Attachment A WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
PROJECT FQ 11236
CCTV SECURITY PERIMETER SYSTEM IN 3 BUS GARAGES
LINE UNIT GRAND TOTAL
ITEM DESCRIPTION MANUFACTURER MODEL UNIT PRICE WESTERN BUS GARAGE MONTGOMERY GUS GARAGE FOUR MILE BUS GARAGE
NUMBER TYPE ($)
QTY EXTENDED COST QTY EXTENDED COST QTY EXTENDED COST
1 CCTV SECURITY PERIMETER SYSTEM
Camera - Fixed
Camera - PTZ
Camera - IP
Camera - Thermal
Enclosure - Camera Support
Camera Mounting
NVR Equipment
NVR Configuration
Analytic Equipment
Analytic Configuration
Conduit/Cabling/Wiring
Racks
KVM
UPS
Media Distribution Amplifier
Encoder Rack
Encoder Cards
Media Converter Rack
Media Converter Card, 1 camera
Media Converter Card, 2 camera
Media Converter Module, 1 camera w/chasis
Media Converter Module, 2 camera w/chasis
Touch Screen Monitor 21 inch
Touch Screen Monitor 32 inch
Workstations
Design
Testing
Line Item Subtotal
2 OTHER SERVICES
Spares Lot 1 $ 75,000.00
O & M Manuals
As-Built drawings
SCI Documentation
Safety Security Certification
Warranty
Line Item Subtotal
Page 1 of 2
Attachment A WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
PROJECT FQ 11236
CCTV SECURITY PERIMETER SYSTEM IN 3 BUS GARAGES
LINE UNIT GRAND TOTAL
ITEM DESCRIPTION MANUFACTURER MODEL UNIT PRICE WESTERN BUS GARAGE MONTGOMERY GUS GARAGE FOUR MILE BUS GARAGE
NUMBER TYPE ($)
QTY EXTENDED COST QTY EXTENDED COST QTY EXTENDED COST
Total Cost per Bus Garage
3 OPTIONS
Preventative Maintenance Program Year 2
Year 3
Year 4
Year 5
Software Maintenance Program (Per Year) Year 2
Year 3
Year 4
Year 5
Training
Training Aids
Line Item Subtotal
Total Options
Total Project Cost 0.00
Page 2 of 2