   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       402       FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         13440   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       403       FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         13441   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                          9/14/2010       406       FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         13442   1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                  9/15/2010       201       FSCATT M109A5
                 OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
                 FIRED A PROJECTILE, FUZE, AND CHARGE
                 COMBINATION, ALL SENSORS ARE
                 OPERATIONAL.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 42
        WO #                Repair Notes                           Problem                     Date                                 Serial #        Description
        13443 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                  202       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13444 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13445 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13446 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13447 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13448 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13449 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13450 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13451 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/15/2010                                 406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13452 Performed system shutdown and restarted             System not responding to command inputs.           9/15/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
               system.                                                                                                                          Instructor Station
         13453 Shipped replacement LLDR and Student IG (ASL LLDR is not responding to movement, LCD inside            9/15/2010     C30-024     CFFT 1:30
               CF051 and CF077).                                   LLDR has a slightly melted appearance. Also
                                                                   Student IG, when joystick is used to pan is very
                                                                   jerky.
         13454 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 9/15/2010       202       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13455 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 9/15/2010       204       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         13456 Replaced Battlefield Image Generator #2 (shuttle Battlefield Image Generator #2 (shuttle type)will     9/15/2010      C-036      CFFT 1:4
               type) with one from ASL (CF078).                    not boot.
         13457 Unable to duplicate error. Both Hard Drives boot Student IG will not boot.                             9/15/2010       null
               fine. Tested, returned to ASL.
         13458 Need power board and inverter board. unable to RCT,No display,FOWO# 7127                               9/15/2010       null
               locate part. part discontinued. closing work order.
               non-repairable.
         13459 Troubleshooting determined failing MB,CPU and Reboots intermittenly.                                   9/15/2010       null
               RAM. Need to order 1ea MB,1ea CPU
               w/heatsync and 2ea RAM. Used parts from other
               spares.Job Complete. Returned to ASL.

         13460 Parts needed:Insert nuts 8-32 .091 p/n:S-832-3;    Testbed LCD Touchscreen display mount bracket 9/15/2010             null
               Machine screws p/n:91400A829;Finishing             unserviceable.
               Washers p/n:90262A011; Sleeve Washers
               p/n:97215A101. received parts. closing work
               order.

         13461 THE ELBOW WAS REPLACED, PART USED:                 THE HYDRUALIC FLUID ELBOW ON THE 2ND 9/15/2010                      402       FSCATT M109A6
               HT1203, 1EA.                                       STAGE RAMMER WAS CRACKED
         13462 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM       9/15/2010                      201       FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 43
        WO #                  Repair Notes                                           Problem                       Date      Serial #        Description
        13463 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       202       FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        13464 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       203       FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        13465 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       204       FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        13466 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       205       FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        13467 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       206       FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        13468 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       401       FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        13469 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       402       FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        13470 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       403       FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        13471 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                9/15/2010       406       FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        13472 Shipped replacement Battlefield Image Generator    Battlefield Image Generator Channel 1's SIM   9/15/2010      C-045      CFFT 1:12
              Channel 1 (ASL CF107)                              Network Card is non-functional.
        13473 1. THE HCT WAS ENERGIZED AND VERIFIED              STUDENT TRAINING: 1. SYSTEM STARTUP 2.        9/16/2010       401       FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED              AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS              OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13474 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/16/2010                          402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13475 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/16/2010                          403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13476 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/16/2010                          406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13477 Unable to duplicate error. Instructor Control     Instructor Control will not boot.             9/16/2010       null
               powered on, and booted to desktop correctly.
               Was only returned with one of the two provided
               Hard Drives. Cloned a new Hard Drive and
               placed in Removable case.
         13478 Performed system shutdown and reinitialization.   System not responding to command inputs.      9/16/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13479 Performed system shutdown and reinitialization.   System not responding to command inputs.      9/16/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                         Instructor Station
         13480 Replaced motherboard P5GL-MX with P5GV-MX The computer would not identify the hard drive        9/16/2010       203       STPT Instructor Station
               the computer comes up correct every time.

         13481                                                                                                 9/16/2010     CFFT1       CFFT 1:30
         13482                                                                                                 9/16/2010      IW1        MM1
         13483                                                                                                 9/16/2010      IW2        MM1
         13484                                                                                                 9/16/2010      IW3        MM1
         13485                                                                                                 9/16/2010      OW1        MM1
         13486                                                                                                 9/16/2010     OW10        MM1
         13487                                                                                                 9/16/2010     OW11        MM1
         13488                                                                                                 9/16/2010     OW12        MM1
         13489                                                                                                 9/16/2010      OW2        MM1
         13490                                                                                                 9/16/2010      OW3        MM1
         13491                                                                                                 9/16/2010      OW4        MM1
         13492                                                                                                 9/16/2010      OW5        MM1
         13493                                                                                                 9/16/2010      OW6        MM1
         13494                                                                                                 9/16/2010      OW7        MM1
         13495                                                                                                 9/16/2010      OW8        MM1
         13496                                                                                                 9/16/2010      OW9        MM1
         13497                                                                                                 9/16/2010      BD2        BIDS Mockup
         13498                                                                                                 9/16/2010      BD1        BIDS Mockup
         13499                                                                                                 9/16/2010    FOX-MF-1     NBCRS FOX
                                                                                                                                         SIMULATOR
         13500                                                                                                 9/16/2010    FOX-MF-2     NBCRS FOX
                                                                                                                                         SIMULATOR




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 44
        WO #                      Repair Notes                                  Problem                                  Date       Serial #        Description
        13501 HCT IOS Would not initialize in normal operation No com Between IOS and HCT                            9/16/2010        407       FSCATT M109A6
              mode. Check for proper EIU Boot. Checked RS-
              485 card for proper connection in ios. Noticed
              HCT Data wires connected up to wrong
              communication port Channel 1 should be channel
              2 on th RS 485 card. Reconfigured for proper
              operation. ( Army Unit Tried to initalize AFCS.
              Expained takes up to 4 min to display AFCS. No
              display so they tried to troubleshoot with
              reconfiguring communication link.Call Tech
              support )Initialized HCT. Initialized AFCS. Sent
              Fire Mission. Fired Good Operation.


         13502 Bad Power supply, receieved from ASL                  Contacted by Sammy Young via Email,"will not     9/16/2010       80        STPT Instructor Station
               line#SP0089. Job complete.                            boot". Coordinated to have system shipped in for
                                                                     repair. Received shipment 09/27/2010 from
                                                                     customer.
         13503 Repaired display configuration. Job Complete.         Contacted by Sammy Young via Email,"will not     9/16/2010     92-100A     STPT Student
                                                                     boot". Coordinated to have system shipped in for
                                                                     repair.Received shipment 09/27/2010 from
                                                                     customer. Display not configured correctly.

         13504 Recieved from ASL complete upgrade mod kit.           Contacted by Sammy Young via Email,"will not     9/16/2010       78        STPT Instructor Station
               Chasis modified with punch out tools, installed       boot". Coordinated to have system shipped in for
               DVD,HD,MB,Power supply,memory and graphics            repair. Received shipment 09/27/2010 from
               card. Sytem tested good. Job complete.                customer. System was older version and requires
                                                                     complete upgrade modification kit.

         13505 System checked and tested good. Received from Contacted by Sammy Young via Email,"will not         9/16/2010         92-206A     STPT Student
               ASL, rev. c trigger line# ST055.Torn boot, rev. c boot". Coordinated to have system shipped in for
               trigger line# ST055.                              repair. Recieved from shipping 9/27/2010.

         13506 Replaced headset,game pad                             Contacted by Sammy Young via Email,"will not     9/16/2010       51        AT3 (STC) c
               controller,Commander PTT switch.                      boot". Coordinated to have system shipped in for
                                                                     repair. Recieved in shipping from Customer
                                                                     09/27/2010.Missing Head set, game pad
                                                                     controller,Commander PTT switch.

         13507 Repaired Hard drive.System tested good.Job            Contacted by Sammy Young via Email,"will not     9/16/2010       81        AT3 (STC) c
               complete. used Ln#AT055 , AT064                       boot". Coordinated to have system shipped in for
                                                                     repair. Recieved in shipping from Customer
                                                                     09/27/2010. Boot disk Failure.

         13508 Missing (1)Headset,(1)Commander PTT                   Contacted by Sammy Young via Email,"will not     9/16/2010       34        AT3 (STC) c
               switch,(1)Game pad. Recieved from ASL line#           boot". Coordinated to have system shipped in for
               AT008 Heat set, AT064 Game pad                        repair. Recieved in shipping from Customer
               controller.Repaired SIM Handstaion. Job               09/27/2010. SIM Handstation not mounted to
               Complete.                                             interface case.
         13509 Replaced computer with Test Bed.Job Complete. Contacted by Sammy Young via Email,"will not     9/16/2010               80        AT3 (STC) c
                                                             boot". Coordinated to have system shipped in for
                                                             repair. Recieved shippment from Customer
                                                             09/27/2010. Troubleshooting determined Bad
                                                             Motherboard.
         13510 Modified HIMARS Tactical with hydrolic and air        HIMARS Tactical needs to be modified for        9/16/2010         8        HIMARS HPU
               connectors for HPU.                                   connection to HPU.
         13511 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                  9/16/2010        401       FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         13512 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                  9/16/2010        402       FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         13513 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                  9/16/2010        403       FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         13514 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                  9/16/2010        406       FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         13515 Recieved from ASL:DVD ln#AT072, graphic card          FOWO#13016.Possible failing power supply,       9/17/2010        null
               ln#AT070, motherboard ln#AT067, power supply          intermittent case fan,poor quaility video.
               ln#AT069, memory ln#AT065, hard drive
               ln#AT045, controller card ln#AT073, cpu
               ln#AT066. Job Complete. Returning to ASL.

         13516 Recieved from ASL Power supply               FOWO#13017.Failing power supply and failing 2            9/17/2010        null
               line#AT069,Graphics card ln#AT070,MB         port Comm card.
               LN#AT067,Ram LN#AT065,HD LN#AT045,
               LN#AT066 and 2 port comm card. Installed
               hardware components and updated software.Job
               complete.Returning to ASL.
         13517 Unable to locate parts for menu board. System         FOWO#13267. No Audio.Error message "Cant        9/17/2010        null
               operational for training purposes only.Returning to   find Mixer".
               ASL.
         13518 Performed system shutdown and restarted               Map display light not responding to inputs      9/17/2010    E110009V8OP   FFROT AN/TPQ-36 (V8)
               system                                                                                                                           Instructor Station
         13519 Removed paper map display, reseated circuit           Map display light not operating properly        9/17/2010    E110009V8OP   FFROT AN/TPQ-36 (V8)
               card and restarted system.                                                                                                       Instructor Station
         13520 Repaired elevation wireing.Job Complete.              FOWO#13135 SIM Avenger Handstation              9/17/2010        null
               Returning to ASL. Line# AT022                         SSB0005
         13521 PMCS done                                                                                             9/19/2010       FOX1       NBCRS FOX
                                                                                                                                                SIMULATOR
         13522                                                                                                       9/19/2010       FOX1       NBCRS FOX
                                                                                                                                                SIMULATOR


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                   Page 45
        WO #                    Repair Notes                                    Problem                        Date      Serial #          Description
        13523 PMCS done                                                                                    9/19/2010      FOX2       NBCRS FOX
                                                                                                                                     SIMULATOR
         13524                                                                                             9/19/2010      FOX2       NBCRS FOX
                                                                                                                                     SIMULATOR
         13525 PMCS done                                                                                   9/19/2010     FOXIS1      NBCRS FOX
                                                                                                                                     SIMULATOR
         13526                                                                                             9/19/2010     FOXIS1      NBCRS FOX
                                                                                                                                     SIMULATOR
         13527 PMCS complete                                                                               9/19/2010    0002V8M36    FFOMT AN/TPQ-36
                                                                                                                                     (V8)
         13528 PMCS complete                                                                               9/19/2010    0001V8M36    FFOMT AN/TPQ-36
                                                                                                                                     (V8)
         13529 PMCS complete                                                                               9/19/2010    0003V8M36    FFOMT AN/TPQ-36
                                                                                                                                     (V8)
         13530 PMCS complete                                                                               9/19/2010    0004V8M36    FFOMT AN/TPQ-36
                                                                                                                                     (V8)
         13531 PMCS complete                                                                               9/19/2010    0005V8M36    FFOMT AN/TPQ-36
                                                                                                                                     (V8)
         13532                                                                                             9/19/2010        1        HIMARS Mockup
         13533                                                                                             9/19/2010        2        HIMARS Mockup
         13534                                                                                             9/19/2010        3        HIMARS Mockup
         13535 Restarted system.                            Map Display light not responding to command    9/20/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                            inputs.                                                                  Instructor Station
         13536 Replaced the CMOS Battery. Adjusted the date Stealth Image Generator will not retain BIOS   9/20/2010     C30-012     CFFT 1:30
               and time. Tested good.                       settings.
         13537 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCHEDULED STUDENT TRAINING:                         9/20/2010       201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13538 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCHEDULED STUDENT TRAINING:                         9/20/2010       202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13539 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCHEDULED STUDENT TRAINING:                         9/20/2010       203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13540 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13541 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13542 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13543 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13544 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13545 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13546 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13547 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                      402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                          Page 46
        WO #                Repair Notes                           Problem                     Date                                Serial #       Description
        13548 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                                 403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13549 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/21/2010                                406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13550 Replaced twenty batteries                             The batteries for the simulated stinger weapons 9/21/2010       301      IMTS
                                                                     would not hold a charge
         13551 Shipped replacment Network Adaptor (2CF020).          Stealth Image Generator will not communicate on 9/21/2010     C4-309     CFFT 1:4 Increment2
                                                                     the SIM network.
         13552 21 Sep: Did a quick look for an unpluged power        Student station will not power up.              9/21/2010     C30-026    CFFT 1:30
               cord but didn't find one. So that training can
               proceed, I plugged the student station into a wall
               outlet. Student station powers up fine when
               plugged into temporary wall outlet. Will
               troubleshoot later when the trainer isn't being
               used. 22 Sep: Found a loose connector, reseated
               it, returned to original configuration. Trainer
               checks out fine.


         13553 Replaced the LLDR with a spare. Problem               LLDR is missing a portion of the left side of its 9/21/2010   C30-026    CFFT 1:30
               occurred during a training session.                   video. LLDR is unusable.
         13554 Shipped replacement SAF. Since we lack any 2U         SAF resolution is set to 640x480. Checked and     9/21/2010   C30-310    CFFT 1:30 Increment 2
               SAF's as spares (have never received any)             nVidia driver seems to be non-functional. Unable
               utilizing a Shuttle SAF (ASL 2CF025) as an            to repair over phone due to inability to access
               interim fix until we can repair the site's 2U SAF     root account.
               and ship that back to them.
         13555 Replaced DVI adaptor on Battlefield Image             Battlefield Image Generator #1 and #2 are not     9/21/2010    C-036     CFFT 1:4
               Generator #2. (CF094). Tested system. System is       providing a terrain image. System has no sound.
               now operational.
         13556 1 Oct 10: This is a follow up to work order 13553.    LLDR video is missing on the left side of the     9/21/2010     null
               Talked with Ivan and he said to send it to Fidelity   video display.
               for repairs. LLDR shipped to vendor for repair.
               PO 85584 25 Mar 11: Received LLDR from
               vendor repair. Checks out fine. Returning to
               supply.
         13557                                       STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                201      FSCATT M109A5
                                                     SENSOR OPERATION CHECK
         13558 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13559 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13560 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13561 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13562 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13563 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13564 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                                402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                   Page 47
        WO #                Repair Notes                           Problem                     Date                         Serial #       Description
        13565 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                          403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13566 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/22/2010                         406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13567 Issue was not a burnt out lamp. Epson projectors Epson Projector lamp is burned out.             9/22/2010    C-012     CFFT 1:4
               have images burnt into them. We no longer stock
               Epson projectors due to cost to repair. Tried to
               replace with two Canon SX60 projectors (ASL
               CF091). However due to unique ceiling mounts at
               the site, are currently unable to mount new
               projectors at this time. Reinstalled original Epson
               projectors, and site will contact us once they have
               procured proper mounting brackets for the
               replacement Canons.


         13568 Shipped replacment Projector Lamp (2CF006).        Canon Projector Lamp is burned out.           9/22/2010   C4-309     CFFT 1:4 Increment2

         13569 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE            9/22/2010     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13570 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE            9/22/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13571 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE            9/22/2010     203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13572 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE            9/22/2010     402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13573 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE            9/22/2010     403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         13574 THT Gripstock S/N 549065 TRIGGER LEVER IS          The trigger assembly was broken               9/22/2010     null
               BROKEN IN HALF ATTEMPTS TO EPOXY IT
               FAILED. NEED NEW ONE TO REPLACE.

         13575                                              Paper Map Display Light does not operate            9/22/2010     null
                                                            properly when performing map registration
                                                            operations
         13576 CHARGE BAG READER DISPLAY SENT TO FT Charge bag Reader Display Reporting Errors                  9/23/2010     407      FSCATT M109A6
               SILL FOR REPAIR/REPLACEMENT S/N:
               003015 97304ASSY PN: 40242-40415-10
               Replaced Charge Bag Reader Tested for proper
               operation.
         13577 THE WORN PARTS WERE REPLACED,                      THE FIRING MECHANISM HAD WORN PARTS 9/23/2010               202      FSCATT M109A5
               PARTS USED: HT0329, 1EA / HT0330, 1EA. /           CAUSING MISFIRES
               HT0225, 1EA.
         13578 1. THE PIN WAS REPLACED, PART USED:                1. THE SRING PIN ON THE FOOT REST WAS         9/23/2010     401      FSCATT M109A6
               HT1207, 1EA. 2. THE SWUTCHES WERE                  BROKEN. 2. TWO BREECH OPEN/CLOSED
               REPLACED, PARTS USED: HT0799, 2EA.                 SWITCHES WERE BROKEN.

         13579 1. THE HARDWARE WAS REPLACED, PARTS 1. HARDWARE ON THE RAMMER ASSEMBLY 9/23/2010                               403      FSCATT M109A6
               USED: HT0580, 2EA. 2. THE SPRING WAS WAS BROKEN. 2. A TRANSFER TROUGH
               REPLACED, PART USED: HT0337, 1EA.    SPRING WAS BROKEN.

         13580 THE HARDWARE WAS REPLACED, PARTS                   THE AMMUNITION EXTRACTION SYSTEM              9/23/2010     402      FSCATT M109A6
               USED: HT0409, 2EA. / HT0547, 2EA. / HT0622,        HAD WORN HARDWARE.
               1EA. / HT0883 1EA.
         13581 Repaired wireing for cable. Job complete.          FOWO#13269.SSB0022/STA 7/2.Frayed wires       9/23/2010     null
               Returning to ASL. Line# IC051                      on CVC helmet.
         13582 Replaced Mouse on the Instructor Control.          The Mouse on the Instructor Control is not    9/24/2010   C30-001    CFFT 1:30
               CF033.                                             functioning.
         13583 Replaced with spare lamp (ASL CF015).              Epson Projector Lamp needs replacement.       9/24/2010   C30-011    CFFT 1:30
         13584 Replaced with spare lamp (ASL CF015).              Epson Projector Lamp needs replacement.       9/24/2010   C30-001    CFFT 1:30
         13585 When the computer was first turned on the Hard     Battlefield Image Generator Channel 1's SIM   9/24/2010     null
               drive was unable to be read. Swapped the SATA      Network Card is non-functional.
               cables with the Optical drive. SIM network error
               was unable to be duplicated. Tests good.
               Returned to ASL. this is a follow up to 13472.

         13586 Performed monthly PMCS -cleaned station--                                                        9/26/2010              FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                Instructor Station
               cleaned network systems, communications
               systems, and black box-
         13587 Performed monthly PMCS -cleaned station--                                                        9/26/2010              FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                Instructor Station
               cleaned network systems, communications
               systems, and black box-


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 48
        WO #                   Repair Notes               Problem        Date      Serial #          Description
        13588 Performed monthly PMCS -cleaned station--              9/26/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13589 Performed monthly PMCS -cleaned station--              9/26/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13590 Performed monthly PMCS -cleaned station--              9/26/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13591 Performed monthly PMCS -cleaned station--              9/26/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13592 Performed monthly PMCS -cleaned station--              9/26/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13593 Performed monthly PMCS -cleaned station--              9/26/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13594 Performed monthly PMCS -cleaned station--              9/26/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13595 Performed monthly PMCS -cleaned station--              9/26/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13596 Performed monthly PMCS -cleaned station--              9/26/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13597 Performed monthly PMCS -cleaned station--              9/26/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13598 Performed monthly PMCS -cleaned station--              9/26/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13599 Performed monthly PMCS -cleaned station--              9/26/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13600 Performed monthly PMCS -cleaned station--              9/26/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13601 Performed monthly PMCS -cleaned station--              9/26/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13602 Performed monthly PMCS -cleaned station--              9/26/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13603 Performed monthly PMCS -cleaned station--              9/26/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13604 Performed monthly PMCS -cleaned station--              9/26/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13605 Performed monthly PMCS -cleaned station--              9/26/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13606 Performed monthly PMCS -cleaned station--              9/26/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13607 Performed monthly PMCS -cleaned station--              9/26/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13608 Performed monthly PMCS -cleaned station--              9/26/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13609 Performed monthly PMCS -cleaned station--              9/26/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                   Page 49
        WO #                     Repair Notes                                         Problem                          Date         Serial #         Description
        13610 Performed monthly PMCS -cleaned station--                                                            9/26/2010     E110012V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13611 Performed monthly PMCS -cleaned station--                                                            9/26/2010     E110012V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13612 Performed monthly PMCS -cleaned station--                                                            9/26/2010     E110013V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13613 Performed monthly PMCS -cleaned station--                                                            9/26/2010     E110013V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13614 Performed monthly PMCS -cleaned station--                                                            9/26/2010     E110014V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13615 Performed monthly PMCS -cleaned station--                                                            9/26/2010     E110014V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                         Instructor Station
              cleaned network systems, communications
              systems, and black box-
        13616 null                                                                                                 9/26/2010         301       IMTS
        13617 null                                                                                                 9/26/2010         302       IMTS
        13618                                                                                                      9/26/2010          1        MLRS Mockup
        13619                                                                                                      9/26/2010          2        MLRS Mockup
        13620                                                                                                      9/26/2010          3        MLRS Mockup
        13621                                                                                                      9/26/2010          4        MLRS Mockup
        13622 Reconfigured the Right side Projector. No parts   BAttlefield IG #1's display is all red.            9/27/2010       C30-020     CFFT 1:30
              used.
        13623 Repaired using spare parts on hand.Changed out    FOWO#13016. Missing Retaining screw on NIDQ 9/27/2010                null
              standoff from 2/56 to 4/40. Job                   ribbon cable assy.Recieved from ASL
              Complete.Returning to ASL.                        Line#AT009.
        13624 Shipped replacment Student Control                Student Control is not will not function properly    9/27/2010     C12-306     CFFT 1:12 Increment 2
              (2CF026)and replacement Student Control spare     with the rest of the system. Displaying a rad error.
              hard drive (2CF018).
        13625 Need to order:screwlock (20ea.)and jack screw     FOWO#M13623 Parts needed: to repair cable          9/27/2010         null
              kit (10ea.) received parts. job complete.         assembly (NIDQ ribbon connector)

         13626 Replaced Stealth Image Generator                 Stealth Image Generator continously freezes up     9/27/2010       C30-020     CFFT 1:30
                                                                image.
         13627   Adjusted the Hor position and Hor size         Instructor LCD would move 1 1/2" to the right      9/27/2010         123       STPT Instructor Station
                                                                when the student station icon was selected
         13628   Rebooted System. Ran scenario. Issue resolved. System locked up.                                  9/27/2010        IS001      SOT
                 Job complete.
         13629   Performed system shutdown and restart          System not responding to command inputs.           9/28/2010     E110012V8OP   FFROT AN/TPQ-36 (V8)
                 procedures.                                                                                                                   Instructor Station
         13630   Replaced EVO Lamp. (ASL CF058).                EVO Projector lamp needs replacing.                9/28/2010       C30-020     CFFT 1:30
         13631   Replaced broken back plain connector.          Broken back plain connector (wire wrap)            9/28/2010     114B0001M37   FIMT
         13632   TROUBLESHOOTING REVEALED THAT A                WEAPON HAS AN ELEVATION PROBLEM AND                9/28/2010      0149USMC     STPT Student Station
                 WIRE GOING TO THE BATTERY SWITCH WAS WILL NOT PASS THE PERFORMANCE TEST
                 BROKEN; IT WAS RE-SOLDERED TO
                 CORRECT THE PROBLEM. THE TRACKER
                 (IC2) WAS REPLACED TO CORRECT THE
                 ELEVATION PROBLEM. THE TRACKER WILL
                 BE SENT TO INTERSENSE FOR REPAIR.
                 RECEIVED REPAIRED TRACKER BACK FROM
                 INTERSENSE 10/20/10
         13633 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                                201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13634 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                                202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13635 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                                203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13636 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                                204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13637 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                                205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 50
        WO #                Repair Notes                           Problem                     Date                              Serial #       Description
        13638 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                               206      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13639 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                              401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13640 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                              402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13641 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                              403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13642 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 9/29/2010                              406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13643 Re-seated CMOS battery, RAM, Video Adaptor,        Stealth Image Generator is not providing a         9/29/2010   C30-020    CFFT 1:30
               and network adaptor. Tested system multiple        display to the monitor.
               times.
         13644 THE FOLLOWING PARTS WERE SENT:                     FSCATT: FORT BLISS, TX. REQUESTED THE              9/29/2010     null
               HT0734, 2EA. / HT0735, 2EA. / HT0739, 1EA. /       FOLLOWING PARTS FROM FORT SILL, OK.
               HT0799, 2EA.                                       FOR ASL REPLENISHMENT: FIRING LOCK
                                                                  SWITCHES, 2EA. / PRIMER INSERT
                                                                  SWITCHES, 2EA. / FRONT/REAR LIMIT
                                                                  SWITCH, 1EA. / BREECH OPEN/CLOSED
                                                                  SWITCHES, 2EA.
         13645 Reloaded Windows XP, installed all drivers and      This is a follow-up to 13626. Stealth Image       9/29/2010     null
               reinstalled the Fidelity software. No Parts needed. Generator continously freezes up image.
               Tested good. Returned to ASL
         13646 Reseated video adaptor. Retested multiple times. Battlefield Image Generator#2 will not provide       9/29/2010     null
                                                                   image to projector.
         13647 COMPLETED QUARTERLY PMCS, NO                        QUARTERLY PMCS                                    9/29/2010     301      IMTS
               PR0BLEMS NOTED
         13648 Could not duplicate error. Test, Returned to ASL. Enhanced Yuma Student Station #3 will not           9/29/2010     null
               no parts used.                                      display an image.
         13649 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     201      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13650 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     202      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13651 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     203      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13652 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     204      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13653 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     205      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13654 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     206      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13655 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     401      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13656 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     402      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13657 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     403      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13658 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                    9/29/2010     406      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13659 Boom Controller cable diagnosed as bad. Right       Boom/Hoist Assembly would not respond to IOS      9/30/2010      3       MLRS Mockup
               boom and hoist control cables where not             or Boom Controller commands.
               connected properly.
         13660 W340 cable diagnosed as bad and replaced from Left Jurry Strut switch not responding correctly.       9/30/2010      2       MLRS Mockup
               ASL.
         13661                                                     Semi-Annual                                       9/30/2010      2       HIMARS HPU
         13662 Closed in error.                                    Contacted by Richard Wisniewski CIV USA           9/30/2010     183      STPT Instructor Station
                                                                   IMCOM via email on 09/28/2010 to make
                                                                   arrangments for repair service on STPT training
                                                                   equipment.Shipping address:Western Region
                                                                   Training Support Center Bldg 1401 W 6TH ST
                                                                   Joint Base Lewis McChord, WA 98433-9500.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 51
        WO #                      Repair Notes                                       Problem                            Date       Serial #         Description
        13663 Closed in error.                                    Contacted by Richard Wisniewski CIV USA           9/30/2010        142       STPT Instructor Station
                                                                  IMCOM via email on 09/28/2010 to make
                                                                  arrangments for repair service on STPT training
                                                                  equipment.Shipping address:Western Region
                                                                  Training Support Center Bldg 1401 W 6TH ST
                                                                  Joint Base Lewis McChord, WA 98433-9500.

         13664 Closed in error.                                   Contacted by Richard Wisniewski CIV USA           9/30/2010      92-172      STPT
                                                                  IMCOM via email on 09/28/2010 to make
                                                                  arrangments for repair service on STPT training
                                                                  equipment.Shipping address:Western Region
                                                                  Training Support Center Bldg 1401 W 6TH ST
                                                                  Joint Base Lewis McChord, WA 98433-9500.

         13665 *NOTE* - AS OF 27 Sep 10: This trainer is no         The compass on the Battlefield screen is roughly 10/1/2010      C-029      CFFT 1:12
               longer in Romania as it is in the transition phase 250 mils off-center.
               of being exchanged for the new Increment 2
               system. Until it is time to actually ship the system
               back to the states, it is now in service in Vilseck
               (as their system is packed up and being prepared
               to be shipped out). 30 Sep 10 - Troubleshooting
               the system revealed that nothing was wrong with
               the projector and that the problem is originating
               from the Battlefield Image Generator (IG). After
               reloading all of the Battlefield IG software, the
               problem was corrected and no other problems
               were found.



         13666 30 Sep 10 - Replaced the dead CMOS battery         The SAF computer will not boot.                   10/1/2010       C-029      CFFT 1:12
               with one obtained locally at no charge. Restored
               the default CMOS settings. Cleaned all of the
               motherboard contacts on the RAM module and
               the Video card. No other problems were found.

         13667 closing work order was a duplicate from work       Order supplies to build 10 each J5 Data cables to 10/1/2010        null
               order# 14585                                       add to the ADA ASL.
         13668 Performed power down and restart procedures.       System not responding to command inputs.          10/1/2010    E110006V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         13669 Unlocked Root account, reinstalled Video Driver. SAF has lost nVidia driver.                         10/1/2010        null
               Cloned a new Hard Drive and placed in
               removable case (ASL 2CF018 and 2CF031).
               Replaced Chassis Handles (ASL CF098). Tested,
               shipped back to site.
         13670 Performed shutdown and restart procedures.         System not responding to command inputs.          10/1/2010    E110011V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         13671 Replaced Stealth IG (ASL CF063).                  Stealth IG is having video issues.                 10/1/2010      C30-020     CFFT 1:30
         13672 Replaced the video card(CF 114) to resolve        Stealth IG is having video issues.                 10/1/2010        null
               issue. Tested, Return to ASL.
         13673 Verified cabling, removed and reseated hard drive RCC will not boot up                               10/1/2010    E110001V8IS   FFROT AN/TPQ-36 (V8)
               and restarted system.                                                                                                           Instructor Station
         13674 Maintenance done                                                                                     10/3/2010       FOX1       NBCRS FOX
                                                                                                                                               SIMULATOR
         13675 PMCS done                                                                                            10/3/2010       FOX2       NBCRS FOX
                                                                                                                                               SIMULATOR
         13676 PMCS done                                                                                            10/3/2010      FOXIS1      NBCRS FOX
                                                                                                                                               SIMULATOR
         13677 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                                201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13678 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                                202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13679 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                                203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13680 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                                204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13681 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                                205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13682 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                                206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 52
        WO #                Repair Notes                           Problem                     Date                               Serial #       Description
        13683 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                                401      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13684 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                               402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13685 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                               403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13686 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/4/2010                               406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13687                                                       QUARTERLY PRIVENTIVE MAINTENANCE                 10/4/2010     301      IMTS
                                                                     CHECKS
         13688   Discovered that it was an operator error. A proper Student Station viewpoint is different from the   10/4/2010   C30-026    CFFT 1:30
                 viewpoint was created on the Instructor station for Battlefield and Stealth viewpoints.
                 the operator to use.
         13689   THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               10/4/2010     202      FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                           GUNTUBE.
         13690   THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               10/4/2010     205      FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                           GUNTUBE.
         13691   THE RAMMER CYLINDER WAS PUT BACK IN DUE TO STUDENT ERROR, THE RAMMER                                 10/4/2010     203      FSCATT M109A5
                 THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
                 REBOOTED AND TEST FIRED.                            POSITION.
         13692   THE RAMMER CYLINDER WAS PUT BACK IN DUE TO STUDENT ERROR, THE RAMMER                                 10/4/2010     205      FSCATT M109A5
                 THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
                 REBOOTED AND TEST FIRED.                            POSITION.
         13693   THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               10/4/2010     402      FSCATT M109A6
                 REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                           GUNTUBE.
         13694   THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE               10/4/2010     403      FSCATT M109A6
                 REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                                           GUNTUBE.
         13695   THE GUNTUBE WAS PUT BACK INTO                       DUE TO STUDENT ERROR, THE GUNTUBE                10/4/2010     406      FSCATT M109A6
                 BATTERY, SYSTEM WAS REBOOTED AND                    DID NOT RETURN INTO BATTERY AFTER
                 TEST FIRED.                                         FIRE MISSION.
         13696   Performed Preventive Maintenance. Performed         PREVENTIVE MAINTENANCE CHECKS                    10/4/2010     407      FSCATT M109A6
                 Service Checks and Lubercation points.
                 Performed test Manuel Action Commands for
                 proper operations. Completed FSCATT PMCS.

         13697 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     201      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13698 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     202      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13699 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     203      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13700 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     204      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13701 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     205      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13702 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     206      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         13703 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     401      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13704 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     402      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13705 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     403      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13706 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     10/4/2010     406      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         13707 1. THE HCT WAS ENERGIZED AND VERIFIED               STUDENT TRAINING: 1. SYSTEM STARTUP 2.             10/5/2010     201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND                SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 53
        WO #                Repair Notes                           Problem                     Date                             Serial #        Description
        13708 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                              202       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13709 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13710 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13711 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13712 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13713 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13714 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13715 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13716 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/5/2010                             406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13717 Replaced broken pin with salvaged pin from       CM - radar card rack simulation - card 4 pin 23   10/5/2010   114B0001M37   FIMT
               junked radar card.                               broken.
         13718 RECEIVED SWITCHES, 100EA., ADDED TO              FSCATT IS AT THE REORDER POINT FOR                10/5/2010       null
               ASL                                              THE FOLLOWING PART: SWITCH,
                                                                PUSHBUTTON, P/N: 94F2571 (NEWARK)
                                                                100EA.
         13719 Shipped Replacement Battlefield IG #1 to site.   Battlefield IG #1 will not boot.                  10/5/2010     C30-006     CFFT 1:30
               CF107.
         13720 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                10/5/2010       201       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13721 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                10/5/2010       203       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13722 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                  10/5/2010       206       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         13723 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                  10/5/2010       202       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         13724 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                10/5/2010       204       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13725 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                10/5/2010       401       FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         13726 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                10/5/2010       406       FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 54
        WO #                   Repair Notes                              Problem                                     Date    Serial #        Description
        13727 FOWO#13509.Parts needed to repair AT3 base FOWO#13509.Parts needed to repair Testbed.              10/5/2010     null
              Testbed. Recieved from ASL:DVD ln#AT072,
              graphic card ln#AT070, motherboard ln#AT067,
              power supply ln#AT069, memory ln#AT065, hard
              drive ln#AT045, controller card ln#AT073, cpu
              ln#AT066. Job Complete.

         13728 Shipped replacement Shuttle SAF (ASL CF31).     SAF has no video.                                 10/5/2010    C-020     CFFT 1:12

         13729 Reseated video card in Battlefield computer.   No Battlefield scene.                              10/5/2010   C12-324    CFFT 1:12 Increment 2
               System checked out fine. Down @ 1100 Up @
               1200
         13730 Reattached loose heatsink. Start 1200 End 1215 There is a loose part inside the Student Control   10/5/2010   C4-313     CFFT 1:4 Increment2
                                                              computer.
         13731 THE RAMMER CYLINDER WAS PUT BACK IN DUE TO STUDENT ERROR, THE RAMMER                              10/5/2010     402      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                       POSITION.
         13732 THE RAMMER CYLINDER WAS PUT BACK IN DUE TO STUDENT ERROR, THE RAMMER                              10/5/2010     403      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                       POSITION.
         13733 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     201      FSCATT M109A5
               CONDUCTED.                                     SHUTDOWN
         13734 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     202      FSCATT M109A5
               CONDUCTED.                                     SHUTDOWN
         13735 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     203      FSCATT M109A5
               CONDUCTED.                                     SHUTDOWN
         13736 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     204      FSCATT M109A5
               CONDUCTED.                                     SHUTDOWN
         13737 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     205      FSCATT M109A5
               CONDUCTED.                                     SHUTDOWN
         13738 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     206      FSCATT M109A5
               CONDUCTED.                                     SHUTDOWN
         13739 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     401      FSCATT M109A6
               CONDUCTED.                                     SHUTDOWN
         13740 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     402      FSCATT M109A6
               CONDUCTED.                                     SHUTDOWN
         13741 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     403      FSCATT M109A6
               CONDUCTED.                                     SHUTDOWN
         13742 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                     10/5/2010     406      FSCATT M109A6
               CONDUCTED.                                     SHUTDOWN
         13743 Guam CFFT Ser#C4-229. System will not fully    System will not fully boot.                        10/6/2010     null
               boot. Talked the National Guard POC through
               setup and boot process of the CFFT.
         13744 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                      10/6/2010     201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13745 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                          202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13746 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                          203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13747 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                          204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13748 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                          205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13749 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                          206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13750 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                          401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13751 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                          402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                            Page 55
        WO #                Repair Notes                           Problem                     Date                            Serial #       Description
        13752 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                             403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13753 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/6/2010                            406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13754 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER                  10/6/2010     201      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         13755 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                10/6/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         13756 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER                  10/6/2010     406      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         13757 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE                 10/6/2010     402      FSCATT M109A6
               BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                       FIRE MISSION.
         13758 Closed in error.                                  Contacted by Richard Wisniewski CIV USA           10/6/2010   92-265     STPT Student
                                                                 IMCOM via email on 09/28/2010 to make
                                                                 arrangments for repair service on STPT training
                                                                 equipment.Shipping address:Western Region
                                                                 Training Support Center Bldg 1401 W 6TH ST
                                                                 Joint Base Lewis McChord, WA 98433-9500.

         13759 Found bad network end on connection going to      Lost communication between mockup and             10/6/2010      1       MLRS Mockup
               the computer in the VMIC. Repaired the            instructor station.
               connector and everything checked out.
         13760 Discovered that the CFFT operator did not power   Licensing error message is displayed on the       10/6/2010   C30-026    CFFT 1:30
               up the trainer in the proper sequence. Showed     Battlefield scene.
               the operator the proper power up sequence.

         13761 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     201      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         13762 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     202      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         13763 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     203      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         13764 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     204      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         13765 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     205      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         13766 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     206      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         13767 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     401      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         13768 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     402      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         13769 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     403      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         13770 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                    10/6/2010     406      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         13771 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2.            10/7/2010     201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND              SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13772 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/7/2010                            202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13773 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/7/2010                            203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13774 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/7/2010                            204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         13775 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/7/2010                            205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 56
        WO #                Repair Notes                           Problem                     Date                                       Serial #         Description
        13776 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/7/2010                                        206        FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         13777 Replaced touchscreen w/ one from ASL                 Touchscreen dead spots.                               10/7/2010         2-4        RT3
               ln#RT006. Job complete.
         13778 Reseated all internal components. Boots up           Battlefield #2 computer is taking longer than         10/7/2010      C30-026       CFFT 1:30
               normally now.                                        normal to boot.
         13779 CONFIRMED DEADSPOTS RETURN TO                        TOUCHSCREEN HAS DEADSPOTS                             10/7/2010         null
               VENDOR FOR REPAIR. PO 85745 Recieved
               from vendor from repair returning to asl line item
               #RT006
         13780 THE GUNTUBE WAS PUT BACK INTO                        DUE TO STUDENT ERROR, THE GUNTUBE                     10/7/2010         201        FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                     DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                          FIRE MISSION.
         13781 THE RAMMER CYLINDER WAS PUT BACK IN                  DUE TO STUDENT ERROR, THE RAMMER                      10/7/2010         204        FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                      CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                             POSITION.
         13782 The errors were unable to be duplicated. No parts    This is a follow-up to 13624. Student Control is      10/7/2010         null
               needed. Returned to ASL.                             not will not function properly with the rest of the
                                                                    system. Displaying a rad error.
         13783 THE SWITCHES WERE FABRICATED WITH                    FSCATT: SUPPLY REQUESTED FABRICATION                  10/7/2010         null
               THE FOLLOWING PARTS: HT0867, 20EA. /                 OF 20EA. FIRING LOCK SWITCHES (HT0734)
               HT0927, 40EA. / HT0961, 20EA. AND ADDED
               TO ASL.
         13784 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                        10/7/2010         201        FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         13785 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                        10/7/2010         202        FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         13786 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                        10/7/2010         203        FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         13787 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                        10/7/2010         204        FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         13788 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                        10/7/2010         205        FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         13789 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                        10/7/2010         206        FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         13790 Replaced with laserjet 4050.                         Removed deskjet printer.                              10/8/2010    ISB0005/STA 6   ICOFT Instructor Station

         13791 Found that the Safety & Actuator Lever was           The THT was losing tone                               10/8/2010         301        IMTS
               always actived on the THT gripstock SN 200402
               and the THT battery would not seat correctly.
               Adjusted the Safety lever contact and filed the
               ridges on the battery
         13792 Found that the Safety lever was always active.       The THT would not activate                            10/8/2010         301        IMTS
               Adjusted the lever contact.
         13793 Replaced projector lamp with one from ASL. The       Projector #13 would not power-up                      10/8/2010         301        IMTS
               projector powered-up
         13794 Found that the Tick had lost it's program.           The THTs could not communcate with the                10/8/2010         301        IMTS
               Replaced the Tick with one from ASL. Re-             InterSense
               programed the old Tick and put in ASL.
         13795 Sending out a replacement USB keyboard.              PS2 keyboard will not work on the replacement         10/8/2010        C-020       CFFT 1:12
               (CF090)                                              SAF
         13796 null                                                                                                       10/10/2010       FOX1        NBCRS FOX
                                                                                                                                                       SIMULATOR
         13797 null                                                                                                       10/10/2010       FOX1        NBCRS FOX
                                                                                                                                                       SIMULATOR
         13798 null                                                                                                       10/10/2010       FOX2        NBCRS FOX
                                                                                                                                                       SIMULATOR
         13799 PMCS Completed.                                                                                            10/10/2010       FOX2        NBCRS FOX
                                                                                                                                                       SIMULATOR
         13800 PMCS Completed.                                                                                            10/10/2010      FOXIS1       NBCRS FOX
                                                                                                                                                       SIMULATOR
         13801 PMCS Completed.                                                                                            10/10/2010      FOXIS1       NBCRS FOX
                                                                                                                                                       SIMULATOR
         13802 Performed all operational checks. Checked                                                                  10/10/2010     ISB0001       ICOFT Instructor Station
               cables and connections for wear and breakage.
               Performed DRC.
         13803 Performed all operational checks. Checked                                                                  10/10/2010     SSB0002       ICOFT Student Station
               cables and connections for wear and breakage.
               Performed DRC.
         13804 Performed all operational checks. Checked                                                                  10/10/2010     SSB0003       ICOFT Student Station
               cables and connections for wear and breakage.
               Performed DRC.
         13805 WO created in error. Duplicate of # 14267.                                                                 10/10/2010     SSB0004       ICOFT Student Station
         13806 Trainers assigned and located to North Dakota.                                                             10/10/2010     SSB0028       ICOFT Student Station

         13807 null                                                                                                       10/10/2010                   FFROT AN/TPQ-36 (V8)
                                                                                                                                                       Instructor Station
         13808 Performed all operational checks. Checked                                                                  10/10/2010        17         STPT Instructor Station
               cables and connections for wear and
               breakage.Performed DRC.
         13809 PMCS - Clean, inspect training system.                                                                     10/10/2010      ETIOS1       SMT ETRAC
         13810 PMCS - Clean, inspect training system.                                                                     10/10/2010      ETSS9        SMT ETRAC
         13811 PMCS - Clean, inspect training system.                                                                     10/10/2010      ETSS1        SMT ETRAC
         13812 PMCS - Clean, inspect training system.                                                                     10/10/2010      ETSS2        SMT ETRAC
         13813 PMCS - Clean, inspect training system.                                                                     10/10/2010      ETSS3        SMT ETRAC


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 57
        WO #                      Repair Notes                 Problem        Date         Serial #           Description
        13814    PMCS - Clean, inspect training system.                   10/10/2010       ETSS4        SMT ETRAC
        13815    PMCS - Clean, inspect training system.                   10/10/2010       ETSS5        SMT ETRAC
        13816    PMCS - Clean, inspect training system.                   10/10/2010       ETSS6        SMT ETRAC
        13817    PMCS - Clean, inspect training system.                   10/10/2010       ETSS7        SMT ETRAC
        13818    PMCS - Clean, inspect training system.                   10/10/2010       ETSS8        SMT ETRAC
        13819    PMCS - Clean, inspect training system.                   10/10/2010       ETSS9        SMT ETRAC
        13820    Performed monthly PMCS -cleaned station--                10/10/2010     E110001V8IS    FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13821   Performed monthly PMCS -cleaned station--                10/10/2010     E110002V8IS    FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13822   Performed monthly PMCS -cleaned station--                10/10/2010    E110003V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13823   Performed monthly PMCS -cleaned station--                10/10/2010    E110004V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13824   Performed monthly PMCS -cleaned station--                10/10/2010    E110005V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13825   Performed monthly PMCS -cleaned station--                10/10/2010    E110006V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13826   Performed monthly PMCS -cleaned station--                10/10/2010    E110007V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13827   Performed monthly PMCS -cleaned station--                10/10/2010    E110008V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13828   Performed monthly PMCS -cleaned station--                10/10/2010    E110009V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13829   Performed monthly PMCS -cleaned station--                10/10/2010    E110010V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13830   Performed monthly PMCS -cleaned station--                10/10/2010    E110011V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13831   Performed monthly PMCS -cleaned station--                10/10/2010    E110012V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13832   Performed monthly PMCS -cleaned station--                10/10/2010    E110013V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13833   Performed monthly PMCS -cleaned station--                10/10/2010    E110014V8OP     FFROT AN/TPQ-36 (V8)
                 performed map registrations--checked and                                               Instructor Station
                 cleaned network systems, communications
                 systems, and black box-
         13834   PMCS - Clean and inspect.                                10/10/2010     114B0001IS     FIMT
         13835   PMCS - None, Programmer takes care of this               10/10/2010    114B0009SSC     FIMT
                 equipment
         13836   PMCS - Clean, inspect and test.                          10/10/2010     114B0001M37    FIMT
         13837   PMCS - Clean, inspect and test.                          10/10/2010     114B0002M37    FIMT
         13838   PMCS - Clean, inspect and test.                          10/10/2010     114B0003M37    FIMT
         13839   PMCS - Clean, inspect and test.                          10/10/2010     114B0004M37    FIMT
         13840                                                            10/10/2010     114B0005M36    FIMT
         13841                                                            10/10/2010     114B0006M36    FIMT
         13842                                                            10/10/2010     114B0007M36    FIMT
         13843                                                            10/10/2010     114B0008M36    FIMT
         13844 PMCS - Clean and inspect                                   10/10/2010    114D0001SMTIS   SMT Student Station
         13845 PMCS - Do not touch. Software Developers                   10/10/2010   114D0006SMTSSC   SMT Student Station
               system.
         13846 PMCS - Clean, inspect and test.                            10/10/2010    114D0002SMT     SMT Student Station
         13847 PMCS - Clean, inspect and test.                            10/10/2010    114D0003SMT     SMT Student Station
         13848 PMCS - Clean, inspect and test.                            10/10/2010    114D0004SMT     SMT Student Station
         13849 PMCS - Clean, inspect and test.                            10/10/2010    114D0005SMT     SMT Student Station
         13850 null                                                       10/10/2010       91-066B      STPT Student Station
         13851 Performed all operational checks. Checked                  10/10/2010          16        STPT Instructor Station
               cables and connections for wear and breakage.

         13852 Performed all operational checks. Checked                  10/10/2010         20         STPT Instructor Station
               cables and connections for wear and
               breakage.Performed DRC.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                        Page 58
        WO #                    Repair Notes                    Problem        Date     Serial #        Description
        13853 Performed all operational checks. Checked                    10/10/2010     22       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13854 Performed all operational checks. Checked                    10/10/2010     23       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13855 Performed all operational checks. Checked                    10/10/2010     32       STPT Instructor Station
              cables and connections for wear and
              breakage.Correction: Should be SN #39. Not on
              PUMA List
        13856 Performed all operational checks. Checked                    10/10/2010     18       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.Should be SN #28. Not
              on list.
        13857 erformed all operational checks. Checked cables              10/10/2010     43       STPT Instructor Station
              and connections for wear and
              breakage.Performed DRC.Correction: Should be
              SN 38. Not on PMCS list.
        13858 null                                                         10/10/2010   92-293B    STPT Student Station
        13859 null                                                         10/10/2010   92-306B    STPT Student Station
        13860 Performed all operational checks. Checked                    10/10/2010      44      STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.Correction: Should be
              SN #36. Not on list.
        13861 Performed all operational checks. Checked                    10/10/2010     45       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.Correction: Should be
              SN #40. Not on list.
        13862 Performed all operational checks. Checked                    10/10/2010     50       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.Correction : Should be S/N 49.
              Not on list.
        13863 Performed all operational checks. Checked                    10/10/2010     51       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13864 Performed all operational checks. Checked                    10/10/2010     52       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13865 Performed all operational checks. Checked                    10/10/2010     53       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13866 Performed all operational checks. Checked                    10/10/2010     54       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13867 Performed all operational checks. Checked                    10/10/2010     58       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13868 Performed all operational checks. Checked                    10/10/2010     57       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13869 Performed all operational checks. Checked                    10/10/2010     62       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13870 Performed all operational checks. Checked                    10/10/2010     69       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13871 Performed all operational checks. Checked                    10/10/2010     59       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13872 Performed all operational checks. Checked                    10/10/2010     60       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13873 Performed all operational checks. Checked                    10/10/2010     63       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13874 Performed all operational checks. Checked                    10/10/2010     64       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13875 Performed all operational checks. Checked                    10/10/2010     66       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13876 Performed all operational checks. Checked                    10/10/2010     61       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13877 Performed all operational checks. Checked                    10/10/2010     71       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13878 Performed all operational checks. Checked                    10/10/2010     67       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13879 Performed all operational checks. Checked                    10/10/2010     89       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13880 Performed all operational checks. Checked                    10/10/2010     81       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                         Page 59
        WO #                   Repair Notes                   Problem        Date     Serial #        Description
        13881 Performed all operational checks. Checked                  10/10/2010     73       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13882 Performed all operational checks. Checked                  10/10/2010     74       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13883 Performed all operational checks. Checked                  10/10/2010     75       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13884 Performed all operational checks. Checked                  10/10/2010     72       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13885 Performed all operational checks. Checked                  10/10/2010     80       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13886 Performed all operational checks. Checked                  10/10/2010     78       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13887 Performed all operational checks. Checked                  10/10/2010     79       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13888 Performed all operational checks. Checked                  10/10/2010     82       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13889 Performed all operational checks. Checked                  10/10/2010     83       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13890 Performed all operational checks. Checked                  10/10/2010     85       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13891 Performed all operational checks. Checked                  10/10/2010     88       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13892 Performed all operational checks. Checked                  10/10/2010     93       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13893 Performed all operational checks. Checked                  10/10/2010     84       STPT Instructor Station
              cables and connections for wear and
              breakage.Performed DRC.
        13894 Performed all operational checks. Checked                  10/10/2010     86       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13895 Performed all operational checks. Checked                  10/10/2010     87       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13896 Performed all operational checks. Checked                  10/10/2010     90       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13897 Performed all operational checks. Checked                  10/10/2010     92       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13898 Performed all operational checks. Checked                  10/10/2010     91       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13899 Performed all operational checks. Checked                  10/10/2010     104      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13900 Performed all operational checks. Checked                  10/10/2010     95       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13901 Performed all operational checks. Checked                  10/10/2010     99       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13902 Performed all operational checks. Checked                  10/10/2010     94       STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13903 Performed all operational checks. Checked                  10/10/2010     100      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13904 Performed all operational checks. Checked                  10/10/2010     106      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13905 Performed all operational checks. Checked                  10/10/2010     103      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13906 Performed all operational checks. Checked                  10/10/2010     101      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13907 Performed all operational checks. Checked                  10/10/2010     102      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13908 Performed all operational checks. Checked                  10/10/2010     107      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13909 Performed all operational checks. Checked                  10/10/2010     108      STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                       Page 60
        WO #                     Repair Notes                    Problem        Date         Serial #            Description
        13910 Performed all operational checks. Checked                     10/10/2010         25           STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13911 Checked cables and connections.Ran DRC.                       10/10/2010        IS001         SOT
        13912 Checked cables and connections.Ran DRC.                       10/10/2010        IS002         SOT
        13913 Checked cables and connections.Ran DRC.                       10/10/2010        SS001         SOT
        13914 Checked cables and connections.Ran DRC.                       10/10/2010        SS002         SOT
        13915 Checked cables and connections.Ran DRC.                       10/10/2010        SS003         SOT
        13916 Checked cables and connections.Ran DRC.                       10/10/2010        SS004         SOT
        13917 Checked cables and connections.Ran DRC.                       10/10/2010        SS005         SOT
        13918 Checked cables and connections.Ran DRC.                       10/10/2010        SS006         SOT
        13919 Created in error. Duplicate of WO #14268.                     10/10/2010       SSB0005        ICOFT Student Station
        13920 Checked cables and connections.Ran DRC.                       10/10/2010        IS001         JTIDS
        13921 Checked cables and connections.Ran DRC.                       10/10/2010         SS-1         JTIDS
        13922 Checked cables and connections.Ran DRC.                       10/10/2010         SS-2         JTIDS
        13923 Checked cables and connections.Ran DRC.                       10/10/2010         SS-3         JTIDS
        13924 Checked cables and connections.Ran DRC.                       10/10/2010         SS-4         JTIDS
        13925 Checked cables and connections.Ran DRC.                       10/10/2010         SS-5         JTIDS
        13926 Checked cables and connections.Ran DRC.                       10/10/2010         SS-6         JTIDS
        13927 Checked cables and connections.Ran DRC.                       10/10/2010         SS-7         JTIDS
        13928 Checked cables and connections.Ran DRC.                       10/10/2010    ISB0004/STA 5     ICOFT Instructor Station

         13929 Checked cables and connections.Ran DRC.                      10/10/2010    ISB0005/STA 6     ICOFT Instructor Station

         13930 Checked cables and connections.Ran DRC.                      10/10/2010    ISB0006/STA 7     ICOFT Instructor Station

         13931   Checked cables and connections.Ran DRC.                    10/10/2010   SSA0001/STA 7/1    ICOFT Student Station
         13932   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0008/STA 5/6    ICOFT Student Station
         13933   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0009/ STA 5/5   ICOFT Student Station
         13934   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0010/STA 5/4    ICOFT Student Station
         13935   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0011/STA 5/3    ICOFT Student Station
         13936   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0012/STA 5/2    ICOFT Student Station
         13937   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0013/STA 5/1    ICOFT Student Station
         13938   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0016/STA 6/1    ICOFT Student Station
         13939   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0017/STA 6/2    ICOFT Student Station
         13940   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0018/STA 6/3    ICOFT Student Station
         13941   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0019/STA 6/4    ICOFT Student Station
         13942   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0020/STA 6/5    ICOFT Student Station
         13943   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0021/STA 6/6    ICOFT Student Station
         13944   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0022/STA 7/2    ICOFT Student Station
         13945   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0023/STA 7/3    ICOFT Student Station
         13946   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0024/STA 7/4    ICOFT Student Station
         13947   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0025/STA 7/5    ICOFT Student Station
         13948   Checked cables and connections.Ran DRC.                    10/10/2010   SSB0026/STA 7/6    ICOFT Student Station
         13949   Assigned to and located in North Dakota.                   10/10/2010       ISB0007        ICOFT Instructor Station

         13950 Performed all operational checks. Checked                    10/10/2010       92-138A        STPT Student Station
               cables and connections for wear and breakage.
               Performed DRC.
         13951 Performed all operational checks. Checked                    10/10/2010       92-236A        STPT Student Station
               cables and connections for wear and breakage.
               Performed DRC.
         13952 Performed all operational checks. Checked                    10/10/2010       92-295A        STPT Student Station
               cables and connections for wear and breakage.
               Performed DRC.
         13953 Performed all operational checks. Checked                    10/10/2010       92-251A        STPT Student Station
               cables and connections for wear and breakage.

         13954 Located at Snow Hall. Performed all operational              10/10/2010       92-310A        STPT Student Station
               checks. Checked cables and connections for
               wear and breakage.Performed DRC.

         13955 Performed all operational checks. Checked                    10/10/2010       91-012A        STPT Student Station
               cables and connections for wear and breakage.

         13956 Performed all operational checks. Checked                    10/10/2010       62-088A        STPT Student Station
               cables and connections for wear and breakage.

         13957 Performed all operational checks. Checked                    10/10/2010        0111A         STPT Student Station
               cables and connections for wear and breakage.

         13958 Performed all operational checks. Checked                    10/10/2010       92-327A        STPT Student Station
               cables and connections for wear and breakage.

         13959 Performed all operational checks. Checked                    10/10/2010        91-043        STPT Student Station
               cables and connections for wear and breakage.

         13960 Performed all operational checks. Checked                    10/10/2010       92-088A        STPT Student Station
               cables and connections for wear and
               breakage.Performed DRC.
         13961 Performed all operational checks. Checked                    10/10/2010        91-003        STPT Student Station
               cables and connections for wear and
               breakage.Performed DRC.
         13962 Performed all operational checks. Checked                    10/10/2010         21           STPT Instructor Station
               cables and connections for wear and breakage.
               Performed DRC.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                          Page 61
        WO #                   Repair Notes                                        Problem                             Date       Serial #         Description
        13963 Performed all operational checks. Checked                                                            10/10/2010       19        STPT Instructor Station
              cables and connections for wear and breakage.
              Performed DRC.
        13964 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13965 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13966 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13967 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13968 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13969 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13970 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13971 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13972 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13973 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13974 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13975 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13976 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13977 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13978 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13979 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13980 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13981 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13982 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13983 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13984 Performed all operational checks. Checked                                                            10/10/2010    SSB0001      ICOFT Student Station
              cables and connections for wear and breakage.
              Performed DRC.
        13985 Assigned to and located in North Dakota.                                                             10/10/2010    SSB0027      ICOFT Student Station
        13986 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13987 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13988 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13989 Checked cables and connections.Ran DRC.                                                              10/10/2010                 AT3 Instructor Station
        13990                                                                                                      10/10/2010        3        HIMARS DT
        13991                                                                                                      10/10/2010        2        MLRS DT
        13992                                                                                                      10/10/2010        1        MLRS DT
        13993 Completed.                                                                                           10/10/2010     910005      IMTS
        13994 Completed.                                                                                           10/10/2010     910005      IMTS
        13995 Completed.                                                                                           10/10/2010     910005      IMTS
        13996 Checked cables and connections.Ran DRC.                                                              10/10/2010     ETIOS1      SOT ETRAC Instructor
                                                                                                                                              Station
         13997 Checked cables and connections.Ran DRC.                                                             10/10/2010     ETSS1       SOT ETRAC STUDENT
                                                                                                                                              STATION
         13998 Checked cables and connections.Ran DRC.                                                             10/10/2010     ETSS2       SOT ETRAC STUDENT
                                                                                                                                              STATION
         13999 Checked cables and connections.Ran DRC.                                                             10/10/2010     ETSS3       SOT ETRAC STUDENT
                                                                                                                                              STATION
         14000 Checked cables and connections.Ran DRC.                                                             10/10/2010     ETSS4       SOT ETRAC STUDENT
                                                                                                                                              STATION
         14001 Checked cables and connections.Ran DRC.                                                             10/10/2010     ETSS5       SOT ETRAC STUDENT
                                                                                                                                              STATION
         14002 Checked cables and connections.Ran DRC.                                                             10/10/2010     ETSS6       SOT ETRAC STUDENT
                                                                                                                                              STATION
         14003 Checked cables and connections.Ran DRC.                                                             10/10/2010     ETSS7       SOT ETRAC STUDENT
                                                                                                                                              STATION
         14004 Replaced NIC card from ASL, rebuilt windows    Student IG will not go into the scenario.            10/12/2010     C12-426     CFFT 1:12 Increment 2
               and CFFT database, tested and verified good.

         14005                                                David Arrowood in Korea needs a copy of CFFT         10/12/2010       null
                                                              Software. This is the work order for shipping the
                                                              software.
         14006 Tightened loose limit switch assembly.         #1 Target projector azimuth limit switch jams.       10/12/2010     910005      IMTS
                                                              Discovered during Quarterly inspection.

         14007 Tightened loose limit switch assembly.         #3 Target projector azimuth limit switch is loose.   10/12/2010     910005      IMTS
                                                              Discovered during Quarterly inspection.

         14008 Reinitialized system.                          System not responding to command inputs              10/12/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                              Instructor Station
         14009 Punch tools need to be sharpened. recieved Dull punch tools.                 10/12/2010                              null
               sharped punch kit. job complete
         14010 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                              201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14011 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                              202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14012 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                              203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 62
        WO #                Repair Notes                           Problem                     Date                                 Serial #          Description
        14013 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                                 204         FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14014 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                                205         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14015 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                                206         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14016 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                                401         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14017 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                                402         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14018 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                                403         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14019 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/13/2010                                406         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14020 Changed computer name on the Network.             No communication with instructor station.         10/13/2010   SSB0018/STA 6/3   ICOFT Student Station
         14021 Reinitialized system.                             System not responding to command inputs.          10/13/2010    E110008V8OP      FFROT AN/TPQ-36 (V8)
                                                                                                                                                  Instructor Station
         14022 Reinitialized system.                             System not responding to command inputs.          10/13/2010    E110001V8IS      FFROT AN/TPQ-36 (V8)
                                                                                                                                                  Instructor Station
         14023 Due to cost of repair for older Epson model       Epson Projector shuts off after a few moments.    10/13/2010       C30-005       CFFT 1:30
               projectors, we no longer stock those. Replacing   Has blinking and solid red lights on projector.
               both projectors at the site with newer Canon
               SX60 Models (ASL CF091).
         14024 THE SWITCH WAS REPLACED, PART USED:               DURING STUDENT TRAINING A FIRING LOCK 10/13/2010                     205         FSCATT M109A5
               HT0734, 1EA.                                      SWITCH WAS DAMAGED.
         14025 Replaced RCC computer due to issues with          RCC system failure                    10/13/2010                E110001V8IS      FFROT AN/TPQ-36 (V8)
               mother board.                                                                                                                      Instructor Station
         14026 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER                  10/13/2010         401         FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         14027 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE                 10/13/2010         403         FSCATT M109A6
               BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                       FIRE MISSION.
         14028 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                10/13/2010         205         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         14029 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                10/13/2010         204         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         14030 Replaced Computer, 386. Line #ST015.              Contacted by Richard Wisniewski CIV USA           10/13/2010         183         STPT Instructor Station
               Inspected cables and connections for wear and     IMCOM via email on 09/28/2010 to make
               tear. Performed DRC. Ready to ship to customer.   arrangments for repair service on STPT training
                                                                 equipment.Shipping address:Western Region
                                                                 Training Support Center Bldg 1401 W 6TH ST
                                                                 Joint Base Lewis McChord, WA 98433-9500.
                                                                 Shipped from customer 10/12/10.

         14031 Replaced Computer, 386. Line #ST015.            Contacted by Richard Wisniewski CIV USA             10/13/2010         142         STPT Instructor Station
               Inspected cables and connections for wear and   IMCOM via email on 09/28/2010 to make
               tear. Performed DRC. Ready to ship to customer. arrangments for repair service on STPT training
                                                               equipment.Shipping address:Western Region
                                                               Training Support Center Bldg 1401 W 6TH ST
                                                               Joint Base Lewis McChord, WA 98433-9500.
                                                               Shipped from customer 10/12/10.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 63
        WO #                   Repair Notes                                            Problem                            Date     Serial #          Description
        14032 Replaced Display Monitor Assembly. Line               Contacted by Richard Wisniewski CIV USA           10/13/2010   92-172     STPT
              #ST080, Mnfr #71012358001. Inspected cables           IMCOM via email on 09/28/2010 to make
              and connections for wear and tear. Performed          arrangments for repair service on STPT training
              DRC. Ready to ship to customer.                       equipment.Shipping address:Western Region
                                                                    Training Support Center Bldg 1401 W 6TH ST
                                                                    Joint Base Lewis McChord, WA 98433-9500.
                                                                    Shipped from customer 10/12/10.

         14033 Inspected cables and connections for wear and   Contacted by Richard Wisniewski CIV USA                10/13/2010   92-265     STPT Student
               tear. Performed DRC. Ready to ship to customer. IMCOM via email on 09/28/2010 to make
                                                               arrangments for repair service on STPT training
                                                               equipment.Shipping address:Western Region
                                                               Training Support Center Bldg 1401 W 6TH ST
                                                               Joint Base Lewis McChord, WA 98433-9500.
                                                               Shipped from customer 10/12/10.

         14034 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     401      FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         14035 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     402      FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         14036 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     403      FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         14037 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     406      FSCATT M109A6
               CONDUCTED.                                           SHUTDOWN
         14038 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     201      FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         14039 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     202      FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         14040 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     203      FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         14041 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     204      FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         14042 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     205      FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         14043 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                    10/13/2010     206      FSCATT M109A5
               CONDUCTED.                                           SHUTDOWN
         14044 Replaced both witness mark switches (Breech          Can                                               10/13/2010     405      FSCATT M109A6
               open/close Qty 2) and one fire lock switch (switch
               primer insert Qty1). Tested good.

         14045 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14046 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14047 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14048 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14049 WRONG SYSTEM                          STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               206      FSCATT M109A5
                                                     SENSOR OPERATION CHECK
         14050 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14051 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14052 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14053 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                               402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 64
        WO #                Repair Notes                           Problem                     Date                              Serial #       Description
        14054 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                              403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14055 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/14/2010                             406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14056 could not recreate issue. started x86, booted to    not reading cd's, and not booting from HDD      10/14/2010      6-6      RT3
               desktop. placed cd in cdrom read cd and files in
               it. the user could not load files from cd rom using
               a linux command. informed him of an alternate
               way to load the files, was succesfull. issue
               resolved.
         14057 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      201      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14058 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      202      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14059 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      203      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14060 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      204      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14061 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      205      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14062 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      206      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14063 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      401      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14064 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      402      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14065 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      403      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14066 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                   10/14/2010      406      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14067 THE SWITCHES WERE REPLACED, PARTS                  TWO PRIMER INSERT SWITCHES WERE                  10/15/2010      201      FSCATT M109A5
               USED: HT0735, 2EA.                                 INOPERATIVE
         14068 Replaced sky lamp bulb.                            Sky lamp is inop.                                10/15/2010    910005     IMTS
         14069 Shipped replacement row 6 binos to site. CF006.    1:12 Row 6 Binoculars are damaged.               10/15/2010     C-146     CFFT 1:12

         14070 Shipping a replacement Student IG to site.       The Student IG will not show a display. Also has   10/15/2010    C12-326    CFFT 1:12 Increment 2
               (2CF027) Upon testing the unit from ASL prior to a potential networking issue before the display
               shipping, the SIM Network Card failed. Replaced problem occured.
               with one from ASL (ASL 2CF020). Unit tested
               correctly.
         14071 PMCS Maintenance done.                                                                              10/17/2010     FOX1      NBCRS FOX
                                                                                                                                            SIMULATOR
         14072 PMCS Maintenance done.                                                                              10/17/2010     FOX1      NBCRS FOX
                                                                                                                                            SIMULATOR
         14073 PMCS Maintenance done.                                                                              10/17/2010     FOX2      NBCRS FOX
                                                                                                                                            SIMULATOR
         14074 PMCS Maintenance done                                                                               10/17/2010     FOX2      NBCRS FOX
                                                                                                                                            SIMULATOR
         14075 PMCS Maintenance done                                                                               10/17/2010    FOXIS1     NBCRS FOX
                                                                                                                                            SIMULATOR
         14076 PMCS Maintenance done                                                                               10/17/2010    FOXIS1     NBCRS FOX
                                                                                                                                            SIMULATOR
         14077   WILL BE CONDUCTED MANUALY                                                                         10/17/2010      400      FSCATT M109A6
         14078   WILL BE CONDUCTED MANUALLY                                                                        10/17/2010      404      FSCATT M109A6
         14079   null                                                                                              10/17/2010     C-087     CFFT 1:12
         14080   null                                                                                              10/17/2010     C-088     CFFT 1:12
         14081                                                                                                     10/17/2010   0002V8M36   FFOMT AN/TPQ-36
                                                                                                                                            (V8)
         14082 PMCS COMPLETE                                                                                       10/17/2010   0001V8M36   FFOMT AN/TPQ-36
                                                                                                                                            (V8)
         14083 PMCS COMPLETE                                                                                       10/17/2010   0003V8M36   FFOMT AN/TPQ-36
                                                                                                                                            (V8)
         14084 PMCS COMPLETE                                                                                       10/17/2010   0004V8M36   FFOMT AN/TPQ-36
                                                                                                                                            (V8)
         14085 PMCS COMPLETE                                                                                       10/17/2010   0005V8M36   FFOMT AN/TPQ-36
                                                                                                                                            (V8)
         14086   CONDUCTED PMCS                                                                                    10/17/2010      401      FSCATT M109A6
         14087   CONDUCTED PMCS                                                                                    10/17/2010      402      FSCATT M109A6
         14088   CONDUCTED PMCS                                                                                    10/17/2010      403      FSCATT M109A6
         14089   CONDUCTED PMCS                                                                                    10/17/2010      406      FSCATT M109A6
         14090   WILL BE CONDUCTED MANUALLY                                                                        10/17/2010      410      FSCATT M109A6
         14091                                                                                                     10/17/2010       1       HIMARS Mockup
         14092                                                                                                     10/17/2010       2       HIMARS Mockup
         14093   null                                                                                              10/17/2010     C-150     CFFT 1:12
         14094                                                                                                     10/17/2010       3       HIMARS Mockup
         14095   Reattached strap, using heavy duty thread and    Charge bag strap torn off.                       10/18/2010      405      FSCATT M109A6
                 glue.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 65
        WO #                   Repair Notes                                             Problem                      Date          Serial #         Description
        14096 Shipped two replacement Sony Projectors, and         Original Epson Projector failed. Shipped two  10/18/2010        C30-005     CFFT 1:30
              requested ASL to requisition 10 DVI to BNC           replacement Canon SX60 Projectors since we no
              Adapters.                                            longer stock Epsons due to obsolescence.
                                                                   However, failed to account for the BNC
                                                                   Connectors used by older Increment One CFFT,
                                                                   and Canon SX60's are incompatible without an
                                                                   adapter. Shipping two replacement Sony
                                                                   Projectors (ASL CF096), and also requesting
                                                                   ASL to requisition 10 DVI to BNC Adapters.


         14097 Replaced video adaptor in Stealth Image             Stealth Image Generator will not provide an      10/18/2010     C30-007     CFFT 1:30
               Generator (CF114). Replaced CMOS batteries in       image to the monitor. System software needs be
               SAF, Stealth IG, Battlefield IG#1, Student Image    upgraded. SAF, Instructor Control, Student Image
               Generator, and Instructor Control computers         Generator, Stealth Image Generator, and
               (CF075). Upgraded System software to CFFT           Battlefield Image Generator #1 will not retain
               Version 1.1.1.8 and Fidview version 2.8.0.1.        system settings.
               Tested system multiple times with new software.
               System is now fully operational and has the
               correct version of Increment #1 software
               installed. Total of 10 hours of work performed on
               this system.


         14098 THE W103 CABLE ASSY. WAS REPLACED,                  DURING STUDENT TRAINING ON 10/14/10, A           10/18/2010       202       FSCATT M109A5
               PART USED: HT0197, 1EA.                             BREECH SWITCH CABLE ASSEMBLY WAS
                                                                   DAMAGED BEYOND REPAIR.
         14099                                                                                                      10/18/2010     CFFT1       CFFT 1:30
         14100                                                                                                      10/18/2010      IW1        MM1
         14101                                                                                                      10/18/2010      IW2        MM1
         14102                                                                                                      10/18/2010      IW3        MM1
         14103                                                                                                      10/18/2010      OW1        MM1
         14104                                                                                                      10/18/2010     OW10        MM1
         14105                                                                                                      10/18/2010     OW11        MM1
         14106                                                                                                      10/18/2010     OW12        MM1
         14107                                                                                                      10/18/2010      OW2        MM1
         14108                                                                                                      10/18/2010      OW3        MM1
         14109                                                                                                      10/18/2010      OW4        MM1
         14110                                                                                                      10/18/2010      OW5        MM1
         14111                                                                                                      10/18/2010      OW5        MM1
         14112                                                                                                      10/18/2010      OW6        MM1
         14113                                                                                                      10/18/2010      OW7        MM1
         14114                                                                                                      10/18/2010      OW8        MM1
         14115                                                                                                      10/18/2010      OW9        MM1
         14116                                                                                                      10/18/2010      BD2        BIDS Mockup
         14117                                                                                                      10/18/2010      BD2        BIDS Mockup
         14118                                                                                                      10/18/2010    FOX-MF-1     NBCRS FOX
                                                                                                                                               SIMULATOR
         14119                                                                                                      10/18/2010    FOX-MF-1     NBCRS FOX
                                                                                                                                               SIMULATOR
         14120 Reinitialized system.                               System not responding to command inputs.         10/18/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                               Instructor Station
         14121 THE CORD WAS REPLACED, PART USED:                   THE POWER CORD FROM THE HCT TO THE 10/18/2010                     403       FSCATT M109A6
               HT0308, 1EA.                                        INSTRUCTOR STATION WAS CUT.
         14122 Shipped replacement Student Control (ASL            Student Control has no image through video card. 10/18/2010      C-020      CFFT 1:12
               CF079)
         14123 WRONG SYSTEM-DELETE                                 HCT NOT READING CHARGE BAGS.                     10/18/2010       212       FSCATT M109A5
         14124 THE CHARGE BAG SCANNER HEAD WAS                     HCT NOT READING CHARGE BAGS.                     10/18/2010       206       FSCATT M109A5
               REPLACED, PART USED: HT0207, 1EA.
         14125 Remotely logged onto each individual device to      Unable to log into the Stealth IG and the        10/18/2010       null
               log on to them. No Parts needed.                    Battlefield IG 1 and 2.
         14126 THE PRINTER WAS REPLACED, PART USED:                THE IOS PRINTER IS INOPERATIVE                   10/18/2010       204       FSCATT M109A5
               HT0093, 1EA.
         14127                                                     LLDR power supply died switched with spare       10/18/2010      C-044      CFFT 1:12
                                                                   LLDR and RMA-ing LLDR to Fidelity. Waiting for
                                                                   PO to ship.
         14128 Adjusted horizontal span in video settings.         Video signal out of calibration.                 10/18/2010       38        STPT Instructor Station

         14129 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/19/2010                               401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14130 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/19/2010                               402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14131 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/19/2010                               403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 66
        WO #                Repair Notes                           Problem                     Date                                   Serial #       Description
        14132 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/19/2010                                   406      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14133 Tightened set screw on azimuth shaft.              Student station #4 has no change in azimuth.           10/19/2010     159      AT3 (STC)

         14134 Repaired headset and reinstalled.                  Student station #16 has broken headset jack            10/19/2010     155      AT3 (STC)
                                                                  plugs.
         14135 Successfully restarted all devices. I recommend    Bldg 2765. At 0740, a building power outage,           10/19/2010              ICOFT Instructor Station
               installing UPS's on all computers in our           lasting approx. one minute in length, caused all
               classrooms, to avoid future damage and loss of     classroom stations (student and instructor)to
               training time for our students.                    shutdown. This was after the classroom was
                                                                  operational and ready for training.

         14136 Replaced Instructor Control CF064.                 Instructor Control fails to consistently boot to       10/19/2010    C-033     CFFT 1:4
                                                                  desktop.
         14137 Reseated the video card. No Parts needed.          Instructor Control fails to consistently boot to       10/19/2010     null
               Returned to ASL.                                   desktop.
         14138 Formatted Hard Drive, reinstalled Operating        This is a follow up to 13719. Battlefield IG #1 will   10/19/2010     null
               System and Drivers. Installed Fidelity Software.   not boot.
               Tested, returned to ASL.
         14139 THE SOUND CARD WAS REPLACED, PART                  THE EIU SOUND CARD WAS INOPERATIVE                     10/19/2010     203      FSCATT M109A5
               USED: HT0023, 1EA.
         14140 RECEIVE NEW PROJECTOR FROM VDC                     SWITCHED OUT LENS/LENS MOUNT FOR                       10/19/2010     301      IMTS
               SYSTEMS CHANGED OUT THE COMMERCIAL                 PROJECTOR #5
               LENS AND REPLACED IT WITH A SPECIAL
               LENS AND MOUNT. TESTED PROJECTOR
               AND PERFORMED A GRID ALIGNMENT IN
               THE SYSTEM. S/N: G4L001864 10/18/10 0800
               TO 1100
         14141 RECEIVE NEW PROJECTOR FROM VDC           SWITCHED OUT LENS/LENS MOUNT FOR                                 10/19/2010     301      IMTS
               SYSTEMS CHANGED OUT THE COMMERCIAL PROJECTOR #13
               LENS AND REPLACED IT WITH A SPECIAL
               LENS AND MOUNT. TESTED PROJECTOR
               AND PERFORMED A GRID ALIGNMENT IN
               THE SYSTEM. S/N: G4L001892 10/18/10 1100
               TO 1500
         14142 Shipped replacment Student Image Generator Student Image Generator will not load terrain. 10/19/2010                    C-142     CFFT 1:12
               (CF077).
         14143 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14144 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14145 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14146 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14147 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14148 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14149 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14150 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                                  402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 67
        WO #                Repair Notes                           Problem                     Date                          Serial #       Description
        14151 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                          403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14152 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/20/2010                         406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14153 Turned on audio amplifier.                      No sound                                        10/20/2010    C30-026    CFFT 1:30
         14154 Shipping a replacement Student Control. 2CF026. Student Control SIM network will not            10/20/2010    C12-306    CFFT 1:12 Increment 2
                                                               communicate with the rest of the system.
         14155 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      201      FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14156 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      202      FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14157 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      203      FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14158 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      204      FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14159 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      205      FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14160 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      206      FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14161 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      401      FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14162 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      402      FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14163 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      403      FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14164 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                  10/20/2010      406      FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14165 Shipped Replacement Student IG to site. CF077. Student IG will not show a display.              10/20/2010     C-043     CFFT 1:12

         14166 I talked to Eldred Nix in regards to the status of Weapons projector #3 has no movement, neither 10/20/2010   910007     IMTS
               the Ft Hood IMTS, and he informed me that they elevation nor azimuth and all voltage outputs read
               had corrected the problem. He said that the        zero
               azimuth limit switches were out of adjustment.
               After making the proper adjustments a scenario
               was run and the system checked out ok.

         14167 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/21/2010                         201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14168 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/21/2010                         202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14169 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/21/2010                         203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14170 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/21/2010                         204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14171 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/21/2010                         205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14172 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/21/2010                         206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14173 THE SOLENOID WAS REPLACED, PART                  THE TRAVERSE SOLENOID HAD A SHORT              10/21/2010      206      FSCATT M109A5
               USED: HT0220, 1EA.
         14174 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                 10/21/2010      201      FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14175 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                 10/21/2010      202      FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14176 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                 10/21/2010      203      FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14177 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                 10/21/2010      204      FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14178 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                 10/21/2010      205      FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 68
        WO #                    Repair Notes                                         Problem                             Date       Serial #        Description
        14179 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                       10/21/2010       206       FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        14180 Removed the video card, configured on-board       SAF will not display a video image.                  10/21/2010       null
              video. Tested and returned to ASL.
        14181 Unable to duplicate the error. Returned to ASL.   Student Control will not display an image. This is   10/21/2010       null
                                                                a follow up to W.O.#14122
         14182 PMCS Maintenance done                                                                                 10/24/2010      FOX1       NBCRS FOX
                                                                                                                                                SIMULATOR
         14183 PMCS Maintenance done                                                                                 10/24/2010      FOX2       NBCRS FOX
                                                                                                                                                SIMULATOR
         14184 PMCS Maintenance done                                                                                 10/24/2010     FOXIS1      NBCRS FOX
                                                                                                                                                SIMULATOR
         14185 Performed monthly PMCS -cleaned station--                                                             10/24/2010                 FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14186 Performed monthly PMCS -cleaned station--                                                             10/24/2010                 FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14187 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14188 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14189 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14190 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14191 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14192 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14193 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14194 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14195 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14196 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14197 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14198 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14199 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14200 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14201 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14202 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14203 Performed monthly PMCS -cleaned station--                                                             10/24/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                         Instructor Station
               cleaned network systems, communications
               systems, and black box-


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 69
        WO #                   Repair Notes                        Problem                       Date        Serial #         Description
        14204 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14205 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14206 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14207 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14208 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14209 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14210 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14211 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14212 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14213 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110014V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14214 Performed monthly PMCS -cleaned station--                                      10/24/2010   E110014V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                  Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14215                                                                                10/24/2010        1        MLRS Mockup
        14216                                                                                10/24/2010        2        MLRS Mockup
        14217                                                                                10/24/2010        3        MLRS Mockup
        14218                                                                                10/24/2010        4        MLRS Mockup
        14219 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.   10/25/2010       201       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14220 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010        202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14221 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010        203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14222 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010        204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14223 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010        205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14224 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010        206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14225 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010        401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                              Page 70
        WO #                Repair Notes                           Problem                     Date                           Serial #       Description
        14226 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010                           402      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14227 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010                          403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14228                                                     STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/25/2010            406      FSCATT M109A6
                                                                   AFCS OPERATION CHECK 3. SENSOR
                                                                   OPERATION CHECK
         14229 Shipping Binos to vendor for repair. 04.26.11 -     This is a follow-up to 14069. 1:12 Row 6 10/25/2010          null
               Per Ivan Hall's request, setting to Awaiting Parts. Binoculars are damaged.

         14230 Shipped replacement Battlefield IG CH2        Hard Drives are not seating properly in removable   10/25/2010   C30-300    CFFT 1:30 Increment 2
               (2CF030)                                      bay, and the Battlefield IG2 is also experiencing
                                                             Network issues.
         14231 THE GUNTUBE WAS PUT BACK INTO                 DUE TO STUDENT ERROR, THE GUNTUBE                   10/25/2010     204      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND              DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                   FIRE MISSION.
         14232 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                  10/25/2010     201      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         14233 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                  10/25/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         14234 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                  10/25/2010     403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         14235 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                  10/25/2010     406      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         14236 Replaced video card with a new one from ASL   Student Control has no video.                       10/25/2010     null
               (2CF014)
         14237 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                  10/25/2010     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         14238 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                  10/25/2010     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         14239 THE PROJECTILE AND CHARGE BAG WAS             DUE TO STUDENT ERROR, A PROJECTILE                  10/25/2010     402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                    AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                     GUNTUBE.
         14240 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     201      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         14241 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     202      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         14242 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     203      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         14243 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     204      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         14244 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     205      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         14245 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     206      FSCATT M109A5
               CONDUCTED.                                    SHUTDOWN
         14246 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     401      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         14247 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     402      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         14248 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     403      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         14249 DE-ENERGIZING PROCEDURES WERE                 AFTER STUDENT TRAINING: SYSTEM                      10/25/2010     406      FSCATT M109A6
               CONDUCTED.                                    SHUTDOWN
         14250 1. THE HCT WAS ENERGIZED AND VERIFIED         STUDENT TRAINING: 1. SYSTEM STARTUP 2.              10/26/2010     401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED         AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS         OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14251 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/26/2010                          402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                          Page 71
        WO #                Repair Notes                           Problem                     Date                          Serial #       Description
        14252 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/26/2010                          403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14253 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 10/26/2010                         406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14254 Shipped Replacement Student IG to site.        Student IG will not show a display.               10/26/2010   C12-312    CFFT 1:12 Increment 2
               2CF027.
         14255 Replaced handstation. Ln# AT022 Mnfr# A3-50-   Hand station azimuth function is nonfunctional.   10/26/2010     149      AT3 (STC)
               0010-800. System tested good. Job complete.

         14256 THE HCT WAS ENERGIZED AND VERIFIED             UNSCHEDULED STUDENT TRAINING:                     10/26/2010     201      FSCATT M109A5
               OPERATIONAL READINESS.                         SYSTEM STARTUP
         14257 THE HCT WAS ENERGIZED AND VERIFIED             UNSCHEDULED STUDENT TRAINING:                     10/26/2010     202      FSCATT M109A5
               OPERATIONAL READINESS.                         SYSTEM STARTUP
         14258 THE HCT WAS ENERGIZED AND VERIFIED             UNSCHEDULED STUDENT TRAINING:                     10/26/2010     203      FSCATT M109A5
               OPERATIONAL READINESS.                         SYSTEM STARTUP
         14259 THE HCT WAS ENERGIZED AND VERIFIED             UNSCHEDULED STUDENT TRAINING:                     10/26/2010     204      FSCATT M109A5
               OPERATIONAL READINESS.                         SYSTEM STARTUP
         14260 THE HCT WAS ENERGIZED AND VERIFIED             UNSCHEDULED STUDENT TRAINING:                     10/26/2010     205      FSCATT M109A5
               OPERATIONAL READINESS.                         SYSTEM STARTUP
         14261 THE HCT WAS ENERGIZED AND VERIFIED             UNSCHEDULED STUDENT TRAINING:                     10/26/2010     206      FSCATT M109A5
               OPERATIONAL READINESS.                         SYSTEM STARTUP
         14262 TROUBLESHOOTING REVEALED THE SAF               SAF NETWORK STOPPED WORKING                       10/26/2010   C12-333    CFFT 1:12 Increment 2
               COMPUTER HAD LOST ITS NETWORK
               ADDRESS. WENT INTO NETWORK
               CONFIGURATION AND STATICALLY SET IP
               ADDRESS(192.168.119.101), REBOOTED
               COMPUTER TO COMPLETE THE
               PROCEDURE. 10/5/10 0800 TO 0900
         14263 THE WIRING WAS RESOLDERED.                     DURING STUDENT TRAINING THE WIRING IN             10/26/2010     402      FSCATT M109A6
                                                              THE FIRING MECHANISM WAS BROKEN.
         14264 THE ADJUSTMENT WAS MADE, TESTED                THE FIRING MECHANISM NEEDED                       10/26/2010     403      FSCATT M109A6
               GOOD.                                          ADJUSTMENT.
         14265 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                10/26/2010     401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                      GUNTUBE.
         14266 TROUBLESHOOTING REVEALED THAT THE              NO POWER TO THE DIS NETWORK SWITCH                10/26/2010   C12-334    CFFT 1:12 Increment 2
               AC POWER CABLE TO THE NETWORK                  & SAF NETWORK NOT WORKING
               SWITCH WAS LOOSE; IT WAS SECURELY
               PLUGGED IN TO CORRECT THE PROBLEM. IT
               WAS ALSO DETERMINED THAT THE SAF
               COMPUTER HAD LOST ITS NETWORK
               ADDRESS. WENT INTO NETWORK
               CONFIGURATION AND STATICALLY SET IP
               ADDRESS (192.168.119.101), REBOOTED
               COMPUTER TO COMPLETE THE
               PROCEDURE. 10/5/10 1300 TO 1400


         14267 Parts required Line #IC001. Mfn #33-3011.       Follow up to WO#13805 PMCS needed and          10/26/2010     SSB0004    ICOFT Student Station
               Needed (2) two VGA to DVI adapters. Installed B reinstall B computer. No communication between
               computer. Performed DRC. Completed final        B computer and CDT.
               check. Total of hours 12 worked.

         14268 Exchanged Gunners Console to truble shoot      Follow up to WO#13919. PMCS needed and            10/26/2010   SSB0005    ICOFT Student Station
               SS4. Reinstalled all hardware. Installed B     reinstall B computer.
               computer. Performed DRC. Completed final
               check. Total of hours 12 worked.
         14269 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                10/26/2010     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                      GUNTUBE.
         14270 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE                10/26/2010     204      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                      GUNTUBE.
         14271 THE RAMMER CYLINDER WAS PUT BACK IN            DUE TO STUDENT ERROR, THE RAMMER                  10/26/2010     205      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                       POSITION.
         14272 TROUBLESHOOTING REVEALED THAT THE              NO AUDIO COMING FROM SPEAKERS &                   10/26/2010   C12-335    CFFT 1:12 Increment 2
               SPEAKERS WERE PLUGGED INTO THE                 WRONG VIDEO ON BATTLEFIELD SCREEN
               MICROPHONE JACK ON THE BACK OF THE
               BATTLEFIELD COMPUTER. ALSO, IT WAS
               DETERMINED THAT THE VIDEO CABLES
               BETWEEN THE STEALTH AND BATTLEFIELD
               COMPUTERS WERE CONNECTED TO THE
               WRONG COMPUTER. THEY WERE
               SWITCHED TO CORRECT THE PROBLEM.
               10/6/10 0830 TO 0930


         14273 DE-ENERGIZING PROCEDURES WERE                  AFTER STUDENT TRAINING: SYSTEM                    10/26/2010     401      FSCATT M109A6
               CONDUCTED.                                     SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                            Page 72
        WO #                 Repair Notes                                          Problem                                 Date         Serial #          Description
        14274 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         402         FSCATT M109A6
              CONDUCTED.                                            SHUTDOWN
        14275 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         403         FSCATT M109A6
              CONDUCTED.                                            SHUTDOWN
        14276 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         406         FSCATT M109A6
              CONDUCTED.                                            SHUTDOWN
        14277 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         201         FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        14278 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         202         FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        14279 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         203         FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        14280 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         204         FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        14281 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         205         FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        14282 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     10/26/2010         206         FSCATT M109A5
              CONDUCTED.                                            SHUTDOWN
        14283 THE TRACKER (IC2) WAS REPLACED TO                     WEAPON HAS AN ELEVATION PROBLEM                    10/26/2010     0137USMC        STPT Student Station
              CORRECT THE ELEVATION PROBLEM. THE
              TRACKER WILL BE SENT TO INTERSENSE
              FOR REPAIR. S/N: SC2-0512060-G RECEIVED
              TRACKER BACK FROM INTERSENSE
              11/15/10, TESTED GOOD.

         14284 Reloaded windows drivers                             Student IG would not boot past windows logo        10/26/2010       C12-424       CFFT 1:12 Increment 2
                                                                    screen.
         14285 Replaced batteries in ten rounds. Tested good.       Fuse sensor failure due to battery faults          10/27/2010         405         FSCATT M109A6

         14286 Replaced from ASL.                                   Fuse type M577A1 damaged during misfire,           10/27/2010         405         FSCATT M109A6
                                                                    physically damaged, replacement required.
         14287 shipped replacement Battlefield IG #1 to site.       Battlefield Image Generator #1 is displaying error 10/27/2010       C30-008       CFFT 1:30
               CF107.                                               message of "unable to find boot device".

         14288 Repaired handstation using a gear wheel from    Hand station azimuth function is nonfunctional.         10/27/2010         null
               spares.Returning to ASL LINE# AT022, MFR# A3- FOWO #14255
               50-0010-800. Job Complete.
         14289 Unable to duplicate the error. Returned to ASL. Student Image Generator will not load terrain.          10/28/2010         null

         14290 Completely rebuilt Instructor Control, as old parts ASL Instructor Control will not boot. Post errors   10/28/2010         null
               were obsolete. Replaced Motherboard, RAM,           occur, followed by "no video".
               CPU, Video Card, Hard Drive and RAM.
               Reinstalled Operating System, Drivers, and all
               Fidelity Software. Ordered new MAK License file,
               installed, and tested.
         14291 Shut system completely down and rebooted             B computer not booting up.                         10/28/2010   SSB0013/STA 5/1   ICOFT Student Station
               system. Performed DRC. Student station ready.

         14292 Replaced connectors                                  Broken back-plain connectors                       10/28/2010     114B0001IS      FIMT
         14293 replaced both epson projectors with 2 canon          Epson Projector will shutdown randomly.            10/28/2010        C-036        CFFT 1:4
               projectors from aSL. (CF091 qty 2)                   (projector has blinking yellow and red lights)
         14294 Updated Nvidia drivers and reset video               Both monitors not displaying properly.             10/28/2010         75          STPT Instructor Station
               settings.Performed DRC.
         14295                                                      6' extendable ladder required for FSCATT PMCS      10/28/2010         405         FSCATT M109A6
                                                                    and corrective maintenance.
         14296                                                      Replacement grease gun required for FSCATT         10/28/2010         405         FSCATT M109A6
                                                                    PMCS and corrective maintenance.
         14297                                                      Loctite 545 required for FSCATT PMCS and           10/28/2010         405         FSCATT M109A6
                                                                    corrective maintenance.
         14298                                                      PMCS required.                                     10/28/2010         null
         14299                                                      Semi-Annual                                        10/29/2010          7          HIMARS HPU
         14300 PMCS Maintenance Done                                                                                   10/31/2010        FOX1         NBCRS FOX
                                                                                                                                                      SIMULATOR
         14301 PMCS Maintenance Done                                                                                   10/31/2010        FOX2         NBCRS FOX
                                                                                                                                                      SIMULATOR
         14302 PMCS Maintenance Done                                                                                   10/31/2010       FOXIS1        NBCRS FOX
                                                                                                                                                      SIMULATOR
         14303                                                      FSCATT: KOREA REQUESTED THE                        11/1/2010          null
                                                                    FOLLOWING PARTS FROM FORT SILL FOR
                                                                    ASL REPLENISHMENT: HT0059, 1EA / HT0734,
                                                                    4EA / HT0735, 4EA / HT0799, 4EA
         14304 THE HCT WAS ENERGIZED AND VERIFIED                   UNSCHEDULED STUDENT TRAINING:                      11/1/2010          201         FSCATT M109A5
               OPERATIONAL READINESS.                               SYSTEM STARTUP
         14305 THE HCT WAS ENERGIZED AND VERIFIED                   UNSCHEDULED STUDENT TRAINING:                      11/1/2010          202         FSCATT M109A5
               OPERATIONAL READINESS.                               SYSTEM STARTUP
         14306 THE HCT WAS ENERGIZED AND VERIFIED                   UNSCHEDULED STUDENT TRAINING:                      11/1/2010          203         FSCATT M109A5
               OPERATIONAL READINESS.                               SYSTEM STARTUP
         14307 THE HCT WAS ENERGIZED AND VERIFIED                   UNSCHEDULED STUDENT TRAINING:                      11/1/2010          204         FSCATT M109A5
               OPERATIONAL READINESS.                               SYSTEM STARTUP
         14308 THE HCT WAS ENERGIZED AND VERIFIED                   UNSCHEDULED STUDENT TRAINING:                      11/1/2010          205         FSCATT M109A5
               OPERATIONAL READINESS.                               SYSTEM STARTUP
         14309 THE HCT WAS ENERGIZED AND VERIFIED                   UNSCHEDULED STUDENT TRAINING:                      11/1/2010          206         FSCATT M109A5
               OPERATIONAL READINESS.                               SYSTEM STARTUP
         14310 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE                 11/1/2010          202         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                   Page 73
        WO #                    Repair Notes                                        Problem                              Date     Serial #       Description
        14311 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                    11/1/2010      204      FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                           POSITION.
        14312 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                  11/1/2010      201      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                          GUNTUBE.
        14313 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                  11/1/2010      203      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                          GUNTUBE.
        14314 Shipped Replacement Row 7 Binos to site.           Row 7 Bino is broken in the middle.                 11/1/2010     C-045     CFFT 1:12
              CF007.
        14315 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                 11/1/2010         205      FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                           POSITION.
        14316 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE               11/1/2010         206      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                          GUNTUBE.
        14317 Shipped Replacement Student Control with a         Student Control's SIM Network is not showing up. 11/1/2010       C12-306    CFFT 1:12 Increment 2
              replacement Hard Disk Drive. ASL 2cf026 and
              2cf018.
        14318 Unable to duplicate the errors. Returned to ASL.   this is a follow-up to 14230. Hard Drives are not   11/1/2010      null
                                                                 seating properly in removable bay, and the
                                                                 Battlefield IG2 is also experiencing Network
                                                                 issues.
         14319 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/1/2010      201      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14320 Replaced Camsim Nose Assy(Green) Replaced         Will not purge errors. Would not clear H & G Air    11/1/2010    0207-16    CAMSIM
               Nozzle Protective Cover Assy Replaced (3)         Source sensor.
               Camsim Simulation Nozzle Filter Replaced
               Camsim Case Latch Glued Motherboard
               Mounting Brackets Glued Bi-Morph Vibration
               Sensor Glued Case Fame Inserts

         14321 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/1/2010      202      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14322 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/1/2010      203      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14323 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/1/2010      204      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14324 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/1/2010      205      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14325 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/1/2010      206      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14326 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2.              11/2/2010      201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND              SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14327 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/2/2010                               202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14328 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/2/2010                               203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14329 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/2/2010                               204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14330 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/2/2010                               205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14331 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/2/2010                               206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14332 Replacing the Bulb. CF015. Projector was bad.. Bulb has gone out in the Epson Projector.              11/2/2010     C-034     CFFT 1:4
               Replaced with (2) Canon sx80 projectors. CF106.

         14333 Radar Processor replaced.                         210/005 fault GI/O Board called out W20 cable       11/2/2010   0004V8M36   FFOMT AN/TPQ-36
                                                                 worn at plug P3/J4                                                          (V8)
         14334 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/2/2010      201      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14335 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/2/2010      202      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14336 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/2/2010      203      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14337 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/2/2010      204      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         14338 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      11/2/2010      205      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 74
        WO #                   Repair Notes                                                Problem                           Date    Serial #       Description
        14339 DE-ENERGIZING PROCEDURES WERE                          AFTER STUDENT TRAINING: SYSTEM                      11/2/2010     206      FSCATT M109A5
              CONDUCTED.                                             SHUTDOWN
        14340 Replaced batteries.                                    Projector will not adjust using projector remote.   11/3/2010   C12-428    CFFT 1:12 Increment 2

         14341 Reseated video card and NIC card.                     Battlefield IG will not boot.                       11/3/2010   C12-425    CFFT 1:12 Increment 2

         14342 Corrected BIOS options.                               Student IG would not boot.                          11/3/2010   C12-428    CFFT 1:12 Increment 2

         14343 Corrected BIOS options                                Student Cntrl would not boot                        11/3/2010   C12-428    CFFT 1:12 Increment 2

         14344 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14345 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14346 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14347 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14348 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14349 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14350 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14351 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/3/2010                                  204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14352 Aligned both video projectors.                        Battlefield video is misaligned.                    11/3/2010   C30-026    CFFT 1:30
         14353 Packed up trainer and assisted with loading onto      108th Brigade needs all AT3 trainers packed up      11/3/2010     121      AT3 (STC)
               truck.                                                and moved to a temporary location.
         14354 Instructed site to send in full system for repairs.   This system is having multiple errors. The SAF      11/3/2010    C-091     CFFT 1:12
               12.10.10 - Replaced 1 cage nut on Blue Box            Computer will randomly shutdown during
               (ASL GF098), Student Image Generator (ASL             operation. The Student IG will not boot. The
               CF077), Sony Projector (ASL CF096) and due to         Student Control will not boot. Instructed site to
               the remote location of the site also provided 6       send in full system for repairs.
               replacement CMOS batteries (CF075). Correctly
               reconnected all Video, USB, Network and Audio
               cables. Also reconnected Power Plug to the rear
               Power Strip on the rear of the Blue Box so that
               power was being correctly supplied to the rest of
               the system. Checked and reset dates and times
               on the system, tested all terrains, repacked in
               shipping crates and returned to site. 9 hours total
               work time peformed.


         14355 Packed up trainer and assisted with loading onto      108th Brigade needs all AT3 trainers packed up      11/3/2010     123      AT3 (STC)
               truck.                                                and moved to a temporary location.
         14356 Packed up trainer and assisted with loading onto      108th Brigade needs all AT3 trainers packed up      11/3/2010     124      AT3 (STC)
               truck.                                                and moved to a temporary location.
         14357 Packed up trainer and assisted with loading onto      108th Brigade needs all AT3 trainers packed up      11/3/2010     125      AT3 (STC)
               truck.                                                and moved to a temporary location.
         14358 Packed up trainer and assisted with loading onto      108th Brigade needs all AT3 trainers packed up      11/3/2010     126      AT3 (STC)
               truck.                                                and moved to a temporary location.
         14359 Packed up trainer and assisted with loading onto      108th Brigade needs all AT3 trainers packed up      11/3/2010     127      AT3 (STC)
               truck.                                                and moved to a temporary location.
         14360 Packed up trainer and assisted with loading onto      108th Brigade needs all AT3 trainers packed up      11/3/2010     128      AT3 (STC)
               truck.                                                and moved to a temporary location.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                     Page 75
        WO #                   Repair Notes                                             Problem                          Date    Serial #       Description
        14361 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 11/3/2010     402      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                           GUNTUBE.
        14362 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 11/3/2010     403      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                           GUNTUBE.
        14363 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 11/3/2010     204      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                           GUNTUBE.
        14364 THE RAMMER CYLINDER WAS PUT BACK IN                 DUE TO STUDENT ERROR, THE RAMMER                   11/3/2010     202      FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                            POSITION.
        14365 Shipped a replacement Instructor Control to site.   Instructor Control loses the MAK License           11/3/2010   C12-220    CFFT 1:12
              CF064                                               Configuration settings everytime the computer is
                                                                  re-booted. (this is not a CMOS Battery issue
                                                                  because the time and date remains current).

         14366 Created and shipped DVDs with Terrain              Student IG has no Database folder containing       11/3/2010   C12-306    CFFT 1:12 Increment 2
               Databases on it for installation on Student IG.    terrains.

         14367 Unable to duplicate the error. Returned to ASL.    Student IG will not show a display.                11/3/2010     null
               This is a follow up to work order 14254.
         14368 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                   11/3/2010     401      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                           POSITION.
         14369 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 11/3/2010     406      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         14370 THE GUNTUBE WAS PUT BACK INTO                      DUE TO STUDENT ERROR, THE GUNTUBE                  11/3/2010     201      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                   DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                        FIRE MISSION.
         14371 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                   11/3/2010     203      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                           POSITION.
         14372 Shipped Replacement Battlefield IG #2 to site.     Battlefield IG #2 will not show a display.         11/3/2010   C30-006    CFFT 1:30
               CF108. Version 2.8.0.1.
         14373 THE GUNTUBE WAS PUT BACK INTO                      DUE TO STUDENT ERROR, THE GUNTUBE                  11/3/2010     202      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                   DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                        FIRE MISSION.
         14374 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 11/3/2010     401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         14375 Reset the passwords on all computers.              User got locked out of all computers and forget    11/3/2010   C12-305    CFFT 1:12 Increment 2
                                                                  the password.
         14376 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     201      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14377 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     202      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14378 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     203      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14379 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     204      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14380 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     401      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14381 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     402      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14382 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     403      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14383 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     11/3/2010     406      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14384                                                    Computer shipped to Danny Carter for testing.      11/3/2010     153      AT3 (STC)
                                                                  Sent to Huntsville, AL.
         14385 Reset BIOS. Restated trainer. Performed DRC.       Trainer will not shut down.                        11/3/2010      5       AT3 (STC)
               Tested and passed.
         14386 Reassembled and reinstalled lock.                  Computer case lock broken.                         11/3/2010     18       AT3 (STC)
         14387 SHIPPED PARTS TO FT HOOD, TX NOV 1,                TRANSFERED THESE PARTS TO FT. HOOD                 11/3/2010   910007     IMTS
               2010 FedEx GROUND; TRACKING NUMBER                 IMTS FOR STORAGE AS REPAIR PARTS.
               066429515000217
         14388 1. THE HCT WAS ENERGIZED AND VERIFIED              STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/4/2010                 401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED              AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS              OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14389 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/4/2010                              402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 76
        WO #                Repair Notes                           Problem                     Date                            Serial #       Description
        14390 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/4/2010                             403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14391 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/4/2010                            406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14392 Shipped replacement Student Control (ASL         Student Control needs to be rebooted several      11/4/2010    C30-305    CFFT 1:30 Increment 2
               2CF026)                                          times before it will work properly.
         14393 THE CHARGE BAG CLAMPS WERE                       THE CHARGE BAG CLAMPS WERE OUT OF                 11/4/2010      403      FSCATT M109A6
               ADJUSTED, SYSTEM WAS TEST FIRED.                 ADJUSTMENT
         14394 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                11/4/2010      402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         14395 THE SYSTEM WAS REBOOTED AND TEST                 DURING STUDENT TRAINING, THE HCT LOST             11/4/2010      401      FSCATT M109A6
               FIRED.                                           COMMUNICATION BETWEEN THE IOS AND
                                                                EIU.
         14396 THE GUNTUBE WAS PUT BACK INTO                    DUE TO STUDENT ERROR, THE GUNTUBE                 11/4/2010      402      FSCATT M109A6
               BATTERY, SYSTEM WAS REBOOTED AND                 DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                      FIRE MISSION.
         14397 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                  11/4/2010      403      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         14398 THE INSTRUCTOR CONTROL COMPUTER                  NO VIDEO DISPLAYED ON THE INSTRUCTOR              11/4/2010    C12-335    CFFT 1:12 Increment 2
               LOST ITS VIDEO SETUP. WENT INTO                  CONTROL MONITOR
               DISPLAY SETTING AND CONFIGURED THE
               VIDEO CARD TO CLONE THE DISPLAY FOR
               BOTH THE INSTRUCTOR CONTROL AND THE
               PROJECTOR TO PROVIDE DUAL VIDEO
               FROM THE INSTRUCTOR CONTROL
               COMPUTER TO ALLOW FOR SCENARIOS
               AND/OR SLIDE SHOWS TO BE RUN. 0730 TO
               0830
         14399 battery is not holding a charge.LN #RT007        UPS will not power on computer.                   11/4/2010     134-1     RT3
         14400 Rebooted system. Checked all cable               Touchscreen not responding                        11/4/2010      159      AT3 (STC)
               connections. Performed DRC.
         14401 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                    11/4/2010      401      FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14402 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                    11/4/2010      402      FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14403 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                    11/4/2010      403      FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14404 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                    11/4/2010      406      FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14405 Replaced eyecups with ones from ASL (GF128).     Eyecup is torn.                                   11/5/2010      null

         14406 battery is not holding a charge. tested UPS,     UPS will not power on computer.                   11/5/2010      null
               working properly returning to ASL line item
               #RT036
         14407 Unable to duplicate error. Tested, returned to   Battlefield Image Generator #1 is displaying error 11/5/2010     null
               ASL.                                             message of "unable to find boot device".

         14408 Unable to duplicate error. Tested, returned to   Student Control's SIM Network is not showing up. 11/5/2010       null
               ASL.
         14409 PMCS Maintenance done                                                                              11/7/2010     FOX1      NBCRS FOX
                                                                                                                                          SIMULATOR
         14410 PMCS Maintenance done                                                                              11/7/2010     FOX1      NBCRS FOX
                                                                                                                                          SIMULATOR
         14411 PMCS Maintenance done                                                                              11/7/2010     FOX2      NBCRS FOX
                                                                                                                                          SIMULATOR
         14412                                                                                                    11/7/2010     FOX2      NBCRS FOX
                                                                                                                                          SIMULATOR
         14413                                                                                                    11/7/2010    FOXIS1     NBCRS FOX
                                                                                                                                          SIMULATOR
         14414                                                                                                    11/7/2010    FOXIS1     NBCRS FOX
                                                                                                                                          SIMULATOR
         14415 Performed monthly PMCS -cleaned station--                                                          11/7/2010               FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                   Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14416 PMCS - Clean and inspect system                                                                    11/7/2010    ETIOS1     SMT ETRAC
         14417 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS9      SMT ETRAC
         14418 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS1      SMT ETRAC
         14419 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS2      SMT ETRAC
         14420 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS3      SMT ETRAC
         14421 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS4      SMT ETRAC
         14422 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS5      SMT ETRAC
         14423 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS6      SMT ETRAC
         14424 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS7      SMT ETRAC
         14425 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS8      SMT ETRAC
         14426 PMCS - Clean and inspect system                                                                    11/7/2010    ETSS9      SMT ETRAC


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 77
        WO #                   Repair Notes                   Problem        Date        Serial #           Description
        14427 Performed monthly PMCS -cleaned station--                  11/7/2010     E110001V8IS    FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14428 Performed monthly PMCS -cleaned station--                  11/7/2010     E110002V8IS    FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14429 Performed monthly PMCS -cleaned station--                  11/7/2010    E110003V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14430 Performed monthly PMCS -cleaned station--                  11/7/2010    E110004V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14431 Performed monthly PMCS -cleaned station--                  11/7/2010    E110005V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14432 Performed monthly PMCS -cleaned station--                  11/7/2010    E110006V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14433 Performed monthly PMCS -cleaned station--                  11/7/2010    E110007V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14434 Performed monthly PMCS -cleaned station--                  11/7/2010    E110008V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14435 Performed monthly PMCS -cleaned station--                  11/7/2010    E110009V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14436 Performed monthly PMCS -cleaned station--                  11/7/2010    E110010V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14437 Performed monthly PMCS -cleaned station--                  11/7/2010    E110011V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14438 Performed monthly PMCS -cleaned station--                  11/7/2010    E110012V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14439 Performed monthly PMCS -cleaned station--                  11/7/2010    E110013V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14440 Performed monthly PMCS -cleaned station--                  11/7/2010    E110014V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14441 PMCS - Clean, inspect and test.                            11/7/2010      114B0001IS    FIMT
        14442 PMCS - Do not touch. Programmer station.                   11/7/2010     114B0009SSC    FIMT
        14443 PMCS - Clean, inspect and test.                            11/7/2010     114B0001M37    FIMT
        14444 PMCS - Clean, inspect and test.                            11/7/2010     114B0002M37    FIMT
        14445 PMCS - Clean, inspect and test.                            11/7/2010     114B0003M37    FIMT
        14446 PMCS - Clean, inspect and test.                            11/7/2010     114B0004M37    FIMT
        14447 PMCS - System in storage                                   11/7/2010     114B0005M36    FIMT
        14448 PMCS - System in storage                                   11/7/2010     114B0006M36    FIMT
        14449 PMCS - System in storage                                   11/7/2010     114B0007M36    FIMT
        14450 PMCS - System in storage                                   11/7/2010     114B0008M36    FIMT
        14451 PMCS - Clean, inspect and test.                            11/7/2010    114D0001SMTIS   SMT Student Station
        14452 PMCS - Do not touch. Programmer station.                   11/7/2010   114D0006SMTSSC   SMT Student Station
        14453 PMCS - Clean, inspect and test.                            11/7/2010     114D0002SMT    SMT Student Station
        14454 PMCS - Clean, inspect and test.                            11/7/2010     114D0003SMT    SMT Student Station
        14455 PMCS - Clean, inspect and test.                            11/7/2010     114D0004SMT    SMT Student Station
        14456 PMCS - Clean, inspect and test.                            11/7/2010     114D0005SMT    SMT Student Station
        14457                                                            11/7/2010           3        HIMARS DT
        14458                                                            11/7/2010           2        MLRS DT
        14459                                                            11/7/2010           1        MLRS DT
        14460 Completed                                                  11/7/2010        910005      IMTS
        14461 Inspected cables and connections for breakage              11/7/2010        ETIOS1      SOT ETRAC Instructor
              and wear and tear. Performed DRC. Passed                                                Station
              DRC.
        14462 Inspected cables and connections for breakage              11/7/2010       ETSS1        SOT ETRAC STUDENT
              and wear and tear. Performed DRC. Passed                                                STATION
              DRC.
        14463 Inspected cables and connections for breakage              11/7/2010       ETSS2        SOT ETRAC STUDENT
              and wear and tear. Performed DRC. Passed                                                STATION
              DRC.
        14464 Inspected cables and connections for breakage              11/7/2010       ETSS3        SOT ETRAC STUDENT
              and wear and tear. Performed DRC. Passed                                                STATION
              DRC.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                       Page 78
        WO #                      Repair Notes                                     Problem                             Date    Serial #        Description
        14465 Inspected cables and connections for breakage                                                        11/7/2010   ETSS4      SOT ETRAC STUDENT
              and wear and tear. Performed DRC. Passed                                                                                    STATION
              DRC.
        14466 Inspected cables and connections for breakage                                                        11/7/2010   ETSS5      SOT ETRAC STUDENT
              and wear and tear. Performed DRC. Passed                                                                                    STATION
              DRC.
        14467 Inspected cables and connections for breakage                                                        11/7/2010   ETSS6      SOT ETRAC STUDENT
              and wear and tear. Performed DRC. Passed                                                                                    STATION
              DRC.
        14468 Inspected cables and connections for breakage                                                        11/7/2010   ETSS7      SOT ETRAC STUDENT
              and wear and tear. Performed DRC. Passed                                                                                    STATION
              DRC.
        14469 *This trainer is on loan to Stuttgart from        Both the User and Administration accounts on all   11/8/2010   C12-331    CFFT 1:12 Increment 2
              Mannheim* 02 Nov 10 - Received the trouble call computers are locked out.
              and made arrangements for a maintenance trip to
              Stuttgart. 03 Nov 10 - Successfully unlocked the
              User, Administration and Maintenance accounts
              on all computers except for the SAF. Brought the
              SAF computer back to Schweinfurt to continue
              repairs. 09 Nov 10 - Successfully unlocked the
              "root" account on the SAF. Restored the
              CFFTUser and CFFTMaintenance accounts on
              the SAF. 10 Nov 10 - Need to make
              arrangements to go test the repair on the trainer
              to ensure proper operation. Received approval for
              a maintenance trip to Stuttgart on 16 Nov 10. 16
              Nov 10 - Reconnected the SAF to the rest of the
              trainer. All tests were successful. - Cloned the
              repaired hard drive onto the spare SAF hard drive
              to complete the job. - Updated the passwords on
              all of the spare hard drives. - Updated the dates
              & times on all hard drives.




         14470 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14471 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14472 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14473 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14474 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14475 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14476 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14477 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14478 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                            403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 79
        WO #                Repair Notes                           Problem                     Date                                Serial #       Description
        14479 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/8/2010                                 406      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14480 THE GUNTUBE WAS PUT BACK INTO                      DUE TO STUDENT ERROR, THE GUNTUBE                    11/8/2010     204      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                   DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                        FIRE MISSION.
         14481 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                   11/8/2010     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         14482 Shipped Replacement EVO 2 Projector to site.       Right side projector will not show a display. (EVO   11/8/2010   C30-006    CFFT 1:30
               CF059.                                             Projector).
         14483 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                     11/8/2010     406      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                           POSITION.
         14484 THE GUNTUBE WAS PUT BACK INTO                      DUE TO STUDENT ERROR, THE GUNTUBE                    11/8/2010     403      FSCATT M109A6
               BATTERY, SYSTEM WAS REBOOTED AND                   DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                        FIRE MISSION.
         14485 Led the site POC through the steps necessary to    The Student Image Generator computer blanks          11/8/2010   C12-330    CFFT 1:12 Increment 2
               reseat the SIM network card inside the Student     out. The rest of the trainer operates normally.
               Control computer to correct the problem.

         14486                                                    System software needs to be upgraded to latest 11/8/2010         C30-007    CFFT 1:30
                                                                  Increment Version of 1.1.1.8 SAF computer,
                                                                  Instructor Control and Student Image Generators
                                                                  will not retain system settings.

         14487 Replaced CMOS batteries in the Stealth Image       System software needs to be upgraded to latest 11/8/2010         C30-003    CFFT 1:30
               Generator, SAF, and Instructor Control             Increment Version of 1.1.1.8 SAF computer,
               computers.Upgraded CFFT system software to         Instructor Control and Student Image Generators
               CFFT Version 1.1.1.8 and Fidview version 2.8.0.1   will not retain system settings.
               Tested system multiple times with new software.
               System is now fully operational with the correct
               version of CFFT software. Total of 8 hours of
               work peformed.

         14488 THE WIRING WAS REPAIED.                 DURING STUDENT TRAINING, WIRING ON                              11/8/2010     203      FSCATT M109A5
                                                       THE FIRING MECHANISM WAS BROKEN.
         14489   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     201      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14490   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     202      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14491   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     203      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14492   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     204      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14493   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     205      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14494   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     206      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14495   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     401      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14496   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     402      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14497   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     403      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14498   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                  11/8/2010     406      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14499   1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                          11/9/2010     201      FSCATT M109A5
                 OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
                 FIRED A PROJECTILE, FUZE, AND CHARGE
                 COMBINATION, ALL SENSORS ARE
                 OPERATIONAL.
         14500 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/9/2010                                202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14501 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/9/2010                                203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14502 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/9/2010                                204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14503 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/9/2010                                205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 80
        WO #                Repair Notes                           Problem                     Date                     Serial #       Description
        14504 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/9/2010                      206      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14505 Mcmaster p/n: 91771a847, machine screws,          FOWO# 13506. Parts needed to fabricate     11/9/2010     null
               unshield multicond cable Newark p/n:02f8731,      Footswitch assy, w/cable.
               cheese head screw Drillspot.com sku#936208
               model:90741 awaiting footswitch brackets to
               complete P.O. 85661 P.O. 85664 P.O. 85665
               P.O. 85666 Finished building switches 3/14/11.
               Received metal plates for stands 3/14/11. Total
               time for repair: 16 shop hrs. Technician Dale
               Nottingham assisted technician Meek. 16 hrs.
               each.


         14506 Shipped replacement Battlefield IG CH1 (ASL       Battlefield IG CH1 will not load FIDVIEW   11/9/2010   C30-007    CFFT 1:30
               CF107).                                           software.
         14507                                                                                          11/9/2010       CFFT1      CFFT 1:30
         14508                                                                                          11/9/2010        IW1       MM1
         14509                                                                                          11/9/2010        IW2       MM1
         14510                                                                                          11/9/2010        IW3       MM1
         14511                                                                                          11/9/2010        OW1       MM1
         14512                                                                                          11/9/2010       OW10       MM1
         14513                                                                                          11/9/2010       OW11       MM1
         14514                                                                                          11/9/2010       OW12       MM1
         14515                                                                                          11/9/2010        OW2       MM1
         14516                                                                                          11/9/2010        OW3       MM1
         14517                                                                                          11/9/2010        OW4       MM1
         14518                                                                                          11/9/2010        OW5       MM1
         14519                                                                                          11/9/2010        OW6       MM1
         14520                                                                                          11/9/2010        OW7       MM1
         14521                                                                                          11/9/2010        OW8       MM1
         14522                                                                                          11/9/2010        OW9       MM1
         14523 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010       201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND              SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14524 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14525 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14526 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14527 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14528 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14529 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14530 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14531 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                    403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 81
        WO #                Repair Notes                           Problem                     Date                                 Serial #       Description
        14532 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/10/2010                                 406      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14533 Unable to duplicate error, rebooted multiple times, Student Control must be booted several times to    11/10/2010      null
               tested, returned to ASL.                            work properly.
         14534                                                     Instructor Control loses the MAK License           11/10/2010      null
                                                                   Configuration settings everytime the computer is
                                                                   re-booted. This is a follow up to W.O. # 14365

         14535 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                  11/10/2010      402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         14536 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                  11/10/2010      403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         14537 Shipped Replacement Lamp to site. CF100            Sony Projector requires a new lamp.                 11/10/2010     C-082     CFFT 1:12
         14538 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      201      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14539 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      202      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14540 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      203      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14541 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      204      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14542 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      205      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14543 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      206      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         14544 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      401      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14545 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      402      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14546 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      403      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14547 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      11/10/2010      406      FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         14548 Shipped replacement Student IG Station 4 (ASL      Student IG Number 4 is not communicating.           11/10/2010    Y-001B     CFFT-SOF 1:12
               CF125) after converting it from a Yuma Student
               IG 3 to a Yuma Student IG 4.
         14549 Replaced the Video card. (CF049). Tests good.      Battlefield IG #2 will not show a display.          11/12/2010      null
               Returned to ASL.
         14550                                                                                                        11/14/2010     FOX1      NBCRS FOX
                                                                                                                                               SIMULATOR
         14551                                                                                                        11/14/2010     FOX2      NBCRS FOX
                                                                                                                                               SIMULATOR
         14552                                                                                                        11/14/2010    FOXIS1     NBCRS FOX
                                                                                                                                               SIMULATOR
         14553 PMCS complete                                                                                          11/14/2010   0002V8M36   FFOMT AN/TPQ-36
                                                                                                                                               (V8)
         14554 PMCS complete                                                                                          11/14/2010   0001V8M36   FFOMT AN/TPQ-36
                                                                                                                                               (V8)
         14555 PMCS complete                                                                                          11/14/2010   0003V8M36   FFOMT AN/TPQ-36
                                                                                                                                               (V8)
         14556 PMCS complete                                                                                          11/14/2010   0004V8M36   FFOMT AN/TPQ-36
                                                                                                                                               (V8)
         14557 PMCS complete                                                                                          11/14/2010   0005V8M36   FFOMT AN/TPQ-36
                                                                                                                                               (V8)
         14558                                                                                                        11/14/2010       1       HIMARS Mockup
         14559                                                                                                        11/14/2010       2       HIMARS Mockup
         14560                                                                                                        11/14/2010       3       HIMARS Mockup
         14561 17 Nov 10 - Unlocked the User and Administrator The User account on the Stealth Image                  11/15/2010    C12-304    CFFT 1:12 Increment 2
               accounts on the Stealth Image Generator. -       Generator is locked out and won't reset.
               Updated the passwords on all hard drives
               (including the spares) to ensure everything is
               current. - Updated the dates & times on all hard
               drives. - Defragged all hard drives.

         14562 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                                201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14563 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                                202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14564 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                                203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 82
        WO #                Repair Notes                           Problem                     Date                             Serial #       Description
        14565 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                             204      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14566 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14567 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14568 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14569 WRONG SYSTEM                          STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            401      FSCATT M109A6
                                                     AFCS OPERATION CHECK 3. SENSOR
                                                     OPERATION CHECK
         14570 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14571 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14572 WRONG SYSTEM                          STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            402      FSCATT M109A6
                                                     AFCS OPERATION CHECK 3. SENSOR
                                                     OPERATION CHECK
         14573 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/15/2010                            403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14574 THE FIRING MECHANISM WAS ADJUSTED,                   THE FIRING MECHANISM WAS OUT OF                11/15/2010     201      FSCATT M109A5
               TESTED GOOD.                                         ADJUSTMENT
         14575 was unable to recreate issue. did not replace        display is darkened unable to get brighter.    11/15/2010     5-1      RT3
               anything
         14576 duplicated issue. replaced monitor. line item #      two green strips on right side of the screen   11/15/2010     5-6      RT3
               RT006
         14577 THE RAMMER CYLINDER WAS PUT BACK IN                  DUE TO STUDENT ERROR, THE RAMMER               11/15/2010     206      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                      CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                             POSITION.
         14578 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE             11/15/2010     203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         14579 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE             11/15/2010     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         14580 THE RAMMER CYLINDER WAS PUT BACK IN                  DUE TO STUDENT ERROR, THE RAMMER               11/15/2010     201      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                      CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                             POSITION.
         14581 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE             11/15/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         14582 THE RAMMER CYLINDER WAS PUT BACK IN                  DUE TO STUDENT ERROR, THE RAMMER               11/15/2010     402      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                      CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                             POSITION.
         14583 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE             11/15/2010     401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         14584 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE             11/15/2010     406      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         14585 ATTT Bench testbed SN#153. Need parts to build       Need to order parts for AT3 J5                 11/15/2010     null
               five spares for ASL. could not locate parts.
               closeing work order.
         14586 THE RAMMER STOW SWITCH WAS                           DURING STUDENT TRAINING THE HCT                11/15/2010     205      FSCATT M109A5
               ADJUSTED.                                            STOPPED RECOILING.
         14587 return to vendor for repair PO 85745 Recieved        two green strips on right side of the screen   11/15/2010     null
               from vendor from repair returning to asl line item
               #RT006



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 83
        WO #                Repair Notes                             Problem                       Date     Serial #       Description
        14588 THE PROJECTILE AND CHARGE BAG WAS       DUE TO STUDENT ERROR, A PROJECTILE       11/15/2010     205      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS              AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                               GUNTUBE.
        14589 THE PROJECTILE AND CHARGE BAG WAS       DUE TO STUDENT ERROR, A PROJECTILE       11/15/2010     202      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS              AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                               GUNTUBE.
        14590 THE PROJECTILE AND CHARGE BAG WAS       DUE TO STUDENT ERROR, A PROJECTILE       11/15/2010     401      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS              AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                               GUNTUBE.
        14591 THE PROJECTILE AND CHARGE BAG WAS       DUE TO STUDENT ERROR, A PROJECTILE       11/15/2010     403      FSCATT M109A6
              REMOVED AND THE SYSTEM WAS              AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                               GUNTUBE.
        14592 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     401      FSCATT M109A6
              CONDUCTED.                              SHUTDOWN
        14593 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     402      FSCATT M109A6
              CONDUCTED.                              SHUTDOWN
        14594 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     403      FSCATT M109A6
              CONDUCTED.                              SHUTDOWN
        14595 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     406      FSCATT M109A6
              CONDUCTED.                              SHUTDOWN
        14596 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     201      FSCATT M109A5
              CONDUCTED.                              SHUTDOWN
        14597 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     202      FSCATT M109A5
              CONDUCTED.                              SHUTDOWN
        14598 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     203      FSCATT M109A5
              CONDUCTED.                              SHUTDOWN
        14599 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     204      FSCATT M109A5
              CONDUCTED.                              SHUTDOWN
        14600 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     205      FSCATT M109A5
              CONDUCTED.                              SHUTDOWN
        14601 DE-ENERGIZING PROCEDURES WERE           AFTER STUDENT TRAINING: SYSTEM           11/15/2010     206      FSCATT M109A5
              CONDUCTED.                              SHUTDOWN
        14602 1. THE HCT WAS ENERGIZED AND VERIFIED   STUDENT TRAINING: 1. SYSTEM STARTUP 2.   11/16/2010     201      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND    SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14603 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14604 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14605 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14606 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14607 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14608 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14609 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14610 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010        403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                               Page 84
        WO #                Repair Notes                           Problem                     Date          Serial #       Description
        14611 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/16/2010          406      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14612 THE PROJECTILE AND CHARGE BAG WAS       DUE TO STUDENT ERROR, A PROJECTILE       11/16/2010     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS              AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                               GUNTUBE.
         14613 THE PROJECTILE AND CHARGE BAG WAS       DUE TO STUDENT ERROR, A PROJECTILE       11/16/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS              AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                               GUNTUBE.
         14614 THE SYSTEM WAS REBOOTED AND TEST        DURING STUDENT TRAINING THE              11/16/2010     206      FSCATT M109A5
               FIRED                                   PROJECTILE RAMMER STOPPED
                                                       FUNCTIONING.
         14615   THE PROJECTILE AND CHARGE BAG WAS     DUE TO STUDENT ERROR, A PROJECTILE       11/16/2010     402      FSCATT M109A6
                 REMOVED AND THE SYSTEM WAS            AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                             GUNTUBE.
         14616   THE PROJECTILE AND CHARGE BAG WAS     DUE TO STUDENT ERROR, A PROJECTILE       11/16/2010     403      FSCATT M109A6
                 REMOVED AND THE SYSTEM WAS            AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                             GUNTUBE.
         14617   THE PROJECTILE AND CHARGE BAG WAS     DUE TO STUDENT ERROR, A PROJECTILE       11/16/2010     204      FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS            AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                             GUNTUBE.
         14618   THE PROJECTILE AND CHARGE BAG WAS     DUE TO STUDENT ERROR, A PROJECTILE       11/16/2010     206      FSCATT M109A5
                 REMOVED AND THE SYSTEM WAS            AND CHARGE BAG BECAME STUCK IN THE
                 REBOOTED.                             GUNTUBE.
         14619   THE GUNTUBE WAS PUT BACK INTO         DUE TO STUDENT ERROR, THE GUNTUBE        11/16/2010     406      FSCATT M109A6
                 BATTERY, SYSTEM WAS REBOOTED AND      DID NOT RETURN INTO BATTERY AFTER
                 TEST FIRED.                           FIRE MISSION.
         14620   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     401      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14621   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     402      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14622   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     403      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14623   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     406      FSCATT M109A6
                 CONDUCTED.                            SHUTDOWN
         14624   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     201      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14625   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     202      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14626   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     203      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14627   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     204      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14628   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     205      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14629   DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM           11/16/2010     206      FSCATT M109A5
                 CONDUCTED.                            SHUTDOWN
         14630   1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.   11/17/2010     401      FSCATT M109A6
                 OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
                 THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
                 IS OPERATIONAL. 3. LOADED AND FIRED A
                 PROJECTILE, FUZE, AND CHARGE
                 COMBINATION, ALL SENSORS ARE
                 OPERATIONAL.
         14631 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010         402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14632 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010         403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14633 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010         406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14634 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010         201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                Page 85
        WO #                Repair Notes                           Problem                     Date                                Serial #          Description
        14635 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010                                202         FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14636 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010                               203         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14637 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010                               204         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14638 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010                               205         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14639 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 11/17/2010                               206         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14640 Replaced Trigger boot line# ST055, MFN#       Torn trigger and uncage boots.                       11/17/2010       92-295A       STPT Student Station
               13012497 - $55.17. Replaced Uncage boot line#
               ST059, MFN# 11448109 - $95.00. Replaced S&A
               switch line# ST115, MFN# 11488114 - $.

         14641 THE SYSTEM WAS REBOOTED AND TEST                A STUDENT PUSHED THE EMERGENCY                     11/17/2010         203         FSCATT M109A5
               FIRED                                           POWER OFF SWITCH
         14642                                                                                                    11/17/2010        BD2          BIDS Mockup
         14643                                                                                                    11/17/2010        BD1          BIDS Mockup
         14644                                                                                                    11/17/2010      FOX-MF-1       NBCRS FOX
                                                                                                                                                 SIMULATOR
         14645                                                                                                    11/17/2010      FOX-MF-2       NBCRS FOX
                                                                                                                                                 SIMULATOR
         14646 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         201         FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14647 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         202         FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14648 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         203         FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14649 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         204         FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14650 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         205         FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14651 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         206         FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         14652 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         401         FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14653 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         402         FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14654 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         403         FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14655 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     11/17/2010         406         FSCATT M109A6
               CONDUCTED.                                      SHUTDOWN
         14656 16 Nov 10 - Reseated the network cards in the   The image on the Student Image Generator           11/18/2010       C12-331       CFFT 1:12 Increment 2
               Student Image Generator and Student Control     dropped out during tests conducted on a repaired
               computers. No other problems found.             SAF computer (W.O.# 14469).

         14657 THE HCT WAS ENERGIZED AND VERIFIED              UNSCHEDULED STUDENT TRAINING:                      11/18/2010         201         FSCATT M109A5
               OPERATIONAL READINESS.                          SYSTEM STARTUP
         14658 THE HCT WAS ENERGIZED AND VERIFIED              UNSCHEDULED STUDENT TRAINING:                      11/18/2010         202         FSCATT M109A5
               OPERATIONAL READINESS.                          SYSTEM STARTUP
         14659 THE HCT WAS ENERGIZED AND VERIFIED              UNSCHEDULED STUDENT TRAINING:                      11/18/2010         203         FSCATT M109A5
               OPERATIONAL READINESS.                          SYSTEM STARTUP
         14660 THE HCT WAS ENERGIZED AND VERIFIED              UNSCHEDULED STUDENT TRAINING:                      11/18/2010         204         FSCATT M109A5
               OPERATIONAL READINESS.                          SYSTEM STARTUP
         14661 THE HCT WAS ENERGIZED AND VERIFIED              UNSCHEDULED STUDENT TRAINING:                      11/18/2010         205         FSCATT M109A5
               OPERATIONAL READINESS.                          SYSTEM STARTUP
         14662 THE HCT WAS ENERGIZED AND VERIFIED              UNSCHEDULED STUDENT TRAINING:                      11/18/2010         206         FSCATT M109A5
               OPERATIONAL READINESS.                          SYSTEM STARTUP
         14663 Cloned Hard drive. Performed DRC. Tested        Will not boot to windows desktop.                  11/18/2010   SSB0013/STA 5/1   ICOFT Student Station
               good.
         14664 Cloned Hard drive. Performed DRC. Tested        Will not boot to windows desktop.                  11/18/2010   SSB0012/STA 5/2   ICOFT Student Station
               good.
         14665 Cloned Hard drive. Performed DRC. Tested        Will not boot to windows desktop.                  11/18/2010   SSB0008/STA 5/6   ICOFT Student Station
               good.
         14666 Cloned Hard drive. Performed DRC. Tested        Will not boot to windows desktop.                  11/18/2010   SSB0017/STA 6/2   ICOFT Student Station
               good.
         14667 Cloned Hard drive. Performed DRC. Tested        Will not boot to windows desktop.                  11/18/2010   SSB0021/STA 6/6   ICOFT Student Station
               good.
         14668 Cloned Hard drive. Performed DRC. Tested        Will not boot to windows desktop.                  11/18/2010   SSA0001/STA 7/1   ICOFT Student Station
               good.
         14669 Cloned Hard drive. Performed DRC. Tested        Will not boot to windows desktop.                  11/18/2010   SSB0023/STA 7/3   ICOFT Student Station
               good.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                            Page 86
        WO #                   Repair Notes                                          Problem                           Date        Serial #            Description
        14670 Cloned Hard drive. Performed DRC. Tested          Will not boot to windows desktop.                  11/18/2010   SSB0025/STA 7/5   ICOFT Student Station
              good.
        14671 Shipping a replacement SAF. (CF031)    The SAF will not display targets and has                      11/18/2010        C-223        CFFT 1:12
                                                     numerous errors.
         14672 TROUBLESHOOTING REVEALED THAT BOTH PROJECTORS #7 & # 4 OVER HEAT AND                                11/19/2010       910007        IMTS
               PROJECTOR'S BLOWER MOTORS WILL NOT SHUT OFF
               TURN CAUSING THE PROJECTOR TO OVER
               HEAT AND TURN OFF. TWO PROJECTORS
               FROM FT. BLISS ASL WILL BE SHIPPED TO
               FT HOOD TO REPLACE THE DEFECTIVE
               ONES. NEED TO REPLACE TWO SLIDE
               TRAYS WITH BROKEN LATCHES. WORK
               DONE 11/16/2010


         14673 UNABLE TO DETERMINE PROBLEM WITH    NUMBER 5 BACKGROUND PROJECTOR WILL 11/19/2010                                    910007        IMTS
               SLIDE ADVANCEMENT, A PROJECTOR FROM NOT ADVANCE SLIDES
               FT. BLISS ASL WILL BE SHIPPED TO FT
               HOOD TO REPLACE THE DEFECTIVE ONE.
               WORK DONE 11/16/2010
         14674 TROUBLESHOOTING REVEALED THAT ALL                ALL FOUR VIDEO DISK PLAYERS WILL NOT               11/19/2010       910007        IMTS
               FOUR OF THE DRIVE BELTS WERE BROKE               EJECT
               AND REQUIRED REPLACEMENT. SHIPPED
               LAST THREE DRIVE BELTS TO FT HOOD
               WORK DONE 11/17/2010
         14675 TROUBLESHOOTING REVEALED THAT THE    PROJECTOR #3'S VIDEO VOLTAGE                                   11/19/2010       910007        IMTS
               DIGITAL INTERFACE CARD FOR PROJECTOR DIAGNOSTICS READINGS ALL DISPLAY
               #3 WAS DEFECTIVE AND WAS REPLACED    ZERO
               WITH A NEW ONE FROM FT HOOD'S ASL. A
               REPLACEMENT WILL BE SHIPPED TO FT
               HOOD FROM FT BLISS'S ASL. WORK DONE
               ON 11/18/2010
         14676 Reloaded the FIDVIEW software and terrains. No   Battlefield Image Generator #1 will not load       11/19/2010         null
               parts needed. Returned to ASL.                   FIDVIEW software.
         14677 unable to duplicate error. Tested. Returned to   Student Image Generator will not provide an        11/19/2010         null
               ASL                                              image.
         14678 Replaced touchscreen monitor.(LCD DISPLAY)       Bldg 700 TSS1 touchscreen monitor has partial      11/19/2010      LAB1 DIS       RT3
               Line# RT006 MFN H445428.                         touchscreen functions.
         14679 Purchased Wireless thermometer.                  Wireless thermometer required to monitor           11/21/2010        405          FSCATT M109A6
                                                                temperature thresholds in the FSCATT building to
                                                                meet the minimum and maximum temperature
                                                                requirements.
         14680 null                                                                                                11/21/2010        FOX1         NBCRS FOX
                                                                                                                                                  SIMULATOR
         14681 null                                                                                                11/21/2010        FOX1         NBCRS FOX
                                                                                                                                                  SIMULATOR
         14682 null                                                                                                11/21/2010        FOX2         NBCRS FOX
                                                                                                                                                  SIMULATOR
         14683 null                                                                                                11/21/2010        FOX2         NBCRS FOX
                                                                                                                                                  SIMULATOR
         14684 null                                                                                                11/21/2010       FOXIS1        NBCRS FOX
                                                                                                                                                  SIMULATOR
         14685 null                                                                                                11/21/2010       FOXIS1        NBCRS FOX
                                                                                                                                                  SIMULATOR
         14686 Performed monthly PMCS -cleaned station--                                                           11/21/2010                     FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14687 Performed monthly PMCS -cleaned station--                                                           11/21/2010    E110001V8IS      FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14688 Performed monthly PMCS -cleaned station--                                                           11/21/2010    E110002V8IS      FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14689 Performed monthly PMCS -cleaned station--                                                           11/21/2010    E110003V8OP      FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14690 Performed monthly PMCS -cleaned station--                                                           11/21/2010    E110004V8OP      FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14691 Performed monthly PMCS -cleaned station--                                                           11/21/2010    E110005V8OP      FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14692 Performed monthly PMCS -cleaned station--                                                           11/21/2010    E110006V8OP      FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14693 Performed monthly PMCS -cleaned station--                                                           11/21/2010    E110007V8OP      FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 87
        WO #                    Repair Notes                                        Problem                         Date        Serial #         Description
        14694 Performed monthly PMCS -cleaned station--                                                         11/21/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14695 Performed monthly PMCS -cleaned station--                                                         11/21/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14696 Performed monthly PMCS -cleaned station--                                                         11/21/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14697 Performed monthly PMCS -cleaned station--                                                         11/21/2010   E110011V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14698 Performed monthly PMCS -cleaned station--                                                         11/21/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14699 Performed monthly PMCS -cleaned station--                                                         11/21/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14700 Performed monthly PMCS -cleaned station--                                                         11/21/2010   E110014V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14701                                                                                                   11/21/2010        1        MLRS Mockup
        14702                                                                                                   11/21/2010        2        MLRS Mockup
        14703                                                                                                   11/21/2010        3        MLRS Mockup
        14704                                                                                                   11/21/2010        4        MLRS Mockup
        14705 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:                   11/22/2010       201       FSCATT M109A5
              OPERATIONAL READINESS.                            SYSTEM STARTUP
        14706 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:                   11/22/2010       202       FSCATT M109A5
              OPERATIONAL READINESS.                            SYSTEM STARTUP
        14707 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:                   11/22/2010       203       FSCATT M109A5
              OPERATIONAL READINESS.                            SYSTEM STARTUP
        14708 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:                   11/22/2010       204       FSCATT M109A5
              OPERATIONAL READINESS.                            SYSTEM STARTUP
        14709 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:                   11/22/2010       205       FSCATT M109A5
              OPERATIONAL READINESS.                            SYSTEM STARTUP
        14710 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:                   11/22/2010       206       FSCATT M109A5
              OPERATIONAL READINESS.                            SYSTEM STARTUP
        14711                                                   The Interface Case SN 43 would not boot         11/22/2010       null      AT3 Instructor Station
        14712 Found that both the removeable harddrives were    The computer case SN 43 would not boot          11/22/2010       null      AT3 Instructor Station
              corrupt. Ghosted both harddrives. The computer
              would boot.
        14713 Adjusted potentiometer. Perform DRC. Passed       #4 Hand station azimuth malfunction.            11/22/2010       159       AT3 (STC)
              DRC.
        14714 Adjusted potentiometer. Perform DRC. Passed       #9 Handstation elevation malfunction.           11/22/2010        4        AT3 (STC)
              DRC.
        14715 Found that both the removeable harddrives were    computer case SN 73 would not boot              11/22/2010       null      AT3 Instructor Station
              corrupt. Ghosted both harddrives. The Computer
              would boot. Replaced the Hinge, Footswitch Assy

         14716 Found that both the removeable harddrives were Computer Case 47 would not boot                   11/22/2010       null      AT3 Instructor Station
               corrupt. Ghosted both harddrives. the computer
               would boot. Replaced one missing heasset

         14717 Adjusted potentiometer. Perform DRC. Passed      #16 Handstaion azimuth malfunction.             11/22/2010       155       AT3 (STC)
               DRC.
         14718 Replaced touchscreen monitor.(LCD DISPLAY)       Bldg 700 TSS2 touchscreen monitor has partial   11/22/2010    LAB1 DIS     RT3
               Line# RT006 MFN H445428.                         touchscreen functions.
         14719 Could not recreate symptoms. Return to ASL.      Touchscreen monitor has dead spot.              11/22/2010       null
               Line# RT006.
         14720 Found that both harddrives were corrupted.       Computer case SN 45 would not boot.             11/22/2010       null      AT3 Instructor Station
               Ghosted both harddrives. The computer booted.
               Replaced the missing headset.
         14721 Could not recreate symptoms. Return to ASL.      Touchscreen monitor has dead spot.              11/22/2010       null
               Line# RT006.
         14722 Found that both removeable harddrives were       The computer case SN 42 would not boot          11/22/2010       null      AT3 Instructor Station
               corrupt. Ghosted the harddrives. The computer
               booted. Replaced broken headset
         14723 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE              11/22/2010       203       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         14724 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE              11/22/2010       206       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         14725 Performed map registration and saved             Map registration information not recognized     11/22/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
               information into system.                         during student scenario                                                    Instructor Station
         14726 TROUBLESHOOTING REVEALED THAT VIDEO              NO VIDEO ON TARGET MONITORS 1 & 2               11/22/2010     910007      IMTS
               CABLE WAS CONNECTED TO THE OUT
               CONNECTOR INSTEAD OF THE IN. WORK
               DONE 11/16/2010




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 88
        WO #                      Repair Notes                                       Problem                                Date         Serial #             Description
        14727 Found that both removeable harddrives were           The computer case SN 46 would not boot               11/22/2010         null         AT3 Instructor Station
              corrupted. Ghosted both harddrives. The
              computer booted. Found that the LCD Display
              would flicker after booting Replaced the LCD
              Display, the display was solid. Fixed the LCD
              Display
         14728 Replaced broken lamp. Line# IC068 MFN# 327.         Radio power light out.                               11/22/2010   SSB0013/STA 5/1    ICOFT Student Station

         14729 Replaced broken lamp. Line# IC068 MFN# 327.         Radio power light out.                               11/22/2010   SSB0010/STA 5/4    ICOFT Student Station

         14730 Found missing y-cable and returned to trainer.      Missing headset Y-cable. CVC helmet present is 11/22/2010         SSB0009/ STA 5/5   ICOFT Student Station
                                                                   not for Classroom ICOFT.
         14731 Drilled and riveted panel back on. Repaired         Side pannel on chair has pulled away from frame. 11/22/2010       SSB0008/STA 5/6    ICOFT Student Station
               communications wire.                                Broken communications wires.
         14732 Replaced broken lamp. Line# IC068 MFN# 327.         Radio power light out.                           11/22/2010       SSB0017/STA 6/2    ICOFT Student Station

         14733 Replaced broken lamp. Line# IC068 MFN# 327.         Radio power light out. Broken E-stop guard.          11/22/2010   SSB0018/STA 6/3    ICOFT Student Station
               Repaired E-stop guard.
         14734 Replaced broken lamp. Line# IC068 MFN# 327.         Radio power light out. Side pannel on chair has      11/22/2010   SSB0019/STA 6/4    ICOFT Student Station
               Drilled and riveted panel back on.                  pulled away from frame.
         14735 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                   11/22/2010         201          FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14736 Reinserted student station stops to prevent         Fell off stops.                                      11/22/2010   SSB0021/STA 6/6    ICOFT Student Station
               movement.
         14737 Repaired and reattached blower cover with semi-     Side blower cover has broken corner.                 11/22/2010   SSB0026/STA 7/6    ICOFT Student Station
               permenent adhesive.
         14738 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       11/22/2010         201          FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14739 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       11/22/2010         202          FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14740 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       11/22/2010         203          FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14741 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       11/22/2010         204          FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14742 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       11/22/2010         205          FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14743 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                       11/22/2010         206          FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14744 Replaced monitor line item # RT006 MFN#             Lower monitor is not working,due to electrical       11/23/2010         7-4          RT3
               H424318.                                            shortage.
         14745 EXPLAINED THAT THE GUNTUBE WAS NOT                  FORT RILEY, KS: CALLED ABOUT BREECH                  11/23/2010         404          FSCATT M109A6
               IN BATTERY, NEEDED TO INITIALIZE AND                NOT FULLY OPENING.
               RUN HYDRAULICS.
         14746 recreated issue, plugged monitor in. immediately    monitor is not working,due to electrical shortage.   11/23/2010         null
               hear sparks and smelled a electrical burn. return
               to vendor for repair. PO 85745 Recieved from
               vendor from repair returning to asl line item
               #RT006
         14747 Reconnected the Battlefield projector cables into Trainer has several issues after being powered         11/23/2010        C-077         CFFT 1:12
               the proper locations. Reconnected the LLDR        up.
               USB cable to the proper computer. Reconfigured
               the joystick so that the magnification control
               worked. Demonstrated to the operator the proper
               power up procedure so that the image generators
               work properly.

         14748 Changed configuration settings. Performed DRC.      Station 10 No audio while running scenario.          11/23/2010       91-066B        STPT Student Station
               Passed DRC. *CORRECTION* WO is for STPT
               0111A located at Fort Sill, OK.
         14749 Changed configuration settings. Performed DRC.      Station 9 Will not boot.                             11/23/2010                      AT3 Instructor Station
               Passed DRC. *CORRECTION* WO is for STPT
               91-043A located at Fort Sill, OK.
         14750 Replaced bone vibrator Line# ST005 MFN#             Station 8 Broken bone vibrator wires. Tube           11/23/2010       91-012A        STPT Student Station
               13012503E. Changed configuration settings.          display misalignment. Wrong video settings.
               Performed DRC. Passed DRC.
         14751 Repaired wire connection. Performed DRC.            Station 7 Broken wire connection on bone             11/23/2010       91-066B        STPT Student Station
               Passed DRC. *CORRECTION* WO is for STPT             vibrator.
               92-295A located at Fort Sill, OK.
         14752 Replaced Uncage boot Line# ST059 MFN#               Station 6 Torn uncage switch boot. Broken bone       11/23/2010       92-236A        STPT Student Station
               11488109. $95.00. Repaired S&A device.              vibrator bracket and S&A device.
               Repaired bone vibrator bracket.
         14753 Replaced S&A device.Line# ST115 MFN#                Station 5 Broken S&A device.                         11/23/2010       92-251A        STPT Student Station
               11488114.Performed DRC. Passed DRC.
         14754 Replaced gripstock assembly. Line# 0088 MFN#        Station 4 Broken antennna pivit pin. Gripstock       11/23/2010       91-066B        STPT Student Station
               87466400060. $9,998.00. Replaced antenna            inoperative.
               pivot pin Line# 008 MFN# 39466400030-1.
               $10.00.Performed DRC. Passed DRC.
               *CORRECTION* WO is for STPT 92-327 located
               at Fort Sill, OK.
         14755 Replaced bone vibrator. Line# ST005 MFN#            Station 3 Bone vibrator not operating during DRC. 11/23/2010          91-066B        STPT Student Station
               1301253E. $92.40. Replaced S&A device.Line#         S&A device worn
               ST115 MFN# 11488114. Performed DRC.
               Passed DRC. *CORRECTION* WO for 92-088A
               located at Fort Sill, OK.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                    Page 89
        WO #                   Repair Notes                                 Problem                                      Date         Serial #         Description
        14756 Replaced S&A assembly. Line# ST115 MFN#    Station 2 Tube monitor color has no blue field.             11/23/2010       91-003      STPT Student Station
              11488114. Performed DRC. Passed DRC. Cable
              nonnector had a bent pin.
        14757 Replaced S&A assembly. Line# ST115 MFN#    Station 1 Broken S&A device.                                11/23/2010       91-012A     STPT Student Station
              11488114. Performed DRC. Passed DRC.

         14758 Replaced trigger boot Line#ST055 MFN#              Inoperative gripstock.                             11/24/2010         null
               13012497 $55.17. Replaced Uncage boot Line#
               ST059 MFN# 11488109 $95.00. Repaired S&A
               device. Job complete. Return to ASL.

         14759 Shipping LLDR to vendor for repair. The LLDR       LLDR is not responding to movement. Follow up      11/26/2010         null
               will not show a display. PO 85684 4.15.2011 -      to W.O. # 13453
               Received from Vendor Repair. Tested, returned
               to ASL.
         14760 Unable to detect any errors. Tested and returned   Student Image Generator is not providing proper 11/26/2010            null
               to ASL.                                            joystick movement. Follow up to original W.O.#
                                                                  13453
         14761 Configured Network Card. Tested, returned to       SAF will not display targets. This is a follow up to 11/26/2010       null
               ASL.                                               W.O. # 14671
         14762 BY DIRECT SUBSTITUTION IT WAS                      STUDEN STATION FAILS THE DRIFT TEST & 11/26/2010                    92-173A     STPT Student
               DETERMINED THAT BOTH GYROS ARE                     IFF ANTENNA NOT CONNECTED
               DEFECTIVE. THE IFF ANTENNA HAS A
               BROKEN SHORT PIVOT PIN. EMAILED FT
               SILL FOR PARTS 11/26/10. RECEIVED NEW
               GYROS 11/30/10, WHEN INSTALLED
               CORRECTED BOTH THE ELEVATION &
               AZIMUTH PROBLEMS.
         14763 TROUBLESHOOTING INDICATED THAT THE                 STUDENT STATION PASSED DRIFT TEST    11/26/2010                     91-055A     STPT Student
               ELEVATION GYRO IS DEFECTIVE.                       BUT WON'T PASS THE ELEVATION PORTION
               REQUESTED A REPLACEMENT FROM FT                    OF THE MOTION DETECTION SYSTEM TEST
               SILL ON 11/26/10 RECEIVED NEW GYRO
               11/30/10, WHEN INSTALLED ELEVATION
               PROBLEM WAS CORRECTED.
         14764 null                                                                                                  11/28/2010        FOX1       NBCRS FOX
                                                                                                                                                  SIMULATOR
         14765 null                                                                                                  11/28/2010        FOX2       NBCRS FOX
                                                                                                                                                  SIMULATOR
         14766 null                                                                                                  11/28/2010       FOXIS1      NBCRS FOX
                                                                                                                                                  SIMULATOR
         14767 Performed monthly PMCS -cleaned station--                                                             11/28/2010                   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14768 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110001V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14769 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110002V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14770 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110003V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14771 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110004V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14772 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110005V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14773 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110006V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14774 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110007V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14775 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110008V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14776 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110009V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14777 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110010V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-
         14778 Performed monthly PMCS -cleaned station--                                                             11/28/2010     E110011V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                                                           Instructor Station
               cleaned network systems, communications
               systems, and black box-


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                   Page 90
        WO #                   Repair Notes                                           Problem                        Date        Serial #         Description
        14779 Performed monthly PMCS -cleaned station--                                                          11/28/2010   E110012V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                      Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14780 Performed monthly PMCS -cleaned station--                                                          11/28/2010   E110013V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                      Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14781 Performed monthly PMCS -cleaned station--                                                          11/28/2010   E110014V8OP   FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                                      Instructor Station
              cleaned network systems, communications
              systems, and black box-
        14782 Shipped replacement Stealth IG (ASL CF063).        Stealth IG will not power on.                   11/29/2010     C12-225     CFFT 1:12

         14783 TROUBLESHOOTING REVEALED THAT BOTH COMPUTER WILL NOT BOOT UP                                      11/30/2010       43        AT3 (STC) c
               REMOVABLE HARD DRIVES WERE
               CORRUPT. AFTER GHOSTED BOTH HARD
               DRIVES THE SYSTEM BOOTED NORMALLY.
               WORK COMPLETED 11/19/2010
         14784 TROUBLESHOOTING REVEALED THAT BOTH COMPUTER WILL NOT BOOTUP                                       11/30/2010       73        AT3 (STC) c
               REMOVABLE HARD DRIVES WERE
               CORRUPT. AFTER GHOSTED BOTH HARD
               DRIVES THE SYSTEM BOOTED NORMALLY.
               REPLACED ONE MISSING FOOT SWITCH
               W/HINGE WORK COMPLETED 11/19/2010
         14785 TROUBLESHOOTING REVEALED THAT BOTH COMPUTER WILL NOT BOOTUP                                       11/30/2010       47        AT3 (STC) c
               REMOVABLE HARD DRIVES WERE
               CORRUPT. AFTER GHOSTED BOTH HARD
               DRIVES THE SYSTEM BOOTED NORMALLY.
               REPLACED ONE MISSING HEADSET. WORK
               COMPLETED 11/19/2010.
         14786 TROUBLESHOOTING REVEALED THAT BOTH COMPUTER WILL NOT BOOTUP                                       11/30/2010       45        AT3 (STC) c
               REMOVABLE HARD DRIVES WERE
               CORRUPT. AFTER GHOSTED BOTH HARD
               DRIVES THE SYSTEM BOOTED NORMALLY.
               REPLACED ONE MISSING HEADSET. WORK
               COMPLETED 11/19/2010.
         14787 TROUBLESHOOTING REVEALED THAT BOTH COMPUTER WILL NOT BOOTUP                                       11/30/2010       42        AT3 (STC) c
               REMOVABLE HARD DRIVES WERE
               CORRUPT. AFTER GHOSTED BOTH HARD
               DRIVES THE SYSTEM BOOTED NORMALLY.
               REPLACED ONE BROKEN HEADSET (60689-
               01). WORK COMPLETED 11/19/2010.

         14788 TROUBLESHOOTING REVEALED THAT BOTH COMPUTER WILL NOT BOOTUP                                       11/30/2010       46        AT3 (STC) c
               REMOVABLE HARD DRIVES WERE
               CORRUPT. AFTER GHOSTED BOTH HARD
               DRIVES THE SYSTEM BOOTED NORMALLY.
               FOUND THAT THE LCD DISPLAY WOULD
               FLICKER AFTER BOOTING, AFTER
               REPLACING THE LCD THE VIDEO WAS
               STEADY. WORK COMPLETED 11/19/2010.
         14789 Opened and checked all cable connections.         Video flickered in vga                          11/30/2010       46        AT3 (STC) c
               Video now stable .
         14790 Repaired bone vibrator. Perfored DRC. Passed      Broken wire on bone vibrator.                   11/30/2010     92-295A     STPT Student Station
               DRC.
         14791 Repaired S&A device. Performed DRC. Passed        Broken S&A Device.                              11/30/2010     62-088A     STPT Student Station
               DRC. Job complete. *Note: SS serial# should be
               92-088A. Does not match list.*

         14792                                                   Semi-Annual                                     12/1/2010         1        HIMARS HPU
         14793 Shipped replacement SAF (CF031).                  SAF has no video.                               12/1/2010       C-095      CFFT 1:12
         14794 Cables were tested and passed.Computer drivers    SS#3 serial# 152. Touchscreen not functioning   12/1/2010        70        AT3 (STC) c
               and settings were adjusted. No change.            properly.
               Reinstalled touchscreen drivers. No change.
               Replaced LCD display Line# AT001 MFN# LO5-
               1812-10-SA-1. Performed DRC. Passed DRC.

         14795 Sent to vendor for repair. Returned from vendor   Touchscreen nonfunctional.                      12/1/2010        null
               because it is obsolete and non-reparable by
               them. Confirmed that touch screen panel is the
               failed component. Keep for parts.

         14796 The network configuration lost its settings.      SAF does not communicate with the other         12/1/2010      C12-324     CFFT 1:12 Increment 2
               Reconfigured the network settings and it worked   computers.
               fine.
         14797 BIOS reset, general maintenance of the rest of    Battlefield IG would not boot after windows but 12/2/2010      C12-425     CFFT 1:12 Increment 2
               the system.                                       before fidelity.
         14798 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/2/2010                 401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED             AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS             OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 91
        WO #                Repair Notes                           Problem                     Date                             Serial #        Description
        14799 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/2/2010                              402       FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14800 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/2/2010                             403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14801 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/2/2010                             406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14802 Restarted system and performed map                Map Registration not recognized.                 12/2/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
               registration.                                                                                                                Instructor Station
         14803 Shipped Replacement LLDR to site. 2CF029.         LLDR does not have left to right movement (Bad   12/2/2010     C30-326     CFFT 1:30 Increment 2
                                                                 Gyro). Site needs replacement LLDR.
         14804   DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                   12/2/2010       401       FSCATT M109A6
                 CONDUCTED.                                      SHUTDOWN
         14805   DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                   12/2/2010       401       FSCATT M109A6
                 CONDUCTED.                                      SHUTDOWN
         14806   DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                   12/2/2010       403       FSCATT M109A6
                 CONDUCTED.                                      SHUTDOWN
         14807   DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                   12/2/2010       406       FSCATT M109A6
                 CONDUCTED.                                      SHUTDOWN
         14808   MSG Mike Wison on site at Fort Sill. MSG Wilson Instructor missing amp/pa intercom.              12/3/2010     ISB0001     ICOFT Instructor Station
                 hand carried back to Camp Blanding, FL.
                 Repalced amp from ASL. Amp/PA,Intercom.
                 Line# IC052 MFN# 32-2041.

         14809                                                                                                    12/5/2010      FOX1       NBCRS FOX
                                                                                                                                            SIMULATOR
         14810                                                                                                    12/5/2010      FOX2       NBCRS FOX
                                                                                                                                            SIMULATOR
         14811                                                                                                    12/5/2010     FOXIS1      NBCRS FOX
                                                                                                                                            SIMULATOR
         14812 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             201       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14813 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14814 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14815 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14816 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14817 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14818 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14819 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                             402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 92
        WO #                Repair Notes                           Problem                     Date                               Serial #       Description
        14820 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                                403      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14821 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/6/2010                               406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14822 Shipping out a replacement Battlefield #2.          The Student IG #4 will not power on. (Battlefied   12/6/2010   Y-001B     CFFT-SOF 1:12
               (CF108)                                             IG #2 on this particular system)
         14823                                                     Preventive Maintenance Checks and Service          12/6/2010     407      FSCATT M109A6
         14824 Replaced the Student IG due to a nonworking         Student Image Generator will not load terrain.     12/6/2010    C-012     CFFT 1:4
               SIM Network Card. Replaced the Student Control
               due to a bad CMOS Battery (the computer kept
               losing the time and date settings). Student IG is
               CF077 and Student Control is CF079.

         14825 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     204      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14826 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14827 THE RAMMER CYLINDER WAS PUT BACK IN                 DUE TO STUDENT ERROR, THE RAMMER                   12/6/2010     201      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                            POSITION.
         14828 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14829 THE RAMMER CYLINDER WAS PUT BACK IN                 DUE TO STUDENT ERROR, THE RAMMER                   12/6/2010     202      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                            POSITION.
         14830 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14831 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14832 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     406      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14833 Replaced the CMOS Battery to correct fault.         Student Control loses time and date.               12/6/2010     null
               Tested, Returned to ASL. CF075.
         14834 Reseated Network Card, tested, returned to ASL.     Student IG will not load terrains.                 12/6/2010     null

         14835 Reseated Video Card. Tested, returned to ASL.       SAF has no video.                                  12/6/2010     null

         14836 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14837 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 12/6/2010     203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         14838 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     201      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14839 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     202      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14840 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     203      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14841 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     204      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14842 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     205      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14843 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     206      FSCATT M109A5
               CONDUCTED.                                          SHUTDOWN
         14844 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     401      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         14845 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     402      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         14846 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     403      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         14847 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     12/6/2010     406      FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         14848 Reseated the Network card in the Student Control    No video on the Student Image Generator or in      12/7/2010   C12-331    CFFT 1:12 Increment 2
               computer to restore the image on the Student IG.    the LLDR.
               Recloned the Student IG video to restore the
               image in the LLDR. No other problems were
               found.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 93
        WO #                Repair Notes                           Problem                     Date                       Serial #        Description
        14849 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                        201       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14850 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14851 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14852 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14853 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14854 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14855 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14856 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14857 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14858 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/7/2010                       406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14859 Adjusted paper map, reloaded software,         Map Registration not reading properly.       12/7/2010    E110007V8OP   FFROT AN/TPQ-36 (V8)
               performed map registration.                                                                                            Instructor Station
         14860 Reloaded Software.                             Password lockout                             12/7/2010    E110009V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                      Instructor Station
         14861 Rebooted system, performed map registration.   Map Registration not registering properly.   12/7/2010    E110007V8OP   FFROT AN/TPQ-36 (V8)
                                                                                                                                      Instructor Station
         14862 Replaced card 57039ASSY - 12945174.            CM - Radar Card Rack Simulation, Pin 23 Row 4 12/7/2010   114B0001M37   FIMT
               Replaced variable resistor.                    broken. Pin 26 Row 5 broken. Alarm knob broken.

         14863 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE           12/7/2010        201       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                      GUNTUBE.
         14864 THE RAMMER CYLINDER WAS PUT BACK IN            DUE TO STUDENT ERROR, THE RAMMER             12/7/2010        204       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                       POSITION.
         14865 THE PROJECTILE AND CHARGE BAG WAS              DUE TO STUDENT ERROR, A PROJECTILE           12/7/2010        403       FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                     AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                      GUNTUBE.
         14866 THE RAMMER CYLINDER WAS PUT BACK IN            DUE TO STUDENT ERROR, THE RAMMER             12/7/2010        203       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                       POSITION.
         14867 THE GUNTUBE WAS PUT BACK INTO                  DUE TO STUDENT ERROR, THE GUNTUBE            12/7/2010        204       FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND               DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                    FIRE MISSION.
         14868 THE PROJECTILE AND CHARGE BAG WAS              A STUDENT PUSHED THE EMERGENCY               12/7/2010        205       FSCATT M109A5
               REMOVED, SYSTEM WAS REBOOTED AND               POWER OFF (EPO) SWITCH DURING A FIRE
               TEST FIRED                                     MISSION
         14869 THE IOS AND AFCS COMPUTERS WERE                A STUDENT PUSHED THE CHECK FIRE              12/7/2010        402       FSCATT M109A6
               REINITIALIZED, SYSTEM WAS TEST FIRED           BUTTON ON THE AFCS CAUSING THE
                                                              SYSTEM TO LOCKUP


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                            Page 94
        WO #                Repair Notes                                        Problem                       Date    Serial #       Description
        14870 THE SYSTEM WAS REINITIALIZED AND TEST              THE HCT LOST COMMUNICATIONS              12/7/2010     401      FSCATT M109A6
              FIRED.                                             BETWEEN THE IOS AND EIU COMPUTERS.
        14871 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER         12/7/2010     205      FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                           POSITION.
        14872 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE       12/7/2010     204      FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                          GUNTUBE.
        14873 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     201      FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        14874 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     202      FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        14875 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     203      FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        14876 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     204      FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        14877 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     205      FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        14878 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     206      FSCATT M109A5
              CONDUCTED.                                         SHUTDOWN
        14879 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     401      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        14880 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     402      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        14881 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     403      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        14882 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM           12/7/2010     406      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        14883 1. THE HCT WAS ENERGIZED AND VERIFIED              STUDENT TRAINING: 1. SYSTEM STARTUP 2.   12/9/2010     201      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND               SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         14884 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14885 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14886 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14887 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14888 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14889 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14890 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14891 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14892 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/9/2010                   406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14893 Information input error. Not for Camp Blanding.   Will not load PCAT login.                12/9/2010   SSB0002    ICOFT Student Station
               Void this WO.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 95
        WO #                  Repair Notes                                          Problem                                Date        Serial #            Description
        14894 Reimaged hard drive, configured IP adress,        Will not load PCAT login.                              12/9/2010    SSB0017/STA 6/2   ICOFT Student Station
              performed DRC. Passed DRC.
        14895 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE                      12/9/2010         201          FSCATT M109A5
              BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
              TEST FIRED.                                       FIRE MISSION.
        14896 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER                       12/9/2010         206          FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                          POSITION.
        14897 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE                      12/9/2010         403          FSCATT M109A6
              BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
              TEST FIRED.                                       FIRE MISSION.
        14898 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                     12/9/2010         406          FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                         GUNTUBE.
        14899                                                                                                          12/9/2010        CFFT1         CFFT 1:30
        14900                                                                                                          12/9/2010         IW1          MM1
        14901                                                                                                          12/9/2010         IW2          MM1
        14902                                                                                                          12/9/2010         IW3          MM1
        14903                                                                                                          12/9/2010         OW1          MM1
        14904                                                                                                          12/9/2010        OW10          MM1
        14905                                                                                                          12/9/2010        OW11          MM1
        14906                                                                                                          12/9/2010        OW12          MM1
        14907                                                                                                          12/9/2010         OW2          MM1
        14908                                                                                                          12/9/2010         OW3          MM1
        14909                                                                                                          12/9/2010         OW4          MM1
        14910                                                                                                          12/9/2010         OW5          MM1
        14911                                                                                                          12/9/2010         OW6          MM1
        14912                                                                                                          12/9/2010         OW7          MM1
        14913                                                                                                          12/9/2010         OW8          MM1
        14914                                                                                                          12/9/2010         OW9          MM1
        14915                                                                                                          12/9/2010         BD2          BIDS Mockup
        14916                                                                                                          12/9/2010         BD1          BIDS Mockup
        14917                                                                                                          12/9/2010       FOX-MF-1       NBCRS FOX
                                                                                                                                                      SIMULATOR
         14918                                                                                                         12/9/2010       FOX-MF-2       NBCRS FOX
                                                                                                                                                      SIMULATOR
         14919 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                     12/9/2010         203          FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         14920 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         201          FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14921 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         202          FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14922 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         203          FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14923 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         204          FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14924 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         205          FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14925 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         206          FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         14926 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         401          FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14927 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         402          FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14928 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         403          FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14929 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                         12/9/2010         406          FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         14930 Ran diagnostics. Replaced Nozzle Assembly        Unspecified.                                           12/10/2010       9912-11       CAMSIM
               Replaced End Cap Assembly Replaced Battery
               Retaining Cap Replaced Nozzle Protective Cover
               Replaced 2 Filters Replaced 1 Case Latch
               Repaired G Air Source

         14931 could not recreate issue.                        computer was beeping, no display. not booting.         12/10/2010         3-2         RT3

         14932 shipped Replacement Joystick to site. CF112.     Instructor Control Joystick is drifting up. The error 12/10/2010        C30-028       CFFT 1:30
                                                                cannot be corrected through the software.

         14933 Reseated the motherboard P1 connector.           Student Control computer will not power up.            12/10/2010       C12-324       CFFT 1:12 Increment 2
               Checked out fine.
         14934                                                  one of the battlefield pcs kept rebooting on itself.   12/10/2010        C-044        CFFT 1:12
                                                                Replaced and reset network switch.
         14935                                                                                                         12/12/2010        FOX1         NBCRS FOX
                                                                                                                                                      SIMULATOR
         14936                                                                                                         12/12/2010        FOX1         NBCRS FOX
                                                                                                                                                      SIMULATOR
         14937                                                                                                         12/12/2010        FOX2         NBCRS FOX
                                                                                                                                                      SIMULATOR
         14938                                                                                                         12/12/2010        FOX2         NBCRS FOX
                                                                                                                                                      SIMULATOR
         14939                                                                                                         12/12/2010       FOXIS1        NBCRS FOX
                                                                                                                                                      SIMULATOR
         14940                                                                                                         12/12/2010       FOXIS1        NBCRS FOX
                                                                                                                                                      SIMULATOR




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 96
        WO #                   Repair Notes                   Problem        Date       Serial #          Description
        14941 Performed monthly PMCS -cleaned station--                  12/12/2010                 FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                              Instructor Station
              cleaned network systems, communications
              systems, and black box
        14942 Inspected cables and connectors for wear and               12/12/2010     ETIOS1      SMT ETRAC
              tear. Cleaned and wiped down cases and
              monitors. Performed DRC. Passed DRC.

         14943 Inspected cables and connectors for wear and              12/12/2010     ETSS9       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14944 Inspected cables and connectors for wear and              12/12/2010     ETSS1       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14945 Inspected cables and connectors for wear and              12/12/2010     ETSS2       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14946 Inspected cables and connectors for wear and              12/12/2010     ETSS3       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14947 Inspected cables and connectors for wear and              12/12/2010     ETSS4       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14948 Inspected cables and connectors for wear and              12/12/2010     ETSS5       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14949 Inspected cables and connectors for wear and              12/12/2010     ETSS6       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14950 Inspected cables and connectors for wear and              12/12/2010     ETSS7       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14951 Inspected cables and connectors for wear and              12/12/2010     ETSS8       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14952 Inspected cables and connectors for wear and              12/12/2010     ETSS9       SMT ETRAC
               tear. Cleaned and wiped down cases and
               monitors. Performed DRC. Passed DRC.

         14953 Performed monthly PMCS -cleaned station--                 12/12/2010   E110001V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14954 Performed monthly PMCS -cleaned station--                 12/12/2010   E110002V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14955 Performed monthly PMCS -cleaned station--                 12/12/2010   E110003V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14956 Performed monthly PMCS -cleaned station--                 12/12/2010   E110004V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14957 Performed monthly PMCS -cleaned station--                 12/12/2010   E110005V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14958 Performed monthly PMCS -cleaned station--                 12/12/2010   E110006V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14959 Performed monthly PMCS -cleaned station--                 12/12/2010   E110007V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14960 Performed monthly PMCS -cleaned station--                 12/12/2010   E110008V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14961 Performed monthly PMCS -cleaned station--                 12/12/2010   E110009V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box
         14962 Performed monthly PMCS -cleaned station--                 12/12/2010   E110010V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                             Instructor Station
               cleaned network systems, communications
               systems, and black box


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                       Page 97
        WO #                   Repair Notes                          Problem                     Date         Serial #           Description
        14963 Performed monthly PMCS -cleaned station--                                      12/12/2010    E110011V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box
        14964 Performed monthly PMCS -cleaned station--                                      12/12/2010    E110012V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box
        14965 Performed monthly PMCS -cleaned station--                                      12/12/2010    E110013V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box
        14966 Performed monthly PMCS -cleaned station--                                      12/12/2010    E110014V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                                     Instructor Station
              cleaned network systems, communications
              systems, and black box
        14967 PMCS - Clean and inspect station.                                              12/12/2010      114B0001IS    FIMT
        14968 Do not touch. Programmer station.                                              12/12/2010     114B0009SSC    FIMT
        14969 null                                                                           12/12/2010     114B0001M37    FIMT
        14970 PMCS - Clean, inspect and test station.                                        12/12/2010     114B0002M37    FIMT
        14971 PMCS - Clean, inspect and test station.                                        12/12/2010     114B0003M37    FIMT
        14972 PMCS - Clean, inspect and test station.                                        12/12/2010     114B0004M37    FIMT
        14973 In storage.                                                                    12/12/2010     114B0005M36    FIMT
        14974 In storage.                                                                    12/12/2010     114B0006M36    FIMT
        14975 In storage.                                                                    12/12/2010     114B0007M36    FIMT
        14976 In storage.                                                                    12/12/2010     114B0008M36    FIMT
        14977 PMCS - Clean and inspect station.                                              12/12/2010    114D0001SMTIS   SMT Student Station
        14978 Do not touch. Programmer station.                                              12/12/2010   114D0006SMTSSC   SMT Student Station
        14979 PMCS - Clean, inspect and test station.                                        12/12/2010     114D0002SMT    SMT Student Station
        14980 PMCS - Clean, inspect and test station.                                        12/12/2010     114D0003SMT    SMT Student Station
        14981 PMCS - Clean, inspect and test station.                                        12/12/2010     114D0004SMT    SMT Student Station
        14982 PMCS - Clean, inspect and test station.                                        12/12/2010     114D0005SMT    SMT Student Station
        14983                                                                                12/12/2010           3        HIMARS DT
        14984                                                                                12/12/2010           2        MLRS DT
        14985                                                                                12/12/2010           1        MLRS DT
        14986 Completed                                                                      12/12/2010        910005      IMTS
        14987 Inspected cables and connectors for wear and                                   12/12/2010        ETIOS1      SOT ETRAC Instructor
              tear. Cleaned and wiped down cases and                                                                       Station
              monitors. Performed DRC. Passed DRC.

         14988 Inspected cables and connectors for wear and                                  12/12/2010       ETSS1        SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases                                                                          STATION
               andmonitors. Performed DRC. Passed DRC.

         14989 Inspected cables and connectors for wear and                                  12/12/2010       ETSS2        SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases                                                                          STATION
               andmonitors. Performed DRC. Passed DRC.

         14990 Inspected cables and connectors for wear and                                  12/12/2010       ETSS3        SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases                                                                          STATION
               andmonitors. Performed DRC. Passed DRC.

         14991 Inspected cables and connectors for wear and                                  12/12/2010       ETSS4        SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases                                                                          STATION
               andmonitors. Performed DRC. Passed DRC.

         14992 Inspected cables and connectors for wear and                                  12/12/2010       ETSS5        SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases                                                                          STATION
               andmonitors. Performed DRC. Passed DRC.

         14993 Inspected cables and connectors for wear and                                  12/12/2010       ETSS6        SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases                                                                          STATION
               andmonitors. Performed DRC. Passed DRC.

         14994 null                                                                          12/12/2010       ETSS7        SOT ETRAC STUDENT
                                                                                                                           STATION
         14995 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010         201         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14996 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010         202         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14997 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010         203         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         14998 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010         204         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                              Page 98
        WO #                Repair Notes                           Problem                     Date                            Serial #       Description
        14999 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010                            205      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15000 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010                           206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15001 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010                           401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15002 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010                           402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15003 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010                           403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15004 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/13/2010                           406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15005 Removed Stealth Image Generator hard drive,       Stealth Image Generator will not boot.          12/13/2010   C30-318     CFFT 1:30 Increment 2
               reinserted and secured it properly with locking
               key. Restarted Stealth, tested. Stealth and
               system are now fully operational.
         15006                                                   Power wire inoperable. Missing battery cover.   12/13/2010      null     ACADASIM

         15007 REPLACED ALL 16 PROJECTOR AIR FILTERS QUARTERLY PMCS FOR IMTS UPGRADE                             12/13/2010      301      IMTS
               & TWO PROJECTOR LAMPS.
         15008 Performed Preventive Maintenance. Performed Preventive Maintenance Checks And services            12/13/2010      407      FSCATT M109A6
               Service Checks And Lubercation Points.
               Performed Test Manuel Action Comands For
               Proper Operations. Completed FSCATT PMCS.

         15009                                                   Power wire inoperative, On/Off switch broken    12/13/2010   0711-0004   ACADASIM
         15010 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      201      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15011 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      202      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15012 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      203      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15013 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      204      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15014 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      205      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15015 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      206      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15016 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      401      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         15017 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      402      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         15018 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      403      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         15019 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                  12/13/2010      406      FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         15020 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2.          12/14/2010      201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND              SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15021 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                           202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15022 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                           203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 99
        WO #                Repair Notes                           Problem                     Date                                  Serial #       Description
        15023 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                                  204      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15024 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                                 205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15025 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                                 206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15026 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                                 401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15027 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                                 402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15028 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                                 403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15029 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/14/2010                                 406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15030 THE GUNTUBE WAS PUT BACK INTO                         DUE TO STUDENT ERROR, THE GUNTUBE                  12/14/2010     202      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                      DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                           FIRE MISSION.
         15031 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                 12/14/2010     204      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                             GUNTUBE.
         15032 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                 12/14/2010     201      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                             GUNTUBE.
         15033 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                 12/14/2010     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                             GUNTUBE.
         15034 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                 12/14/2010     401      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                             GUNTUBE.
         15035 THE PROJECTILE AND CHARGE BAG WAS                     DUE TO STUDENT ERROR, A PROJECTILE                 12/14/2010     403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                            AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                             GUNTUBE.
         15036 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     201      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15037 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     202      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15038 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     203      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15039 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     204      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15040 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     205      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15041 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     206      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15042 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     401      FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         15043 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     402      FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         15044 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     403      FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         15045 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/14/2010     406      FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN
         15046 21 Dec 10 - Received a patch file from Fidelity. 22   Instructor Control computer denies access to the   12/15/2010   C12-366    CFFT 1:12 Increment 2
               Dec 10 - Ran the patch file on the Instructor         User when trying to create or edit scenarios.
               Control computer which restored the proper folder
               permissions. No other problems were found.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                  Page 100
        WO #                Repair Notes                           Problem                     Date                                  Serial #       Description
        15047 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                  201      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15048 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15049 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15050 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15051 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15052 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15053 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15054 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15055 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15056 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/15/2010                                 406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15057 Replaced the Joystick. CF112.                         Joystick is inoperable.                            12/15/2010    C-034     CFFT 1:4
         15058 Received Phone Call from Mr. Echternach on 12-        Shipped a CFFT Dongle to Guy Echternach.           12/15/2010     null
               15-2010. He stated that Fielity needs CFFT
               Dongle Serial # 1478409925. Prepped and
               shipped out on 12-15-2010.
         15059 Advised site to ship system in for repair. 2.8.11 -   Instructor Control and Stealth IG will not boot,   12/15/2010   C12-225    CFFT 1:12
               Replaced the CMOS battery in the Stealth IG and       multiple system errors. Advised site to ship
               the Student IG Computers. Reconfigured the            system in for repair.
               MAK License on the Instructor Control Computer.
               Changed the boot order on the SAF Computer.
               De-fragged all hard drives and set all the time
               dates on all of the computers.

         15060 Shipper a replacement Instructor Control.             Instructor Control is not powering on. Site also   12/15/2010   C30-319    CFFT 1:30 Increment 2
               2CF023.                                               stated that the Power Button was jammed in.

         15061 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/15/2010     201      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15062 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/15/2010     202      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15063 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/15/2010     203      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15064 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/15/2010     204      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15065 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/15/2010     205      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15066 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/15/2010     206      FSCATT M109A5
               CONDUCTED.                                            SHUTDOWN
         15067 DE-ENERGIZING PROCEDURES WERE                         AFTER STUDENT TRAINING: SYSTEM                     12/15/2010     401      FSCATT M109A6
               CONDUCTED.                                            SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                   Page 101
        WO #                Repair Notes                                       Problem                       Date     Serial #       Description
        15068 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM           12/15/2010     402      FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        15069 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM           12/15/2010     403      FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        15070 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM           12/15/2010     406      FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        15071 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2.   12/16/2010     201      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND              SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15072 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15073 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15074 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15075 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15076 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15077 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15078 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15079 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15080 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 12/16/2010                  406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15081 Passed Diagnostics. Clear errors with software   Would not clear errors.                  12/16/2010   0207-27    CAMSIM
               and manually. Replaced complete set of
               magnets. Replaced full filter pack. Replaced
               Errors Card & key.
         15082 Passed Diagnostics. Power switch responded       Power switch not working.                12/16/2010   0408-18    CAMSIM
               correctly. Replaced magnet pack set. Replaced
               Filter Pack. Glued foam insert back into case.

         15083 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE       12/16/2010     203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15084 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE       12/16/2010     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15085 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE       12/16/2010     402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15086 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER         12/16/2010     403      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         15087 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM           12/16/2010     201      FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15088 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM           12/16/2010     202      FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 102
        WO #                 Repair Notes                               Problem                Date      Serial #       Description
        15089 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      203      FSCATT M109A5
              CONDUCTED.                             SHUTDOWN
        15090 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      204      FSCATT M109A5
              CONDUCTED.                             SHUTDOWN
        15091 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      205      FSCATT M109A5
              CONDUCTED.                             SHUTDOWN
        15092 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      206      FSCATT M109A5
              CONDUCTED.                             SHUTDOWN
        15093 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      401      FSCATT M109A6
              CONDUCTED.                             SHUTDOWN
        15094 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      402      FSCATT M109A6
              CONDUCTED.                             SHUTDOWN
        15095 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      403      FSCATT M109A6
              CONDUCTED.                             SHUTDOWN
        15096 DE-ENERGIZING PROCEDURES WERE          AFTER STUDENT TRAINING: SYSTEM        12/16/2010      406      FSCATT M109A6
              CONDUCTED.                             SHUTDOWN
        15097 Need two 2G RAM sticks. Line# AT065    Both RAM sticks are non-functional.   12/17/2010      153      AT3 (STC)
              MFN#PVS34G1500LLV. $119.99.Replaced
              RAM. Performed DRC. Passed DRC.
        15098                                                                              12/19/2010     FOX1      NBCRS FOX
                                                                                                                    SIMULATOR
         15099                                                                             12/19/2010     FOX1      NBCRS FOX
                                                                                                                    SIMULATOR
         15100                                                                             12/19/2010     FOX2      NBCRS FOX
                                                                                                                    SIMULATOR
         15101                                                                             12/19/2010     FOX2      NBCRS FOX
                                                                                                                    SIMULATOR
         15102                                                                             12/19/2010    FOXIS1     NBCRS FOX
                                                                                                                    SIMULATOR
         15103                                                                             12/19/2010    FOXIS1     NBCRS FOX
                                                                                                                    SIMULATOR
         15104 null                                                                        12/19/2010     C-087     CFFT 1:12
         15105 null                                                                        12/19/2010     C-088     CFFT 1:12
         15106 PMCS COMPLETE                                                               12/19/2010   0002V8M36   FFOMT AN/TPQ-36
                                                                                                                    (V8)
         15107 PMCS COMPLETE                                                               12/19/2010   0001V8M36   FFOMT AN/TPQ-36
                                                                                                                    (V8)
         15108 PMCS COMPLETE                                                               12/19/2010   0003V8M36   FFOMT AN/TPQ-36
                                                                                                                    (V8)
         15109 PMCS COMPLETE                                                               12/19/2010   0004V8M36   FFOMT AN/TPQ-36
                                                                                                                    (V8)
         15110 PMCS COMPLETE                                                               12/19/2010   0005V8M36   FFOMT AN/TPQ-36
                                                                                                                    (V8)
         15111   null                                                                      12/19/2010      212      FSCATT M109A5
         15112   null                                                                      12/19/2010      302      FSCATT M109A5
         15113   null                                                                      12/19/2010      213      FSCATT M109A5
         15114   null                                                                      12/19/2010      301      FSCATT M109A5
         15115   null                                                                      12/19/2010      null     FSCATT M109A5
         15116   null                                                                      12/19/2010      311      FSCATT M109A5
         15117   null                                                                      12/19/2010      303      FSCATT M109A5
         15118   null                                                                      12/19/2010      null     FSCATT M109A5
         15119   null                                                                      12/19/2010      101      FSCATT M109A5
         15120   null                                                                      12/19/2010      210      FSCATT M109A5
         15121   null                                                                      12/19/2010      211      FSCATT M109A5
         15122   null                                                                      12/19/2010      307      FSCATT M109A5
         15123   null                                                                      12/19/2010      null     FSCATT M109A5
         15124   null                                                                      12/19/2010      201      FSCATT M109A5
         15125   null                                                                      12/19/2010      202      FSCATT M109A5
         15126   null                                                                      12/19/2010      203      FSCATT M109A5
         15127   PMCS/LO WAS ALREADY CONDUCTED FOR                                         12/19/2010      204      FSCATT M109A5
                 THIS PERIOD, SEE WO# 15166
         15128   PMCS/LO WAS ALREADY CONDUCTED FOR                                         12/19/2010      205      FSCATT M109A5
                 THIS PERIOD, SEE WO# 15190
         15129   PMCS/LO WAS ALREADY CONDUCTED FOR                                         12/19/2010      206      FSCATT M109A5
                 THIS PERIOD, SEE WO# 15180
         15130   null                                                                      12/19/2010      305      FSCATT M109A5
         15131   null                                                                      12/19/2010      null     FSCATT M109A5
         15132   null                                                                      12/19/2010      306      FSCATT M109A5
         15133   null                                                                      12/19/2010      null     FSCATT M109A5
         15134   null                                                                      12/19/2010      null     FSCATT M109A5
         15135   null                                                                      12/19/2010      316      FSCATT M109A5
         15136   null                                                                      12/19/2010      null     FSCATT M109A5
         15137   null                                                                      12/19/2010      null     FSCATT M109A5
         15138   null                                                                      12/19/2010      216      FSCATT M109A5
         15139   null                                                                      12/19/2010      308      FSCATT M109A5
         15140   null                                                                      12/19/2010      null     FSCATT M109A5
         15141   null                                                                      12/19/2010      309      FSCATT M109A5
         15142   null                                                                      12/19/2010      310      FSCATT M109A5
         15143   null                                                                      12/19/2010      102      FSCATT M109A5
         15144   null                                                                      12/19/2010      208      FSCATT M109A5
         15145                                                                             12/19/2010       1       HIMARS Mockup
         15146                                                                             12/19/2010       2       HIMARS Mockup
         15147                                                                             12/19/2010     C-150     CFFT 1:12
         15148                                                                             12/19/2010       3       HIMARS Mockup




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                               Page 103
        WO #                      Repair Notes                                       Problem                              Date      Serial #       Description
        15149 Found s-video connector had been replaced with Will not read hits.                                      12/21/2010   SEDX00003   ATGM BST
              the wrong type of plug. Found CMOS battery to
              be completely discharged. Need to repair s-video
              cable. Needed: circular flourescent bulb(Sylvania
              22W, FC8 T9/OSW/RP) to operate work bench
              magnifier light, in order to solder wiring. Repaired
              s-video cable. Performed DRC. Passed DRC.
              Replaced CMOS battery Line#AT028 MFN#
              2032. Hours in repair: 8hrs total.



         15150 Performed a physical and video algnment of the   There is a gap in the center of the battlefield       12/21/2010    C30-026    CFFT 1:30
               battlefield 2 projector.                         video.
         15151 Installed trainer.                               Assistance is requested to install trainer.           12/21/2010    C12-325    CFFT 1:12 Increment 2

         15152 Removed trainer.                                 Assistance is requested to remove and pack up         12/21/2010     C-137     CFFT 1:12
                                                                trainer in preparation for install of new increment
                                                                II trainer.
         15153 Replaced LCD display. Line# RT006 MFN#           INOP- no touchscreen function.                        12/22/2010      8-6      RT3
               H424318.
         15154 Could not duplicate problem. Performed DRC.      INOP - would not load software or bootup.             12/22/2010      6-6      RT3
               Passed DRC.
         15155                                                                                                        12/26/2010     FOX1      NBCRS FOX
                                                                                                                                               SIMULATOR
         15156                                                                                                        12/26/2010     FOX2      NBCRS FOX
                                                                                                                                               SIMULATOR
         15157                                                                                                        12/26/2010    FOXIS1     NBCRS FOX
                                                                                                                                               SIMULATOR
         15158 null                                                                                                   12/26/2010      301      IMTS
         15159 null                                                                                                   12/26/2010      302      IMTS
         15160                                                                                                        12/26/2010       1       MLRS Mockup
         15161                                                                                                        12/26/2010       2       MLRS Mockup
         15162                                                                                                        12/26/2010       3       MLRS Mockup
         15163                                                                                                        12/26/2010       4       MLRS Mockup
         15164 CONDUCTED PMCS/LO, 5 MAN HOURS. PART             PMCS/LO DUE                                           12/27/2010      201      FSCATT M109A5
               USED: HT0368, 1EA.
         15165 CONDUCTED PMSC/LO, 5 MAN HOURS.                  PMCS/LO DUE                                           12/27/2010      202      FSCATT M109A5
         15166 CONDUCTED PMCS/LO, 5 MAN HOURS. PART             PMCS/LO DUE                                           12/27/2010      204      FSCATT M109A5
               USED: HT0367, 1EA.
         15167 Shipped out another replacement Student IG #4    Student IG #4 will not power on. (This is a the    12/27/2010       Y-001B     CFFT-SOF 1:12
               to Yuma, AZ. ASL # cf125                         Student IG #4 that shipped out on 11-10-2010,
                                                                WO # 14548.)
         15168 Re-seated Network Card. Tested vigorously,       Student IG 4 will not cummunicate with the rest of 12/27/2010         null
               Returned to ASL.                                 the system. This is a follow-up to 14548.

         15169 Reconnected Power Cables, tested, returned to    The Student IG #4 will not power on. This is a        12/27/2010      null
               ASL. No parts used.                              follow-up to 14822.
         15170 PO 85684 Item received back.. tested, returned   LLDR does not have left to right movement (Bad        12/27/2010      null
               to ASL.                                          Gyro). Site needs replacement LLDR. This is a
                                                                follow-up to 14803.
         15171 Replaced Hard Drive in the Student IG CF055.     The Student IG will not boot. This a follow-up to     12/27/2010      null
               Installed Windows XP and all applicable drivers. 14354.
               Installed Fidview 2.8.0.1. Tested, Returned to
               ASL.
         15172 THE CFFT WAS HAND RECEIPTED TO THE               PASSWORD NOT WORKING                                  12/27/2010    C12-333    CFFT 1:12 Increment 2
               41ST FA 1ST AD, THEY DID NOT ATTEND THE
               NET TRAINING AND WERE NOT FAMILIAR
               WITH THE PASSWORD REQUIREMENT.
               TROUBLESHOOTING REVEALED THAT THEY
               HAD LOCKED THEMSELVES OUT OF THE
               INSTRUCTOR CONTROL COMPUTER. THE
               PASSWORD WAS RESET AND THEY WERE
               GIVEN A CLASS ON THE PROPER
               PROCEDURE FOR LOGGING ON AND OFF
               THE TRAINER. WORK DONE ON 20 DEC 10
               1300 to 1500.
         15173 entered in error                                 entered in error                                      12/28/2010    C12-324    CFFT 1:12 Increment 2

         15174                                                 Semi-Annual                                            12/29/2010       9       HIMARS HPU
         15175 Showed the operator the proper logon procedure. Operator is having problems logging into the           12/29/2010    C12-325    CFFT 1:12 Increment 2
                                                               trainer computers
         15176                                                                                                        1/2/2011       FOX1      NBCRS FOX
                                                                                                                                               SIMULATOR
         15177                                                                                                        1/2/2011       FOX2      NBCRS FOX
                                                                                                                                               SIMULATOR
         15178                                                                                                        1/2/2011      FOXIS1     NBCRS FOX
                                                                                                                                               SIMULATOR
         15179 CONDUCTED PMCS/LO, 5 MAN HOURS. PART PMCS/LO DUE                                                       1/3/2011        203      FSCATT M109A5
               USED: HT0368, 1EA
         15180 CONDUCTED PMCS/LO, 5 MAN HOURS. PART PMCS/LO DUE                                                       1/3/2011        206      FSCATT M109A5
               USED: HT0827, 1EA. (SEE F/O# M15181)

         15181 1. THE PISTON WAS REPLACED, PART                 FSCATT, A5: PRIMARY RAMMER CYLINDER,                  1/3/2011        null
               USED: HT1023, 1EA. 2. CYLINDER REBUILT           HT0827, PN: 11643725. CRACKED PISTON
               WITH NEW SEAL KIT, PART USED: HT0239,
               1EA. COST SAVINGS: $1,044.93.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                              Page 104
        WO #                     Repair Notes                                            Problem                           Date    Serial #        Description
        15182 Shipped a replacement Instructor control and a        The user is unable to log into the CFFT            1/3/2011    C30-328    CFFT 1:30 Increment 2
              additional hard drive.(2CF023)                        Administrator account on the Instructor Control
              (2CF018)&(2CF031). Also shipped a                     because it is locked out.
              Replacement Student IG to site. 2CF027 and a
              HDD 2CF018.
         15183 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/4/2011                                 201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15184 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/4/2011                                 202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15185 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/4/2011                                 203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15186 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/4/2011                                 401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15187 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/4/2011                                 402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15188 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/4/2011                                 403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15189 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/4/2011                                 406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15190 CONDUCTED PMCS/LO, 5 MAN HOURS.                      PMCS/LO DUE                                        1/4/2011      205      FSCATT M109A5
               PARTS USED: HT0361, 1EA. / HT0408, 2EA /
               HT0457, 2EA. / HT0729, 2EA. / HT0735, 1EA. /
               HT0799, 1EA. / HT1088, 1EA.
         15191 Reinstalled the factory default exercises to         The left-side projector went out of alignment after 1/4/2011     13       GUARDFIST II 1:30
               correct the deleted exercise issue. Re-aligned the   it was bumped into. Also, Exercise #15 was
               projectors. No other problems found.                 accidentally deleted and needs to be restored.

         15192 Shipped replacement Student Control and spare        Student Control will not power on consistently,    1/4/2011    C12-354    CFFT 1:12 Increment 2
               removable Hard Drive. (ASL 2CF026, 2CF018,           VGA connector is loose, also seems to have an
               2CF031).                                             issue with the SIM Network Card.

         15193 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE                 1/4/2011      203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         15194 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE                 1/4/2011      201      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         15195 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE                 1/4/2011      402      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         15196 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE                 1/4/2011      403      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         15197 confirmed no touchscreen function. return to         No touchscreen function. INOP                      1/4/2011      null
               vendor for repair Recieved from vendor from
               repair returning to asl line item #RT006
         15198 Loaded software patch 2.3.8a. Performed DRC.         Needed patch program load to score student         1/4/2011    ISB0001    ICOFT Instructor Station
               Passed DRC. This IS is located at Fort Sill.         testing.
               Should be ICOFT Instructor Station Serial:
               ISB00005.
         15199 THE PROJECTILE AND CHARGE BAG WAS                    DUE TO STUDENT ERROR, A PROJECTILE                 1/4/2011      202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                           AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                            GUNTUBE.
         15200 THE RAMMER CYLINDER WAS PUT BACK IN                  DUE TO STUDENT ERROR, THE RAMMER                   1/4/2011      203      FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                      CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                             POSITION.
         15201 THE RAMMER CYLINDER WAS PUT BACK IN                  DUE TO STUDENT ERROR, THE RAMMER                   1/4/2011      401      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                      CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                             POSITION.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 105
        WO #                      Repair Notes                                       Problem                     Date       Serial #          Description
        15202 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE            1/4/2011         402         FSCATT M109A6
              BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
              TEST FIRED.                                       FIRE MISSION.
        15203 Motherboard failed post. Replaced with            Student Station 6 will not post.             1/4/2011          2          MLRS DT
              Motherboard from stock.
        15204 Secondary Video Card was bad. Replaced with       Student Station 1 stalled while booting.     1/4/2011          3          HIMARS DT
              card from stock.
        15205 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE           1/4/2011         401         FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                         GUNTUBE.
        15206 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE           1/4/2011         406         FSCATT M109A6
              REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                         GUNTUBE.
        15207 Loaded software patch 2.3.8a. Performed DRC.      Needed patch program load to score student   1/4/2011    ISB0006/STA 7    ICOFT Instructor Station
              Passed DRC.                                       testing.
        15208 Loaded software patch 2.3.8a. Performed DRC.      Needed patch program load to score student   1/4/2011      ISB0007        ICOFT Instructor Station
              Passed DRC. This IS is located at C 2/6 ADA Ft    testing.
              Sill, OK.
        15209 Replaced Monitor, TFT-LCD Student "A"             LCD touchscreen not powering up.             1/4/2011   SSB0019/STA 6/4   ICOFT Student Station
              Touchscreen. Line# IC057 MFN# PT-1212N.
              Bench tested 'A' computer. Rereplaced monitor,
              reset default settings. Used no parts from ASL.

         15210 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM               1/4/2011         201         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15211 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM               1/4/2011         202         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15212 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM               1/4/2011         203         FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15213 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM               1/4/2011         401         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         15214 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM               1/4/2011         402         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         15215 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM               1/4/2011         403         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         15216 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM               1/4/2011         406         FSCATT M109A6
               CONDUCTED.                                       SHUTDOWN
         15217 TROUBLESHOOTING REVEALED THAT THE                SAF NOT RESPONDING TO JOYSTICK               1/4/2011       C12-333       CFFT 1:12 Increment 2
               CFFT TRAINER WAS NOT PROPERLY SET                MOVEMENTS 1/4/2011 1050 - 1300
               UP. PROVIDED INSTRUCTIONS TO THE
               OPERATORS ON HOW TO PROPERLY SET
               UP THE TRAINER. AFTER SETTING UP THE
               TRAINER THERE STILL NO COMMUNICATION
               BETWEEN THE SAF AND THE INSTRUCTOR
               CONTROL COMPUTERS. FURTHER
               TROUBLESHOOTING REVEALED THAT THE
               SAF HAD THE WRONG NETWORK ADDRESS.
               WENT INTO NETWORK CONFIGURATION
               AND STATICALLY SET THE IP ADDRESS
               (192.168.119.101), REBOOTED THE
               COMPUTER TO COMPLETE THE
               PROCEDURE. 1/4/2011 1050 - 1300



         15218 PMCS performed.                       PMCS Required                          1/5/2011                          405         FSCATT M109A6
         15219 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                          201         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15220 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                          202         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15221 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                          203         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15222 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                          204         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15223 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                          205         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15224 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                          206         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 106
        WO #                Repair Notes                           Problem                     Date                          Serial #          Description
        15225 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                            401         FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
              THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
              IS OPERATIONAL. 3. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15226 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                           402         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15227 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                           403         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15228 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/5/2011                           406         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15229 Bench tested 'A' computer. Rereplaced monitor,    No video output from 'A' computer.          1/5/2011    SSB0023/STA 7/3   ICOFT Student Station
               reset default settings.
         15230 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE          1/5/2011          204         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         15231 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE          1/5/2011          206         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         15232 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER            1/5/2011          204         FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         15233 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE          1/5/2011          205         FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         15234 THE BREECH CABLE ASSEMBLY WAS                     DURING STUDENT TRAINING TWO                 1/5/2011          205         FSCATT M109A5
               REPLACED, PART USED: HT0197, 1EA. SEE             CONNECTORS ON THE BREECH WIRING
               FO WO# M15235                                     HARNESS WERE BROKEN.
         15235 THE CONNECTORS AND PINS WERE                      FSCATT A5: BREECH SWITCH CABLE              1/5/2011          null
               REPLACED. TESTED GOOD AND ADDED TO                ASSEMBLY, TWO BROKEN CONNECTORS,
               ASL. PARTS USED: HT0950, 9EA. / HT0962,           HT0197, PN. HCT25132
               1EA. / HT1003, 1EA. COST SAVINGS:
               $1,163.11
         15236 THE SYSTEM WAS REINITIALIZED AND TEST             THE HCT LOST COMMUNICATION BETWEEN          1/5/2011          403         FSCATT M109A6
               FIRED                                             THE IOS AND EIU COMPUTERS
         15237 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER            1/5/2011          406         FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         15238 THE RAMMER CYLINDER WAS PUT BACK IN               DUE TO STUDENT ERROR, THE RAMMER            1/5/2011          202         FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                   CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                          POSITION.
         15239 Demonstrated to instructor how to create files.   No instructor files.                        1/5/2011     ISB0005/STA 6    ICOFT Instructor Station
               Created instructor files.
         15240 TROUBLESHOOTING REVEALED THAT THE                 STUDENT IG COMPUTER WILL NOT LOAD           1/5/2011        C12-333       CFFT 1:12 Increment 2
               CFFT SOFTWARE ON THE STUDENT IG                   TERRAIN MAP
               COMPUTER WAS CORRUPT AND REQUIRED
               REINSTALLING. THE SPARE HARD DRIVE
               WAS USED TO CLONE THE DEFECTIVE
               DRIVE. 1/5/11 0900 TO 1400
         15241 Passed Diagnostics. Glued insert in case.     Unknown                                          1/6/2011       0006-15       CAMSIM
               Repaired H Air Source
         15242 Replaced Camsim LCD Module Replaced On/Off Lots of rust and corosion. Key switch rusted solid. 1/6/2011       0006-16       CAMSIM
               Switch Repaired Antenna Replaced 1 Case Latch
               Ran Diagnostics
         15243 Replaced Camsim Nose Assembly Replaced        Broken Nose Assembly.                            1/6/2011       0010-15       CAMSIM
               Camsim Motherboard Diagnostics

         15244 Diagnostics (Passed)                              Unknown.                                    1/6/2011        0010-16       CAMSIM
         15245 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:               1/6/2011          201         FSCATT M109A5
               OPERATIONAL READINESS.                            SYSTEM STARTUP
         15246 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:               1/6/2011          202         FSCATT M109A5
               OPERATIONAL READINESS.                            SYSTEM STARTUP
         15247 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:               1/6/2011          203         FSCATT M109A5
               OPERATIONAL READINESS.                            SYSTEM STARTUP
         15248 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:               1/6/2011          204         FSCATT M109A5
               OPERATIONAL READINESS.                            SYSTEM STARTUP
         15249 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:               1/6/2011          205         FSCATT M109A5
               OPERATIONAL READINESS.                            SYSTEM STARTUP
         15250 THE HCT WAS ENERGIZED AND VERIFIED                UNSCHEDULED STUDENT TRAINING:               1/6/2011          206         FSCATT M109A5
               OPERATIONAL READINESS.                            SYSTEM STARTUP



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 107
        WO #                   Repair Notes                                            Problem                             Date     Serial #        Description
        15251 THE RAMMER CYLINDER WAS PUT BACK IN                 DUE TO STUDENT ERROR, THE RAMMER                     1/6/2011       201       FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                            POSITION.
        15252 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                   1/6/2011       204       FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                           GUNTUBE.
        15253 THE GUNTUBE WAS PUT BACK INTO                       DUE TO STUDENT ERROR, THE GUNTUBE                    1/6/2011       206       FSCATT M109A5
              BATTERY, SYSTEM WAS REBOOTED AND                    DID NOT RETURN INTO BATTERY AFTER
              TEST FIRED.                                         FIRE MISSION.
        15254 THE RAMMER CYLINDER WAS PUT BACK IN                 DUE TO STUDENT ERROR, THE RAMMER                     1/6/2011       205       FSCATT M109A5
              THE STOWED POSITION, SYSTEM WAS                     CYLINDER STOPPED IN THE EXTENDED
              REBOOTED AND TEST FIRED.                            POSITION.
        15255 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                   1/6/2011       206       FSCATT M109A5
              REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
              REBOOTED.                                           GUNTUBE.
        15256 Tested power supply: Successfully passed.           45 minute wait for program to start after entering   1/6/2011       51        AT3 (STC) c
              Found bad motherboard, not getting power.           password.
              Replaced computer. Line# AT003
              MFN#XIR735MTOWERXEON (ser.022089)
              Performed DRC. Passed DRC. Tested headset
              from other systems. Total time in repair: 8hrs.

         15257 Found W1 cable to be not functioning correctly.    Video image not clear on screen.                     1/6/2011       80        AT3 (STC) c
               Replaced W1 Interface cable. Line# AT021
               MFN#G1-56-1300-800. Replaced student
               headset.Line# AT008 MFN# HP-259 -$7.99
               Performed DRC. Passed DRC. Total hrs. in
               repair: 8
         15258 Found bad hard drive.Replaced computer -Line#      Prompted for boot disk at startup.                   1/6/2011       81        AT3 (STC) c
               AT003 MFN#XIR735MTOWERXEON
               (ser.022089). Cloned hard drive from AT3#80.
               Repaired two pins in NIDAC ribbon cable
               connector. Tested again. Replaced student
               headset- Line# AT008 MFN# HP-259 $7.99.
               Performed DRC. Passed DRC. Total time in
               repair: 8 hrs.
         15259 Reloaded software and updated drivers. No         Reboots to Windows                                    1/6/2011       78        STPT Instructor Station
               physical repairs. Inspected cables and
               connectors for wear and tear. Performed DRC.
               Passed DRC. Total time: 8hrs. Required
               hardware reconfiguration, then failed DRC. Called
               Danny Carter at Redstone, AL. for software
               diagnostics. Awaiting call back.

         15260 Troubleshooting: reloaded MS2K and STPT           Reboots to Windows.                                   1/6/2011       79        STPT Instructor Station
               software, eventually replaced all hardware,
               reloaded STPT and software using MSXP OS.
               No change. Trainer still reboots after opening a
               senario. Called Danny Carter at Redstone, AL. for
               software diagnostics. Awaiting call back.Reloaded
               software and updated drivers. Found a conflict
               with the 3D sound configuration value. Changed
               value for 3D sound . Performed DRC. Passed
               DRC.


         15261 Troubleshooting: reloaded MS2K and STPT           Reboots to Windows.                                   1/6/2011       80        STPT Instructor Station
               software, eventually replaced all hardware,
               reloaded STPT and software using MSXP OS.
               No change. Trainer still reboots after opening a
               senario. Called Danny Carter at Redstone, AL. for
               software diagnostics. Awaiting call back.Reloaded
               software and updated drivers. Found a conflict
               with the 3D sound configuration value. Changed
               value for 3D sound . Total 8hrs.


         15262 Troubleshooting: reloaded MS2K and STPT           Reboots to Windows.                                   1/6/2011       81        STPT Instructor Station
               software, eventually replaced all hardware,
               reloaded STPT and software using MSXP OS.
               No change. Trainer still reboots after opening a
               senario. Called Danny Carter at Redstone, AL. for
               software diagnostics. Awaiting call back.Reloaded
               software and updated drivers. Found a conflict
               with the 3D sound configuration value. Changed
               value for 3D sound . Total 8hrs.


         15263 THE GUNTUBE WAS PUT BACK INTO                      DUE TO STUDENT ERROR, THE GUNTUBE                    1/6/2011       202       FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                   DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                        FIRE MISSION.
         15264 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                     1/6/2011       206       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                           POSITION.
         15265 CM - Found wire disconnected from circuit board.   Radar card simulation rack chassis ground not        1/6/2011   114B0001M37   FIMT
               Reconnected wire.                                  working.
         15266 CM - Replaced bulbs with bench stock bulbs.        Computer power button light out                      1/6/2011   114B0003M37   FIMT

         15267 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                       1/6/2011       201       FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 108
        WO #                Repair Notes                                  Problem               Date     Serial #        Description
        15268 DE-ENERGIZING PROCEDURES WERE                AFTER STUDENT TRAINING: SYSTEM   1/6/2011       202       FSCATT M109A5
              CONDUCTED.                                   SHUTDOWN
        15269 DE-ENERGIZING PROCEDURES WERE                AFTER STUDENT TRAINING: SYSTEM   1/6/2011       203       FSCATT M109A5
              CONDUCTED.                                   SHUTDOWN
        15270 DE-ENERGIZING PROCEDURES WERE                AFTER STUDENT TRAINING: SYSTEM   1/6/2011       204       FSCATT M109A5
              CONDUCTED.                                   SHUTDOWN
        15271 DE-ENERGIZING PROCEDURES WERE                AFTER STUDENT TRAINING: SYSTEM   1/6/2011       205       FSCATT M109A5
              CONDUCTED.                                   SHUTDOWN
        15272 DE-ENERGIZING PROCEDURES WERE                AFTER STUDENT TRAINING: SYSTEM   1/6/2011       206       FSCATT M109A5
              CONDUCTED.                                   SHUTDOWN
        15273 TROUBLESHOOTING REVEALED THAT THE            LOCKED OUT OF THE INSTRUCTOR     1/7/2011     C12-334     CFFT 1:12 Increment 2
              WRONG PASSWORD WAS ENTERED MORE              CONTROL COMPUTER
              THAN THREE TIMES AND OPERATING
              SYSTEM LOCKED THE ACCOUNT. AFTER
              RESETTING THE PASSWORDS THE TRAINER
              WAS POWERED UP, AT WHICH TIME IT WAS
              NOTED THAT THE STUDENT CONTROL
              MONITOR HAD NO VIDEO. PROBLEM WAS A
              RESULT OF A MISSING VIDEO CABLE. 1/7/11
              0900 TO 1100


         15274                                                                              1/9/2011      FOX1       NBCRS FOX
                                                                                                                     SIMULATOR
         15275                                                                              1/9/2011      FOX2       NBCRS FOX
                                                                                                                     SIMULATOR
         15276                                                                              1/9/2011     FOXIS1      NBCRS FOX
                                                                                                                     SIMULATOR
         15277 WRONG SYSTEM                                                                 1/9/2011       400       FSCATT M109A6
         15278 WRONG SYSTEM                                                                 1/9/2011       404       FSCATT M109A6
         15279 Performed monthly PMCS -cleaned station--                                    1/9/2011                 FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15280 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110001V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15281 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110002V8IS   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15282 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110003V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15283 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110004V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15284 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110005V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15285 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110006V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15286 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110007V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15287 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110008V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15288 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110009V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15289 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110010V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15290 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110011V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15291 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110012V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box
         15292 Performed monthly PMCS -cleaned station--                                    1/9/2011   E110013V8OP   FFROT AN/TPQ-36 (V8)
               performed map registrations--checked and                                                              Instructor Station
               cleaned network systems, communications
               systems, and black box




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                  Page 109
        WO #                    Repair Notes                   Problem        Date       Serial #           Description
        15293 Performed monthly PMCS -cleaned station--                   1/9/2011    E110014V8OP     FFROT AN/TPQ-36 (V8)
              performed map registrations--checked and                                                Instructor Station
              cleaned network systems, communications
              systems, and black boxTechnician- Unassigned -
              William RiedlIvan HallArthur SherardRobin
              EskraAllen LaRockFredrick RodriguezLewis
              MeekEric KolkerDaniel EdmondsMaurice
              WilliamsonLloyd WilliamsNicholas AjimineJerry
              KeeferAngela ParkerTerrell JonesJohn
              IzdepskiPhillip AbbottDouglas GulickBrent
              HeilmanMarc JacksonMarc JacksonMarc
              JacksonMarc JacksonKeene TurnerDarrell
              GreenfieldDale NottinghamJack MathewsFrank
              BagwellKristy BeckMichael RumbleDennis
              JacksonCharlie GibsonDonald EastonJason
              UnderwoodKevin FarlerRobert SowersbyKenneth
              Cramer


         15294 PMCS Complete                                              1/9/2011     0002V8M36      FFOMT AN/TPQ-36
                                                                                                      (V8)
         15295 PMCS Complete                                              1/9/2011     0001V8M36      FFOMT AN/TPQ-36
                                                                                                      (V8)
         15296 PMCS Complete                                              1/9/2011     0003V8M36      FFOMT AN/TPQ-36
                                                                                                      (V8)
         15297 PMCS Complete                                              1/9/2011     0004V8M36      FFOMT AN/TPQ-36
                                                                                                      (V8)
         15298 PMCS Complete                                              1/9/2011     0005V8M36      FFOMT AN/TPQ-36
                                                                                                      (V8)
         15299   PMCS - Clean and Inspect system.                         1/9/2011     114B0001IS     FIMT
         15300                                                            1/9/2011     114B0001IS     FIMT
         15301                                                            1/9/2011    114B0009SSC     FIMT
         15302                                                            1/9/2011    114B0009SSC     FIMT
         15303   PMCS - Clean, inspect and test system.                   1/9/2011    114B0001M37     FIMT
         15304                                                            1/9/2011    114B0001M37     FIMT
         15305   PMCS - Clean, inspect and test system.                   1/9/2011    114B0002M37     FIMT
         15306                                                            1/9/2011    114B0002M37     FIMT
         15307   PMCS - Clean, inspect and test system.                   1/9/2011    114B0003M37     FIMT
         15308                                                            1/9/2011    114B0003M37     FIMT
         15309   PMCS - Clean, inspect and test system.                   1/9/2011    114B0004M37     FIMT
         15310                                                            1/9/2011    114B0004M37     FIMT
         15311                                                            1/9/2011    114B0005M36     FIMT
         15312                                                            1/9/2011    114B0005M36     FIMT
         15313                                                            1/9/2011    114B0006M36     FIMT
         15314                                                            1/9/2011    114B0006M36     FIMT
         15315                                                            1/9/2011    114B0007M36     FIMT
         15316                                                            1/9/2011    114B0007M36     FIMT
         15317                                                            1/9/2011    114B0008M36     FIMT
         15318                                                            1/9/2011    114B0008M36     FIMT
         15319 CONDUCTED PMCS/LO, 5 MAN HOURS5                            1/9/2011        401         FSCATT M109A6
               GALLONS OF HYDRAULIC FLUID WAS ADDED
               TO SYSTEM
         15320 CONDUCTED PMCS/LO, 5 MAN HOURS.1.                          1/9/2011        402         FSCATT M109A6
               REPLACED THE FOLLOWING WORN
               HARDWARE: HT0409, 2EA. / HT0432, 1EA. /
               HT0520, 3EA. / HT0522, 1EA. / HT0546, 1EA. /
               HT0582, 1EA. / HT0676, 1EA.
         15321 CONDUCTED PMCS/LO, 5 MAN HOURS                             1/9/2011        403         FSCATT M109A6
         15322 CONDUCTED PMCS/LO, 5 MAN HOURSTHE                          1/9/2011        406         FSCATT M109A6
               FOLLOWING WORN HARDWARE WAS
               REPLACED: HT0409, 2EA. / HT0459, 2EA. /
               HT0520, 3EA.
         15323 WRONG SYSTEM                                               1/9/2011         410        FSCATT M109A6
         15324 PMCS - Clean and inspect system.                           1/9/2011    114D0001SMTIS   SMT Student Station
         15325                                                            1/9/2011   114D0006SMTSSC   SMT Student Station
         15326 PMCS - Clean,inspect and test system.                      1/9/2011     114D0002SMT    SMT Student Station
         15327 PMCS - Clean, inspect and test system.                     1/9/2011     114D0003SMT    SMT Student Station
         15328 PMCS - Clean,inspect and test system.                      1/9/2011     114D0004SMT    SMT Student Station
         15329 PMCS - Clean, inspect and test system.                     1/9/2011     114D0005SMT    SMT Student Station
         15330                                                            1/9/2011          3         HIMARS DT
         15331                                                            1/9/2011          2         MLRS DT
         15332                                                            1/9/2011          1         MLRS DT
         15333 Completed                                                  1/9/2011        910005      IMTS
         15334 Completed                                                  1/9/2011        910005      IMTS
         15335 Inspected cables and connectors for wear and               1/9/2011        ETSS1       SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases                                                     STATION
               andmonitors. Performed DRC. Passed DRC.

         15336 Cleaned and wiped down cases and                           1/9/2011       ETSS2        SOT ETRAC STUDENT
               monitorsInspected cables and connectors for                                            STATION
               wear and tear. Performed DRC. Passed DRC.

         15337 Inspected cables and connectors for wear and               1/9/2011       ETSS3        SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases and                                                 STATION
               monitors. Performed DRC. Passed DRC.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                       Page 110
        WO #                   Repair Notes                                            Problem                           Date        Serial #           Description
        15338 Inspected cables and connectors for wear and                                                           1/9/2011        ETSS4         SOT ETRAC STUDENT
              tear. Cleaned and wiped down cases and                                                                                               STATION
              monitors. Performed DRC. Passed DRC.

         15339 Inspected cables and connectors for wear and                                                          1/9/2011        ETSS5         SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases and                                                                                              STATION
               monitors. Performed DRC. Passed DRC.

         15340 Inspected cables and connectors for wear and                                                          1/9/2011        ETSS6         SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases and                                                                                              STATION
               monitors. Performed DRC. Passed DRC.

         15341 Inspected cables and connectors for wear and                                                          1/9/2011        ETSS7         SOT ETRAC STUDENT
               tear. Cleaned and wiped down cases and                                                                                              STATION
               monitors. Performed DRC. Passed DRC.

         15342 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/10/2011                                  401         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15343 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/10/2011                                  402         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15344 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/10/2011                                  403         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15345 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/10/2011                                  406         FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15346                                                    Electrostatic discharge. Need (4) 12' personal     1/10/2011    114B0001M37      FIMT
                                                                  grounding straps for students.
         15347 THE BREECH WAS DISASSEMBLED,                       DURING STUDENT TRAINING, THE BREECH                1/10/2011         403         FSCATT M109A6
               CLEANED, REASSEMBLED AND TIMED.                    JUMPED TIME.
         15348 Reconfigured com port settings.                    No touch screen function.                          1/10/2011   SSA0001/STA 7/1   ICOFT Student Station
         15349 Reconfigured com port settings.                    No touch screen function.                          1/10/2011   SSB0026/STA 7/6   ICOFT Student Station
         15350 Configured network adapter IP adress.              Network communication failed.                      1/10/2011   SSB0016/STA 6/1   ICOFT Student Station
         15351 Reattached electrical wire connections.Performed   Foot switch not responding.                        1/10/2011   SSB0017/STA 6/2   ICOFT Student Station
               DRC. Passed DRC.
         15352 Shipped Replacement Projector to site. CF012       Epson Projector has a blue tint towards the top.   1/10/2011       C30-003       CFFT 1:30

         15353 Configured network adapter IP adress. Performed    Network communication failed.                      1/10/2011   SSB0020/STA 6/5   ICOFT Student Station
               DRC. Passed DRC.
         15354 Cycled power to the gunners console.               Hand station and Slew to Que not resonding.        1/10/2011   SSB0011/STA 5/3   ICOFT Student Station
               Reprogramed CDT. Performed DRC. Passed
               DRC.
         15355 Reestablished communication connectivity           Freezing during file transfer.                     1/10/2011    ISB0005/STA 6    ICOFT Instructor Station
               between students and instructor station.
               Performed DRC. Passed DRC.
         15356 Unable to duplicate the above error. Also          Will not power on.                                 1/10/2011         null
               removed a loose CMOS battery from the inside of
               the chassis. Returned to ASL. CF063. This is a
               follow up to 14782.
         15357                                                                                                       1/10/2011       CFFT1         CFFT 1:30
         15358                                                                                                       1/10/2011      FOX-MF-1       NBCRS FOX
                                                                                                                                                   SIMULATOR
         15359                                                                                                       1/10/2011      FOX-MF-2       NBCRS FOX
                                                                                                                                                   SIMULATOR
         15360 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/10/2011         401         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         15361 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/10/2011         402         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         15362 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/10/2011         403         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         15363 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/10/2011         406         FSCATT M109A6
               CONDUCTED.                                         SHUTDOWN
         15364 1. THE HCT WAS ENERGIZED AND VERIFIED              STUDENT TRAINING: 1. SYSTEM STARTUP 2.             1/11/2011         201         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND               SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 111
        WO #                Repair Notes                           Problem                     Date                              Serial #       Description
        15365 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                               202      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15366 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15367 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15368 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15369 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15370 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15371 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15372 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15373 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/11/2011                              406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED AFCS OPERATION CHECK 3. SENSOR
               THE AFCS, SENT FIRE MISSION, THE AFCS OPERATION CHECK
               IS OPERATIONAL. 3. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15374 Unable to duplicate the above error. Returned to   Will not power on. This is a follow up to 15167.   1/11/2011     null
               ASL.
         15375 replaced Journey(x86) line item#RT011              cd rom will not read. computer freezes at bios     1/11/2011     6-6      RT3
                                                                  splash screen.
         15376 THE GUNTUBE WAS PUT BACK INTO                      DUE TO STUDENT ERROR, THE GUNTUBE                  1/11/2011     201      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                   DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                        FIRE MISSION.
         15377 THE RAMMER CYLINDER WAS PUT BACK IN                DUE TO STUDENT ERROR, THE RAMMER                   1/11/2011     403      FSCATT M109A6
               THE STOWED POSITION, SYSTEM WAS                    CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                           POSITION.
         15378 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 1/11/2011     406      FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         15379 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 1/11/2011     202      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         15380 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 1/11/2011     204      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         15381 THE PROJECTILE AND CHARGE BAG WAS                  DUE TO STUDENT ERROR, A PROJECTILE                 1/11/2011     206      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                         AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                          GUNTUBE.
         15382 Shipped replacement SAF to site. (ASL CF031).      SAF is not communicating with the rest of the      1/11/2011    C-043     CFFT 1:12
                                                                  system, targets are not appearing on IG's.

         15383 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/11/2011     201      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15384 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/11/2011     202      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15385 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/11/2011     203      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15386 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/11/2011     204      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15387 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                     1/11/2011     205      FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 112
        WO #                     Repair Notes                                        Problem                            Date        Serial #          Description
        15388 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/11/2011         206         FSCATT M109A5
              CONDUCTED.                                        SHUTDOWN
        15389 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/11/2011         401         FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        15390 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/11/2011         402         FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        15391 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/11/2011         403         FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        15392 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/11/2011         406         FSCATT M109A6
              CONDUCTED.                                        SHUTDOWN
        15393 return to vendor for repair PO 85743 Sent to      cd rom will not read. computer freezes at bios      1/11/2011         null
              vendor 3/25/2011 received from vendor returning   splash screen.
              to ASL line item # RT011
        15394 1. THE HCT WAS ENERGIZED AND VERIFIED             STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/12/2011                      201         FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND              SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15395 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/12/2011                                 202         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15396 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/12/2011                                 205         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15397 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/12/2011                                 206         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15398 SYSTEM INSTALLED TESTED GOOD.                    PDFCS INSTALLATION TEAM AND FT. SILL 1/12/2011                        401         FSCATT M109A6
                                                                PERSONNEL ARE INSTALLING NEW SYSTEM

         15399 SYSTEM INSTALLED TESTED GOOD                     PDFCS INSTALLATION TEAM AND FT. SILL 1/12/2011                        402         FSCATT M109A6
                                                                PERSONNEL ARE INSTALLING NEW SYSTEM

         15400 SYSTEM INSTALLED TESTED GOOD                     PDFCS / AFATDS INSTALLATION TEAM AND                1/12/2011         403         FSCATT M109A6
                                                                FT. SILL PERSONNEL ARE INSTALLING NEW
                                                                SYSTEM
         15401 SYSTEM INSTALLED, TESTED GOOD                    PDFCS / AFATDS INSTALLATION TEAM AND                1/12/2011         406         FSCATT M109A6
                                                                FT. SILL PERSONNEL ARE INSTALLING NEW
                                                                SYSTEM
         15402 PR 422 submitted PR 85707 Received parts.        Static electricity. Need 12' static straps for      1/12/2011   114D0001SMTIS     SMT Student Station
               Installed on stations.                           students.
         15403 Reseated RAM. Reloaded default settings.         A' computer not booting up.                         1/12/2011   SSB0024/STA 7/4   ICOFT Student Station
               Performed DRC on student trainer. Passed DRC.

         15404 This work order is a duplicate work order and    Battlefield Image Generators #1 and #2 both will    1/12/2011       C30-309       CFFT 1:30 Increment 2
               made in error.                                   not work with the Admin passwords. The spare
                                                                hard drives for both hard drives will not work as
                                                                well.
         15405 Shipped Replacement Battlfield IG #1 and #2,     Battlefield Image Generator #1 and #2 will not      1/12/2011       C30-325       CFFT 1:30 Increment 2
               and 2 spare removable hard drives with 2 hard    function with the administrative passwords. Both
               drive enclosures. 2CF028, 2CF030, 2CF018,        Image Generator spare hard drives will not
               2CF031.                                          function with the administrative passwords as
                                                                well.
         15406 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/13/2011                                 201         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15407 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/13/2011                                 202         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15408 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/13/2011                                 203         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15409 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/13/2011                                 204         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15410 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/13/2011                                 205         FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 113
        WO #                Repair Notes                           Problem                     Date                              Serial #         Description
        15411 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/13/2011                               206        FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15412 Removed RCT and did visual inspection. Began RCT displayed a white screen after continued use 1/13/2011        114D0002SMT     SMT Student Station
               running simulation to recreate issue. RCT came and would not reset.
               up and was working correctly. Unable to duplicate
               issue.
         15413 Swapped out instructor station with developer        Instructor station has no video.         1/13/2011        114D0001SMTIS   SMT Student Station
               station to test monitor. Monitor failed test. The
               monitor will need to be replaced. Used monitor
               from programmer station to replace instructor
               station monitor. Tested instructor station to insure
               that it was booting correctly.

         15414                                                No battery backup                                   1/13/2011    114B0001IS     FIMT
         15415 Shipped Replacement Student IG to site. CF077. Student IG will not show a video.                   1/13/2011      C12-224      CFFT 1:12

         15416 Repaired the damaged data port carrier. Changed Instructor Control is not powering on. Site also   1/13/2011        null
               the passwords and returned to ASL.              stated that the Power Button was jammed in. This
                                                               is a follow- up to 15060.
         15417 Reset the passwords on both hard drives. No     The user is unable to log into the CFFT            1/13/2011        null
               parts used. Returned to ASL                     Administrator account on the Instructor Control
                                                               because it is locked out. This is a follow-up to
                                                               15182.
         15418 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     1/13/2011        201        FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         15419 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     1/13/2011        202        FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         15420 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     1/13/2011        203        FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         15421 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     1/13/2011        204        FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         15422 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     1/13/2011        205        FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         15423 DE-ENERGIZING PROCEDURES WERE                   AFTER STUDENT TRAINING: SYSTEM                     1/13/2011        206        FSCATT M109A5
               CONDUCTED.                                      SHUTDOWN
         15424 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                       1/14/2011        201        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15425 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/14/2011                              202        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15426 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/14/2011                              203        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15427 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/14/2011                              204        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15428 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/14/2011                              205        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15429 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/14/2011                              206        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15430 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/14/2011                              401        FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15431 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/14/2011                              402        FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15432 Shipped replacement lamp (ASL CF100)             Sony Projector Lamp has burned out.               1/14/2011       C-052       CFFT 1:12
         15433 Shipped replacement Student IG to site (ASL      No video from Student IG.                         1/14/2011      C30-320      CFFT 1:30 Increment 2
               2CF027).
         15434 Shipped replacement Student IG to site (ASL      Blue Screen error on startup. Unable to boot      1/14/2011      C30-301      CFFT 1:30 Increment 2
               2CF027), replacment spare hard drive (2CF018).   Student IG to desktop.



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 114
        WO #               Repair Notes                                           Problem                                 Date        Serial #           Description
        15435 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         201          FSCATT M109A5
              CONDUCTED.                                           SHUTDOWN
        15436 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         202          FSCATT M109A5
              CONDUCTED.                                           SHUTDOWN
        15437 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         203          FSCATT M109A5
              CONDUCTED.                                           SHUTDOWN
        15438 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         204          FSCATT M109A5
              CONDUCTED.                                           SHUTDOWN
        15439 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         205          FSCATT M109A5
              CONDUCTED.                                           SHUTDOWN
        15440 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         206          FSCATT M109A5
              CONDUCTED.                                           SHUTDOWN
        15441 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         401          FSCATT M109A6
              CONDUCTED.                                           SHUTDOWN
        15442 DE-ENERGIZING PROCEDURES WERE                        AFTER STUDENT TRAINING: SYSTEM                     1/14/2011         402          FSCATT M109A6
              CONDUCTED.                                           SHUTDOWN
        15443                                                                                                         1/16/2011        FOX1          NBCRS FOX
                                                                                                                                                     SIMULATOR
         15444                                                                                                        1/16/2011        FOX2          NBCRS FOX
                                                                                                                                                     SIMULATOR
         15445                                                                                                        1/16/2011       FOXIS1         NBCRS FOX
                                                                                                                                                     SIMULATOR
         15446                                                                                                        1/16/2011          1           HIMARS Mockup
         15447                                                                                                        1/16/2011          2           HIMARS Mockup
         15448                                                                                                        1/16/2011          3           HIMARS Mockup
         15449                                                                                                        1/16/2011          4           HIMARS Mockup
         15450 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                           1/18/2011         401          FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15451 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/18/2011                                   402          FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15452 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/18/2011                                   403          FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15453 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/18/2011                                   406          FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15454 There was no hardware change. Posible improper A' computer needs to be reactivated due to              1/18/2011   SSB0009/ STA 5/5   ICOFT Student Station
               shutdown by students. Called MS and reactivated hardware change.
               windows. Restarted system. Ran disk clean up
               and Defragmentation. Performed DRC. Passed
               DRC.
         15455 Projector has a burn-in image. This item needs to   Epson Projector has a blue tint towards the top.   1/18/2011         null
               go to DRMO. This item is un-economically            This is a follow-up to 15352.
               reapairable.
         15456 Reinstalled the Network drivers. Tested.            SAF is not communicating with the rest of the      1/18/2011         null
               Returned to ASL. No parts used.                     system, targets are not appearing on IG's. This is
                                                                   a follow up to 15382
         15457 Applied black silicone and applied strip. Used (1   Fomica strip peeling off.                          1/18/2011   SSA0001/STA 7/1    ICOFT Student Station
               tube) GE window and door 100% silicone -black.

         15458 Applied black silicone and applied strip. Used (1   Fomica strip peeling off.                          1/18/2011   SSB0023/STA 7/3    ICOFT Student Station
               tube) GE window and door 100% silicone -black.

         15459 Switched video output cables and restarted 'A'     Fomica strip peeling off. Touch screen has no       1/18/2011   SSB0025/STA 7/5    ICOFT Student Station
               computer. Video signal returned, reswitched        pic.
               video cables. Ran DRC. Passed DRC. Applied
               black silicone and applied strip. Used (1 tube) GE
               window and door 100% silicone -black.

         15460 THE PROJECTILE AND CHARGE BAG WAS                   DUE TO STUDENT ERROR, A PROJECTILE                 1/18/2011         402          FSCATT M109A6
               REMOVED AND THE SYSTEM WAS                          AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                           GUNTUBE.
         15461 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     1/18/2011         401          FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         15462 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     1/18/2011         402          FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         15463 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     1/18/2011         403          FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN
         15464 DE-ENERGIZING PROCEDURES WERE                       AFTER STUDENT TRAINING: SYSTEM                     1/18/2011         406          FSCATT M109A6
               CONDUCTED.                                          SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                 Page 115
        WO #                Repair Notes                           Problem                     Date                      Serial #        Description
        15465 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                       201       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15466 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      202       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15467 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      203       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15468 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      204       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15469 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      205       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15470 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15471 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      401       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15472 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15473 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15474 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/19/2011                      406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZED
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15475 THE SYSTEM WAS REINITIALIZED AND TEST            THE HCT LOST COMMUNICATION BETWEEN         1/19/2011       201       FSCATT M109A5
               FIRED                                            THE IOS AND EIU COMPUTERS
         15476 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE         1/19/2011       203       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15477 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE         1/19/2011       206       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15478 Rebooted system computer and validated correct   System not responding to command inputs    1/19/2011   E110012V8OP   FFROT AN/TPQ-36 (V8)
               operation.                                                                                                            Instructor Station
         15479 Rebooted system computer and validated correct   System not responding to command inputs.   1/19/2011   E110008V8OP   FFROT AN/TPQ-36 (V8)
               operations.                                                                                                           Instructor Station
         15480 Rebooted system computer and validated correct   System not responding to command inputs    1/19/2011   E110005V8OP   FFROT AN/TPQ-36 (V8)
               operations.                                                                                                           Instructor Station
         15481 Rebooted RCC computer and validated correct      RCC not responding                         1/19/2011   E110001V8IS   FFROT AN/TPQ-36 (V8)
               operations.                                                                                                           Instructor Station
         15482 THE MOUSE WAS REPLACED, PART USED:               THE COMPUTER MOUSE WAS NOT                 1/19/2011      103-5      MLRS/HIMARS FCPT
               ML0012, 1EA.                                     OPERATIONAL.
         15483 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM             1/19/2011       201       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15484 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM             1/19/2011       202       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15485 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM             1/19/2011       203       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15486 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM             1/19/2011       204       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15487 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM             1/19/2011       205       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15488 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM             1/19/2011       206       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 116
        WO #                Repair Notes                                        Problem                                  Date    Serial #       Description
        15489 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/19/2011     401      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        15490 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/19/2011     402      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        15491 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/19/2011     403      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        15492 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/19/2011     406      FSCATT M109A6
              CONDUCTED.                                         SHUTDOWN
        15493 1. THE HCT WAS ENERGIZED AND VERIFIED              STUDENT TRAINING: 1. SYSTEM STARTUP 2.              1/20/2011     201      FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND               SENSOR OPERATION CHECK
              FIRED A PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15494 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/20/2011                              202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15495 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/20/2011                              203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15496 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/20/2011                              204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15497 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/20/2011                              205      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15498 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/20/2011                              206      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15499 Shipped replacement printer (ASL 2CF004).         Printer fails to print complete page.               1/20/2011   C12-372    CFFT 1:12 Increment 2

         15500 Shipped replacement printer (ASL 2CF004).         Printer fails to print complete page.               1/20/2011   C4-343     CFFT 1:4 Increment2
         15501 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                  1/20/2011    201       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         15502 THE GUNTUBE WAS PUT BACK INTO                     DUE TO STUDENT ERROR, THE GUNTUBE                   1/20/2011     204      FSCATT M109A5
               BATTERY, SYSTEM WAS REBOOTED AND                  DID NOT RETURN INTO BATTERY AFTER
               TEST FIRED.                                       FIRE MISSION.
         15503 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                  1/20/2011     203      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         15504 THE PROJECTILE AND CHARGE BAG WAS                 DUE TO STUDENT ERROR, A PROJECTILE                  1/20/2011     205      FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                        AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                         GUNTUBE.
         15505 THE PROJECTILE AND CHARGE BAG WAS                 A STUDENT PUSHED THE EMERGENCY                      1/20/2011     202      FSCATT M109A5
               REMOVED, SYSTEM WAS REBOOTED AND                  POWER OFF (EPO) SWITCH DURING A FIRE
               TEST FIRED                                        MISSION
         15506 Reseated the video card and the network card to   The Student IG will not show a display. Also has    1/20/2011     null
               resolve issues. no parts used. returned to asl.   a potential networking issue before the display
               tested.                                           problem occured. This is a follow-up to 14070.

         15507 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/20/2011     201      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15508 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/20/2011     202      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15509 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/20/2011     203      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15510 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/20/2011     204      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15511 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/20/2011     205      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15512 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                      1/20/2011     206      FSCATT M109A5
               CONDUCTED.                                        SHUTDOWN
         15513 Replaced 1x primmer insert switch, 1x breech      Primmer inserted but not detecting, breech closed   1/21/2011     405      FSCATT M109A6
               open/closed switch. Requesting replacements on    but not detecting.
               PR to Lee Hedrick.
         15514                                                                                                       1/21/2011    IW1       MM1
         15515                                                                                                       1/21/2011    IW2       MM1
         15516                                                                                                       1/21/2011    IW3       MM1
         15517                                                                                                       1/21/2011    OW1       MM1
         15518                                                                                                       1/21/2011    OW2       MM1
         15519                                                                                                       1/21/2011    OW3       MM1
         15520                                                                                                       1/21/2011    OW4       MM1
         15521                                                                                                       1/21/2011    OW5       MM1
         15522                                                                                                       1/21/2011    OW6       MM1
         15523                                                                                                       1/21/2011    OW7       MM1
         15524                                                                                                       1/21/2011    OW8       MM1
         15525                                                                                                       1/21/2011    OW9       MM1
         15526                                                                                                       1/21/2011    OW5       MM1


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 117
        WO #                    Repair Notes                                          Problem                           Date        Serial #          Description
        15527                                                                                                       1/21/2011        OW10       MM1
        15528                                                                                                       1/21/2011        OW11       MM1
        15529                                                                                                       1/21/2011        OW12       MM1
        15530 Reinitialized RCC                                  Cannot print from RCC                              1/21/2011     E110002V8IS   FFROT AN/TPQ-36 (V8)
                                                                                                                                                Instructor Station
         15531 Performed student station shutdown and restart    System not responding to command inputs            1/21/2011     E110008V8OP   FFROT AN/TPQ-36 (V8)
               procedures                                                                                                                       Instructor Station
         15532                                                                                                      1/23/2011        FOX1       NBCRS FOX
                                                                                                                                                SIMULATOR
         15533                                                                                                      1/23/2011        FOX2       NBCRS FOX
                                                                                                                                                SIMULATOR
         15534                                                                                                      1/23/2011       FOXIS1      NBCRS FOX
                                                                                                                                                SIMULATOR
         15535                                                                                                      1/23/2011          1        MLRS Mockup
         15536                                                                                                      1/23/2011          2        MLRS Mockup
         15537                                                                                                      1/23/2011          3        MLRS Mockup
         15538                                                                                                      1/23/2011          4        MLRS Mockup
         15539 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2.                         1/24/2011         402       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15540 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/24/2011                                 403       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15541 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/24/2011                                 406       FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15542 Replaced corrupt hard drive.                      Instructor control computer will not boot.         1/24/2011       C30-330     CFFT 1:30 Increment 2

         15543 Installed complete AT3 upgraded kit: dvd drive AT3 computer (ser.#022522)FOWO 15256                  1/24/2011         null
               Line# AT072 MFN# 90.41D37.1740 $19.99.
               Motherboard, MSI 870-G45, Line#AT067
               $140.00. Graphics Card, Line# AT070 MFN# GS-
               250X-ZLS4, $141.99. Power Supply 850W, Line#
               AT069 MFN# Z Series, $129.99. CPU- Line#
               AT066 MFN# X4955, $152.99. RAM memory-
               Line# AT065 MFN# PVS34G1500LLV, $89.99.
               Hard Drive-Seagate Barracuda 250GB, Line#
               AT045 MFN# SG 7200.12, $34.99. Fan,12Y-
               Line#AT060 MFN# SFF21F. Richard Meek is the
               technician. Loaded PCAT login software, which
               was just received from Redstone Arsenal.
               Performed DRC. Passed DRC. Total time in
               repair: 8hrs. Returned to ASL.


         15544 Installed complete AT3 upgraded kit: dvd drive AT3 computer (ser.#022523)FOWO 15258                  1/24/2011         null
               Line# AT072 MFN# 90.41D37.1740 $19.99.
               Motherboard, MSI 870-G45, Line#AT067
               $140.00. Graphics Card, Line# AT070 MFN# GS-
               250X-ZLS4, $141.99. Power Supply 850W, Line#
               AT069 MFN# Z Series, $129.99. CPU- Line#
               AT066 MFN# X4955, $152.99. RAM memory-
               Line# AT065 MFN# PVS34G1500LLV (2ea.),
               $89.99. Hard Drive-Seagate Barracuda 250GB,
               Line# AT045 MFN# SG 7200.12, $34.99.
               Controller, Card- Line# AT073 MFN# 15-124-058,
               $24.99 OS - XP w/SP4. Performed DRC. Passed
               DRC. Returned to ASL. note: 1st set of ram was
               malfunctioning received 2nd set from ASL.



         15545                                                   AT# J5 Interface cable                               1/24/2011       null
         15546 Shipped Replacement Battlefield IG #1 CF107,      Battlefield IG #1 will not show a display. The right 1/24/2011     Y-001A      CFFT-SOF 1:12
               mouse CF117, and 2 projectors (Sony               side projector (Epson) will not show a display.
               PX32)CF096.                                       The mouse on the Student Control Station will not
                                                                 function properly.
         15547 Shipped Replacement SAF to site. (Shuttle type    2U (rack mount) SAF will not show the display        1/24/2011     C30-328     CFFT 1:30 Increment 2
               SAF due to lacking in 2U type SAF in ASL.)        correctly (resolution will not correct).
               2CF025. plus send the applicable harddrive with
               the computer. 2CF018
         15548 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                     1/24/2011         402       FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         15549 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                     1/24/2011         403       FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN
         15550 DE-ENERGIZING PROCEDURES WERE                     AFTER STUDENT TRAINING: SYSTEM                     1/24/2011         406       FSCATT M109A6
               CONDUCTED.                                        SHUTDOWN



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 118
        WO #                     Repair Notes                                         Problem                             Date       Serial #          Description
        15551 Led a Site POC through the steps necessary to       User accounts are locked out.                       1/25/2011      C12-330      CFFT 1:12 Increment 2
              unlock the accounts. The system was then tested
              for proper operation with no other problems
              found.
        15552 Shipped replacement Instructor Control              Instructor Control IG Movement feature is           1/25/2011      C30-328      CFFT 1:30 Increment 2
              (2CF023), replacement spare hard drive              inoperable.
              (2CF018),
        15553 Removed paper map display and replace               Paper Map Display malfunctioning, intermittent  1/25/2011       E110007V8OP     FFROT AN/TPQ-36 (V8)
              Controller CCA. Replaced Map display and            problems with data processing and map bug-light                                 Instructor Station
              performed map registration and scenario 1 to
              verify malfunction corrected. Used ASL P/N 360-
              0001-00 in lieu of P/N 360-0004-00 due to zero
              balance. PO 85709
         15554 Performed power down procedures, reseated          Paper map display Bug-Light not illuminating        1/25/2011   E110007V8OP     FFROT AN/TPQ-36 (V8)
               map display CCA, restarted student station and     when student runs scenario.                                                     Instructor Station
               performed map registration to verify malfunction
               corrected.
         15555 Replaced TP with one from bench stock CM - Radar Card Simulation Rack Slot(4) TP(23) 1/25/2011                      114B0002M37    FIMT
                                                     broken
         15556 Replaced Knob.                        CM - TES B Delay Time Position Knob not        1/25/2011                      114B0001M37    FIMT
                                                     functioning properly.
         15557 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/26/2011                                  201        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15558 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/26/2011                                  202        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15559 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/26/2011                                  203        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15560 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/26/2011                                  204        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15561 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/26/2011                                  205        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15562 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/26/2011                                  206        FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SENSOR OPERATION CHECK
               FIRED A PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15563 PO 85692 Received monitoor. Installed on SMt     CM - Sun 24.1" LCD Monitor v4 is not working       1/26/2011      114D0001SMTIS   SMT Student Station
               Instructor station. Problem has been corrected.  properly. A replacement monitor of equal size is
                                                                requested.
         15564 Repaired drive motor issue by replacing P/N 365- Repair of Map Display on ASL. Map Display          1/26/2011                      FFROT AN/TPQ-36 (V8)
               0010-00(B16) and JM-5 Repaired LED issue by indicator LED does not illuminate, also once                                           Instructor Station
               replacing P/N 365-0009-00                        indicator returns to home position drive motor
                                                                continues to run.
         15565 Prepared an Increment II Student Image           Student Image Generator will not load terrain data 1/26/2011         C30-318      CFFT 1:30 Increment 2
               Generator 2CF027 and a spare Student IG hard base.
               drive 2CF018 and dataport 2CF031, and replaced
               the faulty Student Image Generator. Tested to
               ensure functionality. System is now fully
               operational.
         15566 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/26/2011        201        FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15567 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/26/2011        202        FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15568 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/26/2011        203        FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15569 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/26/2011        204        FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15570 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/26/2011        205        FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15571 DE-ENERGIZING PROCEDURES WERE                      AFTER STUDENT TRAINING: SYSTEM                      1/26/2011        206        FSCATT M109A5
               CONDUCTED.                                         SHUTDOWN
         15572 This work order needs to be deleted. It was        This work order needs to be deleted. It was         1/26/2011      C30-001      CFFT 1:30
               created in error.                                  created in error.
         15573 Shipped Replacement LLDR to site. CF051.           LLDR does not show a display. this system has       1/26/2011      C30-333      CFFT 1:30 Increment 2
                                                                  been upgraded from an increment 1 system to an
                                                                  increment 2 system. during the upgrade, the
                                                                  increment 1 LLDR did not show a display. Fidelity
                                                                  does not provide a "new" LLDR to replace the old
                                                                  LLDR.
         15574 Configured a power cable from spares. ASL          LLDR power cable is missing from the system.        1/26/2011       C-014       CFFT 1:4
               cf054 and cf099.
         15575 Shipping replacement Battlefield IG #1. CF107.     The Battlefield IG #1 is unable to read the hard    1/27/2011      C30-007      CFFT 1:30
                                                                  drive.


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                               Page 119
        WO #                 Repair Notes                           Problem                    Date                                        Serial #       Description
        15576 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/27/2011                                         401      FSCATT M109A6
              OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
              THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
              MISSION TO PDFCS 4. LOADED AND FIRED A
              PROJECTILE, FUZE, AND CHARGE
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15577 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/27/2011                                        402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15578 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/27/2011                                        403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15579 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/27/2011                                        406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15580 Replaced the Student Ig with one from ASL.               Student Image Generator will not load terrain or       1/27/2011   C30-311    CFFT 1:30 Increment 2
               2CF027 and 2CF018                                        communicate with system.
         15581 Replaced the Network Interface Card. (2CF020.            Student Image Generator will not load terrain data     1/27/2011     null
               Returned to ASL.                                         base. This is a follow up to 15565.
         15582 Installed the proper licensing file on the spare         There is a licensing error message on all              1/27/2011   C12-325    CFFT 1:12 Increment 2
               Instructor control computer hard drive                   computers when the spare hard drives are
                                                                        installed
         15583                                                          Entered in error.                                      1/27/2011   C12-305    CFFT 1:12 Increment 2

         15584 Went to an entirely different exercise/scenario          Objects that are directly hit will not be destroyed.   1/27/2011   C12-325    CFFT 1:12 Increment 2
               and successfully killed targets. Went back to the        Reboot of the entire trainer will not correct the
               original exercise/scenario and it worked fine            problem.
               thereafter.

         15585 Reattached the joystick and LLDR USB                     Student Station joystick and LLDR do not work.         1/27/2011   C12-324    CFFT 1:12 Increment 2
               connectors to the proper computer (Student
               Control).
         15586 Unable to duplicate the above error. Reset all           Student IG will not show a display. This is a follow- 1/27/2011      null
               passwords. Returned to ASL. This is a follow up          up to 15580.
               to work order #15580
         15587 DE-ENERGIZING PROCEDURES WERE                            AFTER STUDENT TRAINING: SYSTEM                         1/27/2011     401      FSCATT M109A6
               CONDUCTED.                                               SHUTDOWN
         15588 DE-ENERGIZING PROCEDURES WERE                            AFTER STUDENT TRAINING: SYSTEM                         1/27/2011     402      FSCATT M109A6
               CONDUCTED.                                               SHUTDOWN
         15589 DE-ENERGIZING PROCEDURES WERE                            AFTER STUDENT TRAINING: SYSTEM                         1/27/2011     403      FSCATT M109A6
               CONDUCTED.                                               SHUTDOWN
         15590 DE-ENERGIZING PROCEDURES WERE                            AFTER STUDENT TRAINING: SYSTEM                         1/27/2011     406      FSCATT M109A6
               CONDUCTED.                                               SHUTDOWN
         15591 Ran the Linux Install script files to re-establish all   SAF will not boot.                                     1/28/2011   C12-331    CFFT 1:12 Increment 2
               account permissions. Duplicated the repaired
               hard drive onto their spare hard drive. No other
               problems were found.

         15592 TROUBLESHOOTING REVEALED THAT THE                        STUDENT IG WILL NOT LOAD CFFT                          1/28/2011   C12-335    CFFT 1:12 Increment 2
               STUDENT IG DID NOT BOOT UP PROPERLY.                     SOFTWARE
               THE COMPUTER WAS REBOOTED AND THE
               VIDEO WAS RECONFIGURED FOR DUAL
               VIDEO. 1/27/11 1300 TO 1400

         15593 TROUBLESHOOTING REVEALED THAT THE     NO VIDEO ON PROJECTOR SCREEN,FROM                                         1/28/2011   C12-335    CFFT 1:12 Increment 2
               SETTING ON THE PROJECT HAD BEEN       BATTLEFIELD IG
               CHANGED FROM PC-2 INPUT TO PC-1 INPUT
               CAUSING NO VIDEO DISPLAY. THE
               PROJECTOR SETTING WAS SWITCH BACK
               TO PC-2 TO CORRECT THE PROBLEM.
               1/28/11 0700 TO 0800
         15594 Shipping out a replacement Battlefield IG #1 to          BAttlefield IG #1 will not power on. Site reported     1/28/2011   C30-326    CFFT 1:30 Increment 2
               site. 2CF028.                                            that they had a building power failure prior to the
                                                                        BF IG #1 failure.
         15595                                                                                                                 1/30/2011      1       HIMARS HPU
         15596                                                                                                                 1/30/2011      2       HIMARS HPU
         15597                                                                                                                 1/30/2011      3       HIMARS HPU
         15598                                                                                                                 1/30/2011      7       HIMARS HPU
         15599                                                                                                                 1/30/2011      8       HIMARS HPU
         15600                                                                                                                 1/30/2011      9       HIMARS HPU
         15601                                                                                                                 1/30/2011    FOX1      NBCRS FOX
                                                                                                                                                      SIMULATOR
         15602                                                                                                                 1/30/2011    FOX2      NBCRS FOX
                                                                                                                                                      SIMULATOR



83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                      Page 120
        WO #                      Repair Notes                                         Problem                          Date    Serial #       Description
        15603                                                                                                       1/30/2011   FOXIS1     NBCRS FOX
                                                                                                                                           SIMULATOR
         15604 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/31/2011                             401      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15605 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/31/2011                             402      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15606 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/31/2011                             403      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15607 1. THE HCT WAS ENERGIZED AND VERIFIED STUDENT TRAINING: 1. SYSTEM STARTUP 2. 1/31/2011                             406      FSCATT M109A6
               OPERATIONAL READINESS. 2. INITIALIZED  PDFCS OPERATION CHECK 3. INITIALIZE
               THE PDFCS. 3. INITIALIZED AFATDS, SENT AFATDS 4. SENOR OPERATION CHECK
               MISSION TO PDFCS 4. LOADED AND FIRED A
               PROJECTILE, FUZE, AND CHARGE
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15608 Ran Western Digital diagnostics on the HD and it Spare Instructor control hard drive for CFFT 1:30 1/31/2011       null
               detected and corrected a bad sector. Repeated    C30-330 will not boot when installed in the trainer.
               diagnostcs numerous times and the HD passed This is a follow-up to WO 15542
               each time. Reinstalled software on HD. Installed
               HD in trainer and it worked fine.

         15609 PCI Slot (Sim Network Card Slot) does not         Student IG will not load terrain data.             1/31/2011     null
               function correctly. We cannot install drivers for
               mulitple network cards. Item needs to go to
               vendor for repair. 4.26.11 - Per Ivan Hall's
               request, setting to Awaiting Parts. 6-20-2011
               received back from vendor, testing the computer.

         15610 Unlocked all accounts and reset all passwords.      Hard Drive is locked out of CFFT Administrator   1/31/2011     null
               Tested, returned to asl. no parts used.             account.

         15611 Replaced the CMOS Battery with one from ASL. Student Control will not power up consistenly,          1/31/2011     null
               Changed all passwords and tested mulitple times. VGA connector is loose, and there is a problem
               Returned to ASL. CF075 was used (CMOS.           with the SIM network adaptor.

         15612 This work order needs to be deleted. The work       SAF display is not correct.                      1/31/2011     null
               order was created in error.
         15613 DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                 1/31/2011     401      FSCATT M109A6
               CONDUCTED.                            SHUTDOWN
         15614 DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                 1/31/2011     402      FSCATT M109A6
               CONDUCTED.                            SHUTDOWN
         15615 DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                 1/31/2011     403      FSCATT M109A6
               CONDUCTED.                            SHUTDOWN
         15616 DE-ENERGIZING PROCEDURES WERE         AFTER STUDENT TRAINING: SYSTEM                                 1/31/2011     406      FSCATT M109A6
               CONDUCTED.                            SHUTDOWN
                                                     Student control will not communicate with the rest
         15617 Sending a replacement Student Control and Hard                                                       1/31/2011   C30-301    CFFT 1:30 Increment 2
               drive. (2CF026 2CF018)                of the system.
                                                     Battlefield Image Generator #1 and #2 will not
         15618 Restarted the terrain database. No parts used.                                                       1/31/2011   C30-318    CFFT 1:30 Increment 2
               Tested.                               display the binoculars, compass, or cursor onto
                                                     the projection screens.
         15619 Shipping a replacement SAF. (CF031).  The SAF will not display any video.                            2/3/2011     C-093     CFFT 1:12
         15620 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCHEDULED STUDENT TRAINING: 1.                               2/3/2011      201      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP 2. SENSOR OPERATION
               FIRED A PROJECTILE, FUZE, AND CHARGE  CHECK
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15621 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCEDULED STUDENT TRAINING: 1.                                2/3/2011      202      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP 2. SENSOR OPERATION
               FIRED A PROJECTILE, FUZE, AND CHARGE  CHECK
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15622 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCEDULED STUDENT TRAINING: 1.                                2/3/2011      203      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP 2. SENSOR OPERATION
               FIRED A PROJECTILE, FUZE, AND CHARGE  CHECK
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15623 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCEDULED STUDENT TRAINING: 1.                                2/3/2011      204      FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP 2. SENSOR OPERATION
               FIRED A PROJECTILE, FUZE, AND CHARGE  CHECK
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.




83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                                Page 121
        WO #                Repair Notes                          Problem                                                 Date     Serial #        Description
        15624 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCEDULED STUDENT TRAINING: 1.                                   2/3/2011       205       FSCATT M109A5
              OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP 2. SENSOR OPERATION
              FIRED A PROJECTILE, FUZE, AND CHARGE  CHECK
              COMBINATION, ALL SENSORS ARE
              OPERATIONAL.
         15625 1. THE HCT WAS ENERGIZED AND VERIFIED UNSCEDULED STUDENT TRAINING: 1.                                  2/3/2011       206       FSCATT M109A5
               OPERATIONAL READINESS. 2. LOADED AND SYSTEM STARTUP 2. SENSOR OPERATION
               FIRED A PROJECTILE, FUZE, AND CHARGE  CHECK
               COMBINATION, ALL SENSORS ARE
               OPERATIONAL.
         15626 Rebooted system computer and validated correct System not responding to command inputs.                2/3/2011   E110013V8OP   FFROT AN/TPQ-36 (V8)
               operations.                                                                                                                     Instructor Station
         15627 Shipped Replacement Student Ig and HardDrive Student IG will not load the NTC or Urban                 2/3/2011     C12-306     CFFT 1:12 Increment 2
               to site. (INC 2) 2CF027 and 2CF018.            Mideast terrain files.

         15628 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    2/3/2011       202       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15629 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    2/3/2011       205       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15630 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                      2/3/2011       206       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         15631 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    2/3/2011       201       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15632 THE RAMMER CYLINDER WAS PUT BACK IN              DUE TO STUDENT ERROR, THE RAMMER                      2/3/2011       203       FSCATT M109A5
               THE STOWED POSITION, SYSTEM WAS                  CYLINDER STOPPED IN THE EXTENDED
               REBOOTED AND TEST FIRED.                         POSITION.
         15633 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    2/3/2011       203       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15634 THE PROJECTILE AND CHARGE BAG WAS                DUE TO STUDENT ERROR, A PROJECTILE                    2/3/2011       204       FSCATT M109A5
               REMOVED AND THE SYSTEM WAS                       AND CHARGE BAG BECAME STUCK IN THE
               REBOOTED.                                        GUNTUBE.
         15635 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        2/3/2011       201       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15636 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        2/3/2011       202       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15637 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        2/3/2011       203       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15638 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        2/3/2011       204       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15639 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        2/3/2011       205       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15640 DE-ENERGIZING PROCEDURES WERE                    AFTER STUDENT TRAINING: SYSTEM                        2/3/2011       206       FSCATT M109A5
               CONDUCTED.                                       SHUTDOWN
         15641 This item needs to go to vendor for repair. PO   LLDR will not respond to the Student Control. The     2/4/2011       null
               85699 Item received back.. tested, returned to   driver would never install correctly on the Student
               ASL.                                             Control Computer. This item was bad off the ASL
                                                                Shelf.
         15642 Reseated Hard Drive cable, rebooted, tested      The Battlefield IG #1 is unable to read the hard 2/4/2011            null
               multiple times and returned to ASL. No parts     drive. This is a follow-up to 15575
               used.
         15643 Replaced tp's with bench stock tp's recovered CM - radar card rack simulation - slot 5 tp 29 & tp 2/4/2011        114B0001M37   FIMT
               from bad board.                               3 broken off.
         15644 TROUBLESHOOTING REVEALED THAT THE             STUDENT STATION WILL NOT BOOT UP                    2/4/2011          C12-334     CFFT 1:12 Increment 2
               VIDEO CABLE WAS ATTACHED TO THE
               WRONG VIDEO OUT PUT; IT WAS
               CONNECTED TO THE MOTHERBOARD
               INSTEAD OF THE VIDEO CARD. THE
               NETWORK CABLE WAS NOT PROPERLY
               ATTACHED DUE TO A STRAIN ON THE CABLE
               HARNESS. THE CABLE HARNESS WAS WIRE
               TIED TO THE TABLE TO RELIEVE THE
               STRESS. 2/1/2011 1000 TO 1200


         15645                                                                                                        2/6/2011      FOX1       NBCRS FOX
                                                                                                                                               SIMULATOR
         15646                                                                                                        2/6/2011      FOX2       NBCRS FOX
                                                                                                                                               SIMULATOR
         15647                                                                                                        2/6/2011     FOXIS1      NBCRS FOX
                                                                                                                                               SIMULATOR
         15648 Performed all PMCS. Passed DRC. No repairs                                                             2/6/2011     ISB0001     ICOFT Instructor Station
               needed.
         15649 Performed all PMCS. Passed DRC. No repairs                                                             2/6/2011    SSB0002      ICOFT Student Station
               needed. Richard Meek is the technician.

         15650 Can not complete PMCS. Device located at                                                               2/6/2011    SSB0003      ICOFT Student Station
               Starke, Florida - National Guard.
         15651 Can not complete PMCS. Device located at                                                               2/6/2011    SSB0004      ICOFT Student Station
               Starke, Florida - National Guard.
         15652 Can not complete PMCS. Device located at                                                               2/6/2011    SSB0028      ICOFT Student Station
               Grand Forks, North Dakota - National Guard.
         15653 CONDUCTED PMCS/LO                                                                                      2/6/2011     R 0003      MLRS HYD CART
         15654 CONDUCTED PMCS/LO                                                                                      2/6/2011     R 0004      MLRS HYD CART
         15655 CONDUCTED PMCS/LO                                                                                      2/6/2011     R 0005      MLRS HYD CART


83a3dc32-5a11-4318-9b4b-89f872178ee5.xls                                             Page 122
        WO #              Repair Notes                           Problem        Date     Serial #          Description
        15656 CONDUCTED PMCS/LO                                             2/6/2011     R 0006      MLRS HYD CART
        15657 null                                                          2/6/2011                 FFROT AN/TPQ-36 (V8)
                                                                                                     Instructor Station
         15658 -cleaned station--performed map registrations--              2/6/2011   E110001V8IS   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box

         15659 -cleaned station--performed map registrations--              2/6/2011   E110002V8IS   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box

         15660 -cleaned station--performed map registrations--              2/6/2011   E110003V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15661 -cleaned station--performed map registrations--              2/6/2011   E110004V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15662 -cleaned station--performed map registrations--              2/6/2011   E110005V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15663 -cleaned station--performed map registrations--              2/6/2011   E110006V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15664 -cleaned station--performed map registrations--              2/6/2011   E110007V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15665 -cleaned station--performed map registrations--              2/6/2011   E110008V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15666 -cleaned station--performed map registrations--              2/6/2011   E110009V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15667 -cleaned station--performed map registrations--              2/6/2011   E110010V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15668 -cleaned station--performed map registrations--              2/6/2011   E110011V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15669 -cleaned station--performed map registrations--              2/6/2011   E110012V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15670 -cleaned station--performed map registrations--              2/6/2011   E110013V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15671 -cleaned station--performed map registrations--              2/6/2011   E110014V8OP   FFROT AN/TPQ-36 (V8)
               checked and cleaned network systems,                                                  Instructor Station
               communications systems, and black box
               connections
         15672 PMCS COMPLETE                                                2/6/2011    0002V8M36    FFOMT AN/TPQ-36
                                                                                                     (V8)
         15673 PMCS COMPLETE                                                2/6/2011    0001V8M36    FFOMT AN/TPQ-36
                                                                                                     (V8)
         15674 PMCS COMPLETE                                                2/6/2011    0003V8M36    FFOMT AN/TPQ-36