Laser Scanning Presentation

W
Document Sample
scope of work template
							plant design
engineers sdn bhd

Ron Bouman
Technical Director

Kuala Lumpur
Malaysia




                     www.pdengineers.biz
                                                                                                   profil
          plant design
          engineers sdn bhd
Specialist Services to the Oil & Gas and Petrochemical Industries




                                                                                                  company
Established 1999 in Kuala Lumpur, Malaysia

      •pdms modeling
                              Catalogues, Specifications, Intelligent P&IDs and Pipe Spooling

      •offshore living quarters
                              Specialising in Architectural & Interior Design Works

      •engineering services
                              Structural, Piping, Mechanical and E&I Services Design

      •as-built surveying




                                                                                                www.pdengineers.biz
                                                                                                                                                  project
major projects:

                   2004 Malaysia
                   As-built Laser Scan survey and 3D PDMS modelling of Bintulu Stabiliser Plant 1 & 2
                   for MMC Oil & Gas Engineering & Shell Sarawak Berhad

                   2004 Indonesia
                   As-built Laser Scan survey and 3D PDMS modelling of Central Gathering Station I in Duri, Riau, Sumatra
                   for Caltex Pacific Indonesia




                                                                                                                                                  select
                   2003/2004 Malaysia/Vietnam
                   As-built Laser Scan survey and 3D PDMS modelling of riser tie-ins & Deck extension plus flow line/manifold modifications.
                   for Talisman Malaysia Limited



                   2003 Malaysia
                   As-built Laser Scan survey and 3D PDMS modelling of Pulai A offshore process platform.
                   for MMC Oil & Gas Engineering & Petronas Carigali Sdn Bhd


                   2002 Singapore
                   As-built Laser Scan survey, 3D modelling & verification with PDMS model of combined cycle power station.
                   for Alstom Power Sdn Bhd & Senoko Power Station Ltd


clients include:




                                                                                                                                               www.pdengineers.biz
Gas Manifold Extention
         for
  TALISMAN ENERGY
                         Malaysia

   BS-A PLATFORM

project case study


                                    www.pdengineers.biz
  plant design
  engineers sdn bhd

Project background:
• Talisman Energy BS-A Platform
• Location about 200km offshore Kota Baru (Malaysia
  Vietnam Joint Development Area)
• Better then expected production
• Additional flow lines needed to be installed and existing
  Gas manifolds needed to be extended.




                                                    www.pdengineers.biz
  plant design
  engineers sdn bhd
Client requirements:
• No shutdown during installation of deck extension and
  pipe spools
• Installation window small
• No work barge/boat available for any rework
• Especially the deck extension had to fit. No room for any
  mismatch.




                                                    www.pdengineers.biz
 plant design
 engineers sdn bhd
Scope of Work:
• 3D Laser Scan Survey and 3D Modelling of effected
  areas (Manifolds, Wellheads, Water Injection, Drain
  Vessel & Structure)
Deliverables:
• Registered Point Cloud
• Semi Intelligent PDMS Model
• Clash Report (New design verified against existing
  conditions)



                                                  www.pdengineers.biz
    plant design
    engineers sdn bhd
Coordination:
• Provide appointed Design Consultant with 3D As-Built
   PDMS Model. (Engineering PDMS Model was available)
• Verify and resolve any clashes between 3D As-Built
   PDMS Model and Design consultant’s new design.
• Dimensional verification of Fabricated (Tag welded)
   Deck extension by appointed Fabricator.
• Dimensional verification of Fabricated critical pipe
   spools



                                                         www.pdengineers.biz
     plant design
     engineers sdn bhd



  Planning and Logistics

• Kuala Lumpur – Kota Baru Airport (1 hour flight)
• Kota Baru Helibase – BS-A Platform (1 Hour Helicopter flight)


   Depart 06.00 KL Arrive on the Platform 12.00 noon
                   Did it work out?




                                                        www.pdengineers.biz
plant design
engineers sdn bhd




            Well no…….


                         www.pdengineers.biz
plant design
engineers sdn bhd




      2 Days later we arrived…


                                 www.pdengineers.biz
plant design
engineers sdn bhd




                    www.pdengineers.biz
plant design
engineers sdn bhd




            Manifold Area


                            www.pdengineers.biz
plant design
engineers sdn bhd




           Wellhead Area


                           www.pdengineers.biz
    plant design
    engineers sdn bhd




Water Injection Area    Drain Vessel


                                   www.pdengineers.biz
Work flow




                                       case stud
      laser scanning at site

       registering survey data on
                         platform

      point cloud processing in
      home office


             3D model in cyclone

      import to PDMS




                                    www.pdengineers.biz
plant design
engineers sdn bhd




                              case stud
                Malaysia




                           www.pdengineers.biz
plant design
engineers sdn bhd




           Drain Vessel Area


                               www.pdengineers.biz
plant design
engineers sdn bhd




           Manifold Area

                           www.pdengineers.biz
plant design
engineers sdn bhd




            Manifold Area


                            www.pdengineers.biz
plant design
engineers sdn bhd




            Manifold Area


                            www.pdengineers.biz
    plant design
    engineers sdn bhd



Turn around time for the Survey and Modeling:
• 3D Laser Scan Survey - 5 days (3 days of scanning, about 60 scans)
• 3D Modeling in Cyclone - 3 weeks
• Transfer to PDMS and Labelling of objects – 3 days
• Clash Check – 2 days (35 clashes/misalignments)


Completed within 6 weeks as per Schedule




                                                               www.pdengineers.biz
plant design
engineers sdn bhd




       Survey at the fabrication yard



                                        www.pdengineers.biz
    plant design
    engineers sdn bhd


Turn around time for Dimensional Verification of
Fabricated Deck extention and Pipe Spools:

• Initial Dimensional Survey of Deck extension - 1 day survey
  (25mm offset was measured against existing conditions)
• Resurvey of Deck extension after 25mm correction – 1 day
• Dimensional Survey of critical pipe spools – 1 day


Completed inclusive of Resurvey within 1 week




                                                                www.pdengineers.biz
    plant design
    engineers sdn bhd


Installation of Deck extention:

• Perfect fit

Installation of Pipe spools:

• Installation of the pipe spools is ongoing




                                               www.pdengineers.biz
Thank you

            www.pdengineers.biz

						