Embed
Email

Wages

Document Sample

Shared by: ajizai
Categories
Tags
Stats
views:
4
posted:
11/30/2011
language:
English
pages:
6
Electrical Power Industry Award 2010—Wages comparison—Division 2B State Awards

Note: This document (consisting of two sheets) contains the following information:

• Modern award wages and allowances as at 01 Jan 2010

• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009

• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied



Federal Queensland Queensland

Electrical Power Industry Electricity Generation, Transmission and Supply Electricity Generation, Transmission and Supply

Award 2010 Award - State 2002 Award - State 2002

Division 1 - Government Owned Generation Division 2 - Government Owned Transmission and Supply

MA000088 Link to Division AN140104 Link to Division 2B AN140104

2B State award State award

Classifications Modern Classifications Div 2B NAPSA Classifications Div 2B NAPSA

award

$ $ $ $ $

cl 17 Division 1 - cl 5.7 Division 1 - cl 5.7 Division 1 - cl 5.7 Division 2 - cl 5.6



Salary Point Salary Point

Level 1 563.00 0.0 630.23 606.11 0.0 630.23 606.11

Level 2 601.00 1.0 638.10 613.97 1.0 638.10 613.97

Level 3 638.00 1.1 640.60 616.48 1.1 640.60 616.48

Level 4 701.00 1.2 643.10 618.97 1.2 643.10 618.97

Level 5 765.00 1.3 645.60 621.48 1.3 645.60 621.48

Level 6 829.00 1.4 648.10 623.98 1.4 648.10 623.98

Level 7 893.00 1.5 650.61 626.49 1.5 650.61 626.49

Level 8 957.00 1.6 653.10 628.98 1.6 653.10 628.98

Level 9 1021.00 1.7 655.61 631.49 1.7 655.61 631.49

Level 10 1085.00 2.0 658.10 633.98 2.0 658.10 633.98

Level 11 1148.00 2.1 660.61 636.49 2.1 660.61 636.49

2.2 663.11 638.98 2.2 663.11 638.98

2.3 665.62 641.50 2.3 665.62 641.50

2.4 668.11 643.99 2.4 668.11 643.99

2.5 670.62 646.50 2.5 670.62 646.50

2.6 673.11 648.99 2.6 673.11 648.99

2.7 675.62 651.50 2.7 675.62 651.50

3.0 680.11 655.99 3.0 680.11 655.99

3.1 682.62 658.50 3.1 682.62 658.50

3.2 685.11 660.99 3.2 685.11 660.99

3.3 687.62 663.50 3.3 687.62 663.50

3.4 690.12 665.99 3.4 690.12 665.99

3.5 692.63 668.51 3.5 692.63 668.51

3.6 695.12 671.00 3.6 695.12 671.00

3.7 697.63 673.51 3.7 697.63 673.51

4.0 700.14 676.02 4.0 700.14 676.02

4.1 709.34 685.22 4.1 709.34 685.22

4.2 718.54 694.42 4.2 718.54 694.42

5.0 725.75 701.63 5.0 725.75 701.63









Electrical Power Industry Award 2010—Wages comparison—Div 2B State Awards. Spreadsheet as at 31 January 2011 Page 1 of 6

Electrical Power Industry Award 2010—Wages comparison—Division 2B State Awards

Note: This document (consisting of two sheets) contains the following information:

• Modern award wages and allowances as at 01 Jan 2010

• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009

• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied



Federal Queensland Queensland

Electrical Power Industry Electricity Generation, Transmission and Supply Electricity Generation, Transmission and Supply

Award 2010 Award - State 2002 Award - State 2002

Division 1 - Government Owned Generation Division 2 - Government Owned Transmission and Supply

MA000088 Link to Division AN140104 Link to Division 2B AN140104

2B State award State award

Classifications Modern Classifications Div 2B NAPSA Classifications Div 2B NAPSA

award

$ $ $ $ $

cl 17 Division 1 - cl 5.7 Division 1 - cl 5.7 Division 1 - cl 5.7 Division 2 - cl 5.6



Salary Point Salary Point

5.1 734.95 710.83 5.1 734.95 710.83

5.2 744.15 720.03 5.2 744.15 720.03

6.0 753.35 729.23 6.0 753.35 729.23

6.1 762.56 733.44 6.1 762.56 733.44

6.2 771.76 742.64 6.2 771.76 742.64

7.0 780.96 751.84 7.0 780.96 751.84

7.1 790.16 755.64 7.1 790.16 755.64

7.2 799.36 764.84 7.2 799.36 764.84

8.0 808.56 774.04 8.0 808.56 774.04

8.1 817.76 783.24 8.1 817.76 783.24

8.2 826.96 792.44 8.2 826.96 792.44

9.0 836.19 801.66 9.0 836.19 801.66

9.1 840.79 806.27 9.1 845.39 810.87

9.2 845.39 810.87 9.2 854.59 820.07

9.3 849.99 815.47 9.3 863.79 829.27

9.4 854.59 820.07 10.0 872.99 838.47

9.5 859.19 824.67 10.1 882.19 847.67

9.6 863.79 829.27 10.2 891.39 856.87

10.0 868.39 833.87 10.3 900.59 866.07

10.1 873.00 838.47 11.0 905.19 870.67

10.2 877.59 843.07 11.1 915.57 881.04

10.3 882.19 847.67 11.2 925.94 891.42

10.4 886.79 852.27 11.3 936.33 901.81

10.5 891.39 856.87 11.4 946.72 912.19

10.6 895.99 861.47 11.5 957.11 922.58

10.7 900.59 866.07 12.0 967.50 932.97

11.0 905.19 870.67 12.1 977.88 943.36

11.1 915.57 881.04 12.2 988.27 953.75

11.2 925.94 891.42 12.3 998.66 964.14

11.3 936.33 901.81 12.4 1009.05 974.53

11.4 946.72 912.19 12.5 1019.44 984.92

11.5 957.11 922.58 13.0 1029.83 995.31









Electrical Power Industry Award 2010—Wages comparison—Div 2B State Awards. Spreadsheet as at 31 January 2011 Page 2 of 6

Electrical Power Industry Award 2010—Wages comparison—Division 2B State Awards

Note: This document (consisting of two sheets) contains the following information:

• Modern award wages and allowances as at 01 Jan 2010

• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009

• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied



Federal Queensland Queensland

Electrical Power Industry Electricity Generation, Transmission and Supply Electricity Generation, Transmission and Supply

Award 2010 Award - State 2002 Award - State 2002

Division 1 - Government Owned Generation Division 2 - Government Owned Transmission and Supply

MA000088 Link to Division AN140104 Link to Division 2B AN140104

2B State award State award

Classifications Modern Classifications Div 2B NAPSA Classifications Div 2B NAPSA

award

$ $ $ $ $

cl 17 Division 1 - cl 5.7 Division 1 - cl 5.7 Division 1 - cl 5.7 Division 2 - cl 5.6



Salary Point Salary Point

12.0 967.50 932.97 13.1 1047.09 1012.57

12.1 977.88 943.36 13.2 1064.34 1029.82

12.2 988.27 953.75 13.3 1081.59 1047.07

12.3 998.66 964.14 14.0 1098.84 1064.32

12.4 1009.05 974.53 14.1 1116.10 1081.58

12.5 1019.44 984.92 14.2 1133.35 1098.83

13.0 1029.83 995.31 14.3 1150.60 1116.08

13.1 1047.09 1012.57 15.0 1167.85 1133.33

13.2 1064.33 1029.82 15.1 1187.02 1152.50

13.3 1081.59 1047.07 15.2 1206.19 1171.67

14.0 1098.84 1064.32 15.3 1225.36 1190.84

14.1 1116.10 1081.58 15.4 1244.53 1210.01

14.2 1133.35 1098.83 15.5 1263.70 1229.18

14.3 1150.60 1116.08 16.0 1282.87 1248.35

15.0 1167.85 1133.33 16.1 1303.96 1269.43

15.1 1187.02 1152.50 16.2 1325.04 1290.52

15.2 1206.19 1171.67 16.3 1346.13 1311.61

15.3 1225.36 1190.84 16.4 1367.21 1332.69

15.4 1244.53 1210.01 16.4A 1370.95 1336.43

15.5 1263.70 1229.18

16.0 1282.87 1248.35

16.1 1303.96 1269.43

16.2 1325.04 1290.52

16.3 1346.13 1311.61

16.4 1367.21 1332.69

16.5 1388.30 1353.78

AN140104 - QLD: NAPSA rates as at 15/8/06 were used for comparison as rates were updated on the basis of work

value

# Annual rates converted to weekly rates for comparative purposes by multiplying by 6 and dividing by 313









Electrical Power Industry Award 2010—Wages comparison—Div 2B State Awards. Spreadsheet as at 31 January 2011 Page 3 of 6

Electrical Power Industry Award 2010—Allowances comparison—Division 2B State Awards

Note: This document (consisting of two sheets) contains the following information:

• Modern award wages and allowances as at 01 Jan 2010

• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009

• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied



Federal Queensland Queensland

Electrical Power Electricity Generation, Transmission and Supply Electricity Generation, Transmission and Supply

Industry Award 2010 Award - State 2002 Award - State 2002

Instrument Modern Award Div 2B NAPSA Div 2B NAPSA

Link MA000088 Link to Division 2B State AN140104 Link to Division 2B State AN140104

award award

Allowance Type Standard rate (SR)

$638



Meal allowance (per meal) $12.24 $9.60 $9.60 $9.60 $9.60

Motor vehicle allowance

Motor vehicle $0.74 per km

- Up to 1.5 litres $0.2745 per km $0.2745 per km $0.2745 per km $0.2745 per km

- Over 1.5 and up to 2.5 litres $0.292 per km $0.292 per km $0.292 per km $0.292 per km

- Over 2.5 litres $0.335 per km $0.335 per km $0.335 per km $0.335 per km

Motorcycle $0.25 per km $0.206 per km $0.206 per km $0.206 per km $0.206 per km

Motorcycle with sidecar $0.232 per km $0.232 per km $0.232 per km $0.232 per km

Bicycle $3.50 per week $3.50 per week $3.50 per week $3.50 per week

Availability allowance

1 in 5 or more $114.84 per day or

week

1 in 4 or less $165.88 per day or

week

First Aid allowance (per week) $12.12 $13.40 $11.60 $13.40 $11.60

Power Station Allowance (per week)

Professional, Managerial, Specialist or $13.08 $14.00 $12.20

Administrative employee

Technical or Operations employee $44.66 $29.20 $25.40

Open cut brown coal mine allowance $70.18 per week

Briquette factory allowance $54.23 per week

Coal handling allowance $70.18 per week

Transmission allowance $38.28 per week

Tool allowance (per week)

General $18

Carpentry, joinery, plumbing, gasfitting $23.10 $23.10 $23.10 $23.10

Bricklaying $16.50 $16.50 $16.50 $16.50

Painting, draining (by a licensed drainer) $5.70 $5.70 $5.70 $5.70

Electrical work (general), electrical work $20.00 $20.00 $20.00 $20.00

(instrumentation and process control),

mechanical work (general)

Electrical work (automotive), electronic work, $15.00 $15.00 $15.00 $15.00

boilermaking, toolmaking, turning, sheetmetal

work

Cable jointing electrical line work, $10.00 $10.00 $10.00 $10.00

blacksmithing, welding

Asbestos removal (per hour) $0.65 $0.56 $0.65 $0.56

Battery work (per day) $4.24 $3.68 $4.24 $3.68

Bitumen or tar (per hour)

Hot bitumen or tar $0.66 $0.57 $0.66 $0.57

Cold bitumen or tar $0.42 $0.37 $0.42 $0.37

Boiler ducting maintenance $1.5505 per hour (min 2 $1.3455 per hour (min 2 hrs

hrs payment) payment)

Boiler repair work (per hour) $0.66 $0.57

Building construction work (per week) $25.00 $21.70 $25.00 $21.70









Electrical Power Industry Award 2010—Allowances comparison—Div 2B State Awards. Spreadsheet as at 31 May 2010 Page 4 of 6

Electrical Power Industry Award 2010—Allowances comparison—Division 2B State Awards

Note: This document (consisting of two sheets) contains the following information:

• Modern award wages and allowances as at 01 Jan 2010

• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009

• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied



Federal Queensland Queensland

Electrical Power Electricity Generation, Transmission and Supply Electricity Generation, Transmission and Supply

Industry Award 2010 Award - State 2002 Award - State 2002

Instrument Modern Award Div 2B NAPSA Div 2B NAPSA

Link MA000088 Link to Division 2B State AN140104 Link to Division 2B State AN140104

award award

Allowance Type Standard rate (SR)

$638



Concrete mixing (per hour) $0.54 $0.47 $0.54 $0.47

Confined space (per hour) $0.66 $0.57 $0.66 $0.57

Dirty work (per hour) $0.51 $0.45 $0.51 $0.45

Heavy machinery and/or transformers $6 per week $5.30 per week $6 per week $5.30 per week

Height allowance (per week)

15 - 23 metres from the ground $12.80 $11.10 $12.80 $11.10

23 metres or more above ground $19.70 $17.10 $19.70 $17.10

Hot and cold work (per hour) $0.66 $0.57 $0.66 $0.57

Insulation work (per hour) $0.65 $0.56 $0.65 $0.56

Machinery floats and/or low loaders $14.50 per week $12.60 per week $14.50 per week $12.60 per week

Marker-off (per day) $3.17 $2.75 $3.17 $2.75

Noxious gas fumes $0.661 per hour $0.574 per hour $0.661 per hour $0.574 per hour

Jack hammer work and handling cement



Power workers using jack hammers $3.47 per day $3.02 per day $3.47 per day $3.02 per day

Power workers loading or unloading no less $0.542 per hour $0.4705 per hour $0.542 per hour $0.4705 per hour

than 6 bags of cement

Power workers employed in a pole lifting gang $3.47 per day $3.02 per day

Powder Monkeys $6.59 per day $5.72 per day

Substation and test department allowances



Professional and Managerial employees etc. $9.60 per week $8.40 per week

Technical employees etc. $20.70 per week $18 per week

Precipitator allowance

Working in uncleaned or hot precipitators $3.162 per hour $2.745 per hour

(min 2 hrs payment) (min 2 hrs payment)

Working in clean precipitators $2.1215 per hour $1.842 per hour

(min 2 hrs payment) (min 2 hrs payment)

Roof repairs (per hour) $0.65 $0.56 $0.65 $0.56

Shot/sand blasting (per hour) $0.51 $0.45 $0.51 $0.45

Toxic substances (per hour)

Using toxic substances $0.65 $0.56 $0.65 $0.56

In proximity to someone using toxic $0.54 $0.47 $0.54 $0.47

substances

Unpleasant conditions (per hour) $1.42 $1.23

Weed control (per hour) $1.43 $1.24 $1.43 $1.24

Wet work (per hour) $0.66 $0.57 $0.66 $0.57









Electrical Power Industry Award 2010—Allowances comparison—Div 2B State Awards. Spreadsheet as at 31 May 2010 Page 5 of 6

Electrical Power Industry Award 2010—Allowances comparison—Division 2B State Awards

Note: This document (consisting of two sheets) contains the following information:

• Modern award wages and allowances as at 01 Jan 2010

• Division 2B State Award rates (applying to non-Constitutional corporations), with wage and allowance increases applied by relevant State industrial relations body up to 31 December 2009

• NAPSA - the pre-reform rate as at 27 March 2006 with 2006, 2007 & 2008 AIRC wage and allowance review increases applied



Federal Queensland Queensland

Electrical Power Electricity Generation, Transmission and Supply Electricity Generation, Transmission and Supply

Industry Award 2010 Award - State 2002 Award - State 2002

Instrument Modern Award Div 2B NAPSA Div 2B NAPSA

Link MA000088 Link to Division 2B State AN140104 Link to Division 2B State AN140104

award award

Allowance Type Standard rate (SR)

$638



Uniform and laundry allowances

(Occupational Health Nursing staff)

Cost of uniform if not supplied by employer $143.20 per annum $143.20 per annum (paid $143.20 per annum (paid $143.20 per annum (paid

(paid on a daily pro-rata on a daily pro-rata basis) on a daily pro-rata basis) on a daily pro-rata basis)

basis)

If uniforms are not laundered at employer's $1.66 per week $1.66 per week $1.66 per week $1.66 per week

expense

Laundry allowance (Food services $1.35 per week $1.35 per week

employees

Certificate allowance (per hour) $0.54 $0.47 $0.54 $0.47

Chain saw (per hour) $0.54 $0.47 $0.54 $0.47

Confidential allowance (per annum) $633.00 $550.00 $633.00 $550.00

Degree allowance (per annum) $1,390.00 $1,207.00 $1,390.00 $1,207.00

Explosive powered tools $0.173 per hour $0.1505 per hour (min $0.173 per hour (min $0.1505 per hour (min

(min payment of $1.35 payment of $1.17 per day) payment of $1.35 per payment of $1.17 per day)

per day) day)

Goods in excess of 16.764m (per day) $2.09 $1.82 $2.09 $1.82

Handling furniture and whitegoods $2.70 per day $2.34 per day $2.70 per day $2.34 per day

Drivers of articulated vehicles

(Ergon energy) (per week)

Driving articulated vehicles $8.30 $7.20

Driving double articulated vehicles $14.70 $12.80

Motor vehicles drawing trailers

drawing a loaded single axle trailer $2.20 per day $1.91 per day $2.20 per day $1.91 per day

drawing an empty single axle trailer $1.27 per day $1.10 per day $1.27 per day $1.10 per day

drawing a loaded trailer with more than one $2.82 per day $2.45 per day $2.82 per day $2.45 per day

axle

drawing an empty trailer with more than one $1.61 per day $1.39 per day $1.61 per day $1.39 per day

axle

motor vehicles drawing compressors, concrete $0.22 per hour $0.191 per hour $0.22 per hour $0.191 per hour

mixers or welding plants

Employee required to operate a truck crane $2.41 per day $2.09 per day

Accommodation $264.40 per week (or $264.40 per week (or $264.40 per week (or $264.40 per week (or

$37.80 for each $37.80 for each overnight $37.80 for each overnight $37.80 for each overnight

overnight absence) absence) absence) absence)

Cable jointing - Energex Limited $0.4975 per hour $0.4315 per hour

Tunnelling under roads (per day) $6.39 $5.54

Employee in charge (per annum)

All purpose rate $1,653.00 $1,436.00

Further amount upon completion of specific $828.00 $718.00

training









Electrical Power Industry Award 2010—Allowances comparison—Div 2B State Awards. Spreadsheet as at 31 May 2010 Page 6 of 6



Related docs
Other docs by ajizai
Fall 2010
Views: 0  |  Downloads: 0
Math 111
Views: 0  |  Downloads: 0
Training_listing_275360_7
Views: 1  |  Downloads: 0
C4-051739
Views: 0  |  Downloads: 0
DEFINITIONS
Views: 0  |  Downloads: 0
Unit POPULATIONS
Views: 0  |  Downloads: 0
albhed
Views: 0  |  Downloads: 0
price_list
Views: 9  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!