DocList.xls - 3GPP by hedongchenchen

VIEWS: 16 PAGES: 31

									Doc. Name;"File Name";"Title";"Source";"Reserved by";"Reservation for";"Reservation Date";"Allocations";"Content Type";"A
          Approval ofLast SA5 meetingregistrationreport,Inter-organizational communication reports, 4.5level, 5.1 Administr
                      the agendaLast SA meeting of new4.3
                                  and report, 4.2
                                             LS status overview, 4.4 Other
                                                            Adrian Zoicas";"ETSI Cross-SWG OAM Maintenance and Rel-8 sma
S5-081001;"S5-081001.zip";"Agenda";"WG Chairman";"Mr.documents, 4.1 reports, 5               issues at SA5
                                                                                 Secretariat";"2008-05-03 11:54:38";"2
          Last SA5 meeting report";"INPUT REPORT: Input Report (Work Program, STF report, Progress Report, ...)";"";"Yes"
S5-081002;"S5-081002.zip";"Report of the last SA5 meeting";"MCC";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54
          Last SA meeting report";"INPUT REPORT: last SA meeting";"MCC";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05
S5-081003;"S5-081003.zip";"SA5 status report at the Input Report (Work Program, STF report, Progress Report, ...)";"";"No"
          LS status overview";"CONTRIBUTION: Contribution";"";"No"
S5-081004;"S5-081004.zip";"Liaison Statement Status BEFORE this meeting";"WG Vice Chairman";"Mr. Adrian Zoicas";"ETSI S
          LS status overview";"CONTRIBUTION: Contribution";"";"No"
S5-081005;"S5-081005.zip";"Liaison Statement Status AFTER this meeting";"WG Vice Chairman";"Mr. Adrian Zoicas";"ETSI Se
S5-081006;"S5-081006.zip";"SA5 Structure and Meeting Facility Requirements";"SA5 Chair Team";"Mr. Adrian Zoicas";"ETSI S
S5-081007;"S5-081007.zip";"Draft TS/TR Management Process";"WG Vice Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008
S5-081008;"S5-081008.zip";"SA5 Meeting Calendar";"WG Chairman";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:5
S5-081009;"S5-081009.zip";"TR 30.818 Project scheduling and open issues for SA5 Release 8";"MCC";"Mr. Adrian Zoicas";"ET
S5-081010;"S5-081010.zip";"R8 Deliverables due for the NEXT SA plenary";"MCC";"Mr. Adrian Zoicas";"ETSI Secretariat";"200
S5-081011;"S5-081011.zip";"OAM Time Plan";"OAM Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:38";"6.
S5-081012;"S5-081012.zip";"OAM Detailed Report from LAST Meeting";"OAM Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"
S5-081013;"S5-081013.zip";"OAM Action Item Register (from previous meetings, LSs, Conference Calls)";"OAM Chair";"Mr. A
S5-081014;"S5-081014.zip";"OAM Executive Report from THIS Meeting";"OAM Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";
S5-081015;"S5-081015.zip";"OAM Detailed Report from THIS Meeting";"OAM Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2
S5-081016;"S5-081016.zip";"CH Agenda and Time Plan";"CH Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54
S5-081017;"S5-081017.zip";"CH Detailed Report from LAST Meeting";"CH Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008
S5-081018;"S5-081018.zip";"CH List of documents";"CH Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:39";
S5-081019;"S5-081019.zip";"CH Executive Report from THIS Meeting";"CH Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"200
S5-081020;"S5-081020.zip";"CH Detailed Report from THIS Meeting";"CH Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008
S5-081021;"S5-081021.zip";"CR quality check process";"SA5 Chair Team";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03
S5-081022;"S5-081022.zip";"RESUBMITTED_LS_in from OMA on AVPs for AoC";"OMA-LS_269";"Mr. Adrian Zoicas";"ETSI Secr
S5-081023;"S5-081023.zip";"Usage of 'shall' and 'should' in SA5";"WG Chairman";"Mr. Christian Toche";"HUAWEI TECHNOLO
S5-081024;"S5-081024.zip";"TR 32.816-161 Study on Management of E-UTRAN and EPC";"MCC";"Mr. Adrian Zoicas";"ETSI Se
S5-081025;"S5-081025.zip";"R8 32260 Correction on Number Portability and Carrier Selection";"Nokia Siemens Networks";"M
S5-081026;"S5-081026.zip";"R8 32299 Correction on AVP codes – Alignment with TS 29.230";"Nokia Siemens Networks";"Mr
S5-081027;"S5-081027.zip";"R8 32274 Multiple SMS destination – Alignment with TS 23.040";"Nokia Siemens Networks";"M
S5-081028;"S5-081028.zip";"R8 32299 Multiple SMS destination – Alignment with TS 23.040";"Nokia Siemens Networks";"M
S5-081029;"S5-081029.zip";"R7 32298 Correction on ASN.1 code for IMS Charging";"Nokia Siemens Networks";"Mr. Gerald G
S5-081030;"S5-081030.zip";"R8 32298 Correction on ASN.1 code for IMS Charging";"Nokia Siemens Networks";"Mr. Gerald G
S5-081031;"S5-081031.zip";"TS 32.275-011 MultiMedia Telephony (MMTel) charging";"MCC";"Ing. Dionisio Zumerle";"ETSI S
S5-081032;"S5-081032.zip";"TS 32.280-021 Charging management: Advice of Charge (AoC) service";"MCC";"Ing. Dionisio Zum
S5-081033;"S5-081033.zip";"TS 32.410-007 Key Performance Indicators (KPI) for UMTS and GSM";"MCC";"Ing. Dionisio Zume
S5-081034;"S5-081034.zip";"TS 32.451-011 Telecommunication management: Key Performance Indicators (KPI) for Evolved U
S5-081035;"S5-081035.zip";"TS 32.450-011 Telecommunication management: Key Performance Indicators (KPI) for Evolved U
S5-081036;"S5-081036.zip";"TS 32.426 Telecommunication management: Performance Management (PM): Performance me
S5-081037;"S5-081037.zip";"TS 32.425 Telecommunication management: Performance Management (PM): Performance me
S5-081038;"S5-081038.zip";"TS 32.823 Study on Self-healing of SON";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008
S5-081039;"S5-081039.zip";"TS 32.521 Telecommunication management: Self-Organizing Networks (SON): Self-optimization
S5-081040;"S5-081040.zip";"TR 32.821 Telecommunication management: Study of Self-Organising Networks (SON) related O
S5-081041;"S5-081041.zip";"TR 32.822 Telecommunication management: Study on System Maintenance over Itf-N";"MCC";"
S5-081042;"S5-081042.zip";"New Work Item Proposal on Software Management";"Huawei Technologies.";"Miss Lan Zou";"H
S5-081043;"S5-081043.zip";"Draft LS to RAN3 on removal of neighbour relations by OAM";"WG Chairman";"Mr. Christian Toc
S5-081044;"S5-081044.zip";"New WID on Rc Reference Point Functionalities and Message Flows";"Huawei";"Mr. Chun Li";"H
S5-081045;"S5-081045.zip";"MMTel charging principles";"Huawei";"Mr. Chun Li";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-0
S5-081046;"S5-081046.zip";"Adjustments and small refinements on MMTel Charging";"Nokia Siemens Networks";"Mr. Gerald
S5-081047;"S5-081047.zip";"MMTel Offline message flows for TIP and TIR";"Nokia Siemens Networks";"Mr. Gerald Görmer";
S5-081048;"S5-081048.zip";"Principles on Diameter message flows for MMTel Charging";"Nokia Siemens Networks";"Mr. Ger
S5-081049;"S5-081049.zip";"MMTel Offline message flows for HOLD and CB";"Nokia Siemens Networks";"Mr. Gerald Görmer
S5-081050;"S5-081050.zip";"MMTel Offline message flows for OIP and OIR";"Nokia Siemens Networks";"Mr. Gerald Görmer"
S5-081051;"S5-081051.zip";"Use case - Monitor of SAE Bearer release";"Motorola, Nortel";"Mr. Yizhi Yao";"MOTOROLA S.A.S
S5-081052;"S5-081052.zip";"SAE Bearer release related measurements";"Motorola, Nortel";"Mr. Yizhi Yao";"MOTOROLA S.A
S5-081053;"S5-081053.zip";"Use case - Monitor of SAE Bearer level QoS modification";"Motorola";"Mr. Yizhi Yao";"MOTORO
S5-081054;"S5-081054.zip";"SAE Bearer level QoS modification related measurements";"Motorola";"Mr. Yizhi Yao";"MOTOR
S5-081055;"S5-081055.zip";"M CR Add EPS into the performance measurement definition template in 32.404";"Motorola, No
S5-081056;"S5-081056.zip";"R8 CR 32240 EPC Offline Charging architecture – Alignment with TS 23.060";"Nokia Siemens Net
S5-081057;"S5-081057.zip";"R8 CR 32.251 EPC Offline Charging architecture – Alignment with TS 23.060";"Nokia Siemens Ne
S5-081058;"S5-081058.zip";"R8 CR 32.251 Impact on Charging trigger for EPC Charging";"Nokia Siemens Networks";"Mr. Gera
S5-081059;"S5-081059.zip";"R8 CR 32297 Clarification on EPC Charging";"Nokia Siemens Networks";"Mr. Gerald Görmer";"No
S5-081060;"S5-081060.zip";"R8 CR 32240 Alignment on Bx interface";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Noki
S5-081061;"S5-081061.zip";"R8 CR 32251 Alignment on Bx interface";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Noki
S5-081062;"S5-081062.zip";"R8 CR 32272 Alignment on Bx interface";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Noki
S5-081063;"S5-081063.zip";"R8 CR 32297 Alignment on Bx interface";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Noki
S5-081064;"S5-081064.zip";"3GPP TS 32.501 Self-Organizing Networks (SON): Self-establishment of eNodeBs: Concepts and
S5-081065;"S5-081065.zip";"Small refinements on AoC service";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siem
S5-081066;"S5-081066.zip";"AoC interfaces in IMS";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networ
S5-081067;"S5-081067.zip";"Adding requirements for SON";"Rapporteur";"Mr. Panagiotis Gompakis";"Vodafone D2 GmbH";
S5-081068;"S5-081068.zip";"CR R8 32.251 EPC Offline charging architecture";"Alcatel-Lucent";"Mrs. Maryse Gardella";"Alcate
S5-081069;"S5-081069.zip";"CR R8 32.251 document Impact for EPC Offline charging description";"Alcatel-Lucent";"Mrs. Mar
S5-081070;"S5-081070.zip";"CR R8 32.240 Impact for EPC offline charging";"Alcatel-Lucent";"Mrs. Maryse Gardella";"Alcatel-
S5-081071;"S5-081071.zip";"MMTel scenario for CDIV";"Alcatel-Lucent";"Mrs. Maryse Gardella";"Alcatel-Lucent";"2008-06-2
S5-081075;"S5-081075.zip";"Skeleton of draft TS 32.436 EPC performance measurements";"Samsung";"Mr. Zhe Chen";"SAMS
S5-081077;"S5-081077.zip";"AoC AVP Support";"Orange";"Mr. Rony Chahine";"ORANGE SA";"2008-06-26 10:48:44";"7.05 U
S5-081078;"S5-081078.zip";"AoC Message Flows";"Orange";"Mr. Rony Chahine";"ORANGE SA";"2008-06-26 10:49:45";"7.05
S5-081079;"S5-081079.zip";"AoC Use Cases";"Orange";"Mr. Rony Chahine";"ORANGE SA";"2008-06-26 10:50:58";"7.05 UID
S5-081080;"S5-081080.zip";"Change SA#62 charging meeting dates";"Amdocs";"Mr. Yishai Brown";"Amdocs Software System
S5-081081;"S5-081081.zip";"DRAFT LS response to OMA-LS_269";"Amdocs";"Mr. Yishai Brown";"Amdocs Software Systems L
S5-081082;"S5-081082.zip";"AoC Architecture";"Amdocs";"Mr. Yishai Brown";"Amdocs Software Systems Ltd";"2008-06-26 1
S5-081083;"S5-081083.zip";"R8 CR TS32.299 satisfying OMA & RTTI AoC";"Amdocs";"Mr. Yishai Brown";"Amdocs Software Sy
S5-081084;"S5-081084.doc";"AoC definitions and abbreviations";"Deutsche Telekom";"Mr. Matthias Seibel";"Deutsche Telek
S5-081085;"S5-081085.doc";"High level AoC aspects";"Deutsche Telekom";"Mr. Matthias Seibel";"Deutsche Telekom AG";"20
S5-081086;"S5-081086.doc";"R8 32299 use of CER/CEA and DWR/DWA in Offline Charging messages";"Deutsche Telekom";"M
S5-081087;"S5-081087.zip";"Charging management for IMS service continuity";"Orange";"Mr. Rony Chahine";"ORANGE SA";"
          OAM Maintenance and Rel-8 small Enhancements ";"CR: Change Request";"";"Yes"
S5-081088;"S5-081088.zip";"CR 32645-750 Correction of XSD containment for UTRAN Cell classes";"Ericsson";"Mr. Frode Ner
S5-081092;"S5-081092.zip";"Performance Measurements for HO Parameter Optimisation";"Qualcomm";"Dr. Amer Catovic";"
S5-081093;"S5-081093.zip";"Message flows for AoC in IMS";"Nokia SIemens Networks";"Mr. Gerald Görmer";"Nokia Siemens
S5-081094;"S5-081094.zip";"SON SWG ToR";"Convenor";"Mr. Christian Toche";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081095;"S5-081095.zip";"LS on charging related terminology in TS 29.658";"C3-080785";"Mr. Christian Toche";"HUAWEI T
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081096;"S5-081096.zip";"SG4 work on Service Activation and Fulfilment and their relations to JointSum activity";"LS-145"
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081097;"S5-081097.zip";"Transition from the NGN Management Focus Group to the Joint Coordination Activity on Manag
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081098;"S5-081098.zip";"Consent of Rec.M.3410 - Guidelines and Requirements for Security Management Systems to Sup
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081099;"S5-081099.zip";"Consent of Revised Rec. M.3020";"LS-155";"Mr. Christian Toche";"HUAWEI TECHNOLOGIES Co. L
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081100;"S5-081100.zip";"LS on reservation of an MMEC value";"R2-082894";"Mr. Christian Toche";"HUAWEI TECHNOLOG
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081101;"S5-081101.zip";"LS on MME pool configuration";"R3-081578";"Mr. Christian Toche";"HUAWEI TECHNOLOGIES Co
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081102;"S5-081102.zip";"LS on SA5 2nd responsibility for WID ''Charging for multi-phases services'' (CHRGMPH)";"S1-0805
          LS status overview";"LIAISON IP address visibility Statement";"";"Yes"
S5-081103;"S5-081103.zip";"LS on lack ofSTATEMENT: Liaisonin MME and S4 based SGSN";"S2-084366";"Mr. Christian Toche"
          LS status overview";"LIAISON STATEMENT: credit Statement";"";"Yes"
S5-081104;"S5-081104.zip";"LS on Actions upon out ofLiaisoncondition";"C3-081180";"Mr. Christian Toche";"HUAWEI TECHN
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081105;"S5-081105.zip";"Reply LS on Actions upon out of credit condition";"S2-085258";"Mr. Christian Toche";"HUAWEI T
          LS status overview";"LIAISON STATEMENT: an MMEC value";"S2-085261";"Mr. Christian Toche";"HUAWEI TECHN
S5-081106;"S5-081106.zip";"Reply LS on reservation ofLiaison Statement";"";"Yes"
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081107;"S5-081107.zip";"LS on IMS session setup with UE initiated resource reservation";"S2-085282";"Mr. Christian Toch
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081108;"S5-081108.zip";"LS on S1 management plane protection";"S3-080862";"Mr. Christian Toche";"HUAWEI TECHNOL
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
S5-081109;"S5-081109.zip";"Transition from the NGN Management Focus Group to the Joint Coordination Activity on Manag
          LS status overview";"LIAISON STATEMENT: Liaison Statement";"";"No"
S5-081110;"S5-081110.zip";"Reserved for LS";"WG Chairman";"Mr. Christian Toche";"HUAWEI TECHNOLOGIES Co. Ltd.";"200
S5-081111;"S5-081111.zip";"M TD EP models for EPC";"Motorola, Nortel";"Mr. Yizhi Yao";"MOTOROLA S.A.S";"2008-06-27 09
S5-081112;"S5-081112.zip";"No X2 discussion";"Ericsson";"Mr. Per Elmdahl";"Telefon AB LM Ericsson";"2008-06-27 16:08:19
S5-081113;"S5-081113.zip";"TS 32.500-0.2.1 Telecommunication management: Self-Organizing Networks (SON): Concepts an
S5-081114;"S5-081114.zip";"TS 32.502-021 Telecommunication management: Self-Organizing Networks (SON): Self-establish
S5-081115;"S5-081115.zip";"TS 32.511 Telecommunication management: Self-Organizing Networks (SON): Automatic Neighb
S5-081117;"S5-081117.zip";"Discussion paper on Ro enhancement for initial redirection";"Alcatel-Lucent";"Mrs. Maryse Gard
S5-081118;"S5-081118.zip";"32275 Rf and data description for MMTel offline charging";"Alcatel-Lucent";"Mrs. Maryse Garde
S5-081119;"S5-081119.zip";"Discussion on Tariff information from OCS";"Alcatel-Lucent";"Mrs. Maryse Gardella";"Alcatel-Lu
S5-081120;"S5-081120.zip";"Add measurements related to inter-RNC handover switching in the CN for E-DCH";"China Mobile
S5-081121;"S5-081121.zip";"Iput RAB Abnormal Release Rate for UTRAN KPIs";"China Mobile";"Dr. Shuangchun Liang";"China
S5-081122;"S5-081122.zip";"Input GERAN KPIs defined for 32.410";"China Mobile";"Dr. Shuangchun Liang";"China Mobile Co
S5-081123;"S5-081123.zip";"Use case for GPRS attachment related measurements for EPC";"China Mobile";"Dr. Shuangchun
S5-081124;"S5-081124.zip";"proposal of GPRS attachment related measurements for EPC";"China Mobile";"Dr. Shuangchun L
S5-081125;"S5-081125.zip";"use case for handover related measurements definition for EUTRAN";"China Mobile";"Dr. Shuan
S5-081126;"S5-081126.zip";"proposal of handover related measurements definition for EUTRAN";"China Mobile";"Dr. Shuang
S5-081127;"S5-081127.zip";"Update of PLMN management processes, relation to IRPs.";"TeliaSonera";"Mr. Tommy Berggren
S5-081128;"S5-081128.zip";"WID to Introduce Online Charging From SMS-SC";"Acision";"Mr. Erik Gebler";"Acision UK Ltd";"2
S5-081129;"S5-081129.zip";"CR to introduce Online Charging from SMS-SC into 32.274";"Acision";"Mr. Erik Gebler";"Acision U
S5-081130;"S5-081130.zip";"Correction of figure number in TR32.820";"ZTE";"Mr. Shuqiang Huang";"ZTE Corporation";"2008
S5-081131;"S5-081131.zip";"Ameliorate reference points description and addition of reference in TS32.240";"ZTE";"Mr. Shuq
S5-081132;"S5-081132.zip";"correct measurements related to channel switch between RACH/DCH and E-DCH";"TD-Tech, Hua
S5-081133;"S5-081133.zip";"correct measurements related to serving E-DCH cell change";"TD-Tech, HuaWei, China Mobile";
S5-081134;"S5-081134.zip";"correct measurements related to Mac-d setups for HSUPA";"TD-Tech, HuaWei, China Mobile";"
S5-081135;"S5-081135.zip";"Proposal of 32.153 Annex C skeleton";"Nortel";"Mrs. Marie Divialle";"NORTEL NETWORKS (EURO
S5-081136;"S5-081136.zip";"Update the TS 32.153 for SOAP Solution Sets";"Nortel";"Mrs. Marie Divialle";"NORTEL NETWORK
S5-081137;"S5-081137.zip";"Cell Traffic Trace in E-UTRAN - Requirements";"Nokia Siemens Networks";"Mr. Gyula Bódog";"N
S5-081138;"S5-081138.zip";"CR to TS32.422 - Cell Traffic Trace in E-UTRAN - Stage 2 description";"Nokia Siemens Networks";
S5-081139;"S5-081139.zip";"TR 32.816 -018 Telecommunication management: Study on management of Evolved Universal T
S5-081140;"S5-081140.zip";"Add XML Schema Files for SOAP SS";"Nortel";"Mrs. Marie Divialle";"NORTEL NETWORKS (EUROP
S5-081141;"S5-081141.zip";"XML version and encoding for SOAP Solution Sets";"Nortel";"Mrs. Marie Divialle";"NORTEL NETW
          OAM Maintenance 32.607: small Enhancements for namespaces";"Nortel";"Mrs.
S5-081142;"S5-081142.zip";"TSand Rel-8incorrect URI specified";"CR: Change Request";"";"Yes" Marie Divialle";"NORTEL NET
S5-081143;"S5-081143.zip";"Configuration of radio parameter ranges";"Qualcomm";"Dr. Amer Catovic";"QUALCOMM EUROP
S5-081144;"S5-081144.zip";"Requirements for Addition and Removal of NRs (re-submission of S5-080981 and revision of S5-
S5-081145;"S5-081145.zip";"Thresholds for addition and removal of neighbour relations by the ANR function (revised S5-081
S5-081146;"S5-081146.zip";"ZTE Overview of Self-healing";"ZTE";"Mr. Shuqiang Huang";"ZTE Corporation";"2008-07-01 03:3
S5-081147;"S5-081147.zip";"ZTE Use cases of Self-healing";"ZTE";"Mr. Shuqiang Huang";"ZTE Corporation";"2008-07-01 03:3
S5-081148;"S5-081148.zip";"EUTRAN Generic Cell Object Attributes definition";"Huawei,China Mobile";"Miss Lan Zou";"HUA
S5-081149;"S5-081149.zip";"EUTRAN Neighbour Cell Relation Object Attributes definition";"Huawei,China Mobile";"Miss Lan
S5-081150;"S5-081150.zip";"External UTRAN Cell FDD Object Attributes definition";"Huawei,China Mobile";"Miss Lan Zou";"H
S5-081151;"S5-081151.zip";"PM counter for SAE bearer modification";"Huawei Technologies.";"Miss Lan Zou";"HUAWEI TECH
S5-081152;"S5-081152.zip";"Use case for monitor of SAE bearer modification";"Huawei Technologies.";"Miss Lan Zou";"HUAW
S5-081153;"S5-081153.zip";"Analysis of options to manage ANR";"Ericsson";"Mr. Per Elmdahl";"Telefon AB LM Ericsson";"20
S5-081154;"S5-081154.zip";"New and updated KPI proposals for E-UTRAN";"Ericsson";"Mr. Ulf Hübinette";"Telefon AB LM Er
S5-081155;"S5-081155.zip";"Additional Requirements on NRs";"Nokia Siemens Networks";"Mr. Clemens Suerbaum";"Nokia S
S5-081156;"S5-081156.zip";"Naming conventions for E-UTRAN performance measurements";"Ericsson";"Mr. Ulf Hübinette";"
S5-081157;"S5-081157.zip";"Requirements for managing&monitoring self-configuration";"Nokia Siemens Networks";"Mr. Cle
S5-081158;"S5-081158.zip";"Supporting object classes for managing&monitoring self-configuration";"Nokia Siemens Network
          OAM Maintenance and Rel-8 small Enhancements ";"CR: Change Request";"";"Yes"
S5-081159;"S5-081159.zip";"CR 32.407 v7.1.0 Incorrect description of information flow for paging related performance.";"Eri
S5-081160;"S5-081160.zip";"Operations and notifications for managing&monitoring self-configuration";"Nokia Siemens Netw
S5-081161;"S5-081161.zip";"Stop points and steps for managing&monitoring self-configuration";"Nokia Siemens Networks";"
S5-081162;"S5-081162.zip";"How to manage&monitor self-configuration, an example";"Nokia Siemens Networks";"Mr. Clem
S5-081163;"S5-081163.zip";"Supporting object classes for SW Management";"Nokia Siemens Networks";"Mr. Clemens Suerb
S5-081164;"S5-081164.zip";"Operations and notifications for Software Management";"Nokia Siemens Network";"Mr. Clemen
S5-081165;"S5-081165.zip";"Stop points and steps for SW management";"Nokia Siemens Networks";"Mr. Clemens Suerbaum
S5-081166;"S5-081166.zip";"Draft LS on OAM visibility of HO/X2 real status of neighbour relations";"Huawei";"Mr. Christian T
S5-081167;"S5-081167.zip";"TS32.500. Add Concept and Background information to Section 4";"Vodafone, T-Mobile";"Dr. Ad
S5-081168;"S5-081168.zip";"TS32.500. Add Actor Roles and Telecommunication Resources to Section 5";"Vodafone";"Dr. Adr
S5-081169;"S5-081169.zip";"TS32.500. Add references to specification level use cases, actors, and resources in WT specificat
S5-081170;"S5-081170.zip";"TS32.500. Update to References, Definitions, and Abbreviations sections.";"Vodafone";"Dr. Adri
S5-081171;"S5-081171.zip";"Automatic Physical Cell ID Assignment";"Nokia Siemens Networks";"Dr. Olaf Pollakowski";"Nokia
S5-081172;"S5-081172.zip";"Time synchronization requirement for TR 32.822";"ZTE";"Mr. Shuqiang Huang";"ZTE Corporation
S5-081173;"S5-081173.zip";"Software management of EM system for TR 32.822";"ZTE";"Mr. Shuqiang Huang";"ZTE Corporat
S5-081174;"S5-081174.zip";"E TD MME Pool Mgmt";"Ericsson";"Mr. Edwin Tse";"Ericsson Inc.";"2008-07-01 20:45:54";"6.06.
S5-081175;"S5-081175.zip";"E TD EUTRAN NRM";"Ericsson";"Mr. Edwin Tse";"Ericsson Inc.";"2008-07-01 20:48:22";"6.05.2 U
S5-081176;"S5-081176.zip";"E TD SOA IRP TR 32.xyz";"Ericsson";"Mr. Edwin Tse";"Ericsson Inc.";"2008-07-01 20:51:12";"6.10
S5-081177;"S5-081177.zip";"Add Specification Level Requirements for Software Management";"Nortel";"Mrs. Marie Divialle"
S5-081178;"S5-081178.zip";"Minutes of Methodology alignment mtg SA5-SG4-etc 2008-07-01";"Ericsson (Meth. Rapporteur)
S5-081179;"S5-081179.zip";"Methodology Alignment Living List (MALL) v6";"Ericsson (Meth. Rapporteur)";"Mr. Thomas Tovi
S5-081181;"S5-081181.zip";"Draft TS/TR email approval status and issues after SA5#59 and #59bis";"WG Vice Chair";"Mr. Tho
S5-081182;"S5-081182.zip";"Workplan Rel-8 01.07.08";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-07-02 09:28:4
S5-081183;"S5-081183.zip";"TR 30.818 Project scheduling and open issues for SA5 Release 8 (replaces S3-081009)";"MCC";"In
S5-081184;"S5-081184.zip";"ANR Management Requirements";"Qualcomm";"Dr. Amer Catovic";"QUALCOMM EUROPE S.A.R
S5-081185;"S5-081185.zip";"Update to S5-081171: Automatic Physical Cell Id Assignment";"Nokia Siemens Networks";"Dr. O
S5-081186;"S5-081186.zip";"Resolving the GCI into an IP Address";"Nokia Siemens Networks";"Dr. Olaf Pollakowski";"Nokia S
e";"Allocations";"Content Type";"Abstract";"Uploaded"
              Any Other Business";"AGENDA-SCHEDULE: Meeting Agenda / Meeting Schedule";"";"Yes"
 ort, Progress Report, ...)";"";"Yes"
 rt, Progress Report, ...)";"";"No"


Team";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:38";"5.1 Administrative issues at SA5 level";"CONTRIBUTION: Contributio
an Zoicas";"ETSI Secretariat";"2008-05-03 11:54:38";"5.1 Administrative issues at SA5 level";"CONTRIBUTION: Contribution";"";"Yes"
ETSI Secretariat";"2008-05-03 11:54:38";"5.2 Meeting Calendar";"CONTRIBUTION: Contribution";"";"No"
 8";"MCC";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:38";"5.4 Review of the 3GPP Work Plan";"CONTRIBUTION: Contributi
 an Zoicas";"ETSI Secretariat";"2008-05-03 11:54:38";"5.4 Review of the 3GPP Work Plan";"CONTRIBUTION: Contribution";"";"No"
 tariat";"2008-05-03 11:54:38";"6.01 OAM Plenary";"CONTRIBUTION: Contribution";"";"No"
Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:38";"6.01 OAM Plenary";"INPUT REPORT: Input Report (Work Program, STF report, P
  rence Calls)";"OAM Chair";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:39";"6.01 OAM Plenary";"CONTRIBUTION: Contribu
 Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:39";"6.01 OAM Plenary";"OUTPUT REPORT: Output Report (minutes, actions, decisio
Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:54:39";"6.01 OAM Plenary";"OUTPUT REPORT: Output Report (minutes, actions, decisio
 SI Secretariat";"2008-05-03 11:54:39";"7.01 Charging Plenary";"CONTRIBUTION: Contribution";"";"No"
 n Zoicas";"ETSI Secretariat";"2008-05-03 11:54:39";"7.01 Charging Plenary";"INPUT REPORT: Input Report (Work Program, STF report, Pr
 cretariat";"2008-05-03 11:54:39";"7.01 Charging Plenary";"CONTRIBUTION: Contribution";"";"No"
an Zoicas";"ETSI Secretariat";"2008-05-03 11:54:39";"7.01 Charging Plenary";"OUTPUT REPORT: Output Report (minutes, actions, decisio
n Zoicas";"ETSI Secretariat";"2008-05-03 11:54:39";"7.01 Charging Plenary";"CONTRIBUTION: Contribution";"";"No"
 s";"ETSI Secretariat";"2008-05-03 11:54:39";"5.1 Administrative issues at SA5 level";"CONTRIBUTION: Contribution";"";"No"
 69";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-05-03 11:56:59";"7.01 Charging Plenary";"LIAISON STATEMENT: Liaison Statement";"";"
  tian Toche";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-12 15:16:17";"5.3 Technical issues at SA5 level";"";"";"No"
MCC";"Mr. Adrian Zoicas";"ETSI Secretariat";"2008-06-17 10:49:42";"6.10.3 UID 340036 Study on Management for LTE and SAE - TR 32.81
 on";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-18 13:08:46";"7.03 Charging Maintenance and
0";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-18 13:10:28";"7.03 Charging Maintenance and R
  0";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-18 13:12:42";"7.03 Charging Maintenance and
  0";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-18 13:14:36";"7.03 Charging Maintenance and
Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-18 13:16:07";"7.03 Charging Maintenance and Rel-8 smal
Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-18 13:16:31";"7.03 Charging Maintenance and Rel-8 smal
 C";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-18 15:38:40";"7.06 UID 380041 MMTel Charging";"NEW DRAFT VERSION: New Dr
 service";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-18 15:48:32";"7.05 UID 380042 AoC support in IMS Charging";"NEW
  GSM";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-18 16:58:53";"6.04.4 UID 360002 Key Performance Indicators (KPIs) fo
 ance Indicators (KPI) for Evolved Universal Terrestrial Radio Access Network (E-UTRAN): Requirements";"MCC";"Ing. Dionisio Zumerle";"E
 ance Indicators (KPI) for Evolved Universal Terrestrial Radio Access Network (E-UTRAN): Definitions";"MCC";"Ing. Dionisio Zumerle";"ETSI
 nagement (PM): Performance measurements Evolved Packet Core (EPC) network";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008
 nagement (PM): Performance measurements Evolved Universal Terrestrial Radio Access Network (E-UTRAN)";"MCC";"Ing. Dionisio Zumer
Zumerle";"ETSI Secretariat";"2008-06-19 18:06:13";"6.10.4 UID_390017 Study on SON Self-Optimization & Self-Healing OAM Requiremen
 etworks (SON): Self-optimization and self-healing: Concepts and requirements";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-0
 anising Networks (SON) related OAM Interfaces for Home NodeB";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-19 18:11:51
  Maintenance over Itf-N";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-19 18:12:31";"6.10.2 UID 360006 Study on System M
  Technologies.";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-20 11:51:30";"6.02 New OAM Work Item proposals";"NEW W
"WG Chairman";"Mr. Christian Toche";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-23 08:06:59";"6.07.2 UID_390006 SON Automatic Ne
  lows";"Huawei";"Mr. Chun Li";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-23 10:21:38";"7.02 New Charging Work Item proposals";"NE
  TECHNOLOGIES Co. Ltd.";"2008-06-23 10:40:17";"7.06 UID 380041 MMTel Charging";"CONTRIBUTION: Contribution";"";"Yes"
 ia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-23 13:59:58";"7.06 UID 380041 MMTel Charging";"CO
  Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-23 15:08:53";"7.06 UID 380041 MMTel Charging";"CONTRIBUTIO
  okia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-23 15:10:03";"7.06 UID 380041 MMTel Charging";"
ns Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-23 15:12:57";"7.06 UID 380041 MMTel Charging";"CONTRIBUT
s Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-23 15:16:11";"7.06 UID 380041 MMTel Charging";"CONTRIBUTIO
"Mr. Yizhi Yao";"MOTOROLA S.A.S";"2008-06-25 09:16:07";"6.05.3 UID_390002 Performance measurements for E-UTRAN - TS 32.425";"C
";"Mr. Yizhi Yao";"MOTOROLA S.A.S";"2008-06-25 09:17:14";"6.05.3 UID_390002 Performance measurements for E-UTRAN - TS 32.425";"
 torola";"Mr. Yizhi Yao";"MOTOROLA S.A.S";"2008-06-25 09:18:06";"6.05.3 UID_390002 Performance measurements for E-UTRAN - TS 32.
otorola";"Mr. Yizhi Yao";"MOTOROLA S.A.S";"2008-06-25 09:18:45";"6.05.3 UID_390002 Performance measurements for E-UTRAN - TS 32
 emplate in 32.404";"Motorola, Nortel";"Mr. Yizhi Yao";"MOTOROLA S.A.S";"2008-06-25 09:20:31";"6.05.3 UID_390002 Performance mea
th TS 23.060";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:19:19";"7.04 UID 380038 EPC
 th TS 23.060";"Nokia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:21:05";"7.04 UID 380038 EPC
okia Siemens Networks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:24:17";"7.04 UID 380038 EPC Charging";"CR: C
  tworks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:27:38";"7.04 UID 380038 EPC Charging";"CR: Change Request"
 orks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:28:21";"7.04 UID 380038 EPC Charging";"CR: Change Request";""
 orks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:28:46";"7.04 UID 380038 EPC Charging";"CR: Change Request";""
 orks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:29:09";"7.04 UID 380038 EPC Charging";"CR: Change Request";""
 orks";"Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 12:29:35";"7.04 UID 380038 EPC Charging";"CR: Change Request";""
hment of eNodeBs: Concepts and requirements";"Rapporteur";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-25 13:11:17";"6.07.1 U
  "Mr. Gerald Görmer";"Nokia Siemens Networks";"2008-06-25 15:40:44";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTIO
  Görmer";"Nokia Siemens Networks";"2008-06-25 15:45:11";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Contribu
Gompakis";"Vodafone D2 GmbH";"2008-06-25 17:42:47";"6.07 BB: UID_390004 Management of SON - TS 32.500";"CR: Change Request";
nt";"Mrs. Maryse Gardella";"Alcatel-Lucent";"2008-06-25 21:51:09";"7.04 UID 380038 EPC Charging";"CR: Change Request";"";"Yes"
 ption";"Alcatel-Lucent";"Mrs. Maryse Gardella";"Alcatel-Lucent";"2008-06-25 21:58:09";"7.04 UID 380038 EPC Charging";"CR: Change Re
 ;"Mrs. Maryse Gardella";"Alcatel-Lucent";"2008-06-25 21:59:11";"7.04 UID 380038 EPC Charging";"CR: Change Request";"";"Yes"
 ella";"Alcatel-Lucent";"2008-06-25 22:01:07";"7.06 UID 380041 MMTel Charging";"CONTRIBUTION: Contribution";"";"Yes"
 "Samsung";"Mr. Zhe Chen";"SAMSUNG Electronics Co.";"2008-06-26 03:46:45";"6.06.2 UID_390011 Performance measurements for EPC
";"2008-06-26 10:48:44";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Contribution";"";"Yes"
SA";"2008-06-26 10:49:45";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Contribution";"";"Yes"
2008-06-26 10:50:58";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Contribution";"";"Yes"
Brown";"Amdocs Software Systems Ltd";"2008-06-26 12:43:16";"7.01 Charging Plenary";"AGENDA-SCHEDULE: Meeting Agenda / Meetin
 wn";"Amdocs Software Systems Ltd";"2008-06-26 13:00:31";"7.01 Charging Plenary";"LIAISON STATEMENT: Liaison Statement";"";"Yes"
 ware Systems Ltd";"2008-06-26 13:12:38";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Contribution";"";"Yes"
shai Brown";"Amdocs Software Systems Ltd";"2008-06-26 13:20:52";"7.05 UID 380042 AoC support in IMS Charging";"CR: Change Reque
 Matthias Seibel";"Deutsche Telekom AG";"2008-06-26 15:14:27";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Con
eibel";"Deutsche Telekom AG";"2008-06-26 15:17:01";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Contribution";"
messages";"Deutsche Telekom";"Mr. Matthias Seibel";"Deutsche Telekom AG";"2008-06-26 15:25:27";"7.03 Charging Maintenance and R
Mr. Rony Chahine";"ORANGE SA";"2008-06-26 16:08:42";"7.03 Charging Maintenance and Rel-8 small Enhancements";"CONTRIBUTION: C

"Qualcomm";"Dr. Amer Catovic";"QUALCOMM EUROPE S.A.R.L.";"2008-06-26 19:49:01";"6.05.3 UID_390002 Performance measurement
r. Gerald Görmer";"Nokia Siemens Networks";"2008-06-26 22:38:08";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION:
ECHNOLOGIES Co. Ltd.";"2008-06-27 04:06:16";"5.1 Administrative issues at SA5 level";"OTHER INFO INPUT: Other Informational Input";"
 MOTOROLA S.A.S";"2008-06-27 09:34:38";"6.04.2 UID 370002 End point modelling for reference point (OAM8) - CR 32.152, 32.62/3/4x, 3
M Ericsson";"2008-06-27 16:08:19";"6.07.2 UID_390006 SON Automatic Neighbour Relations (ANR) List Management - 32.511, 32.76x";"C
 zing Networks (SON): Concepts and requirements";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-27 19:55:14";"6.07 BB: UID
 ng Networks (SON): Self-establishment of eNodeBs: Stage 2";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-27 20:02:25";"6.
 etworks (SON): Automatic Neighbour Relation (ANR) management: Concepts and requirements";"MCC";"Ing. Dionisio Zumerle";"ETSI Sec
Alcatel-Lucent";"Mrs. Maryse Gardella";"Alcatel-Lucent";"2008-06-28 15:39:31";"7.03 Charging Maintenance and Rel-8 small Enhanceme
 catel-Lucent";"Mrs. Maryse Gardella";"Alcatel-Lucent";"2008-06-28 15:58:57";"7.06 UID 380041 MMTel Charging";"CONTRIBUTION: Co
Mrs. Maryse Gardella";"Alcatel-Lucent";"2008-06-28 18:10:10";"7.05 UID 380042 AoC support in IMS Charging";"CONTRIBUTION: Contrib
n the CN for E-DCH";"China Mobile";"Dr. Shuangchun Liang";"China Mobile Com. Corporation";"2008-06-29 08:47:27";"6.04.3 UID 360001
 le";"Dr. Shuangchun Liang";"China Mobile Com. Corporation";"2008-06-29 08:49:35";"6.04.4 UID 360002 Key Performance Indicators (KP
 angchun Liang";"China Mobile Com. Corporation";"2008-06-29 08:51:30";"6.04.4 UID 360002 Key Performance Indicators (KPIs) for UMT
 ;"China Mobile";"Dr. Shuangchun Liang";"China Mobile Com. Corporation";"2008-06-29 08:53:37";"6.06.2 UID_390011 Performance mea
 "China Mobile";"Dr. Shuangchun Liang";"China Mobile Com. Corporation";"2008-06-29 08:55:31";"6.06.2 UID_390011 Performance meas
 TRAN";"China Mobile";"Dr. Shuangchun Liang";"China Mobile Com. Corporation";"2008-06-29 08:56:49";"6.05.3 UID_390002 Performanc
TRAN";"China Mobile";"Dr. Shuangchun Liang";"China Mobile Com. Corporation";"2008-06-29 08:58:02";"6.05.3 UID_390002 Performanc
eliaSonera";"Mr. Tommy Berggren";"TeliaSonera AB";"2008-06-29 20:59:28";"6.04.5 UID_390016 Alignment with eTOM and M.3060 arch
 r. Erik Gebler";"Acision UK Ltd";"2008-06-29 23:54:54";"7.02 New Charging Work Item proposals";"NEW WI PROPOSAL: New WI proposa
  ision";"Mr. Erik Gebler";"Acision UK Ltd";"2008-06-30 00:01:59";"7.03 Charging Maintenance and Rel-8 small Enhancements";"CONTRIB
   Huang";"ZTE Corporation";"2008-06-30 03:02:59";"7.03 Charging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"
 nce in TS32.240";"ZTE";"Mr. Shuqiang Huang";"ZTE Corporation";"2008-06-30 03:12:43";"7.03 Charging Maintenance and Rel-8 small En
  H/DCH and E-DCH";"TD-Tech, HuaWei, China Mobile";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-30 05:53:01";"6.04.3
 TD-Tech, HuaWei, China Mobile";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-30 05:56:29";"6.04.3 UID 360001 HSUPA p
D-Tech, HuaWei, China Mobile";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-06-30 05:57:32";"6.04.3 UID 360001 HSUPA pe
vialle";"NORTEL NETWORKS (EUROPE)";"2008-06-30 10:03:32";"6.04.1 UID 35051 Telecom Management Methodology (OAM8) - TS 32.1
Marie Divialle";"NORTEL NETWORKS (EUROPE)";"2008-06-30 10:05:33";"6.04.1 UID 35051 Telecom Management Methodology (OAM8) -
 Networks";"Mr. Gyula Bódog";"Nokia Siemens Networks";"2008-06-30 10:35:09";"6.05.1 UID 370001 Subscriber and Equipment Trace fo
  tion";"Nokia Siemens Networks";"Mr. Gyula Bódog";"Nokia Siemens Networks";"2008-06-30 10:40:16";"6.05.1 UID 370001 Subscriber a
anagement of Evolved Universal Terrestrial Radio Access Network (E-UTRAN) and Evolved Packet Core (EPC)";"MCC";"Ing. Dionisio Zumer
alle";"NORTEL NETWORKS (EUROPE)";"2008-06-30 16:01:26";"6.04.1 UID 35051 Telecom Management Methodology (OAM8) - TS 32.155
Mrs. Marie Divialle";"NORTEL NETWORKS (EUROPE)";"2008-06-30 16:02:34";"6.04.1 UID 35051 Telecom Management Methodology (OAM

mer Catovic";"QUALCOMM EUROPE S.A.R.L.";"2008-06-30 19:52:58";"6.07.3 UID_390007 SON Self-Optimization & Self-Healing handling -
   of S5-080981 and revision of S5-081089)";"Qualcomm";"Dr. Amer Catovic";"QUALCOMM EUROPE S.A.R.L.";"2008-06-30 23:59:27";"6.0
  the ANR function (revised S5-081090)";"Qualcomm";"Dr. Amer Catovic";"QUALCOMM EUROPE S.A.R.L.";"2008-07-01 00:07:52";"6.07.2 U
  E Corporation";"2008-07-01 03:37:16";"6.10.4 UID_390017 Study on SON Self-Optimization & Self-Healing OAM Requirements - TR 32.8
TE Corporation";"2008-07-01 03:39:50";"6.10.4 UID_390017 Study on SON Self-Optimization & Self-Healing OAM Requirements - TR 32.8
 ina Mobile";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-07-01 03:56:12";"6.05.2 UID_380036 E-UTRAN NRM IRP - TS 32.761
"Huawei,China Mobile";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-07-01 03:59:41";"6.05.2 UID_380036 E-UTRAN NRM IRP
 i,China Mobile";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-07-01 04:00:23";"6.05.2 UID_380036 E-UTRAN NRM IRP - TS 32
es.";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-07-01 05:15:22";"6.05.3 UID_390002 Performance measurements for E-UTR
 hnologies.";"Miss Lan Zou";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-07-01 05:16:23";"6.05.3 UID_390002 Performance measurements f
 hl";"Telefon AB LM Ericsson";"2008-07-01 10:11:11";"6.07.2 UID_390006 SON Automatic Neighbour Relations (ANR) List Management - 3
 Ulf Hübinette";"Telefon AB LM Ericsson";"2008-07-01 11:25:41";"6.05.4 UID_390003 Key Performance Indicators (KPIs) for E-UTRAN - TS
 Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:26:56";"6.07.2 UID_390006 SON Automatic Neighbour Relations (AN
s";"Ericsson";"Mr. Ulf Hübinette";"Telefon AB LM Ericsson";"2008-07-01 11:28:16";"6.05.3 UID_390002 Performance measurements for E
Nokia Siemens Networks";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:29:20";"6.07.1 UID_390005 Self-Establish
guration";"Nokia Siemens Networks";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:31:31";"6.07.1 UID_390005 Se

 nfiguration";"Nokia Siemens Networks";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:36:12";"6.07.1 UID_390005
 tion";"Nokia Siemens Networks";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:37:16";"6.07.1 UID_390005 Self-E
kia Siemens Networks";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:38:53";"6.07.1 UID_390005 Self-Establishme
ns Networks";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:56:32";"6.07.1 UID_390005 Self-Establishment of eNB
 ia Siemens Network";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 11:59:41";"6.07.1 UID_390005 Self-Establishmen
 etworks";"Mr. Clemens Suerbaum";"Nokia Siemens Networks";"2008-07-01 12:03:27";"6.07.1 UID_390005 Self-Establishment of eNBs - T
 lations";"Huawei";"Mr. Christian Toche";"HUAWEI TECHNOLOGIES Co. Ltd.";"2008-07-01 12:08:06";"6.07.2 UID_390006 SON Automatic N
n 4";"Vodafone, T-Mobile";"Dr. Adrian Neal";"VODAFONE Group Plc";"2008-07-01 14:36:49";"6.07 BB: UID_390004 Management of SON
 to Section 5";"Vodafone";"Dr. Adrian Neal";"VODAFONE Group Plc";"2008-07-01 14:38:41";"6.07 BB: UID_390004 Management of SON -
 rs, and resources in WT specifications in Section 6";"Vodafone";"Dr. Adrian Neal";"VODAFONE Group Plc";"2008-07-01 14:42:14";"6.07 B
  s sections.";"Vodafone";"Dr. Adrian Neal";"VODAFONE Group Plc";"2008-07-01 14:52:31";"6.07 BB: UID_390004 Management of SON - T
  rks";"Dr. Olaf Pollakowski";"Nokia Siemens Networks";"2008-07-01 15:58:25";"6.10.3 UID 340036 Study on Management for LTE and SA
  huqiang Huang";"ZTE Corporation";"2008-07-01 16:17:16";"6.10.2 UID 360006 Study on System Maintenance over Itf-N - TR 32.822";"CO
r. Shuqiang Huang";"ZTE Corporation";"2008-07-01 17:24:26";"6.10.2 UID 360006 Study on System Maintenance over Itf-N - TR 32.822";"
nc.";"2008-07-01 20:45:54";"6.06.1 UID_380037 EPC NRM IRP - TS 32.751/2/3/5";"CONTRIBUTION: Contribution";"";"Yes"
  ;"2008-07-01 20:48:22";"6.05.2 UID_380036 E-UTRAN NRM IRP - TS 32.761/2/3/5";"CONTRIBUTION: Contribution";"";"Yes"
  nc.";"2008-07-01 20:51:12";"6.10.5 UID_400029 Study on Service Oriented Architecture (SOA) for IRP - TR 32.824";"CONTRIBUTION: Con
  nt";"Nortel";"Mrs. Marie Divialle";"NORTEL NETWORKS (EUROPE)";"2008-07-01 22:45:00";"6.07.1 UID_390005 Self-Establishment of eNB
  01";"Ericsson (Meth. Rapporteur)";"Mr. Thomas Tovinger";"Telefon AB LM Ericsson";"2008-07-01 23:19:20";"6.04.1 UID 35051 Telecom
h. Rapporteur)";"Mr. Thomas Tovinger";"Telefon AB LM Ericsson";"2008-07-01 23:20:39";"6.04.1 UID 35051 Telecom Management Meth
  #59bis";"WG Vice Chair";"Mr. Thomas Tovinger";"Telefon AB LM Ericsson";"2008-07-01 23:25:56";"6.04.1 UID 35051 Telecom Managem
 I Secretariat";"2008-07-02 09:28:41";"5.4 Review of the 3GPP Work Plan";"INPUT REPORT: Input Report (Work Program, STF report, Prog
8 (replaces S3-081009)";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-07-02 10:49:51";"5.4 Review of the 3GPP Work Plan";"N
 ovic";"QUALCOMM EUROPE S.A.R.L.";"2008-07-02 20:05:33";"6.07.2 UID_390006 SON Automatic Neighbour Relations (ANR) List Manage
  "Nokia Siemens Networks";"Dr. Olaf Pollakowski";"Nokia Siemens Networks";"2008-07-02 20:43:55";"6.10.3 UID 340036 Study on Mana
  s";"Dr. Olaf Pollakowski";"Nokia Siemens Networks";"2008-07-02 20:47:31";"6.07.2 UID_390006 SON Automatic Neighbour Relations (AN
 vel";"CONTRIBUTION: Contribution";"";"No"
TION: Contribution";"";"Yes"

Plan";"CONTRIBUTION: Contribution";"";"Yes"
ON: Contribution";"";"No"

port (Work Program, STF report, Progress Report, ...)";"";"No"
enary";"CONTRIBUTION: Contribution";"";"No"
ut Report (minutes, actions, decisions)";"";"No"
 Report (minutes, actions, decisions)";"";"No"

ort (Work Program, STF report, Progress Report, ...)";"";"No"

   Report (minutes, actions, decisions)";"";"No"
 ion";"";"No"
ontribution";"";"No"
ATEMENT: Liaison Statement";"";"Yes"
 l";"";"";"No"
gement for LTE and SAE - TR 32.816";"NEW DRAFT VERSION: New Draft version";"";"Yes"
";"7.03 Charging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"";"Yes"
 7.03 Charging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"";"Yes"
 "7.03 Charging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"";"Yes"
 "7.03 Charging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"";"Yes"
  ging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"";"Yes"
  ging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"";"Yes"
g";"NEW DRAFT VERSION: New Draft version";"";"Yes"
 C support in IMS Charging";"NEW DRAFT VERSION: New Draft version";"";"Yes"
y Performance Indicators (KPIs) for UMTS/GERAN (OAM8) - TS 32.410";"NEW DRAFT VERSION: New Draft version";"";"Yes"
  "MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-18 17:11:00";"6.05.4 UID_390003 Key Performance Indicators (KPIs) for E-UT
 CC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-18 17:15:49";"6.05.4 UID_390003 Key Performance Indicators (KPIs) for E-UTRAN
  Zumerle";"ETSI Secretariat";"2008-06-18 17:20:29";"6.06.2 UID_390011 Performance measurements for EPC - new TS 32.426";"NEW DR
RAN)";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-19 17:59:28";"6.05.3 UID_390002 Performance measurements for E-UT
n & Self-Healing OAM Requirements - TR 32.823";"NEW DRAFT VERSION: New Draft version";"";"Yes"
 merle";"ETSI Secretariat";"2008-06-19 18:08:55";"6.07.3 UID_390007 SON Self-Optimization & Self-Healing handling - TS 32.521";"NEW D
 Secretariat";"2008-06-19 18:11:51";"6.10.1 UID 360007 Study on SON related OAM interfaces for Home NodeB - TR 32.821";"NEW DRAF
  .2 UID 360006 Study on System Maintenance over Itf-N - TR 32.822";"NEW DRAFT VERSION: New Draft version";"";"Yes"
AM Work Item proposals";"NEW WI PROPOSAL: New WI proposal";"New work Item proposal on Software Management";"Yes"
2 UID_390006 SON Automatic Neighbour Relations (ANR) List Management - 32.511, 32.76x";"LIAISON STATEMENT: Liaison Statement";"
harging Work Item proposals";"NEW WI PROPOSAL: New WI proposal";"";"Yes"
 : Contribution";"";"Yes"
UID 380041 MMTel Charging";"CONTRIBUTION: Contribution";"";"Yes"
  MMTel Charging";"CONTRIBUTION: Contribution";"";"Yes"
   UID 380041 MMTel Charging";"CONTRIBUTION: Contribution";"";"Yes"
41 MMTel Charging";"CONTRIBUTION: Contribution";"";"Yes"
1 MMTel Charging";"CONTRIBUTION: Contribution";"";"Yes"
ments for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
 ments for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
 easurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
measurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
5.3 UID_390002 Performance measurements for E-UTRAN - TS 32.425";"CR: Change Request";"";"Yes"
 12:19:19";"7.04 UID 380038 EPC Charging";"CR: Change Request";"";"Yes"
  12:21:05";"7.04 UID 380038 EPC Charging";"CR: Change Request";"";"Yes"
  UID 380038 EPC Charging";"CR: Change Request";"";"Yes"
C Charging";"CR: Change Request";"";"Yes"
 harging";"CR: Change Request";"";"Yes"
 harging";"CR: Change Request";"";"Yes"
 harging";"CR: Change Request";"";"Yes"
 harging";"CR: Change Request";"";"Yes"
";"2008-06-25 13:11:17";"6.07.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"NEW DRAFT VERSION: New
 rt in IMS Charging";"CONTRIBUTION: Contribution";"";"Yes"
arging";"CONTRIBUTION: Contribution";"";"Yes"
TS 32.500";"CR: Change Request";"";"Yes"
 R: Change Request";"";"Yes"
038 EPC Charging";"CR: Change Request";"";"Yes"
  Change Request";"";"Yes"
ontribution";"";"Yes"
 formance measurements for EPC - new TS 32.426";"CONTRIBUTION: Contribution";"Based on the agreed draft skeleton of TS 32.436 EPC

 tion";"";"Yes"

 EDULE: Meeting Agenda / Meeting Schedule";"";"Yes"
MENT: Liaison Statement";"";"Yes"
UTION: Contribution";"";"Yes"
 IMS Charging";"CR: Change Request";"";"Yes"
 S Charging";"CONTRIBUTION: Contribution";"Following S5-080929 discussed during and beyond SA5#59, this document contains the upda
 ;"CONTRIBUTION: Contribution";"Following S5-080929 discussed during and beyond SA5#59, this document contains new proposals for c
 7.03 Charging Maintenance and Rel-8 small Enhancements";"CR: Change Request";"This CR proposes some modifications to TS 32.299, c
 nhancements";"CONTRIBUTION: Contribution";"";"Yes"

90002 Performance measurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
 IMS Charging";"CONTRIBUTION: Contribution";"";"Yes"
PUT: Other Informational Input";"";"No"
(OAM8) - CR 32.152, 32.62/3/4x, 32.73x";"CONTRIBUTION: Contribution";"";"Yes"
Management - 32.511, 32.76x";"CONTRIBUTION: Contribution";"";"Yes"
  08-06-27 19:55:14";"6.07 BB: UID_390004 Management of SON - TS 32.500";"NEW DRAFT VERSION: New Draft version";"";"Yes"
 tariat";"2008-06-27 20:02:25";"6.07.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"NEW DRAFT VERSION
 ;"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-27 20:05:38";"6.07.2 UID_390006 SON Automatic Neighbour Relations (ANR) List Ma
nance and Rel-8 small Enhancements";"CONTRIBUTION: Contribution";"";"Yes"
 el Charging";"CONTRIBUTION: Contribution";"";"Yes"
 harging";"CONTRIBUTION: Contribution";"";"Yes"
 -29 08:47:27";"6.04.3 UID 360001 HSUPA performance measurements (OAM8) - CR 32.405";"CR: Change Request";"inter-RNC handover
02 Key Performance Indicators (KPIs) for UMTS/GERAN (OAM8) - TS 32.410";"CONTRIBUTION: Contribution";"According to KPI template o
ormance Indicators (KPIs) for UMTS/GERAN (OAM8) - TS 32.410";"CONTRIBUTION: Contribution";"According to KPI template of draft spec
6.2 UID_390011 Performance measurements for EPC - new TS 32.426";"CONTRIBUTION: Contribution";"Network attachment for a UE/use
  2 UID_390011 Performance measurements for EPC - new TS 32.426";"CONTRIBUTION: Contribution";"According to EPC measurements d
 ";"6.05.3 UID_390002 Performance measurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"Mobility management play
";"6.05.3 UID_390002 Performance measurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"According to E-UTRAN mea
ment with eTOM and M.3060 architectural concepts - CR 32.101/2, 32.xyz";"CR: Change Request";"The PLMN management processes inh
W WI PROPOSAL: New WI proposal";"Proposed WID to Introduce Online Charging from SMS-SC into the scope of the SMS charging specific
8 small Enhancements";"CONTRIBUTION: Contribution";"Introduce Online Charging from SMS-SC into the scope of 32.274";"Yes"
cements";"CR: Change Request";"Editorial error of figure number occurs in description of “Note” and it’s a correction of editorial error.";"
g Maintenance and Rel-8 small Enhancements";"CR: Change Request";"Reference points description is updated to satisfy evolution of cha
 .";"2008-06-30 05:53:01";"6.04.3 UID 360001 HSUPA performance measurements (OAM8) - CR 32.405";"CR: Change Request";"";"Yes"
 :29";"6.04.3 UID 360001 HSUPA performance measurements (OAM8) - CR 32.405";"CR: Change Request";"";"Yes"
32";"6.04.3 UID 360001 HSUPA performance measurements (OAM8) - CR 32.405";"CR: Change Request";"";"Yes"
nt Methodology (OAM8) - TS 32.155, CR 32.151/2, 32.622, 32.732";"CONTRIBUTION: Contribution";"";"Yes"
nagement Methodology (OAM8) - TS 32.155, CR 32.151/2, 32.622, 32.732";"CONTRIBUTION: Contribution";"";"Yes"
  ubscriber and Equipment Trace for eUTRAN and EPC (OAM8) - CR 32.42x, 32.44x";"CR: Change Request";"";"Yes"
;"6.05.1 UID 370001 Subscriber and Equipment Trace for eUTRAN and EPC (OAM8) - CR 32.42x, 32.44x";"CR: Change Request";"";"Yes"
EPC)";"MCC";"Ing. Dionisio Zumerle";"ETSI Secretariat";"2008-06-30 11:05:50";"6.10.3 UID 340036 Study on Management for LTE and SA
 Methodology (OAM8) - TS 32.155, CR 32.151/2, 32.622, 32.732";"CONTRIBUTION: Contribution";"";"Yes"
   Management Methodology (OAM8) - TS 32.155, CR 32.151/2, 32.622, 32.732";"CONTRIBUTION: Contribution";"";"Yes"

mization & Self-Healing handling - TS 32.521";"CONTRIBUTION: Contribution";"This contribution proposes that the OAM be able to config
R.L.";"2008-06-30 23:59:27";"6.07.2 UID_390006 SON Automatic Neighbour Relations (ANR) List Management - 32.511, 32.76x";"CONTR
";"2008-07-01 00:07:52";"6.07.2 UID_390006 SON Automatic Neighbour Relations (ANR) List Management - 32.511, 32.76x";"CONTRIBUT
ling OAM Requirements - TR 32.823";"CONTRIBUTION: Contribution";"";"Yes"
ling OAM Requirements - TR 32.823";"CONTRIBUTION: Contribution";"";"Yes"
036 E-UTRAN NRM IRP - TS 32.761/2/3/5";"CONTRIBUTION: Contribution";"";"Yes"
5.2 UID_380036 E-UTRAN NRM IRP - TS 32.761/2/3/5";"CONTRIBUTION: Contribution";"";"Yes"
 380036 E-UTRAN NRM IRP - TS 32.761/2/3/5";"CONTRIBUTION: Contribution";"";"Yes"
 ormance measurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
002 Performance measurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
 lations (ANR) List Management - 32.511, 32.76x";"CONTRIBUTION: Contribution";"";"Yes"
 Indicators (KPIs) for E-UTRAN - TS 32.450, 32.451";"CONTRIBUTION: Contribution";"";"Yes"
 utomatic Neighbour Relations (ANR) List Management - 32.511, 32.76x";"CONTRIBUTION: Contribution";"";"Yes"
 Performance measurements for E-UTRAN - TS 32.425";"CONTRIBUTION: Contribution";"";"Yes"
"6.07.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"Yes"
 11:31:31";"6.07.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"Yes"

  01 11:36:12";"6.07.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"Yes
37:16";"6.07.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"Yes"
 07.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"Yes"
 390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"No"
7.1 UID_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"No"
 005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"Yes"
07.2 UID_390006 SON Automatic Neighbour Relations (ANR) List Management - 32.511, 32.76x";"LIAISON STATEMENT: Liaison Statement
UID_390004 Management of SON - TS 32.500";"CONTRIBUTION: Contribution";"";"Yes"
 ID_390004 Management of SON - TS 32.500";"CONTRIBUTION: Contribution";"";"Yes"
c";"2008-07-01 14:42:14";"6.07 BB: UID_390004 Management of SON - TS 32.500";"CONTRIBUTION: Contribution";"";"Yes"
D_390004 Management of SON - TS 32.500";"CONTRIBUTION: Contribution";"";"No"
dy on Management for LTE and SAE - TR 32.816";"CONTRIBUTION: Contribution";"";"Yes"
 enance over Itf-N - TR 32.822";"CONTRIBUTION: Contribution";"";"Yes"
  ntenance over Itf-N - TR 32.822";"CONTRIBUTION: Contribution";"";"Yes"
 tribution";"";"Yes"
ontribution";"";"Yes"
  TR 32.824";"CONTRIBUTION: Contribution";"";"Yes"
_390005 Self-Establishment of eNBs - TS 32.501, 32.502, 32.76x/32.75x";"CONTRIBUTION: Contribution";"";"No"
9:20";"6.04.1 UID 35051 Telecom Management Methodology (OAM8) - TS 32.155, CR 32.151/2, 32.622, 32.732";"INPUT REPORT: Input R
5051 Telecom Management Methodology (OAM8) - TS 32.155, CR 32.151/2, 32.622, 32.732";"CONTRIBUTION: Contribution";"";"Yes"
4.1 UID 35051 Telecom Management Methodology (OAM8) - TS 32.155, CR 32.151/2, 32.622, 32.732";"OTHER INFO INPUT: Other Inform
   (Work Program, STF report, Progress Report, ...)";"";"Yes"
 eview of the 3GPP Work Plan";"NEW DRAFT VERSION: New Draft version";"";"Yes"
  bour Relations (ANR) List Management - 32.511, 32.76x";"CONTRIBUTION: Contribution";"Add requirement to 32.511 to inform OAM ab
  .10.3 UID 340036 Study on Management for LTE and SAE - TR 32.816";"CONTRIBUTION: Contribution";"";"Yes"
  utomatic Neighbour Relations (ANR) List Management - 32.511, 32.76x";"CONTRIBUTION: Contribution";"";"No"
ft version";"";"Yes"
 rmance Indicators (KPIs) for E-UTRAN - TS 32.450, 32.451";"NEW DRAFT VERSION: New Draft version";"";"Yes"
ance Indicators (KPIs) for E-UTRAN - TS 32.450, 32.451";"NEW DRAFT VERSION: New Draft version";"";"Yes"
or EPC - new TS 32.426";"NEW DRAFT VERSION: New Draft version";"";"Yes"
 formance measurements for E-UTRAN - TS 32.425";"NEW DRAFT VERSION: New Draft version";"";"Yes"

ling handling - TS 32.521";"NEW DRAFT VERSION: New Draft version";"";"Yes"
e NodeB - TR 32.821";"NEW DRAFT VERSION: New Draft version";"";"Yes"
 version";"";"Yes"
re Management";"Yes"
STATEMENT: Liaison Statement";"";"Yes"
 .75x";"NEW DRAFT VERSION: New Draft version";"";"Yes"




 d draft skeleton of TS 32.436 EPC performance measurements, this paper modifies the content of the skeleton to include more details of




 , this document contains the updated definitions and abbreviations for Advice of Charge.";"Yes"
ment contains new proposals for chapter 4.1 (High level AoC aspects)";"Yes"
ome modifications to TS 32.299, chapter 6.2.1.1, in order to make clear that Diameter messages for connection control (Capabilities-Exch
ew Draft version";"";"Yes"
 6x/32.75x";"NEW DRAFT VERSION: New Draft version";"";"Yes"
Neighbour Relations (ANR) List Management - 32.511, 32.76x";"NEW DRAFT VERSION: New Draft version";"";"Yes"




ge Request";"inter-RNC handover for E-DCH should be happened for inter-RNC hard handover switching in the CN. If the handover is failed
tion";"According to KPI template of draft specification KPI, RAB Abnormal Release Rate KPI is defined. ";"Yes"
  ding to KPI template of draft specification KPI, KPIs defined in 32.814 are re-writed. If detailed proposal is agreed then put in draft specifi
 Network attachment for a UE/user is an important procedure when they access network. If user or subscriber cannot attach to the PS net
According to EPC measurements draft skeletion and following definition method of exitsted measurements for UMTS, GPRS attachment re
ution";"Mobility management plays an important role in the E-UTRAN in effectively delivering services to the mobile users on the move. H
 tion";"According to E-UTRAN measurements draft skeletion and following definition method of exitsted measurements for EPS, handover
PLMN management processes inherited from TeleManagement Forum early work called Telecom Operations Map is superseeded with the
scope of the SMS charging specifications";"Yes"
 e scope of 32.274";"Yes"
s a correction of editorial error.";"Yes"
 pdated to satisfy evolution of charging standard. Reference is also updated. ";"Yes"
";"CR: Change Request";"";"Yes"




on";"";"Yes"

 ;"CR: Change Request";"";"Yes"
dy on Management for LTE and SAE - TR 32.816";"NEW DRAFT VERSION: New Draft version";"";"Yes"

 bution";"";"Yes"

es that the OAM be able to configure a range of radio parameters at the network elements, providing the flexibility of locally setting/optim
gement - 32.511, 32.76x";"CONTRIBUTION: Contribution";"Re-submission of S5-080981 from #59bis and revision of S5-081089";"Yes"
ent - 32.511, 32.76x";"CONTRIBUTION: Contribution";"Replaces S5-081090";"Yes"
ontribution";"";"Yes"
IBUTION: Contribution";"";"Yes"

NTRIBUTION: Contribution";"";"Yes"
TION: Contribution";"";"Yes"
 tribution";"";"Yes"

 bution";"";"No"

 N STATEMENT: Liaison Statement";"";"Yes"


 ntribution";"";"Yes"




 32.732";"INPUT REPORT: Input Report (Work Program, STF report, Progress Report, ...)";"";"Yes"
UTION: Contribution";"";"Yes"
"OTHER INFO INPUT: Other Informational Input";"";"Yes"


ment to 32.511 to inform OAM about the added/removed NRs by the ANR function as agreed in RAN3";"Yes"
keleton to include more details of the measurement. ";"Yes"




nection control (Capabilities-Exchange-Request/Answer, Device-Watchdog-Request/Answer, Disconnect-Peer-Request/Answer) are mand
 in the CN. If the handover is failed, inter-RNC HHO switching in the CN will not be success. Then call drop may be happened. It can be use

 is agreed then put in draft specification KPI.";"Yes"
scriber cannot attach to the PS network of EPC, they cannot access network. So it is necessary to define attach related measurements to e
nts for UMTS, GPRS attachment related measurements for EPC are proposed. If detailed proposal is agreed then put in draft specification
o the mobile users on the move. Handover success rate calculated by measurements is an important indicator for network. Measurement
  measurements for EPS, handover related measurements for E-UTRAN are proposed. If detailed proposal is agreed then put in draft speci
 tions Map is superseeded with the Enhanced Telecom Operations Map (eTOM). This change clarifies the relation between eTOM and the




he flexibility of locally setting/optimizing the exact parameter values.";"Yes"
 revision of S5-081089";"Yes"
t-Peer-Request/Answer) are mandatory Diameter capabilities for capabilities exchange and transport failure detection and are used both
p may be happened. It can be used for FDD and TDD mode for handover switching in the CN. So it is necessary to define inter-RNC hand


attach related measurements to evaluate attchment performance of EPC network by attchment success rate.";"Yes"
eed then put in draft specification.";"Yes"
 icator for network. Measurements related to handover for E-UTRAN that may be happened in some scenarios are different with measure
al is agreed then put in draft specification.";"Yes"
e relation between eTOM and the 3GPP IRP concept.";"Yes"
lure detection and are used both for online- and for offline charging.";"Yes"
ecessary to define inter-RNC handover for E-DCH switching in the CN related measurements. ";"Yes"


s rate.";"Yes"

narios are different with measurements existed for UTRAN and GERAN. So it is necessary to define measuremnts related to handover for
suremnts related to handover for E-UTRAN.";"Yes"

								
To top