Embed
Email

Saddleback Valley Unified School District

Document Sample

Shared by: liamei12345
Categories
Tags
Stats
views:
4
posted:
12/3/2011
language:
English
pages:
56
Saddleback Valley Unified School District



Strategic Plan

Report of Accomplishments









January 2007

Meeting the Needs of the Whole Child

Meeting the Needs of the Whole Child

We shall prepare all students for tomorrow’s world through a

partnership among school, home, and the larger community.

Strategy 1: Provide all students access to a comprehensive

curriculum that will lead toward achieving academic proficiency or

beyond, graduation from high school, and appropriate preparation

for post secondary endeavors



• Developed CAHSEE support materials and implementation of

CAHSEE intervention and preparation classes at the high schools,

continuation and adult education programs.

• Developed after school CAHSEE supplemental instruction programs

at each high school and the adult education program for students

who had not passed the CAHSEE. In addition, CAHSEE summer

school courses were offered in the summer of 2005 and 2006.

• Completed Physical Education course descriptions and curriculum

revisions for grades 9–12.

Meeting the Needs of the Whole Child

We shall prepare all students for tomorrow’s world through a

partnership among school, home, and the larger community.

Strategy 1: Provide all students access to a comprehensive

curriculum that will lead toward achieving academic proficiency or

beyond, graduation from high school, and appropriate preparation

for post secondary endeavors



• Provided updated curricular support for Holt and Houghton Mifflin.

Restructured the English Language Arts writing component in the

District’s Houghton Mifflin English Language Arts series to integrate

reading and writing instruction and focus on standards-based

genres. Developed/provided K-5 writing plans. New English

Language Arts writing pacing guides were distributed to all

elementary teachers.

• Conducted an annual 6th grade writing benchmark. Representative

teachers from each school met for two days to participate in the

district-wide scoring of these papers. The writing benchmark in the

04/05 and 05/06 school years was persuasive writing.

Meeting the Needs of the Whole Child

We shall prepare all students for tomorrow’s world through a

partnership among school, home, and the larger community.

Strategy 1: Provide all students access to a comprehensive

curriculum that will lead toward achieving academic proficiency or

beyond, graduation from high school, and appropriate preparation

for post secondary endeavors



• Developed and monitored the District Writing Portfolio System that

was utilized in grades 7-12. Students collected samples of both

guided process and on-demand writings, aligned with genres specific

to grade level ELA standards. On-line portfolios were also assembled

using writing from the EETT project.

• Facilitated the implementation of new reading intervention

programs such as High Point and Read 180.

• Provided targeted support for those schools where EL students are

not achieving at expected proficiency levels.

Meeting the Needs of the Whole Child

We shall prepare all students for tomorrow’s world through a

partnership among school, home, and the larger community.

Strategy 1: Provide all students access to a comprehensive

curriculum that will lead toward achieving academic proficiency or

beyond, graduation from high school, and appropriate preparation

for post secondary endeavors



• Purchased portions of the Avenues ELD program for the primary

grade levels. Training was provided for representative teachers at

grades K, 1, 2, and 3.

• Utilized High Point materials in many 4-6 grade special education

SDC classes for language arts instruction.

Meeting the Needs of the Whole Child

We shall prepare all students for tomorrow’s world through a

partnership among school, home, and the larger community.



Strategy 2: Promote the social and emotional growth and

development of all students in an environment that supports positive

character traits and encourages respectful connections among all

students and adults.



• Introduced Positive Behavior Support at several elementary schools. The

Pupil Services staff provided training and collaboration opportunities.

• Provided support for positive school climates.

• Character Counts (non-Mission Viejo version in other schools)

• The PAL® Peer Assistance Leadership Program, a peer-to-peer youth

development program for elementary, intermediate, and high school

students, is designed to improve school attendance; reduce drug and

alcohol use; develop a positive school climate; increase academic success

and responsible behavior, and increase involvement in the community.

Meeting the Needs of the Whole Child

We shall prepare all students for tomorrow’s world through a

partnership among school, home, and the larger community.

Strategy 2: Promote the social and emotional growth and

development of all students in an environment that supports positive

character traits and encourages respectful connections among all

students and adults.



• Currently ten elementary schools, two intermediate schools, and one

high school are participating in the Positive Behavior Support (PBS)

activities. The PBS program provides school wide training to improve

behavior for all students, and targeted interventions for those who need

additional support.

• Three of our intermediate and three high schools have Advancement via

Individual Determination (AVID) programs. AVID targets secondary

students with potential and drive, who are “in the middle,” to prepare

them to enter and succeed at a four-year college or university.

Meeting the Needs of the Whole Child

We shall prepare all students for tomorrow’s world through a

partnership among school, home, and the larger community.

Strategy 3: Provide a learning environment that promotes life-long

learning habits and contributes to good physical health and

development.





• Strengthened physical education and health instruction and standards

alignments.

• Adopted new district wide K-12 physical education and health materials.

• Developed the federally mandated District Wellness Policy. The policy

was adopted by the Board of Education. An initial draft of the

Administrative Regulation was created and is now in place for the

2006-07 school year.

Professional & Impassioned Staff

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 1: Attract, retain, and support a professional staff

dedicated to providing the highest quality educational and

experience for students.







 Recruited and selected a high quality staff. For the 2005-06 school year,

10 administrators, 121 teachers, 144 regular classified employees, 400

exempt classified employees, and 153 exempt recreation employees were

hired. All newly hired regular teachers and instructional aides meet the

requirements for NCLB and have CLAD or equivalent EL certification.

The NCLB requirements for special education teachers are still not fully

spelled out by the State so in some cases we are still hiring some special

education teachers who are not yet NCLB complainant.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 1: Attract, retain, and support a professional staff

dedicated to providing the highest quality educational and experience

for students.





 A number of actions were implemented to increase the applicant pool for

qualified instructional assistants, especially those in the IBI Program.

Advertisements were placed in the OC Register and the local Penny

Saver. Brochures were updated and mailed with a display folder to

branches of the county and city libraries within the school district

boundaries as well as to large local churches. Substitute teachers were

invited to an orientation meeting about the IBI Program and asked to

consider working in the classified positions. Administrators provided

tutoring and coaching to applicants that had difficulty passing the

proficiency test. As a result, our vacancy rate decreased from 14% to 9%.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 1: Attract, retain, and support a professional staff dedicated

to providing the highest quality educational and experience for

students.





• Sub Finder, an automated substitute system with both phone and web

capabilities, was implemented for 1,676 teachers and 642 instructional

aides.

• Audit and monitor NCLB “Highly Qualified Teacher” requirements, and

implement new procedures for the auditing and monitoring of teaching

assignments based on the Williams settlement. At the beginning of the

2005-2006 school year there were 25 teachers who were not NCLB

compliant; at the end of the year there were only four teachers. Each of

these teachers has a written plan, approved by the Principal and

Personnel, and will be compliant by the NCLB deadline of June 30, 2007.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 1: Attract, retain, and support a professional staff

dedicated to providing the highest quality educational and experience

for students.





• Explored feasibility of implementing an on-line electronic application

process. During the 2005-06 school year, staff reviewed on-line

application processes currently being utilized in Capistrano and Irvine

Unified School Districts. In July 2006, staff attended a county-

sponsored training on a similar system and will determine whether to

move forward with such a system.

• A day-long Asset Building training for all teachers and staff at all four

intermediate schools started the school year off. The purpose of the

training was to familiarize teachers with the connections between the 40

Developmental Asset framework and academic success.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 2: Create a structure to promote a collaborative culture in

which employees are valued.









 Negotiations were completed with all employee groups for new collective

bargaining agreements. A one-year contract was negotiated with SVEA

for 2005-06; the second year of a three-year agreement (2004-07) was

negotiated with CSEA; the second year of a three-year agreement (2004-

07) was negotiated with SVPSA.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 2: Create a structure to promote a collaborative culture in

which employees are valued.









 Reviewed class size ratios in grades 7-12 and made recommendations as

appropriate. Over the past few years, several factors have combined to

result in high class sizes in grades 7-12. Based on an analysis of class size

both within and outside the District as well as input from secondary

principals, it was determined to develop a plan to reduce class size. Staff

recommended and the Board of Education approved 10 FTE (50 teaching

sections) to be authorized on an off-ratio basis to lower class size in

grades 7-12. Each intermediate school received 2 off-ratio sections and

each high school received 10 sections.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 3: Design opportunities for professional growth to reflect

staff needs, interests and District goals; to promote life-long learning;

and to foster self-reflection as a professional.





• Developed and implemented two inservices for high school teachers of

the special CAHSEE courses implemented in January for juniors and

seniors who had not passed the CAHSEE. During the inservices, teachers

reviewed standards and assessment data, developed curriculum, and

identified materials to meet the needs of the students enrolled in the

CAHSEE courses.

• Provided physical education inservices for all K–6 elementary school

teachers as part of the District Staff Development Days. Several schools

followed up with additional activities at their school sites.

• Provided related staff development options.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 3: Design opportunities for professional growth to reflect

staff needs, interests and District goals; to promote life-long learning;

and to foster self-reflection as a professional.





• Structured two elementary staff development days devoted to writing

instruction, with specific emphasis on teaching and response strategies.

• Developed an optional full day inservice on 4th grade on-demand

writing, which was provided to interested 4th grade teachers. A District

handbook on 4th grade writing was distributed.

• Eighth grade teachers were trained and supported in the use of My

Access on-line computerized writing scoring program.

• All intermediate English teachers attended site-based writing inservices.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 3: Design opportunities for professional growth to reflect

staff needs, interests and District goals; to promote life-long learning;

and to foster self-reflection as a professional.





• Eighth grade English teachers attended the annual UCI Writing Project

conference in December. Funding will be extended into year 3 because

the writing gains exceeded the program requirement.

• Provided opportunities for EL certification training (AB 2913) and other

EL teacher inservices for school sites to increase their number of highly

qualified teachers instructing English Learners. Over 410 teachers were

trained throughout the school year and summer.

• Utilized High Point materials with many EL and at-risk students for

language arts instruction. Ongoing staff development was provided.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 3: Design opportunities for professional growth to reflect

staff needs, interests and District goals; to promote life-long learning;

and to foster self-reflection as a professional.





• Provided professional development to elementary principals and teams

of teachers from our title I schools by consultant, Dennis Parker, on

strategic schooling.

• Several very successful sessions for Special Education staff development

days. Sessions were presented to audiences composed of both special

education teachers and regular education teachers on topics such as

autism and behavior disorders. All kindergarten and first grade teachers

received information from three speech and language pathologists about

the cognitive development of language skills and the implications for the

instructional program.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 3: Design opportunities for professional growth to reflect

staff needs, interests and District goals; to promote life-long learning;

and to foster self-reflection as a professional.





 Planned and supervised two formal days of inservice training for all

special education teachers and instructional aides, psychologists and

direct service providers, worked collaboratively with the instructional

services department to cross over categorical trainings to regular

education staff. We sent various staff members to over 100 other staff

development opportunities.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 3: Design opportunities for professional growth to reflect

staff needs, interests and District goals; to promote life-long learning;

and to foster self-reflection as a professional.





 Increased number of teachers with EL certification - The District has

1,676 teachers. Of these, 950 are EL certified. Of the remaining

teachers, 237 have completed the requirements and are waiting for CTC

to issue the certificate; 166 teachers have completed AB 2713 training and

are waiting test results from the OCDE; 224 teachers participated in AB

2913 training in summer of 2006 or have applied for an emergency

permit while taking college/university coursework.

Professional & Impassioned Staff

Meeting the Needs of the Whole Child

We shall foster a positive learning environment that will result

in the creation of and inspiring and inspired professional

Learning community.

Strategy 3: Design opportunities for professional growth to reflect

staff needs, interests and District goals; to promote life-long learning;

and to foster self-reflection as a professional.





• In accord with AB 1825, sexual harassment training was provided to all

supervisors prior to January 1, 2006. The Personnel Department

developed a 2-hour training program to meet the requirements of AB

1825 and held four sessions to train all District administrators, managers

and supervisors.

• Authorized credentials for teachers who will complete their credential

requirements under the District’s Induction Program. A total of 27

teachers completed their second and final year of participation in the

BTSA/Induction program. Of these, 25 have completed the requirements

and are being recommended for the Professional Clear Credential.

Parent & Community Involvement

Parent & Community Involvement

Meeting the Needs of the Whole Child

We shall encourage and welcome the involvement of parents

and the broader community in the educational process and in

The celebration of student and organizational success.

Strategy 1: Promote the role of parents as volunteers and partners in

the education of their children.







• Each school continues to encourage, invite, and promote parent

participation in booster groups, site council PTA, PTO, etc. Schools who

completed WASC reviews in the 2005-06 school year acknowledged the

contributions of parent participation and the numerous volunteer hours.

• 100% of the EL parents in the Even Start Program increased their

volunteer support in the classroom during the 05-06 school year.

• Open Houses/Back-to-School nights were offered at all levels.

• Parent conference days were held at elementary schools.

• Superintendent Forums are held three times a year with PTA

representatives from each SVUSD school.

Parent & Community Involvement

Meeting the Needs of the Whole Child

We shall encourage and welcome the involvement of parents

and the broader community in the educational process and in

The celebration of student and organizational success.

Strategy 2: Implement a District-wide method for mass telephone

communication.







• In August 2005 proposals were received from eleven companies which

provide parent/student notification services. A committee of District

Principals and Staff heard proposals from five companies.

• In February 2006 Chatter, Inc. (Family First Alerts) set up primary

accounts for all 36 schools and provided training to site administration.

As of June 2006, 18 of the 36 school have used the system and sent either

a voice or a text message to parents.

Parent & Community Involvement

Meeting the Needs of the Whole Child

We shall encourage and welcome the involvement of parents

and the broader community in the educational process and in

The celebration of student and organizational success.

Strategy 3: Promote a parent education program to assist in

strengthening skills and in fostering conditions that enhance student

learning.



• Approximately 50% of the EL parents from Even Start meet each week

during the summer for literacy lessons with their children. Family

Literacy with Orange County READ summer program has also increased

in attendance.

• From Oct 2005 through May 2006, parents in the School Readiness

Program were enrolled in a series of six week parenting classes.

• Thirty-six eligible parents were enrolled in the William F. Goodling Even

Start Family Literacy Program to promote English language/literacy

acquisition for parents and are actively participating six hours per day –

five days per week.

Parent & Community Involvement

Meeting the Needs of the Whole Child

We shall encourage and welcome the involvement of parents

and the broader community in the educational process and in

The celebration of student and organizational success.

Strategy 3: Promote a parent education program to assist in

strengthening skills and in fostering conditions that enhance student

learning.



• Seventy-two parents and students were enrolled in the School Readiness

and Resource Project, which require that their parents attend a one day a

week class to increase their parenting skills and improve their role as

their child’s first teacher.

• Various elementary schools held Family Science Night and Science Fairs.

Gates Elementary held Family Resource Center and Family literacy every

week. Nutrition classes and Family Math, “Grupo Crecer” was also held.

Project Tomorrow Schools also held a variety of Family Nights on

different topics. Plans are underway to provide a special Math Resources

page on the District website for parents of elementary aged students.

Parent & Community Involvement

Meeting the Needs of the Whole Child

We shall encourage and welcome the involvement of parents

and the broader community in the educational process and in

The celebration of student and organizational success.

Strategy 4: Expand the partnerships between students, teachers,

parents and community which promote ownership of student and

school achievement.



• 100% of the EL parents in the School Readiness & Resource Center

Project increased their volunteer support in the classroom as partners in

education.

• DELAC Officers Planning Mtg. dates: 10/13/05; 12/14/05; 1/12/06;

3/9/06; 5/4/06. DELAC Mtg. dates: 10/27/05; 1/19/06; 3/22/06;

5/11/06. A parent forum was held for parents to learn about the school

district and its programs for English Learners. Questions and concerns

were addressed.

Parent & Community Involvement

Meeting the Needs of the Whole Child

We shall encourage and welcome the involvement of parents

and the broader community in the educational process and in

The celebration of student and organizational success.

Strategy 4: Expand the partnerships between students, teachers,

parents and community which promote ownership of student and

school achievement.



• Provided Sophomore Counseling to tenth grade students and their

parents; including assistance in completing the four-year plan and

guidance for post-high school options. A total of 2,342 10th graders

received individual scholastic advisement sessions in 2005-06.

• Adult Education Brochure and Principals’ Newsletters continue to be

sent regularly to District parents; Guidance Newsletter is mailed bi-

annually to all 9-12 grade parents. All information is posted on SVUSD

website.

• Guidance Newsletter & Principals’ Newsletters continue to be sent

regularly to District parents. Educationally sponsored nights are posted

on the SVUSD website.

Parent & Community Involvement

Meeting the Needs of the Whole Child

We shall encourage and welcome the involvement of parents

and the broader community in the educational process and in

The celebration of student and organizational success.

Strategy 4: Expand the partnerships between students, teachers,

parents and community which promote ownership of student and

school achievement.



• CPAC Meeting Dates: 11/15/05, 2/7/06, 5/16/06 Agendas & Minutes are

housed in Pupil Services/Guidance Specialist Office.

• FAC Meeting Dates: 9/21/05, 10/19/05, 3/15/06, 5/17/06, 5/31/06,

6/7/06. Agendas & Minutes are housed in Business Services.

• DLAC Meeting Dates: 10/27/05, 1/19/06, 3/22/06, 5/11/06. Agendas &

Minutes are housed in the Second Language Department.

• COC Meeting Dates: 1/12/06, 4/28/06, 7/20/06. Minutes are housed in

the facilities Department.

• The District, in collaboration with CUSD and many community agencies,

organizes and operates the South Orange County Youth Job/Career Fair.

Infrastructure & Facilities

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 1: Evaluate, enhance and communicate disaster-safety

plans.





• Board presentation and follow-up preparation for pandemic flu outbreak.

• Held a district office emergency drill and all school call-in on 6/1/06.

• Reviewed and updated the district’s emergency preparedness plan

• Established a radio communication protocol and implemented a two way

radio communication drill.

• Developed a wild fire evacuation plan for Trabuco Elementary and

conducted an actual campus evacuation with students and teachers

• Conducted small group meetings for Disaster Plan Talk Group Teams

and school site office managers

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 1: Evaluate, enhance and communicate disaster-safety

plans.





• Participated in the Orange County Emergency Operation Center

Emergency Radio Program with monthly radio checks.

• Participated in the OC Emergency Operation’s Area Tsunami Drill.

• Coordinated with the Red Cross for Disaster Shelter in Place Program

and site evaluations.

• Continued the deployment of security cameras at school sites throughout

the district.

• Continue the systematic upgrade of fire alarms.

• Completed the Bi-Annual fire alarm testing at each school site

• Installed the First Alert as the district-wide parent notification system

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- NEW CONSTRUCTION

Del Lago, Montevideo, Lomarena & La Madera Elementary

• A multi-purpose room is being constructed at each site; all are expected

to be ready for occupancy in February 2007.

Cordillera/De Portola Elementary School

• Construction on new multi-use (three classroom) building at both

Cordillera and de Portola began this summer. Construction is scheduled

for completion in mid-February 2007.

La Tierra Elementary School

• A portable staff restroom building has been installed at this site.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- NEW CONSTRUCTION

Rancho Canada Elementary School

• Six (6) new portable classrooms were added to this site and three

existing portable classrooms were relocated to make maximum use of

available space while not impacting the playground.

Los Alisos Intermediate School

• A large, new band portable classroom has been installed at this site.

El Toro High School

• A sports turf and all weather track at ETHS have been completed.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- NEW CONSTRUCTION

Laguna Hills High School

• Construction began on a new athletic stadium in November and will last

approximately 8 months and should be ready for the 2007 football

season.

Mission Viejo High School

• A sports turf and all weather track at MVHS have been completed.

• The Performing Arts Project design is complete, and has been submitted

to DSA.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- NEW CONSTRUCTION

Trabuco Hills High School

• The schematic planning for a parking structure and 18 classroom

building project has been completed and design is currently under way.

• Resurfacing of the THHS track took place early this summer.

• All fire alarm changes required by DSA have recently been completed.

Silverado High School

• A new modular two-story office/classroom building and the relocation

of the Adult Education building is currently under construction and

scheduled for completion in April, 2007.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- MODERNIZATION

Glen Yermo Elementary School

• Ten (10) interim portable classrooms were installed this summer. The

Administration office, library, food service area and multiple

classrooms have been modernized. The entire modernization project

will be completed by the end of February 2007.

Rancho Canada Elementary School

• Nine (9) interim portables classrooms were installed this summer.

• The administration office, kindergartens, library and multi-purpose

room are complete. Modernization was completed December 15.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- MODERNIZATION

El Toro High School

• Portion 1 - The administration building, library, computer lab, food

service, ASB, and portions of vocational education were completed in

early November.

• Roofing was also completed on the administration building, 300, 400 &

500 classroom buildings

• The modernization of the 300 building is currently under way.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- MODERNIZATION

Esperanza Special Education School

• Completion of the main office spaces and the food service kitchen is

expected by the end of January 2007.

• The installation of two modular buildings to house Special Education

offices and the California Children’s Services completed in December.

Laguna Hills High School

• Modernization has been DSA approved, and State funding has been

obtained for this project. Modernization is scheduled to begin during

summer, 2007.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- ENHANCEMENTS

Cielo Vista Elementary School

• A new parking lot was completed this summer.

• Fencing around the kindergarten playground was moved to enlarge the

area.

• A shade structure fabric was installed to cover the trellis outside the

kindergarten classroom

Lake Forest Elementary

• An additional TLC rental building was installed in summer.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- ENHANCEMENTS

Portola Hills Elementary School

• Slide and soil conditions at this site continue.

• No planning for enhancement projects has taken place.

Trabuco Mesa Elementary School

• A small wall around the playground was constructed.

RSM Intermediate School

• Construction on a large band room and a drama storage area will begin

shortly. Demolition began on December 27, 2006.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- ENHANCEMENTS

O’Neill Elementary School

• Completion on an enhanced teachers’ work room was completed in early

fall.

MEASURE B -- DISTRICT WIDE PROJECTS

Field Renovations

• The renovation of the play fields have been completed at nine (9)

elementary schools - Melinda Heights, San Joaquin, Cordillera, O’Neill,

Linda Vista, Aliso, Cielo Vista, La Tierra and Lake Forest.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





MEASURE B -- DISTRICT WIDE PROJECTS

Shade Structures

• At MVHS, a shade structure now covers both the swimming pool

bleachers and the outdoor weight training area.

• At RSM, a shade structure covers the food service outdoor eating area.

Playgrounds

• Upgraded playground equipment was installed at Lake Forest

Elementary.

• New playground equipment for Portola Hills Elementary is being

installed this month.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 2: Assess and modify facility requirements for instructional

programs and student needs





• A food service survey was created and administered to 86% of students in

grades 4-11.

• Food service facilities at several school sites are in the process of, or will

be, reconfigured through the Measure B bond program.

• The Food Service Management contract with Sodexo was renegotiated

for a one-year extension with the goal of reducing the operational costs

while increasing student participation (Free and Reduced Lunch

Program) and offering more nutritional food choices.

• A new District Wellness Policy was established and approved in spring of

2005, which is currently in practice at all schools.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 3: Evaluate basic equipment and technology needs.

Develop standards as necessary and appropriate.





• Made improvements to the technology infrastructure of the schools,

including such things as wireless capabilities, security cameras and new

phone systems at a majority of the schools.

• Upgraded Cisco firewall to provide better security policies to prevent

intruders (hackers).

• Migrated T-1 lines to Cox broadband for better and faster access from the

sites to the District Office and the Internet.

• Replaced the substitute calling system with an online system called "Sub

Finder" to enable a more efficient method of reserving and calling

substitutes.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 3: Evaluate basic equipment and technology needs.

Develop standards as necessary and appropriate.





• Migrated Special Education management system from the VAX to SEIS

which is an online database for managing the needs of special education.

• Provided more efficient printing services for report cards and school

locators by using a new printer better designed for this function.

• Purchased minimal installation of wireless capabilities at the school sites

with close to 200 access points. Installation was completed in fall 2006.

• Provided better web filtering and more complete reporting of web activity

through a new web filtering software called 8e6. This will allow

principals to gain access to site reports of any internet activity and track a

history of this activity.

Infrastructure the Whole

Meeting the Needs of& Facilities Child

We shall provide a safe, fully-functioning learning environment

that enhances educational programs for all students.



Strategy 4: Review maintenance needs associated with improving

the physical environment of District wide facilities.









• Budgeting is monitoring requisitions from Facilities to determine the

appropriateness of the expenditure.

• Maintenance and Operations conducts annual assessment of needs and

recommends program of work.

Resources

Resources

Meeting the Needs of the Whole Child

We shall increase the net District income by $20 million

Through identifying new resources and maximizing current

resources, including time, money, materials and staff.

Strategy 1: Enhance business and community partnerships for

innovative funding alternatives.









• Board Member/Superintendent’s office participation in South County

Regional Chambers of Commerce activities.

• Working with SVEF to invite new directors through corporate, civic,

and/or community involvement. Assisting in membership expansion

and the redirection of the foundation’s mission.

• Principal for a Day event held to bring in new business and community

leaders into schools.

Resources

Meeting the Needs of the Whole Child

We shall increase the net District income by $20 million

Through identifying new resources and maximizing current

resources, including time, money, materials and staff.

Strategy 2: Research the feasibility of voters authorizing a Parcel

Tax.









• No action

Resources

Meeting the Needs of the Whole Child

We shall increase the net District income by $20 million

Through identifying new resources and maximizing current

resources, including time, money, materials and staff.

Strategy 3: Advocate for state and federal funding reform.









• More active in taking positions/advocating for legislation in Sacramento

• In March 2006 and October 2006, Field Representatives from our local

legislators’ offices attended a meeting with Executive Cabinet to discuss

the legislative issues pertinent to SVUSD. Direct contacts were made and

a working partnership has been established. A Legislative Field

Representative meeting will continue to be held each fall.

• Participated in OC Superintendents Legislative Action Day in

Sacramento on March 21, 2006 to lobby for educational needs.

• PTA Council conducted a Sacramento Safari on May 1-2, 2006 to lobby

for educational needs.

Resources

Meeting the Needs of the Whole Child

We shall increase the net District income by $20 million

Through identifying new resources and maximizing current

resources, including time, money, materials and staff.

Strategy 3: Advocate for state and federal funding reform.









• Assembly and Senate activity is tracked on a regular basis.

• Participated in the California Declining Enrollment Coalition and

reevaluated the five-year enrollment projection based on 2005-06 actual

enrollment data.

• Provided information to District’s lobbyist and legislators’

representatives regarding declining enrollment, funding issues and

flexibility, and the need for local control.

• Sent several letters to Assembly and Senate Committee Members in

support (or opposition) of bills related to the above and their effect on

SVUSD.

Resources

Meeting the Needs of the Whole Child

We shall increase the net District income by $20 million

Through identifying new resources and maximizing current

resources, including time, money, materials and staff.

Strategy 4: Implement formal and informal management strategies

to ensure the efficient use of fiscal resources.





• Provided monthly updates on attendance rates to the schools.

• Provided schools with an Attendance Counts! Template to be used in

their newsletters.

• Positive certification was attained for the 1st and 2nd interim financial

reports.

• Using all funding flexibilities provided in the Mega and AB 825 Block

Grants to maintain a positive ending balance.

• Closer scrutiny by executive cabinet of District expenditures.

Resources

Meeting the Needs of the Whole Child

We shall increase the net District income by $20 million

Through identifying new resources and maximizing current

resources, including time, money, materials and staff.

Strategy 4: Implement formal and informal management strategies

to ensure the efficient use of fiscal resources.









• Changed the investment strategy for the Alternative Retirement System

(ARS) which increased interest earnings to 5% (if old strategy had been

maintained only 1% would have been earned per PARS).

• Began the process to issue tax revenue anticipatory notes (TRANS) for

2006-07 with possible earnings of $200K.





- End -


Shared by: liamei12345
Other docs by liamei12345
eCampus TOP Course Template
Views: 0  |  Downloads: 0
Media Kit 2011
Views: 2  |  Downloads: 0
14-43-23_09_11_460
Views: 2  |  Downloads: 0
thermal
Views: 0  |  Downloads: 0
DRC Water Plant alarm guidance
Views: 0  |  Downloads: 0
why-phil-got-my-post-wrong
Views: 0  |  Downloads: 0
Guideline
Views: 0  |  Downloads: 0
map4
Views: 0  |  Downloads: 0
mlar1_stats_sep11
Views: 0  |  Downloads: 0
Related docs