Embed
Email

AIRCRAFT

Document Sample

Shared by: linzhengnd
Categories
Tags
Stats
views:
1
posted:
12/3/2011
language:
English
pages:
2
COMMONWEALTH OF AUSTRALIA (Civil Aviation Safety Regulations 1998), PART 39 - 107

CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES







AIRWORTHINESS DIRECTIVE

On the effective date specified below, and for the reasons set out in the background section, the CASA delegate whose signature appears below revokes

Airworthiness Directive (AD) AD/ELECT/11 and issues the following AD under subregulation 39.001(1) of CASR 1998. The AD requires that the action set out in

the requirement section (being action that the delegate considers necessary to correct the unsafe condition) be taken in relation to the aircraft or aeronautical product

mentioned in the applicability section: (a) in the circumstances mentioned in the requirement section; and (b) in accordance with the instructions set out in the

requirement section; and (c) at the time mentioned in the compliance section.





Electrical Equipment



AD/ELECT/11 Leach Relays - Control Terminal Insulation 2/2009

Amdt 1



Applicability: Applicability: All Leach type 5038, 5039, 5058, 5059, 5060, 5061 relays.



Requirement: Modify relays by increasing the insulation between the coil terminals and both the

main contactor bar and the earthed metal yoke of the coil.



An approved method of compliance is as follows:



1. Remove the two coil terminal screw assemblies.



2. Form a piece of 3 in. x 3 in. fibrous insulating sheet of 0.015 inch minimum

thickness into a hat section so that the hollow portion can fit over the existing

insulated terminal strip, with the remaining portions bearing against the moulded

cover and the metal yoke respectively, so as to provide an equal overhang of

Insulation at each end of the terminal strip. Cut a suitable hole to permit the

passage of the coil end wires through the new insulation and cut appropriate

holes in the hat section to correspond with the existing holes in the terminal strip.

Varnish the formed strip.



3. Place the completed hat section in position and pass the coil wires through the

appropriate hole. Replace the coil terminal assemblies at the same time

connecting up the coil wires and clamping the new insulation firmly in place on

each side of the terminal strip.



Note: Compliance with previous issue of this AD constitutes compliance with this

AD.



Compliance: Before installation in an aircraft.



This Amendment becomes effective on 12 February 2009.









Page 1 of 2

COMMONWEALTH OF AUSTRALIA (Civil Aviation Safety Regulations 1998), PART 39 - 107

CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES



Electrical Equipment



AD/ELECT/11 Amdt 1 (continued)



Background: This AD was originally issued on 1 January 1963 and is now amended to remove

reference to ANO 107.2.6.2.1 which has since been cancelled.









James Coyne

Delegate of the Civil Aviation Safety Authority



22 December 2008









Page 2 of 2



Related docs
Other docs by linzhengnd
Comment_organiser_une_manifestation_sportive
Views: 2  |  Downloads: 0
Report
Views: 0  |  Downloads: 0
professionalismprogramfinaldraft
Views: 0  |  Downloads: 0
Testing _ Certification
Views: 0  |  Downloads: 0
Community Art Murals
Views: 1  |  Downloads: 0
p1-9
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!