PRBoA 2Q Quarter Report

Document Sample
PRBoA 2Q Quarter Report Powered By Docstoc
					                                                                                  Republic of the Philippines
                                                                      Department of Labor and Employment
                                                                                                      (DoLE)




                                                                Professional Regulation Commission
                                                                                            (PRC)




                                                                   Professional Regulatory Board
                                                                                      of Architecture
                                                                                                       (PRBoA)

                                                                2nd Quarter Report
                                                                                for the Period
                                                               01 April through 30 June 2011



                                                                                                 08 July 2011


______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 1 of 15
                                               Republic of the Philippines
                                           Department of Labor & Employment
                                   Professional Regulation Commission
                                                        Manila
____________________________________________________________________________________________________________
                                 The Professional Regulatory Board of
                                         Architecture
                                              (PRBoA)
                                      Office of the Acting PRBoA Chairman
                                 Email Address:       prboa.prc.gov.ph@gmail.com
                                URL/ website: www.architectureboard.ph
                                    Mobiles: 0928.3695508 0922.8415161 0916.3822826
                               c/o Telefax: 02.915.9089 & c/o Fax:02.286.2678
____________________________________________________________________________________________________________
Your Ref:                                        Our Ref : e.11jul20_PRBoA-680

                                                                                                      20 July 2011
Republic of the Philippines
Department of Labor & Employment (DoLE)
Professional Regulation Commission (PRC)
2/F PRC Building, Paredes St., City of Manila


ATTENTION           :     The Hon. Teresita R. Manzala
                          Chairperson

                          The Hon. Alfredo Y. Po
                          Commissioner

                          The Hon. Jennifer Hardin-Manalili
                          Commissioner
                          Planning and Monitoring Division
SUBJECT       PRBoA : Second   (2nd)  Quarter   2011   Report   of
              Accomplishments (Narrative Version)
Dear Mesdames/ Sir,
   Warm greetings from the Professional Regulatory Board of
Architecture (the “PRBoA”).
   The PRBoA transmits herewith its Report of Accomplishments
(Narrative Version) for the Second (2nd) Quarter of 2011 (in 17
pages total).
   For Commission information only. Thank You.
                                                  Yours sincerely,
                                                    For the PRBoA




                                                                                              Armando N. Alli
                                                                                              Acting Chairman
att   :  a/s
file :   e.11jul20_PRBoA-680
__________________________________________________________________________________________
Office of the Assistant Secretary (AsSec) to the Professional Regulatory Boards (PRBs), 3/F Professional Regulation Commission
(PRC) Main Building, PRC Compound, P. Paredes St., cor. N. Reyes St., Sampaloc 1008, City of Manila, PH, P.O. Box 2038 City
of Manila PH      Telephone 02.735.1533 (c/o Mrs. Myrna Taruc) or c/o Telephone 02.314.0018 and PRBoA Fax: c/o 02.286.2678
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 2 of 15
                                                                           Republic of the Philippines
                                                           Department of Labor & Employment (DoLE)
                                                Professional Regulation Commission (PRC)



                          Professional Regulatory Board of Architecture (PRBoA)
                                                       2011 Second (2nd) Quarter Report (Narrative)
                                                         for the Period 01 April through 30 June 2011



1) PRBoA Meeting/s Held
   For the period April through June 2011, the PRBoA officially met on various dates i.e. on at
   least four (4) separate occasions, at the PRC (the “Commission”) and elsewhere to discuss
   pending matters on R.A. No. 9266 implementation and enforcement that need to be addressed
   the soonest.

2) Result of the June 2011 LEAs and Related Activities
   In early June 2011, the PRBoA and the PRC administered the Licensure Examinations for
   Architects (LEAs) for 2,054 examinees, of which 1,082 (52.68%) passed. This is the highest
   passing rate under the incumbent PRBoA (since the January 2007 LEA), and also quite
   possibly the highest in terms of passing rate and number of takers/ passers ever recorded for
   the LEA (or its predecessor equivalents) over the last 90 years (starting in 1921).
     The PRBoA thereafter undertook activities relative to the final processing of the result of the
     said LEAs. Among these were :
     a. checking and reading of all LEA results (including the rating via optical scans of the
         reformatted architectural design and site development planning Subject results);
     b. reading of the answer and rating sheets for the LEAs;
     c. general review of the LEA results and the questions; and
     d. selection of sample LEA questions and safekeeping of the LEA questions.

     The result of the LEA was officially released by the Commission on the evening of 16 June
     2011 (4 days after the last June 2011 LEA day) at the PRC Rating Division.

3) Review of/ Hearings for/ Decision on Docketed Cases
   There were 6 administrative cases reviewed and about 4 hearings attended by the PRBoA at
   the Commission. Orders and/or decisions for about 5 cases were also released during the 2nd
   quarter of 2011.

4) Monitoring of the Full Implementation and Enforcement of R.A. No. 9266
   (The Architecture Act of 2004)
   The PRBoA has consistently monitored developments concerning the full implementation and
   enforcement of R.A. No. 9266, its 2004 IRR and derivative regulations. Among the key
   developments being monitored are:
     1) the matter of the preparation/ signing/ dry sealing of ARCHITECTURAL documents
        as part of building permit application applications required by the DPWH through the
        LGU Offices of Acting Building Officials (ABOs); the PRBoA has been consistent in
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 3 of 15
          reminding/ warning national and local government officials of the mandated and sworn
          duties of their officials to fully implement the multiple provisions of R.A. No. 9266 and
          under Secs. 302.3 & 4 of the 2004 Revised IRR of P.D. No. 1096, otherwise known as the
          1977 National Building Code of the Philippines (NBCP) that limit the preparation/
          signing/ dry sealing of ARCHITECTURAL plans and documents only to registered and
          licensed architects (RLAs), violations of which merit stiff administrative and criminal
          penalties; with the 04 May 2009 Order of the Court AFFIRMING its 29 January 2008
          Decision ordering the LIFTING/ DISSOLUTION of the 24 May 2005 injunction on
          Secs. 302.3 & 4 of the 2004 Revised IRR of P.D. No. 1096 (which also limit to Architects
          the acts of signing/ sealing architectural documents, there is presently NO legal
          impediment to the implementation of Philippine laws and regulations that purposely
          LIMIT/ RESTRICT the preparation/ signing/ dry sealing of ARCHITECTURAL
          plans/ documents only to RLAs i.e. there is NO TRO, NO injunction and NO pending
          constitutional question before any Philippine Court on any of the provisions of R.A.
          No. 9266, a valid and subsisting law; as such, no other registered and licensed
          professional (RLP), particularly civil engineers (CEs), can lay claim to expertise in the
          preparation of such documents; notwithstanding the protestations of the DPWH and the
          PICE, the pendency of the PICE appeal before the Court of Appeals (CA) cannot have
          any effect on the 2008 automatic lifting of the preliminary injunction on Secs. 302.3 & 4
          of the 2004 Revised IRR of P.D. No. 1096; since the dissolved writ of preliminary
          injunction on Secs. 302.3 & 4 of the 2004 Revised IRR of P.D. No. 1096 was merely
          “interlocutory and ancillary in character, [it is] automatically lifted upon dismissal of
          the main case (on 29 January 2008), regardless of whether the period for filing a motion
          for reconsideration of the order dismissing the case or appeal therefrom has expired or
          not.” [Golez v. Leonidas, 107 SCRA 187 (1981), citing Roldan, Jr. vs. Arca, 65 SCRA
          336, 344 (1975); National Sugar Workers' Union, etc. vs. La Carlota Sugar Central, et
          al., 45 SCRA 104, 109 (1972); Lazaro vs. Mariano, 59 Phil. 627, 631 (1934); Saavedra
          vs. Ibañez, 56 Phil. 33, 37 (1931); Hi Caiji vs. Phil. Sugar Estates and Development
          Company, 50 Phil. 592, 594 (1927)]
        Very Important Notes:
     1) Under Department of Public Works and Highways (DPWH )Special Order No. 73, series
        of 2011, dated 04 April 2011, the Hon. DPWH Secretary Rogelio L. Singson re-
        appointed PRBoA Acting Chairman Armando N. Alli, this time to the solo position of
        Vice Chairman of the DPWH Board of Consultants (BoC), a public-private advisory
        collaboration tasked with policy changes relating to the implementation and enforcement
        of P.D. No. 1096 (the 1977 National Building Code of the Philippines/ NBCP, including
        its 2004 Revised IRR). PRBoA Acting Chairman Alli has been a member of the DPWH
        BoC since 2002, becoming its Co-Vice Chairman in March 2007. He is joined in the 2011
        BoC by 2 representatives of the IAPOA-UAP.
     2) In April 2011, the Professional Regulatory Board of Civil Engineering (PRBoCE) under
        PRC has officially refused to continue to dialogue with the PRBoA to discuss and
        resolve the matter of the signing and sealing of architectural documents by civil
        engineers/ CEs (which has been turned over in October 2009 by the DPWH to the PRC
        for proper resolution); with the latest PRBoCE refusal to dialogue and after an
        unsuccessful 4.5 year wait for the resolution of the matter within the PRC, the PRBoA
        has resolved to bring the matter before the Court;
     3) In a Joint Order dated 21 December 2010 (postmarked 29 April 2011 Quezon City, with
        copy of registered mail received by the PRBoA on 13 May 2011 and read by PRBoA
        Acting Chairman Armando N. Alli on 17 May 2011), the Office of the Ombudsman
        dismissed the 2010 complaint filed by the Philippine Institute of Civil Engineers
        (PICE) against PRBoA Acting Chairman Alli for alleged violations of R.A. No. 3019
        (Anti-Graft and Corrupt Practices Act) and R.A. No. 6713 (Code of Conduct for
        Government Officials and Employees); the Joint Order was signed by Russel C. Labor-
        Lay-at (Graft Investigation and Prosecution Officer-II), as reviewed by Mothalib C. Onos
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 4 of 15
          [Graft Investigation and Prosecution Officer III and Acting Director, Preliminary
          Investigation and Administrative Adjudication – E (PIAB-E)]. Mary Susan S. Guillermo
          [Acting Assistant Ombudsman of the Preliminary Investigation and Administrative
          Adjudication and Monitoring Office (PAMO)] recommended the approval of the Order.
          The approval of the Order was signed on 07 April 2011 by Orlando Casimiro (Overall
          Deputy Ombudsman, by authority of the Ombudsman Ma. Merceditas N. Gutierrez,
          pursuant to Memorandum dated March 3, 2011).

     2) on the separate matter of the preparation/ signing/ dry sealing of “subdivision” plan
        documents as part of development applications required by the Housing and Land Use
        Regulatory Board (HLURB); with the firm Commission position (stated in its letter
        dated 01 Feb 2007 to the HLURB) as regards the matter of the signatory to
        “subdivision” plans, it may now be the opportune time to officially discuss the matter
        among the four (4) professional regulatory boards (PRBs) involved i.e.
        PRBoA(rchitecture), PRBoE(nvironmental) P(lanning), PRBoC(ivil) E(ngineering) and
        PRBoG(eodetic) E(ngineering), possibly in a non-confrontational manner, so that the
        proper nomenclature of the pertinent site/ subdivision planning documents could be
        agreed upon and would therefore serve as the primary guide for the HLURB in its future
        policy-making functions; otherwise the PRBoA must continue a similar campaign for
        implementation and enforcement of R.A. No. 9266 provisions that limit to RLAs the
        preparation/ signing/ dry sealing of architectural documents in the form of physical or
        site plans in general i.e. specifically subdivision plans.

     The PRBoA is also presently monitoring the implementation and enforcement of the
     following provisions of R.A. No. 9266:
     1) registration of architectural firms under Sec. 37;
     2) application, processing and issuance of temporary special permits (TSPs) for foreign
         architects (FAs) working on projects on Philippine soil under Sec. 38 of R.A. No. 9266;
     3) continuing professional development/ education (CPD/E) under Secs. 7 (i) and 28 of R.A.
         No. 9266 and professional specialization for RLAs; the IAPoA was accredited by the
         CPE Council for Architecture as a CPE Provider on 07 August 2009;
     4) revision of the B.S. Architecture curriculum together with the CHED Technical Panel for
         Architecture and the CHED Technical Committee for Architecture Education, where the
         CODHASP and the IAPoA are represented;
     5) the intellectual property rights (IPR) of RLAs to their crafted architectural documents
         (which are apparently misappropriated/ illegally used by unscrupulous entities whenever
         the same are submitted under various governmental permitting processes);
     6) the filling up of all national and local positions that require the training and expertise of
         RLAs i.e. specifically the work of ABOs or ABO architectural review staff in LGUs with
         or without ABOs or Offices of ABOs, a provision under R.A. No. 9266 that has been in
         full effect since 10 April 2007; and
     7) preparations attendant to the filing of criminal and/or administrative complaints at various
         venues against offending national and/or local government officials and the private
         entities who have directly benefitted from official violations of R.A. No. 9266, etc.

5) General Dissemination of Information on R.A. No. 9266 and Its Implementation/
   Enforcement
     Over the period April through June 2011, the PRBoA has actively taken part in (or has
     attended) various activities relative to the general dissemination of information on R.A. No.
     9266 e.g. information exchanges at its various mailboxes and through its website at
     www.architectureboard.ph i.e. messages, clarifications, statements, general regulation
     documents, etc., direct mailing to parties (electronic and courier) that may be in violation of
     the law; fora on addressing graft and corruption, general architecture advocacy meetings,
     meetings/ conferences/ conventions of RLAs, etc.
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 5 of 15
     The PRBoA website has also served as a continuing platform for PRBoA advocacies, which
     now include the need to correct many provisions of the July 2009 Revised IRR of R.A. No.
     9184 (The Government Procurement Reform Act/ GPRA of 2003) to make the same fully
     conform to the correct professional practices enshrined under valid and subsisting
     professional regulatory laws (PRLs, such as R.A. No. 9266).
     By the end of June 2011, over seven hundred fifty thousand (750,000) visits to the PRBoA
     website have been logged. Ironically, while the IAPOA-UAP website is presently linked to
     the new PRC website, the PRBoA website is not. This possible oversight needs to be
     addressed the soonest.

6) Liaison with the Accredited IAPOA (UAP) and with Other Associations of Architects
   (OAAs) and Stakeholders
     The PRBoA has attended (and actively taken part in) the various IAPOA and other local/
     international architectural organization (PIA, AAIF, CODHASP, APEC Architect Register,
     ASEAN MRAr/ MRA, etc.) activities pertaining to R.A. No. 9266 implementation and
     enforcement in the Philippines and overseas.

     During the 25 June 2011 University of the Philippines College of Architecture (UPCA)
     Homecoming, the PRBoA Acting Chairman Alli, as the Main Alumnus-Honoree called on the
     UPCA Alumni Foundation, Inc. to lead in the formation of a new OAA exclusively
     composed of juridical entities such as the alumni associations of the various architectural
     schools in the Philippines, i.e. not to be under the IAPOA-UAP, which is exclusively for
     natural persons. The matter was again the subject of an informal request made by the PRBoA
     Acting Chairman with the AAIF Chairman/ President during a late June 2011 meeting.

7) Liaison with the PRC and PAPRB
     During the 2nd quarter of 2011, the PRBoA has actively supported the various activities
     carried out by the PRC with the PAPRB, including events relating to the PRC Foundation
     Day celebrations and the various events-planning activities relating to the proposed
     Professional Summit in September 2011.

     Attachments follow.




                                      2nd Quarter 2011 Schedule of Official PRBoA Activities
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 6 of 15
                                                      (undertaken from 01 April through 30 June 2011)
I. April 2011
                 PRBoA                                                                                             Description/
 Apr    2011                                       Activity*                                  Venue
                 Member                                                                                              Objective
  1        Fri   Alli, AN      Work on PRBoA correspondences* and emails           ADNAapec Home Office, TR           The full
                  ATCC                    NCAAA/ NCCA meeting                               Cebu                    implement-
                  MBS         Preparation of TQ for June Licensure examination          Home Office                   ation &
  2       Sat    Alli, AN                                                                                          enforcement
                  ATCC                                                                                              of R.A. No.
                                   Preparation of TQ for June 2011 Licensure
                   MBS                                                                     Home Office
                                                  examination                                                          9266
  3      Sun     Alli, AN          Work on PRBoA correspondences*/ emails          ADNAapec Home Office, TR            -do-
                  ATCC
                                 Preparation of TQ for June 2011 Licensure
                   MBS                                                                     Home Office
                                                 examination
  4      Mon     Alli, AN        Work on PRBoA correspondences*/ emails            ADNAapec Home Office, TR            -do-
                                 Prepare message for UAP, telecon w/ PRC
                  ATCC        AsCom re SPLBE, Submit SAL, fix withholding w/            Home Office, PRC
                                               Accounting Div
                             PAPRB meeting with PRC Chair Manzala @ 2:15            2nd Floor Executive floor,    Program Support
                   MBS
                                       p.m regarding PAPRB services                     Conference Room           for PRBs & PRC
  5      Tue     Alli, AN        Work on PRBoA correspondences*/ emails            ADNAapec Home Office, TR             -do-
                                 Leave for New Zealand for APEC Architect
                  ATCC                                                              In transit to NZ via Sydney     APEC MC
                                        Register Secretariat turnover
                             Meeting with FOP @ 11:30 am regarding the PRC
                                                                                                                  Program Support
                   MBS            Anniversary & PAPRB @ 2pm regarding               PAPRB Conference Room
                                                                                                                  for PRBs & PRC
                                      Professional Summit Conference
                               Work on PRBoA correspondences*/ emails and
  6      Wed     Alli, AN                                                          ADNAapec Home Office, TR            -do-
                                                  webposts
                             Arrive Wellington, assist in preparation for
                  ATCC                                                                    Wellington, NZ            APEC MC
                             turnover
                                                                                                                    PRB Program
                              Special Committee (Physical & Finance) Meeting
                   MBS                                                              PAPRB Conference Room          Development w/
                                 for the Professional Summit Conference
                                                                                                                        PRC
                             1) Meeting of the CHED Technical Panel for            1) CHED; and
                                Architecture; and
  7      Thu     Alli, AN                                                                                              -do-
                             2) Work on PRBoA correspondences*/ emails &           2) ADNAapec Home Office,
                                webpost                                               TR
                             Meeting with NZ Registered Architects Board
                  ATCC                                                                    Wellington, NZ            APEC MC
                             (NZRAB)
                   MBS
                             1) Work on PRBoA correspondences*             and     1) ADNAapec Home Office;
  8        Fri   Alli, AN       emails; and                                           and                              -do-
                             2) Meeting with PRBoA Assistant Secretary             2) PRC Checking Room
                               Free day at Wellington with Chief Executive of
                  ATCC                                                                    Wellington, NZ            APEC MC
                                                  NZRAB
                  MBS
  9       Sat    Alli, AN
                                  Visit Museum at Wellington with IAPOA-UAP
                  ATCC                                                                    Wellington, NZ            APEC MC
                                              APEC Delegation
                  MBS
  10     Sun     Alli, AN
                                  Visit more Museums and Botanical Garden at
                  ATCC                                                                    Wellington, NZ            APEC MC
                                                  Wellington
                   MBS
                               Work on PRBoA correspondences*/ emails and
                                                                                    ADNAapec NDCS Office,
  11     Mon     Alli, AN       draft Suggestion/s for the PRC-PAPRB 2011                                              -do-
                                                                                            QC
                                   Professional Summit Theme Program
                                                                                      In transit to Manila via
                  ATCC                       Return flight to Manila                                                APEC MC
                                                                                              Sydney
                                                                                                                    PRB Program
                              Meeting on the Preparations for the Professional
                   MBS                                                              PAPRB Conference Room          Development w/
                                           Summit Conference
                                                                                                                        PRC
  12     Tue     Alli, AN          Work on PRBoA correspondences*/ emails          ADNAapec Home Office, TR             -do-
                  ATCC
                              Attended hearing on Administrative Complaint: Lg     2nd floor Legal Dept Hearing    Board function
                   MBS
                                              vs. Rs @ 2 pm                                    Room                under RA 9266
  13     Wed     Alli, AN        Work on PRBoA correspondences*/ emails            ADNAapec Home Office, TR            -do-
                  ATCC
                             1)          Attended the interview for Outstanding 1) 2nd Floor Executive floor,       PRC Annual
                   MBS
                                         Professional of the Year under Architecture  PRC Conference Room;          Anniversary
 ______________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 7 of 15
                            2)   Signed case orders of Y vs. Sg & case order            and                        Program; and
                                 of Br vs Ls ordering Archt. Ls to surrender the   2)    3rd flr.PRB Checking     Board function
                                 Certificate of Registration to PRC.                    Room                      under RA 9266


                                                                                   1) PRC Checking Room;
                            1) Submit SALN and review administrative cases;
                                                                                      and
 14     Thu     Alli, AN       and                                                                                    -do-
                                                                                   2) ADNAapec Home Office,
                            2) Work on PRBoA correspondences*/ emails
                                                                                      TR
                 ATCC
                 MBS               Prepared the SALN & worked on TQ                     Home Office                   -do-
 15       Fri   Alli, AN         Work on PRBoA correspondences*/ emails            ADNAapec Home Office, TR           -do-
                 ATCC
                 MBS             PAPRB Monthly Board Meeting @ 10 am                PAPRB Conference Room             -do-
                              Work on PRBoA correspondences* and emails
 16      Sat    Alli, AN     and the PRBoA 2011 1st Quarter Accomplishment         ADNAapec Home Office, TR           -do-
                                               Report
                 ATCC
                 MBS
                              Work on PRBoA correspondences* and emails
 17     Sun     Alli, AN     and the PRBoA 2011 1st Quarter Accomplishment         ADNAapec Home Office, TR           -do-
                                            Report (Matrix)
                 ATCC
                 MBS
                            1) Work on PRBoA correspondences* & emails;
                               and                                                 1) ADNAapec Home Office,
                            2) PRBoA meeting with Com. AY Po, Counsel                 TR;
                               Atty. Valencia and PRC SID OIC Shirley Eden         2) PRC Office of Com. Po;
                               (re CPD/E for RLAs);
                            3) PAPRB Theme/ Program Sub-Committee
 18     Mon     Alli, AN                                                                                              -do-
                               Meeting on the Sep 2011 Professional Summit;        3)    PAPRB    Conference
                               and                                                      Room; and
                            4) Meeting of the CPE Council (CPEC) for
                               Architects with PRC SID OIC Shirley Eden (re        1) PRC SID Office
                               Pending Applications for CPE Providers and
                               Programs)
                            1) Work on the PRBoA 2011 1st Quarter                  1) Home Office,
                               Accomplishment Report (Matrix)
                            2) PRBoA meeting with Com. AY Po, Counsel              2) PRC Office of Com. Po;
                               Atty. Valencia and PRC SID OIC Shirley Eden
                               (re CPD/E for RLAs);
                 ATCC       3) PAPRB Theme/ Program Sub-Committee                  3) PAPRB          Conference
                               Meeting on the Sep 2011 Professional Summit;           Room; and
                                                                                                                      -do-
                               and
                            4) Meeting with CPEC Chair AN Alli and PRC SID         4) PRC SID Office
                               OIC Shirley Eden (re Pending Applications for
                               CPE Providers and Programs)
                             PRBoA meeting with Com. AY Po, Counsel Atty.
                                                                                   PRC Office of Com. Po
                  MBS           Valencia and PRC SID OIC Shirley Eden (re                                             -do-
                                             CPD/E for RLAs);
 19     Tue     Alli, AN
                              Meeting with UAP re Alaga Ka Project w/ Health
                 ATCC                                                                    Serye, Eastwood          UAP program
                                                 Futures
                  MBS
                                                                                   1) ADNAapec Home Office,
                            1) Work on PRBoA correspondences* and emails;
                                                                                       TR;
                            1) PRBoA meeting with Com. AY Po (re CPD/E for
                                                                                   2) PRC Office of Com. Po;
                               RLAs); and
                                                                                       and
 20     Wed     Alli, AN    2) PRBoA meeting with Com. AY Po and PRC
                               Chairperson TR Manzala with Official                                                   -do-
                               Representatives of the IAPOA-UAP (re CPD/E
                               for RLAs)
                                                                                   3) PRC Conference Room
                            1) Meeting with RLAs from Riyadh, KSA;                 1) Cubao, QC;
                            2) PRBoA meeting with Com. AY Po (re CPD/E for         2) PRC Office of Com. Po;
                               RLAs); and                                             and
                 ATCC       3) PRBoA meeting with Com. AY Po and PRC                                                  -do-
                               Chairperson TR Manzala with Official                3) PRC Conference Room
                               Representatives of the IAPOA-UAP (re CPD/E
                               for RLAs)
                            1) PRBoA meeting with Com. AY Po (re CPD/E for
                               RLAs); and                                          1) PRC Office of Com. Po;
                  MBS       2) PRBoA meeting with Com. AY Po and PRC               and                                -do-
                               Chairperson TR Manzala with Official
                               Representatives of the IAPOA-UAP (re CPD/E          2) PRC Conference Room
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 8 of 15
                              for RLAs)
 21     Thu     Alli, AN      Work on PRBoA correspondences* and reports          ADNAapec Home Office, TR            -do-
        Holy     ATCC
         Wk      MBS
 22      Fri    Alli, AN         Work on PRBoA correspondences*/ emails           ADNAapec Home Office, TR            -do-
                 ATCC
                 MBS
 23      Sat    Alli, AN      Work on PRBoA correspondences* and reports          ADNAapec Home Office, TR            -do-
                 ATCC
                 MBS
 24     Sun     Alli, AN      Work on PRBoA correspondences* and reports          ADNAapec Home Office, TR            -do-
                 ATCC
                 MBS
 25     Mon     Alli, AN
                 ATCC
                             Went to CHED to verify information regarding the
                             Washington Accord and discovered new subject
                  MBS          proposals under the Civil Engineering (CE)              CHED Head Office, Q.C          -do-
                                curriculum with similarities to architecture
                                                subjects.
 26     Tue     Alli, AN                                                                                              -do-
                                  Review of Joint UAP PRC Notice re CPE
                 ATCC                                                                       Home Office               -do-
                                                 Requirement
                                   1) Work on PRBoA first quarter
                                       accomplishment report.                     1).Home office
                            2) Attended the oath taking of Real Estate Board      2) PICC
                               passers.
                  MBS
                            3) Meeting with Gerald, account officer of PICC       3) PICC lobby                       -do-
                               and Centrex representative regarding PICC
                               layout of exhibit for Professional Summit
                               Conference
                            1) Tripartite Meeting with the IAPOA and              1) 7/F UAP HQ Building,
                                 CODHASP;                                         QC;
 27     Wed     Alli, AN    2) IAPOA Chapter President’s Assembly; and            2) Mozzaico Showroom,               -do-
                            3) Meeting with the Confederation of Filipino              Libis, QC; and
                                 Consulting Organizations, Inc. (COFILCO)         3) Quezon Blvd., QC
                                                                                  1) 7/F UAP HQ Building,
                            1)  Tripartite Meeting with the IAPOA and
                                                                                  QC;
                 ATCC          CODHASP;                                                                               -do-
                                                                                  2) Mozzaico Showroom,
                            2) IAPOA Chapter President’s Assembly; and
                                                                                  Libis, QC;
                                                                                  1) 7/F UAP HQ Building,
                            1) Tripartite Meeting with the UAP-IAPOA and          QC; and
                               Council of Deans and Heads of Architecture
                  MBS                                                                                                 -do-
                               schools of the Philippines (CODHASP);
                            2) IAPOA Chapter President’s Assembly; and            2)     Mozzaico    Showroom,
                                                                                        Libis, QC;
                            1) PRBoA Meeting with the BoCE (non-
                                                                                  1)          Office of Com AY
                               appearance) and with the Commission
                                                                                       Po, 2/F PRC Bldg.; and
                               (represented by Com AY Po, the Sec for the
 28     Thu     Alli, AN                                                                                              -do-
                               PRBs Atty. CG Almelor and with the Dir for
                               Registration Atty. Mamalo); and
                                                                                  2)         SMX, Pasay City
                            2) Seminar 2 at the IAPOA National Convention
                            1) PRBoA Meeting with the BoCE (non-
                               appearance) and with the Commission                1) Office of Com AY Po, 2/F
                               (represented by Com AY Po, the Sec for the            PRC Bldg.; and
                 ATCC          PRBs Atty. CG Almelor and with the Dir for                                             -do-
                               Registration Atty. Mamalo); and
                            2) CoF Convocation at            IAPOA National       2) SMX, Pasay City
                               Convention
                            1) PRBoA Meeting with the BoCE (non-                  1) Office of Com AY Po, 2/F
                                 appearance) and with the Commission                 PRC Bldg.; and
                                 (represented by Com AY Po, the Sec for the
                                 PRBs Atty. CG Almelor and with the Dir for
                                 Registration Atty. Mamalo);                      2) SMX, Pasay City
                  MBS       2) Monitor the CPE seminars of UAP-IAPOA                                                  -do-
                                 during its National Convention.                  3) 3rd floor PRB Checking
                            3) Signed case orders of the following:                 room
                               Pz & Ty vs. Sv; Fr & Tn vs Dg; Lh vs Pr; Vv
                               vs Jo Vv; and Sg vs Aa

                            1) Attend PhD Conferment Rites and Luncheon           1) MoA Center Stage,
                               (hosted by the National University) for Ar Angel   Pasay City;
 29       Fri   Alli, AN                                                                                              -do-
                               Lazaro, Jr., Past UAP President and Past
                               Chairman of the DPWH Board of Consultants
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 9 of 15
                                   (BoC);                                                2) SMX, Pasay City; and
                                2) IAPOA National Convention; and                        3) ADNAapec Home Office,
                                3) Work on PRBoA correspondences* and reports            TR
                                IAPOA National Convention; and                           SMX, Pasay City; and
                    ATCC                                                                                                      -do-
                                Brought RLA from Jeddah KSA to Emergency                 Manila Doctors Hospital
                                 Monitor the CPE seminars of UAP-IAPOA during
                    MBS                                                                  SMX, Pasay City                      -do-
                                             its National Convention.
  30       Sat     Alli, AN                                                                                                   -do-
                    ATCC                    IAPOA National Convention                    SMX, Pasay City                      -do-
                                  Monitor the CPE seminars of UAP-IAPOA during           SMX, Pasay City; and
                                its National Convention; and
                    MBS                                                                                                       -do-
                                  Prepare the report for the UAP-IAPOA CPE               Home Office
                                monitored during its Convention
*Note: For selected emails and official correspondences issued by the PRBoA in 2011, please refer to separate schedules
accompanying this Activity listing.



 May 2011
                   PRBoA                                                                                                  Description/
 May     2011                                         Activity*                                     Venue
                   Member                                                                                                  Objective
   1      Sun      Alli, AN             Work on PRBoA correspondences*                   ADNAapec Home Office, TR           The full
                    ATCC                Meeting w/ RLA from Jeddah, KSA                          Makati                   implement-
                                    Prepare the Monitoring Report for the UAP-
                     MBS        IAPOA CPE Program/ Offerings monitored during                    Home Office                ation &
                                                   its Convention
   2      Mon      Alli, AN       Work on PRBoA correspondences* and emails              ADNAapec Home Office, TR         enforcement
                                1) Meeting w/ UAP and RLA from Jeddah, KSA;
                                                                                         1) UAP HQ; and
                    ATCC            and                                                                                   of R.A. No.
                                                                                         2) PRC Checking Room
                                2) Sign Certificates for SPLBE Nov 2010 Top Ten
                                 Professional Summit regular steering committee
                     MBS                                                                  PAPRB Conference room              9266
                                                       meeting
                                Lunch meeting with a USA-based Filipino
   3      Tue      Alli, AN     architect and with a representative of a PRC/                  Shangri-La Hotel               -do-
                                PRBoA-registered architectural firm (RAF)
                    ATCC
                    MBS
   4      Wed      Alli, AN            Work on LEA questions manuscript                  ADNAapec Home Office, TR             -do-
                    ATCC              Meet family of RLA from Riyadh, KSA                       PRC PRB Lounge
                    MBS            Signed the FLEA Certificates of Registration          3rd floor PRB Checking room          -do-
                                                                                         ADNAapec Home Office,
                                Work on LEA questions manuscript;                        TR;
                                Encoding of LEA questions;                               PRC Encoding Room;
   5      Thu      Alli, AN                                                                                                   -do-
                                Merging of LEA question data bank;                       PRC Rating Division Office;
                                Checking of LEA Applications & Logbooks                  &
                                                                                         PRC Checking Room
                                Lunch Meeting w/ Dean of National University Col
                    ATCC                                                                   Serendra, Fort Bonifacio
                                                      of Arch
                                  Collate all the reports of UAP-IAPOA CPE for
                     MBS                                                                        PAPRB Office                  -do-
                                    Submission to CPE Council at PRC SID
   6        Fri    Alli, AN
                    ATCC               Revise Table of Specifications (ToS)                      Home Office                  -do-
                    MBS
   7       Sat     Alli, AN         Work on draft of CPE Guidelines for RLAs                         Subic                    -do-
                                1) Speaker at UAPGA Conference re Licensure
                                                                                         1) 7F UAP Headquarters;
                                Examinations
                                                                                         and
                    ATCC        2) Hosted dinner for 5 families of RLAs from KSA                                              -do-
                                                                                         2) ATCC Residence
                                   who attended the IAPOA-UAP National
                                   Convention
                    MBS
   8      Sun      Alli, AN
                    ATCC
                    MBS
   9      Mon      Alli, AN
                                1) Validate pertinent information re SPLBE
                                investigation                                            1) Ascom’s Office PRC; and
                    ATCC        2) Meet leaving RLA from UAP KSA Eastern                 2) NAIA 1                            -do-
                                    Province to send certificates and medals of
                                    top ten from Al-Khobar
                    MBS
  10      Tue      Alli, AN       Work on PRBoA correspondences* and reports             ADNAapec Home Office, TR             -do-
                    ATCC                   Attend BCI Awards Night                             Esplanade

 ______________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 10 of 15
                  MBS
                             Meeting with Com. AY Po (w/ Atty. Mamalo);
                                                                                   Office of Com. AY Po;
                             Checking of LEA Applications & Logbooks;
                                                                                   PRC Checking Room;
                             Joint review of IAPOA Re-Accreditation
 11     Wed      Alli, AN                                                          –do-; and                           -do-
                             Documents;
                             Work on documents relating to Administrative
                                                                                   –do-
                             Cases and signing of replacement certificates
                             1) Meeting with Com. AY Po (w/ Atty. Mamalo);         1) Office of Com. AY Po;
                             2) Review / sign administrative cases; and            2) PRB Checking Room;
                 ATCC                                                                                                  -do-
                             3) Review IAPOA-UAP Re-accreditation                  and
                             Documents                                             3) -do-
                             Meeting with Com. AY Po (w/ Atty. Mamalo);            Office of Com. AY Po;                 :
                                                                                   3rd
                             Signed certificates and case orders of the                 floor PRB’s Checking           -do-
                             following:                                            room; and
                  MBS
                                   Do vs Pzj (case dismissed); Ba vs Dg.;
                             Review the IAPOA-UAP renewal documents as             -do-
                             accredited professional organization (APO)
                             Checking of LEA Applications & Logbooks;
                                                                                   PRC Checking Room; and
 12     Thu      Alli, AN    Joint review of IAPOA Re-Accreditation                                                    -do-
                                                                                   -do-
                             Documents;
                             1) Meeting w/ RLA from Jeddah, KSA
                                                                                   1) PRC
                 ATCC        2) Meeting w UAP revision of re-accreditation                                             -do-
                                                                                   2) UAP Headquarters 5/F
                             documents
                  MBS
 13       Fri    Alli, AN           Work on PRBoA correspondences*                 ADNAapec Home Office, TR            -do-
                             Check out flight arrangements to Bandung,
                 ATCC                                                               PRC Checking Room, IAD             -do-
                             Indonesia
                  MBS
                             Work on PRBoA emails, reports and documents;
 14      Sat     Alli, AN    and                                                              Subic                    -do-
                             Work on draft of CPE Guidelines for RLAs
                             1) Revise MRA MOA between PRC and UAP
                             2) MRA: Revise Matrix for Philippines entry:
                 ATCC           Comparison of Regulatory and Licensing                    Home Office                  -do-
                                Requirements for Architecture in ASEAN
                                member states
                  MBS
 15     Sun      Alli, AN
                                MRA: Revise Matrix for Philippines entry:
                                Comparison of Regulatory and Licensing
                 ATCC                                                                     Home Office                  -do-
                             Requirements for Architecture in ASEAN member
                                                 states
                  MBS
                             Prepare materials for GMA News TV interview;
                             and
                             GMA News TV interview anent the growth of and         ADNAapec Home Office,
                             the built environment of Metro Manila, urban          TR;
                             pollution in general, the role/ value of architects       and
 16     Mon      Alli, AN                                                                                              -do-
                             and non-conventional/ sustainable design building     ADNAapec Office, MMA
                             materials/ technologies, for the program
                             Investigative Documentaries broadcast 8-9 pm on
                             Thu/ 19 May 2011 (hosted by M. Malou
                             Mangahas);
                               Submit Matrix for MRA to ASEAN Secretariat,
                 ATCC                                                                                                  -do-
                                          AAC Secretariat and PRC IAD
                                Steering Committee Meeting on Professional
                  MBS                                                                PAPRB Board Meeting               -do-
                                                   Summit
                             Prepare additional text and graphic material for      ADNAapec     Home       Office,
                             the GMA News TV program (for subsequent               TR; and
 17     Tue      Alli, AN                                                                                              -do-
                             posting at the PRBoA website); and
                             Checking of LEA Applications & Logbooks               PRC Checking Room
                 ATCC                Revise Table of Specifications (ToS)                Home Office
                 MBS
                             Prepare additional text and graphic material for      ADNAapec     Home       Office,
                             the GMA News TV program (for subsequent               TR; and
 18     Wed      Alli, AN                                                                                              -do-
                             posting at the PRBoA website); and
                             Checking of LEA Applications & Logbooks               PRC Checking Room
                                 Received PRC Notice NOT to attend MRA
                 ATCC                                                                 PRC Checking Room                -do-
                                       Meeting in Bandung, Indonesia
                  MBS
 19     Thu      Alli, AN
                                   1) Reviewed documents revised and resubmitted
                 ATCC                   by IAPOA-UAP for APO re accreditation        PRC Checking Room                 -do-
                                   2) Review/ signed administrative cases
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 11 of 15
                                                                                         2nd Flr Executive Office of
                                Meeting with PRC Chair Manzala regarding the
                                                                                         the Chairperson
                                finalization of Professional Summit Conference at
                                9:30 am;
                                                                                         PAPRB Board Room
                                Monthly PAPRB Board meeting;
                     MBS                                                                 3rd Floor PRB Checking           -do-
                                Signed case orders of the following:
                                                                                         Room
                                       Fl (Sg & Re). vs Dg
                                       Fl (Sg & Re). vs.Ga
                                       Rt vs. Ns
                                         Work on PRBoA email messages/
  20        Fri    Alli, AN                                                              ADNAapec Home Office, TR         -do-
                                                correspondences*
                    ATCC                           Revise ToS                                    Home Office              -do-
                    MBS
  21       Sat     Alli, AN
                    ATCC
                    MBS
  22      Sun      Alli, AN
                    ATCC
                    MBS
                                Checking of LEA Applications & Logbooks; and
                                                                                         PRC Checking Room; and
  23      Mon      Alli, AN     Final review of IAPOA Re-Accreditation                                                    -do-
                                                                                         -do-
                                Documents
                    ATCC                           Revise ToS                                  Home Office
                                                                                         PAPRB Board Room; and
                                Meet the Steering Committee of the Professional
                                Summit for the Event Organizer presentation; and
                     MBS                                                                 3rd Floor PRB Checking           -do-
                                Signed case orders of the following:
                                                                                         Room
                                   Fl (Sg & Re). vs Bd
  24      Tue      Alli, AN                    Work on PRBoA report                      ADNAapec Home Office, TR         -do-
                    ATCC                            Revise ToS                                Home Office
                    MBS
  25      Wed      Alli, AN         Checking of LEA Applications & Logbooks                 PRC Checking Room             -do-
                    ATCC
                    MBS
  26      Thu      Alli, AN
                                IAPOA-UAP Presentation for Outstanding APO
                    ATCC        Award; and                                               PRC 2/F Conference Room          -do-
                                read Administrative cases
                                Attended the IAPOA-UAP presentation vying for
                                                                                         2nd Floor Conference Room;
                                PRC Outstanding APO Award
                                Rearranged the pieces of furniture of the PRC
                                                                                         2nd    floor Chairperson’s       -do-
                     MBS        Chairman’s Office at the 2nd floor
                                                                                         Office; and
                                Meeting with the Finance Committee of
                                                                                         PAPRB Board Room
                                Professional Summit together with the event
                                organizer
  27        Fri    Alli, AN             Work on PRBoA email messages                                 Subic                -do-
                    ATCC
                    MBS
  28       Sat     Alli, AN
                    ATCC
                    MBS
  29      Sun      Alli, AN                    Work on PRBoA report                      ADNAapec Home Office, TR         -do-
                    ATCC
                                Review and edit the Table of Specifications (ToS)
                     MBS                                                                      MBS Home Office             -do-
                                  for the Architectural History subject of the LEA
                                Checking of LEA Applications & Logbooks; and             PRC Checking Room; and
  30      Mon      Alli, AN     Attend PRC-PAPRB 2011 Professional Summit                                                 -do-
                                Program Committee Meeting                                -do-
                                                                                         1) Home Office; and
                                1) Preparation / Encoding of test questions (TQ)
                    ATCC                                                                 2) IAPOA-UAP HQ Building         -do-
                                2) Meeting - APEC Monitoring Committee
                                                                                             5/F
                                       Meeting of the Steering Committee of
                                      Professional Summit together with PRC                 3rd floor PRB Checking
                     MBS                                                                                                  -do-
                                              Commissioner Manalili                                   Room

                                Organizational Meeting of the DPWH Board of              DPWH Multipurpose Hall,
                                Consultants (BoC), with Com. AY Po; and                  5/F DPWH Central Office,
  31      Tue      Alli, AN                                                                                               -do-
                                                                                         City of Manila; and
                                 Checking of LEA Applications & Logbooks                 PRC Checking Room
                    ATCC                  Preparation / Encoding of TQ                            Home Office             -do-
                    MBS
*Note: For selected emails and official correspondences issued by the PRBoA in 2011, please refer to separate schedules
accompanying this Activity listing.
 ______________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 12 of 15
June 2011
                PRBoA                                                                                             Description/
Jun    2011                                      Activity*                                   Venue
                Member                                                                                             Objective
                            Checking of LEA Applications & Logbooks; and
                                                                                  PRC Checking Room; and
 1      Wed     Alli, AN    Meeting with the PRB Secretary re bills in
                                                                                  PRB Secretary’s Office
                            Congress                                                                                 The full
                 ATCC         Preparation/ Encoding of test questions (TQ)                 Home Office             implement-
                 MBS                                                                                                 ation &
                              Work on PRBoA email messages and memo to
 2      Thu     Alli, AN                                                          ADNAapec Home Office, TR
                                                 PRC                                                              enforcement
                 ATCC                 Preparation/ Encoding of TQ                          Home Office             of R.A. No.
                 MBS                                                                                                  9266
                            PRBoA emails; and                                     ADNAapec Home Office,
 3        Fri   Alli, AN    Work on Tables of Specifications (ToS) for the        TR; and                              -do-
                            2012 Licensure Examination for Architects (LEA)       -do-
                 ATCC                   Preparation/ Encoding of TQ                        Home Office                 -do-
                            Submitted the Table of Specifications (ToS);          Office of the Secretary c/o
                            Spoke with PRC Chair Manzala with PAPRB Luz           Myrna Taruc;
                            Guzman on issue of Hasekani;                          2nd Floor Chair Manzala’s
                            Spoke with Commissioner Manalili regarding the        Office;
                  MBS                                                                                                  -do-
                            service of Index for the PRC Staff for PRC week       2nd Floor Commissioner
                            celebration; and                                      Manalili’s Office; and
                            Worked on the Architectural History TQ
                            Manuscript                                            4, MBS Home Office
 4       Sat    Alli, AN
                 ATCC                  Preparation/ Encoding of TQ                         Home Office                 -do-
                                                                                                                       -do-
                  MBS                          TQ encoding                               MBS Home Office
 5      Sun     Alli, AN
                 ATCC                  Preparation/ Encoding of TQ                         Home Office                 -do-
                                                                                                                       -do-
                  MBS                          TQ encoding                               MBS Home Office
                            Checking of LEA Applications & Logbooks; and          PRC Checking Room; and
 6      Mon     Alli, AN                                                                                               -do-
                            Peer Review of LEA Questions                          -do-
                 ATCC                  Preparation/ Encoding of TQ                      Home Office                    -do-
                            Signed case order: Tz vs Cc; and                        rd
                  MBS                                                              3 flr PRB Checking Room             -do-
                            TQ editing and Peer Review
 7      Tue     Alli, AN             Work on PRBoA correspondences*               ADNAapec Home Office, TR             -do-
                 ATCC                  Preparation/ Encoding of TQ                        Home Office                  -do-
                 MBS                              Edit TQ                             MBS Home Office                  -do-
                            Attend a Court of Appeals (CA) hearing anent          CA 10th Division; and
                            violations of the National Building Code of the
 8      Wed     Alli, AN                                                                                               -do-
                            Philippines (NBCP and its 2004 Revised IRR); and
                            Peer review on TQ                                     2) Edsa Shangri-La Plaza
                 ATCC                  Preparation/ Encoding of TQ                      Home Office                    -do-
                            PAPRB Meeting to discuss the standard Oath-
                                                                                  PAPRB Board Room; and
                  MBS       taking Fee; and                                                                            -do-
                                                                                  Edsa Shangri-La Plaza
                            Peer review on TQ
                                  Meeting with representatives of a foreign          EDSA Shangri-La Hotel
 9      Thu     Alli, AN                                                                                               -do-
                                       architectural firm (US-based)                      restaurant
                            1) Merging of TQ                                      1) PRC Rating Division; and
                 ATCC       2) Extraction for Day 1 of the Licensure              2) PRC Confidential Room             -do-
                                Examination for Architects (LEA)
                            Merging of TQ @ 3:30 pm; and                          Rating Room; and
                  MBS       Sequestration at the Confidential Room for            Confidential Room                    -do-
                            Extraction of LEA Day 1 Questions
                             Meeting with the PRC Chairperson re GATS and
 10       Fri   Alli, AN                                                            PRC Conference Room                -do-
                                                   MRA
                                                                                  PRC     Confidential   Room;
                            Printing and Sequestration for Day 1 of the
                                                                                  and
                            Licensure Examination for Architects (LEA); and
                 ATCC                                                                                                  -do-
                            Meeting with the PRC Chairperson re GATS and
                            MRA
                                                                                  PRC Conference Room
                                                                                  PRC Confidential Room;
                            Printing of TQ for LEA Day 1
                  MBS                                                             and                                  -do-
                            Meeting with Chair Manzala re GATS and MRAr
                                                                                  PRC Conference Room
 11      Sat        Alli, AN                   Extraction for Day 2 of the LEA      PRC Confidential Room              -do-
                     ATCC
                      MBS
 12       Sun       Alli, AN            Printing and Sequestration for Day 2 of the  PRC Confidential Room             -do-
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 13 of 15
                                Licensure Examination for Architects (LEA)
                 ATCC                 Preparation of the Answer Key                         Home Office               -do-
                 MBS
                              Prepare LEA Answer Key and Reading of LEA
 13     Mon     Alli, AN                                                            PRC Rating Division Office        -do-
                                           Answer Sheets
                                                                                    PRC Rating Division Office;
                            Reading / correcting of Answer Sheets; and
                 ATCC                                                               &                                 -do-
                            Review administrative cases/ sign orders
                                                                                    PRB Checking Room
                                                                                    PRC Rating Division Office;
                            Prepare LEA Answer Key and Reading of LEA
                                                                                    and
                            Answer Sheets; and
                                                                                    3rd floor PRB Checking
                  MBS       Signed case orders of the following:                                                      -do-
                                                                                    Room
                                Vd vs Cz;
                                Pd vs.Ev & Av
 14     Tue     Alli, AN              Reading of LEA Answer Sheets                  PRC Rating Division Office        -do-
                 ATCC
                 MBS
                                CHED Technical Committee on Architecture
 15     Wed     Alli, AN                                                              3/F CHED, Quezon City           -do-
                                               Education
                 ATCC
                 MBS              Reading of answer sheet for TQ History             PRC Rating Division room         -do-
                                                                                    PRC Rating Division Office;
                            Release of June 2011 LEA Results; and
 16     Thu     Alli, AN                                                            and                               -do-
                            Work on PRBoA webposts & email messages
                                                                                    ADNAapec Home Office, TR
                 ATCC              Release of June 2011 LEA Results                  PRC Rating Division Office       -do-
                            Release of June 2011 LEA Results; and                   PRC Rating Division Office;
                            Signed case orders on the following:                    and
                  MBS           Sn vs. Gj;                                          PRB Checking Room                 -do-
                                Mj vs Rn; and
                                Yg vs Ra
 17       Fri   Alli, AN            PAPRB Semi-Annual Conference                           City of Manila             -do-
                 ATCC
                 MBS                 PAPRB Semi-Annual Conference                          City of Manila             -do-
 18      Sat    Alli, AN
                 ATCC
                 MBS
 19     Sun     Alli, AN
                 ATCC
                 MBS
                                    Work on PRBoA email messages &
 20     Mon     Alli, AN                                                            ADNAapec Home Office, TR          -do-
                                            correspondences
                 ATCC
                 MBS
 21     Tue     Alli, AN            Work on PRBoA correspondences*                  ADNAapec Home Office, TR          -do-
                 ATCC
                 MBS
                            38th PRC Foundation Day Ceremonies (Press
                            Conference and Awards Night for the 2011 PRC
 22     Wed     Alli, AN                                                                    Manila Hotel              -do-
                            Outstanding Professionals and Outstanding
                            Professional Organization/ APO)
                 ATCC
                                  PRC Awards night and Foundation Day
                  MBS                                                                           -do-                  -do-
                                             Ceremonies
 23     Thu     Alli, AN           Work on PRBoA correspondences*                   ADNAapec Home Office, TR          -do-
                 ATCC
                            Joined the PRC in Congressional Inquiry and
                            Investigation on the issue of PRC ICT budget
                                                                                       Sandiganbayan, Q.C.
                            expenditures; and
                  MBS                                                                                                 -do-
                            Went to the Congress committee offices to secure
                            the bills related to the practice of architecture for
                            monitoring
 24       Fri   Alli, AN
                 ATCC
                 MBS
                                                                                    City of Manila
                            Meeting with the AAIF Chairman/ President (Greg
                            Timbol II)                                              IAPOA-UAP    Auditorium;
 25      Sat    Alli, AN    IAPOA-UAP Turnover Ceremony; and                        and                               -do-
                            University of the Philippines College of                UPCA, Diliman, Quezon
                            Architecture (UPCA) 2011 Homecoming                     City

                 ATCC
                 MBS
______________________________________________________________________________________________________________________
Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 14 of 15
  26      Sun      Alli, AN
                    ATCC
                    MBS
                                    Work on PRBoA correspondences*, email
  27      Mon      Alli, AN                                                              ADNAapec Home Office, TR         -do-
                                     messages, webposts, reports, files, etc.
                    ATCC
                    MBS
                                  Work on PRBoA documents, applications and
  28      Tue      Alli, AN                                                                 PRC Checking Room             -do-
                                            administrative cases
                    ATCC
                                Signing of 2,000 plus tickets for the 25 July 2011        PAPRB Office and MBS
                    MBS                                                                                                   -do-
                                Oath-taking of New Architects at the Manila Hotel             Home Office
  29      Wed      Alli, AN      Work on PRBoA correspondences* and emails               ADNAapec Home Office, TR         -do-
                    ATCC
                                Meeting with PRC Comm Po regarding the LERIS
                                                                                         2nd flr. Board Room;
                                Task Force in preparation for Congressional
                                Investigation on July 11, 2011;
                                Short meeting in PAPRB regarding the PAPRB
                    MBS                                                                  PAPRB Conference Room;           -do-
                                Congress and Professional Summit schedules;
                                                                                         and
                                and
                                                                                         MBS Home Office
                                Signed the remaining tickets for the 25 July 2011
                                New Architects Oath-taking Ceremony
  30      Thu      Alli, AN
                                Flight to Kuala Lumpur, Malaysia; and                    In transit; and
                    ATCC                                                                                                  -do-
                                Dinner with ASEAN Architect Council                       2) KL Tower
                    MBS
*Note: For selected emails and official correspondences issued by the PRBoA in 2011, please refer to separate schedules
accompanying this Activity listing.




 ______________________________________________________________________________________________________________________
 Professional Regulatory Board of Architecture (PRBoA) at www.architectureboard.ph
 Second (2nd) Quarter Report (Narrative) for the Period 01 April through 30 June 2011                        page 15 of 15

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:15
posted:11/30/2011
language:English
pages:15