									Caltrans Division of Local Assistance                                  Federal Highway Safety Improvement Program (HSIP)
                                                                                     2011 FTIP Back-Up List

                                                                                                                                                       Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                       Total Project    Other/Local                                                                           FTIP Program
District        Agency         MPO              Project Location                    Description of Work                                                 Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                           Cost           Funds                                                                                   Year
                                                                                                                                                       Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                             Widen WB left & right-turn lanes;
                                                                             upgrade traffic signals; reconstruct
                                       Intersection of Pacific St. and Del
  05       Monterey            AMBAG                                         curb returns; install safety lighting,          $728,000 $       72,800               $0                                              $655,200     2012/13
                                       Monte Ave.
                                                                             signs, stripes and pavement
                                                                             markings
                                       FAIRVIEW RD. AT ITS
                                       INTERSECTION WITH JOHN
  05       San Benito County   AMBAG                                         INSTALL GUARDRAIL                                $54,700         $5,470               $0                             $49,230                       2011/12
                                       SMITH RD. AT SANTA ANA
                                       CREEK CROSSING.
                                       SALINAS GRADE RD AT
  05       San Benito County   AMBAG   COUNTY MILE POST 2.91 AND             UPGRADE GUARDRAIL                               $120,700        $12,070               $0                            $108,630                       2011/12
                                       3.85
                                       Intersection of Santa Ana Rd. and
  05       San Benito County   AMBAG                                         Install traffic signal                          $302,000 $       65,750               $0                                              $236,250     2012/13
                                       Fairview Rd.
                                                                             INSTALL TRAFFIC SIGNAL;
                                       INTERSECTION OF GRAHAM
                                                                             WIDEN SHOULDER AND
  05       Santa Cruz County   AMBAG   HILL ROAD AND LOCKEWOOD                                                               $500,000        $50,000               $0          $450,000                                         2010/11
                                                                             LENGTHEN LEFT TURN LANE
                                       LANE.
                                                                             ON GRAHAM HILL ROAD.
                                       GRAHAM HILL ROAD, NORTH
  05       Santa Cruz County   AMBAG                                         UPGRADE GUARDRAIL.                              $106,500        $10,650               $0                             $95,850                       2011/12
                                       OF JEWELL STREET
                                                                             Replace and install warning signs
  05       Santa Cruz County   AMBAG   Various locations                                                                     $100,000 $       10,000               $0                                               $90,000     2012/13
                                                                             and guide signs
                                                                                                 AMBAG TOTAL:              $1,911,900       $226,740               $0          $450,000          $253,710          $981,450

                                                                             INSTALL RAISED CONCRETE
                                                                             MEDIANS WITH CURB RAMPS
                                       LINCOLN BLVD. FROM ELGIN
  03       Butte County        BCAG                                          AND LEFT TURN POCKETS;                        $1,100,000       $200,000               $0                            $900,000                       2011/12
                                       ST. TO ARNOLD AVE.
                                                                             CONSTRUCT PED REFUGE
                                                                             AREA.

                                                                             Construct curb, gutter, sidewalk,
                                                                             and curb ramps; install crosswalk
                                       Lincoln Blvd. from 150' north of
                                                                             warning signs with integrated
  03       Butte County        BCAG    Elgin St. to 100' south of Arnold                                                   $1,010,000 $      110,000               $0                                              $900,000     2012/13
                                                                             flashing beacons at all three
                                       Ave.
                                                                             midblock crossings, and class II
                                                                             bike lane markings

                                                                                                      BCAG TOTAL:          $2,110,000 $      310,000               $0                            $900,000          $900,000




                                                                                                                      Page 1 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                                Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                                Total Project    Other/Local                                                                            FTIP Program
District        Agency      MPO              Project Location                  Description of Work                                               Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                    Cost           Funds                                                                                    Year
                                                                                                                                                Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                        UPGRADE TRAFFIC SIGNALS;
                                    CLOVIS AVE. AND SANTA ANA
  06       Clovis          COFCG                                        ADD PROTECTIVE LEFT TURN                      $159,700        $15,970            $9,810          $133,920                                         2010/11
                                    AVE. INTERSECTION
                                                                        PHASE
                                    VILLA AVE. AND BULLARD AVE.         LENGHTEN LEFT TURN
  06       Clovis          COFCG                                                                                       $59,800         $5,980            $4,680           $49,140                                         2010/11
                                    INTERSECTION                        POCKET
                                                                        Upgrade traffic signal; convert to
                                    Intersection of Peach and
  06       Clovis          COFCG                                        fully actuated operation with                 $378,800 $       78,800               $0                                               $300,000     2012/13
                                    Gettysburg
                                                                        protected left-turn phases

                                                                        Upgrade traffic signal; convert two-
                                                                        phase to eight-phase operation
  06       Clovis          COFCG    Intersection of Fifth and Sunnyside with protected turning movements;             $221,000 $       45,820               $0                                               $175,180     2012/13
                                                                        install audible pedestrian system;
                                                                        improve curb ramps

                                                                        Install audible pedestrian system
                                    Fowler Ave. between Sierra Ave.     and signs; construct
  06       Clovis          COFCG                                                                                      $184,800 $       18,480               $0                                               $166,320     2012/13
                                    and Herndon Ave.                    diverter/median islands and curb
                                                                        ramps
                                    BELMONT AVE. AND MAPLE              INSTALL LEFT TURN PHASING
  06       Fresno          COFCG                                                                                      $510,100        $51,010          $38,200           $420,890                                         2010/11
                                    AVE. INTERSECTION                   FOR ALL FOUR LEGS

  06       Fresno          COFCG    DAKOTA AVE. AND FIRST AVE.          UPGRADE TRAFFIC SIGNALS                       $516,100        $51,610          $39,600           $424,890                                         2010/11

                                    HUGHES AVE. AND WEBER
  06       Fresno          COFCG                                        INSTALL TRAFFIC SIGNALS                       $513,900        $51,390          $38,400           $424,110                                         2010/11
                                    AVE.
                                    OLIVE AVE. AT BOTH SR99
                                                                        INSTALL TRAFFIC SIGNAL;
                                    SOUTHBOUND AND
  06       Fresno          COFCG                                        COOPERATIVE PROJECT WITH                    $1,623,100       $723,100               $0                             $900,000                       2011/12
                                    NORTHBOUND OFF AND ON
                                                                        CALTRANS
                                    RAMPS

  06       Fresno County   COFCG    Howard Ave. south of Shaw Ave.      Realign roadway                               $110,000 $       11,000               $0                                                $99,000     2012/13

                                                                        INSTALL TRAFFIC SIGNALS;
                                    INTERSECTION OF REED AVE.
                                                                        INSTALL SAFETY STREET
                                    AND MANNING AVE.; REED AVE.
                                                                        LIGHTING; CONSTRUCT
  06       Reedley         COFCG    BETWEEN "I" STREET AND                                                            $834,600       $234,600          $67,500                             $532,500                       2011/12
                                                                        ROUNDABOUT; INSTALL IN-
                                    MANNING AVE.; REED AVE. AND
                                                                        PAVEMENT CROSSWALK
                                    NORTH AVE.
                                                                        LIGHTS.

                                                                                          COFCG TOTAL:              $5,111,900     $1,287,760         $198,190         $1,452,950        $1,432,500          $740,500




                                                                                                               Page 2 of 32                                                                                        April 15, 2010
Caltrans Division of Local Assistance                             Federal Highway Safety Improvement Program (HSIP)
                                                                                2011 FTIP Back-Up List

                                                                                                                                                  Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                  Total Project    Other/Local                                                                           FTIP Program
District         Agency     MPO             Project Location                   Description of Work                                                 Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                      Cost           Funds                                                                                   Year
                                                                                                                                                  Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                        Install traffic signals with left-turn
                                    Intersection of SR 43 with SR 137
  06       Kings County     KCAG                                        phase for SR 43 or construct                  $1,200,000 $      738,000               $0                                              $462,000     2012/13
                                    and Whitley Ave.
                                                                        roundabout
                                                                                              KCAG TOTAL:             $1,200,000       $738,000               $0                                              $462,000
                                    BENTON STREET BETWEEN               INSTALL FLASHING BEACONS
  06       Bakersfield      KCOG                                                                                         $40,100         $4,010               $0                             $36,090                       2011/12
                                    MING AVE. AND WILSON RD.            AND CURB RAMPS.
                                    CECIL AVE. AND HIETT AVE.
  06       Delano           KCOG                                        INSTALL TRAFFIC SIGNAL                          $350,000        $35,000          $36,000          $279,000                                         2010/11
                                    INTERSECTION
                                    7TH STREET BETWEEN
                                                                        BICYCLE/PEDESTRIAN
  06       Wasco            KCOG    BROADWAY AND PALM                                                                   $235,100        $23,510               $0                            $211,590                       2011/12
                                                                        IMPROVEMENTS
                                    AVENUES

                                    Palm Ave. between SR 46 and 9th Construct ADA compliant curb,
  06       Wasco            KCOG                                                                                        $232,900 $       48,900               $0                                              $184,000     2012/13
                                    Place                           gutter, sidewalk, and curb ramps

                                    Adjacent to and around the
                                                                       Widen shoulder to remove existing
                                    pedestrian bridge on the southside
  09       Tehachapi        KCOG                                       guardrail; install curb and gutter;               $84,500 $        8,450               $0                                               $76,050     2012/13
                                    of Valley Blvd. between Tucker Rd.
                                                                       extend culverts
                                    and Mountain Ave.

                                                                                              KCOG TOTAL:               $942,600       $119,870          $36,000          $279,000          $247,680          $260,050

                                    INTERSECTION OF ROBERTSON INSTALL IN-PAVEMENT
  06       Chowchilla       MCTC                                                                                         $36,000         $3,600               $0                             $32,400                       2011/12
                                    BLVD (SR 233) AND 3RD ST. CROSSWALK LIGHTS.

                                                                                              MCTC TOTAL:                $36,000         $3,600               $0                             $32,400

                                    FOOTHILL ROAD BETWEEN
                                    CASTLEWOOD AND SUNOLE
                                    AREA AND ON MINER RD.       REMOVE PERMANENT
  04       Alameda County    MTC    BETWEEN DEL VALLE RD AND OBSTACKEL ALONG                                            $539,000        $53,900          $58,500          $426,600                                         2010/11
                                    THE VICINITY OF MILEPOST 10 SHOULDER
                                    IN UNINCORPORATED COUNTY
                                    LINE.

                                                                        INSTALL TRAFFIC SIGNAL AND
                                    CASTRO VALLEY BLVD AND
  04       Alameda County    MTC                                        PROVIDE FRONTAGE                                $776,000        $77,600          $58,500                            $639,900                       2011/12
                                    WISTERIA ST.
                                                                        IMPROVEMENTS




                                                                                                                 Page 3 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                                Federal Highway Safety Improvement Program (HSIP)
                                                                                   2011 FTIP Back-Up List

                                                                                                                                              Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                              Total Project    Other/Local                                                                           FTIP Program
District         Agency     MPO              Project Location                  Description of Work                                             Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                  Cost           Funds                                                                                   Year
                                                                                                                                              Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                        Install in-pavement crosswalk
                                    Intersection of Valparaiso Ave. and
  04       Atherton          MTC                                        lights, traffic signs, pavement              $35,000 $        4,400               $0                                               $30,600     2012/13
                                    Hoover St.
                                                                        markings, and striping

  04       Campbell          MTC    CAMPBELL AVE AND LEIGH AVE INSTALL NEW TRAFFIC SIGNAL                           $360,000        $36,000          $28,314          $295,686                                         2010/11

                                                                         REALIGN HORIZONTAL CURVE;
                                    DEER VALLEY ROAD, 1/4 MILE           WIDEN TRAVEL LANES,
           Contra Costa
  04                         MTC    TO 1/2 MILE SOUTH OF                 SHOULDERS, AND BACKING;                  $1,300,000       $400,000         $170,000          $730,000                                         2010/11
           County
                                    CHADBOURNE RD.                       IMPROVE SIGNING AND
                                                                         STRIPING

                                                                         Widen travel lanes; add paved
                                    Marsh Creek Rd. from                 shoulders and backing; relocate
           Contra Costa             approximately 5,200' east of         utility poles; install guardrail;
  04                         MTC                                                                                  $2,344,600 $    1,644,600               $0                                              $700,000     2012/13
           County                   Russelmann Park Rd. to 4,000'        eliminate roadside obstacles;
                                    west of Morgan Territory Rd.         realign roadway; improve/install
                                                                         pavement markings

                                    Camino Tassajara from
                                                                         Widen travel lanes; add paved
           Contra Costa             approximately 2,900' east of
  04                         MTC                                         shoulders and shoulder backing;          $1,165,000 $      265,000               $0                                              $900,000     2012/13
           County                   Blackhawk Dr. to 100' South of
                                                                         install signs and stripes
                                    Finley Rd.

                                                                       Install pavement markings and
                                    Gellert Blvd. between Hickey Blvd. directional signage for Class II
  04       Daly City         MTC                                                                                     $98,500 $        9,850               $0                                               $88,650     2012/13
                                    and King Dr.                       bike lanes; construct pedestrian
                                                                       refuge at Serra Vista Ave.

                                    FAIRMONT AVE AND ASHBURY
  04       El Cerrito        MTC                                         UPGRADE TRAFFIC SIGNALS                    $692,100        $69,210          $83,252          $539,638                                         2010/11
                                    AVE INTERSECTION

                                                                         UPGRADE TRAFFIC SIGNALS;
                                    PORTRERO AVE. BETWEEN                MODIFY CHANNELIZATION;
  04       El Cerrito        MTC                                                                                    $649,900        $64,990          $83,253          $501,657                                         2010/11
                                    SOUTH 55TH ST AND 56 ST              EXTEND LEFT-TURN LANE;
                                                                         REMOVE RIGHT-TURN ISLAND

                                    VARIOUS LOCATIONS ON THE
                                    OHLONE GREENWAY BIKE AND
                                                              INSTALL IN-PAVEMENT
  04       El Cerrito        MTC    PED PATH BETWEEN                                                                $588,100        $58,810               $0                            $529,290                       2011/12
                                                              CROSSWALK LIGHTS.
                                    FAIRMOUNT AVE AND CUTTING
                                    BLVD.




                                                                                                             Page 4 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                               Federal Highway Safety Improvement Program (HSIP)
                                                                                  2011 FTIP Back-Up List

                                                                                                                                                 Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                 Total Project    Other/Local                                                                           FTIP Program
District        Agency      MPO              Project Location                    Description of Work                                              Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                     Cost           Funds                                                                                   Year
                                                                                                                                                 Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                          INSTALL MEDIAN BARRIER;
                                    MOWRY AVE. EAST AND WEST
  04       Fremont           MTC                                          INSTALL RAISED MEDIAN;                       $221,100        $22,110          $35,100          $163,890                                         2010/11
                                    OF OVERACKER AVE.
                                                                          IMPROVE DELINEATION.

                                    PASEO PADRE PARKWAY FROM
                                                             REPLACE CONCRETE POLES
                                    DECOTO RD. TO FREMONT
  04       Fremont           MTC                             WITH ALUMINUM POLES                                       $332,200        $33,220          $35,100          $263,880                                         2010/11
                                    BLVD. AND FROM THORNTON
                                                             WITHIN MEDIAN
                                    AVE. TO WALNUT AVE.

                                                                    Remove and replace existing
                                    Paseo Padre Parkway from Walnut
  04       Fremont           MTC                                    concrete pole electroliers in the                  $159,300 $       15,930               $0                                              $143,370     2012/13
                                    Ave. to Washington Blvd.
                                                                    median with aluminum poles
                                    Walnut Ave. between Fremont           Construct roundabout; reduce
                                    Blvd. and Parkhurst Dr. and           number of lanes from four to two;
  04       Fremont           MTC                                                                                       $575,200 $       57,520               $0                                              $517,680     2012/13
                                    Argonaut Way between Parkhurst        install new bicycle lanes and two-
                                    Dr. and Mowry Ave.                    way left-turn lane
                                    CARLOS BEE BLVD. BETWEEN
  04       Hayward           MTC    WEST LOOP RD. AND MISSION             REALIGN ROADWAY                              $805,000        $80,500          $72,000                            $652,500                       2011/12
                                    BLVD.
                                    HEALDSBURG AVE. PIPER AND            INSTALL IN-PAVEMENT
  04       Healdsburg        MTC                                                                                       $104,800        $21,000               $0                             $83,800                       2011/12
                                    PLAZA ST.                            CROSSWALK LIGHTS.
                                                                         Flatten roadway profile; install 80'
                                    T-intersection of St. Mary's Rd. and
  04       Lafayette         MTC                                         of guardrail; shift stop-bar 15'              $151,600 $       15,160               $0                                              $136,440     2012/13
                                    Topper Ln.
                                                                         south

                                                                        Reconstruct intersection; upgrade
                                                                        signal poles and equipment;
                                    Intersection of SR 9 and University relocate utility pole; remove
  04       Los Gatos         MTC                                                                                     $1,169,000 $      269,000               $0                                              $900,000     2012/13
                                    Ave.                                porkchop island; extend WB left-
                                                                        turn lane; close median opening
                                                                        250' east of intersection

                                    POINT REYES PETALUMA RD.
                                                                          INSTALL APPROX. 200FT
  04       Marin County      MTC    SOUTH OF PLATFORM BRIDGE,                                                           $44,000         $4,400          $13,500           $26,100                                         2010/11
                                                                          GUARDRAIL
                                    MP 11.92 - MP 12.03.
                                    DEER PARK ROAD AND                    INSTALL SOLAR POWERED
  04       Napa County       MTC                                                                                        $19,300         $1,930               $0                             $17,370                       2011/12
                                    SUNNYSIDE ROAD                        SPEED SIGNS.
                                                                          INSTALL COUNT-DOWN
  04       Oakland           MTC    VARIOUS INTERSECTIONS                                                               $89,600         $8,960               $0                             $80,640                       2011/12
                                                                          PEDESTRIAN HEADS




                                                                                                                Page 5 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                                 Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                 Total Project    Other/Local                                                                           FTIP Program
District         Agency     MPO              Project Location                   Description of Work                                               Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                     Cost           Funds                                                                                   Year
                                                                                                                                                 Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                    WEST GRAND AVE. AT MARKET            INSTALL PROTECTED LEFT-
                                    ST.; MACARTHUR BLVD. AT              TURN PHASE WITH NEW LEFT
  04       Oakland           MTC                                                                                       $247,700        $24,770               $0                            $222,930                       2011/12
                                    FRUITVALE AVE.; MARKET ST.           TURN LANE; INSTALL VIDEO
                                    AT 55TH ST.                          AND PEDESTRIAN DETECTION

                                                                RECONSTRUCT MEDIAN
                                                                CHANNELIZATION;
                                                                CONSTRUCT CURB RAMPS;
                                    SAN ANTONIO RD. FROM SR 101
  04       Palo Alto         MTC                                UPGRADE SIGNALS; OVERLAY                             $1,464,100       $564,100               $0                            $900,000                       2011/12
                                    TO SOUTH CITY LIMIT
                                                                AND RESTRIPE RDWY;
                                                                LENGTHEN LEFT-TURN
                                                                POCKETS
                                                                         REMOVE, REPLACE, REPAIR
                                                                         MBGR; INSTALL SIGNS,
                                                                         STRIPES, AND PAVEMENT
                                    ALMA ST. FROM COLORADO               MARKINGS; UPGRADE
  04       Palo Alto         MTC    AVE. TO CITY LIMITS AT               PEDESTRIAN FACILITIES;                      $2,211,000     $1,311,000               $0                            $900,000                       2011/12
                                    MOUNTAIN VIEW                        UPGRADE TRAFFIC SIGNALS;
                                                                         LENGTHEN LEFT-TURN
                                                                         POCKETS; RESTORE CURB
                                                                         AND GUTTER
                                                                         CONSTRUCT PEDESTRIAN
                                    EAST WASHINGTON ST. AND
  04       Petaluma          MTC                                         CROSSING AND INSTALL                          $565,900        $56,590         $116,100          $393,210                                         2010/11
                                    THE PETALUMA RING TRAIL
                                                                         FLASHING BEACONS

                                                                         Upgrade traffic signals to
                                    26 signalized intersections within
  04       Petaluma          MTC                                         protected left-turn only operations;          $490,000 $       49,000               $0                                              $441,000     2012/13
                                    the city.
                                                                         install signs and stripes

                                                                         UPGRADE TRAFFIC SIGNAL
                                    OAK PARK BLVD AND
  04       Pleasant Hill     MTC                                         AND PROVIDE LEFT-TURN                         $325,600        $32,560          $54,000          $239,040                                         2010/11
                                    PATTERSON BLVD
                                                                         LANE.
                                                                         RELOCATE SIGNAL POLE AND
                                    PLEASANT HILL ROAD AND
  04       Pleasant Hill     MTC                                         CONSTRUCT INTERSECTION                        $352,000        $35,200               $0                            $316,800                       2011/12
                                    GEARY ROAD
                                                                         IMPROVEMENTS.
                                                                         Construct additional left-turn lane;
                                    Intersection of Contra Costa Blvd.
  04       Pleasant Hill     MTC                                         modify intersection geometry and            $1,373,000 $      723,000               $0                                              $650,000     2012/13
                                    and Golf Club Rd.
                                                                         traffic signals




                                                                                                                Page 6 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                               Federal Highway Safety Improvement Program (HSIP)
                                                                                  2011 FTIP Back-Up List

                                                                                                                                                Federal Funds    Federal Funds     Federal Funds   Federal Funds
                                                                                                                Total Project    Other/Local                                                                         FTIP Program
District          Agency    MPO              Project Location                    Description of Work                                             Programmed      Programmed in     Programmed in   Programmed in
                                                                                                                    Cost           Funds                                                                                 Year
                                                                                                                                                Under "Prior"     2010/11 FFY       2011/12 FFY     2012/13 FFY


                                                                          Remove corner pedestrian islands
                                                                          and reconfigure right turning
                                                                          lanes; construct new curbs,
                                    Intersection of Sir Francis Drake     sidewalks, curb ramps and
  04       Ross              MTC                                                                                      $553,400 $      110,500               $0                                            $442,900     2012/13
                                    Blvd. and Lagunitas Rd.               crosswalks; upgrade traffic and
                                                                          pedestrian signals; install new
                                                                          traffic signs and pavement
                                                                          markings

                                                                       Relocate crosswalk and bus pad;
                                                                       install pedestrian activated
                                    Intersection of El Camino Real and overhead flashing beacon;
  04       San Carlos        MTC                                                                                      $220,000 $       22,000               $0                                            $198,000     2012/13
                                    Belmont Ave.                       construct pedestrian refuge area;
                                                                       install signs, stripes and crosswalk
                                                                       pavement markings

                                    FULTON ST. BETWEEN 8TH AVE
  04       San Francisco     MTC                               RECONSTRUCT CURB RAMPS.                                $269,500        $26,950          $14,281          $228,269                                       2010/11
                                    AND 25TH AVE.
                                    BAYSHORE BLVD. AND PAUL
  04       San Francisco     MTC                               UPGRADE TRAFFIC SIGNAL                                 $360,000        $36,000          $40,500          $283,500                                       2010/11
                                    AVE. INTERSECTION
                                                                          Replace rail traffic signal heads;
           San Francisco            San Francisco MUNI T-line Light-
                                                                          remove and/or modify adjacent
           Municipal                Rail Corridor on 3rd St. and
  04                         MTC                                          vehicle traffic signals, install            $987,600 $       98,760               $0                                            $888,840     2012/13
           Transportation           Bayshore Blvd. from King St. to
                                                                          pavement markings and traffic
           Agency                   Geneva Ave.
                                                                          signs
           San Francisco
                                    Sunset Blvd. at its intersections   Install traffic signals; construct
           Municipal
  04                         MTC    with Kirkham St., Santiago St., and curb ramps; install signs and                 $999,500 $       99,950               $0                                            $899,550     2012/13
           Transportation
                                    Ulloa St.                           stripes
           Agency
                                    ALCOSTA BLVD AND DAVONA
  04       San Ramon         MTC                                          UPGRADE TRAFFIC SIGNAL                      $320,000        $32,000          $58,500          $229,500                                       2010/11
                                    DR. INTERSECTION
                                    Bollinger Canyon Rd. between          Install pedestrian signal
  04       San Ramon         MTC    Canyon Lakes Dr. and Dougherty        improvements; upgrade signal                $382,000 $       38,200               $0                                            $343,800     2012/13
                                    Rd.                                   controller and phasing




                                                                                                               Page 7 of 32                                                                                     April 15, 2010
Caltrans Division of Local Assistance                                   Federal Highway Safety Improvement Program (HSIP)
                                                                                      2011 FTIP Back-Up List

                                                                                                                                                   Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                   Total Project    Other/Local                                                                           FTIP Program
District        Agency          MPO              Project Location                   Description of Work                                             Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                       Cost           Funds                                                                                   Year
                                                                                                                                                   Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                              Upgrade traffic signal with
                                                                              protected left turn phasing,
                                                                              interconnect, and emergency
                                        Intersection of Pomeroy Ave. and
  04       Santa Clara          MTC                                           vehicle preemption; add left-turn          $625,400 $       62,540               $0                                              $562,860     2012/13
                                        Benton St.
                                                                              pockets; install bulb-outs;
                                                                              construct curb, gutter, sidewalk,
                                                                              curb ramps
                                                                              CONSTRUCT SHOULDER
                                        BLACK RD. FROM SR 17 TO               IMPROVEMENT; INSTALL
  04       Santa Clara County   MTC                                                                                      $590,000        $59,000          $45,000          $486,000                                         2010/11
                                        SKYLINE BLVD.                         MBGR; UPGRADE STRIPING
                                                                              AND SIGNAGE

                                        SONOMA AVE BETWEEN SANTA RECONFIGURE ROADWAYS
  04       Santa Rosa           MTC                                                                                      $580,000       $190,000               $0                            $390,000                       2011/12
                                        ROSA AVE AND HAHMAN DR.  FOR BIKE LANES.

                                                                    CONSTRUCT SIDEWALKS AND
                                        SARATOGA-LOS GATOS RD (SR
                                                                    CURB RAMPS; RELOCATE
                                        9) BETWEEN BIG BASIN WAY IN
  04       Saratoga             MTC                                 UTILITY POLE; SIGNING AND                          $1,020,000       $120,000               $0          $900,000                                         2010/11
                                        SARATOGA AND LOS GATOS
                                                                    STRIPING; CONSTRUCT
                                        BLVD IN LOS GATOS
                                                                    PED/BIKE BRIDGE.

                                                                           Install protected left-turn phasing
                                        Napa/Leveroni Rd. at its
  04       Sonoma               MTC                                        in all directions; extend eastbound           $167,100 $       33,230               $0                                              $133,870     2012/13
                                        intersection with Broadway (SR 12)
                                                                           left-turn pocket striping

                                        Sister Cities Blvd. between Hillside
           South San
  04                            MTC     Blvd. and 1700' west of Airport      Install guardrail                           $330,000 $       33,000               $0                                              $297,000     2012/13
           Francisco
                                        Blvd.
                                                                                                   MTC TOTAL:         $26,653,100     $6,972,440         $965,900        $5,706,970        $4,733,230        $8,274,560

                                                                              INSTALL SIGNS AND
                                                                              PAVEMENT MARKINGS;
  01       Arcata               RURAL   FICKLE HILL ROAD                      CONSTRUCT MINOR                            $110,000        $11,000          $12,375           $86,625                                         2010/11
                                                                              SHOULDER WIDENING AND
                                                                              ASPHALT BERMS

                                        Intersection of Washington Blvd.
                                                                              Install two in-pavement lighted
  01       Del Norte County     RURAL   and Leif Circle; intersection of                                                 $171,300 $       17,130               $0                                              $154,170     2012/13
                                                                              crosswalks; construct curb ramps
                                        Calaveras St. and Pacific Ave.




                                                                                                                  Page 8 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                               Federal Highway Safety Improvement Program (HSIP)
                                                                                  2011 FTIP Back-Up List

                                                                                                                                                Federal Funds     Federal Funds     Federal Funds   Federal Funds
                                                                                                                Total Project    Other/Local                                                                          FTIP Program
District         Agency     MPO              Project Location                   Description of Work                                              Programmed       Programmed in     Programmed in   Programmed in
                                                                                                                    Cost           Funds                                                                                  Year
                                                                                                                                                Under "Prior"      2010/11 FFY       2011/12 FFY     2012/13 FFY


                                    COMPTON ROAD BETWEEN
  01       Eureka           RURAL   FERN DRIVE SOUTH TO CITY    INSTALL GUARDRAIL                                      $88,000         $8,800            $9,000           $70,200                                       2010/11
                                    LIMIT
                                    INTERSECTIONS OF HARRIS ST. INSTALL LEFT TURN LANES;
  01       Eureka           RURAL                                                                                     $154,000        $15,400            $9,000          $129,600                                       2010/11
                                    WITH E ST. AND F ST.        UPGRADE TRAFFIC SIGNALS
                                                                         Install Emergency Vehicle Pre-
                                    Citywide (all 25 signalized          emption devices (including
  01       Eureka           RURAL                                                                                     $584,100 $       58,410               $0                                             $525,690     2012/13
                                    intersections)                       detectors, wiring, and phase
                                                                         selectors)
                                                                         Install protected left-turn signals
                                    Intersection of Harris St. and "S"
  01       Eureka           RURAL                                        for eastbound and westbound                  $160,600 $       16,060               $0                                             $144,540     2012/13
                                    St.
                                                                         Harris St.
                                    BOTTLE ROCK RD. FROM
                                                                         INSTALL OPEN-GRADED
                                    HARRINGTON FLAT RD. TO 1.0
  01       Lake County      RURAL                                        ASPHALT SKID-RESISTANT                       $782,600        $78,260          $51,300           $653,040                                       2010/11
                                    MILE NORTH OF HARRINGTON
                                                                         OVERLAY
                                    FLAT RD.
                                    COUNTY ROAD 54 FROM CR 71
  02       Modoc County     RURAL                                        WIDEN SHOULDERS                              $203,500        $20,350          $18,000           $165,150                                       2010/11
                                    TO ALTURAS CITY LIMITS
                                    ORANGEWOOD RD APPROX 0.6             IMPROVE STOPPING SIGHT
                                    MILES WEST OF HALL ROAD AT           DISTANCE WITH VERTICAL
  02       Tehama County    RURAL                                                                                     $715,000        $71,500          $85,155           $558,345                                       2010/11
                                    TEHAMA COLUSA CANAL                  ALIGNMENT CORRECTION AND
                                    CROSSING                             TREE REMOVAL.
                                                               INSTALL LEFT-TURN LANE &
                                    INTERSECTION OF SOUTH AVE.
  02       Tehama County    RURAL                              ACCELERATION LANE AT NON-                              $308,300        $30,830          $31,500           $245,970                                       2010/11
                                    AND HALL RD.
                                                               SIGNALIZED INTERSECTION
                                    INTERSECTION OF HALL RD.   CONSTRUCT NEW LEFT-TURN
  02       Tehama County    RURAL                                                                                     $239,000        $23,900          $27,000           $188,100                                       2010/11
                                    AND HOAG RD.               LANE; REALIGN INTERSECTION
                                    INTERSECTIONS OF GERBER
  02       Tehama County    RURAL   RD. WITH SR 99W AND SAN    INSTALL LEFT TURN LANES                                $730,000        $73,000          $58,500           $598,500                                       2010/11
                                    BENITO AVE.
                                    RUTH ZENIA RD AT POST MILE
  02       Trinity County   RURAL                              INSTALL GUARDRAIL                                      $133,500        $13,350          $20,250            $99,900                                       2010/11
                                    3.4

                                    County Rd. 105 (Trinity Dam Blvd.)
  02       Trinity County   RURAL                                      Install guardrail                              $115,200 $       11,520               $0                                             $103,680     2012/13
                                    2.4 miles north of Rush Creek Rd.

                                    County Rd. 105 (Trinity Dam Blvd.)
  02       Trinity County   RURAL   0.1 to 1.3 miles south of Mtn. View Install warning signs                          $47,900 $        4,790               $0                                              $43,110     2012/13
                                    Rd.




                                                                                                               Page 9 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                                Federal Highway Safety Improvement Program (HSIP)
                                                                                   2011 FTIP Back-Up List

                                                                                                                                             Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                             Total Project    Other/Local                                                                            FTIP Program
District        Agency        MPO              Project Location                   Description of Work                                         Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                 Cost           Funds                                                                                    Year
                                                                                                                                             Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                           WIDEN SHOULDERS AND
                                      LIME KILN RD. FROM SR 49 TO
  03       Nevada County      RURAL                                        CONSTRUCT DRAINAGE                      $330,000        $33,000          $34,200           $262,800                                         2010/11
                                      WOLF CREEK
                                                                           IMPROVEMENTS
                                      INTERSECTION OF
                                                                           REALIGN ROADWAY ON
  03       Nevada County      RURAL   MCCOURTNEY RD. AND ADAIR                                                     $385,000        $38,500               $0                             $346,500                       2011/12
                                                                           MCCOURTNEY RD.
                                      AVE.
                                      Ninemile Canyon Rd. approx. 7
  09       Inyo County        RURAL                                        Install 7,400' of guardrail             $639,400 $       63,940               $0                                               $575,460     2012/13
                                      miles West of U.S. 395
                                                                           INSTALL SNOWMELT SYSTEM
                                      LAKEVIEW ROAD BETWEEN
                                                                           TO PREVENT SNOW AND ICE
  09       Mammoth Lakes      RURAL   LAKEVIEW BLVD AND LAKE                                                       $671,000        $67,100         $112,500           $491,400                                         2010/11
                                                                           BUILDUP ON STEEP 15%
                                      MARY RD.
                                                                           GRADE.
                                                                           INSTALL TRAFFIC SIGNAL;
                                      INTERSECTION OF RIDGE RD.
  10       Amador County      RURAL                                        CONSTRUCT LEFT-TURN AND               $1,164,000       $264,000         $149,000           $751,000                                         2010/11
                                      AND NEW YORK RANCH RD.
                                                                           ACCELERATION LANES

                                                                           Install emergency vehicle
           Amador County
                                      Eleven signalized intersections in   preemption systems and provide
  10       Transportation     RURAL                                                                                $517,000 $       51,700               $0                                               $465,300     2012/13
                                      Amador County                        ‘emitters’ for participating
           Commission
                                                                           emergency vehicles

                                      COPPER COVE DR. FROM 0.6    CONSTRUCT 8- FOOT
  10       Calaveras County   RURAL   MILES W. OF SAWMILL RED. TO SHOULDER; INSTALL                                 $51,400         $5,140            $3,510           $42,750                                         2010/11
                                      0.2 MILES E. OF QUIVER ST.  GUARDRAIL

                                      INTERSECTION OF O'BYRNES             CONSTRUCT LEFT-TURN LANE;
  10       Calaveras County   RURAL                                                                                $897,300        $89,730          $66,739           $740,831                                         2010/11
                                      FERRY RD. AND DUCHESS DR.            WIDEN SHOULDERS

                                                                           Resurface roadway; install
  10       Calaveras County   RURAL   Mountain Ranch Rd.                   centerline and edgeline rumble        $1,500,000 $      600,000               $0                                               $900,000     2012/13
                                                                           strips, guardrail and striping
                                                                           IMPROVE TRAFFIC
                                      INTERSECTION OF SR 88 AND            CHANNELIZATION AND
  10       Jackson            RURAL                                                                                $780,800        $78,080         $114,075           $588,645                                         2010/11
                                      COURT STREET.                        DECEL/ACCEL LANES FOR
                                                                           TURNING LANES.
                                                                           REALIGN OLD SUTTER HILL
                                      OLD SUTTER HILL ROAD AT
                                                                           ROAD INTERSECTION WITH
                                      RIDGE ROAD APPROXIMATELY
  10       Sutter Creek       RURAL                                        RIDGE ROAD; INCLUDES THE                $974,000        $97,400         $126,000           $750,600                                         2010/11
                                      0.1 MILES EAST OF THE SR 104
                                                                           REALIGNMENT OF OLD RIDGE
                                      INTERSECTION WITH SR 49.
                                                                           ROAD.




                                                                                                            Page 10 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                                Federal Highway Safety Improvement Program (HSIP)
                                                                                   2011 FTIP Back-Up List

                                                                                                                                                  Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                  Total Project    Other/Local                                                                           FTIP Program
District        Agency        MPO              Project Location                  Description of Work                                               Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                      Cost           Funds                                                                                   Year
                                                                                                                                                  Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                 INSTALL CENTERLINE RUMBLE
                                      ENTIRE LENGTH OF LA GRANGE
  10       Tuolumne County    RURAL                              STRIP AND HIGH VISIBILITY                              $103,619        $10,019               $0           $93,600                                         2010/11
                                      ROAD; 13 MILES.
                                                                 PAINT.
                                      3 MILES OF TUOLUMNE ROAD
                                                                           INSTALL CENTERLINE RUMBLE
                                      BETWEEN SOULSBYVILLE
  10       Tuolumne County    RURAL                                        STRIP AND HIGH VISIBILITY                     $25,400         $2,540               $0           $22,860                                         2010/11
                                      ROAD AND WARDS FERRY
                                                                           PAINT.
                                      ROAD.

                                                                                             RURAL TOTAL:            $12,581,919     $1,855,449         $928,104        $6,539,916          $346,500        $2,911,950

                                      INTERSECTION OF GREEN                REALIGN ROADWAY; ADD 8
                                      VALLEY RD. AND NORTH                 FOOT SHOULDERS; INSTALL
  03       El Dorado County   SACOG                                                                                   $1,100,000       $200,000         $148,386          $751,614                                         2010/11
                                      SHINGLE RD. TO TENNESSEE             TRAFFIC SIGNAL WITH LEFT
                                      CREEK BRIDGE                         AND RIGHT TURN LANES

                                      INTERSECTION OF PLEASANT             WIDEN SHOULDERS;
  03       El Dorado County   SACOG                                                                                   $1,108,800       $208,800         $184,500          $715,500                                         2010/11
                                      VALLEY RD. AND OAK HILL RD.          CONSTRUCT LEFT TURN LANE

                                                                           Realign roadway; widen
                                      Salmon Falls Rd., south of the T-    shoulders; construct drainage
  03       El Dorado County   SACOG   intersection at Glenesk Ln.          improvements; install flashing             $1,133,400 $      233,400               $0                                              $900,000     2012/13
                                      between PM 7.79 and 7.89             beacon warning signs and rumble
                                                                           strips

                                                                           Realign roadway; widen
                                      Cold Springs Rd., at the
                                                                           shoulders; construct draininage
  03       El Dorado County   SACOG   intersection with Mt. Shasta Ln.                                                $1,024,400 $      125,400               $0                                              $899,000     2012/13
                                                                           improvements; install flashing
                                      between PM 3.4 and 3.55
                                                                           beacon warning signs

                                                                           INSTALL NEW TRAFFIC
                                                                           SIGNALS WITH
                                      SR99 (LIVE OAK BLVD) AT ELM          INTERCONNECTS TO UNION
  03       Live Oak           SACOG                                                                                   $1,507,000       $607,000               $0          $900,000                                         2010/11
                                      STREET.                              PACIFIC RR CROSSING AND
                                                                           EXISTING SIGNAL AT NEXT
                                                                           INTERSECTION.

                                      Rollins Lake Rd. for 2 miles north   Construct segments of shoulder
                                      of its intersection with SR 174,     widening and guardrail; realign
  03       Placer County      SACOG                                                                                   $1,110,200 $      210,200               $0                                              $900,000     2012/13
                                      including its intersection with      roadway intersection; install speed
                                      Norton Grade Rd.                     limit and curve warning signage




                                                                                                                 Page 11 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                                  Federal Highway Safety Improvement Program (HSIP)
                                                                                     2011 FTIP Back-Up List

                                                                                                                                                   Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                   Total Project    Other/Local                                                                           FTIP Program
District        Agency         MPO              Project Location                    Description of Work                                             Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                       Cost           Funds                                                                                   Year
                                                                                                                                                   Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                              Improve horizontal geometry of 3
                                       Foresthill Rd. 3.2 miles east of the   curves; repave and apply a micro-
  03       Placer County       SACOG   intersection of SR 80 and the          surface friction course; increase        $1,000,000 $      100,000               $0                                              $900,000     2012/13
                                       "Auburn Ravine - Foresthill Exit"      sight distance and add
                                                                              acceleration lane.
                                                                              UPGRADE TRAFFIC SIGNALS
                                       INTERSECTION OF RIO LINDA
  03       Sacramento          SACOG                                          TO INCLUDE LEFT TURN                       $405,100        $40,510          $67,500          $297,090                                         2010/11
                                       BLVD AT BELL AVENUE.
                                                                              PHASE.

                                                                              UPGRADE TRAFFIC SIGNAL
                                       INTERSECTION OF ALHAMBRA               WITH PROTECTED/SPLIT
  03       Sacramento          SACOG                                                                                     $391,600        $39,160          $49,500          $302,940                                         2010/11
                                       BLVD. AND FOLSOM BLVD.                 PHASES; ADD AND UPGRADE
                                                                              PEDESTRIAN IMPROVEMENTS


                                                                              Upgrade traffic signal system;
                                                                              repair conduit infrastructure
                                       12th St. between Richards Blvd.
  03       Sacramento          SACOG                                          between signals; provide dynamic         $1,300,000 $      400,000               $0                                              $900,000     2012/13
                                       and "L" St.
                                                                              train and vehicle signs; improve
                                                                              signing and striping.

                                                                              INSTALL TRAFFIC SIGNAL;
                                       AT INTERSECTION OF WATT                CONSTRUCT SIDEWALKS,
  03       Sacramento County   SACOG                                                                                     $444,800        $44,480               $0                            $400,320                       2011/12
                                       AVE. AND LARCHMONT DR.                 CURB RAMPS. PEDESTRIAN
                                                                              PADS AND RAISED MEDIAN

                                       Florin Rd. at East Southgate Dr.;
  03       Sacramento County   SACOG                                          Install raised median                      $191,700 $       19,170               $0                                              $172,530     2012/13
                                       Fruitridge Rd. at Mendocino Blvd.

                                       BUTTE HOUSE RD. BETWEEN
                                       HUMPHREY RD. AND A POINT
  03       Sutter County       SACOG                                          WIDEN SHOULDERS                            $882,200        $88,220          $26,100          $767,880                                         2010/11
                                       3500 FEET EAST OF EAST
                                       BUTTE HOUSE RD.

                                                                              WIDEN SHOULDERS; REHAB
                                       COUNTY ROAD 22 FROM CR 26              ROADWAY; INSTALL RUMBLE
  03       Yolo County         SACOG                                                                                   $1,381,000       $481,000          $76,500          $823,500                                         2010/11
                                       TO CR 128A                             STRIPS ON SHOULDERS AND
                                                                              ALONG CENTERLINE

                                       INTERSECTION OF
                                       HAMMONTON-SMARTVILLE                   INSTALL NEW 3-PHASE
  03       Yuba County         SACOG                                                                                     $396,000        $39,600          $58,500          $297,900                                         2010/11
                                       ROAD AND SIMPSON LANE IN               TRAFFIC SIGNAL.
                                       LINDA.



                                                                                                                  Page 12 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                                  Federal Highway Safety Improvement Program (HSIP)
                                                                                     2011 FTIP Back-Up List

                                                                                                                                                    Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                    Total Project    Other/Local                                                                           FTIP Program
District         Agency        MPO               Project Location                   Description of Work                                              Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                        Cost           Funds                                                                                   Year
                                                                                                                                                    Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                        North Beale Rd. from Feather River
  03       Yuba County        SACOG                                          Install raised median                      $1,100,000 $      200,000               $0                                              $900,000     2012/13
                                        Blvd. to Linda Ave.
                                        Hammonton-Smartsville Rd. from       Widen the typical shoulder section
  03       Yuba County        SACOG     0.7 miles west to 2 miles west of    to 4' of pavement with 3' of                 $645,000 $       64,500               $0                                              $580,500     2012/13
                                        South Golden Parkway                 aggregate base rock
                                                                                                  SACOG TOTAL:         $15,121,200     $3,101,440         $610,986        $4,856,424          $400,320        $6,152,030
                                        Intersection of Fourth Ave. and "G" Modify traffic signals to provide
  11       Chula Vista        SANDAG                                                                                      $304,700 $       30,470               $0                                              $274,230     2012/13
                                        St.                                 protected left-turn
                                                                             Construct curb, gutter, sidewalks,
                                     Naples St. between Fifth Ave. and       and curb ramps; resurface
  11       Chula Vista        SANDAG                                                                                      $322,000 $       32,200               $0                                              $289,800     2012/13
                                     Broadway                                roadway; modify traffic signal,
                                                                             install striping
                                                                             RECONSRUCT ROADWAY TO
                                        SR 78 AT THE NORDAHL RD.
  11       Escondido          SANDAG                                         INCREASE VERTICAL                            $918,400        $91,840               $0                            $826,560                       2011/12
                                        OVERCROSSING
                                                                             CLEARANCE.

                                                                             Modify traffic signal with mast-arm
                                                                             mounted left-turn indications;
                                        University Ave. at Massachusetts
  11       La Mesa            SANDAG                                         install and upgrade pedestrian               $201,500 $       20,150               $0                                              $181,350     2012/13
                                        Ave.
                                                                             signal indicators and actuators;
                                                                             construct curb ramps

                                     E. 8TH STREET BETWEEN K                 CONSTRUCT MEDIANS, TURN
                                     AVE. AND PALM AVE. AND AT               LANES, ROADWAY WIDENING,
  11       National City      SANDAG                                                                                    $1,130,000       $230,000               $0                            $900,000                       2011/12
                                     THE INTERSECTION OF E 8TH               TRAFFIC SIGNALS AND
                                     ST. AND L AVE.                          BEACONS, AND SIDEWALKS.
                                                                             Construct Type 60 concrete
                                                                             median barriers on both sides of
                                        Florida Dr. between Pershing Dr.     the new center median; install
  11       San Diego          SANDAG                                                                                      $641,500 $       64,150               $0                                              $577,350     2012/13
                                        and Bob Wilson Dr.                   safety lighting and warning signs;
                                                                             restripe roadway for wider bike
                                                                             lanes

                                        Jamacha Rd. between Sweetwater Upgrade traffic signals with
  11       San Diego County   SANDAG                                                                                      $391,600 $       39,160               $0                                              $352,440     2012/13
                                        Rd. and Grand Ave.             interconnect cable

                                        Intersection of Jamacha Rd. and
  11       San Diego County   SANDAG                                         Install traffic signal                       $409,200 $       40,920               $0                                              $368,280     2012/13
                                        Helix St.




                                                                                                                   Page 13 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                               Federal Highway Safety Improvement Program (HSIP)
                                                                                  2011 FTIP Back-Up List

                                                                                                                                               Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                               Total Project    Other/Local                                                                           FTIP Program
District           Agency    MPO              Project Location                 Description of Work                                              Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                   Cost           Funds                                                                                   Year
                                                                                                                                               Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY



                                                                         INSTALL TRAFFIC SIGNAL;
                                                                         INSTALL COUNT-DOWN
                                   MULBERRY DR. AND ROSE
                                                                         PEDESTRIAN HEADS; MODIFY
                                   RANCH RD.; VARIOUS
                                                                         TRAFFIC SIGNAL AND
                                   INTERSECTIONS ALONG SAN
                                                                         RECONFIGURE INTERSECTION;
                                   MARCOS BLVD. AND ALONG
  11       San Marcos       SANDAG                                       INSTALL SIGNAL                            $1,071,700       $107,170          $90,000                            $874,530                       2011/12
                                   RANCHO SANTA FE RD.;
                                                                         INTERCONNECT SYSTEM,
                                   MISSION RD. AND KNOLL RD.;
                                                                         FIBER OPTIC CABLE, REMOTE
                                   MISSION RD. FROM PICO AVE.
                                                                         TELEVISION CAMERAS,
                                   TO BOSSTICK BLVD.
                                                                         INTEGRATE WITH TRAFFIC
                                                                         MANAGEMENT CENTER

                                                                         Replace/upgrade regulatory traffic
  11       San Marcos       SANDAG Citywide                                                                          $358,000 $       35,800               $0                                              $322,200     2012/13
                                                                         signs

                                     Coronado Hills Dr. between Via Del
  11       San Marcos       SANDAG                                      Install/upgrade guardrail                    $210,000 $       21,000               $0                                              $189,000     2012/13
                                     Campo and Washingtonia Dr.

                                     Mission Gorge Rd. between
  11       Santee           SANDAG                                       Install 440' of raised median               $220,200 $       22,020               $0                                              $198,180     2012/13
                                     Magnolia Ave. and First Ave.
                                                              CONSTRUCT CONCRETE
                                                              POSITIVE PROTECTIVE
                                   INTERSECTION OF WEST VISTA
  11       Vista            SANDAG                            BARRIER AT NORTH COUNTY                                $495,000        $49,500         $111,375          $334,125                                         2010/11
                                   WAY AND GRAPEVINE RD.
                                                              TRANSIT DISTRICT (NCTD) BUS
                                                              STOP.
                                   WEST VISTA WAY BETWEEN                CONSTRUCT POSITIVE
  11       Vista            SANDAG EMERALD DR. AND THUNDER               PROTECTIVE BARRIER AT BUS                   $495,000        $49,500         $111,375                            $334,125                       2011/12
                                   DR.                                   STOP




                                                                                                              Page 14 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                                       Federal Highway Safety Improvement Program (HSIP)
                                                                                          2011 FTIP Back-Up List

                                                                                                                                                    Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                    Total Project    Other/Local                                                                           FTIP Program
District           Agency        MPO              Project Location                   Description of Work                                             Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                        Cost           Funds                                                                                   Year
                                                                                                                                                    Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                              CONSTRUCT RIGHT-TURN
                                                                              LANE; UPGRADE TRAFFIC
                                                                              SIGNAL; CONSTRUCT CURB,
                                         EASTBOUND OFFRAMP FROM
  11       Vista                SANDAG                                        GUTTER, SIDEWALK AND                      $1,281,500       $381,500         $130,500                            $769,500                       2011/12
                                         SR78 ONTO SYCAMORE AVE.
                                                                              RETAINING WALL; INSTALL
                                                                              SIGNS, STRIPES AND SAFETY
                                                                              BARRIERS

                                                                                               SANDAG TOTAL:            $8,450,300     $1,215,380         $443,250          $334,125        $3,704,715        $2,752,830
                                         MCMURRAY ROAD                        TRAFFIC SIGNAL UPGRADE;
  05       Buellton             SBCAG    INTERSECTION WITH STATE              LEFT TURN PHASING,                          $418,000        $41,800               $0          $376,200                                         2010/11
                                         HIGHWAY 246.                         RESTRIPING AND WIDENING.
                                                                              Install traffic signal and upgrade
  05       Lompoc               SBCAG    Intersection of "R" St. and SR 246                                               $249,700 $       87,700               $0                                              $162,000     2012/13
                                                                              curb ramps
                                                                              Install mast arms, pedestrian
                                         Intersection of Carrillo St. and     heads and safety lighting;
  05       Santa Barbara        SBCAG                                                                                     $500,000 $      100,000               $0                                              $400,000     2012/13
                                         Anacapa St.                          reconstruct curb, gutter, sidewalk
                                                                              and curb ramps
                                         APPROX. 6 MILES EAST OF THE
                                         CITY OF SANTA MARIA AT THE
           Santa Barbara
  05                            SBCAG    INTERSECTION OF FOXEN CYN REALIGNMENT OF ROADWAY                                 $421,700        $42,170          $58,950          $320,580                                         2010/11
           County
                                         RD., AND SANTA MARIA MESA
                                         ROAD.
                                                                              REPLACE EXISTING RR
           Santa Barbara                                                      BRIDGE AND CONSTRUCT
                                         CABRILLO BLVD, 0.1 MILE
  05       County Association   SBCAG                                         ROADWAY IMPROVEMENTS                      $7,127,700     $6,227,700               $0                            $900,000                       2011/12
                                         SOUTH OF HIGHWAY 1
           of Governments                                                     FOR BICYCLISTS AND
                                                                              PEDESTRIANS.
                                                                              INSTALL CONCRETE MEDIAN;
                                         EAST DONOVAN RD. AND
  05       Santa Maria          SBCAG                                         UPGRADE EXISTING TRAFFIC                     $77,000         $7,700               $0                             $69,300                       2011/12
                                         NORTH LYNNE DR.
                                                                              SIGNAL.
                                                                              Widen shoulder; Construct curb,
                                         Intersection of Battles Rd. and
  05       Santa Maria          SBCAG                                         gutter, sidewalk and curb ramps;            $163,200 $       24,820               $0                                              $138,380     2012/13
                                         Depot St.
                                                                              relocate street lights

                                         Alisal Rd., approximately 0.7 miles Widen shoulder; install warnings
  05       Solvang              SBCAG                                                                                     $289,100 $       28,910               $0                                              $260,190     2012/13
                                         south of Santa Ynez River Bridge signs and edge stripe

                                                                                                 SBCAG TOTAL:           $9,246,400     $6,560,800          $58,950          $696,780          $969,300          $960,570




                                                                                                                   Page 15 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                               Federal Highway Safety Improvement Program (HSIP)
                                                                                  2011 FTIP Back-Up List

                                                                                                                                                 Federal Funds    Federal Funds   Federal Funds     Federal Funds
                                                                                                                 Total Project    Other/Local                                                                         FTIP Program
District         Agency     MPO              Project Location                    Description of Work                                              Programmed      Programmed in   Programmed in     Programmed in
                                                                                                                     Cost           Funds                                                                                 Year
                                                                                                                                                 Under "Prior"     2010/11 FFY     2011/12 FFY       2012/13 FFY


                                                                          CONSTRUCT RAISED MEDIANS
                                                                          AND 5 LEFT-TURN LANES W/
                                    VALLEY BLVD. BETWEEN I-710            DEDICATED LEFT-TURN
  07       Alhambra         SCAG    FREEWAY TERMINUS AND                  PHASING; INSTALL                             $880,300       $440,150               $0                          $440,150                       2011/12
                                    MARENGO AVE.                          COUNTDOWN SIGNAL HEADS,
                                                                          SAFETY LIGHTING AND
                                                                          PAVEMENT MARKINGS
                                                                          CONSTRUCT RAISED MEDIANS
                                                                          AND 3 LEFT-TURN LANES W/
                                                                          DEDICATED LEFT-TURN
                                    MISSION RD. FROM FREMONT
  07       Alhambra         SCAG                                          PHASING; INSTALL TRAFFIC                     $869,200       $479,200               $0                          $390,000                       2011/12
                                    AVE. TO ATLANTIC BLVD.
                                                                          SIGNALS, SIGNS, SAFETY
                                                                          LIGHTING AND PAVEMENT
                                                                          MARKINGS

                                                                     Construct raised medians; install
                                                                     LED traffic and countdown
                                    Valley Blvd. between Marengo and
  07       Alhambra         SCAG                                     pedestrian signals; improve sight-                $644,700 $       92,900               $0                                            $551,800     2012/13
                                    New Ave.
                                                                     distance, install pavement
                                                                     markings and safety lighting

                                    VARIOUS MID-BLOCK                     INSTALL TRAFFIC CALMING
  07       Baldwin Park     SCAG                                                                                       $110,100        $11,010               $0                           $99,090                       2011/12
                                    LOCATIONS CITYWIDE                    ROADWAY DEVICES
                                                                        Install traffic signals; construct
                                    Bellflower Blvd. from Walnut St. to curb extensions; install in-
  07       Bellflower       SCAG                                                                                       $913,000 $       91,300               $0                                            $821,700     2012/13
                                    Flora Vista St.                     pavement crosswalk lights;
                                                                        improve signange and visibility
                                    Intersections of Verdugo
                                                                          Modify/upgrade two existing traffic
  07       Burbank          SCAG    Ave./Parish Place and Verdugo                                                      $710,000 $       71,000               $0                                            $639,000     2012/13
                                                                          signals; construct bulb-outs
                                    Ave./Keystone St.

                                                                       Widen turn lane; modify
                                                                       intersection; relocate signal pole;
                                    Indian Hill Blvd. between American
  07       Claremont        SCAG                                       upgrade curb ramps; increase turn             $1,200,100 $      300,100               $0                                            $900,000     2012/13
                                    Ave. and Oak Park Dr.
                                                                       pocket length; remove turn pocket,
                                                                       reconfigure/extend median

                                                                          Construct raised median; install
                                    Washington Blvd. from the I-5
  07       Commerce         SCAG                                          LED pedestrian count-down                    $353,100 $       99,000               $0                                            $254,100     2012/13
                                    interchange ramps to Fidelia Ave.
                                                                          signals and crosswalk striping




                                                                                                                Page 16 of 32                                                                                    April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                               Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                               Total Project    Other/Local                                                                           FTIP Program
District        Agency      MPO             Project Location                   Description of Work                                              Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                   Cost           Funds                                                                                   Year
                                                                                                                                               Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                    GOLDEN SPRINGS DRIVE,               INSTALL FRONTAGE ROAD,
  07       Diamond Bar      SCAG    BETWEEN LEMON AVE. AND              STREET LIGHTINGS, AND                        $476,300        $76,300               $0                            $400,000                       2011/12
                                    BREA CANYON RD.                     MEDIAN ISLAND IMPROVEMTS.
                                    20+ INTERSECTIONS WITHIN            INSTALL PEDESTRIAN
  07       Downey           SCAG                                                                                      $75,000         $7,500               $0           $67,500                                         2010/11
                                    THE CITY OF DOWNEY                  COUNTDOWN HEADS
                                                                        VARIOUS MODIFICATIONS AND
                                                                        IMPROVEMENTS TO EXISTING
                                    IN THE VICINITY OF 20
  07       Downey           SCAG                                        SCHOOL TRAFFIC WARNING                        $48,400         $4,840               $0           $43,560                                         2010/11
                                    SCHOOLS
                                                                        SIGNS, MARKINGS AND
                                                                        PAVEMENT LEGENDS.

                                    INTERSECTIONS OF FLORENCE           INSTALL TRAFFIC SIGNAL;
                                    AVE. AT LAKEWOOD BLVD. AND          MODIFY EXISTING TRAFFIC
  07       Downey           SCAG                                                                                     $215,000        $21,500               $0                            $193,500                       2011/12
                                    FLORENCE AVE. AT                    SIGNAL; INSTALL PAVEMENT
                                    ARRINGTON AVE.                      MARKINGS

                                    WOODRUFF AVE. AND
  07       Downey           SCAG                                        UPGRADE TRAFFIC SIGNAL.                      $150,000        $15,000               $0                            $135,000                       2011/12
                                    WASHBURN RD.

  07       Downey           SCAG    Woodruff Ave. at Via Amorita        Install pedestrian-activated signal          $170,000 $       17,000               $0                                              $153,000     2012/13

                                    On Barlin Ave., Cecilia St.,
                                    Cedartree Rd., Haledon Rd., Quill   Install solar-powered variable
  07       Downey           SCAG    Dr., Rives Ave., Smallwood Ave.,    message speed feedback sign in               $200,200 $       20,020               $0                                              $180,180     2012/13
                                    Third St., Tweedy Ln., and          each direction
                                    Washburn Rd. (10 locations)

                                                                CONVERT FOUR-LANE
                                    VISTA DEL MAR FROM 45TH ST. ARTERIAL TO THREE LANES;
  07       El Segundo       SCAG                                                                                     $500,000        $50,000               $0          $450,000                                         2010/11
                                    TO GRAND AVE.               CONSTRUCT CENTER BARRIER
                                                                WITH ATTENUATION.

                                    VERDUGO RD. / HONOLULU
                                                                        UPGRADE TRAFFIC SIGNAL TO
  07       Glendale         SCAG    AVE. AND MONTROSE                                                                $418,000        $41,800               $0                            $376,200                       2011/12
                                                                        INCLUDE LEFT TURN PHASES.
                                    BLD./VERDUGO BLD.
                                                                        UPGRADE TRAFFICE SIGNAL
                                    WILSON AVE. / HARVEY DR.
  07       Glendale         SCAG                                        AND PROVIDE LET-TURN                         $369,600        $36,960               $0                            $332,640                       2011/12
                                    AND BROADWAY
                                                                        PHASES.

  07       Glendora         SCAG    Glendora Ave. and Gladstone St.     Install protected left-turn phasing          $154,000 $       15,400               $0                                              $138,600     2012/13




                                                                                                              Page 17 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                               Federal Funds    Federal Funds     Federal Funds   Federal Funds
                                                                                                               Total Project    Other/Local                                                                         FTIP Program
District         Agency     MPO              Project Location                  Description of Work                                              Programmed      Programmed in     Programmed in   Programmed in
                                                                                                                   Cost           Funds                                                                                 Year
                                                                                                                                               Under "Prior"     2010/11 FFY       2011/12 FFY     2012/13 FFY


                                                               UPGRADE AND CONSTRUCT
                                    ON ROSECRANS AVE FROM      RAISED MEDIAN; IMPROVE
  07       Hawthorne        SCAG    INGLEWOOD AVE TO 250' WEST EXISTING SHOULDERS;                                 $2,001,000     $1,101,000          $90,000          $810,000                                       2010/11
                                    OF I-405 SB OFF-RAMP.      UPGRADE PAVEMENT
                                                               MARKINGS AND DELINEATION.
                                    FIVE INTERSECTIONS: EL
                                    SEGUNDO BLVD. AND DOTY
                                    AVE., EL SEGUNDO BLVD. AND
  07       Hawthorne        SCAG    YUKON AVE., 120TH ST. AND            UPGRADE TRAFFIC SIGNALS                   $1,057,100       $176,600          $99,000          $781,500                                       2010/11
                                    WILKIE AVE., VAN NESS AVE.
                                    AND 116TH ST., 135TH ST. AND
                                    DOTY AVE.

                                                                         Upgrade pedestrian traffic signal
                                    Intersection of Valley Dr. and the   to full traffic signal; install
  07       Hermosa Beach    SCAG    driveway for Valley School (a T-     pedestrian countdown signals,               $120,400 $       12,040               $0                                            $108,360     2012/13
                                    intersection)                        safety lighting and advance
                                                                         warning signs; construct sidewalks

                                    INTERSECTION OF
                                                                         CONSTRUCT PEDESTRIAN
  07       Inglewood        SCAG    MANCHESTER BLVD AND                                                              $172,000        $17,200               $0          $154,800                                       2010/11
                                                                         BULB-OUT.
                                    HILLCREST BLVD.

                                                                      Extend and improve raised
                                    Crenshaw Blvd. at 84th Place East median for SB Crenshaw; modify
  07       Inglewood        SCAG    & 84th Place West, including the  signal operations; install right-turn          $273,000 $       27,300               $0                                            $245,700     2012/13
                                    intersection with South 8th Ave.  lane, signs, pavement markings
                                                                      and speed feedback signs


                                                                         INSTALL MID-BLOCK
                                                                         BIKE/PEDESTRIAN CROSSING
                                    ARROW HIGHWAY AT THE                 WITH IN-ROADWAY WARNING
  07       Irwindale        SCAG                                                                                     $312,800        $31,280          $28,440          $253,080                                       2010/11
                                    SANTA FE DAM.                        LIGHTS AND ADVANCE
                                                                         WARNING FLASHING YELLOW
                                                                         BEACONS.

                                                                         UPGRADE TRAFFIC SIGNAL TO
                                    TEMPLE AVE. AND ORANGE
                                                                         INCLUDE LEFT-TURN
                                    AVE.; VALLEY BLVD. AND
  07       La Puente        SCAG                                         PHASING; INSTALL                            $329,900        $32,990          $32,518          $264,392                                       2010/11
                                    FERRERO LANE; TEMPLE AVE.
                                                                         PROTECTED-PERMISSIVE LEFT-
                                    AND SUNSET AVE.
                                                                         TURN PHASING




                                                                                                              Page 18 of 32                                                                                    April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                               Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                               Total Project    Other/Local                                                                            FTIP Program
District        Agency      MPO             Project Location                   Description of Work                                              Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                   Cost           Funds                                                                                    Year
                                                                                                                                               Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                    TEMPLE AVE. AND SUNKIST
  07       La Puente        SCAG                                        INSTALL TRAFFIC SIGNALS                      $267,100        $26,710               $0                             $240,390                       2011/12
                                    AVE.

                                    Intersection of Amar Rd. and        Install school crossing signals for
  07       La Puente        SCAG                                                                                     $223,100 $       22,310               $0                                               $200,790     2012/13
                                    Tonopah Ave.                        NB and SB pedestrian crossings

                                    STREETS SURROUNDING
                                                                        INSTALL SOLAR POWERED
  07       La Verne         SCAG    ROYNON ELEMENTARY                                                                $212,850        $21,285               $0                             $191,565                       2011/12
                                                                        SPEED FEEDBACK SIGNS
                                    SCHOOL
  07       Lancaster        SCAG    AVE. I AND 40TH ST. WEST            CONSTRUCT LEFT-TURN LANE                     $266,400        $26,640          $49,500           $190,260                                         2010/11
                                    FIVE INTERSECTIOSN: AVE. J-8
                                    AND 15TH ST. WEST; AVE. L
                                    AND 20TH ST. WEST; AVE. J
  07       Lancaster        SCAG                                  UPGRADE TRAFFIC SIGNALS                            $566,700        $56,670               $0                             $510,030                       2011/12
                                    AND 15TH ST. EAST; AVE. J AND
                                    5TH ST. EAST; AVE. I AND 5TH
                                    ST. EAST

                                    Ave. "J" between Challenger Way
  07       Lancaster        SCAG                                        Construct raised medians                     $583,500 $      210,470               $0                                               $373,030     2012/13
                                    (10th St. East) and 20th St. East

                                                                      Install speed humps, signs, and
                                    Citywide (twenty-one neighborhood
  07       Lancaster        SCAG                                      stripes; reduce lane widths to add             $523,900 $      113,900               $0                                               $410,000     2012/13
                                    street segments)
                                                                      bike lanes
                                    WOODLEY AVENUE/ RAYMER              UPGRADE TRAFFIC SIGNAL
                                    STREET AND DE SOTO STREET/          EQUIPMENT, ROADWAY
  07       Los Angeles      SCAG    KNAPP STREET AT METRO               MEDIANS AND OTHER TRAFFIC                    $849,300        $84,930         $180,000           $584,370                                         2010/11
                                    LINK'S HIGHWAY-RAIL GRADE           CONTROL DEVICES; RAILROAD
                                    CROSSINGS.                          PREEMPTION

                                    CAMARILLO ST, RIVERSIDE DR.
                                    AND TUJUNGA AVE; VICTORY
                                    BLVD AT WOODMAN AVE.;               UPGRADE TRAFFIC SIGNALS;
                                    HAZELTINE AVE AT SHERMAN            INSTALL PROTECTED AND/OR
  07       Los Angeles      SCAG    WAY, VAN NUYS BLVD. AT              PROTECTED-PERMISSIVE LEFT                    $802,000       $213,110          $63,000           $525,890                                         2010/11
                                    VICTORY BLVD, MARTIN                TURN SIGNAL PHASING;
                                    LUTHER KING BLVD AT                 INSTALL CURB RAMPS.
                                    NORMANDIE AVE. AND
                                    PARTHENIA ST. AT TAMPA AVE.

                                    INTERSECTION OF 11TH AVE.
  07       Los Angeles      SCAG                                        INSTALL TRAFFIC SIGNALS                      $220,000        $22,000            $9,000          $189,000                                         2010/11
                                    AND SLAUSON AVE.




                                                                                                              Page 19 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                             Federal Highway Safety Improvement Program (HSIP)
                                                                                2011 FTIP Back-Up List

                                                                                                                                                  Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                  Total Project    Other/Local                                                                           FTIP Program
District        Agency      MPO              Project Location                  Description of Work                                                 Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                      Cost           Funds                                                                                   Year
                                                                                                                                                  Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                    ROXFORD ST. AND I-5 (THE
                                    GOLDEN STATE FREEWAY)
  07       Los Angeles      SCAG                                        INSTALL TRAFFIC SIGNALS.                        $209,000        $20,900          $18,000          $170,100                                         2010/11
                                    SOUTHBOUND ON AND OFF
                                    RAMPS
                                                                        CONSTRUCT FRONTAGE
                                                                        IMPROVEMENTS TO INCLUDE
                                    DEVONSHIRE ST. BETWEEN
                                                                        CONCRETE SIDEWALKS,
  07       Los Angeles      SCAG    TOPANGA CANYON BLVD. AND                                                            $430,000        $43,000               $0                            $387,000                       2011/12
                                                                        CURBS, GUTTERS, RAMPS,
                                    HANNA AVE.
                                                                        SPEED FEEDBACK SIGNS, AND
                                                                        DRIVEWAYS.
                                                                INSTALL FRONTAGE
                                                                IMPROVEMENTS TO INCLUDE
                                    ORO VISTA AVE. BETWEEN
                                                                CONCRETE SIDEWALKS,
  07       Los Angeles      SCAG    FOOTHILL BLVD. AND HILLROSE                                                         $650,000        $65,000               $0                            $585,000                       2011/12
                                                                CURBS, GUTTER, RAMPS,
                                    ST.
                                                                SPEED FEEDBACK SIGNS, AND
                                                                DRIVEWAYS.

                                    ANAHEIM ST. FROM VERMONT            INSTALL METAL BEAM
  07       Los Angeles      SCAG                                                                                        $300,000        $30,000               $0                            $270,000                       2011/12
                                    AVE. TO FIGUEROA PL.                GUARDRAIL

                                    Intersection of Dearborn St. and
  07       Los Angeles      SCAG                                        Install traffic signal                          $270,600 $       27,060               $0                                              $243,540     2012/13
                                    Reseda Blvd.
                                                                        Construct new medians; upgrade
                                    Intersection of Broadway/Brazil St.
                                                                        pedestrian access and curb
                                    and San Fernando Rd. at
  07       Los Angeles      SCAG                                        returns; install pavement markings            $5,463,000 $    4,563,000               $0                                              $900,000     2012/13
                                    Metrolink's highway-rail grade
                                                                        and other railroad traffic control
                                    crossing
                                                                        devices
                                                                        Construct new medians; upgrade
                                    Intersection of Clybourn Ave. and pedestrian access and curb
  07       Los Angeles      SCAG    Vanowen St. at Metrolink's highway- returns, install pavement markings              $483,000 $       48,300               $0                                              $434,700     2012/13
                                    rail grade crossing                 and other railroad traffic control
                                                                        devices
  07       Los Angeles      SCAG    Western Ave. and 37th Place         Install traffic signal                          $200,000 $       20,000               $0                                              $180,000     2012/13
                                    Intersection of Lankershim Blvd.    Install traffic signal; construct curb
  07       Los Angeles      SCAG                                                                                        $180,000 $       18,000               $0                                              $162,000     2012/13
                                    and Valerio St.                     ramps
                                                             UPGRADE TRAFFIC SIGNALS,
           Los Angeles              INTERSECTION OF WOODBURY SIGNING, STRIPING AND
  07                        SCAG                                                                                        $258,500        $25,850               $0          $232,650                                         2010/11
           County                   RD. AND FAIR OAKS AVE.   PAVEMENT MARKINGS;
                                                             CONSTRUCT CURB RAMPS




                                                                                                                 Page 20 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                               Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                               Total Project    Other/Local                                                                           FTIP Program
District        Agency      MPO              Project Location                 Description of Work                                               Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                   Cost           Funds                                                                                   Year
                                                                                                                                               Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                        UPGRADE TRAFFIC SIGNALS,
           Los Angeles              INTERSECTION OF RAMONA
  07                        SCAG                                        SIGNING, STRIPING AND                        $209,000        $20,900               $0          $188,100                                         2010/11
           County                   BLVD. AND CAMPUS RD.
                                                                        PAVEMENT MARKINGS
                                    VARIOUS ROADS WITHIN THE
           Los Angeles              SANTA MONICA MOUNTAINS   INSTALL CENTERLINE RUMBLE
  07                        SCAG                                                                                     $469,700        $46,970               $0          $422,730                                         2010/11
           County                   KNOWN AS THE "MULHOLLAND STRIPS
                                    RACEWAY"
                                    HAWES STREET OVER                   REPLACE EXISTING CHAIN
           Los Angeles              LEFFINGWELL CREEK AND               LINK FENCE AND EXISTING
  07                        SCAG                                                                                     $469,700        $46,970          $75,480          $347,250                                         2010/11
           County                   OTHER DRAINAGE CANAL                SIDEWALK WITH CONCRETE
                                    LOCATIONS                           BARRIERS AND SIDEWALKS.
                                                                        Install guardrail, advance warning
           Los Angeles
  07                        SCAG    Angeles Forest Hwy.                 signs, delineators and pavement            $1,242,500 $      342,500               $0                                              $900,000     2012/13
           County
                                                                        markings
                                    Reis St. North Crossing over
                                    Sorensen Drain 707-B3, Mills Ave.
           Los Angeles                                                Remove and replace steel railing
  07                        SCAG    over Sorensen Drain 707-D5,                                                      $512,300 $       51,230               $0                                              $461,070     2012/13
           County                                                     and sidewalk
                                    Gladstone St. over Big Dalton
                                    Wash 599-C1

                                    Colima Rd. between Banida Ave.
                                    and Brea Canyon Cutoff; Olympic
           Los Angeles                                                  Conduct Roadway Safety Audit
  07                        SCAG    Blvd. between Kern Ave. and                                                      $100,000 $       10,000               $0                                               $90,000     2012/13
           County                                                       along three corridors
                                    Hillview Ave.; Valley Blvd. between
                                    Santa Mariana Ave. and Bielec Ln.

                                                                        Install in-roadway warning light
                                    In the vicinity of Firebaugh High
                                                                        systems and radar speed
  07       Lynwood          SCAG    School, Will Rogers School, and                                                  $385,800 $       38,580               $0                                              $347,220     2012/13
                                                                        feedback signs; construct bulb
                                    J.P. Abbott School
                                                                        outs
                                    Pacific Coast Hwy. (SR 1) from      Improve existing bike route to a
  07       Malibu           SCAG    Trancas Canyon Rd. west to the      Class II Bikeway; install signs and        $3,190,000 $    2,290,000               $0                                              $900,000     2012/13
                                    city limits                         stripes; widen shoulders
                                                             UPGRADE TRAFFIC SIGNAL TO
                                                             COORDINATE WITH RAILROAD
                                    MONTEBELLO BLVD. AND     CROSSING AND PROVIDE
  07       Montebello       SCAG                                                                                     $757,700        $75,770               $0                            $681,930                       2011/12
                                    MONTEBELLO WAY/TRUCK WAY ASSOCIATED TRAFFIC
                                                             STRIPING AND LEGEND
                                                             IMPROVEMENTS.




                                                                                                              Page 21 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                                  Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                                  Total Project    Other/Local                                                                            FTIP Program
District        Agency      MPO              Project Location                   Description of Work                                                Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                      Cost           Funds                                                                                    Year
                                                                                                                                                  Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                         Widen existing road for Class II
                                                                         Bikeway in both directions;
                                    Princeton Ave. east of Spring Rd.    construct curb and gutter; install 2-
  07       Moorpark         SCAG                                                                                      $2,660,100 $    1,760,100               $0                                               $900,000     2012/13
                                    and to the south of Condor Dr.       way left-turn lane, signs, stripes
                                                                         and pavement markings; construct
                                                                         retaining walls


                                                                         UPGRADE TRAFFIC SIGNAL;
                                                                         ADD PROTECTED LEFT-TURN
                                    INTERSECTION OF ROSE AVE.
  07       Oxnard           SCAG                                         PHASE; INSTALL EMERGENCY                        $80,600         $8,060            $7,200           $65,340                                         2010/11
                                    AND EMERSON AVE.
                                                                         VEHICLE DETENTION AND
                                                                         BATTERY BACKUP SYSTEM


                                                                         UPGRADE TRAFFIC SIGNAL;
                                    INTERSECTION OF SR 1                 ADD PROTECTED LEFT-TURN
  07       Oxnard           SCAG    (OXNARD BLVD.) AND SR 34             PHASE; INSTALL EMERGENCY                       $125,600        $12,200            $9,450          $103,950                                         2010/11
                                    (FIFTH ST.)                          VEHICLE DETENTION AND
                                                                         BATTERY BACKUP SYSTEM

                                    Intersection of Ventura Rd. and      Modify existing traffic signal and
  07       Oxnard           SCAG                                                                                        $168,400 $       16,840               $0                                               $151,560     2012/13
                                    Devonshire Dr.                       median
                                    Intersection of Saviers Rd. and Hill
  07       Oxnard           SCAG                                         Install new traffic signal                     $170,600 $       17,060               $0                                               $153,540     2012/13
                                    St.
                                                                         WIDEN SHOULDER;
                                    INTERSECTION OF AVE. R AND           CONSTRUCT LEFT-TURN
  07       Palmdale         SCAG                                                                                      $1,162,000       $262,900               $0                             $899,100                       2011/12
                                    10TH ST. EAST                        LANES; INSTALL LEFT-TURN
                                                                         PHASING
                                    SIERRA HWY FROM AVE. M TO
                                    AVE. S; PEARBLOSSOM HWY
                                                                         INSTALL STRIPING AND
  07       Palmdale         SCAG    FROM CITY LIMITS WEST OF                                                            $718,000        $71,800               $0                             $646,200                       2011/12
                                                                         PAVEMENT MARKERS
                                    25TH ST. TO FORT TEJON
                                    RD./AVE. T

                                    INTERSECTION OF                      INSTALL
  07       Pasadena         SCAG    WASHINGTON BLVD. AND HILL            PROTECTED/PERMISSIVE LEFT-                     $150,700        $15,070          $20,000           $115,630                                         2010/11
                                    ST.                                  TURN TRAFFIC SIGNALS




                                                                                                                 Page 22 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                                Federal Highway Safety Improvement Program (HSIP)
                                                                                   2011 FTIP Back-Up List

                                                                                                                                          Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                          Total Project    Other/Local                                                                            FTIP Program
District         Agency     MPO             Project Location                 Description of Work                                           Programmed       Programmed in     Programmed in     Programmed in
                                                                                                              Cost           Funds                                                                                    Year
                                                                                                                                          Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY



                                                                       INSTALL
                                    INTERSECTION OF LOS
  07       Pasadena         SCAG                                       PROTECTED/PERMISSIVE LEFT-               $117,800        $11,780          $20,000            $86,020                                         2010/11
                                    ROBLES AVE. AND UNION ST.
                                                                       TURN TRAFFIC SIGNALS

                                    DOWNEY TELEGRAPH RD.
                                    BETWEEN LAKEWOOD BLVD. /
  07       Pico Rivera      SCAG                                       CONSTRUCT RAISE MEDIAN.                $1,000,000       $100,000               $0                             $900,000                       2011/12
                                    ROSEMEAD BLVD. AND
                                    PASSONS BLVD.
                                    Intersection of Monroe St. and
  07       Pomona           SCAG                                       Construct new sidewalks                  $120,000 $       12,000               $0                                               $108,000     2012/13
                                    Orange Grove Ave.
                                                               UPGRADE TRAFFIC SIGNAL;
           Rancho Palos             INTERSECTION OF CRENSHAW INSTALL PROTECTED LEFT-
  07                        SCAG                                                                                $236,000        $23,600            $8,550          $203,850                                         2010/11
           Verdes                   BLVD. AND CRESTRIDGE ROAD. TURN PHASING; UPGRADE
                                                               PEDESTRIAN FACILITIES.
                                    PALOS VERDES DRIVE EAST            UPGRADE GUARDRAIL AND
           Rancho Palos
  07                        SCAG    FROM PALOS VERDES DRIVE            INSTALL NEW GUARDRAIL;                   $280,500        $28,050               $0                             $252,450                       2011/12
           Verdes
                                    SOUTH TO NORTH CITY LIMIT          INSTALL SIGNS

                                    ARTESIA BLVD. AT FELTON LN.,
                                    AND NORTH REDONDO BEACH INSTALL COUNT-DOWN
  07       Redondo Beach    SCAG                                                                                 $33,000         $3,300               $0                              $29,700                       2011/12
                                    BIKEWAY; AND GRANT AVE. AT PEDESTRIAN HEADS.
                                    GREEN LN., AND FELTON LN.

                                                                       Install ten solar-powered, LED
                                    North Redondo Beach bikeway
                                                                       pathway lighting assemblies and
  07       Redondo Beach    SCAG    between Robinson St. and Felton                                             $180,800 $       18,080               $0                                               $162,720     2012/13
                                                                       eleven solar-powered, LED
                                    Ln.
                                                                       roadway lighting fixtures
                                                                       INSTALL COUNT DOWN
  07       San Fernando     SCAG    VARIOUS LOCATIONS                                                            $61,900         $6,190               $0                              $55,710                       2011/12
                                                                       PEDESTRIAN HEADS.
                                    Intersection of Railroad Ave.      Upgrade traffic signal; add
  07       Santa Clarita    SCAG    (formerly San Fernando Rd.) and    protected left-turn phasing;             $221,800 $       22,180               $0                                               $199,620     2012/13
                                    Drayton St.                        construct curb ramps
                                    LOS ANGELES AVE. AT                INSTALL ILLUMINATED "NO
                                    ERRINGER RD., SYCAMORE             LEFT TURN" AND "NO RIGHT
  07       Simi Valley      SCAG                                                                                 $77,000         $7,700               $0                              $69,300                       2011/12
                                    DR., SEQUOIA AVE., TAPO            TURN" SIGNS FOR RAILROAD
                                    CANYON RD., AND TAPO ST.           PREEMPTION.




                                                                                                         Page 23 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                                Federal Highway Safety Improvement Program (HSIP)
                                                                                   2011 FTIP Back-Up List

                                                                                                                                              Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                              Total Project    Other/Local                                                                            FTIP Program
District         Agency       MPO            Project Location                  Description of Work                                             Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                  Cost           Funds                                                                                    Year
                                                                                                                                              Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                        CONSTRUCT RAISED CENTER
                                                                        MEDIANS; MODIFY EXISTING
                                     TWEEDY BLVD BETWEEN
                                                                        TRAFFIC SIGNAL; INSTALL PED
  07       South Gate         SCAG   ALAMEDA STREET AND LONG                                                        $973,500        $97,350          $87,615           $788,535                                         2010/11
                                                                        COUNTDOWN SIGNALS AND
                                     BEACH BLVD.
                                                                        PROTECTED LEFT TURN
                                                                        PHASING.
                                     FIRESTONE BLVD AT OTIS STR., UPGRADE TRAFFIC SIGNALS
  07       South Gate         SCAG   CALIFORNIA AVE., LONG BEACH TO INCLUDE LEFT TURN                               $792,000        $79,200               $0                             $712,800                       2011/12
                                     BLVD. AND SANTA FE.          PHASES
                                                                        INSTALL TRAFFIC SIGNALS
  07       South Pasadena     SCAG   FAIR OAKS AVE. AND BANK ST.        WITH COUNT DOWN                             $247,500        $24,750               $0                             $222,750                       2011/12
                                                                        PEDESTRIAN HEADS
                                                                        INSTALL GUARDRAIL,
                                     MOORPARK RD. NORTH OF              FLASHING YELLOW CURVE
  07       Thousand Oaks      SCAG                                                                                  $935,000       $135,000               $0                             $800,000                       2011/12
                                     CALLE CONTENTO                     WARNING BEACONS AND
                                                                        SIGNS
                                     Santa Clara Ave. between Central
                                                                        Fill existing earthen ditch; widen
  07       Ventura County     SCAG   Ave. and Los Angeles Ave. (SR                                                  $250,000 $       25,000               $0                                               $225,000     2012/13
                                                                        shoulder; flatten side slopes
                                     118)
                                     South Lomita Ave. from Lomita      Construct sidewalk and curb
  07       Ventura County     SCAG                                                                                  $379,000 $       37,900               $0                                               $341,100     2012/13
                                     Ave. to El Roblar Dr.              ramps

                                     INTERSECTION OF CAMERON    INSTALL TRAFFIC SIGNAL WITH
  07       West Covina        SCAG                                                                                  $247,500        $24,750               $0                             $222,750                       2011/12
                                     AVE. AND NORTH GARVEY AVE. INTERCONNECT

                                                                        Construct sidewalk and curb
                                                                        ramps; install in-pavement
  07       West Covina        SCAG   Workman Ave. at Phillips Ave.                                                   $72,800 $        7,280               $0                                                $65,520     2012/13
                                                                        crosswalk lights, striping and
                                                                        pavement markings
                                                                        UPGRADE PEDESTRIAN HEADS
                                                                        TO COUNT DOWN PEDESTRIAN
  07       Westlake Village   SCAG   CITYWIDE                                                                        $71,500         $7,150               $0                              $64,350                       2011/12
                                                                        HEADS AND PROVIDE
                                                                        CROSSWALKS.
                                     BEVERLY BLVD. CURVE
                                                               GROOVE CONCRETE
  07       Whittier           SCAG   BETWEEN MAGNOLIA AVE. AND                                                       $28,600         $2,860            $3,150           $22,590                                         2010/11
                                                               PAVEMENT
                                     CITRUS AVE.
                                                                        INSTALL RIGHT EDGE LINE
                                     COLIMA RD. FROM MAR VISTA          RUMBLE STRIP BETWEEN
  07       Whittier           SCAG                                                                                   $28,600         $2,860            $3,150           $22,590                                         2010/11
                                     ST. TO NORTH CITY LIMITS           VEHICLE TRAVEL AND CLASS II
                                                                        BIKE LANES




                                                                                                             Page 24 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                             Federal Highway Safety Improvement Program (HSIP)
                                                                                2011 FTIP Back-Up List

                                                                                                                                                  Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                                  Total Project    Other/Local                                                                            FTIP Program
District         Agency     MPO              Project Location                   Description of Work                                                Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                      Cost           Funds                                                                                    Year
                                                                                                                                                  Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                         INSTALL TWO-WAY LEFT-TURN
                                    BROADWAY FROM WHITTIER
  07       Whittier         SCAG                                         LANE, SIGNS, STRIPES AND                        $17,600         $1,760            $3,150           $12,690                                         2010/11
                                    BLVD. TO MAGNOLIA AVE.
                                                                         PAVEMENT MARKINGS
                                                                         Construct raised medians and
                                                                         curb extensions; install in-roadway
                                    Beverly Blvd. from the west city
                                                                         warning lights, traffic signs, Class
  07       Whittier         SCAG    limits to Norwalk Blvd./Workman                                                   $1,242,500 $      342,500               $0                                               $900,000     2012/13
                                                                         II Bike lane striping, pavement
                                    Mill Rd.
                                                                         markings, bus shelters and safety
                                                                         lighting
                                                                         Widen roadway; install two-way
                                    Lakeview Dr./Big Bear Blvd. (SR
                                                                         left-turn lane and paved shoulder;
  08       Big Bear Lake    SCAG    18) between Pine Knot Ave. and                                                      $188,500 $       18,850               $0                                               $169,650     2012/13
                                                                         replace/modify signs and
                                    Paine Rd.
                                                                         pavement markings
  08       Coachella        SCAG    VARIOUS LOCATIONS                    UPGRADE TRAFFIC SIGNS.                         $500,000        $50,000          $45,000           $405,000                                         2010/11
                                                                          INSTALL TRAFFIC SIGNALS,
                                    INTERSECTION OF RIMPAU
  08       Corona           SCAG                                         LEFT-TURN LANES AND                            $815,000       $189,500               $0           $625,500                                         2010/11
                                    AVE. AND CALIFORNIA AVE.
                                                                         PEDESTRIAN CROSSWALKS.
                                                               INSTALL TRAFFIC SIGNAL,
                                                               RIGHT- AND LEFT-TURN
                                    INTERSECTION OF EAST SIXTH
  08       Corona           SCAG                               LANES, CROSSWALK AND                                     $612,400        $61,240               $0                             $551,160                       2011/12
                                    ST. AND EL CAMINO AVE.
                                                               SIGNS; CONSTRUCT CURB,
                                                               GUTTER AND CURB RAMPS

                                    ON SIERRA AVENUE BETWEEN
                                                             CONSTRUCT RAISED
  08       Fontana          SCAG    VALLEY BOULEVARD AND SAN                                                          $1,145,100       $245,100               $0           $900,000                                         2010/11
                                                             CONCRETE MEDIAN.
                                    BERNARDINO AVENUE.


                                                                         Construct raised median;
                                                                         resurface existing pavement;
                                                                         construct curb, gutter, sidewalk,
                                    Foothill Blvd. between Sierra Ave.
  08       Fontana          SCAG                                         commercial driveways and curb                  $953,200 $       95,320               $0                                               $857,880     2012/13
                                    and Mango Ave.
                                                                         ramps; modify traffic signal; install
                                                                         traffic signs, stripes and pavement
                                                                         markings

                                    BASE LINE ST. BETWEEN
  08       Highland         SCAG                                         CONSTRUCT RAISED MEDIAN.                       $976,400       $292,900          $47,600           $635,900                                         2010/11
                                    SR210 AND BOULDER AVE.

                                                                         INSTALL EMERGENCY VEHICLE
  08       Moreno Valley    SCAG    VARIOUS LOCATIONS                                                                 $1,000,000       $100,000               $0                             $900,000                       2011/12
                                                                         PRE-EMPTION SYSTEM.




                                                                                                                 Page 25 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                                Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                                Total Project    Other/Local                                                                           FTIP Program
District            Agency    MPO            Project Location                   Description of Work                                              Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                    Cost           Funds                                                                                   Year
                                                                                                                                                Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                     MURRIETA HOT SPRINGS ROAD
                                                               CONSTRUCT RAISED TRAFFIC
  08       Murrieta           SCAG   BETWEEN ALTA MURRIETA                                                            $560,000        $56,000          $44,640          $459,360                                         2010/11
                                                               MEDIANS.
                                     DRIVE AND MARGARITA ROAD.

                                     INTERSECTION OF VINEYARD
  08       Ontario            SCAG                                        INSTALL TRAFFIC SIGNALS.                    $326,200       $118,890               $0          $207,310                                         2010/11
                                     AVENUE AT FRANCIS STREET.

                                     INTERSECTION OF GROVE
  08       Ontario            SCAG   AVENUE AND PRINCETON                 INSTALL TRAFFIC SIGNALS.                    $295,500        $29,550               $0          $265,950                                         2010/11
                                     STREET.
                                                                          UPGRADE TRAFFIC SIGNALS
  08       Ontario            SCAG   GROVE AVE. AT SIXTH ST.              AND MODIFY INTERSECTION                     $538,300        $53,830               $0                            $484,470                       2011/12
                                                                          GEOMETRY.
                                                                WIDEN ROADWAY AND
                                                                SHOULDERS; CONSTRUCT
                                     AYALA DR. BETWEEN BASELINE
  08       Rialto             SCAG                              CURB, GUTTER, SIDEWALKS,                            $1,052,200       $152,200         $213,707          $686,293                                         2010/11
                                     RD. AND SR 210
                                                                CURB RAMPS AND BIKE
                                                                LANES;
                                                                          INSTALL TRAFFIC SIGNAL,
                                     INTERSECTION OF RUBIDOUX
  08       Riverside County   SCAG                                        LEFT-TURN LANES, SIGNS,                   $1,145,000       $245,000               $0                            $900,000                       2011/12
                                     BLVD. AND 28TH ST.
                                                                          STRIPES, AND MARKINGS
                                                                REALIGN VERICAL PROFILE;
                                     LEON RD. FROM SCOTT RD. TO
  08       Riverside County   SCAG                              INSTALL SIGNS, STRIPING AND                         $1,956,000     $1,056,000               $0                            $900,000                       2011/12
                                     KELLER RD.
                                                                MARKINGS
                                                                INTALL TRAFFIC SIGNAL,
                                     INTERSECTION OF MARKET ST.
  08       Riverside County   SCAG                              RAISED MEDIAN, SIGNS,                                 $508,200        $50,820               $0                            $457,380                       2011/12
                                     AND AGUA MANSA RD.
                                                                STRIPES AND MARKINGS

                                                                       Install two solar-powered radar
                                     Sierra Ave. between Karen Ln. and speed feedback signs, centerline
  08       Riverside County   SCAG   the Riverside/San Bernardino      and edgeline rumble strips, anti-              $326,200 $       32,620               $0                                              $293,580     2012/13
                                     County line                       skid pavement overlay, signs,
                                                                       stripes and pavement markings

                                     Gilman Springs Rd. between
                                                                          Widen shoulder; install centerline
  08       Riverside County   SCAG   Riverside County/Moreno Valley                                                 $1,161,100 $      261,100               $0                                              $900,000     2012/13
                                                                          and edgeline rumble strips
                                     limits to 2.26 miles southeasterly
                                     10 HIGH-ACCIDENT LOCATIONS           INSTALL RADAR SPEED
  08       San Bernardino     SCAG                                                                                    $100,000        $10,000               $0           $90,000                                         2010/11
                                     THROUGHOUT CITY.                     FEEDBACK SIGNS.




                                                                                                               Page 26 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                            Federal Highway Safety Improvement Program (HSIP)
                                                                               2011 FTIP Back-Up List

                                                                                                                                               Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                               Total Project    Other/Local                                                                           FTIP Program
District        Agency       MPO            Project Location                  Description of Work                                               Programmed      Programmed in     Programmed in     Programmed in
                                                                                                                   Cost           Funds                                                                                   Year
                                                                                                                                               Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                                       MODIFY TRAFFIC SIGNALS;
                                    INTERSECTION OF BASE LINE
  08       San Bernardino    SCAG                                      CONSTRUCT SOUTH LEG                           $175,000        $17,500               $0          $157,500                                         2010/11
                                    AND STATE ST.
                                                                       DRIVEWAY APPROACH.
                                    INDUSTRIAL PARKWAY
                                                                       INSTALL TWO-WAY LEFT-TURN
  08       San Bernardino    SCAG   BETWEEN PALM AVENUE AND                                                           $45,000         $4,500               $0           $40,500                                         2010/11
                                                                       LANE; RESTRICT PARKING.
                                    LEXINGTON WAY.
           San Bernardino           Cedar Ave. between Jurupa Ave.
  08                         SCAG                                      Construct raised median                     $1,034,000 $      134,000               $0                                              $900,000     2012/13
           County                   and El Rivino Rd.
           San Bernardino           Valley Blvd. between Linden Ave.
  08                         SCAG                                      Construct raised median                       $937,200 $       93,720               $0                                              $843,480     2012/13
           County                   and Spruce Ave.
                                                                       Install 1,425' of raised median
  08       Yucca Valley      SCAG   SR 62, SR 247, and Joshua Ln.                                                    $206,000 $       20,600               $0                                              $185,400     2012/13
                                                                       island
                                    SR 62 between LaHonda Way and
  08       Yucca Valley      SCAG                                 Install raised median island                     $1,516,000 $      616,000               $0                                              $900,000     2012/13
                                    Dumosa Ave.

                                    INTERSECTION OF COLE ROAD
                                                              INSTALL TRAFFIC SIGNAL;
                                    AND VAN DE GRAAFF AVE.;
  11       Calexico          SCAG                             CONSTRUCT CONCRETE                                     $500,000        $50,000               $0          $450,000                                         2010/11
                                    COLE RD. BETWEEN SR 111
                                                              MEDIAN.
                                    AND VAN DE GRAAFF AVENUE.

                                                                       Install traffic signal; construct AC
                                                                       pavement, curb, gutter, sidewalk
                                    Cesar Chavez Blvd. and SR
  11       Calexico          SCAG                                      and curb ramps; install traffic             $1,800,000 $      900,000               $0                                              $900,000     2012/13
                                    98/West Birch St.
                                                                       signs, stripes and pavement
                                                                       markings
                                                                       COOPERATIVE PROJECT WITH
                                                                       CALTRANS; INSTALL TRAFFIC
                                    INTERSECTION OF SR 86 AND          SIGNALS; MODIFY VERTICAL
  11       Imperial County   SCAG                                                                                    $687,120       $343,560               $0          $343,560                                         2010/11
                                    KEYSTONE RD.                       PROFILE WITHIN THE
                                                                       INTERSECTION, ADJUST CURB
                                                                       RETURN.
                                    FORRESTER RD. AND                  CONSTRUCT RIGHT-TURN
  11       Imperial County   SCAG                                                                                    $800,000        $80,000          $70,200                            $649,800                       2011/12
                                    WORTHINGTON RD.                    LANES.

                                    INTERSECTION OF FORRESTER CONSTRUCT NORTHBOUND
  11       Imperial County   SCAG                                                                                    $340,000        $34,000          $67,500                            $238,500                       2011/12
                                    RD. AND ATEN RD.          RIGHT TURN LANE

                                    WORTHINGTON RD AND
  11       Imperial County   SCAG                                      INSTALL RIGHT-TURN LANE.                      $490,000        $49,000          $67,500                            $373,500                       2011/12
                                    COOLEY RD.




                                                                                                              Page 27 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                            Federal Highway Safety Improvement Program (HSIP)
                                                                               2011 FTIP Back-Up List

                                                                                                                                           Federal Funds    Federal Funds     Federal Funds     Federal Funds
                                                                                                           Total Project    Other/Local                                                                           FTIP Program
District            Agency   MPO             Project Location                Description of Work                                            Programmed      Programmed in     Programmed in     Programmed in
                                                                                                               Cost           Funds                                                                                   Year
                                                                                                                                           Under "Prior"     2010/11 FFY       2011/12 FFY       2012/13 FFY


                                                              UPGRADE TRAFFIC SIGNALS;
                                                              INSTALL PAVEMENT
                                    BALL RD BETWEEN KNOTT AVE MARKINGS, CROSSWALKS AND
  12       Anaheim           SCAG                                                                                $812,700        $81,270          $92,700          $638,730                                         2010/11
                                    & BROOKHURST ST.          DELINEATION; CONSTRUCT
                                                              ADA RAMPS; LENGTHEN LEFT
                                                              TURN POCKETS.

                                                                       CONSTRUCT RAISED MEDIAN;
                                    EUCLID ST. BETWEEN
                                                                       INSTALL LEFT-TURN SIGNALS;
  12       Anaheim           SCAG   CRESCENT ST. AND                                                             $998,200        $99,820               $0          $898,380                                         2010/11
                                                                       WIDEN EUCLID ST; CLOSE
                                    WESTMONT ST.
                                                                       WESTMONT ST. AT EUCLID ST.
                                    MALVERN AVE. AND OWENS             INSTALL NEW TRAFFIC
  12       Buena Park        SCAG                                                                                $330,000        $33,000               $0                            $297,000                       2011/12
                                    ST.                                SIGNAL.

                                                                       Upgrade traffic signal with
                                                                       protected-permissive signal
                                                                       phasing and enhanced safety
  12       Costa Mesa        SCAG   Victoria St. at Valley                                                       $273,000 $       27,300               $0                                              $245,700     2012/13
                                                                       lighting; install various
                                                                       bicycle/pedestrian improvements
                                                                       and radar speed feedback signs


                                                                       INSTALL WARNING SIGNS AT
                                    VARIOUS LOCATIONS WITHIN
  12       Fullerton         SCAG                                      PED/BIKE CROSSINGS;                       $110,800        $11,100               $0           $99,700                                         2010/11
                                    THE CITY.
                                                                       INSTALL "BIKE ROUTE " SIGNS.

                                    Valley View St. from SR 22 to north
  12       Garden Grove      SCAG                                       Upgrade 5,700' of raised median          $750,000 $       75,000               $0                                              $675,000     2012/13
                                    city limit
                                    Harbor Blvd. from Trask Ave. to
  12       Garden Grove      SCAG                                       Upgrade 2,250' of raised median          $500,000 $       50,000               $0                                              $450,000     2012/13
                                    Westminster Ave.
                                    Euclid St. from Lampson Ave. to
  12       Garden Grove      SCAG                                       Upgrade 2,300' of raised median          $507,100 $       50,710               $0                                              $456,390     2012/13
                                    Garden Grove Blvd.
                                                                        UPGRADE TRAFFIC SIGNALS;
                                    INTERSECTION OF CALIFORNIA
  12       Irvine            SCAG                                       ADD PROTECTIVE LEFT-TURN                 $108,300        $10,830          $40,500           $56,970                                         2010/11
                                    AVE AND CAMPUS DR.
                                                                        PHASING.
                                    MACARTHUR BLVD. SOUTH OF           UPGRADE MEDIAN BARRIER
  12       Irvine            SCAG   UNIVERSITY DR. AND NORTH           AND CONSTRUCT DRAINAGE                    $443,500        $44,350               $0                            $399,150                       2011/12
                                    OF SR-73                           IMPROVEMENTS.
  12       Irvine            SCAG   Various intersections              Construct curb ramps                    $1,001,000 $      101,000               $0                                              $900,000     2012/13




                                                                                                          Page 28 of 32                                                                                      April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                                 Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                                Total Project    Other/Local                                                                             FTIP Program
District         Agency     MPO              Project Location                 Description of Work                                                 Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                    Cost           Funds                                                                                     Year
                                                                                                                                                 Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                    KATELLA AVE. FROM                  CONSTRUCT RAISED ISLAND
  12       Los Alamitos     SCAG    WALLINGSFORD RD./WALNUT            MEDIAN; LENGTHEN LEFT-                         $116,800        $11,680                $0                             $105,120                       2011/12
                                    ST. TO LOS ALAMITOS BLVD.          TURN LANES
                                    KATELLA AVE FROM PINE ST.
  12       Los Alamitos     SCAG                                       CONSTRUCT RAISED MEDIAN.                        $67,700         $6,770                $0                              $60,930                       2011/12
                                    TO REAGAN ST.

                                                                       CONSTRUCT RAISED MEDIAN
                                    SANTIAGO CANYON BETWEEN
                                                                       AND GUARD RAIL. INSTALL
  12       Orange           SCAG    WINDS DR AND EAST ANGEL                                                           $776,300        $77,630           $63,671           $634,999                                         2010/11
                                                                       NEW SIGNS, STRIPING, AND
                                    VIEW TERRACE
                                                                       PAVEMENT MARKINGS.


                                                                       Construct free right-turn lane and
                                                                       a portion of a Class I bike route
                                    Santiago Canyon Rd. and Cannon     including new AC pavement, curb,
  12       Orange           SCAG                                                                                    $1,071,100 $      171,100                $0                                               $900,000     2012/13
                                    St.                                gutter, sidewalk, curb ramps,
                                                                       signs, traffic signals, striping, and
                                                                       raised median island


                                    INTERSECTION OF CIVIC
  12       Santa Ana        SCAG                                INSTALL TRAFFIC SIGNAL                                $382,300        $38,230           $24,300           $319,770                                         2010/11
                                    CENTER DR. AND PACIFIC AVE.

  12       Santa Ana        SCAG    17TH ST AND KING ST                INSTALL TRAFFIC SIGNAL.                        $382,250        $38,225           $24,300           $319,725                                         2010/11
                                    MESA DR. BETWEEN                   UPGRADE GUARDRAIL; WIDEN
  12       Villa Park       SCAG    HENDERSON WAY AND                  SHOULDER; INSTALL WARNING                      $227,200        $22,720                $0           $204,480                                         2010/11
                                    CANYON CREST DR.                   SIGNS.
                                                                                            SCAG TOTAL:            $77,417,620     $21,469,250        $1,608,821       $15,536,004       $16,424,615       $22,378,930

                                                                       COOPERATIVE PROJECT WITH
                                    INTERSECTION OF SR 273 AND
                                                                       CALTRANS. INSTALL TRAFFIC
  02       Anderson        SCRTPA   ALEXANDER AVENUE/3RD                                                            $1,476,000       $836,000           $76,950           $563,050                                         2010/11
                                                                       SIGNAL AND IMPROVE
                                    STREET.
                                                                       TURNING LANES
                                                                       CONSTRUCT CURB, GUTTER
                                                                       AND SIDEWALK; INSTALL
                                    BUENAVENTURA AVE. FROM
                                                                       SAFETY LIGHTING, SIGNING
  02       Redding         SCRTPA   400' WEST OF RAILROAD AVE.                                                        $787,500        $78,750           $77,314           $631,436                                         2010/11
                                                                       AND STRIPING FOR BIKE LANE;
                                    TO SR 273
                                                                       WIDEN PAVEMENT AND
                                                                       SHOULDERS.
                                                                       Improve left-turn storage and sight
                                    Intersection of Old Oregon Trail
  02       Redding         SCRTPA                                      distance; install overhead flashing            $996,300 $       99,630                $0                                               $896,670     2012/13
                                    and Oasis Rd.
                                                                       signal



                                                                                                               Page 29 of 32                                                                                        April 15, 2010
Caltrans Division of Local Assistance                             Federal Highway Safety Improvement Program (HSIP)
                                                                                2011 FTIP Back-Up List

                                                                                                                                            Federal Funds    Federal Funds     Federal Funds   Federal Funds
                                                                                                            Total Project    Other/Local                                                                         FTIP Program
District        Agency      MPO             Project Location                  Description of Work                                            Programmed      Programmed in     Programmed in   Programmed in
                                                                                                                Cost           Funds                                                                                 Year
                                                                                                                                            Under "Prior"     2010/11 FFY       2011/12 FFY     2012/13 FFY


                                                                                        SCRTPA TOTAL:           $3,259,800     $1,014,380         $154,264        $1,194,486                          $896,670

                                    North Lower Sacramento Rd. from
                                                                        Install turning lanes, safety
           San Joaquin              600' north of Collier Rd. to 1000'
  10                       SJCOG                                        lighting, pavement markings, and          $654,700 $       65,470               $0                                            $589,230     2012/13
           County                   south of the Union Pacific Railroad
                                                                        speed feedback signs
                                    UC
                                                                       INSTALL AUDIBLE AND
                                                                       COUNTDOWN SIGNAL HEADS;
                                    INTERSECTIONS OF AIRPORT
                                                                       UPGRADE TRAFFIC SIGNALS
                                    WAY AND PARK ST., AIRPORT
                                                                       AND CURB RAMPS; INSTALL
  10       Stockton        SJCOG    WAY AND OAK ST., AND                                                        $1,330,000       $637,000          $54,000          $639,000                                       2010/11
                                                                       LEFT-TURN LANES AND
                                    AIRPORT WAY AND FREMONT
                                                                       PHASING; INSTALL PRIORITY
                                    ST.
                                                                       CONTROL SYSTEM


                                                              INSTALL AUDIBLE AND
                                    INTERSECTION OF EL DORADO COUNTDOWN SIGNAL HEADS;
  10       Stockton        SJCOG                                                                                  $264,000        $26,400               $0          $237,600                                       2010/11
                                    ST. AND CHARTER WAY       UPGRADE TRAFFIC SIGNALS
                                                              AND CURB RAMPS




                                                                                                           Page 30 of 32                                                                                    April 15, 2010
Caltrans Division of Local Assistance                                  Federal Highway Safety Improvement Program (HSIP)
                                                                                     2011 FTIP Back-Up List

                                                                                                                                              Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                              Total Project    Other/Local                                                                            FTIP Program
District        Agency          MPO              Project Location                  Description of Work                                         Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                  Cost           Funds                                                                                    Year
                                                                                                                                              Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


                                         Along the curve of Glacier Point Dr.
  10       Stockton            SJCOG     in front of Ansel Adams Elementary Install raised curb median              $120,000 $       12,000               $0                                               $108,000     2012/13
                                         and near Matt Equinoa Park

                                                                                              SJCOG TOTAL:        $2,368,700       $740,870          $54,000           $876,600                            $697,230
                                      INTERSECTION OF GRAND                 COOPERATIVE PROJECT WITH
  05       San Luis Obispo     SLOCOG AVENUE AND THE NB OFF                 CALTRANS. INSTALL TRAFFIC               $370,000        $92,500          $27,000           $250,500                                         2010/11
                                      RAMP OF STATE ROUTE 101.              SIGNAL.
                                      HUTTON RD. BETWEEN THE
           San Luis Obispo                                                  WIDEN SHOULDERS; STRIPE
  05                           SLOCOG NIPOMO CREEK BRIDGE AND                                                       $590,000        $59,000         $108,000           $423,000                                         2010/11
           County                                                           FOR BICYCLE LANE.
                                      SR 166
                                                                                            SLOCOG TOTAL:           $960,000       $151,500         $135,000           $673,500

                                                                            CONSTRUCT CONCRETE
                                                                            MEDIAN; EXTEND LEFT TURN
                                         INTERSECTION OF SOUTH
  10       Stanislaus County   StanCOG                                      POCKET; INSTALL SIGNS,                  $120,000        $12,000            $9,000           $99,000                                         2010/11
                                         NINTH ST. AND LATIMER AVE.
                                                                            STRIPES AND PAVEMENT
                                                                            MARKINGS
                                                                            CONSTRUCT RAISED
                                         INTERSECTION OF HATCH RD.
  10       Stanislaus County   StanCOG                                      CONCRETE MEDIAN; UPGRADE                $485,000        $48,500          $45,000           $391,500                                         2010/11
                                         AND CROWS LANDING RD.
                                                                            TRAFFIC SIGNALS
                                                                            CONSTRUCT RAISED
                                       CLARIBEL RD. AT THE BNSF
                                                                            CONCRETE MEDIAN; WIDEN
                                       RAILROAD CROSSING AND
  10       Stanislaus County   StanCOG                                      RADIUS RETURN; INSTALL                   $29,000         $2,900            $4,500           $21,600                                         2010/11
                                       INTERSECTION OF CLARIBEL
                                                                            SIGNS, STRIPES AND
                                       ROAD AND TERMINAL AVE.
                                                                            PAVEMENT MARKINGS

                                                                                            StanCOG TOTAL:          $634,000        $63,400          $58,500           $512,100
                                         SANTA FE TRAIL AND LASPINA         INSTALL IN-PAVEMENT
  06       Tulare               TCAG                                                                                 $59,000         $5,900               $0                              $53,100                       2011/12
                                         AVE.                               CROSSWALK LIGHTS.

                                         AVENUE 280 (VISALIA RD) AND
  06       Tulare County        TCAG                                        INSTALL TRAFFIC SIGNAL                  $423,500        $42,350               $0                             $381,150                       2011/12
                                         ROAD 180 (ANDERSON RD)

                                         AVE. 256 AND ROAD 204
  06       Tulare County        TCAG                                        INSTALL TRAFFIC SIGNAL                  $539,000        $53,900               $0                             $485,100                       2011/12
                                         (SPRUCE RD.) INTERSECTION




                                                                                                             Page 31 of 32                                                                                       April 15, 2010
Caltrans Division of Local Assistance                              Federal Highway Safety Improvement Program (HSIP)
                                                                                 2011 FTIP Back-Up List

                                                                                                                                                  Federal Funds     Federal Funds     Federal Funds     Federal Funds
                                                                                                                 Total Project    Other/Local                                                                             FTIP Program
District         Agency     MPO              Project Location                   Description of Work                                                Programmed       Programmed in     Programmed in     Programmed in
                                                                                                                     Cost           Funds                                                                                     Year
                                                                                                                                                  Under "Prior"      2010/11 FFY       2011/12 FFY       2012/13 FFY


           Tulare County                                               Install traffic signal and upgrade
           Resource                                                    intersection; upgrade left-turn
  06                        TCAG    Intersection of SR 63 and Ave. 256                                               $2,068,700 $    1,718,700                $0                                               $350,000     2012/13
           Management                                                  lanes; realign the west leg of Ave.
           Agency                                                      256 to correct the offset

           Tulare County
           Resource                 Intersection of Ave. 148 and Rd.
  06                        TCAG                                         Install traffic signal                        $484,000 $       48,400                $0                                               $435,600     2012/13
           Management               256
           Agency

           Tulare County                                               Install traffic signals with protected
           Resource                                                    left-turn phase or install
  06                        TCAG    Intersection of SR 190 and Rd. 284                                               $1,864,100 $    1,514,100                $0                                               $350,000     2012/13
           Management                                                  roundabout; install flashing
           Agency                                                      beacons for advanced warning

                                                                         Install traffic signal; construct
                                    Intersection of Mooney Blvd. and     curb, gutter, sidewalk, and curb
  06       Visalia          TCAG                                                                                       $346,500 $       48,500                $0                                               $298,000     2012/13
                                    Goshen Ave.                          ramps; improve railroad
                                                                         signs/signals

                                                                                                  TCAG TOTAL:        $5,784,800      $3,431,850               $0                             $919,350        $1,433,600

                                                                                                     TOTALS:       $173,790,239     $49,262,729        $5,251,965       $39,108,855       $30,364,320       $49,802,370




                                                                                                                Page 32 of 32                                                                                        April 15, 2010

								