TABLE EA - 1(a), Annual Report to OFWAT

Discharge Consent Compliance Report Company United Utilities Water Plc

Year 2005

Calendar Year report



Open Guidance

Ref. No. No. of discharges No. of discharges No. of discharges %. of discharges

Date: 3 May 2006 on register during assessed for confirmed failing in compliant[1] with consent in

Contact: Tony Heaney calendar year (in compliance calendar year. the year (Automatically

Description force). Calculated)





Numeric Consents



1 Sewage Treatment Works: Total Number 356 356 13 96.3

2 Look-Up Table 351 351 2 99.4

3 Upper Tier 122 122 3 97.5

4 Absolute Non-Sanitary (excluding flow) 65 65 2 96.9

5 WSplc Disinfection - self monitored 25 25 1 96.0

6 WSplc UWWT - self monitored 87 87 5 94.3

7 WSplc Trade Discharges -Water Treatment Works 57 27 2 96.5

8 WSplc Trade Discharges - Other (including trade effluent 2 2 2 0.0

treatment facilities)



Non-Numeric Consents (Descriptive)

9 Sewage Treatment Works: Total Number 229 93 0 100.0

[2]

10 WSplc Trade Discharges -Water Treatment Works 4 1 0 100.0

11 WSplc Trade Discharges[2] -Other (including trade effluent 2 0 0 100.0

treatment facilities)



[1]

Compliant = not confirmed as failing



[2]

It is not usual for trade discharges to have descriptive consents -

this category is provided as a catch-all, to accommodate any rare

circumstances where such consents may exist



Authorisation



Designation: Water Company Account Manager (or equivalent) Signed: Clive Gaskell



Dated:

TABLE EA - 1(b), Annual Report to OFWAT

Discharges Confirmed as Failing Company United Utilities Water Plc

Year 2005

Calendar Year report

Open Guidance

Ref No:

Date: 3 May 2006

Contact: Tony Heaney Critieria



Name of EA Region Receiving Population LUT Upper Tier Upper Tier/absolute UWWT Disinfection Descriptive Action Taken Parameter Comments

Discharge [1] Water [2] Equivalent Sanitary Sanitary Non sanitary All Self-reporting All [3] [4] [5]



SEWAGE TREATMENT WORKS (including septic tanks and crude outfalls)

Count Reference

1 017160006 Colne WwTW NW IS 36,628 Y EA Ammonia 4 LUT failures

2 016930112 Fazakerley WwTW NW IS 207,263 Y EA Chloroform 3 failures. UU are prosecuting the trader who caused the failures.



3 017160008 Hyndburn WwTW NW IS 150,860 Y EA BOD 1 UT failure

4 017030100 Southport WwTW NW CS 93,220 Y EA Dose (24hr Rule)

5 016810052 Biddulph WwTW NW IN 14,837 Y N Ammonia 1 UT failure

6 016950033 Bury NW IS 282,516 Y N Ammonia 1 UT failure due to BAFF plant problems. No further action taken.



7 016940193 Davyhulme NW IN 1,196,951 Y N Hg Result challenged by UU but lab confirmed result is correct. UU

then challenged the process and the matter is with RSU Manager

to resolve. No further action taken.



8 016910006 High Legh NW IN 918 Y O BOD Failures due to problems with newly commisioned process units on

site. Enforcement action under consideration.

9 016810030 Ellesmere Port NW IN 93,034 Y O COD UT 1 COD UT failure. Action to be taken under consideration.

10 017580285 Workington NW CH 72,150 Y O BOD UT 1 BOD UT failure. Action to be taken under consideration.

11 016993397 Sandon Dock NW EN 709,412 Y EA BOD UT 1 BOD UT failure. Action to be taken under consideration.

COD UT 5 COD UT failures. Action to be taken under consideration.

COD LUT 15 COD LUT failures. Action to be taken under consideration.

12 016993399 Birkenhead NW EN 174,369 Y O COD LUT 4 COD LUT failures. Action to be taken under consideration.

13 016993398 Bromborough NW EN 145,150 Y O BOD UT 1 BOD UT failure. Action to be taken under consideration.

COD UT 2 COD UT failures. Action to be taken under consideration.





WSplc TRADE DISCHARGES - Water Treatment Works



1 CM0151201 v2 Huntington WTW (8022) NW IN Y EA TAC 1 failure on 17th Aug (0.12mg/l) against 0.05mg/l standard.

Warning letter sent.

2 CG0416901 v1 Tailbay Area @ Huntington WTW (26753)

NW IN Y EA TAC 3 failures on: 21st Sep (0.06mg/l); 17th Oct (0.07 mg/l) & 2nd Nov

(0.1mg/l) against 0.05mg/l standard. Warning letters sent.



3

4



WSplc TRADE DISCHARGES - Other



1 017580291 Raby Cote Discharge NW EN Y EA pH Warning letter was sent, consent was reviewed and there are

Y EA SS ongoing discussions

Y EA Sulphide

2 0166/296 Kirkby 72" outfall NW IS Y O BOD Outfall only operates in storm conditions. Ongoing discussions with

Y O SS UU regarding its future.



[1] NW = North West, NE = North East, M = Midlands, A = Anglian, T = Thames, S = Southern, SW = South West, W = Wales (please specify)

[2] One from: I = Inland, E = Estuarial, C = Coastal, G = Groundwater, and one from: N = Normal, S = Sensitive Area (UWWTD), H = exHNDA (please specify)

[3] PI(M) = Planned Investment (Maintenance), PI(3) = Planned Investment (AMP3), PI(4) = Planned Investment (AMP4), IU= investigation undertaken, RA = remedial action by discharger, EA = Enforcement

action, N = None (please provide comment in comment field), O = Other (please specify)





[4] BOD, COD, SS, NH3, pH, Scheme in breach of statutory deadlines, etc. For UWWTD failures specify: Reporting, Audit, Insufficient samples, BOD UT, BOD LUT, COD UT, COD LUT or Annual average (or a

combination of these). For UV disinfection failures please specify whether due to one or more of the following; ‘Dose (99% rule)’, ‘Dose (24-hour rule)’ or ‘reporting’. (Please specify one parameter per row).

[5] To include reasons for failure, mitigating circumstances and remedial actions taken. Any failed condition that is under appeal should be noted.



OFWAT Levels of Service Report

1) The Levels of Service Report only includes BOD LUT and P failures for UWWT reporting

2) In the Levels of Service Report, where a STW failues both the LUT part of its WRA consent and the BOD LUT or P UWWT consent condition, the failure is reported against the WRA consent only



Authorisation

Designation: Water Company Account Manager (or equivalent) Signed: Clive Gaskell



Dated:

TABLE EA - 1(d), Annual Report to OFWAT

Pollution Incidents Data by Premises/Source



Calendar Year Report

Open Guidance



Ref. No: Contact

Date: Completion Tony

Date Heaney



Ref. I/C



Reference

1 I/C

2 I/C

3 I/C

4 I/C

5 I/C

6 I/C

7 I/C

8 I/C









9 I/C

10 I/C

11 I/C

12 I/C







13 C



14 C









Authorisation



Designation Water Company Account Manager

nnual Report to OFWAT

Data by Premises/Source Company United Utilities Water Plc

Year 2005









Source/ Cat 1 Cat 2



Total Number Total Number









Sewage Related Premises

Sewage Treatment Works 0 2

Storm Tank 0 0

Combined Sewer Overflow 1 5

Foul Sewer 0 3

Pumping Station 0 9

Rising Mains 0 0

Other 0 1

Number of incidents where site compliant with discharge consent 0 1







Water and Surface Water Related Premises

Water Treatment Works 0 0

Water Distribution System 0 2

Surface Water Outfall 0 0

Number of incidents where site compliant with discharge consent 0 0







Total (Sewage and Water and Surface Water) related Premises

1 22

(Automatically Calculated)

Total (Sewage and Water and Surface Water) number of Incidents 0 1

where site compliant with Discharge Consent (Automatically

Calculated)





Total Number of all Category 1-3 incidents (Automatically Calculated) 165

Total Number where site compliant with Consent (Automatically

7

Calculated)

Total Number of Water Company self reported incidents 33





OFWAT Levels of Service and OPA Reports

1) Category 1-3 sewage related incidents and Category 1-2 water related incidents are reported in OFWAT Levels of Service Repor

2) Category 1-3 sewage related incidents are used in the OPA. (0.5 weighting for category 1 and 2 incidents, 0.25 weighting for cate

3) Category 1 and 2 water treatment and distribution related incidents are used in the OPA (0.25 weighting for both category 1 and 2

4) Incidents from public surface water sewers are not used by OFWAT in either LoS report or OPA







ompany Account Manager Signed: Clive Gaskell

Dated: 22nd March 2006









[

United Utilities Water Plc

2005









Cat 3 Total

Total Number (Cat 1-3 incidents)

Total Number

(Automatically Calculated)









5 7

1 1

46 52

35 38

26 35

7 7

2 3

6 7









0 0

6 8

14 14

0 0







142

6









1,2,3 as per the pollution incident categories detailed

in the EA Water Pollution Incidents in England and

Wales Report









re reported in OFWAT Levels of Service Reports

egory 1 and 2 incidents, 0.25 weighting for category 3 incidents.

e OPA (0.25 weighting for both category 1 and 2 incidents

22nd March 2006

Anglian Water Service Ltd





Dwr Cymru Cyfynfedig

Northumbrian Water Ltd

United Utilities Water Plc

Severn Trent Water Ltd

Southern Water Services Ltd

South West Water

Thames Water Utilities Plc

Wessex Water

Yorkshire Water Services Ltd

Bournemouth & W Hampshire Water

Bristol Water



Cambridge Water

Cholderton and District Water

Dee Valley Water

Essex & Suffolk Water

Folkestone & Dover Water

Mid Kent Water



North Surrey Water

Portsmouth Water



South East Water





South Staffs Water

Sutton and E Surrey Water

Tendring Hundreds Water

Three Valleys Water

York Waterworks

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006



NW-all :Scheme Delivery and Environmental Outcomes AMP4 Tracking Spreadsheet Key to Regional / Area Worksheets

Region North West Yellow High priority habitat sites date changes

Area NW-all

Lead Contact









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440229 Bank Parade B2 United Utilities Ltd SD 5421 2866 B2 3/31/2009 3/31/2009 I Y 3/24/2005

CSO/Preston AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440229 Bank Parade B2 United Utilities Ltd SD 5421 2866 UID1 3/31/2009 3/31/2009 I Y 3/24/2005

CSO/Preston AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU190101 "APPLEGARTH" A41 UID0 United Utilities Ltd SJ 4475 6467 UID0 3/31/2008 3/31/2008 I N To be issued by Wales

ROWTON

3UU440219 176 Ribbleton Lane B2 United Utilities Ltd SD 5528 2874 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 14 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440219 176 Ribbleton Lane B2 United Utilities Ltd SD 5528 2874 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440223 18 Deepdale Road B2 United Utilities Ltd SD 5528 2874 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440223 18 Deepdale Road B2 United Utilities Ltd SD 5528 2874 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 15 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440226 207 Watling Street B2 United Utilities Ltd SD 5485 3134 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440226 207 Watling Street B2 United Utilities Ltd SD 5485 3134 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440231 42 Sharoe Green Lane B2 United Utilities Ltd SD 5397 3204 B2 3/31/2009 3/31/2009 I Y 3/24/2005

CSO AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 16 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440231 42 Sharoe Green Lane B2 United Utilities Ltd SD 5397 3204 UID1 3/31/2009 3/31/2009 I Y 3/24/2005

CSO AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440209 Albyn Street East B2 United Utilities Ltd SD 5493 2933 B2 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440209 Albyn Street East B2 United Utilities Ltd SD 5493 2933 UID1 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU108701 Alderley Edge STW F1b United Utilities Ltd SJ 8283 7858 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation 75% FFD Designation



4UU110501 Alsager STW C1 United Utilities Ltd SJ 7891 5679 C1 3/31/2008 3/31/2008 C N Not deliverable as C1

investigation

4UU102601 Altrincham STW F1b United Utilities Ltd SJ 7504 9044 F1b 3/31/2009 3/31/2009 C Y 3/31/2005

75% FFD Designation 75% FFD Designation



4UU723201 AMBLESIDE STW BAP1 (1) United Utilities Ltd NY 3722 0389 BAP1 (1) 3/31/2009 3/31/2009 C Y 3/31/2005



4UU724201 ASBY STW H3 (2) United Utilities Ltd NY 0654 2068 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive Driver

H5 (2)



4UU724201 ASBY STW H3 (2) United Utilities Ltd NY 0654 2068 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive Driver

H5 (2)







Page 17 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

4UU102001 Ashton-U-Lyne STW F1b United Utilities Ltd SJ 9300 9714 F1b 12/31/2006 12/31/2006 C Y 3/31/2005

75% FFD Designation; 75% FFD Designation;

AMP3/4 scheme AMP3/4 scheme



4UU108001 Ashworth Moor WTP G1 United Utilities Ltd SD 8420 1525 G1 3/31/2008 3/31/2008 C Y 3/31/2005



4UU901101 BAP3 Nature Conservation BAP3 United Utilities Ltd BAP3 3/31/2010 3/31/2010 N Not Deliverable as BAP3 is

& Catchment Management 5 to 10 year management plan 5 to 10 year management plan UU-promoted "blue driver" &

is a 5 year plus

management plan rather

than consent



4UU126901 Barlow Moor Road/Palatin UID0 United Utilities Ltd SJ 8346 9162 UID0 3/31/2007 3/31/2007 I Y 2/16/2005

Road

4UU126801 Barlow Moor UID0 United Utilities Ltd SJ 8329 9178 UID0 3/31/2007 3/31/2007 I Y 2/16/2005

Road/Rowsley

4UU715801 BARROW-IN-FURNESS H8 (4) United Utilities Ltd SD 2148 6728 H8 (4) 3/31/2006 3/31/2006 C N Not deliverable as Habitats 2005-06. Delayed output.

WwTW Directive Driver



4UU130501 Barton Lane/Fountain St F1b United Utilities Ltd SJ 7677 9768 F1b 3/31/2007 3/31/2010 I Y 3/31/2005

Eccles investigation investigation



F1b

75% designation option



UID0

4UU130501 Barton Lane/Fountain St F1b United Utilities Ltd SJ 7677 9768 F1b 3/31/2010 3/31/2010 I Y 3/31/2005

Eccles investigation 75% designation option



F1b

75% designation option



UID0

4UU130501 Barton Lane/Fountain St F1b United Utilities Ltd SJ 7677 9768 UID0 3/31/2010 3/31/2010 I Y 3/31/2005

Eccles investigation



F1b

75% designation option



UID0

4UU702101 BASSENTHWAITE STW H3 (2) United Utilities Ltd NY 2237 3215 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive Driver



4UU110201 Biddulph STW F1b United Utilities Ltd SJ 8871 5897 F1b 3/31/2010 3/31/2010 C Y 5/20/2005

75% FFD Designation - 75% FFD Designation -

Biddulph Brook (Biddulph Biddulph Brook (Biddulph

STW to Dane) STW to Dane)

4UU440101 Blackburn STW F1b United Utilities Ltd SD 6047 2941 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% designation 75% designation



4UU101201 Bolton STW F1b United Utilities Ltd SD 7695 0452 F1b 12/31/2008 12/31/2008 C Y 1/20/2006

75% FFD Designation 75% FFD Designation



U3

4UU101201 Bolton STW F1b United Utilities Ltd SD 7695 0452 U3 12/31/2008 12/31/2008 C Y 1/20/2006

75% FFD Designation



U3



4UU450300 Bradley Lane, M.H 830 UID0 United Utilities Ltd SD 5748 1126 UID0 3/31/2009 3/31/2009 I Y 3/11/2005



4UU717701 BRAMPTON (CARLISLE) H3 (2) United Utilities Ltd NY 5076 6098 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

STW Directive Driver



4UU129601 Buckton Vale Road UID0 United Utilities Ltd SD 9768 0005 UID0 3/31/2010 3/31/2010 I Y 2/16/2005



4UU412901 Bulk Road B2 United Utilities Ltd SD 4799 6209 B2 3/31/2007 3/31/2007 I Y 3/24/2005



4UU430501 Burnley STW F1b United Utilities Ltd SD 8255 3527 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% designation 75% designation



4UU460101 Burscough STW H1 (2) United Utilities Ltd SD 4244 1344 H1 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive Driver



4UU127001 Burton Road/Lapwing Lane UID0 United Utilities Ltd SJ 8346 9162 UID0 3/31/2007 3/31/2007 I Y 2/16/2005









Page 18 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

4UU101401 Bury STW U3 United Utilities Ltd SD 8044 0781 U3 12/31/2008 12/31/2008 C Y Not issued - Application for

variation still being

determined. AMP 4

conditions to be included in

variation.

4UU413001 Cable Street B2 United Utilities Ltd SD 4761 6194 B2 3/31/2007 3/31/2007 I Y 3/24/2005



4UU702001 CAMERTON PS UID0 United Utilities Ltd NY 0380 3055 UID0 3/31/2008 3/31/2008 I Y 2/24/2005



4UU722801 CARK CSO UID0 United Utilities Ltd SD 3581 7683 UID0 3/31/2009 3/31/2009 I Y 3/31/2005



4UU723301 CARK TANK NO 1 STW U1a United Utilities Ltd SD 3545 7635 U1a 12/31/2005 12/31/2005 C Y 3/31/2005 2005-06. Delayed output.



4UU712101 CARLISLE STW H1 (2) United Utilities Ltd NY 3847 5652 H1 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive Driver



4UU128901 Caroline St (N of Bridge) UID0 United Utilities Ltd SJ 9610 9855 UID0 3/31/2010 3/31/2010 I Y 2/22/2005



4UU129501 Caroline Street/Castle UID0 United Utilities Ltd SJ 9606 9848 UID0 3/31/2010 3/31/2010 I Y 2/16/2005

Street



3UU440222 Clarkson Fold Cow Hill B2 United Utilities Ltd SD 5705 3403 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440222 Clarkson Fold Cow Hill B2 United Utilities Ltd SD 5705 3403 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

3UU440206 Clifton Village PS delivery delay.

B2 United Utilities Ltd SD 4710 3000 B2 3/31/2008 3/31/2008 I Y 1/17/2006

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.





Page 19 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440206 Clifton Village PS B2 United Utilities Ltd SD 4710 3000 UID1 3/31/2008 3/31/2008 I Y 1/17/2006

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU430102 Clitheroe Storm Tanks UID0 United Utilities Ltd SD 7293 4017 UID0 3/31/2009 3/31/2009 I Y 3/31/2005



4UU723101 CONISTON STW BAP1 (2) United Utilities Ltd SD 3072 9705 BAP1 (2) 3/31/2010 3/31/2010 C N Not deliverable as BAP1

BAP1 investigation to BAP1 investigation to investigation; this will inform

complete by 30/09/06 complete by 30/09/06 final BAP1 works to ensure

a cost-effective solution is

delivered)



4UU721401 CONISTON STW STORM BAP1 (2) United Utilities Ltd SD 3072 9705 BAP1 (2) 9/30/2006 9/30/2006 I N Not deliverable as BAP1

TANKS Investigation to inform final Investigation to inform final investigation; this will inform

Coniston STW scheme Coniston STW scheme final BAP1 works to ensure

a cost-effective solution is

delivered)



3UU440203 Cop Lane/Poplar Avenue B2 United Utilities Ltd SD 3522 4281 B2 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440203 Cop Lane/Poplar Avenue B2 United Utilities Ltd SD 3522 4281 UID1 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU730301 CROGLIN STW G1 United Utilities Ltd NY 5742 4680 G1 3/31/2010 3/31/2010 C Y 3/31/2005



4UU724301 CROSSGATE STW H3 (2) United Utilities Ltd NY 0759 2103 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver

H5 (2)



Page 20 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

4UU724301 CROSSGATE STW H3 (2) United Utilities Ltd NY 0759 2103 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver

H5 (2)

4UU129801 Cumberland Street UID0 United Utilities Ltd SJ 9590 9880 UID0 3/31/2010 3/31/2010 I Y 2/16/2005



4UU900701 D1 Investigations Project D1 United Utilities Ltd D1 3/31/2007 3/31/2007 N Not deliverable as D1 is

investigatative



4UU700201 DALSTON STW H1 (1) United Utilities Ltd NY 3796 5117 H1 (1) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver



4UU413401 Damside B2 United Utilities Ltd SD 4754 6203 B2 3/31/2007 3/31/2007 I Y 3/24/2005



4UU101101 Davyhulme STW F1b United Utilities Ltd SJ 7480 9646 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works

75% FFD Designation 75% FFD Designation required.



4UU101102 Davyhulme STW Storm F1b United Utilities Ltd SJ 7480 9646 F1b 3/31/2007 3/31/2010 I Y 3/31/2005

Tanks investigation investigation



UID0



4UU101102 Davyhulme STW Storm F1b United Utilities Ltd SJ 7480 9646 UID0 3/31/2010 3/31/2010 I Y 3/31/2005

Tanks investigation



UID0



4UU101901 Denton STW F1b United Utilities Ltd SJ 9213 9347 F1b 12/31/2006 12/31/2006 C Y 3/31/2005

75% FFD Designation; 75% FFD Designation;

AMP3/4 scheme AMP3/4 scheme



4UU129701 Disused Railway Station UID0 United Utilities Ltd SJ 9590 9855 UID0 3/31/2010 3/31/2010 I Y 2/22/2005

Rassbottom St/b



3UU440202 Dow Br, Kirkham Bypass B2 United Utilities Ltd SD 3436 4317 B2 3/31/2008 3/31/2008 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440202 Dow Br, Kirkham Bypass B2 United Utilities Ltd SD 3436 4317 UID1 3/31/2008 3/31/2008 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU101801 Dukinfield STW F1b United Utilities Ltd SJ 9332 9649 F1b 3/31/2009 3/31/2009 C Y 3/31/2005

75% FFD Designation 75% FFD Designation



4UU101001 Eccles STW F1b United Utilities Ltd SJ 7496 9715 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works

75% FFD Designation 75% FFD Designation required.

(Worsley Brook & MSC) (Worsley Brook & MSC)





Page 21 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

4UU700601 EMBLETON STW H3 (2) United Utilities Ltd NY 1795 3053 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver



4UU700602 EMBLETON STW STORM H8 (4) United Utilities Ltd NY 1795 3053 H8 (4) 3/31/2006 3/31/2006 I N Not deliverable as Habitats 2005-06. Partial output

Directive driver and delivered Mar-06 -

investigation investigation carried out but

no remediation options

identified. Further work

required.



4UU727901 ESTHWAITE LODGE PS I1 (2) United Utilities Ltd SD 3563 9675 I1 (2) 3/31/2010 3/31/2010 I N Not deliverable as

investigation only



4UU105201 Failsworth STW F1b United Utilities Ltd SJ 8970 9975 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works

75% FFD Designation 75% FFD Designation required.



4UU470101 Fazakerley STW C1 United Utilities Ltd SJ 3937 9660 C1 3/31/2008 12/31/2008 C Y 3/31/2005



U3

4UU470101 Fazakerley STW C1 United Utilities Ltd SJ 3937 9660 U3 12/31/2008 12/31/2008 C Y 3/31/2005



U3

4UU724401 FELL DYKE STW H3 (2) United Utilities Ltd NY 0812 1989 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver

H5 (2)

4UU724401 FELL DYKE STW H3 (2) United Utilities Ltd NY 0812 1989 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver

H5 (2)

4UU728001 FOLDGATE PS I1 (2) United Utilities Ltd SD 3565 9655 I1 (2) 3/31/2010 3/31/2010 I N Not deliverable as

investigation only



4UU470301 Formby STW U3 United Utilities Ltd SD 2964 0587 U3 12/31/2008 12/31/2008 C Y 3/31/2005



3UU440216 Frenchwood Knoll CSO B2 United Utilities Ltd SD 5425 2869 B2 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440216 Frenchwood Knoll CSO B2 United Utilities Ltd SD 5425 2869 UID1 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU900901 G4 scheme - Lords Street, G4 United Utilities Ltd G4 3/31/2010 3/31/2010 N Not deliverable as G4 is UU-

Cadishead (Irlam WwTW) promoted "blue driver"









Page 22 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440224 Garstang Road Bridge B2 United Utilities Ltd SD 5327 3177 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440224 Garstang Road Bridge B2 United Utilities Ltd SD 5327 3177 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU102301 Glazebury STW F1b United Utilities Ltd SJ 6780 9552 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation 75% FFD Designation



4UU722501 GLEBE ROAD CSO B2 United Utilities Ltd SD 3941 9635 B2 3/31/2007 3/31/2007 I Y 3/31/2005



BAP1 (2)



4UU722501 GLEBE ROAD CSO B2 United Utilities Ltd SD 3941 9635 BAP1 (2) 3/31/2007 3/31/2007 I Y 3/31/2005



BAP1 (2)



4UU703901 GLENRIDDING STW H3 (2) United Utilities Ltd NY 3845 1683 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver



4UU100401 Glossop STW (Melandra) I1 (2) United Utilities Ltd SJ 9993 9416 I1 (2) 3/31/2009 3/31/2009 C N Not deliverable as

investigation only

4UU709201 GREAT SALKELD STW U1a United Utilities Ltd NY 5569 3643 U1a 12/31/2005 12/31/2005 C Y 2/8/2005



4UU721501 HAWKSHEAD STW I1 (2) United Utilities Ltd SD 3574 9766 I1 (2) 3/31/2010 3/31/2010 C N Not deliverable as

investigation only

4UU721502 HAWKSHEAD STW I1 (2) United Utilities Ltd SD 3574 9766 I1 (2) 3/31/2010 3/31/2010 I N Not deliverable as

STORM/INLET investigation only

4UU113101 Hindley Storm Tanks UID0 United Utilities Ltd SD 6154 0326 UID0 3/31/2010 3/31/2010 I Y 3/31/2005



4UU128801 Huddersfield Road UID0 United Utilities Ltd SJ 9723 9881 UID0 3/31/2010 3/31/2010 I Y 2/16/2005



4UU719701 HUTTON ROOF STW G1 United Utilities Ltd SD 5705 7790 G1 3/31/2010 3/31/2010 C Y Not issued - not a discharge

to groundwater as stated in

database. Issues to be

resolved.





4UU101701 Hyde STW F1b United Utilities Ltd SJ 9379 9484 F1b 3/31/2009 3/31/2009 C Y 3/31/2005

75% FFD Designation 75% FFD Designation



4UU430601 Hyndburn STW F1b United Utilities Ltd SD 7575 3355 F1b 3/31/2010 3/31/2010 C Y 6/23/2005

75% designation 75% designation









Page 23 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

4UU901001 I0 Nature Conservation & I0 United Utilities Ltd I0 3/31/2010 3/31/2010 N Not delivered as I0 is UU-

Catchment Management 5 to 10 year management plan 5 to 10 year management plan promoted "blue driver" & is a

Proj 5 year plus management

plan rather than consent)







4UU129301 Illingworth Avenue UID0 United Utilities Ltd SJ 9727 9843 UID0 3/31/2010 3/31/2010 I Y 2/1/2005



4UU450111 Ince in Makerfield PS UID0 United Utilities Ltd SD 5872 0403 UID0 3/31/2009 3/31/2009 I Y 3/31/2005



4UU720001 KENDAL STW H1 (2) United Utilities Ltd SD 5141 9012 H1 (2) 3/31/2008 12/31/2008 C N Not deliverable as Habitats

0.7 mg/l required to achieve 0.7 mg/l required to achieve Directive driver

National P Target for Habitats National P Target for Habitats

Directive purposes. Directive purposes.



U3





4UU720001 KENDAL STW H1 (2) United Utilities Ltd SD 5141 9012 U3 12/31/2008 12/31/2008 C N Not deliverable as Habitats

0.7 mg/l required to achieve Directive driver

National P Target for Habitats

Directive purposes.



U3





4UU701901 KESWICK STW H1 (1) United Utilities Ltd NY 2487 2495 H1 (1) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver



4UU701902 KESWICK STW STORM H8 (4) United Utilities Ltd NY 2487 2495 H8 (4) 3/31/2006 3/31/2009 I N Not deliverable as Habitats 2005-06. Partial output

Directive driver & delivered Mar-06 -

UID0 investigation; delay UID0 investigation carried out but

until Habs requirement no remediation options

known so that cost-effective identified. Further work

solution is delivered) required.



4UU701902 KESWICK STW STORM H8 (4) United Utilities Ltd NY 2487 2495 UID0 3/31/2009 3/31/2009 I N Not deliverable as Habitats

Directive driver &

UID0 investigation; delay UID0

until Habs requirement

known so that cost-effective

solution is delivered)



4UU710601 KIRKBY STEPHEN STW H3 (2) United Utilities Ltd NY 7715 1044 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver



4UU129201 Knowle Street UID0 United Utilities Ltd SJ 9666 9860 UID0 3/31/2010 3/31/2010 I Y 2/16/2005



4UU103701 Ladies Lane / Gidlow UID0 United Utilities Ltd SD 6212 0473 UID0 3/31/2010 3/31/2010 I Y 3/31/2005

Street CSO

4UU103801 Ladies Lane CSO UID0 United Utilities Ltd SD 6212 0473 UID0 3/31/2010 3/31/2010 I Y 3/31/2005



3UU440204 Lamaleach PS B2 United Utilities Ltd SD 4250 2820 B2 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 24 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440204 Lamaleach PS B2 United Utilities Ltd SD 4250 2820 UID1 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU721301 LANGDALE STW BAP1 (2) United Utilities Ltd NY 3268 0410 BAP1 (2) 3/31/2010 3/31/2010 C Y 3/31/2005



4UU102501 Leigh STW F1b United Utilities Ltd SJ 6650 9846 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation 75% FFD Designation



3UU440220 London Road B2 United Utilities Ltd SD 5528 2874 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440220 London Road B2 United Utilities Ltd SD 5528 2874 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU190301 Long Hey Road/Croft Drive UID0 United Utilities Ltd SJ 2302 8394 UID0 3/31/2009 3/31/2009 I Y To be issued by Wales

East junction

4UU730901 LOWICK GREEN NO. 2 U1a United Utilities Ltd SD 2992 8532 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.

STW









Page 25 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440208 Lytham Road, Warton PS B2 United Utilities Ltd SD 3820 2820 B2 3/31/2008 3/31/2008 I Y Not issued - the

AMP4 Preston Strategy split AMP4 Preston Strategy split database is in

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - error as the

current split is arbitary). current split is arbitary). asset is an EO

Completion date after EA Completion date after EA not a SSO.

guidance date of 2007 due to guidance date of 2007 due to This issue

likely knock-on effects of likely knock-on effects of needs to be

AMP3 Preston Strategy AMP3 Preston Strategy resolved prior to

delivery delay. delivery delay. the issue of the

AMP4 consent.

UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440208 Lytham Road, Warton PS B2 United Utilities Ltd SD 3820 2820 UID1 3/31/2008 3/31/2008 I Y Not issued - the

AMP4 Preston Strategy split AMP4 Preston Strategy split database is in

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - error as the

current split is arbitary). current split is arbitary). asset is an EO

Completion date after EA Completion date after EA not a SSO.

guidance date of 2007 due to guidance date of 2007 due to This issue

likely knock-on effects of likely knock-on effects of needs to be

AMP3 Preston Strategy AMP3 Preston Strategy resolved prior to

delivery delay. delivery delay. the issue of the

AMP4 consent.

UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU108301 Macclesfield STW F1b United Utilities Ltd SJ 8935 7869 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works

75% FFD Designation 75% FFD Designation required.



3UU440214 Manch Road/James St B2 United Utilities Ltd SD 5472 2896 B2 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 26 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440214 Manch Road/James St B2 United Utilities Ltd SD 5472 2896 UID1 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440227 Manchester B2 United Utilities Ltd SD 5470 2899 B2 3/31/2009 3/31/2009 I Y 3/8/2005

Road/Selbourne Road AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440227 Manchester B2 United Utilities Ltd SD 5470 2899 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

Road/Selbourne Road AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 27 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440228 Manchester B2 United Utilities Ltd SD 5482 2885 B2 3/31/2009 3/31/2009 I Y 3/8/2005

Road/Frenchwood Avenue AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440228 Manchester B2 United Utilities Ltd SD 5482 2885 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

Road/Frenchwood Avenue AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU128601 Manor Road P.S, Woodley UID0 United Utilities Ltd SJ 9333 9288 UID0 3/31/2009 3/31/2009 I Y Issued after

deadline



4UU102701 Market Street / Lowe Mill UID0 United Utilities Ltd SD 6192 0442 UID0 3/31/2010 3/31/2010 I Y 2/16/2005

Lane CSO

4UU730801 MEALBANK STW U1a United Utilities Ltd SD 5407 9563 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.



4UU129101 Melbourne Street UID0 United Utilities Ltd SJ 9628 9853 UID0 3/31/2010 3/31/2010 I Y 2/16/2005



4UU103401 Mere Platt Pumping Station UID0 United Utilities Ltd SJ 7350 8262 UID0 3/31/2009 3/31/2009 I Y Not issued - possible

habitats implications which

need to be discussed with

EN prior to issue.



3UU440225 Mh H.42 Victoria Road B2 United Utilities Ltd SD 5340 3140 B2 3/31/2009 3/31/2009 I Y Not issued -

Near Jun AMP4 Preston Strategy split AMP4 Preston Strategy split unable to find

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - current

current split is arbitary). current split is arbitary). consent.

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 28 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440225 Mh H.42 Victoria Road B2 United Utilities Ltd SD 5340 3140 UID1 3/31/2009 3/31/2009 I Y Not issued -

Near Jun AMP4 Preston Strategy split AMP4 Preston Strategy split unable to find

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - current

current split is arbitary). current split is arbitary). consent.

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU109601 Middlewich STW F1b United Utilities Ltd SJ 7122 6622 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation - River 75% FFD Designation - River

Croco (Middlewich STW to Croco (Middlewich STW to

Dane) Dane)

4UU125501 New Warrington Road, UID0 United Utilities Ltd SJ 6699 7512 UID0 3/31/2009 3/31/2009 I Y 2/16/2005

Wincham

4UU731101 NEWTON REIGNY (SUN U1a United Utilities Ltd NY 4811 3197 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.

INN) STW

4UU731201 NEWTON REIGNY STW U1a United Utilities Ltd NY 4811 3197 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.



4UU109401 Northwich STW F1b United Utilities Ltd SJ 6374 7416 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation - 75% FFD Designation -

Weaver (Navigation Overflow Weaver (Navigation Overflow

to Weston Canal) to Weston Canal)



3UU440201 Nr Ship Inn/Bunker St B2 United Utilities Ltd SD 3436 4287 B2 3/31/2008 3/31/2008 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440201 Nr Ship Inn/Bunker St B2 United Utilities Ltd SD 3436 4287 UID1 3/31/2008 3/31/2008 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU128101 Off Grove Rd, Millbrook UID0 United Utilities Ltd SJ 9764 9980 UID0 3/31/2010 3/31/2010 I Y 2/16/2005







Page 29 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

4UU128001 Off Huddersfield Road, UID0 United Utilities Ltd SJ 9785 9948 UID0 3/31/2010 3/31/2010 I Y 2/16/2005

Adj Swinesha

4UU125201 Off Jack Lane, Moulton UID0 United Utilities Ltd SJ 6610 6920 UID0 3/31/2009 3/31/2009 I Y 2/16/2005



4UU105101 Oldham STW F1b United Utilities Ltd SD 8926 0430 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works

75% FFD Designation (River 75% FFD Designation (River required.

Irk); 100% FFD Designation Irk); 100% FFD Designation

(Wince Brook) (Wince Brook)





4UU412801 Owen Road, Skerton B2 United Utilities Ltd SD 4788 6236 B2 3/31/2007 3/31/2007 I Y 3/24/2005



4UU129401 Park Road/Sandy Lane UID0 United Utilities Ltd SJ 9510 9822 UID0 3/31/2010 3/31/2010 I Y 2/16/2005



4UU102801 Partington STW F1b United Utilities Ltd SJ 7045 9092 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation 75% FFD Designation



3UU440212 Peddars Lane B2 United Utilities Ltd SD 5014 2928 B2 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440212 Peddars Lane B2 United Utilities Ltd SD 5014 2928 UID1 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU731501 PENNY BRIDGE STW U1a United Utilities Ltd SD 3120 8290 U1a 12/31/2005 12/31/2005 C Y 3/22/2005 2005-06. Delayed output.



4UU705801 PENRITH CSO TO UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y REVOKATION

EAMONT

4UU704601 PENRITH CSO-24 UID0 United Utilities Ltd NY 5169 3029 UID0 3/31/2008 3/31/2008 I Y 2/24/2005

SANDGATE

4UU704101 PENRITH CSO-ARTHUR UID0 United Utilities Ltd NY 5150 3029 UID0 3/31/2008 3/31/2008 I Y 2/24/2005

ST

4UU705201 PENRITH CSO- UID0 United Utilities Ltd NY 5172 3032 UID0 3/31/2008 3/31/2008 I Y 2/24/2005

BRENTFIELD LANE

4UU706301 PENRITH CSO-CASTLE UID0 United Utilities Ltd NY 5188 2973 UID0 3/31/2008 3/31/2008 I Y 2/24/2005

DRIVE 1

4UU704801 PENRITH CSO-FELL UID0 United Utilities Ltd NY 5172 3032 UID0 3/31/2008 3/31/2008 I Y 2/24/2005

LANE/BENSONS ROW

4UU705301 PENRITH CSO- UID0 United Utilities Ltd NY 5061 3083 UID0 3/31/2008 3/31/2008 I Y 2/24/2005

ROBINSON ST

4UU706501 PENRITH CSO-SSO35 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005









Page 30 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

4UU705601 PENRITH CSO-SSO36 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005





4UU706401 PENRITH CSO-SSO37 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005





4UU704001 PENRITH CSO-SSO38 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005





4UU705001 PENRITH CSO-SSO39 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005





4UU704301 PENRITH CSO-SSO40 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005





4UU706201 PENRITH CSO- UID0 United Utilities Ltd NY 5142 3038 UID0 3/31/2008 3/31/2008 I Y 2/24/2005

WORDSWORTH ST

4UU705701 PENRITH OUTFALL CSO UID0 United Utilities Ltd NY 5417 2947 UID0 3/31/2008 3/31/2008 I Y 3/11/2005





4UU705901 PENRITH SPS UID0 United Utilities Ltd NY 5082 3050 UID0 3/31/2008 3/31/2008 I Y Not issued -

This was not

issued as the

database was in

error. The

asset is an EO

so the Formula

A solution was

not appropriate.





4UU726301 PLUMPTON NORTH STW U1a United Utilities Ltd NY 4910 3752 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.



3UU440211 Powis Road B2 United Utilities Ltd SD 5014 2928 B2 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440211 Powis Road B2 United Utilities Ltd SD 5014 2928 UID1 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU413101 Railway Farm B2 United Utilities Ltd SD 4808 5524 B2 3/31/2007 3/31/2007 I Y 3/24/2005



4UU413801 Ramparts CSO B2 United Utilities Ltd SD 4792 6242 B2 3/31/2007 3/31/2007 I Y 3/31/2005









Page 31 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440218 Riverside Penwortham B2 United Utilities Ltd SD 5307 2819 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440218 Riverside Penwortham B2 United Utilities Ltd SD 5307 2819 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440215 Riversway CSO B2 United Utilities Ltd SD 5013 2928 B2 3/31/2008 3/31/2008 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 32 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440215 Riversway CSO B2 United Utilities Ltd SD 5013 2928 UID1 3/31/2008 3/31/2008 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU715701 ROA ISLAND STW H8 (4) United Utilities Ltd SD 2319 6461 H8 (4) 3/31/2006 3/31/2006 3/31/2006 C N Not delivered as Habitats 3/31/2006 2005-06. Investigation

Directive driver & completed and no further

investigation work required.





4UU105001 Rochdale STW U3 United Utilities Ltd SD 8816 1237 U3 12/31/2008 12/31/2008 C Y 3/31/2005



4UU413201 Rosemary Lane B2 United Utilities Ltd SD 4782 6182 B2 3/31/2007 3/31/2007 I Y 3/24/2005



4UU104901 Rossendale STW U3 United Utilities Ltd SD 7937 2040 U3 12/31/2008 12/31/2008 C Y 3/31/2005



4UU724501 ROWRAH STW H3 (2) United Utilities Ltd NY 0618 1878 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver



4UU104801 Royton STW F1b United Utilities Ltd SD 9067 0711 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation (River 75% FFD Designation (River

Irk); 100% FFD Designation Irk); 100% FFD Designation

(Luzley Brook) (Luzley Brook)



4UU100901 Sale STW F1b United Utilities Ltd SJ 7677 9292 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation - River 75% FFD Designation - River

Mersey (Princess Parkway to Mersey (Princess Parkway to

Carrington PS); 100% FFD Carrington PS); 100% FFD

Designation - Stromford Designation - Stromford

Brook(QSL at Sale STW to Brook(QSL at Sale STW to

Mersey) Mersey)

4UU47200 Sandy Lane / 48 Moss UID0 United Utilities Ltd SD 3642 0395 UID0 3/31/2009 3/31/2009 I Y 2/1/2005

Lane

4UU411401 Scale Hall PS B2 United Utilities Ltd SD 4644 6224 B2 3/31/2007 3/31/2007 I Y 3/24/2005



3UU440205 School Lane B2 United Utilities Ltd SD 4300 3240 B2 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 33 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440205 School Lane B2 United Utilities Ltd SD 4300 3240 UID1 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU723801 SHAP STW H3 (2) United Utilities Ltd NY 5573 1584 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver

H5 (2)



4UU723801 SHAP STW H3 (2) United Utilities Ltd NY 5573 1584 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver

H5 (2)



4UU723803 SHAP STW INLET H8 (4) United Utilities Ltd NY 5573 1584 H8 (4) 3/31/2006 3/31/2006 I N Not deliverable as Habitats 2005-06. Partial output

OVERFLOW Directive driver & delivered Mar-06 -

UID0 investigation; delay UID0 investigation carried out but

until Habs requirement no remediation options

known so that cost-effective identified. Further work

solution is delivered) required.



4UU723803 SHAP STW INLET H8 (4) United Utilities Ltd NY 5573 1584 UID0 3/31/2006 3/31/2006 I N Not deliverable as Habitats

OVERFLOW Directive driver &

UID0 investigation; delay UID0

until Habs requirement

known so that cost-effective

solution is delivered)



4UU723802 SHAP STW STORM TANK H8 (4) United Utilities Ltd NY 5573 1584 H8 (4) 3/31/2006 3/31/2006 I N Not deliverable as Habitats 2005-06. Partial output

Directive driver & delivered Mar-06 -

UID0 investigation; delay UID0 investigation carried out but

until Habs requirement no remediation options

known so that cost-effective identified. Further work

solution is delivered) required.



4UU723802 SHAP STW STORM TANK H8 (4) United Utilities Ltd NY 5573 1584 UID0 3/31/2006 3/31/2006 I N Not deliverable as Habitats

Directive driver &

UID0 investigation; delay UID0

until Habs requirement

known so that cost-effective

solution is delivered)







3UU440230 Sharoe Green Hospital B2 United Utilities Ltd SD 5395 3202 B2 3/31/2009 3/31/2009 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 34 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440230 Sharoe Green Hospital B2 United Utilities Ltd SD 5395 3202 UID1 3/31/2009 3/31/2009 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440221 Sharoe Green Lane B2 United Utilities Ltd SD 5414 3214 B2 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440221 Sharoe Green Lane B2 United Utilities Ltd SD 5414 3214 UID1 3/31/2009 3/31/2009 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU190201 Shore Road/Croft Drive UID0 United Utilities Ltd SJ 2221 8483 UID0 3/31/2009 3/31/2009 I Y To be issued by Wales









Page 35 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440210 St Georges Road B2 United Utilities Ltd SD 5482 3045 B2 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440210 St Georges Road B2 United Utilities Ltd SD 5482 3045 UID1 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU106601 St Helens STW F1b United Utilities Ltd SJ 5382 9590 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation - 75% FFD Designation -

Sankey Brook (Rainford Brook Sankey Brook (Rainford Brook

to FWL at A57) to FWL at A57)





4UU413601 St Nicholas Lane PS B2 United Utilities Ltd SD 4782 6876 B2 3/31/2007 3/31/2007 I Y 3/31/2005



UID0



4UU413601 St Nicholas Lane PS B2 United Utilities Ltd SD 4782 6876 UID0 3/31/2007 3/31/2007 I Y 3/31/2005



UID0



4UU127901 Stamford St, Millbrook UID0 United Utilities Ltd SJ 9789 9968 UID0 3/31/2010 3/31/2010 I Y 2/16/2005









Page 36 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440207 Station Road B2 United Utilities Ltd SD 4180 3260 B2 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



F1b

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440207 Station Road B2 United Utilities Ltd SD 4180 3260 F1b 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



F1b

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 37 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440207 Station Road B2 United Utilities Ltd SD 4180 3260 UID1 3/31/2008 3/31/2008 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



F1b

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU104001 Strangeways PS & CSO UID0 United Utilities Ltd SD 6132 0345 UID0 3/31/2010 3/31/2010 I Y Not issued - This is currently

No. 1 only consented as an EO.

UU should apply to extend

this to cover a storm

overflow.





4UU124001 Strangeways PS No.2 UID0 United Utilities Ltd SD 6105 0334 UID0 3/31/2010 3/31/2010 I Y Not issued - The database

only identified an aesthetics

solution for this discharge.

WQ date indicates that this

should also have a river

impact driver and further

clarification is required.









4UU100601 Stretford STW F1b United Utilities Ltd SJ 7806 9318 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% FFD Designation (River 75% FFD Designation (River

Mersey); 100% FFD Mersey); 100% FFD

Designation (Stromford Brook) Designation (Stromford Brook)





4UU730501 THREE BRIDGES U1a United Utilities Ltd SD 2763 7755 U1a 12/31/2005 12/31/2005 I Y 2/8/2005 2005-06. Delayed output.

(SWARTHMOOR) STW



4UU730401 THRELKELD STW H3 (2) United Utilities Ltd NY 3245 2515 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats

Directive driver



4UU722301 TORVER STW U1a United Utilities Ltd SD 2817 9393 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.



4UU129001 Trinity Street/Dean Street UID0 United Utilities Ltd SJ 9636 9853 UID0 3/31/2010 3/31/2010 I Y 2/16/2005





4UU128401 Two Trees Lane/Marina UID0 United Utilities Ltd SJ 9316 9438 UID0 3/31/2009 3/31/2009 I Y 2/16/2005

Avenue



4UU100501 Urmston STW F1b United Utilities Ltd SJ 7287 9399 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works

75% FFD Designation 75% FFD Designation required.









Page 38 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440232 Valley Road PS B2 United Utilities Ltd SD 5281 2845 B2 3/31/2009 3/31/2009 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440232 Valley Road PS B2 United Utilities Ltd SD 5281 2845 UID1 3/31/2009 3/31/2009 I Y 3/31/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU128501 Wakeling Road/Stockport UID0 United Utilities Ltd SJ 9223 9388 UID0 3/31/2009 3/31/2009 I Y 2/16/2005

Road

3UU440217 Watery Lane 79 B2 United Utilities Ltd SD 5013 2928 B2 3/31/2009 3/31/2009 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.









Page 39 of 42

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006









Modification Deliverable by

Discharge Name / location









Final Scheme Completion

Planned Completion Date









Modification issued - date

Continuous or Intemittent









Consenting Comments

Water Company Name









Variation issued - date

Driver completed date









Date (dd/mm/yyyy)

Completion Date

Planned Driver









(dd/mm/yyyy)









(dd/mm/yyyy)

(dd/mm/yyyy)









(dd/mm/yyyy)









(dd/mm/yyyy)









31/03/2005









Comments

Unique ID









Drivers









Driver









(C / I)

NGR

3UU440217 Watery Lane 79 B2 United Utilities Ltd SD 5013 2928 UID1 3/31/2009 3/31/2009 I Y 3/24/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU109501 Weaverham STW F1b United Utilities Ltd SJ 61150 75180 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works

75% FFD Designation - River 75% FFD Designation - River required.

Weaver (Navigation Overflow Weaver (Navigation Overflow

to Weston Canal) to Weston Canal)





4UU420202 Weeton STW Inlet UID0 United Utilities Ltd SD 3828 3484 UID0 3/31/2008 3/31/2008 I Y 2/23/2005

Overflow

4UU450101 Wigan STW F1b United Utilities Ltd SD 4817 1202 F1b 3/31/2010 3/31/2010 C Y 3/31/2005

75% designation 75% designation



4UU411501 Willow Lane PS B2 United Utilities Ltd SD 4665 6223 B2 3/31/2007 3/31/2007 I Y 3/24/2005



4UU721901 WINDERMERE STW BAP1 (1) United Utilities Ltd SD 3847 9136 BAP1 (1) 3/31/2009 3/31/2009 C Y 3/31/2005



3UU440213 Wolseley Road B2 United Utilities Ltd SD 5311 2828 B2 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



3UU440213 Wolseley Road B2 United Utilities Ltd SD 5311 2828 UID1 3/31/2008 3/31/2008 I Y 3/8/2005

AMP4 Preston Strategy split AMP4 Preston Strategy split

into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -

current split is arbitary). current split is arbitary).

Completion date after EA Completion date after EA

guidance date of 2007 due to guidance date of 2007 due to

likely knock-on effects of likely knock-on effects of

AMP3 Preston Strategy AMP3 Preston Strategy

delivery delay. delivery delay.



UID1

AMP4 Preston Strategy split

into 2 phases (2008 & 2009 -

current split is arbitary).

Completion date after EA

guidance date of 2007 due to

likely knock-on effects of

AMP3 Preston Strategy

delivery delay.



4UU413301 Wood Street B2 United Utilities Ltd SD 4770 6187 B2 3/31/2007 3/31/2007 I Y 3/24/2005









Page 40 of 42

Unique ID









4UU101301

Worsley STW





Discharge Name / location

F1b





Moss Bk)









Drivers

Brook (Qsl At Railway To

75% FFD Designation - Astley









Water Company Name

United Utilities Ltd









NGR

F1b SD 7214 0273





Moss Bk)









Driver

Brook (Qsl At Railway To

75% FFD Designation - Astley









Planned Driver

Completion Date

(dd/mm/yyyy)

3/31/2010









Page 41 of 42

Driver completed date

(dd/mm/yyyy)

43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls









Planned Completion Date

(dd/mm/yyyy)

3/31/2010









Continuous or Intemittent

C









(C / I)



Modification Deliverable by

Y









31/03/2005







Modification issued - date

3/31/2005









(dd/mm/yyyy)









Consenting Comments









Variation issued - date

(dd/mm/yyyy)







Final Scheme Completion

Date (dd/mm/yyyy)









Comments

20/03/2006

TABLE 3ci - Annual Return to OFWAT

Sludge Quantity and Quality Report Company United Utilities Water Plc

Year 2005

Calendar Year Report





Sewage

Treatment Main Sewage

Works: Treatment Recovery and Sludge

Total Works: Total Disposal Produced: Treated Sludge: Enhanced Treated Untreated Recovery to Agriculture: Land

Number Number Routes Amount Amount Sludge: Amount Sludge: Amount Quality

Average

Agriculture 147927 69662 38286 Zero zinc 887.8

Average

Incineration 40558 26363 Zero Zero copper 275.2

Average

Reclamation 39235 Zero Zero 36880 nickel 36.7

Average

Landfill 282 Zero Zero 282 lead 197

Average

tds tds tds tds cadmium 2.1

Average

tds tds tds tds mercury 1.5

Average

tds tds tds tds chromium 140

Average

Notes: tds = tonnes dry solids; ds = dry solids nitrogen 37988



Examples of recoveryand disposal routes inlcude: Average

agriculture, incineration, landfill, land reclamation. phosphorus 22401

Land used:

total 17517



Authorisation



Designation Operations Manager, Environmental Services Signed: Carl Startin



Dated: 1st March 2006


Related docs
Other docs by HC111130165329
June 8th 2009 Meeting Minutes
Views: 0  |  Downloads: 0
studentproofs
Views: 0  |  Downloads: 0
Milano 10 febbraio 2009
Views: 3  |  Downloads: 0
Index to Tables
Views: 0  |  Downloads: 0
Anexo 7a
Views: 0  |  Downloads: 0
Perenco U
Views: 0  |  Downloads: 0
carner3
Views: 0  |  Downloads: 0
009 Dios habla por su Espiritu
Views: 1  |  Downloads: 0
CAP Worksheet 1 3 1 Early Alert 09 10
Views: 0  |  Downloads: 0
CIAD1108300100205
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!