Scenario Overview – 1

   Purpose and Benefits:

     Purpose
          Check if the budgeted sales quantities can be produced, assess material
           requirements and utilization of the manufacturing cost centers.

     Benefits
          Avoid bottlenecks, over- and under-absorption in production. Material
           requirements planning as a basis for purchasing contracts.

     Key process flows covered
          Create sales plan and transfer to SOP (Sales and Operations Planning).
          Rough matching of budgeted sales quantities and production resources in SOP.
          Create planning scenario in “Long Term Planning” to simulate production
           planning for the budgeted sales quantities.
          Based on simulated production and operative production data (bills of material,
           routings), work center capacity and material requirements are calculated.
          Use material requirements for AOP – purchase material price planning.
          Use work centers capacity in AOP – general cost center planning.
Scenario Overview – 2

   SAP Applications Required:

        Required
             SAP ECC 6.0 EhP3

        Company roles involved in process flows
             Revenue Planner
             Logistics Planner
Scenario Overview – 3

   Detailed Process Description:
       AOP – SOP through Long Term Planning Transfer to
         LIS/PIS/Capacity


            Please refer to specification 172 – AOP - Sales Quantity Budget and Transfer
             to SOP for all steps concerning the planning of sales quantities.
            The current specification starts with the transfer of confirmed sales quantities
             to Sales and Operations Planning (SOP). In SOP rough cut capacity planning
             is carried out in order to verify whether the goods planned to be sold can run
             through the company’s bottleneck resources needed for production.
            After the production plan has been proven feasible by SOP, it is passed on to
             a planning scenario in Long Term Planning module (LTP). In LTP, planned
             independent requirements (PIR) are created.
            Based on these PIRs, Materials Requirements Planning (MRP) is simulated
             to create and review planned requirements for all the materials (components,
             raw materials) and resources. Simulation of MRP also allows review of
             capacities of the plants. Capacity leveling can then be carried out to smooth
             out the bottlenecks.
            After having run MRP as described above, one of the key objectives of the
             logistics part of AOP is achieved: calculate the total utilization of the activity
             types assigned to the manufacturing work centers needed to produce the
             budgeted sales quantities. The utilization is based on the consumption of
             activity types indicated in the routings of the (semi finished and finished)
             products of the production plan.
Process Flow Diagram
SOP through Long Term Planning Transfer to LIS/PIS/Capacity


                                                                                                                              AOP -
Event




                                  Annual                                                          AOP –                    Manufacturing                       AOP -
                                 Operating                                                    Standard Cost                 Cost Center                      Purchased
                                   Plan                                                        Calculation                   Planning                      Material Price
                                                                                                  (178)                        (176)                       Planning (174)
Revenue Planner




                                AOP - Sales
                                  Quantity
                                Budget and
                                Transfer to
                                 SOP (172)




                                                                                                                                                               Yes




                                                                                                              Operative
Logistics Planner




                                                                                                              Production
                                                                                                                 Data




                                                          Transfer to Inactive                                                                               Accepta
                              SOP Verification                 Demand                         LTP             LTP MRP                  Capacity Planning     ble Plan?
                                                             Management




                                                                                                       No


                    AOP= Annual Operating Planning     LTP= Long Term Planning
                    SOP= Sales and Operations Planning MRP= Materials Requirements Planning
 Legend

Symbol                         Description                                                Usage              Symbol                 Description                           Usage Comments
                                                                                          Comments

                               Band: Identifies a user role, such as Accounts             Role band                                 To next / From last Diagram: Leads    Flow chart continues on the next /
                                                                                                                                    to the next / previous page of the    previous page
                               Payable Clerk or Sales Representative. This band           contains tasks                            Diagram
   <Function>




                               can also identify an organization unit or group,           common to that               Diagram
                               rather than a specific role.                               role.                       Connection
                               The other process flow symbols in this table go into
                               these rows. You have as many rows as required to
                               cover all of the roles in the scenario.                                                              Hardcopy / Document: Identifies a     Does not correspond to a task
                                                                                                                                    printed document, report, or form     step in a document; instead, it is
                                                                                                                      Hardcopy /                                          used to reflect a document
                               External Events: Contains events that start or end the                                 Document                                            generated by a task step; this
   External




                               scenario, or influence the course of events in the                                                                                         shape does not have any outgoing
   to SAP




                               scenario.                                                                                                                                  flow lines



                                                                                                                                    Financial Actuals: Indicates a        Does not correspond to a task
                               Flow line (solid): Line indicates the normal sequence      Connects two                              financial posting document            step in a document; instead, it is
                                                                                          tasks in a                   Financial                                          used to reflect a document
                               of steps and direction of flow in the scenario.            scenario                                                                        generated by a task step; this
                               Flow line (dashed): Line indicates flow to infrequently-
                                                                                                                        Actuals
                                                                                          process or a                                                                    shape does not have any outgoing
                               used or conditional tasks in a scenario. Line can          non-step event                                                                  flow lines
                               also lead to documents involved in the process flow.


                               Business Activity / Event: Identifies an action that       Does not                                  Budget Planning: Indicates a          Does not correspond to a task
                               either leads into or out of the scenario, or an outside    correspond to a                           budget planning document              step in a document; instead, it is
                Business       Process that happens during the scenario                   task step in the                                                                used to reflect a document
                                                                                                                        Budget                                            generated by a task step; this
                Activity /                                                                document
                                                                                                                       Planning                                           shape does not have any outgoing
                 Event                                                                                                                                                    flow lines


                               Unit Process: Identifies a task that is covered in a       Corresponds to
                               step-by-step manner in the scenario                        a task step in                            Manual Process: Covers a task         Does not generally correspond to
                                                                                          the document                              that is manually done                 a task step in a document;
                Unit Process                                                                                            Manual                                            instead, it is used to reflect a task
                                                                                                                        Proces                                            that is manually performed, such
                                                                                                                           s                                              as unloading a truck in the
                                                                                                                                                                          warehouse, which affects the
                                                                                                                                                                          process flow.
                               Process Reference: If the scenario references another      Corresponds to
                               scenario in total, put the scenario number and name        a task step in
                  Process      here.                                                      the document
                                                                                                                                    Existing Version / Data: This block   Does not generally correspond to
                 Reference                                                                                                          covers data that feeds in from an     a task step in a document;
                                                                                                                        Existing    external process                      instead, this shape reflects data
                                                                                                                        Version /                                         coming from an external source;
                                                                                                                          Data                                            this step does not have any
                               Sub-Process Reference: If the scenario references          Corresponds to                                                                  incoming flow lines
                               another scenario in part, put the scenario number,         a task step in
                   Sub-        name, and the step numbers from that scenario here         the document
                  Process
                 Reference                                                                                                          System Pass / Fail Decision: This     Does not generally correspond to
                                                                                                                        System      block covers an automatic             a task step in the document;
                                                                                                                        Pass/F      decision made by the software         instead it is used to reflect an
                               Process Decision: Identifies a decision / branching        Does not
                                                                                                                          ail                                             automatic decision by the system
                                                                                                                        Decisio                                           that is made after a step has been
                               point, signifying a choice to be made by the end           usually                                                                         executed.
                               user. Lines represent different choices emerging           correspond to a                 n
                  Proces       from different parts of the diamond.                       task step in the
                     s                                                                    document;
                  Decisio                                                                 Reflects a
                    n                                                                     choice to be
                                                                                          made after step
                                                                                          execution

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:12
posted:12/1/2011
language:English
pages:6