TABLE EA - 1(a), Annual Report to OFWAT
Discharge Consent Compliance Report Company United Utilities Water Plc
Year 2005
Calendar Year report
Open Guidance
Ref. No. No. of discharges No. of discharges No. of discharges %. of discharges
Date: 3 May 2006 on register during assessed for confirmed failing in compliant[1] with consent in
Contact: Tony Heaney calendar year (in compliance calendar year. the year (Automatically
Description force). Calculated)
Numeric Consents
1 Sewage Treatment Works: Total Number 356 356 13 96.3
2 Look-Up Table 351 351 2 99.4
3 Upper Tier 122 122 3 97.5
4 Absolute Non-Sanitary (excluding flow) 65 65 2 96.9
5 WSplc Disinfection - self monitored 25 25 1 96.0
6 WSplc UWWT - self monitored 87 87 5 94.3
7 WSplc Trade Discharges -Water Treatment Works 57 27 2 96.5
8 WSplc Trade Discharges - Other (including trade effluent 2 2 2 0.0
treatment facilities)
Non-Numeric Consents (Descriptive)
9 Sewage Treatment Works: Total Number 229 93 0 100.0
[2]
10 WSplc Trade Discharges -Water Treatment Works 4 1 0 100.0
11 WSplc Trade Discharges[2] -Other (including trade effluent 2 0 0 100.0
treatment facilities)
[1]
Compliant = not confirmed as failing
[2]
It is not usual for trade discharges to have descriptive consents -
this category is provided as a catch-all, to accommodate any rare
circumstances where such consents may exist
Authorisation
Designation: Water Company Account Manager (or equivalent) Signed: Clive Gaskell
Dated:
TABLE EA - 1(b), Annual Report to OFWAT
Discharges Confirmed as Failing Company United Utilities Water Plc
Year 2005
Calendar Year report
Open Guidance
Ref No:
Date: 3 May 2006
Contact: Tony Heaney Critieria
Name of EA Region Receiving Population LUT Upper Tier Upper Tier/absolute UWWT Disinfection Descriptive Action Taken Parameter Comments
Discharge [1] Water [2] Equivalent Sanitary Sanitary Non sanitary All Self-reporting All [3] [4] [5]
SEWAGE TREATMENT WORKS (including septic tanks and crude outfalls)
Count Reference
1 017160006 Colne WwTW NW IS 36,628 Y EA Ammonia 4 LUT failures
2 016930112 Fazakerley WwTW NW IS 207,263 Y EA Chloroform 3 failures. UU are prosecuting the trader who caused the failures.
3 017160008 Hyndburn WwTW NW IS 150,860 Y EA BOD 1 UT failure
4 017030100 Southport WwTW NW CS 93,220 Y EA Dose (24hr Rule)
5 016810052 Biddulph WwTW NW IN 14,837 Y N Ammonia 1 UT failure
6 016950033 Bury NW IS 282,516 Y N Ammonia 1 UT failure due to BAFF plant problems. No further action taken.
7 016940193 Davyhulme NW IN 1,196,951 Y N Hg Result challenged by UU but lab confirmed result is correct. UU
then challenged the process and the matter is with RSU Manager
to resolve. No further action taken.
8 016910006 High Legh NW IN 918 Y O BOD Failures due to problems with newly commisioned process units on
site. Enforcement action under consideration.
9 016810030 Ellesmere Port NW IN 93,034 Y O COD UT 1 COD UT failure. Action to be taken under consideration.
10 017580285 Workington NW CH 72,150 Y O BOD UT 1 BOD UT failure. Action to be taken under consideration.
11 016993397 Sandon Dock NW EN 709,412 Y EA BOD UT 1 BOD UT failure. Action to be taken under consideration.
COD UT 5 COD UT failures. Action to be taken under consideration.
COD LUT 15 COD LUT failures. Action to be taken under consideration.
12 016993399 Birkenhead NW EN 174,369 Y O COD LUT 4 COD LUT failures. Action to be taken under consideration.
13 016993398 Bromborough NW EN 145,150 Y O BOD UT 1 BOD UT failure. Action to be taken under consideration.
COD UT 2 COD UT failures. Action to be taken under consideration.
WSplc TRADE DISCHARGES - Water Treatment Works
1 CM0151201 v2 Huntington WTW (8022) NW IN Y EA TAC 1 failure on 17th Aug (0.12mg/l) against 0.05mg/l standard.
Warning letter sent.
2 CG0416901 v1 Tailbay Area @ Huntington WTW (26753)
NW IN Y EA TAC 3 failures on: 21st Sep (0.06mg/l); 17th Oct (0.07 mg/l) & 2nd Nov
(0.1mg/l) against 0.05mg/l standard. Warning letters sent.
3
4
WSplc TRADE DISCHARGES - Other
1 017580291 Raby Cote Discharge NW EN Y EA pH Warning letter was sent, consent was reviewed and there are
Y EA SS ongoing discussions
Y EA Sulphide
2 0166/296 Kirkby 72" outfall NW IS Y O BOD Outfall only operates in storm conditions. Ongoing discussions with
Y O SS UU regarding its future.
[1] NW = North West, NE = North East, M = Midlands, A = Anglian, T = Thames, S = Southern, SW = South West, W = Wales (please specify)
[2] One from: I = Inland, E = Estuarial, C = Coastal, G = Groundwater, and one from: N = Normal, S = Sensitive Area (UWWTD), H = exHNDA (please specify)
[3] PI(M) = Planned Investment (Maintenance), PI(3) = Planned Investment (AMP3), PI(4) = Planned Investment (AMP4), IU= investigation undertaken, RA = remedial action by discharger, EA = Enforcement
action, N = None (please provide comment in comment field), O = Other (please specify)
[4] BOD, COD, SS, NH3, pH, Scheme in breach of statutory deadlines, etc. For UWWTD failures specify: Reporting, Audit, Insufficient samples, BOD UT, BOD LUT, COD UT, COD LUT or Annual average (or a
combination of these). For UV disinfection failures please specify whether due to one or more of the following; ‘Dose (99% rule)’, ‘Dose (24-hour rule)’ or ‘reporting’. (Please specify one parameter per row).
[5] To include reasons for failure, mitigating circumstances and remedial actions taken. Any failed condition that is under appeal should be noted.
OFWAT Levels of Service Report
1) The Levels of Service Report only includes BOD LUT and P failures for UWWT reporting
2) In the Levels of Service Report, where a STW failues both the LUT part of its WRA consent and the BOD LUT or P UWWT consent condition, the failure is reported against the WRA consent only
Authorisation
Designation: Water Company Account Manager (or equivalent) Signed: Clive Gaskell
Dated:
TABLE EA - 1(d), Annual Report to OFWAT
Pollution Incidents Data by Premises/Source
Calendar Year Report
Open Guidance
Ref. No: Contact
Date: Completion Tony
Date Heaney
Ref. I/C
Reference
1 I/C
2 I/C
3 I/C
4 I/C
5 I/C
6 I/C
7 I/C
8 I/C
9 I/C
10 I/C
11 I/C
12 I/C
13 C
14 C
Authorisation
Designation Water Company Account Manager
nnual Report to OFWAT
Data by Premises/Source Company United Utilities Water Plc
Year 2005
Source/ Cat 1 Cat 2
Total Number Total Number
Sewage Related Premises
Sewage Treatment Works 0 2
Storm Tank 0 0
Combined Sewer Overflow 1 5
Foul Sewer 0 3
Pumping Station 0 9
Rising Mains 0 0
Other 0 1
Number of incidents where site compliant with discharge consent 0 1
Water and Surface Water Related Premises
Water Treatment Works 0 0
Water Distribution System 0 2
Surface Water Outfall 0 0
Number of incidents where site compliant with discharge consent 0 0
Total (Sewage and Water and Surface Water) related Premises
1 22
(Automatically Calculated)
Total (Sewage and Water and Surface Water) number of Incidents 0 1
where site compliant with Discharge Consent (Automatically
Calculated)
Total Number of all Category 1-3 incidents (Automatically Calculated) 165
Total Number where site compliant with Consent (Automatically
7
Calculated)
Total Number of Water Company self reported incidents 33
OFWAT Levels of Service and OPA Reports
1) Category 1-3 sewage related incidents and Category 1-2 water related incidents are reported in OFWAT Levels of Service Repor
2) Category 1-3 sewage related incidents are used in the OPA. (0.5 weighting for category 1 and 2 incidents, 0.25 weighting for cate
3) Category 1 and 2 water treatment and distribution related incidents are used in the OPA (0.25 weighting for both category 1 and 2
4) Incidents from public surface water sewers are not used by OFWAT in either LoS report or OPA
ompany Account Manager Signed: Clive Gaskell
Dated: 22nd March 2006
[
United Utilities Water Plc
2005
Cat 3 Total
Total Number (Cat 1-3 incidents)
Total Number
(Automatically Calculated)
5 7
1 1
46 52
35 38
26 35
7 7
2 3
6 7
0 0
6 8
14 14
0 0
142
6
1,2,3 as per the pollution incident categories detailed
in the EA Water Pollution Incidents in England and
Wales Report
re reported in OFWAT Levels of Service Reports
egory 1 and 2 incidents, 0.25 weighting for category 3 incidents.
e OPA (0.25 weighting for both category 1 and 2 incidents
22nd March 2006
Anglian Water Service Ltd
Dwr Cymru Cyfynfedig
Northumbrian Water Ltd
United Utilities Water Plc
Severn Trent Water Ltd
Southern Water Services Ltd
South West Water
Thames Water Utilities Plc
Wessex Water
Yorkshire Water Services Ltd
Bournemouth & W Hampshire Water
Bristol Water
Cambridge Water
Cholderton and District Water
Dee Valley Water
Essex & Suffolk Water
Folkestone & Dover Water
Mid Kent Water
North Surrey Water
Portsmouth Water
South East Water
South Staffs Water
Sutton and E Surrey Water
Tendring Hundreds Water
Three Valleys Water
York Waterworks
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
NW-all :Scheme Delivery and Environmental Outcomes AMP4 Tracking Spreadsheet Key to Regional / Area Worksheets
Region North West Yellow High priority habitat sites date changes
Area NW-all
Lead Contact
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440229 Bank Parade B2 United Utilities Ltd SD 5421 2866 B2 3/31/2009 3/31/2009 I Y 3/24/2005
CSO/Preston AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440229 Bank Parade B2 United Utilities Ltd SD 5421 2866 UID1 3/31/2009 3/31/2009 I Y 3/24/2005
CSO/Preston AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU190101 "APPLEGARTH" A41 UID0 United Utilities Ltd SJ 4475 6467 UID0 3/31/2008 3/31/2008 I N To be issued by Wales
ROWTON
3UU440219 176 Ribbleton Lane B2 United Utilities Ltd SD 5528 2874 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 14 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440219 176 Ribbleton Lane B2 United Utilities Ltd SD 5528 2874 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440223 18 Deepdale Road B2 United Utilities Ltd SD 5528 2874 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440223 18 Deepdale Road B2 United Utilities Ltd SD 5528 2874 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 15 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440226 207 Watling Street B2 United Utilities Ltd SD 5485 3134 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440226 207 Watling Street B2 United Utilities Ltd SD 5485 3134 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440231 42 Sharoe Green Lane B2 United Utilities Ltd SD 5397 3204 B2 3/31/2009 3/31/2009 I Y 3/24/2005
CSO AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 16 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440231 42 Sharoe Green Lane B2 United Utilities Ltd SD 5397 3204 UID1 3/31/2009 3/31/2009 I Y 3/24/2005
CSO AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440209 Albyn Street East B2 United Utilities Ltd SD 5493 2933 B2 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440209 Albyn Street East B2 United Utilities Ltd SD 5493 2933 UID1 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU108701 Alderley Edge STW F1b United Utilities Ltd SJ 8283 7858 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation 75% FFD Designation
4UU110501 Alsager STW C1 United Utilities Ltd SJ 7891 5679 C1 3/31/2008 3/31/2008 C N Not deliverable as C1
investigation
4UU102601 Altrincham STW F1b United Utilities Ltd SJ 7504 9044 F1b 3/31/2009 3/31/2009 C Y 3/31/2005
75% FFD Designation 75% FFD Designation
4UU723201 AMBLESIDE STW BAP1 (1) United Utilities Ltd NY 3722 0389 BAP1 (1) 3/31/2009 3/31/2009 C Y 3/31/2005
4UU724201 ASBY STW H3 (2) United Utilities Ltd NY 0654 2068 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive Driver
H5 (2)
4UU724201 ASBY STW H3 (2) United Utilities Ltd NY 0654 2068 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive Driver
H5 (2)
Page 17 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
4UU102001 Ashton-U-Lyne STW F1b United Utilities Ltd SJ 9300 9714 F1b 12/31/2006 12/31/2006 C Y 3/31/2005
75% FFD Designation; 75% FFD Designation;
AMP3/4 scheme AMP3/4 scheme
4UU108001 Ashworth Moor WTP G1 United Utilities Ltd SD 8420 1525 G1 3/31/2008 3/31/2008 C Y 3/31/2005
4UU901101 BAP3 Nature Conservation BAP3 United Utilities Ltd BAP3 3/31/2010 3/31/2010 N Not Deliverable as BAP3 is
& Catchment Management 5 to 10 year management plan 5 to 10 year management plan UU-promoted "blue driver" &
is a 5 year plus
management plan rather
than consent
4UU126901 Barlow Moor Road/Palatin UID0 United Utilities Ltd SJ 8346 9162 UID0 3/31/2007 3/31/2007 I Y 2/16/2005
Road
4UU126801 Barlow Moor UID0 United Utilities Ltd SJ 8329 9178 UID0 3/31/2007 3/31/2007 I Y 2/16/2005
Road/Rowsley
4UU715801 BARROW-IN-FURNESS H8 (4) United Utilities Ltd SD 2148 6728 H8 (4) 3/31/2006 3/31/2006 C N Not deliverable as Habitats 2005-06. Delayed output.
WwTW Directive Driver
4UU130501 Barton Lane/Fountain St F1b United Utilities Ltd SJ 7677 9768 F1b 3/31/2007 3/31/2010 I Y 3/31/2005
Eccles investigation investigation
F1b
75% designation option
UID0
4UU130501 Barton Lane/Fountain St F1b United Utilities Ltd SJ 7677 9768 F1b 3/31/2010 3/31/2010 I Y 3/31/2005
Eccles investigation 75% designation option
F1b
75% designation option
UID0
4UU130501 Barton Lane/Fountain St F1b United Utilities Ltd SJ 7677 9768 UID0 3/31/2010 3/31/2010 I Y 3/31/2005
Eccles investigation
F1b
75% designation option
UID0
4UU702101 BASSENTHWAITE STW H3 (2) United Utilities Ltd NY 2237 3215 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive Driver
4UU110201 Biddulph STW F1b United Utilities Ltd SJ 8871 5897 F1b 3/31/2010 3/31/2010 C Y 5/20/2005
75% FFD Designation - 75% FFD Designation -
Biddulph Brook (Biddulph Biddulph Brook (Biddulph
STW to Dane) STW to Dane)
4UU440101 Blackburn STW F1b United Utilities Ltd SD 6047 2941 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% designation 75% designation
4UU101201 Bolton STW F1b United Utilities Ltd SD 7695 0452 F1b 12/31/2008 12/31/2008 C Y 1/20/2006
75% FFD Designation 75% FFD Designation
U3
4UU101201 Bolton STW F1b United Utilities Ltd SD 7695 0452 U3 12/31/2008 12/31/2008 C Y 1/20/2006
75% FFD Designation
U3
4UU450300 Bradley Lane, M.H 830 UID0 United Utilities Ltd SD 5748 1126 UID0 3/31/2009 3/31/2009 I Y 3/11/2005
4UU717701 BRAMPTON (CARLISLE) H3 (2) United Utilities Ltd NY 5076 6098 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
STW Directive Driver
4UU129601 Buckton Vale Road UID0 United Utilities Ltd SD 9768 0005 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
4UU412901 Bulk Road B2 United Utilities Ltd SD 4799 6209 B2 3/31/2007 3/31/2007 I Y 3/24/2005
4UU430501 Burnley STW F1b United Utilities Ltd SD 8255 3527 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% designation 75% designation
4UU460101 Burscough STW H1 (2) United Utilities Ltd SD 4244 1344 H1 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive Driver
4UU127001 Burton Road/Lapwing Lane UID0 United Utilities Ltd SJ 8346 9162 UID0 3/31/2007 3/31/2007 I Y 2/16/2005
Page 18 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
4UU101401 Bury STW U3 United Utilities Ltd SD 8044 0781 U3 12/31/2008 12/31/2008 C Y Not issued - Application for
variation still being
determined. AMP 4
conditions to be included in
variation.
4UU413001 Cable Street B2 United Utilities Ltd SD 4761 6194 B2 3/31/2007 3/31/2007 I Y 3/24/2005
4UU702001 CAMERTON PS UID0 United Utilities Ltd NY 0380 3055 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
4UU722801 CARK CSO UID0 United Utilities Ltd SD 3581 7683 UID0 3/31/2009 3/31/2009 I Y 3/31/2005
4UU723301 CARK TANK NO 1 STW U1a United Utilities Ltd SD 3545 7635 U1a 12/31/2005 12/31/2005 C Y 3/31/2005 2005-06. Delayed output.
4UU712101 CARLISLE STW H1 (2) United Utilities Ltd NY 3847 5652 H1 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive Driver
4UU128901 Caroline St (N of Bridge) UID0 United Utilities Ltd SJ 9610 9855 UID0 3/31/2010 3/31/2010 I Y 2/22/2005
4UU129501 Caroline Street/Castle UID0 United Utilities Ltd SJ 9606 9848 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
Street
3UU440222 Clarkson Fold Cow Hill B2 United Utilities Ltd SD 5705 3403 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440222 Clarkson Fold Cow Hill B2 United Utilities Ltd SD 5705 3403 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
3UU440206 Clifton Village PS delivery delay.
B2 United Utilities Ltd SD 4710 3000 B2 3/31/2008 3/31/2008 I Y 1/17/2006
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 19 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440206 Clifton Village PS B2 United Utilities Ltd SD 4710 3000 UID1 3/31/2008 3/31/2008 I Y 1/17/2006
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU430102 Clitheroe Storm Tanks UID0 United Utilities Ltd SD 7293 4017 UID0 3/31/2009 3/31/2009 I Y 3/31/2005
4UU723101 CONISTON STW BAP1 (2) United Utilities Ltd SD 3072 9705 BAP1 (2) 3/31/2010 3/31/2010 C N Not deliverable as BAP1
BAP1 investigation to BAP1 investigation to investigation; this will inform
complete by 30/09/06 complete by 30/09/06 final BAP1 works to ensure
a cost-effective solution is
delivered)
4UU721401 CONISTON STW STORM BAP1 (2) United Utilities Ltd SD 3072 9705 BAP1 (2) 9/30/2006 9/30/2006 I N Not deliverable as BAP1
TANKS Investigation to inform final Investigation to inform final investigation; this will inform
Coniston STW scheme Coniston STW scheme final BAP1 works to ensure
a cost-effective solution is
delivered)
3UU440203 Cop Lane/Poplar Avenue B2 United Utilities Ltd SD 3522 4281 B2 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440203 Cop Lane/Poplar Avenue B2 United Utilities Ltd SD 3522 4281 UID1 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU730301 CROGLIN STW G1 United Utilities Ltd NY 5742 4680 G1 3/31/2010 3/31/2010 C Y 3/31/2005
4UU724301 CROSSGATE STW H3 (2) United Utilities Ltd NY 0759 2103 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
H5 (2)
Page 20 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
4UU724301 CROSSGATE STW H3 (2) United Utilities Ltd NY 0759 2103 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
H5 (2)
4UU129801 Cumberland Street UID0 United Utilities Ltd SJ 9590 9880 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
4UU900701 D1 Investigations Project D1 United Utilities Ltd D1 3/31/2007 3/31/2007 N Not deliverable as D1 is
investigatative
4UU700201 DALSTON STW H1 (1) United Utilities Ltd NY 3796 5117 H1 (1) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
4UU413401 Damside B2 United Utilities Ltd SD 4754 6203 B2 3/31/2007 3/31/2007 I Y 3/24/2005
4UU101101 Davyhulme STW F1b United Utilities Ltd SJ 7480 9646 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works
75% FFD Designation 75% FFD Designation required.
4UU101102 Davyhulme STW Storm F1b United Utilities Ltd SJ 7480 9646 F1b 3/31/2007 3/31/2010 I Y 3/31/2005
Tanks investigation investigation
UID0
4UU101102 Davyhulme STW Storm F1b United Utilities Ltd SJ 7480 9646 UID0 3/31/2010 3/31/2010 I Y 3/31/2005
Tanks investigation
UID0
4UU101901 Denton STW F1b United Utilities Ltd SJ 9213 9347 F1b 12/31/2006 12/31/2006 C Y 3/31/2005
75% FFD Designation; 75% FFD Designation;
AMP3/4 scheme AMP3/4 scheme
4UU129701 Disused Railway Station UID0 United Utilities Ltd SJ 9590 9855 UID0 3/31/2010 3/31/2010 I Y 2/22/2005
Rassbottom St/b
3UU440202 Dow Br, Kirkham Bypass B2 United Utilities Ltd SD 3436 4317 B2 3/31/2008 3/31/2008 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440202 Dow Br, Kirkham Bypass B2 United Utilities Ltd SD 3436 4317 UID1 3/31/2008 3/31/2008 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU101801 Dukinfield STW F1b United Utilities Ltd SJ 9332 9649 F1b 3/31/2009 3/31/2009 C Y 3/31/2005
75% FFD Designation 75% FFD Designation
4UU101001 Eccles STW F1b United Utilities Ltd SJ 7496 9715 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works
75% FFD Designation 75% FFD Designation required.
(Worsley Brook & MSC) (Worsley Brook & MSC)
Page 21 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
4UU700601 EMBLETON STW H3 (2) United Utilities Ltd NY 1795 3053 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
4UU700602 EMBLETON STW STORM H8 (4) United Utilities Ltd NY 1795 3053 H8 (4) 3/31/2006 3/31/2006 I N Not deliverable as Habitats 2005-06. Partial output
Directive driver and delivered Mar-06 -
investigation investigation carried out but
no remediation options
identified. Further work
required.
4UU727901 ESTHWAITE LODGE PS I1 (2) United Utilities Ltd SD 3563 9675 I1 (2) 3/31/2010 3/31/2010 I N Not deliverable as
investigation only
4UU105201 Failsworth STW F1b United Utilities Ltd SJ 8970 9975 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works
75% FFD Designation 75% FFD Designation required.
4UU470101 Fazakerley STW C1 United Utilities Ltd SJ 3937 9660 C1 3/31/2008 12/31/2008 C Y 3/31/2005
U3
4UU470101 Fazakerley STW C1 United Utilities Ltd SJ 3937 9660 U3 12/31/2008 12/31/2008 C Y 3/31/2005
U3
4UU724401 FELL DYKE STW H3 (2) United Utilities Ltd NY 0812 1989 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
H5 (2)
4UU724401 FELL DYKE STW H3 (2) United Utilities Ltd NY 0812 1989 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
H5 (2)
4UU728001 FOLDGATE PS I1 (2) United Utilities Ltd SD 3565 9655 I1 (2) 3/31/2010 3/31/2010 I N Not deliverable as
investigation only
4UU470301 Formby STW U3 United Utilities Ltd SD 2964 0587 U3 12/31/2008 12/31/2008 C Y 3/31/2005
3UU440216 Frenchwood Knoll CSO B2 United Utilities Ltd SD 5425 2869 B2 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440216 Frenchwood Knoll CSO B2 United Utilities Ltd SD 5425 2869 UID1 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU900901 G4 scheme - Lords Street, G4 United Utilities Ltd G4 3/31/2010 3/31/2010 N Not deliverable as G4 is UU-
Cadishead (Irlam WwTW) promoted "blue driver"
Page 22 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440224 Garstang Road Bridge B2 United Utilities Ltd SD 5327 3177 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440224 Garstang Road Bridge B2 United Utilities Ltd SD 5327 3177 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU102301 Glazebury STW F1b United Utilities Ltd SJ 6780 9552 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation 75% FFD Designation
4UU722501 GLEBE ROAD CSO B2 United Utilities Ltd SD 3941 9635 B2 3/31/2007 3/31/2007 I Y 3/31/2005
BAP1 (2)
4UU722501 GLEBE ROAD CSO B2 United Utilities Ltd SD 3941 9635 BAP1 (2) 3/31/2007 3/31/2007 I Y 3/31/2005
BAP1 (2)
4UU703901 GLENRIDDING STW H3 (2) United Utilities Ltd NY 3845 1683 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
4UU100401 Glossop STW (Melandra) I1 (2) United Utilities Ltd SJ 9993 9416 I1 (2) 3/31/2009 3/31/2009 C N Not deliverable as
investigation only
4UU709201 GREAT SALKELD STW U1a United Utilities Ltd NY 5569 3643 U1a 12/31/2005 12/31/2005 C Y 2/8/2005
4UU721501 HAWKSHEAD STW I1 (2) United Utilities Ltd SD 3574 9766 I1 (2) 3/31/2010 3/31/2010 C N Not deliverable as
investigation only
4UU721502 HAWKSHEAD STW I1 (2) United Utilities Ltd SD 3574 9766 I1 (2) 3/31/2010 3/31/2010 I N Not deliverable as
STORM/INLET investigation only
4UU113101 Hindley Storm Tanks UID0 United Utilities Ltd SD 6154 0326 UID0 3/31/2010 3/31/2010 I Y 3/31/2005
4UU128801 Huddersfield Road UID0 United Utilities Ltd SJ 9723 9881 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
4UU719701 HUTTON ROOF STW G1 United Utilities Ltd SD 5705 7790 G1 3/31/2010 3/31/2010 C Y Not issued - not a discharge
to groundwater as stated in
database. Issues to be
resolved.
4UU101701 Hyde STW F1b United Utilities Ltd SJ 9379 9484 F1b 3/31/2009 3/31/2009 C Y 3/31/2005
75% FFD Designation 75% FFD Designation
4UU430601 Hyndburn STW F1b United Utilities Ltd SD 7575 3355 F1b 3/31/2010 3/31/2010 C Y 6/23/2005
75% designation 75% designation
Page 23 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
4UU901001 I0 Nature Conservation & I0 United Utilities Ltd I0 3/31/2010 3/31/2010 N Not delivered as I0 is UU-
Catchment Management 5 to 10 year management plan 5 to 10 year management plan promoted "blue driver" & is a
Proj 5 year plus management
plan rather than consent)
4UU129301 Illingworth Avenue UID0 United Utilities Ltd SJ 9727 9843 UID0 3/31/2010 3/31/2010 I Y 2/1/2005
4UU450111 Ince in Makerfield PS UID0 United Utilities Ltd SD 5872 0403 UID0 3/31/2009 3/31/2009 I Y 3/31/2005
4UU720001 KENDAL STW H1 (2) United Utilities Ltd SD 5141 9012 H1 (2) 3/31/2008 12/31/2008 C N Not deliverable as Habitats
0.7 mg/l required to achieve 0.7 mg/l required to achieve Directive driver
National P Target for Habitats National P Target for Habitats
Directive purposes. Directive purposes.
U3
4UU720001 KENDAL STW H1 (2) United Utilities Ltd SD 5141 9012 U3 12/31/2008 12/31/2008 C N Not deliverable as Habitats
0.7 mg/l required to achieve Directive driver
National P Target for Habitats
Directive purposes.
U3
4UU701901 KESWICK STW H1 (1) United Utilities Ltd NY 2487 2495 H1 (1) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
4UU701902 KESWICK STW STORM H8 (4) United Utilities Ltd NY 2487 2495 H8 (4) 3/31/2006 3/31/2009 I N Not deliverable as Habitats 2005-06. Partial output
Directive driver & delivered Mar-06 -
UID0 investigation; delay UID0 investigation carried out but
until Habs requirement no remediation options
known so that cost-effective identified. Further work
solution is delivered) required.
4UU701902 KESWICK STW STORM H8 (4) United Utilities Ltd NY 2487 2495 UID0 3/31/2009 3/31/2009 I N Not deliverable as Habitats
Directive driver &
UID0 investigation; delay UID0
until Habs requirement
known so that cost-effective
solution is delivered)
4UU710601 KIRKBY STEPHEN STW H3 (2) United Utilities Ltd NY 7715 1044 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
4UU129201 Knowle Street UID0 United Utilities Ltd SJ 9666 9860 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
4UU103701 Ladies Lane / Gidlow UID0 United Utilities Ltd SD 6212 0473 UID0 3/31/2010 3/31/2010 I Y 3/31/2005
Street CSO
4UU103801 Ladies Lane CSO UID0 United Utilities Ltd SD 6212 0473 UID0 3/31/2010 3/31/2010 I Y 3/31/2005
3UU440204 Lamaleach PS B2 United Utilities Ltd SD 4250 2820 B2 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 24 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440204 Lamaleach PS B2 United Utilities Ltd SD 4250 2820 UID1 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU721301 LANGDALE STW BAP1 (2) United Utilities Ltd NY 3268 0410 BAP1 (2) 3/31/2010 3/31/2010 C Y 3/31/2005
4UU102501 Leigh STW F1b United Utilities Ltd SJ 6650 9846 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation 75% FFD Designation
3UU440220 London Road B2 United Utilities Ltd SD 5528 2874 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440220 London Road B2 United Utilities Ltd SD 5528 2874 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU190301 Long Hey Road/Croft Drive UID0 United Utilities Ltd SJ 2302 8394 UID0 3/31/2009 3/31/2009 I Y To be issued by Wales
East junction
4UU730901 LOWICK GREEN NO. 2 U1a United Utilities Ltd SD 2992 8532 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.
STW
Page 25 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440208 Lytham Road, Warton PS B2 United Utilities Ltd SD 3820 2820 B2 3/31/2008 3/31/2008 I Y Not issued - the
AMP4 Preston Strategy split AMP4 Preston Strategy split database is in
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - error as the
current split is arbitary). current split is arbitary). asset is an EO
Completion date after EA Completion date after EA not a SSO.
guidance date of 2007 due to guidance date of 2007 due to This issue
likely knock-on effects of likely knock-on effects of needs to be
AMP3 Preston Strategy AMP3 Preston Strategy resolved prior to
delivery delay. delivery delay. the issue of the
AMP4 consent.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440208 Lytham Road, Warton PS B2 United Utilities Ltd SD 3820 2820 UID1 3/31/2008 3/31/2008 I Y Not issued - the
AMP4 Preston Strategy split AMP4 Preston Strategy split database is in
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - error as the
current split is arbitary). current split is arbitary). asset is an EO
Completion date after EA Completion date after EA not a SSO.
guidance date of 2007 due to guidance date of 2007 due to This issue
likely knock-on effects of likely knock-on effects of needs to be
AMP3 Preston Strategy AMP3 Preston Strategy resolved prior to
delivery delay. delivery delay. the issue of the
AMP4 consent.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU108301 Macclesfield STW F1b United Utilities Ltd SJ 8935 7869 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works
75% FFD Designation 75% FFD Designation required.
3UU440214 Manch Road/James St B2 United Utilities Ltd SD 5472 2896 B2 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 26 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440214 Manch Road/James St B2 United Utilities Ltd SD 5472 2896 UID1 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440227 Manchester B2 United Utilities Ltd SD 5470 2899 B2 3/31/2009 3/31/2009 I Y 3/8/2005
Road/Selbourne Road AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440227 Manchester B2 United Utilities Ltd SD 5470 2899 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
Road/Selbourne Road AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 27 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440228 Manchester B2 United Utilities Ltd SD 5482 2885 B2 3/31/2009 3/31/2009 I Y 3/8/2005
Road/Frenchwood Avenue AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440228 Manchester B2 United Utilities Ltd SD 5482 2885 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
Road/Frenchwood Avenue AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU128601 Manor Road P.S, Woodley UID0 United Utilities Ltd SJ 9333 9288 UID0 3/31/2009 3/31/2009 I Y Issued after
deadline
4UU102701 Market Street / Lowe Mill UID0 United Utilities Ltd SD 6192 0442 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
Lane CSO
4UU730801 MEALBANK STW U1a United Utilities Ltd SD 5407 9563 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.
4UU129101 Melbourne Street UID0 United Utilities Ltd SJ 9628 9853 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
4UU103401 Mere Platt Pumping Station UID0 United Utilities Ltd SJ 7350 8262 UID0 3/31/2009 3/31/2009 I Y Not issued - possible
habitats implications which
need to be discussed with
EN prior to issue.
3UU440225 Mh H.42 Victoria Road B2 United Utilities Ltd SD 5340 3140 B2 3/31/2009 3/31/2009 I Y Not issued -
Near Jun AMP4 Preston Strategy split AMP4 Preston Strategy split unable to find
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - current
current split is arbitary). current split is arbitary). consent.
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 28 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440225 Mh H.42 Victoria Road B2 United Utilities Ltd SD 5340 3140 UID1 3/31/2009 3/31/2009 I Y Not issued -
Near Jun AMP4 Preston Strategy split AMP4 Preston Strategy split unable to find
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 - current
current split is arbitary). current split is arbitary). consent.
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU109601 Middlewich STW F1b United Utilities Ltd SJ 7122 6622 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation - River 75% FFD Designation - River
Croco (Middlewich STW to Croco (Middlewich STW to
Dane) Dane)
4UU125501 New Warrington Road, UID0 United Utilities Ltd SJ 6699 7512 UID0 3/31/2009 3/31/2009 I Y 2/16/2005
Wincham
4UU731101 NEWTON REIGNY (SUN U1a United Utilities Ltd NY 4811 3197 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.
INN) STW
4UU731201 NEWTON REIGNY STW U1a United Utilities Ltd NY 4811 3197 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.
4UU109401 Northwich STW F1b United Utilities Ltd SJ 6374 7416 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation - 75% FFD Designation -
Weaver (Navigation Overflow Weaver (Navigation Overflow
to Weston Canal) to Weston Canal)
3UU440201 Nr Ship Inn/Bunker St B2 United Utilities Ltd SD 3436 4287 B2 3/31/2008 3/31/2008 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440201 Nr Ship Inn/Bunker St B2 United Utilities Ltd SD 3436 4287 UID1 3/31/2008 3/31/2008 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU128101 Off Grove Rd, Millbrook UID0 United Utilities Ltd SJ 9764 9980 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
Page 29 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
4UU128001 Off Huddersfield Road, UID0 United Utilities Ltd SJ 9785 9948 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
Adj Swinesha
4UU125201 Off Jack Lane, Moulton UID0 United Utilities Ltd SJ 6610 6920 UID0 3/31/2009 3/31/2009 I Y 2/16/2005
4UU105101 Oldham STW F1b United Utilities Ltd SD 8926 0430 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works
75% FFD Designation (River 75% FFD Designation (River required.
Irk); 100% FFD Designation Irk); 100% FFD Designation
(Wince Brook) (Wince Brook)
4UU412801 Owen Road, Skerton B2 United Utilities Ltd SD 4788 6236 B2 3/31/2007 3/31/2007 I Y 3/24/2005
4UU129401 Park Road/Sandy Lane UID0 United Utilities Ltd SJ 9510 9822 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
4UU102801 Partington STW F1b United Utilities Ltd SJ 7045 9092 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation 75% FFD Designation
3UU440212 Peddars Lane B2 United Utilities Ltd SD 5014 2928 B2 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440212 Peddars Lane B2 United Utilities Ltd SD 5014 2928 UID1 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU731501 PENNY BRIDGE STW U1a United Utilities Ltd SD 3120 8290 U1a 12/31/2005 12/31/2005 C Y 3/22/2005 2005-06. Delayed output.
4UU705801 PENRITH CSO TO UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y REVOKATION
EAMONT
4UU704601 PENRITH CSO-24 UID0 United Utilities Ltd NY 5169 3029 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
SANDGATE
4UU704101 PENRITH CSO-ARTHUR UID0 United Utilities Ltd NY 5150 3029 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
ST
4UU705201 PENRITH CSO- UID0 United Utilities Ltd NY 5172 3032 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
BRENTFIELD LANE
4UU706301 PENRITH CSO-CASTLE UID0 United Utilities Ltd NY 5188 2973 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
DRIVE 1
4UU704801 PENRITH CSO-FELL UID0 United Utilities Ltd NY 5172 3032 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
LANE/BENSONS ROW
4UU705301 PENRITH CSO- UID0 United Utilities Ltd NY 5061 3083 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
ROBINSON ST
4UU706501 PENRITH CSO-SSO35 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
Page 30 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
4UU705601 PENRITH CSO-SSO36 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
4UU706401 PENRITH CSO-SSO37 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
4UU704001 PENRITH CSO-SSO38 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
4UU705001 PENRITH CSO-SSO39 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
4UU704301 PENRITH CSO-SSO40 UID0 United Utilities Ltd NY 5384 2913 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
4UU706201 PENRITH CSO- UID0 United Utilities Ltd NY 5142 3038 UID0 3/31/2008 3/31/2008 I Y 2/24/2005
WORDSWORTH ST
4UU705701 PENRITH OUTFALL CSO UID0 United Utilities Ltd NY 5417 2947 UID0 3/31/2008 3/31/2008 I Y 3/11/2005
4UU705901 PENRITH SPS UID0 United Utilities Ltd NY 5082 3050 UID0 3/31/2008 3/31/2008 I Y Not issued -
This was not
issued as the
database was in
error. The
asset is an EO
so the Formula
A solution was
not appropriate.
4UU726301 PLUMPTON NORTH STW U1a United Utilities Ltd NY 4910 3752 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.
3UU440211 Powis Road B2 United Utilities Ltd SD 5014 2928 B2 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440211 Powis Road B2 United Utilities Ltd SD 5014 2928 UID1 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU413101 Railway Farm B2 United Utilities Ltd SD 4808 5524 B2 3/31/2007 3/31/2007 I Y 3/24/2005
4UU413801 Ramparts CSO B2 United Utilities Ltd SD 4792 6242 B2 3/31/2007 3/31/2007 I Y 3/31/2005
Page 31 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440218 Riverside Penwortham B2 United Utilities Ltd SD 5307 2819 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440218 Riverside Penwortham B2 United Utilities Ltd SD 5307 2819 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440215 Riversway CSO B2 United Utilities Ltd SD 5013 2928 B2 3/31/2008 3/31/2008 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 32 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440215 Riversway CSO B2 United Utilities Ltd SD 5013 2928 UID1 3/31/2008 3/31/2008 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU715701 ROA ISLAND STW H8 (4) United Utilities Ltd SD 2319 6461 H8 (4) 3/31/2006 3/31/2006 3/31/2006 C N Not delivered as Habitats 3/31/2006 2005-06. Investigation
Directive driver & completed and no further
investigation work required.
4UU105001 Rochdale STW U3 United Utilities Ltd SD 8816 1237 U3 12/31/2008 12/31/2008 C Y 3/31/2005
4UU413201 Rosemary Lane B2 United Utilities Ltd SD 4782 6182 B2 3/31/2007 3/31/2007 I Y 3/24/2005
4UU104901 Rossendale STW U3 United Utilities Ltd SD 7937 2040 U3 12/31/2008 12/31/2008 C Y 3/31/2005
4UU724501 ROWRAH STW H3 (2) United Utilities Ltd NY 0618 1878 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
4UU104801 Royton STW F1b United Utilities Ltd SD 9067 0711 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation (River 75% FFD Designation (River
Irk); 100% FFD Designation Irk); 100% FFD Designation
(Luzley Brook) (Luzley Brook)
4UU100901 Sale STW F1b United Utilities Ltd SJ 7677 9292 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation - River 75% FFD Designation - River
Mersey (Princess Parkway to Mersey (Princess Parkway to
Carrington PS); 100% FFD Carrington PS); 100% FFD
Designation - Stromford Designation - Stromford
Brook(QSL at Sale STW to Brook(QSL at Sale STW to
Mersey) Mersey)
4UU47200 Sandy Lane / 48 Moss UID0 United Utilities Ltd SD 3642 0395 UID0 3/31/2009 3/31/2009 I Y 2/1/2005
Lane
4UU411401 Scale Hall PS B2 United Utilities Ltd SD 4644 6224 B2 3/31/2007 3/31/2007 I Y 3/24/2005
3UU440205 School Lane B2 United Utilities Ltd SD 4300 3240 B2 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 33 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440205 School Lane B2 United Utilities Ltd SD 4300 3240 UID1 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU723801 SHAP STW H3 (2) United Utilities Ltd NY 5573 1584 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
H5 (2)
4UU723801 SHAP STW H3 (2) United Utilities Ltd NY 5573 1584 H5 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
H5 (2)
4UU723803 SHAP STW INLET H8 (4) United Utilities Ltd NY 5573 1584 H8 (4) 3/31/2006 3/31/2006 I N Not deliverable as Habitats 2005-06. Partial output
OVERFLOW Directive driver & delivered Mar-06 -
UID0 investigation; delay UID0 investigation carried out but
until Habs requirement no remediation options
known so that cost-effective identified. Further work
solution is delivered) required.
4UU723803 SHAP STW INLET H8 (4) United Utilities Ltd NY 5573 1584 UID0 3/31/2006 3/31/2006 I N Not deliverable as Habitats
OVERFLOW Directive driver &
UID0 investigation; delay UID0
until Habs requirement
known so that cost-effective
solution is delivered)
4UU723802 SHAP STW STORM TANK H8 (4) United Utilities Ltd NY 5573 1584 H8 (4) 3/31/2006 3/31/2006 I N Not deliverable as Habitats 2005-06. Partial output
Directive driver & delivered Mar-06 -
UID0 investigation; delay UID0 investigation carried out but
until Habs requirement no remediation options
known so that cost-effective identified. Further work
solution is delivered) required.
4UU723802 SHAP STW STORM TANK H8 (4) United Utilities Ltd NY 5573 1584 UID0 3/31/2006 3/31/2006 I N Not deliverable as Habitats
Directive driver &
UID0 investigation; delay UID0
until Habs requirement
known so that cost-effective
solution is delivered)
3UU440230 Sharoe Green Hospital B2 United Utilities Ltd SD 5395 3202 B2 3/31/2009 3/31/2009 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 34 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440230 Sharoe Green Hospital B2 United Utilities Ltd SD 5395 3202 UID1 3/31/2009 3/31/2009 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440221 Sharoe Green Lane B2 United Utilities Ltd SD 5414 3214 B2 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440221 Sharoe Green Lane B2 United Utilities Ltd SD 5414 3214 UID1 3/31/2009 3/31/2009 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU190201 Shore Road/Croft Drive UID0 United Utilities Ltd SJ 2221 8483 UID0 3/31/2009 3/31/2009 I Y To be issued by Wales
Page 35 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440210 St Georges Road B2 United Utilities Ltd SD 5482 3045 B2 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440210 St Georges Road B2 United Utilities Ltd SD 5482 3045 UID1 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU106601 St Helens STW F1b United Utilities Ltd SJ 5382 9590 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation - 75% FFD Designation -
Sankey Brook (Rainford Brook Sankey Brook (Rainford Brook
to FWL at A57) to FWL at A57)
4UU413601 St Nicholas Lane PS B2 United Utilities Ltd SD 4782 6876 B2 3/31/2007 3/31/2007 I Y 3/31/2005
UID0
4UU413601 St Nicholas Lane PS B2 United Utilities Ltd SD 4782 6876 UID0 3/31/2007 3/31/2007 I Y 3/31/2005
UID0
4UU127901 Stamford St, Millbrook UID0 United Utilities Ltd SJ 9789 9968 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
Page 36 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440207 Station Road B2 United Utilities Ltd SD 4180 3260 B2 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
F1b
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440207 Station Road B2 United Utilities Ltd SD 4180 3260 F1b 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
F1b
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 37 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440207 Station Road B2 United Utilities Ltd SD 4180 3260 UID1 3/31/2008 3/31/2008 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
F1b
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU104001 Strangeways PS & CSO UID0 United Utilities Ltd SD 6132 0345 UID0 3/31/2010 3/31/2010 I Y Not issued - This is currently
No. 1 only consented as an EO.
UU should apply to extend
this to cover a storm
overflow.
4UU124001 Strangeways PS No.2 UID0 United Utilities Ltd SD 6105 0334 UID0 3/31/2010 3/31/2010 I Y Not issued - The database
only identified an aesthetics
solution for this discharge.
WQ date indicates that this
should also have a river
impact driver and further
clarification is required.
4UU100601 Stretford STW F1b United Utilities Ltd SJ 7806 9318 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% FFD Designation (River 75% FFD Designation (River
Mersey); 100% FFD Mersey); 100% FFD
Designation (Stromford Brook) Designation (Stromford Brook)
4UU730501 THREE BRIDGES U1a United Utilities Ltd SD 2763 7755 U1a 12/31/2005 12/31/2005 I Y 2/8/2005 2005-06. Delayed output.
(SWARTHMOOR) STW
4UU730401 THRELKELD STW H3 (2) United Utilities Ltd NY 3245 2515 H3 (2) 3/31/2008 3/31/2008 C N Not deliverable as Habitats
Directive driver
4UU722301 TORVER STW U1a United Utilities Ltd SD 2817 9393 U1a 12/31/2005 12/31/2005 C Y 2/8/2005 2005-06. Delayed output.
4UU129001 Trinity Street/Dean Street UID0 United Utilities Ltd SJ 9636 9853 UID0 3/31/2010 3/31/2010 I Y 2/16/2005
4UU128401 Two Trees Lane/Marina UID0 United Utilities Ltd SJ 9316 9438 UID0 3/31/2009 3/31/2009 I Y 2/16/2005
Avenue
4UU100501 Urmston STW F1b United Utilities Ltd SJ 7287 9399 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works
75% FFD Designation 75% FFD Designation required.
Page 38 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440232 Valley Road PS B2 United Utilities Ltd SD 5281 2845 B2 3/31/2009 3/31/2009 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440232 Valley Road PS B2 United Utilities Ltd SD 5281 2845 UID1 3/31/2009 3/31/2009 I Y 3/31/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU128501 Wakeling Road/Stockport UID0 United Utilities Ltd SJ 9223 9388 UID0 3/31/2009 3/31/2009 I Y 2/16/2005
Road
3UU440217 Watery Lane 79 B2 United Utilities Ltd SD 5013 2928 B2 3/31/2009 3/31/2009 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
Page 39 of 42
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls 20/03/2006
Modification Deliverable by
Discharge Name / location
Final Scheme Completion
Planned Completion Date
Modification issued - date
Continuous or Intemittent
Consenting Comments
Water Company Name
Variation issued - date
Driver completed date
Date (dd/mm/yyyy)
Completion Date
Planned Driver
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
(dd/mm/yyyy)
31/03/2005
Comments
Unique ID
Drivers
Driver
(C / I)
NGR
3UU440217 Watery Lane 79 B2 United Utilities Ltd SD 5013 2928 UID1 3/31/2009 3/31/2009 I Y 3/24/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU109501 Weaverham STW F1b United Utilities Ltd SJ 61150 75180 F1b 4/1/2005 4/1/2005 4/1/2005 C Y 3/31/2005 4/1/2005 2005-06. No capital works
75% FFD Designation - River 75% FFD Designation - River required.
Weaver (Navigation Overflow Weaver (Navigation Overflow
to Weston Canal) to Weston Canal)
4UU420202 Weeton STW Inlet UID0 United Utilities Ltd SD 3828 3484 UID0 3/31/2008 3/31/2008 I Y 2/23/2005
Overflow
4UU450101 Wigan STW F1b United Utilities Ltd SD 4817 1202 F1b 3/31/2010 3/31/2010 C Y 3/31/2005
75% designation 75% designation
4UU411501 Willow Lane PS B2 United Utilities Ltd SD 4665 6223 B2 3/31/2007 3/31/2007 I Y 3/24/2005
4UU721901 WINDERMERE STW BAP1 (1) United Utilities Ltd SD 3847 9136 BAP1 (1) 3/31/2009 3/31/2009 C Y 3/31/2005
3UU440213 Wolseley Road B2 United Utilities Ltd SD 5311 2828 B2 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
3UU440213 Wolseley Road B2 United Utilities Ltd SD 5311 2828 UID1 3/31/2008 3/31/2008 I Y 3/8/2005
AMP4 Preston Strategy split AMP4 Preston Strategy split
into 2 phases (2008 & 2009 - into 2 phases (2008 & 2009 -
current split is arbitary). current split is arbitary).
Completion date after EA Completion date after EA
guidance date of 2007 due to guidance date of 2007 due to
likely knock-on effects of likely knock-on effects of
AMP3 Preston Strategy AMP3 Preston Strategy
delivery delay. delivery delay.
UID1
AMP4 Preston Strategy split
into 2 phases (2008 & 2009 -
current split is arbitary).
Completion date after EA
guidance date of 2007 due to
likely knock-on effects of
AMP3 Preston Strategy
delivery delay.
4UU413301 Wood Street B2 United Utilities Ltd SD 4770 6187 B2 3/31/2007 3/31/2007 I Y 3/24/2005
Page 40 of 42
Unique ID
4UU101301
Worsley STW
Discharge Name / location
F1b
Moss Bk)
Drivers
Brook (Qsl At Railway To
75% FFD Designation - Astley
Water Company Name
United Utilities Ltd
NGR
F1b SD 7214 0273
Moss Bk)
Driver
Brook (Qsl At Railway To
75% FFD Designation - Astley
Planned Driver
Completion Date
(dd/mm/yyyy)
3/31/2010
Page 41 of 42
Driver completed date
(dd/mm/yyyy)
43f5791b-11b4-4ddb-af84-3319a7f26cc2.xls
Planned Completion Date
(dd/mm/yyyy)
3/31/2010
Continuous or Intemittent
C
(C / I)
Modification Deliverable by
Y
31/03/2005
Modification issued - date
3/31/2005
(dd/mm/yyyy)
Consenting Comments
Variation issued - date
(dd/mm/yyyy)
Final Scheme Completion
Date (dd/mm/yyyy)
Comments
20/03/2006
TABLE 3ci - Annual Return to OFWAT
Sludge Quantity and Quality Report Company United Utilities Water Plc
Year 2005
Calendar Year Report
Sewage
Treatment Main Sewage
Works: Treatment Recovery and Sludge
Total Works: Total Disposal Produced: Treated Sludge: Enhanced Treated Untreated Recovery to Agriculture: Land
Number Number Routes Amount Amount Sludge: Amount Sludge: Amount Quality
Average
Agriculture 147927 69662 38286 Zero zinc 887.8
Average
Incineration 40558 26363 Zero Zero copper 275.2
Average
Reclamation 39235 Zero Zero 36880 nickel 36.7
Average
Landfill 282 Zero Zero 282 lead 197
Average
tds tds tds tds cadmium 2.1
Average
tds tds tds tds mercury 1.5
Average
tds tds tds tds chromium 140
Average
Notes: tds = tonnes dry solids; ds = dry solids nitrogen 37988
Examples of recoveryand disposal routes inlcude: Average
agriculture, incineration, landfill, land reclamation. phosphorus 22401
Land used:
total 17517
Authorisation
Designation Operations Manager, Environmental Services Signed: Carl Startin
Dated: 1st March 2006