Embed
Email

WP1_Romania

Document Sample

Shared by: wanghonghx
Categories
Tags
Stats
views:
0
posted:
12/3/2011
language:
English
pages:
282
Primary data on reported flash floods - Hydra



Section Identification

1 Event code

2 Date of the event

3 River Name

4 Cross-section Name

5 Cross-section Longitude (World Geodetic System 84 )

6 Cross-section Latitude (World Geodetic System 84 )

7 Cross-section elevation [m]

Basin data

Minimum information

8 Watershed area [km2]

9 Estimated time of concentration [h]

Additional Data- Optional fields

10 Minimum elevation [m]

11 Maximal elevation [m]

12 Average elevation [m]

13 Average basin slope

14 Glacial Areas [%]

15 Land use

16 Soils

17 Average soil thickness [m]

18 Geology

19 Location map

20 Other geographical document

Discharge data

Minimum information

21 Peak discharge [m3/s], probable

22 Estimation method

23 Discharge estimation quality

24 Regulated stream

Additional Data- Optional fields

25 Peak discharge [m3/s] max

26 Peak discharge [m3/s] Min

27 10 year return period peak discharge [m3/s]

28 100 year return period peak discharge [m3/s]

29 Sediment transport processes

30 Flood duration [h]

31 Flood hydrograph

32 Past- historical floods

33 Report on the estimation

34 Pictures of the cross-section

35 Cross-section survey

36 Other attached file

Rainfall data

Minimum information

36' Reference weather station

37 Total rainfall duration [h]

38 No. of raingauges

39 No of raingauges within the basin

40 Quality of data

41 Hydro-Meteorological type of event

Additional Data- Optional fields

42 Maximum total accumulated point rainfall [mm]

43 Spatial extent

44 Average accumulated rainfall on the watershed [mm]

45 Rainfall spatial distribution map

46 Maximum Intensity over time of concentration [mm/h]

47 Initial wetness

48 Hailfall (y/n)

49 Radar data

50 Other attached files

Climatic data

Minimum information

51 Average annual precipitation [mm]

52 Observation period [years]

Additional Data- Optional fields

53 1 years return period hourly rainfall [mm]

54 10 years return period hourly rainfall [mm]

55 100 years return period hourly rainfall [mm]

56 1 years return period daily rainfall [mm]

57 10 years return period daily rainfall [mm]

58 100 years return period daily rainfall [mm]

59 Intensity Duration Frequency (IDF) curve

60 Monthly distribution of precipitation

Damages (only 1990-… events)

Minimum information

61 Total Economical damages [€]

Additional Data- Optional fields

62 Displaced persons

63 Population affected

64 Direct Damages to private properties [€]

65 Direct Damages to public equipment [€]

66 Indirect Damages [€]

67 Origin of the Data

68 Report on the damages

Casualties (only 1990-… events)

Minimum information

69 No of casualties

70 No of Inured people

71 Medical causes

72 Circumstances

73 Timing

74 Gender

75 Age

Related documents

Minimum information

76 Comments and additional information notes

Additional Data- Optional fields

77 Photos

78 Attached reports

79 References list

Lists Used in the sheet

Estimation method

Direct current- meter measurement

Calibrated stage-discharge relation

Reconstruction from reservoir operation

Manning Strickler formula estimation

Slope conveyance method

Hydraulic 1D simulation

Hydraulic 2D simulation

Orifice laws

Critical flow assumption

Surface velocity estimation

Erosion- sediment clues

Other

Unknow

n reported flash floods - Hydrate Projet WP1

1 2



1 2

Bistra-Padurea Neagra Bistra-Padurea Neagra



RO_19810610_III1.44.33.15_001 RO_19890507_III1.44.33.15_002

06/10/1981 07/05/1989

Bistra Bistra

Padurea Neagra Padurea Neagra

22 27 37 23 27 37

46 09 06 47 09 06

299 299









39 39

14 14





299 299

757 757

576 576

13.40% 13.40%

no

text

text

num

text

link

link









15.9 24.4

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No

34.4

93.6

water flow (0-20%, mostly 0-10%)

12 38

Bistra_Padurea Neagra_001.xls Bistra_Padurea Neagra_002.xls









num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

ate Projet WP1

3 4



3 4

Bistra-Padurea Neagra Chisindia-Chisindia



RO_20050823_III1.44.33.15_003 RO_19780214_III.1.31_001

23/08/2005 14/02/1978

Bistra Chisindia

Padurea Neagra Chisindia

24 27 37 22 05 29

48 09 06 46 18 45

299 182









39 46

14 13





299 182

757 724

576 435

13.40% 435

no

text

text

num

text

link

link









23.5 15.5

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No

num

29

79

water flow (0-20%, mostly 0-10%)

19 24

Bistra_Padurea Neagra_003.xls Chisindia_Chisindia_001.xls

link

link

link

link

link









WT

num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Sediment transport Initial wetness status

water flow (0-20%, mostly 0-10%) very dry

(20-40%)

debris flood or hyperconcentrated flow in recharge

debris flow (>40-50%) in recession

very wet

5



5

Chisindia-Chisindia



RO_19790530_III.1.31_002

30/051979

Chisindia

Chisindia

23 05 29

47 18 45

182









46

13





182

724

435

435

no









20.8

Direct current- meter measurement

2 - Good

No

15

Chisindia_Chisindia_002.xls

Size of rainfall event

(S100km2) Generalised storm

6



6

Halmagel-Halmagel



RO_19770211_III.1.15.1_001

11/02/1977

Halmagel

Halmagel

22 38 25

46 17 24

268









68

15





268

1486

746

30.10%

no

text

text

num

text

link

link









19

Direct current- meter measurement

2 - Good

No





19

num

55.8

152

water flow (0-20%, mostly 0-10%)

36

Halmagel_Halmagel_001.xls

link

link

link

link

link









WT

num

num

num









num





num

link









link

link









713.8

1964_present





num

num

num

num

num

num

IDF-Tebea.xls

Monthly_pp_Tebea.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Hydro-meteorological type of event

Storm

Storm on snow

7



7

Halmagel-Halmagel



RO_20050717_III.1.15.1_002

17/07/2005

Halmagel

Halmagel

23 38 25

47 17 24

269









68

15





268

1486

746

30.10%

no









26.5

Direct current- meter measurement

2 - Good

No

34

Halmagel_Halmagel_002.xls









Tebea

1h31'









1 - Very good









1.2









Halmagel_Halmagel_002.jpg

0.6

very wet









713.8

1964_present





14.6

26.5

38.4

30.8

54.4

77.9

IDF-Tebea.xls

Monthly_pp_Tebea.xls

Hailfall

yes

no

8



9

Luncoiu-Brad



RO_19790713_III.1.4_001

13/07/1979

Luncoiu

Brad

22 47 50

46 07 30

274









65.5

9





274

704

455

19.00%

no

text

text

num

text

link

link









15.2

Direct current- meter measurement

2 - Good

No

num

53.9

147

water flow (0-20%, mostly 0-10%)

19

Luncoiu_Brad_001.xls

link

link

link

link

link









Tebea

0h55'

num

num

1 - Very good









11.7





num

link

75

very wet





link

link









713.8

1964-present





NA

NA

NA

30.8

54.4

77.9

IDF-Tebea.xls

Monthly_pp_Tebea.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Casualties Timing

pre-impact phase

impact phase

post-impact phase

9



10

Luncoiu-Brad



RO_19800731_III.1.4_002

31/07/1980

Luncoiu

Brad

23 47 50

47 07 30

275









65.5

9





274

704

455

19.00%

no









28.8

Direct current- meter measurement

2 - Good

No

22

Luncoiu_Brad_002.xls









Tebea

3h48'









1









5.9









36

very wet









713.8

1964-present





NA

NA

NA

30.8

54.4

77.9

IDF-Tebea.xls

Monthly_pp_Tebea.xls

10 11 12 13



11

Luncoiu-Brad Sighisoara-Brazii

Sighisoara-Brazii Sighisoara-Brazii



RO_20050712_III.1.4_003 RO_19940712-III.1.21_004

RO_19910729_III.1.21_003 RO_19970816_III.1.21_005

12/07/2005 29/07/1991 12/071994 16/081997

Luncoiu Sighisoara Sighisoara Sighisoara

Brad Brazii Brazii Brazii

24 47 50 24 19 59 25 19 59 26 19 59

48 07 30 48 14 11 49 14 11 50 14 11

276 187 187 187









65.5 120 120 120

9 12 12 12





274 187 187 187

704 831 831 831

455 450 450 450

19.00% 25.00% 25.00% 25.00%

no no no no









25.5 76.3 30.2 33.6

Direct current- meter measurement meter measurement measurement

meter

Direct current-Direct current-Direct current- meter measurement

2 - Good 2 - Good 2 - Good 2 - Good

No No No

28 24 17 12

Luncoiu_Brad_003.xls Sighisoara_Brazii_004.xls

Sighisoara_Brazii_003.xls Sighisoara_Brazii_005.xls









Tebea Gurahomt Gurahomt Gurahomt

NA









NA









NA









713.8 752.6 752.6 752.6

1964-present 1966-present 1966-present 1966-present





NA

NA

NA

30.8

54.4

77.9

IDF-Tebea.xls Gurahont-IDF.doc

Gurahont-IDF.doc Gurahont-IDF.doc

Monthly_pp_Tebea.xls Monthly_pp_Gurahont.doc

Monthly_pp_Gurahont.doc Monthly_pp_Gurahont.doc

14 15 16



1 1

Valea

Sighisoara-Brazii Banestilor-Halmagiu Valea Satului-Buces



RO_20000310_III.1.15_001

RO_20010703_III.1.21_006 RO_19800731_III.1.1_001

03/07/2001 10/03/2000 31/05/1980

Sighisoara V.Banestilor V.Satului

Brazii Halmagiu Buces

27 19 59 22 34 30 22 56 51

51 14 11 46 15 32 46 10 58

187 234 337









120 109 104

12 15 15





187 234 337

831 1408 1257

450 652 695

25.00% 26.40% 24.50%

no no no

1. Crop field 13.81%

text 2. Forest 57.05%

text text

num num

text text

link link

link link









45.9 33 70

meter measurement

Direct current-Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good 2 - Good

No No No





33

num num

70.1 68.3

190 187

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

36 120 17

Banestilor_Halmagiu_001.xls

Sighisoara_Brazii_006.xls V. Satului_Buces_001.xls

link link

link link

link link

link link

link link









Gurahomt WT Tebea

num 3h18'

num num

num num









num 8.1





num num

link V.Satului_Buces_001.jpg

9

very wet





link link

link link









752.6 713.8

1966-present 1964-present





num 14.6

num 26.5

num 38.4

num 30.8

num 54.4

num 77.9

link

Gurahont-IDF.doc IDF-Tebea.xls

link

Monthly_pp_Gurahont.doc Monthly_pp_Tebea.xls









num num





num num

num num

num num

num num

num num





link link









num num





txt txt

txt txt





txt txt

txt txt









link link





link link

link link

link link

Quality of data Quality of data

1 - Very good 1 - Very good

2 - Good 2 - Good

3 - Fair 3 - Fair

4 - Poor 4 - Poor

17 18



2 4

Valea Satului-Buces Valea Satului-Buces



RO_19950602_III.1.1_002 RO_20020703_III.1.1_004

02/06/1995 03/07/2002

V.Satului V.Satului

Buces Buces

23 56 51 25 56 51

47 10 58 49 10 58

337 337









104 104

15 15





337 337

1257 1257

695 695

24.50% 24.50%

no no

1. Crop field 13.81% 1. Crop field 13.81%

2. Forest 57.05% 2. Forest 57.05%









43.3 60

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No

40 60

V.Satului_Buces_002.xls V.Satului_Buces_004.xls









Tebea Tebea

1h33' NA









1 NA









8.2 NA









V.Satului_Buces_002.jpg NA

60.6 NA

very wet









713.8 713.8

1964-present 1964-present





14.6 14.6

26.5 26.5

38.4 38.4

30.8 30.8

54.4 54.4

77.9 77.9

IDF-Tebea.xls IDF-Tebea.xls

Monthly_pp_Tebea.xls Monthly_pp_Tebea.xls

Regulated during flood Initial wetness status

Yes very dry

No in recharge

in recession

very wet

19 20



1 2

Beliu -h.s. Beliu



RO_19800723_III.1.42.26a_001 RO_19890607_III.1.42.26a_002

23/07/1980 07/06/1989

Beliu Beliu

Beliu Beliu

21 59 12 22 59 12

46 29 27 47 29 27

120 120









100 100

12 12





120 120

1112 1112

366 366

11.30% 11.30%

no no

text

text

num

text

link

link









77 44.6

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

50.6

138

water flow (0-20%, mostly 0-10%)

55 30

Beliu_Beliu_001.xls Beliu_Beliu_002.xls

link

link

link

link

link









Holod Holod

num

num

num









num





num

link









link

link









700.4 700.4

1968-present 1968-present





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

21 22



3 4





RO_19970730_III.1.42.26a_003 RO_20040325_III.1.42.26a_004

30/07/1997 15/03/2004

Beliu Beliu

Beliu Beliu

23 59 12 24 59 12

48 29 27 49 29 27

120 120









100 100

12 12





120 120

1112 1112

366 366

11.30% 11.30%

no no









52.4 42.4

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

24 48

Beliu_Beliu_003.xls Beliu_Beliu_004.xls









Dumbravita de Codru WT









825.6

1983-present

Sediment transport Initial wetness status

water flow (0-20%, mostly 0-10%) very dry

in recharge

debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%) in recession

very wet

23 24



5 6





RO_20050418_III.1.42.26a_005 RO_20050531_III.1.42.26a_006

18/04/2005 31/05/2005

Beliu Beliu

Beliu Beliu

25 59 12 26 59 12

50 29 27 51 29 27

120 120









100 100

12 12





120 120

1112 1112

366 366

11.30% 11.30%

no no









40.8 55.6

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

48 36

Beliu_Beliu_005.xls Beliu_Beliu_006.xls









Dumbravita de Codru Dumbravita de Codru









825.6 825.6

1983-present 1983-present

Size of rainfall event Hydro-meteorological type of event

(S100km2) Generalised storm Storm on snow

25 26



1 2

Boga-h.s. Pietroasa



RO_19870606_III.1.42.9_001 RO_19890607_III.1.42.9_002

06/06/1987 07/06/1989

Boga Boga

Pietroasa Pietroasa

22 38 02 23 38 02

46 36 09 47 36 09

522 523









50 50

9 9





522 522

1441 1441

1200 1200

26.40% 26.40%

no no

1. Crop field 1.64% 1. Crop field 1.64%

2. Forest 91.14% 2. Forest 91.14%

text

num

text

link

link









27.1 19.1

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

52.8

144

water flow (0-20%, mostly 0-10%)

48 36

Boga_Pietroasa_001.xls Boga_Pietroasa_002.xls

link

link

link

link

link









Stana de Vale Stana de Vale

14h06' 9h05'

num

num

1 - Very good 1 - Very good









56.2 49.7





num

Boga_Pietroasa_001.jpg Boga_Pietroasa_002.jpg

66 39

very wet very wet





link

link









1642.7 1642.7

1979-present 1979-present





19.5 19.5

34.7 34.7

50.0 50.0

62.3 62.3

107.0 107.0

151.8 151.8

NA NA

Monthlt_pp_StanaVale.xls Monthlt_pp_StanaVale.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

27 28



3 4





RO_19911002_III.1.42.9_003 RO_19961019_III.1.42.9_004

02/11/1991 19/10/1996

Boga Boga

Pietroasa Pietroasa

24 38 02 25 38 02

48 36 09 49 36 09

524 525









50 50

9 9





522 522

1441 1441

1200 1200

26.40% 26.40%

no no

1. Crop field 1.64% 1. Crop field 1.64%

2. Forest 91.14% 2. Forest 91.14%









16.7 19.2

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

24 24

Boga_Pietroasa_003.xls Boga_Pietroasa_004.xls









WT WT

NA NA









NA NA









NA NA









1642.7 1642.7

1979-present 1979-present

Sediment transport Initial wetness status

water flow (0-20%, mostly 0-10%) very dry

(20-40%)

debris flood or hyperconcentrated flowin recharge

debris flow (>40-50%) in recession

very wet

29 30



5 6





RO_19970720_III.1.42.9_005 RO_20020813_III.1.42.9_006

20/07/1997 13/08/2002

Boga Boga

Pietroasa Pietroasa

26 38 02 27 38 02

50 36 09 51 36 09

526 527









50 50

9 9





522 522

1441 1441

1200 1200

26.40% 26.40%

no no

1. Crop field 1.64% 1. Crop field 1.64%

2. Forest 91.14% 2. Forest 91.14%









22.6 28

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

36 36

Boga_Pietroasa_005.xls Boga_Pietroasa_006.xls









Stana de Vale Stana de Vale

19h53' 14h04'









1 - Very good 1 - Very good









90.1 77









18 12

very wet very wet









1642.7 1642.7

1979-present 1979-present





19.5 19.5

34.7 34.7

50.0 50.0

62.3 62.3

107.0 107.0

151.8 151.8

NA NA

Monthlt_pp_StanaVale.xls Monthlt_pp_StanaVale.xls

Size of rainfall event Hydro-meteorological type of event

(S100km2) Generalised storm Storm on snow

31 32



1 2

Crisul Baita-h.s.Stei Crisul Baita-h.s.Stei



RO_19850517_III.1.42.5_001 RO_19970727_III.1.42.5_002

17/05/1985 27/07/1997

Crisul Baita Crisul Baita

Stei Stei

22 27 50 23 27 50

46 32 08 47 32 08

249 250









65 65

16 16





249 249

1658 1658

796 796

34.20% 34.20%

no no

1. Crop field 3.17% 1. Crop field 3.17%

2. Forest 66.81% 2. Forest 66.81%

text

num

text

link

link









22.8 30.6

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

58.9

163

water flow (0-20%, mostly 0-10%)

16 36

Crisu Baita_Stei_001.xls Crisu Baita_Stei_002.xls

link

link

link

link

link









Stei Stei

4h45' 8h00'

num

num

1 - Very good 1 - Very good









10.3 8.3





num

Crisul_Baita_Stei_001.jpg Crisul_Baita_Stei_002.jpg

9.6 6

very wet very wet









link









698.2 698.2

1961-present 1961-present





NA NA

NA NA

NA NA

34.2 34.2

51.2 51.2

68.2 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

33 34



3 1

Crisul Baita-h.s.Stei Crisul Negru- Poiana



RO_20050415_III.1.42.5_003 RO_19840514_III.1.42_001

15/04/2005 14/05/1984

Crisul Baita Crisul Negru

Stei Poiana

24 27 50 22 37 15

48 32 08 46 27 19

251 480









65 29.9

16 14





249 480

1658 1849

796 1016

34.20% 23.90%

no no

1. Crop field 3.17% 1. Crop field 6.16%

2. Forest 66.81% 2. Forest 88.42%

text

num

text

link

link









45 12.4

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

28.6

105

water flow (0-20%, mostly 0-10%)

12 48

Crisu Baita_Stei_003.xls Cr Negru_Poiana_001.xls

link

link

link

link

link









Stei Stei

26h42' 15h10'

num

num

1 - Very good 1 - Very good









14.5 22.5





num

Crisul_Baita_Stei_003.jpg Cr_Negru_Poiana_001.jpg

36 7.8

very wet very wet





Radar_Crisul_Baita-h.s.Stei link

link









698.2 698.2

1961-present 1961-present





NA NA

NA NA

NA NA

34.2 34.2

51.2 51.2

68.2 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Sediment transport Quality of data

water flow (0-20%, mostly 0-10%) 1 - Very good

2 - Good

debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%) 3 - Fair

4 - Poor

35 36



2 3

Crisul Negru- Poiana Crisul Negru- Poiana



RO_19850521_III.1.42_002 RO_19870606_III.1.42_003

21/05/1985 06/06/1987

Crisul Negru Crisul Negru

Poiana Poiana

23 37 15 24 37 15

47 27 19 48 27 19

480 480









29.9 29.9

14 14





480 480

1849 1849

1016 1016

23.90% 23.90%



1. Crop field 6.16% 1. Crop field 6.16%

2. Forest 88.42% 2. Forest 88.42%









10.7 13.4

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

9 60

Cr Negru_Poiana_002.xls Cr Negru_Poiana_003.xls









Stei Stei

NA 7h53'









1









NA 21.1









Cr_Negru_Poiana_003.jpg

NA 24

very wet









698.2 698.2

1961-present 1961-present





NA NA

NA NA

NA NA

34.2 34.2

51.2 51.2

68.2 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls

Regulated during flood Sediment transport

Yes water flow (0-20%, mostly 0-10%)

No debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%)

37 38 39



4 5 6

Crisul Negru- Poiana Crisul Negru- Poiana Crisul Negru- Poiana



RO_19970727_III.1.42_004 RO_20000406_III.1.42_005 RO_20020813_III.1.42_006

27/07/1997 06/04/2000 13/08/2002

Crisul Negru Crisul Negru Crisul Negru

Poiana Poiana Poiana

25 37 15 26 37 15 27 37 15

49 27 19 50 27 19 51 27 19

480 480 480









29.9 29.9 29.9

14 14 14





480 480 480

1849 1849 1849

1016 1016 1016

23.90% 23.90% 23.90%



1. Crop field 6.16% 1. Crop field 6.16% 1. Crop field 6.16%

2. Forest 88.42% 2. Forest 88.42% 2. Forest 88.42%









14.6 20.5 14.6

Direct current- meter measurement Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good 1 - Very good

48 48 72

Cr Negru_Poiana_004.xls Cr Negru_Poiana_005.xls Cr Negru_Poiana_006.xls









Stei Stei Stei

8h00' 21h07' 6h01'









1 1 1









8.3 22.2 17.3









6 4.2 72

very wet very wet









698.2 698.2 698.2

1961-present 1961-present 1961-present





NA NA NA

NA NA NA

NA NA NA

34.2 34.2 34.2

51.2 51.2 51.2

68.2 68.2 68.2

IDF-Stei.xls IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls Monthly_pp_Stei.xls

Initial wetness status Size of rainfall event Hydro-meteorological type of event

very dry (S100km2) Generalised storm Storm on snow

in recession

very wet

40 41



1 2

Crisul Negru - h.s. Susti



RO_19800801_III.1.42_001 RO_19820529_III.1.42_002

01/08/1980 29/05/1982

Crisul Negru Crisul Negru

Susti Susti

22 27 50 23 27 50

46 28 55 47 28 55

269 269









137 137

21 21





269 269

1849 1849

617 617

15.10% 15.10%

no no

text

text

num

text

link

link









57.9 27.2

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

80.4

219

water flow (0-20%, mostly 0-10%)

25 9

Cr Negru_Susti_001.xls Cr Negru_Susti_002.xls

link

link

link

link

link









Stei Stei

NA 8h38'

num

num

1









NA 10.5





num

Cr Negru_Susti_002.jpg

NA 42

in recharge





link

link









698.2 698.2

1961-present 1961-present





num NA

num NA

num NA

num 34.2

num 51.2

num 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

42 43



3 4





RO_19830629_III.1.42_003 RO_19850522_III.1.42_004

29/06/1983 22/05/1985

Crisul Negru Crisul Negru

Susti Susti

24 27 50 25 27 50

48 28 55 49 28 55

269 269









137 137

21 21





269 269

1849 1849

617 617

15.10% 15.10%

no no









26.4 43.6

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

24 36

Cr Negru_Susti_003.xls Cr Negru_Susti_004.xls









Stei Stei

NA 3h56'









1









NA 28.6









Cr Negru_Susti_004.jpg

NA 142.2

very wet









698.2 698.2

1961-present 1961-present





NA NA

NA NA

NA NA

34.2 34.2

51.2 51.2

68.2 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls

Sediment transport Initial wetness status

water flow (0-20%, mostly 0-10%) very dry

(20-40%)

debris flood or hyperconcentrated flowin recharge

debris flow (>40-50%) in recession

very wet

44 45



5 6





RO_19910805_III.1.42_005 RO_19990222_III.1.42_006

05/08/1991 22/02/1999

Crisul Negru Crisul Negru

Susti Susti

26 27 50 27 27 50

50 28 55 51 28 55

269 269









137 137

21 21





269 269

1849 1849

617 617

15.10% 15.10%

no no









69.4 39.6

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

30 51

Cr Negru_Susti_005.xls Cr Negru_Susti_006.xls









Stei WT

NA









NA









NA









698.2 698.2

1961-present 1961-present





NA NA

NA NA

NA NA

34.2 34.2

51.2 51.2

68.2 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls

Size of rainfall event Hydro-meteorological type of event

(S100km2) Generalised storm Storm on snow

46 47



7 8





RO_20011230_III.1.42_007 RO_20050415_III.1.42_008

30/12/2001 15/04/2005

Crisul Negru Crisul Negru

Susti Susti

28 27 50 29 27 50

52 28 55 53 28 55

269 269









137 137

21 21





269 269

1849 1849

617 617

15.10% 15.10%

no no









58.6 52.8

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

72 45

Cr Negru_Susti_007.xls Cr Negru_Susti_008.xls









WT Stei

2h32'









1









14.5









36

very wet









698.2 698.2

1961-present 1961-present





NA NA

NA NA

NA NA

34.2 34.2

51.2 51.2

68.2 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls

Hailfall Origin of Damages Data

yes Official reports (State, Regional or Local)

no Insurance Companies

Newspapers

Other

48 49



1 2

Crisul Pietros- h.s. Pietroasa Crisul Pietros- h.s. Pietroasa



RO_19850521_III.1.42.9_001 RO_19960604_III.1.42.9_002

21/05/1985 04/06/1996

Crisul Pietros Crisul Pietros

Pietroasa Pietroasa

22 34 30 23 34 30

46 35 05 47 35 05

325 326









158 158

13 13





325 325

1694 1694

972 972

11.20% 11.20%

no no

1. Crop field 6.97% 1. Crop field 6.97%

2. Forest 87.78% 2. Forest 87.78%

text

num

text

link

link









68.5 96

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

99

270

water flow (0-20%, mostly 0-10%)

36 48

Crisul Pietros-_Pietroasa_001.xls Crisul Pietros-_Pietroasa_002.xls

link

link

link

link

link









Stana de Vale Stana de Vale

8h26' 2h51'

num

num

1 - Very good 1 - Very good









75 7.5





num

Crisul Pietros_Pietroasa_001.jpg Crisul Pietros_Pietroasa_002.jpg

120 48

very wet very wet





link

link









1642.7 1642.7

1979-present 1979-present





19.5 19.5

34.7 34.7

50.0 50.0

62.3 62.3

107.0 107.0

151.8 151.8

NA NA

Monthlt_pp_StanaVale.xls Monthlt_pp_StanaVale.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

50 51



1 2

Finis- h.s. Finis



RO_19990222_III.1.42.14_001 RO_20000406_III.1.42.14_002

22/02/1999 06/04/2000

Finis Finis

Finis Finis

22 14 54 23 14 54

46 39 38 47 39 38

181 182









85 85

20 20





181 181

1112 1112

591 591

16.6 16.6

no no

1. Crop field 5.03% 1. Crop field 5.03%

2. Forest 83.93% 2. Forest 83.93%

text

num

text

link

link









38.5 68

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good









num

num

65

177

water flow (0-20%, mostly 0-10%)

48 48

Finis_Finis_001.xls Finis_Finis_002.xls

link

link

link

link

link









WT Dumbravita de Codru

num

num

num









num





num

link









link

link









num 825.6

num 1983-present





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

52 53



3 4





RO_20011230_III.1.42.14_003 RO_20040325_III.1.42.14_004

30/12/2001 25/03/2004

Finis Finis

Finis Finis

24 14 54 25 14 54

48 39 38 49 39 38

183 184









85 85

20 20





181 181

1112 1112

591 591

16.6 16.6

no no

1. Crop field 5.03% 1. Crop field 5.03%

2. Forest 83.93% 2. Forest 83.93%









71.9 23

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

24 48

Finis_Finis_003.xls Finis_Finis_004.xls









WT WT

Sediment transport Initial wetness status

water flow (0-20%, mostly 0-10%) very dry

in recharge

debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%) in recession

very wet

54 55



1 2

V.Galbena-Pietroasa



RO_19891123_III.1.42.9.1_001 RO_19960604_III.1.42.9.1_002

23/11/1989 04/06/1996

Valea Galbena Valea Galbena

Pietroasa Pietroasa

22 38 35 23 38 35

46 34 49 47 34 49

434 435









36 36

7 7





434 434

1476 1476

1077 1077

28.10% 28.10%

no no

1. Crop field 2.33% 1. Crop field 2.33%

2. Forest 93.44% 2. Forest 93.44%

text

num

text

link

link









25.3 39.7

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No





num

num

44.8

122

water flow (0-20%, mostly 0-10%)

18 13

Galbena_Pietroasa_001.xls Galbena_Pietroasa_002.xls

link

link

link

link

link









WT Stana de Vale

num

num

num









num





num

link









link

link









num 1642.7

1979-present





num 19.5

num 34.7

num 50.0

num 62.3

num 107.0

num 151.8

link NA

Monthlt_pp_StanaVale.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

56 57



3 1

V.Grosenilor-Archis



RO_20000309_III.1.42.9.1_003 RO_19880317_III.1.42.23.3_001

09/03/2000 17/03/1988

Valea Galbena Valea Grosenilor

Pietroasa Archis

24 38 35 22 03 08

48 34 49 46 28 39

436 145









36 29.2

7 9





434 145

1476 1112

1077 408

28.10% 23.20%

no no

1. Crop field 2.33%

2. Forest 93.44% text

text

num

text

link

link









34.5 23.9

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No





num

num

37.8

103

water flow (0-20%, mostly 0-10%)

30 17

Galbena_Pietroasa_003.xls Grosilor_Archis_001.xls

link

link

link

link

link









WT WT

num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Sediment transport Quality of data

water flow (0-20%, mostly 0-10%) 1 - Very good

2 - Good

debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%) 3 - Fair

4 - Poor

58 59



2 3





RO_19970220_III.1.42.23.3_002 RO_19990222_III.1.42.23.3_003

20/02/1997 22/02/1999

Valea Grosenilor Valea Grosenilor

Archis Archis

47 28 39 48 28 39

23 03 08 24 03 08

145 145









29.2 29.2

9 9





145 145

1112 1112

408 408

23.20% 23.20%

no no









22.9 25

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No

26 23

Grosilor_Archis_002.xls Grosilor_Archis_003.xls









WT WT

60 61



4 1

Holod-Lunca Sprie



RO_20000406_III.1.42.23.3_004 RO_19880317_III.1.42.22_001

06/04/2000 17/03/1988

Valea Grosenilor Holod

Archis Lunca Sprie

49 28 39 22 18 02

25 03 08 46 50 37

145 221









29.2 57

9 18





145 221

1112 754

408 495

23.20% 12.80%

no no

1. Crop field 4.75%

2. Forest 85.31%

text

num

text

link

link









29 36

Direct current- meter measurement Direct current- meter measurement

2 - Good 1 - Very good

No No





num

num

53.9

147

water flow (0-20%, mostly 0-10%)

29 48

Grosilor_Archis_004.xls Holod_Lunca Sprie_001.xls

link

link

link

link

link









WT

num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data

1 - Very good

2 - Good

3 - Fair

4 - Poor

62 63



1 2

Nimaiesti- h.s.Beius



RO_19740607_III.1.42.13_001 RO_19780503_III.1.42.13_002

07/06/1974 03/05/1978

Nimaiesti Nimaiesti

Beius Beius

22 22 21 23 22 21

46 40 10 47 40 10

187 188









108 108

19 19





187 187

1490 1490

502 502

14.90% 14.90%

no no

text text

text text

num num

text text

link link

link link









53.5 51.5

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

78

160

water flow (0-20%, mostly 0-10%)

48 48

Nimaiesti_Beius_001.xls Nimaiesti_Beius_002.xls





link

link

link

link









Stana de Vale Stei

num

num

num









num





num









link

link









1642.7 698.2

1979-present 1961-present





19.5 NA

34.7 NA

50.0 NA

62.3 34.2

107.0 51.2

151.8 68.2

NA IDF-Stei.xls

Monthlt_pp_StanaVale.xls Monthly_pp_Stei.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

64 65 66



3 4 1

Nimaiesti-Budureasa



RO_19800723_III.1.42.13_003 RO_19990222_III.1.42.13_004 RO_19850522_III.1.42.13_001

23/07/1980 22/02/1999 22/05/1985

Nimaiesti Nimaiesti Nimaiesti

Beius Beius Budureasa

24 22 21 25 22 21 22 30 11

48 40 10 49 40 10 46 40 11

189 190 370









108 108 23

19 19 4





187 187 370

1490 1490 1490

502 502 795

14.90% 14.90% 20.30%

no no no

text

text

num

text

link

link









196 52.4 13.6

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good









num

num

35

94

water flow (0-20%, mostly 0-10%)

17 24 48

Nimaiesti_Beius_003.xls Nimaiesti_Beius_004.xls Nimaiesti_Budureasa_001.xls

link

link

link

link

link









Stana de Vale WT

num

num

num









num





num

Nimaesti_Beius_003.jpg link









link

link









1642.7 num

1979-present num





19.5 num

34.7 num

50.0 num

62.3 num

107.0 num

151.8 num

NA link

Monthlt_pp_StanaVale.xls link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Sediment transport Initial wetness status Quality of data

water flow (0-20%, mostly 0-10%) very dry 1 - Very good

(20-40%)

debris flood or hyperconcentrated flow in recharge 2 - Good

debris flow (>40-50%) in recession 3 - Fair

very wet 4 - Poor

67 68



2 3





RO_19870606_III.1.42.13_002 RO_19890607_III.1.42.13_003

06/06/1987 07/06/1989

Nimaiesti Nimaiesti

Budureasa Budureasa

23 30 11 24 30 11

47 40 11 48 40 11

370 370









23 23

4 4





370 370

1490 1490

795 795

20.30% 20.30%

no no









14 17.8

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

72 60

Nimaiesti_Budureasa_002.xls Nimaiesti_Budureasa_003.xls

Regulated during flood Sediment transport

Yes water flow (0-20%, mostly 0-10%)

No debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%)

69 70



4 5





RO_20000406_III.1.42.13_004 RO_20030514_III.1.42.13_005

06/04/2000 14/05/2003

Nimaiesti Nimaiesti

Budureasa Budureasa

25 30 11 26 30 11

49 40 11 50 40 11

370 370









23 23

4 4





370 370

1490 1490

795 795

20.30% 20.30%

no no









24.8 22.2

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

60 40

Nimaiesti_Budureasa_004.xls Nimaiesti_Budureasa_005.xls

Initial wetness status Size of rainfall event

very dry (S100km2) Generalised storm

in recession

very wet

71 72



1 2

Sartis-Siad



RO_19800611_III.1.42.26a.6_001 RO_19800723_III.1.42.26a.6_002

11/06/1980 23/07/1980

Sartis Sartis

Siad Siad

21 58 25 22 58 25

44 35 37 45 35 37

136 136









53 53

8 8





136 136

439 439

255 255

6.10% 6.10%

no no

text

text

num

text

link

link









29.4 29

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good









num

num

36.7

100

water flow (0-20%, mostly 0-10%)

24 60

Sartis_Siad_001.xls Sartis_Siad_002.xls

link

link

link

link

link









num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

73 74



3 4





RO_19810305_III.1.42.26a.6_003 RO_19840517_III.1.42.26a.6_004

05/03/1981 17/05/1984

Sartis Sartis

Siad Siad

23 58 25 24 58 25

46 35 37 47 35 37

136 136









53 53

8 8





136 136

439 439

255 255

6.10% 6.10%

no no









25.4 28.7

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

14 19

Sartis_Siad_003.xls Sartis_Siad_004.xls









WT

Sediment transport Initial wetness status

water flow (0-20%, mostly 0-10%) very dry

in recharge

debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%) in recession

very wet

75 76



5 6





RO_19850522_III.1.42.26a6_005 RO_19880607_III.1.42.26a6_006

22/05/1985 07/06/1988

Sartis Sartis

Siad Siad

25 58 25 26 58 25

48 35 37 49 35 37

136 136









53 53

8 8





136 136

439 439

255 255

6.10% 6.10%

no no









29.8 29.1

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

10 24

Sartis_Siad_005.xls Sartis_Siad_006.xls

Size of rainfall event Hydro-meteorological type of event

(S100km2) Generalised storm Storm on snow

77 78



7 8





RO_19910802_III.1.42.26a6_007 RO_19970726_III.1.42.26a6_008

02/08/1991 26/07/1997

Sartis Sartis

Siad Siad

27 58 25 28 58 25

50 35 37 51 35 37

136 136









53 53

8 8





136 136

439 439

255 255

6.10% 6.10%

no no









28.2 30.9

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

12 18

Sartis_Siad_007.xls Sartis_Siad_008.xls

Hailfall Origin of Damages Data

yes Official reports (State, Regional or Local)

no Insurance Companies

Newspapers

Other

79 80



9 1

Sighistel_Stei



RO_19990222_III.1.42.26a6_009 RO_19890508_III.1.42.5.1_001

22/02/1999 08/05/1989

Sartis Sighistel

Siad Stei

29 58 25 22 27 50

52 35 37 46 32 40

136 252









53 25

8 12





136 252

439 1304

255 589

6.10% 29.90%

no no

1. Crop field 9.55%

2. Forest 61.89%

text

num

text

link

link









28.5 14.8

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

35.4

96.5

water flow (0-20%, mostly 0-10%)

30 60

Sartis_Siad_009.xls Sighistel_Stei_001.xls

link

link

link

link

link









WT Stei

16h36'

num

num

1 - Very good









24.7





num

Sighistel_Stei_001.jpg

4.2

very wet





link

link









698.2

1961-present





NA

NA

NA

34.2

51.2

68.2

IDF-Stei.xls

Monthly_pp_Stei.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Casualties Timing Quality of data

pre-impact phase 1 - Very good

impact phase 2 - Good

post-impact phase 3 - Fair

4 - Poor

81 82



2 3





RO_19890607_III.1.42.5.1_002 RO_19960605_III.1.42.5.1_003

07/06/1989 05/06/1996

Sighistel Sighistel

Stei Stei

23 27 50 24 27 50

47 32 40 48 32 40

252 252









25 25

12 12





252 252

1304 1304

589 589

29.90% 29.90%

no no

1. Crop field 9.55% 1. Crop field 9.55%

2. Forest 61.89% 2. Forest 61.89%









16.9 10.2

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

48 60

Sighistel_Stei_002.xls Sighistel_Stei_003.xls









Stei Stei

5h11' 1h01'









1 - Very good 1 - Very good









13.2 8.1









Sighistel_Stei_002.jpg Sighistel_Stei_003.jpg

10.2 28.8

very wet very wet









698.2 698.2

1961-present 1961-present





NA NA

NA NA

NA NA

34.2 34.2

51.2 51.2

68.2 68.2

IDF-Stei.xls IDF-Stei.xls

Monthly_pp_Stei.xls Monthly_pp_Stei.xls

Regulated during flood Sediment transport

Yes water flow (0-20%, mostly 0-10%)

No debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%)

83 84



4 5





RO_20050415_III.1.42.5.1_004 RO_20050518_III.1.42.5.1_005

15/04/2005 18/05/2005

Sighistel Sighistel

Stei Stei

25 27 50 26 27 50

49 32 40 50 32 40

252 252









25 25

12 12





252 252

1304 1304

589 589

29.90% 29.90%

no no

1. Crop field 9.55% 1. Crop field 9.55%

2. Forest 61.89% 2. Forest 61.89%









14.4 9.07

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

12 48

Sighistel_Stei_004.xls Sighistel_Stei_005.xls









Gurahont Stei









Sighistel_Stei_004.jpg Sighistel_Stei_005.jpg









552.6 698.2

1966-present 1961-present





NA

NA

NA

34.2

51.2

68.2

Gurahont-IDF.doc IDF-Stei.xls

Monthly_pp_Gurahont.doc Monthly_pp_Stei.xls

Initial wetness status Size of rainfall event

very dry (S100km2) Generalised storm

in recession

very wet

85 86



1 2

Teuz-Ignesti



RO_19960516_III.1.42.28_001 RO_20000604_III.1.42.28_002

16/05/1996 04/06/2000

Teuz Teuz

Ignesti Ignesti

22 08 14 22 08 14

46 23 50 46 23 50

99 99









17 17

7 7





99 99

1098 1098

529 529

27.70% 27.70%

no

1. Crop field 20.31% 1. Crop field 20.31%

2. Forest 68.33% 2. Forest 68.33%

text

num

text

link

link









28.1 25.1

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No





num

num

28.1 28.1

76.5 76.5

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

18 42

Teuz_Ignesti_001.xls Teuz_Ignesti_002.xls

link

link

link

link

link









num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

87 88 89



1 2 3

Topa-Hidisel



RO_19800605_III.1.42.22.2_001 RO_19800723_III.1.42.22.2_002 RO_19850521_III.1.42.22.2_003

05/06/1980 23/07/1980 21/05/1985

Topa-Hidisel Topa-Hidisel Topa-Hidisel

Hidisel Hidisel Hidisel

22 13 19 23 13 19 24 13 19

46 48 28 47 48 28 48 48 28

145 146 147









157 157 157

21 21 21





145 145 145

686 686 686

376 376 376

8.80% 8.80% 8.80%

no no no

1. Crop field 24.30% 1. Crop field 24.30% 1. Crop field 24.30%

2. Forest 61.11% 2. Forest 61.11% 2. Forest 61.11%

text

num

text

link

link









67.5 82 73.8

Direct current- meter measurement

2 - Good

No





num

num

62.4

170

water flow (0-20%, mostly 0-10%)

22 90 35

Topa_Hidisel_001.xls Topa_Hidisel_002.xls Topa_Hidisel_003.xls

link

link

link

link

link









Holod Holod Holod

num

num

num









num





num

link









link

link









700.4 700.4 700.4

1968-present 1968-present 1968-present





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood Sediment transport

1 - Very good Yes water flow (0-20%, mostly 0-10%)

2 - Good No debris flood or hyperconcentrated flow (20-40%)

3 - Fair debris flow (>40-50%)

4 - Poor

90 91 92



4 5 6





RO_19860124_III.1.42.22.2_004 RO_19880317_III.1.42.22.2_005RO_20040325_III.1.42.22.2_006

24/01/1986 17/03/1988 25/03/2004

Topa-Hidisel Topa-Hidisel Topa-Hidisel

Hidisel Hidisel Hidisel

25 13 19 26 13 19 27 13 19

49 48 28 50 48 28 51 48 28

148 149 150









157 157 157

21 21 21





145 145 145

686 686 686

376 376 376

8.80% 8.80% 8.80%

no no no

1. Crop field 24.30% 1. Crop field 24.30% 1. Crop field 24.30%

2. Forest 61.11% 2. Forest 61.11% 2. Forest 61.11%









76 79.1 45.5

70 58 40

Topa_Hidisel_004.xls Topa_Hidisel_005.xls Topa_Hidisel_006.xls









WT WT WT

Initial wetness status Size of rainfall event Hydro-meteorological type of event

very dry (S100km2) Generalised storm Storm on snow

in recession

very wet

93 94 95



1 2 3

Topa-Varciorog



RO_19800506_III.1.42.22.2_001 RO_19811212_III.1.42.22.2_002 RO_19860124_III.1.42.22.2_003

06/05/1980 12/12/1981 24/01/1986

Topa-Varciorog Topa-Varciorog Topa-Varciorog

Varciorog Varciorog Varciorog

22 09 48 23 09 48 24 09 48

46 52 13 47 52 13 48 52 13

277 278 279









9.5 9.5 9.5

8 8 8





277 277 277

686 686 686

467 467 467

13.00% 13.00% 13.00%

no no no

1. Crop field 26.99% 1. Crop field 26.99% 1. Crop field 26.99%

2. Forest 57.01% 2. Forest 57.01% 2. Forest 57.01%

text

num

text

link

link









109 59.7 41.6

Direct current- meter measurement Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good 2 - Good

No No No





num

num

35.4

96.5

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

15 14 36

Topa_Varciorog_001.xls Topa_Varciorog_002.xls Topa_Varciorog_003.xls

link

link

link

link

link









Borod WT WT

num

num

num









num





num

link









link









716.6

1971-present





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood Sediment transport

1 - Very good Yes water flow (0-20%, mostly 0-10%)

2 - Good No debris flood or hyperconcentrated flow (20-40%)

3 - Fair debris flow (>40-50%)

4 - Poor

96 97



4 5





RO_19880317_III.1.42.22.2_004 RO_19950613_III.1.42.22.2_005

17/03/1988 13/06/1995

Topa-Varciorog Topa-Varciorog

Varciorog Varciorog

25 09 48 26 09 48

49 52 13 50 52 13

280 281









9.5 9.5

8 8





277 277

686 686

467 467

13.00% 13.00%

no no

1. Crop field 26.99% 1. Crop field 26.99%

2. Forest 57.01% 2. Forest 57.01%









35.5 44.7

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

32 13

Topa_Varciorog_004.xls Topa_Varciorog_005.xls









WT Borod









716.6

1971-present

Initial wetness status Size of rainfall event

very dry (S100km2) Generalised storm

in recession

very wet

98 99



6 1

Calata-Morlaca cariera



RO_2005.4.24_III.1.42.22.2_006 RO_19980618_III.1.44.3_001

24/05/2005 18/06/1998

Topa-Varciorog Calata

Varciorog Morlaca Cariera

27 09 48 22 52 06

51 52 13 46 51 41

282 508









9.5 151

8 24





277 508

686 1404

467 778

13.00% 17.60%

no no

1. Crop field 26.99%

2. Forest 57.01% text

text

num

text

link

link









51 38.9

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No





38.9

num

73

200

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

12 84

Topa_Varciorog_006.xls Calata_Morlaca Cariera_001.xls

link

link

link

link

link









Borod Huedin

26h56'

num

num

1 - Very good









43





num

Calata_Morlaca Cariera_001.jpg

54

very wet





Radar_Topa_Varciorog link

link









717.6 577.3

1971-present 1961-present





NA

NA

NA

32.1

54

75.8

IDF-Huedin.xls

Monthly_pp_Huedin.xls









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Hydro-meteorological type of event Quality of data

Storm 1 - Very good

Storm on snow 2 - Good

3 - Fair

4 - Poor

100 101



2 1

Calata-Morlaca cariera Hent-Rachitele



RO_20050609_III.1.44.3_002 RO_19980619_III.1.44.4_001

09/06/2005 19/06/1998

Calata Hent

Morlaca Cariera Rachitele

23 52 06 22 53 41

47 51 41 46 42 35

509 797









151 55

24 5





508 797

1404 1936

778 1118

17.60% 29.30%

no no

text

text

num

text

link

link









28.3 13

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No





13

num

49.5

135

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

36 60

Calata_Morlaca Cariera_002.xls Hent_Rachitele_001.xls

link

link

link

link

link









Huedin

11h51' num

num

num

1 - Very good









35.2 num





num

Calata_Morlaca Cariera_002.jpg link

12

very wet





link

link









577.3 num

1961-present num





NA num

NA num

NA num

32.1 num

54 num

75.8 num

IDF-Huedin.xls link

Monthly_pp_Huedin.xls link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Regulated during flood Quality of data

Yes 1 - Very good

No 2 - Good

3 - Fair

4 - Poor

102 103



1 2

Izvor-Alesd Izvor-Alesd



RO_19770416_III.1.44.19_001 RO_20020925_III.1.44.19_002

16/04/1977 25/09/2002

Izvor Izvor

Alesd Alesd

22 23 41 23 23 41

47 03 28 48 03 28

225 225









51 51

10 10





225 225

757 757

757 757

21.50% 21.50%

no no

text

text

num

text

link

link









20.6 13.4

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No

num

44.3

121

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

14 19

Izvor_Alesd_001.xls Izvor_Alesd_002.xls

link

link

link

link

link









num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

104 105



1 2

Peta-Sanmartin Peta-Sanmartin



RO_19870411_III.1.44.30_001 RO_19970620_III.1.44.30_002

11/04/1987 20/06/1997

Peta Peta

Sanmartin Sanmartin

21 59 56

47 00 00

118 118









54 54

14





118 118

296 296

217 217

9.20% 9.20%

no no

text

text

num

text

link

link









20.3 16.9

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No

num

37.8

103

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

20 10

Peta_ Sanmartin_001.xls Peta_Sanmartin_002.xls

link

link

link

link

link









num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

106 107



1 2

Poicu-Vanatori



RO_19800724_III1.44.6_001 RO_19860707_III1.44.6_002

24/07/1980 07/07/1986

Poicu Poicu

Vanatori Vanatori

22 50 55 47 57 51

46 57 51 23 50 55

464 464









37 37

11 11





464 464

996 996

638 638

14.50% 14.50%

no no

text

text

num

text

link

link









23 19

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No





23

num

42.6

116

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

86 24

Poicu_Vanatori_001.xls Poicu_Vanatori_002.xls

link

link

link

link

link









num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data

1 - Very good

2 - Good

3 - Fair

4 - Poor

108 109



3 1

Tasad-Osorhei



RO_20020707_III1.44.6_003 RO_19990222_III.1.44.27_001

07/07/2002 22/02/1999

Poicu Tasad

Vanatori Osorhei

48 57 51 22 03 09

24 50 55 47 01 20

464 141









37 54

11 18





464 141

996 301

638 215

14.50% 5.40%

no no

text

text

num

text

link

link









52.2 31.8

Direct current- meter measurement Direct current- meter measurement

2 - Good 1 - Very good

No No





31.8

num

38.5

105

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

12 48

Poicu_Vanatori_003.xls Tasad_Osorhei_001.xls

link

link

link

link

link









WT

num

num

num









num





num

link









link

link









num

num





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data

1 - Very good

2 - Good

3 - Fair

4 - Poor

110 111



2 3

Tasad-Osorhei Tasad-Osorhei



RO_20000406_III.1.44.27_002 RO_20010424_III.1.44.27_003

06/04/2000 24/04/2001

Tasad Tasad

Osorhei Osorhei

23 03 09 24 03 09

48 01 20 49 01 20

141 141









54 54

18 18





141 141

301 301

215 215

5.40% 5.40%

no no









31.8 16.6

Direct current- meter measurement Direct current- meter measurement

1 - Very good 1 - Very good

No

36 36

Tasad_Osorhei_002.xls Tasad_Osorhei_003.xls

Regulated during flood Sediment transport

Yes water flow (0-20%, mostly 0-10%)

No debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%)

112 113

Update Jul07 RO_V.Noua_Husasau de Tinca.xls

1 2

V.Noua-Husasau de Tinca



RO_19850522_III.1.42.25_001 RO_20040325_III.1.42.25_002

22/05/1985 25/03/2004

Valea Noua Valea Noua

Husasau de Tinca Husasau de Tinca

21 58 49 22 58 49

46 49 33 47 49 33

131 132









135 135

20 20





131 131

402 402

207 207

5.30% 5.30%

no no

text

text

num

text

link

link





133 49.2



133 49.2

Direct current- meter measurement Direct current- meter measurement

2 - Good 2 - Good

No No





num

num

55

150

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

36 34

V.Noua_Husasau de Tinca_001.xls V.Noua_Husasau de Tinca_002.xls

link

link

link

link

link









Holod WT

num

num

num









num





num

link









link

link









700.4

1968-present





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood

1 - Very good Yes

2 - Good No

3 - Fair

4 - Poor

114 115 116

oua_Husasau de Tinca.xls

3

Valea Cerbului -Busteni 1



RO_20050519_III.1.42.25_003 RO_20010619_XI.1.20.2_002 RO_19730607_III.1.21_001

19/05/2005 19/06/2001 07/06/1973

Valea Noua Valea Cerbului Sighisoara

Husasau de Tinca Busteni Brazii

23 58 49 26 32 18 22 19 59

48 49 33 46 25 45 46 14 11

133 99 187









135 26 120

20 6 12





131 890 187

402 2507 831

207 1530 450

5.30% 31.50% 25.00%

no no no

1. Forest 74.78% Artificial

2. Locality 0.83% surface:

Luvisols:

42.48%

num

text

Location_maps\RO_1_19730607_

link





55.5



55.5 62.3 139

Direct current- meter measurement Direct current- meter measurement Direct current- meter measureme

2 - Good 1 - Very good 1 - Very good

No No No

num

28.8 57.3

127 156

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

24 30 12

V.Noua_Husasau de Tinca_003.xls V.Cerbului_Busteni_002.xls Hydrographs\RO_1_19730607_Si

link

link

link

link

link









Holod Predeal Gurahont

4h54'

num

num

1 - Very good

Storm





22.3





num

Hourly_rainfall_maps\RO_1_1973

0.6

in recharge









link









700.4 946.7 752.6

1968-present 1961-present 1966-present





NA 22.7

NA 42.5

NA 62.3

161.7 35.1

249.0 58.6

336.3 82.2

Predeal-IDF.doc IDF\IDF-Gurahont.doc

Predeal_average monthly precipitation amounts.doc Monthly_precipitation\RO_Gurah









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

Sediment transport

water flow (0-20%, mostly 0-10%)

debris flood or hyperconcentrated flow (20-40%)

debris flow (>40-50%)

117 118 119 120 121 122 123







2 3 4 5 6 7 8



RO_19790626_X.1.24.2_001 RO_19800729_V.1.8.2_001 RO_19880522/23_XII.1.79.18_001

RO_19850521_III.1_001

RO_19750716_III.1.21_002 RO_19800729_IV.1.159_001 RO_19880717_X.1.20.2_001

16/07/1975 26/06/1979 29/07/1980 29/07/1980 21/05/1985 22-23/05/198817/07/1988

Sighisoara Potop Cladova Hauzeasca Crisul Alb Milcov Valea Cerbului

Brazii Orb Orb Blajeni

Orb Confluence Confluence Confluence Golesti Busteni

22 19 59 25 16 36 22 54 07 27 10 09 25 32 18

46 14 11 44 45 48 46 14 43 45 40 00 45 25 45

187 192 140 195 337 44 890









120 194 40 29 111 395 26

12 9 13 8 16 9 6





187 192 140 195 337 44 890

831 551 553 874 1321 960 2507

450 348 315 364 716 410 1530

25.00% 7.20% 11.40% 10.20% 26.00% 9.80% 31.50%

no no no no no no no

Artificial Artificial Artificial Artificial Artificial Artificial Artificial surface:

surface: surface: surface: surface: surface: surface: 0.98%

Luvisols: Luvisols: Luvisols: Luvisols: Luvisols: Luvisols: Luvisols: 4.66%

42.48% 81.03% 86.53% 36.73% 8.68% 37.75% Cambisols: 44.15%









1 Location_maps\RO_4_19800729_Cladova_location.jpg

Location_maps\RO_5_19800729_Hauzeasca_location.jpg

Location_maps\RO_6_19951224_CrisAlb_location.jpg

Location_maps\RO_8_19880717_VCerbulu

See case no. Location_maps\RO_3_19790626_Potop_location.jpg Location_maps\RO_7_19880522_Milcov_location.jpg









99 870 200 320 141 316 54.2

Reconstruction from reservoir operation from reservoir operation meter measurementmeasurement

Reconstruction from reservoir operation meter measurement

Direct current- meter measurement Reconstruction Direct current-

Direct current- Direct current- meter

1 - Very good2 - Good 2 - Good 2 - Good 1 - Very good1 - Very good1 - Very good

No No No No No No No





num

num num

57.3 220 35.5 47.7 71.2 420 28.8

153 510 96.8 130 190 780 127

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

water water water water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

18 37 48 24

No

measured No measuredNo measuredHydrographs\RO_6_19850521_CrisAlb_hydrograph.xls

discharges, only

discharges, only reconstructuted maximum discharge

Hydrographs\RO_7_19880717_Milcov_hydrograph.xls

Hydrographs\RO_8_19880717_VCerbului_

Hydrographs\RO_2_19750716_Sighisoara_hydrograph.xlsreconstructuted maximum discharge









Gurahont Targoviste Varadia Lugoj Tebea Tulnici Predeal

No rainfall data recorded at weather stations

No rainfall data recorded at weather stations+F16

1h16'

No rainfall data recorded at weather stations 3h50' 2h30' 0h54'

num

num

1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good

Storm Storm Storm





8.5 20.5 2.0 19.6





num

Hourly_rainfall_maps\RO_5_19800729_Hauzeasca_rainfall.jpg

Hourly_rainfall_maps\RO_1_19730607_Sighisoara_rainfall.jpg Hourly_rainfall_maps\RO_7_19880522_Milcov_rainfall.jp

Hourly_rainfall_maps\RO_8_19880717_Vce

Hourly_rainfall_maps\RO_6_19850521_CrisAlb_rainfall.jpg

73.6 96 114 60 31.8

very wet very wet very wet very wet in recharge









link









752.6 685.2 713.8 658.2 945.7

1966-present 1961-present 1961-present 1961-present 1964-present 1961-present 1961-present





22.7 NA NA 5.0 NA NA

42.5 NA NA 12.9 NA NA

62.3 NA NA 20.9 NA NA

35.1 42.6 31.8 33.7 30.8 42.1 47.7

58.6 93.3 52.3 59.1 54.4 69.6 87.5

82.2 144 72.8 84.5 77.9 97.1 127.3

IDF\IDF_Targoviste.doc

IDF\IDF-Gurahont.doc IDF\IDF_Lugoj.doc

IDF\IDF_Varadia.doc IDF\IDF_Tulnici.doc

IDF\IDF-Tebea.doc IDF\IDF-Predeal.doc

Monthly_precipitation\RO_Lugoj_monthly_pp.xls

Monthly_precipitation\RO_Tulnici_monthly_pp.xls

Monthly_precipitation\RO_Predeal_month

Monthly_precipitation\RO_Gurahont_monthly_pp.xls Monthly_precipitation\RO_Tebea_monthly_pp.xls









3









Casualties from a camp site









Stanescu, $ Lazar, M., $ Micridin, Nedelcu, G., Cerbului Valley 16-

V.Al. and 1980, The Z.,1981, 1991, The 17.07.1988 was

124 125 126 127 128 129 130







9 10 11 12 13 14 15



RO_19951224_III.1_002 RO_19970726_III.1.44.14_001

RO_19990622_XII.1.82.33.2.2_001

RO_19950524_II.1.36_001 RO_19970615_III.1.44.33.15_004 RO_19990712_IV.1.117.14_001

RO_19990711_III.1.44.14_002

24/05/1995 24/12/1995 15/06/1997 26/07/1997 22/06/1999 11/07/1999 12/07/1999

Poiana Crisul Alb Bistra Borod Comisoaia Borod Raul Mare

Blajeni

Poiana Blenchii Chiribis Topa

Topa de Cris Orb Confluence de Cris Orb Confluence

23 43 18 22 54 07 22 20 31 22 31 45 22 31 45

47 17 56 46 14 43 47 18 12 47 00 02 47 00 02

241 337 132 266 80 266 1120









96 111 169 112 25.5 112 243

11 16 23 13 6 13 8





241 337 132 266 80 266 1120

770 1321 757 918 331 918 2509

423 716 354 485 185 485 1770

15.50% 26% 11.70% 10.40% 7.70% 10.40% 30.20%

no no no no no no no

Artificial Artificial Artificial Artificial Artificial Artificial Lake:

surface: surface: surface: surface: surface: surface: 0.30%

Luvisols: Luvisols: Luvisols: Luvisols: Protisols: Luvisols: Umbrisols:

84.64% 8.68% 34.10% 34.22% 5.28% 34.22% 2.72%









See case no. 6 ocation_maps\RO_11_19970615_Bistra_location.jpgLocation_maps\RO_15_19990712_RMare_

L Location_maps\RO_12_19970726_Borod_location.jpg

See case no. 12

Location_maps\RO_9_19950524_Poiana_location.jpg Location_maps\RO_13_19990622_Comisoaia_location.jpg









144 235 250 100 210 130 850

Direct current- meter

Direct current- meter

Direct current- meter

Reconstruction from reservoir operation from reservoir operation

Direct current- meter measurement

Direct current- meter measurementmeasurementmeasurementmeasurement Reconstruction

1 - Very good1 - Very good1 - Very good1 - Very good2 - Good 1 - Very good2 - Good

No No No No No No No

51.9 71.2 58.4 59 40.7 59 167

141 190 155 160 111 160 455

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

water water water water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

18 31 36 12 24

Hydrographs\RO_10_19951224_CrisAlb_hydrograph.xls

Hydrographs\RO_11_19970615_Bistra_hydrograph.xls measured discharges, only reconstruc

Hydrographs\RO_12_19970726_Borod_hydrograph.xls

No discharges, only reconstructuted maximum discharge

No

Hydrographs\RO_9_19950524_Poiana_hydrograph.xls measuredHydrographs\RO_14_19990711_Borod_hydrograph.xls









Dej Tebea Borod Borod Rm. Sarat Borod Obarsia Lotrului

2h57' time 7h00' No data` 2h20'

during winter4h34' unable to record rainfall rainfall data 1h45'









1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good









17.7 23.3 29 28.4 10.1









Hourly_rainfall_maps\RO_11_19970615_Bistra_rainfall.jpg

Hourly_rainfall_maps\RO_12_19970726_Borod_rainfall.jpg

Hourly_rainfall_maps\RO_9_19950524_Poiana_rainfall.jpg Hourly_rainfall_maps\RO_15_19990712_R

Hourly_rainfall_maps\RO_14_19990711_Borod_rainfall.

18 0.91 144 78 9

very wet in recharge very wet in recharge in recharge in recharge









624.5 713.8 716.6 716.6 716.6 881.7

1961-present 1964-present 1961-present 1971-present 1961-present 1971-present 1976-present





NA 15.9 15.9 15.9 NA

NA 32.4 32.4 32.4 NA

NA 48.9 48.9 48.9 NA

29.9 33.3 33.3 39.7 33.3 34.4

48.7 58.2 58.2 68.7 58.2 62.1

67.5 82.9 82.9 97.6 82.9 89.8

IDF\IDF-Tebea.doc

IDF\IDF_Dej.doc IDF\IDF_Borod.doc

IDF\IDF_Borod.doc IDF\IDF_Borod.doc

IDF\IDF_Rm Sarat.doc

Monthly_precipitation\RO_Tebea_monthly_pp.xls

Monthly_precipitation\RO_Borod_monthly_pp.xls

Monthly_precipitation\RO_Borod_monthly_pp.xls

Monthly_precipitation\RO_Dej_monthly_pp.xls Monthly_precipitation\RO_Obarsia Lotrulu

Monthly_precipitation\RO_Borod_monthly_pp.xls









asualties from a camp site









Mustatea A. Tinca, L., Stanescu, V.

(2005). and Minea, Al, Drobot,

131 132 133 134 135 136 137







16 17 18 19 20 21 22



RO_19990813_XI.1.20.WN_001

RO_20000309_III.1.1_003 RO_20020801_XIV.1.40_001

RO_19990726_III.1.44.14_003 RO_20020530_XIV.1.47_001 RO_20040728_XII.1.69.24_001

RO_20020808_XIV.1.8_001

26/07/1999 13/08/1999 09/03/2000 30/05/2002 01/08/2002 08/08/2002 28/07/2004

Borod Urlatoarea Valea Satului Topolog Iris Sacele Dofteana

Buces

Topa de Cris Orb Confluence Saraiu Pietreni Sacele Orb Confluence

22 31 45 22 56 51 28 09 25 28 05 16 28 37 44 26 31 52

47 00 02 46 10 58 44 42 51 44 05 53 44 29 28 46 19 01

266 824 337 20 53 45 297









112 4.6 104 264 6 32 110

13 1 15 20 1 3 6





266 824 337 20 53 45 297

918 2143 1257 359 176 114 1640

485 1498 695 181 106 78 735

10.40% 46.20% 24.50% 7% 10% 2.50% 21%

no no no no no no no

Artificial Artificial Artificial Artificial Artificial Artificial Artificial

surface: surface: surface: surface: surface: surface: surface:

Luvisols: Cambisols: Luvisols: Protisols: Protisols: Protisols: Luvisols:

34.22% 17.59% 1.86% 26.85% 0.66% 14.89% 17.56%









12 Location_maps\RO_18_20000309_VSatului_location.jpg

Location_maps\RO_19_20020530_Topolog_location.jpg

Location_maps\RO_20_20020801_Iris_location.jpg

Location_maps\RO_21_20020808_Sacele_location.jpg

See case no. Location_maps\RO_17_19990812_Urlatoarea_location.jpg Location_maps\RO_22_20040728_Doftean









131 30 116 209 77.6 45 151

Reconstruction from reservoir operation meter measurementmeasurementmeasurement

Direct current- meter measurement

Direct current- meter measurement Direct current- meter

Direct current- Reconstruction from reservoir operation

Direct current- meter

1 - Very good2 - Good 1 - Very good1 - Very good1 - Very good1 - Very good2 - Good

No No No No No No No

59 12.3 68.3 130 26 51.7 95

160 54.3 187 355 72 141 260

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

water water water water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

25 33 23 13 5

No measuredHydrographs\RO_18_20000309_VSatului_hydrograph.xlsmeasured discharges, only reconstruc

discharges, only reconstructuted maximum discharge

Hydrographs\RO_19_20020530_Topolog_hydrograph.xls

Hydrographs\RO_16_19990726_Borod_hydrograph.xls Hydrographs\RO_21_20020808_Sacele_hydrograph.xls

No

Hydrographs\RO_20_20020801_Iris_hydrograph.xls









Borod Predeal Tebea Harsova Adamclisi Constanta Tg. Ocna

1h50' 7h06' time 3h03' 1h00'

during winter2h00' unable to record rainfall data` 4h22'









1 - Very good1 - Very good 1 - Very good1 - Very good1 - Very good1 - Very good









39.8 82.9 2..0 12.6 5.4 6.6









Hourly_rainfall_maps\RO_17_19990813_Urlatoarea_rainfall.jpg

Hourly_rainfall_maps\RO_19_20020530_Topolog_rainfall.jpg

Hourly_rainfall_maps\RO_20_20020801_Iris_rainfall.jpg

Hourly_rainfall_maps\RO_16_19990726_Borod_rainfall.jpg Hourly_rainfall_maps\RO_22_20040728_D

Hourly_rainfall_maps\RO_21_20020808_Sacele_rainfall.

10.8 15 22.2 84 84 84 51

in recession in recession very wet in recharge in recharge in recharge in recharge





NA Radar\RO_22_20040728_Dofteana_radar.ra









716.6 945.7 418.9 476.6 416.9 573.9

1971-present 1961-present 1964-present 1961-present 1961-present 1961-present 1961-present





15.9 NA NA NA 16.1 NA

32.4 NA NA NA 32.1 NA

48.9 NA NA NA 48.1 NA

33.3 47.7 29.9 34.6 31.7 36.9

58.2 87.5 64.4 62.7 82.3 63.5

82.9 127.3 98.8 90.7 132.8 90.2

IDF\IDF-Predeal.doc

IDF\IDF_Borod.doc IDF\IDF_Harsova.doc

IDF\IDF-Tebea.doc IDF\IDF_Constanta.doc Ocna.doc

IDF\IDF-Adamclisi.doc IDF\IDF-Tg.

Monthly_precipitation\RO_Predeal_monthly_pp.xls Monthly_precipitation\RO_Constanta_monthly_pp.xls

Monthly_precipitation\RO_Tebea_monthly_pp.xls

Monthly_precipitation\RO_Harsova_monthly_pp.xls

Monthly_precipitation\RO_Borod_monthly_pp.xls Monthly_precipitation\RO_TgOcna_month

Monthly_precipitation\RO_Adamclisi_monthly_pp.xls









Urlatoarea

Valley 12-

138 139 140 141 142 143 144







23 24 25 26 27 28 29



RO_20050507_XII.1.82.16_001

RO_20050703_XIV.1.69.24_001

RO_20040828_XIV.1.10_001 RO_20050703_XIV.1.47_002

RO_20050712_XII.1.69.18_001

RO_20050703_XIV.1.10_001 RO_20050712_XII.1.75_001

28/08/2004 07/05/2005 03/07/2005 03/07/2005 03/07/2005 12/07/2005 12/07/2005

Casimcea Nehoiu Casimcea Cartal Topolog Asau Susita

Cheia Cheia

Orb Confluence Saraiu

Pantelimonu de Sus Orb

Orb Confluence Confluence

28 24 54 28 24 54 28 21 53 28 09 25 26 24 04 26 52 51

44 31 51 44 31 51 44 34 14 44 42 51 46 27 00 46 00 00

35 343 35 54 20 402 310









500 36 500 127 264 205 179

22 9 22 12 20 11 7





35 343 35 54 20 402 310

359 1345 359 284 359 1442 1350

145 820 145 150 181 951 588

5% 21% 5% 6.10% 7% 17.20% 12.90%

no no no no no no no

Artificial Artificial Artificial Artificial Artificial Artificial Artificial

surface: surface: surface: surface: surface: surface: surface:

Cambisols: Luvisols: Cambisols: Protisols: Protisols: Luvisols: Luvisols:

0.08% 9.29% 0.08% 6.19% 26.85% 0.15% 28.01%









Location_maps\RO_24_20050507_Nehoiu_location.jpg

See case no. Location_maps\RO_26_20050703_Cartal_location.jpg

23 See Location_maps\RO_28_20050712_Asau_location.jpg

Location_maps\RO_23_20040828_Casimcea_location.jpg case no. 19 Location_maps\RO_29_20050712_Susita_l









287 104 387 310 214 389 540

Reconstruction from reservoir operation meter measurementmeasurement

Direct current- meter measurement

Direct current- meter measurement Direct current- meter

Direct current- Reconstruction from reservoir operation

Reconstruction from reservoir operation

1 - Very good2 - Good 1 - Very good1 - Very good1 - Very good2 - Good 2 - Good

No No No No No No No

144 59.4 144 88.5 130 115 195

465 162 465 241 355 310 535

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

water water water water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

16 23 19 12

No measuredHydrographs\RO_25_20050703_Casimcea_hydrograph.xls

discharges, only reconstructuted

Hydrographs\RO_26_20050703_Cartal_hydrograph.xls

Hydrographs\RO_27_20050703_Cartal_hydrograph.xls

No measuredNo

discharges, only reconstructuted maximu

Hydrographs\RO_23_20040829_Casimcea_hydrograph.xls maximum discharge measured discharges, only reconstruc









Harsova Patarlagele Harsova Harsova Harsova Tg. Ocna Adjud

18h05' 11h13' 9h56' 9h56' 9h56' 2h20' 00h36'









1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good









53.8 22.1 60.1 60.1 60.1 11.2 6.7









Hourly_rainfall_maps\RO_24_2005007_Nehoiu_rainfall.jpg

Hourly_rainfall_maps\RO_25_20050703_Casimcea_rainfall.jpg

Hourly_rainfall_maps\RO_26_20050703_Cartal_rainfall.jpg

Hourly_rainfall_maps\RO_27_20050703_Topolog_rainfall.jpg

Hourly_rainfall_maps\RO_23_20040828_Casimcea_rainfall.jpg Hourly_rainfall_maps\RO_29_20050712_Su

Hourly_rainfall_maps\RO_28_20050712_Asau_rainfall.jp

42.6 51 12 104.4 168 168

very wet in recharge very wet in recharge very wet very wet





Radar\RO_24_20050507_Nehoiu_radar.rar

Radar\RO_25_26_27_20050703_Dobrogea_radar.rar Radar\RO_28_29_30_20050712_Trotus_rad

Radar\RO_25_26_27_20050703_Dobrogea_radar.rar

Radar\RO_23_20040828_Casimcea_radar.rar Radar\RO_28_29_30_20050712_Trotus_radar.rar

Radar\RO_25_26_27_20050703_Dobrogea_radar.rar









418.9 635.8 418.9 418.9 418.9 573.9 538.8

1961-present 1961-present 1961-present 1961-present 1961-present 1961-present 1961-present





NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

29.9 38.5 29.9 29.9 29.9 36.9 40.3

64.4 79.8 64.4 64.4 64.4 63.5 66.8

98.8 121.1 98.8 98.8 98.8 90.2 93.3

IDF\IDF_Patarlagele.doc IDF\IDF_Harsova.doc

IDF\IDF_Harsova.doc IDF\IDF_Harsova.doc IDF\IDF-Tg. Ocna.doc

IDF\IDF_Harsova.doc IDF\IDF_Adjud.doc

Monthly_precipitation\RO_Patarlagele_monthly_pp.xls

Monthly_precipitation\RO_Harsova_monthly_pp.xls Monthly_precipitation\RO_Adjud_monthly

Monthly_precipitation\RO_Harsova_monthly_pp.xls

Monthly_precipitation\RO_TgOcna_monthly_pp.xls

Monthly_precipitation\RO_Harsova_monthly_pp.xls Monthly_precipitation\RO_Harsova_monthly_pp.xls

145 146 147 148 149 150 151







30 31 32 33 34 35 36



RO_20050712_III.1.22_001 RO_20050823_IV.1.96.11_001

RO_20050818/19_XIII.1.15.32.12_001

RO_20050712_XII.1.69.24_002 RO_20060620_II.1.2.27_001

RO_20060630_XII.1.17.24.3.1_001

RO_20050823_IV.1.96.19_001

12/07/2005 12/07/2005 18-19/08/200523/08/2005 23/08/2005 20/06/2006 30/06/2006

Dofteana Iosasel Bahluet Sarat Feernic Ilisua Clit

Iosasel

Orb Confluence Simonesti

Tg. Frumos Orb Confluence Orb

Orb Confluence Confluence

26 31 52 22 31 22 27 01 11 25 06 00

46 19 01 46 18 28 47 12 15 45 20 00

297 164 90 470 99 382 413









110 81 68 19 168.1 139 31.2

6 16 14 2 21 6 4





297 164 90 470 420 382 413

1640 930 476 988 943 1839 937

735 412 252 584 683 672 570

21% 19% 8.70% 12% 10.10% 18.20% 11.60%

no no no no no no no

Artificial Artificial Artificial Artificial Artificial Artificial Artificial

surface: surface: surface: surface: surface: surface: surface:

Luvisols: Luvisols: Luvisols: Luvisols: Luvisols: Luvisols: Luvisols:

17.56% 24.29% 3.28% 59.71% 46.52% 21.70% 32.16%









22 Location_maps\RO_32_20050818_Bahluet_location.jpg

Location_maps\RO_33_20050823_Sarat_location.jpg

Location_maps\RO_34_20050823_Feernic_location.jpg

Location_maps\RO_35_20060620_Ilisua_location.jpg

See case no. Location_maps\RO_31_20050712_Iosasel_location.jpg Location_maps\RO_36_20060630_Clit_loc









275 106 87.8 85 368 193 170

Direct current- meter measurement

Direct current-

Reconstruction from reservoir operation from reservoir operation

Direct current- meter measurement

Reconstruction from reservoir operation meter measurement ReconstructionReconstruction from reservoir operation

1 - Very good 1 - Very good

No





num

num

95 60 58.6 26.1 65.6 45.5 51.4

260 164 160 71 175 124.0 140.0

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

water water water water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

19 24 48

No No

discharges, only reconstructuted maximum discharge

Hydrographs\RO_32_20050818_Bahluet_hydrograph.xls

No measuredHydrographs\RO_34_20050823_Feernic_hydrograph.xls

discharges, only

measured measured

No measuredHydrographs\RO_31_20050712_Iosasel_hydrograph.xls reconstructuted maximum discharge









Tg. Ocna Gurahont Cotnari Odorheiu Secuiesc

Odorheiu Secuiesc Bistrita Radauti

2h20' 4h43' 10h30' 3h58' 3h58' 9 4









1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good









11.2 11.8 62.9 25.1 25.1 2.2 36









Hourly_rainfall_maps\RO_31_20050712_Iosasel_rainfall.jpg

Hourly_rainfall_maps\RO_32_20050819_Bahluet_rainfall.jpg

Hourly_rainfall_maps\RO_33_20050823_Sarat_rainfall.jpg

Hourly_rainfall_maps\RO_34_20050823_Feernic_rainfall.jpg

Hourly_rainfall_maps\RO_30_20050712_Dofteana_rainfall.jpg Hourly_rainfall_maps\RO_36_20060630_C

Hourly_rainfall_maps\RO_35_20060620_Ilisua_rainfall.jp

12 104.4 168 168 48 60

very wet in recharge very wet very wet





Radar\RO_31_20050712_Iosasel_radar.rar

Radar\RO_32_20050818_19_Bahluet_radar.rar

Radar\RO_33_34_20050823_Harghita_radar.rar

Radar\RO_28_29_30_20050712_Trotus_radar.rar Radar\RO_35_20060620_Ilisua_radar.rar

Radar\RO_36_20060630_Clit_radar.rar

Radar\RO_33_34_20050823_Harghita_radar.rar









573.9 752.6 521.3 608.2 608.2 797.3 619.1

1961-present 1966-present 1961-present 1961-present 1961-present 1987-present 1961-present





NA 22.7 NA NA NA NA NA

NA 42.5 NA NA NA NA NA

NA 62.3 NA NA NA NA NA

36.9 35.1 56.6 31.1 31.1 32.2 36.6

63.5 58.6 99.3 52.2 52.2 52.0 58.7

90.2 82.2 141.9 73.2 73.2 71.8 80.8

IDF\IDF-Gurahont.doc

IDF\IDF-Tg. Ocna.doc IDF\IDF-Odorhei.doc

IDF\IDF_Cotnari.doc IDF\IDF_Bistrita.doc

IDF\IDF-Odorhei.doc IDF\IDF_Radauti.doc

Monthly_precipitation\RO_Gurahont_monthly_pp.xls Monthly_precipitation\RO_Bistrita_montly_pp.xls

Monthly_precipitation\RO_Cotnari_monthly_pp.xls Monthly_precipitation\RO_Radauti_montly

Monthly_precipitation\RO_Odorheiu Secuiesc_monthly_pp.xls

Monthly_precipitation\RO_TgOcna_monthly_pp.xls Monthly_precipitation\RO_Odorheiu Secuiesc_monthly_pp.xls









Pictures_Clit octombrie 2006.rar

Rusan_Pluvial_Risk_Harghita_2005.doc

Rusan_Pluvial_Risk_Harghita_2005.doc

Iosasel Feernic Clit River

River River 30.06.2006

152







37



RO_20070804_XII.1.53.40.15

04/08/2007

Grinties

Grinties

23 53 44

47 02 05

542.1









51

16





542.1

1740.8

1039.27

18.26%

no

Artificial

surface:

Cambisols:

73.86%

num

text

Location_maps\RO_37_20070804_Grinties_location.jpg

Location_maps\RO_37_20070804_Grinties_location2.jpg









96.1

Reconstruction from reservoir operation

2 - Good

No





96.1

num

48.8

133

water flow (0-20%, mostly 0-10%)

5.5

No

measured

link

link

link

link

link









Ceahlau-Toaca

6

num

num

1 - Very good

Storm





25





num

Hourly_rainfall_maps\RO_37_20070408_Grinties_rainfall.jpg





in recharge





Radar\RO_37_20070804_Grinties_radar.rar

Hourly_rainfall_maps\RO_37_20070408_Grinties_rainfall_gaugestattion.jpg









668.9

1961-present

IDF\IDF_Radauti.doc

Monthly_precipitation\RO_Ceahlau-Toaca_monthly_pp.xls









num





num

num

num

num

num





link









1





txt

txt





txt

txt









RO_37_20070804_GRINTIES_24hprecipitation.jpg





Pictures_Grinties_august 2007.rar

link

http://www.

grinties.ho

Primary data on reported flash floods - Hydrate P

64

1

3

Section Identification

1 Event code RO_19800723_III.1.42.13_003

2 Date of the event 23/07/1980

3 River Name Nimaiesti

4 Cross-section Name Beius

24 22 21

5 Cross-section Longitude (World Geodetic System 84 )

Geodetic

6 Cross-section Latitude (World 48 40 10 System 84 )

7 Cross-section elevation [m] 189

Basin data

Minimum information

8 Watershed area [km2] 108

19

9 Estimated time of concentration [h]

Additional Data- Optional fields

10 Minimum elevation [m] 187

11 Maximal elevation [m] 1490

12 Average elevation [m] 502

13 Average basin slope 14.90%

14 Glacial Areas [%] no

15 Land use

16 Soils

17 Average soil thickness [m]

18 Geology

19 Location map

20 Other geographical document

Discharge data

Minimum information

196

21 Peak discharge [m3/s], probable

22 Estimation method Calibrated stage - discharge relationship

23 Discharge estimation quality 1 - Very good

24 Regulated stream

Additional Data- Optional fields

25 Peak discharge [m3/s] max

26 Peak discharge [m3/s] Min

27 10 year return period peak discharge [m3/s]

28 100 year return period peak discharge [m3/s]

29 Sediment transport processes

30 Flood duration [h] 17

31 Flood hydrograph Nimaiesti_Beius_003.xls

32 Past- historical floods

33 Report on the estimation

34 Pictures of the cross-section

35 Cross-section survey

36 Other attached file

Rainfall data

Minimum information

36' Reference weather station Stana de Vale

37 Total rainfall duration [h]

38 No. of raingauges

39 No of raingauges within the basin

40 Quality of data

41 Hydro-Meteorological type of event

Additional Data- Optional fields

42 Maximum total accumulated point rainfall [mm]

43 Spatial extent

44 Average accumulated rainfall on the watershed [mm]

N

45 Rainfall spatial distribution map imaesti_Beius_003.jpg

46 Maximum Intensity over time of concentration [mm/h]

47 Initial wetness

48 Hailfall (y/n)

49 Radar data

50 Other attached files

Climatic data

Minimum information

1642.7

51 Average annual precipitation [mm]

52 Observation period [years] 1979-present

Additional Data- Optional fields

19.5

53 1 years return period hourly rainfall [mm]

34.7

54 10 years return period hourly rainfall [mm]

rainfall

55 100 years return period hourly 50.0 [mm]

62.3

56 1 years return period daily rainfall [mm]

107.0

57 10 years return period daily rainfall [mm]

151.8

58 100 years return period daily rainfall [mm]

NA

59 Intensity Duration Frequency (IDF) curve

Monthlt_pp_StanaVale.xls

60 Monthly distribution of precipitation

Damages (only 1990-… events)

Minimum information

61 Total Economical damages [€]

Additional Data- Optional fields

62 Displaced persons

63 Population affected

64 Direct Damages to private properties [€]

65 Direct Damages to public equipment [€]

66 Indirect Damages [€]

67 Origin of the Data

68 Report on the damages

Casualties (only 1990-… events)

Minimum information

69 No of casualties

70 No of Inured people

71 Medical causes

72 Circumstances

73 Timing

74 Gender

75 Age

Related documents

Minimum information

76 Comments and additional information notes

Additional Data- Optional fields

77 Photos

78 Attached reports

79 References list

Lists Used in the sheet

Estimation method Sediment transport

water

Direct current- meter measurement flow (0-20%, mostly 0-10%)

debris

Calibrated stage-discharge relation flood or hyperconcentrated flow (20-40%)

operation

Reconstruction from reservoir debris flow (>40-50%)

Manning Strickler formula estimation

Slope conveyance method

Hydraulic 1D simulation

Hydraulic 2D simulation

Orifice laws

Critical flow assumption

Surface velocity estimation

Erosion- sediment clues

Other

Unknow

eported flash floods - Hydrate Projet WP1

93 94 95

2 3 4

1 2 3

Topa-Varciorog



RO_19800506_III.1.42.22.2_001 RO_19811212_III.1.42.22.2_002 RO_19860124_III.1.42.22.2_003

06/05/1980 12/12/1981 24/01/1986

Topa-Varciorog Topa-Varciorog Topa-Varciorog

Varciorog Varciorog Varciorog

22 09 48 23 09 48 24 09 48

46 52 13 47 52 13 48 52 13

277 278 279









9.5 9.5 9.5

8 8 8





277 277 277

686 686 686

467 467 467

13.00% 13.00% 13.00%

no no no

1. Crop field 26.99% 1. Crop field 26.99% 1. Crop field 26.99%

2. Forest 57.01% 2. Forest 57.01% 2. Forest 57.01%

text

num

text

link

link









109 59.7 41.6

Calibrated stage - discharge relationship

Calibrated stage - discharge relationship Calibrated stage - discharge relationship

2 - Good 2 - Good 2 - Good

No No No





num

num

35.4

96.5

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

15 14 36

Topa_Varciorog_001.xls Topa_Varciorog_002.xls Topa_Varciorog_003.xls

link

link

link

link

link









Borod WT WT

num

num

num









num





num

link









link









716.6

1971-present





num

num

num

num

num

num

link

link









num





num

num

num

num

num





link









num





txt

txt





txt

txt









link





link

link

link

Quality of data Regulated during flood Sediment transport

1 - Very good Yes water flow (0-20%, mostly 0-10%)

2 - Good No debris flood or hyperconcentrated flow (20-40%)

3 - Fair debris flow (>40-50%)

4 - Poor

96 97

5 6

4 5





RO_19880317_III.1.42.22.2_004 RO_19950613_III.1.42.22.2_005

17/03/1988 13/06/1995

Topa-Varciorog Topa-Varciorog

Varciorog Varciorog

25 09 48 26 09 48

49 52 13 50 52 13

280 281









9.5 9.5

8 8





277 277

686 686

467 467

13.00% 13.00%

no no

1. Crop field 26.99% 1. Crop field 26.99%

2. Forest 57.01% 2. Forest 57.01%









35.5 44.7

Calibrated stage - discharge relationship

Calibrated stage - discharge relationship

2 - Good 2 - Good

No No

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

32 13

Topa_Varciorog_004.xls Topa_Varciorog_005.xls









WT Borod









716.6

1971-present

Initial wetness status Size of rainfall event

very dry (S100km2) Generalised storm

in recession

very wet

98 115 118

7 8 9

6

Valea Cerbului -Busteni 3



RO_2005.4.24_III.1.42.22.2_006 RO_20010619_XI.1.20.2_002 RO_19790626_X.1.24.2_001

24/05/2005 19/06/2001 26/06/1979

Topa-Varciorog Valea Cerbului Potop

Varciorog Busteni Orb Confluence

27 09 48 26 32 18 25 16 36

51 52 13 46 25 45 44 45 48

282 99 192









9.5 26 194

8 6 9





277 890 192

686 2507 551

467 1530 348

13.00% 31.50% 7.20%

no no no

1. Crop field 26.99% 1. Forest 74.78% Artificial

2. Forest 57.01% 2. Locality 0.83% surface:

Luvisols:

81.03%









Location_maps\RO_3_19790626_P









51 62.3 870

Calibrated stage - discharge relationship

Calibrated stage - discharge relationship Reconstruction from reservoir ope

2 - Good 1 - Very good 2 - Good

No No

28.8 220

127 510

water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%) water flow (0-20%, mostly 0-10%)

12 30

No

Topa_Varciorog_006.xls V.Cerbului_Busteni_002.xls measured









Borod Predeal Targoviste

No rainfall data recorded at weathe









1 - Very good









96

very wet





Radar_Topa_Varciorog









717.6 946.7

1971-present 1961-present 1961-present





NA NA

NA NA

NA NA

161.7 42.6

249.0 93.3

336.3 144

Predeal-IDF.doc IDF\IDF_Targoviste.doc

Predeal_average monthly precipitation amounts.doc









Stanescu,

V.Al. and

Hydro-meteorological type of event

Storm

Storm on snow

119 120 122 124 125 126 128

10 11 12 13 14 15 16





4 5 7 9 10 11 13



RO_19800729_V.1.8.2_001 RO_19950524_II.1.36_001 RO_19970615_III.1.44.33.15_004

RO_19880522/23_XII.1.79.18_001

RO_19800729_IV.1.159_001 RO_19951224_III.1_002 RO_19990622_XII.1.82.33.2.2_001

29/07/1980 29/07/1980 22-23/05/198824/05/1995 24/12/1995 15/06/1997 22/06/1999

Cladova Hauzeasca Milcov Poiana Crisul Alb Bistra Comisoaia

Orb Golesti

Orb Confluence Confluence Blajeni

Poiana Blenchii Chiribis Orb Confluence

21.2 21.5 27 10 09 23 43 18 22 54 07 22 20 31 21.2

46.1 45.5 45 40 00 47 17 56 46 14 43 47 18 12 46.1

140 195 44 241 337 132 80









40 29 395 96 111 169 25.5

13 8 9 11 16 23 6





140 195 44 241 337 132 80

553 874 960 770 1321 757 331

315 364 410 423 716 354 185

11.40% 10.20% 9.80% 15.50% 26% 11.70% 7.70%

no no no no no no no

Artificial Artificial Artificial Artificial Artificial Artificial Artificial

surface: surface: surface: surface: surface: surface: surface:

Luvisols: Luvisols: Luvisols: Luvisols: Luvisols: Luvisols: Protisols:

86.53% 36.73% 37.75% 84.64% 8.68% 34.10% 5.28%









Location_maps\RO_5_19800729_Hauzeasca_location.jpg

Location_maps\RO_7_19880522_Milcov_location.jpg Location_maps\RO_13_19990622_Comiso

Location_maps\RO_9_19950524_Poiana_location.jpg

See case no. 6 ocation_maps\RO_11_19970615_Bistra_location.jpg

Location_maps\RO_4_19800729_Cladova_location.jpg L









200 320 316 144 235 250 210

Reconstruction from reservoir operationrelationship Calibrated stage - discharge relationship

Calibrated stage

Calibrated stage - discharge relationship relationship

Reconstruction from reservoir operation - discharge Calibrated stage - discharge Reconstruction from reservoir operation

2 - Good 2 - Good 1 - Very good1 - Very good1 - Very good1 - Very good2 - Good

No No No No No No No

num

35.5 47.7 420 51.9 71.2 58.4 40.7

96.8 130 780 141 190 155 111

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

water water water water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

48 18 31 36

discharges, only reconstructuted maximum discharge

discharges, only reconstructuted maximum discharge

Hydrographs\RO_9_19950524_Poiana_hydrograph.xls

Hydrographs\RO_10_19951224_CrisAlb_hydrograph.xls

Hydrographs\RO_11_19970615_Bistra_hydrograph.xls

No

No measuredNo measuredHydrographs\RO_7_19880717_Milcov_hydrograph.xls measured discharges, only reconstruc









Varadia Lugoj Tulnici Dej Tebea Borod Rm. Sarat

1h16' 2h30' 2h57'

No rainfall data recorded at weather stations+F16 time No rainfall data

during winter4h34' unable to record rainfall data`









1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good

Storm Storm





8.5 2.0 17.7 23.3









Hourly_rainfall_maps\RO_7_19880522_Milcov_rainfall.jpg

Hourly_rainfall_maps\RO_9_19950524_Poiana_rainfall.jpg

Hourly_rainfall_maps\RO_11_19970615_Bistra_rainfall.j

Hourly_rainfall_maps\RO_5_19800729_Hauzeasca_rainfall.jpg

114 18 0.91 144

very wet very wet in recharge very wet in recharge









685.2 658.2 624.5 713.8 716.6

1961-present 1961-present 1961-present 1961-present 1964-present 1961-present 1961-present





NA NA NA 15.9

NA NA NA 32.4

NA NA NA 48.9

31.8 33.7 42.1 29.9 33.3 39.7

52.3 59.1 69.6 48.7 58.2 68.7

72.8 84.5 97.1 67.5 82.9 97.6

IDF\IDF_Lugoj.doc

IDF\IDF_Varadia.doc IDF\IDF_Dej.doc

IDF\IDF_Tulnici.doc IDF\IDF_Borod.doc

IDF\IDF-Tebea.doc IDF\IDF_Rm Sarat.doc

Monthly_precipitation\RO_Tulnici_monthly_pp.xls

Monthly_precipitation\RO_Dej_monthly_pp.xls

Monthly_precipitation\RO_Tebea_monthly_pp.xls

Monthly_precipitation\RO_Lugoj_monthly_pp.xls Monthly_precipitation\RO_Borod_monthly_pp.xls









$ Lazar, M., $ Micridin, Nedelcu, G., Mustatea A. Tinca, L.,

1980, The Z.,1981, 1991, The (2005). and Minea,

130 132 135 137 139 140 141

17 18 19 20 21 22 23





15 17 20 22 24 25 26



RO_19990813_XI.1.20.WN_001

RO_20020801_XIV.1.40_001

RO_19990712_IV.1.117.14_001 RO_20050507_XII.1.82.16_001

RO_20050703_XIV.1.69.24_001

RO_20040728_XII.1.69.24_001 RO_20050703_XIV.1.10_001

12/07/1999 13/08/1999 01/08/2002 28/07/2004 07/05/2005 03/07/2005 03/07/2005

Raul Mare Urlatoarea Iris Dofteana Nehoiu Casimcea Cartal

Orb Pietreni

Orb Confluence Confluence Orb Cheia

Orb Confluence Confluence Pantelimonu de Sus

22.4 25.3 28 05 16 26 31 52 26.1 28 24 54 28 21 53

45.2 45.2 44 05 53 46 19 01 45.1 44 31 51 44 34 14

1120 824 53 297 343 35 54









243 4.6 6 110 36 500 127

8 1 1 6 9 22 12





1120 824 53 297 343 35 54

2509 2143 176 1640 1345 359 284

1770 1498 106 735 820 145 150

30.20% 46.20% 10% 21% 21% 5% 6.10%

no no no no no no no

Lake: Artificial Artificial Artificial Artificial Artificial Artificial

0.30% surface: surface: surface: surface: surface: surface:

Umbrisols: Cambisols: Protisols: Luvisols: Luvisols: Cambisols: Protisols:

2.72% 17.59% 0.66% 17.56% 9.29% 0.08% 6.19%









Location_maps\RO_17_19990812_Urlatoarea_location.jpgcase no. Location_maps\RO_26_20050703_Cartal_l

Location_maps\RO_20_20020801_Iris_location.jpg 23

Location_maps\RO_22_20040728_Dofteana_location.jpg

Location_maps\RO_24_20050507_Nehoiu_location.jpg

Location_maps\RO_15_19990712_RMare__location.jpg See









850 30 77.6 151 104 387 310

Reconstruction from reservoir operationrelationship Calibrated stage - operation - discharge

Calibrated stage

Reconstruction from reservoir operationCalibrated stage

Reconstruction from reservoir operation - discharge Reconstruction from reservoir discharge relationship relationship

2 - Good 2 - Good 1 - Very good2 - Good 2 - Good 1 - Very good1 - Very good

No No No No No No No

167 12.3 26 95 59.4 144 88.5

455 54.3 72 260 162 465 241

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

water water water water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)

13 23 19

discharges, only reconstructuted maximum discharge reconstructuted maximum discharge

discharges, only reconstructuted maximum discharge

No measuredNo measuredHydrographs\RO_25_20050703_Casimcea_hydrograph.

discharges, only

discharges, Hydrographs\RO_26_20050703_Cartal_hyd

No measuredNo measuredHydrographs\RO_20_20020801_Iris_hydrograph.xls only reconstructuted maximum discharge









Predeal

Obarsia Lotrului Adamclisi Tg. Ocna Patarlagele Harsova Harsova

1h45' 7h06' 3h03' 4h22' 11h13' 9h56' 9h56'









1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good1 - Very good









10.1 82.9 12.6 6.6 22.1 60.1 60.1









Hourly_rainfall_maps\RO_17_19990813_Urlatoarea_rainfall.jpg

Hourly_rainfall_maps\RO_20_20020801_Iris_rainfall.jpg

Hourly_rainfall_maps\RO_22_20040728_Dofteana_rainfall.jpg

Hourly_rainfall_maps\RO_24_2005007_Nehoiu_rainfall.jpg

Hourly_rainfall_maps\RO_15_19990712_RMare_rainfall.jpg Hourly_rainfall_maps\RO_26_20050703_C

Hourly_rainfall_maps\RO_25_20050703_Casimcea_rain

9 15 84 51 51 12 104.4

in recharge in recession in recharge in recharge in recharge very wet in recharge





NA Radar\RO_24_20050507_Nehoiu_radar.rar

Radar\RO_25_26_27_20050703_Dobrogea_radar.rar

Radar\RO_25_26_27_20050703_Dobrogea_

Radar\RO_22_20040728_Dofteana_radar.rar









881.7 945.7 476.6 573.9 635.8 418.9 418.9

1976-present 1961-present 1961-present 1961-present 1961-present 1961-present 1961-present





NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

34.4 47.7 34.6 36.9 38.5 29.9 29.9

62.1 87.5 62.7 63.5 79.8 64.4 64.4

89.8 127.3 90.7 90.2 121.1 98.8 98.8

IDF\IDF_Rm Sarat.doc IDF\IDF-Adamclisi.doc Ocna.doc

IDF\IDF-Predeal.doc IDF\IDF_Harsova.doc

IDF\IDF-Tg. IDF\IDF_Patarlagele.doc IDF\IDF_Harsova.doc

Monthly_precipitation\RO_Predeal_monthly_pp.xls Monthly_precipitation\RO_Harsova_monthly_pp.xls

Monthly_precipitation\RO_Adamclisi_monthly_pp.xls Monthly_precipitation\RO_Harsova_month

Monthly_precipitation\RO_TgOcna_monthly_pp.xls

Monthly_precipitation\RO_Patarlagele_monthly_pp.xls

Monthly_precipitation\RO_Obarsia Lotrului_monthly_pp.xls









Stanescu, V. Urlatoarea

Al, Drobot, Valley 12-

144 145 148 149 150 151

24 25 26 27 28 29





29 30 33 34 35 36



RO_20050712_XII.1.69.24_002

RO_20050823_IV.1.96.19_001

RO_20050712_XII.1.75_001RO_20050823_IV.1.96.11_001 RO_20060630_XII.1.17.24.3.1_001

RO_20060620_II.1.2.27_001

12/07/2005 12/07/2005 23/08/2005 23/08/2005 20/06/2006 30/06/2006

Susita Dofteana Sarat Feernic Ilisua Clit

Orb Orb Simonesti

Orb Confluence Confluence Confluence Orb

Orb Confluence Confluence

26 52 51 26 31 52 25.3 25 06 00 240824 255639

46 00 00 46 19 01 46.2 45 20 00 472154 474403

310 297 470 99 382 413









179 110 19 168.1 139 31.2

7 6 2 21 6 4





310 297 470 420 382 413

1350 1640 988 943 1839 937

588 735 584 683 672 570

12.90% 21% 12% 10.10% 18.20% 11.60%

no no no no no no

Artificial Artificial Artificial Artificial surface: Artificial Artificial

surface: surface: surface: 6.45% surface: surface:

Luvisols: Luvisols: Luvisols: Luvisols: 46.52% Luvisols: Luvisols:

28.01% 17.56% 59.71% Cambisols: 21.70% 32.16%









See case no. 22

Location_maps\RO_33_20050823_Sarat_location.jpg

Location_maps\RO_34_20050823_Feernic_location.jpg

Location_maps\RO_29_20050712_Susita_location.jpg Location_maps\RO_36_20060630_Clit_location.jp

Location_maps\RO_35_20060620_Ilisua_location.jpg









540 275 85 368 193 170

Reconstruction from reservoir operation - operation

ReconstructionCalibrated stage Reconstruction from

Reconstruction from reservoir operation

Reconstruction from reservoir operation from reservoir discharge relationship reservoir operation

2 - Good 1 - Very good

No No





num

num

195 95 26.1 65.6 45.5 51.4

535 260 71 175 124.0 140.0

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)water flow (0-20%, mostly 0-10%)

water water

water flow (0-20%, mostly 0-10%)flow (0-20%, mostly 0-10%)water flow (0-20%, mostly 0-10%)

48

No No

discharges, only reconstructuted maximum reconstructuted maximum discharge

discharges, only reconstructuted maximum discharge

discharges, only discharge

measured measured

No measuredNo measuredNo measuredHydrographs\RO_34_20050823_Feernic_hydrograph.xls









Adjud Tg. Ocna Odorheiu Secuiesc Bistrita

Odorheiu Secuiesc Radauti

00h36' 2h20' 3h58' 3h58' 9 4









1 - Very good1 - Very good1 - Very good1 - Very good









6.7 11.2 25.1 25.1 2.2 36









Hourly_rainfall_maps\RO_30_20050712_Dofteana_rainfall.jpg

Hourly_rainfall_maps\RO_33_20050823_Sarat_rainfall.jpg

Hourly_rainfall_maps\RO_34_20050823_Feernic_rainfall.jpg

Hourly_rainfall_maps\RO_36_20060630_Clit_rainf

Hourly_rainfall_maps\RO_29_20050712_Susita_rainfall.jpg Hourly_rainfall_maps\RO_35_20060620_Ilisua_rainfall.jpg

168 168 48 60

very wet very wet





Radar\RO_28_29_30_20050712_Trotus_radar.rar

Radar\RO_33_34_20050823_Harghita_radar.rar

Radar\RO_33_34_20050823_Harghita_radar.rar

Radar\RO_28_29_30_20050712_Trotus_radar.rar Radar\RO_36_20060630_Clit_radar.rar

Radar\RO_35_20060620_Ilisua_radar.rar









538.8 573.9 608.2 608.2 797.3 619.1

1961-present 1961-present 1961-present 1961-present 1987-present 1961-present





NA NA NA NA NA NA

NA NA NA NA NA NA

NA NA NA NA NA NA

40.3 36.9 31.1 31.1 32.2 36.6

66.8 63.5 52.2 52.2 52.0 58.7

93.3 90.2 73.2 73.2 71.8 80.8

IDF\IDF-Tg. Ocna.doc

IDF\IDF_Adjud.doc IDF\IDF-Odorhei.doc

IDF\IDF-Odorhei.doc IDF\IDF_Radauti.doc

IDF\IDF_Bistrita.doc

Monthly_precipitation\RO_TgOcna_monthly_pp.xls

Monthly_precipitation\RO_Odorheiu Secuiesc_monthly_pp.xls

Monthly_precipitation\RO_Odorheiu Secuiesc_monthly_pp.xls

Monthly_precipitation\RO_Adjud_monthly_pp.xls Monthly_precipitation\RO_Radauti_montly_pp.xls

Monthly_precipitation\RO_Bistrita_montly_pp.xls









110000 86000 74500





224 350 55

1315 1500 526









Report ANAR 2005









11 7 13









8 male, 3 female 8 males, 5 females

5 females, 2 males









Pictures_Clit octombrie 2006.rar

Rusan_Pluvial_Risk_Harghita_2005.doc

Rusan_Pluvial_Risk_Harghita_2005.doc

Feernic River Clit River

23.08.2005 was 30.06.2006

152

30





37



RO_20070804_XII.1.53.40.15

04/08/2007

Grinties

Grinties

23 53 44

47 02 05

542.1









51

16





542.1

1740.8

1039.27

18.26%

no

Artificial surface: 4.10%

Crop: 0.02%

Cambisols: 73.86%

Protisols: 7.58%

num

text

Location_maps\RO_37_20070804_Grinties_location.jpg

Location_maps\RO_37_20070804_Grinties_location2.jpg









96.1

Reconstruction from reservoir operation

2 - Good

No





96.1

num

48.8

133

water flow (0-20%, mostly 0-10%)

5.5

No measured discharges, only

reconstructuted maximum discharge

link

link

link

link

link









Ceahlau-Toaca

6

num

num

1 - Very good

Storm





25





num

Hourly_rainfall_maps\RO_37_20070408_Grinties_rainfall.jpg





in recharge





Radar\RO_37_20070804_Grinties_radar.rar

Hourly_rainfall_maps\RO_37_20070408_Grinties_rainfall_gaugestattion.jpg









668.9

1961-present

IDF\IDF_Radauti.doc

Monthly_precipitation\RO_Ceahlau-Toaca_monthly_pp.xls









85000





8

75









Media, local info









1









male









RO_37_20070804_GRINTIES_24hprecipitation.jpg





Pictures_Grinties_august 2007.rar

link

http://www.grinties.home.ro/pgid5_sit

e_RO.html



Other docs by wanghonghx
Chap005
Views: 150  |  Downloads: 0
AntivirusInstructions_parent_
Views: 0  |  Downloads: 0
Dear friends_
Views: 0  |  Downloads: 0
A Film By William Friedkin
Views: 1  |  Downloads: 0
計算機網路
Views: 5  |  Downloads: 0
Annonsebrev
Views: 0  |  Downloads: 0
Camp Tejas Release Form
Views: 1  |  Downloads: 0
iprseligibilitymatrix
Views: 0  |  Downloads: 0
Australian Percussion Eisteddfod
Views: 6  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!