Planning for Estidama

A supplement to Development Review Applications to

address the Community Pearl Rating Requirements

The Intent

The Development Review (DR) Process outlines a clear path for project applications to comply with the mandatory

requirements of the Pearl Rating Systems for Estidama (PRS). This step of the PRS certification process precedes the

Estidama Design and Construction Rating steps, at which point formal Pearl Ratings are awarded. Submission items

required during the Development Review Process are intended to illustrate clear principles and methodologies that

are to be formulated by the applicant team to demonstrate how the mandatory credit requirements will be

addressed at each stage of the review process. The requirements outlined in this “Planning for Estidama” document

are very important but do not fulfill the complete submittal requirements to obtain a Design Rating. More detailed

submittal requirements are to be addressed at later stages of the review process and are clearly outlined in the

relevant sections of the Pearl Rating System documents.



How to read this Supplement

This document must be read in conjunction with the Development Review Forms A, B and C for each application

type: i.e. (A) Large Development, (B) Medium Development, and (C) Small Development. Note that "Concept

Review" applies only to (A) and (B), not (C).









Figure 1: DR Forms A, B and C



The above forms outline DR submittal requirements related to:

• Urban Development • Environment

• Public Realm • Safety & Security

• Transportation • Development Delivery

• Utilities



Applications addressing the above topics are reviewed by relevant departments in the Urban Planning Council (UPC)

and are also captured as part of the Estidama review for their relevance to applicable Pearl Rating System. In

addition, a number of submittal items are required to document design approaches and strategies in relation to the

following PRS categories:



• Integrated Development Process • Precious Water

• Natural Systems • Resourceful Energy

• Livable Communities/Buildings/Villas • Stewarding Materials









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 1

Planning for Estidama or Estidama in the DR process

The DR process aims to set a pathway for compliance with the Required Credits in the applicable Pearl Rating System

for Estidama (PRS). As such, there are submittal requirements for each of the PRS Required Credits. The preparation

of these Development Review submissions process is also meant to support the Integrated Development Process

(IDP), which is the first prerequisite of Estidama certification.



During Development Review, applicants are expected to demonstrate understanding and effective implementation

of IDP from the initial project intent, to the planning of Preliminary Development Options, to selection of a Concept

Plan through fine-tuning of the Detailed Plan. Specifically, IDP would involve:



(1) System Thinking when developing strategies and solutions,

(2) Monitoring of ongoing sustainability performance of the project using an Estidama Framework with clear

vision and objectives and specific indicators and targets, and

(3) True Collaboration and Continuity within the design and development team.



Although successful projects must document an IDP during Development Review, the process should continue after

receipt of the Planning Award. All the required credits, including an IDP, must also be documented at the end of the

Design Stage, when projects apply for a Pearl Design Rating, and the end of the Construction Stage, when projects

apply for a Pearl Construction Rating.









*Buildings only









Figure 2: DR within the project life cycle





The IDP process is one of the mandatory requirements of the Pearl Rating System, but it will also facilitate projects in

striving for a higher sustainability performance, which all projects are encouraged to consider early in the Design

Stage. Applicants are also encouraged to meet with staff members of the UPC to ensure that applications are in

compliance with Planning for Estidama.



The following flowchart illustrates in more detail the IDP process during DR, defining ‘Planning for Estidama’









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 2

Step 1: UPC Staff explain relevant Estidama policies to the UPC staff

landowner representative, outline the Integrated UPC assigns Pearl

The Information describes

Development Process, and clarify which Pearl Assessor

Estidama Policy,

Meeting Rating System is applicable to the development.

IDP, PRS

UPC assigns Pearl Assessor.









Step 2: The team is formed. Collaboratively, team Set Estidama Form IDP team and

members have planned for, and are implementing,

The Preliminary Framework organise Process

the IDP.

Development &Workshops



Options An Estidama Framework is set, with clear vision,

objectives, indicators and targets. Assess Assess Comply w/

Natural Urban Regulatory

The team develops an understanding of the site Systems Systems Framework

and project’s natural, urban and regulatory

contexts and identified opportunities and Identify Opportunities & Constraints

constraints.

Develop Preliminary Dev. Options

Initial Development Options are formulated as well

as initial approaches to various urban and technical

strategies. Develop Initial Approach to:

Natural Systems, Livable

Initial assessment of Development Options is Community/Building, Precious

carried out with UPC DR and Estidama staff prior to Water , Resourceful Energy,

submission of Concept Plan (Step 3). Stewarding Materials









Step 3: Team develops a Concept Plan and associated Develop Concept Plan

Concept Strategies.

The Concept

Develop Concept Strategies with

Plan Team continues to implement IDP. A workshop

options for: Natural Systems,

(for Types A & B only) with UPC DR and Estidama staff is held to review

Concept. Livable Community/Building,

Precious Water, Resourceful

Scheme performance is assessed against initial Energy, Stewarding Materials

indicators and targets.







Step 4: Team develops a Detailed Plan and associated Develop Detailed Plan

Detailed Strategies.

The Detailed

Plan Team continues to implement IDP. Develop Detailed Strategies for:

Natural Systems, Livable

Scheme performance is assessed against initial Community/Building, Precious

indicators and targets.

Water, Resourceful Energy,

A plan was developed for the next stages of design,

Stewarding Materials

construction, commissioning and operation.

Assess IDP

Performance Implementation

Strategy



-Estidama Integrated Development Process during DR-







The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 3

About the Pearl Rating System for Estidama



The Pearl Rating System (PRS) for Estidama is Abu Dhabi Emirate’s sustainable development program for the built

environment. The program aims to guide and rate the sustainability performance of a given development

throughout its lifecycle from design through construction to operation. It is comprised of a suite of rating systems

specific to the design and construction of Communities, Building and Villas, as well as the ongoing operation of

Existing Buildings.



The PRS provides guidance and detailed key performance indicators, called Credits, for rating a project’s potential

performance in relation to the four pillars of Estidama − environmental, economic, cultural and social − and the PRS

categories:



• Integrated Development Process: Encouraging cross-disciplinary teamwork to deliver environmental and

quality management throughout the life of the project.

• Natural Systems: Conserving, preserving and restoring the region’s critical natural environments and

habitats.

• Livable Communities, Livable Buildings and Livable Villas: Improving the quality of urban settlements and

ensuring quality of outdoor and indoor spaces.

• Precious Water: Reducing water demand and encouraging efficient distribution and alternative water

sources.

• Resourceful Energy: Targeting energy conservation through passive design measures, reduced demand,

energy efficiency and renewable sources.

• Stewarding Materials: Ensuring consideration of the ‘whole-of-life’ cycle when selecting and specifying

materials.

• Innovating Practice: encouraging innovation to facilitate market transformation.



Within each section there are both Required and Optional Credits and Points are awarded for each Optional Credit

achieved. In order to achieve 1 Pearl rating, all Required Credits must be met. Higher Pearl rating levels require

compliance with all Required Credits along with a minimum number of Optional Credits.



More information about the program is available at www.estidama.org







Detailed Estidama Submissions for Development Review



A summary of the Estidama submission items are detailed in Table 1 (Community) and 2 (Building) on the next

pages. The tables list the items specific for Estidama review and as well as items required independently for

Development Review that will support Estidama review.









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 4

Table 1. Estidama Submissions for Development Review

Community Rating System

Note these are Development Rating submissions, not final submissions for a Design Rating.

The unlabelled text denotes specific Estidama submission for Development Review.

Page lengths in parentheses indicate the maximum submission for review.

A Type A Development Review requirements also evaluated as part of the Estidama submission.

B Type B Development Review requirements also evaluated as part of the Estidama submission.

C Type C Development Review requirements also evaluated as part of the Estidama submission.

Please do not submit the above Development Review requirements twice.

Req. Credits Pre-Concept Review Concept Review Detailed Review

Estidama Summary

Estidama Summary: Estidama Summary: Estidama Summary: Updated

Narrative summarizing Updated narrative with narrative with supporting plans

urban and technical supporting plans and and graphics summarizing

approach taken. The aim is graphics summarizing urban urban and technical strategies

to illustrate system thinking and technical strategies and chosen. The aim is to illustrate

implemented on the options considered. The aim system thinking implemented

project. (2 Pages). is to illustrate system on the project. (2 Pages)

Supporting plans and thinking implemented on

graphics. the project. (2 Pages)



INTEGRATED DEVELOPMENT PROCESS

IDP-R1. Estidama IDP-R1. Estidama IDP-R1. Estidama

Framework Narrative Performance: Updated Performance: Updated

summarizing vision, narrative illustrating project narrative illustrating project

IDP-R1: objectives, indicators and performance in relation to performance in relation to

Integrated targets set jointly by the indicators and targets set. indicators and targets set.

Development design and development (2 Pages) (2 Pages)

Strategy team; initial project

To ensure new performance against IDP-R1. IDP Process Chart: IDP-R1. IDP Process Chart:

development indicators. (2 Pages) Updated Process chart for Updated Process chart for the

adopts an the IDP to illustrate changes IDP to illustrate changes from

Integrated IDP-R1. IDP Process Chart: from the IDP Process Chart the IDP Process Chart

Development Narrative with supporting submitted at Pre-Concept submitted at Concept Review.

Process (IDP) as a chart of team structure Review. (1 Page)

way listing team members and (1 Page)

of attaining their roles; design IDP-R1. IDP Implementation

greater synergy milestones and workshops Strategy: Narrative describing

between project listing participants, goals, the implementation strategy

systems resulting expected outcomes, for transition between project

in high required actions with task stages and project packages

performance assignments; and and hand-over of design

communities. methodology for ensuring process to succeeding design

appropriate stakeholders teams.

are involved. (3 Pages) (2 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 5

Req. Credits Pre-Concept Review Concept Review Detailed Review

IDP-R2. Draft Sustainable IDP-R2. Draft Sustainable IDP-R2. Sustainable Building

Building Guidelines: Building Guidelines: Guidelines: Narrative outlining

Narrative outlining the Updated narrative outlining the IDP planned for the project

building guidelines being the building guidelines for and building design and

considered for the project, the project, including vision, development team’s role as

IDP-R2: including initial vision, targets, and certification part of this process;

Sustainable targets, and certification process. sustainability vision and

Building process. (1 page) objectives for the project; a

Guidelines (1 page) summary of targets for the

To ensure that project (can be in the form of

the design and scorecard(s) highlighting

construction of credits targeted based on the

buildings will Pearl Building Rating System,

contribute to the Pearl Villa Rating System or the

overall Pearl Operational Rating

community’s System, as appropriate); the

sustainability certification process for the

objectives and community and its various

targets. milestones; the owner’s /

developer’s quality assurance

procedure for verifying the

requirements have been

implemented. (4 pages)



IDP-R3: IDP-R3. Commitment to Basic

Community- Commissioning: Letter of

Dedicated commitment from the owner

Infrastructure to engage an independent

Basic commissioning agent as part of

Commissioning the project design team

To ensure that throughout the design stages,

the infrastructure to assess performance of

systems perform community-dedicated energy,

as designed, water and waste

thereby Infrastructure. The

protecting Commissioning agent will be

occupant health responsible for overseeing the

and providing commissioning process at

ongoing completion stage.

efficiency. (1 Page)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 6

Req. Credits Pre-Concept Review Concept Review Detailed Review

NATURAL SYSTEMS

NS-R1. Natural Systems NS-R1. Natural Systems Key NS-R1. Natural Systems Key

Context: Narrative with performance indicators performance indicators (KPIs):

supporting illustrations (KPIs): Narrative describing Updated assessment of design-

addressing the following in KPIs identified to guide the related KPIs.

relation to the project site, design of the development, (3 Pages)

the area of probable based on the results of the

impact surrounding it, as opportunities and

well as the sub-regional constraints analysis. These

and regional scales: are to include indicators and

• Topography; targets relating to the

• Geology / following, as a minimum:

geomorphology; • Soil;

• Soils and geotechnical • Flora;

attributes; • Fauna;

NS-R1: Natural

• Hydrology and • Microclimate;

Systems

groundwater; • Topography and views;

Assessment

• Waste and • Drainage;

To ensure that

contamination; • Other targets relating to

before the design

• Coastal conditions; mitigation of identified

process begins,

• Microclimate (such as environmental constraints;

the

prevailing winds, solar and

environmental

orientation and solar • Area of site to be

baseline

shading); protected, maintained,

conditions

• Priority species, habitats created or restored.

surrounding,

and ecosystems (both

connected to and

onsite and those Initial assessment of project

on the site are

influenced by the site); against design-related KPIs.

considered and

• Flora and fauna (3 Pages)

assessed.

(including wildlife

corridors, seasonal uses);

• Archaeological features.

(7 Pages)



#4 "Development

A Opportunities and

Constraints"

#4 "Development

B Opportunities and

Constraints"

#3 "Development

C Opportunities and

Constraints"









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 7

Req. Credits Pre-Concept Review Concept Review Detailed Review

NS-R2&3. Natural Systems NS-R2&3. Natural System

NS-R2: Natural Map: Map identifying areas Design and Management

Systems to be protected; used as Strategy: Narrative describing

Protection mitigation areas; enhanced; the detailed strategy for

To protect remediated; and/or natural systems addressing soil

significant and allocated for habitat creation enhancement, plant selection,

valuable natural or restoration beyond planting, irrigation, pesticide

systems assets mitigation and / or and herbicide avoidance, plant

identified in NS- compensation requirements. establishment, survival,

R1, Natural (1 Page) generation and protection, and

Systems monitoring and maintenance

Assessment. NS-R2&3. Natural System program.

Design and Management (4 Pages)

Strategy: Narrative

describing options and

concept strategy for natural

systems addressing soil

enhancement, plant

selection, planting, irrigation,

pesticide and herbicide

avoidance, plant

NS-R3: Natural

establishment, survival,

Systems Design

generation and protection,

and

and monitoring and

Management

maintenance program.

Strategy

(4 Pages)

To minimize

demand for #1 Site Plan #6 Site Design Regulations

resources, #3 Land Use Plan and Guidelines

promote soil #4 At Grade Uses Plan #10 Summary of Public

protection and #13 Marina and Realm Plan

enhancement A Waterfront Plan (if A #11 Public Realm Design

and ensure the applicable) Specifications

long term #33 Proof of

survival and Commencement of

management of Environmental Analysis

landscaped / #1 Site Plan #3 Illustrative Site Plan

habitat areas. #3 Land Use Plan #9 Landscaping Plan

B

#4 At Grade Uses Plan

B #13 Marina and #3 Illustrative Site Plan

Waterfront Plan (if #9 Landscaping Plan

C

applicable)

#33 Proof of

Commencement of

Environmental Analysis









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 8

Req. Credits Pre-Concept Review Concept Review Detailed Review

LIVABLE COMMUNITIES

LC-R1: Plan 2030 Note that there are no Estidama-specific submissions beyond Development Review items for

To ensure that all LC-R1, LC-R2, and LC-R3.

new

development #7 Regulatory #9 Regulatory #3 Density Plan

Compliance A Compliance A #5 Building Typology Plan

supports the A

vision for the

Emirate of Abu

Dhabi, as defined #7 Regulatory #9 Regulatory #2 Development Summary

Compliance Compliance Statistics

by the applicable

B B

Plan 2030,

and/or B

Development #4 Development #2 Development Summary

Code, and/ or Statistics Summary Statistics

C C

Area Plan.



#1 Climate Context #14 Demographic

#2 Urban Systems Analysis

Context #15 Community Facility

#3 Transportation Needs Assessment

Capacity Estimate #20 Transportation

LC-R2: Urban

A #4 Development A Analysis

Systems

Opportunities and #33 Proof of

Assessment

Constraints Commencement of

To ensure that,

#5 Development Environmental Analysis

before the design

Concept Illustrations

process begins, a

#1 Climate Context #14 Demographic

thorough

#2 Urban Systems Analysis

understanding of

Context #15 Community Facility

the urban

#3 Transportation Needs Assessment

systems

Capacity Estimate #20 Transportation

influencing the

B #4 Development Analysis

site are

Opportunities and #33 Proof of

considered and B

Constraints Commencement of

assessed.

#5 Development Environmental Analysis

Concept Illustrations

#1 Existing Services

C









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 9

Req. Credits Pre-Concept Review Concept Review Detailed Review

#5 Development #11 Public Realm #2 Land Use Plan

Concept Illustrations Programme #7 Building Design

#15 Community Facility Regulations and

Needs Assessment Guidelines

#16 Community

Facilities Plan

LC-R3: Provision

#17 Community

of Amenities and

Facilities Plot Plan A

Facilities A

A #18 Community

To ensure that a

Facilities Users Plan

neighborhood’s

#19 Community Facility

cultural

Provision and

amenities and

Management Strategy

community

#21 Pedestrian and

facilities are

Cyclist Network Plan

accessible to the

greater #5 Development #11 Public Realm #6 Universal Access Plan

population, Concept Illustrations #18 Community Services

Programme

affording social

connectivity, #15 Community Facility

interaction and Needs Assessment

shared public #16 Community B

B

benefit of Facilities Plan

community #17 Community

resources.

Facilities Plot Plan

B

#18 Community

#6 Preliminary Site #6 Universal Access Plan

Facilities Users Plan

Plan #18 Community Services

#19 Community Facility

Provision and

Management Strategy C

C

#21 Pedestrian and

Cyclist Network Plan









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 10

Req. Credits Pre-Concept Review Concept Review Detailed Review

LC-R4. Concept Outdoor LC-R4. Detailed Outdoor

Thermal Comfort Strategy: Thermal Comfort Strategy:

Narrative with supporting Narrative with supporting plan

plan and calculations and calculations describing

describing proposed proposed measures for shading

measures and options for and improving outdoor thermal

LC-R4: Outdoor

shading and improving comfort in priority areas.

Thermal Comfort

outdoor thermal comfort in (5 Pages)

Strategy

priority areas.

To increase

(3 Pages)

outdoor thermal

comfort during

#4 At Grade Uses Plan #10 Summary of Public

transition

#21 Pedestrian and Realm Plan

months and

Cyclist Network Plan #11 Public Realm Design

reduce thermal

#24 Street Sections Specifications

discomfort A

A #25 Street Design #14 Summary of Multi-

during summer

Audit (if applicable) Modal Transportation Plan

months in public

#15 Transportation Design

spaces and

Specifications

walkways.

#4 At Grade Uses Plan #10 Shading Plan

#21 Pedestrian and B

Cyclist Network Plan

B #24 Street Sections #10 Shading Plan

#25 Street Design C

Audit (if applicable)

LC-R5: Minimum LC-R5: Pearl Rated Building

Pearl Rated Targets: Initial calculation of

Buildings Within average targeted Pearl Building

Communities Rating

To reward (2 Pages)

development

that has a high

proportion of

buildings

achieving

minimum pearl

building ratings.









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 11

Req. Credits Pre-Concept Review Concept Review Detailed Review

PRECIOUS WATER

PW-R1,2,& 3. Water PW-R1&2. Water Concept: PW-R1. Detailed Water

Approach: Narrative Narrative describing options Strategy: Narrative describing

outlining the team’s and concept strategy for the detailed concept strategy

approach to water, water covering the following for water covering the

covering as a minimum the public realm items: following public realm

following public realm Irrigation; water features; components: irrigation; water

components: Irrigation; district cooling; and features; district cooling; and

water features; district stormwater. (2 Pages) stormwater. (3 Pages)

cooling; and stormwater.

(2 Pages) PW-R1&2. Community PW-R1&2. Community Water

Water Balance: Draft Balance: Updated Community

Community Water Water Calculator detailing

Calculator detailing output output of community water

of community water balance; draft Building and/or

balance; draft Building Villa Water Calculator for each

PW-R1: and/or Villa Water representative building. (Water

Community Calculator for each Calculator .xls)

Water Strategy representative building.

To develop and (Water Calculator .xls)

PW-R1&2. Irrigation Plan:

integrate a

PW-R1&2. Irrigation Plan Updated calculations of total

comprehensive

Initial calculations of total annual average irrigation

water strategy

annual average irrigation demand of external softscape

during the early

demand of external areas (liters/day), including

stages of design

softscape areas (liters/day). plant schedules for landscape

with the goal of

(1 Page) program. (1 Page)

minimizing the

overall water

#1 Site Plan #6 Site Design Regulations

consumption and

#4 At Grade Uses Plan and Guidelines

establishing a

#28 Utility Demand #7 Building Design

project water

Calculations Regulations and

balance.

#29 Treated Sewage Guidelines

Effluent (TSE) Analysis #10 Summary of Public

A

A Realm Plan

#11 Public Realm Design

Specifications

#16 Utility Demand

Calculations

#18 Utility Plan

#1 Site Plan #9 Landscaping Plan

#4 At Grade Uses Plan B #19 Utility Demand

#28 Utility Demand Calculations

Calculations #9 Landscaping Plan

B #29 Treated Sewage #19 Utility Demand

C

Effluent (TSE) Analysis Calculations









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 12

Req. Credits Pre-Concept Review Concept Review Detailed Review

PW-R2. Building Water

Strategy: Narrative detailing

the analysis undertaken to

identify the most efficient

measures for reducing water

PW-R2: Building

consumption of buildings

Water

within the community. At a

Guidelines

minimum the analysis must

To focus the

cover the following: fixtures

design and

and fittings, appliances,

development

landscaping, and heat

team on

rejection. Explanation of

promoting water

mechanism to ensure

conservation in

compliance with building

buildings within

requirements.

the community.

(2 Pages)



#6 Site Design Regulations

and Guidelines

A #7 Building Design

Regulations and

Guidelines

PW-R3. Water Monitoring and

Leak Detection Strategy:

Narrative detailing the

community water monitoring

and leak detection strategy,

PW-R3: Water covering, at minimum, the

Monitoring and following major uses (where

Leak Detection present):

To reduce loss of • Building plots, divided into

water associated occupancy type (office, retail,

with leaks, residential, school etc);

system • Irrigation (public realm);

degradation, or • District cooling plants;

failure. • Water Features (public

realm); and

• Any other major community

water requirements (e.g. water

parks etc).

(2 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 13

Req. Credits Pre-Concept Review Concept Review Detailed Review

RESOURCEFUL ENERGY

RE-R1,2& 3. Energy RE-R1&2. Energy Concept: RE-R1. Energy Detailed

Approach: Narrative Narrative describing options Strategy: Narrative describing

outlining the team’s and concept strategy for the detailed strategy for

approach to energy, energy covering the energy covering the following

covering the following at a following at a minimum: at a minimum: climate analysis

minimum: climate response; climate analysis and and response; street

street orientation; building response; street orientation; building

orientation, massing and orientation; building orientation, massing and

layout; and shading orientation, massing and layout; shading strategies;

strategies. layout; shading strategies; district energy systems, and

(3 Pages) district energy systems, and renewable energy systems

renewable energy systems. (4 Pages)

RE-R1: (3 Pages)

Community

Energy Strategy RE-R1&2. Energy RE-R1. Energy Calculations:

To focus the Calculations: Result Updated summary and

design and summary and calculations calculations of the

development of the community’s energy community’s energy

team on energy consumption. At a minimum consumption. At a minimum

conservation this should include the total this should include: Total

through demand annual energy consumption annual energy consumption

reduction and (MWh) of the entire (MWh) of the entire

efficient community as well as each community as well as each

generation and major use category, peak major use category; Peak

distribution, power demand (MW) of the power demand (MW) of the

while making entire community as well as entire community as well as

informed each major use category, each major use category; and

decisions about and the total energy Total energy supplied by onsite

the implications supplied by onsite renewable technologies,

of renewable renewable technologies, expressed as both annual

energy expressed as both annual generation (MWh) and peak

strategies. generation (MWh) and peak generation (MW).

generation (MW). (2 Pages)

(2 Pages)



#28 Utility Demand #5 Building Typology Plan

Calculations #6 Site Design Regulations

and Guidelines

#7 Building Design

A A Regulations and

Guidelines

#16 Utility Demand

Calculations

#18 Utility Plan









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 14

Req. Credits Pre-Concept Review Concept Review Detailed Review

#28 Utility Demand #19 Utility Demand

Calculations B Calculations

#20 Utility Plan



B #19 Utility Demand

C Calculations

#20 Utility Plan



RE-R2. Building Energy

Strategy: Narrative detailing

the analysis undertaken to

RE-R2: Building

identify the most efficient

Energy

measures for reducing energy

Guidelines

consumption of buildings

To focus the

within the community. At a

design and

minimum the analysis must

development

cover the following: Passive

team on

design strategies, Mechanical

promoting

and electrical systems, and

energy

Integrated renewable energy

conservation in

generation options.

buildings within

Explanation of mechanism to

the community.

ensure compliance with

building requirements.

(3 Pages)

RE-R3. Energy Monitoring and

Reporting Strategy: Narrative

detailing the community

RE-R3: Energy

energy monitoring and

Monitoring and

reporting strategy covering at a

Reporting

minimum the following major

To ensure the

uses:

provision of

• Buildings, divided into

metering

occupancy type (office, retail,

facilities to

residential, school etc);

monitor the

• District energy systems;

performance of

• Infrastructure lighting (road,

infrastructure

public, traffic lights, signage);

systems,

• Water pumping;

enabling future

• Water treatment systems;

improvements

and

and

• Any other major

understanding of

infrastructure energy

energy use

requirements such as transport

within the

systems (metro) etc.

community.

• Any onsite energy generating

systems where applicable.

(3 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 15

Req. Credits Pre-Concept Review Concept Review Detailed Review

STEWARDING MATERIALS

SM-R1: CCA SM-R1. Material Approach SM-R1. Material Strategy for

Treated Timber for public realm and public realm and

Elimination infrastructure: Narrative infrastructure: Narrative

To minimize toxic describing the team’s including schedule of materials

effects of approach for material to be used and specifications

chromated selection and procurement for public realm and

copper arsenate for public realm and infrastructure items.

(CCA) treated infrastructure items. (3-4 Pages)

timber on people (2-3 Pages)

and the

environment.

SM-R2&3. Waste SM-R2&3. Waste Concept: SM-R2&3. Waste Detailed

Approach: Narrative Narrative describing options Strategy: Narrative describing

providing a review of for diverting construction, the detailed strategy for

SM-R2: Basic existing and planned waste demolition and operational diverting construction,

Construction management infrastructure waste from landfill and demolition and operational

Waste and programs available incineration. waste from landfill and

Management from the appropriate (2 Pages) incineration. (3 Pages)

authority and the team’s

& approach to waste, covering SM-R2&3. Waste SM-R2&3. Waste Calculations:

construction demolition and Calculations: Result Updated result and

SM-R3: Basic operational waste summary and calculations calculations of annual

Operational management. (2 Pages) for the different options estimates of construction,

Waste considered of annual demolition and operational

Management estimates of construction, waste generated and diverted

demolition and operational from landfill and incineration.

To reduce the waste generated and The minimum diversion rate to

long-term diverted from landfill and target should be 50% for

environmental incineration. The minimum construction and demolition

diversion rate to target waste and 40% by weight or

impacts

should be 50% for volume of the total operational

associated with construction and demolition waste generated at full

construction and waste and 40% by weight or occupancy. (2 Pages)

operational volume of the total

waste collection, operational waste

transport and generated at full occupancy.

(2 Pages)

disposal.









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 16

Req. Credits Pre-Concept Review Concept Review Detailed Review

SM-R2&3. Waste SM-R2&3. Waste

Management Facilities Management Facilities Plan:

Plan: Illustrations indicating Updated illustrations indicating

possible location of location and dimensions of the

proposed waste proposed waste management

management facilities facilities (collection, storage for

(collection, storage for recyclables, general waste and

recyclables, general waste hazardous waste and

and hazardous waste and treatment facilities) and

treatment facilities) and vehicle access areas designed

vehicle access areas to ensure adequate space for

designed to ensure maneuvering delivery and

adequate space for waste removal vehicles.

maneuvering delivery and (3-4 Pages)

waste removal vehicles.

(2-3 Pages)

#16 Utility Demand

#28 Utility Demand Calculations

A Calculations A #18 Utility Plan

#30 Utility Plan



#28 Utility Demand #19 Utility Demand

Calculations Calculations

#30 Utility Plan #20 Utility Plan



B





B



#19 Utility Demand

Calculations

#20 Utility Plan

C









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 17

Table 2. Estidama Submissions for Development Review

Building Rating System

Note these are Development Rating submissions, not final submissions for a Design Rating.

The unlabelled text denotes specific Estidama submission for Development Review

Page lengths in parentheses indicate the maximum submission for review.

A Type A Development Review requirements also evaluated as part of the Estidama submission.

B Type B Development Review requirements also evaluated as part of the Estidama submission.

C Type C Development Review requirements also evaluated as part of the Estidama submission.

Please do not submit the above Development Review requirements twice.



Req. Credits Pre-Concept Review Concept Review Detailed Review

Estidama Summary

Estidama Summary: Estidama Summary: Estidama Summary: Updated

Narrative summarising Narrative with supporting narrative with supporting plans

sustainability approach plans and graphics and graphics summarising

taken. The aim is to summarising sustainability sustainability strategies

illustrate system thinking approach and options pursued. The aim is to illustrate

implemented on the project. considered. The aim is to system thinking implemented

(2 Pages) Supporting plans illustrate system thinking on the project. (2 Pages)

and graphics. implemented on the

project. (2 Pages)



INTEGRATED DEVELOPMENT PROCESS

IDP-R1. Estidama IDP-R1. Estidama IDP-R1. Estidama

Framework Narrative Performance: Updated Performance: Updated

summarizing vision, narrative and scorecard narrative and scorecard

IDP-R1: objectives, indicators and illustrating project illustrating project

Integrated To targets set jointly by the performance in relation to performance in relation to

ensure new design and development indicators and targets set. indicators and targets set.

development team; initial project (1-2 Pages) (1-2 Pages)

adopts the performance against

Integrated indicators. (2 Pages) IDP-R1. IDP Process Chart: IDP-R1. IDP Process Chart:

Development Updated Process chart for Updated Process chart for the

Process (IDP) as a IDP-R1. IDP Process Chart: the IDP to illustrate IDP to illustrate changes from

way of attaining Narrative with supporting changes from the IDP the IDP Process Chart

greater synergy chart of team structure, Process Chart submitted at submitted at Concept Review.

between project team members and their Pre-Concept Review. (1 Page)

systems, roles; design milestones and (1 Page)

resulting in high workshops listing IDP-R1. IDP Implementation

performance participants, goals, expected Strategy: Narrative describing

Development outcomes, required actions the implementation strategy

Strategy with task assignments; and for transition between project

buildings. method for ensuring stages and project packages

appropriate stakeholders and hand-over of design

are involved. (3 Pages) process to succeeding design

teams. (2 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 18

Req. Credits Pre-Concept Review Concept Review Detailed Review

IDP-R2. Draft Tenant Fit- IDP-R2. Draft Tenant Fit- IDP-R2. Outline Tenant Fit-Out

Out Design & Construction Out Design & Construction Design & Construction Guide:

Guide: Narrative outlining Guide: Updated narrative Narrative outlining the tenant

the tenant fit-out guidelines outlining the tenant fit-out fit-out design and construction

being considered for the guidelines for the project, guidelines being considered for

project, including initial including vision, targets, the project, addressing:

IDP-R2: Tenant vision, targets, and and certification process. • The IDP planned for the

Fit-Out Design & certification process. (1 page) project and building design and

Construction (1 page) development team’s role as

Guide part of this process;

To ensure that • Sustainability vision and

the design and objectives for the project;

construction of • Summary of targets for the

interior space fit- project in the form of PRS

out Scorecard highlighting credits

will contribute to targeted;

the overall • Initial technical guidance;

project’s • Certification process for the

sustainability building and its various

objectives and milestones;

targets. • The owner’s / developer’s

quality assurance procedure for

verifying the requirements

have been implemented.



This submission is only required

for Core & Shell projects

(5 Pages)

IDP-R3: Basic IDP-R3. Commitment to Basic

Commissioning Commissioning: Letter of

To ensure that commitment from the owner

the building to engage an independent

performs as commissioning agent as part of

designed to the project design team

protect occupant throughout the design stages.

health and The Commissioning agent will

provide comfort be responsible for overseeing

and ongoing the commissioning process at

building completion stage.

efficiency. (1 Page)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 19

Req. Credits Pre-Concept Review Concept Review Detailed Review

NATURAL SYSTEMS

NS-R1. Natural Systems NS-R1. Natural Systems NS-R1. Natural Systems Key

Context: Narrative with Key performance performance indicators (KPIs):

supporting illustrations indicators (KPIs): Narrative Updated assessment of design-

addressing the following in describing KPIs identified to related KPIs.

relation to the project site, guide the design of the (3 Pages)

the area of probable impact development, based on the

surrounding it, as well as the results of the opportunities

sub-regional and regional and constraints analysis.

scales: These are to include

• Topography; indicators and targets

• Geology / geomorphology; relating to the following, as

• Soils and geotechnical a minimum:

NS-R1: Natural attributes; • Soil;

Systems • Hydrology and • Flora;

Assessment groundwater; • Fauna;

To ensure that at • Waste and contamination; • Microclimate;

the • Coastal conditions; • Topography and views;

commencement • Microclimate (such as • Drainage;

of the design prevailing winds, solar • Other targets relating to

process, the orientation and solar mitigation of identified

environmental shading); environmental constraints;

baseline • Priority species, habitats and

conditions and ecosystems (both onsite • Area of site to be

surrounding, and those influenced by the protected, maintained,

connected to and site); created or restored.

on the site are • Flora and fauna (including

considered and wildlife corridors, seasonal Initial assessment of

assessed. uses); project against design-

• Archaeological features. related KPIs.

(7 Pages) (3 Pages)



#4 "Development

A Opportunities and

Constraints"

#4 "Development

B Opportunities and

Constraints"

#3 "Development

C Opportunities and

Constraints"









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 20

Req. Credits Pre-Concept Review Concept Review Detailed Review

NS-R2&3. Natural Systems NS-R2&3. Natural System

Map: Map identifying areas Design and Management

NS-R2: Natural

to be protected; used as Strategy: Narrative describing

Systems

mitigation areas; the detailed strategy for

Protection

enhanced; remediated; natural systems addressing soil

To protect

and/or allocated for habitat enhancement, plant selection,

significant and

creation or restoration planting, irrigation, pesticide

valuable Natural

beyond mitigation and / or and herbicide avoidance, plant

Systems assets

compensation req'mts. establishment, survival,

identified in NS-

(1 Page) generation and protection, and

R1 Natural

monitoring and maintenance

Systems

NS-R2&3. Natural System program.

Assessment.

Design and Management (4 Pages)

Strategy: Narrative

describing options and

concept strategy for

natural systems addressing

soil enhancement, plant

selection, planting,

irrigation, pesticide and

herbicide avoidance, plant

establishment, survival,

NS-R3: Natural generation and protection,

Systems Design and monitoring and

and maintenance program.

Management (4 Pages)

Strategy

To minimize #1 Site Plan #6 Site Design Regulations

demand for #3 Land Use Plan and Guidelines

resources, #4 At Grade Uses Plan #10 Summary of Public

promote soil #13 Marina and Realm Plan

protection and Waterfront Plan (if #11 Public Realm Design

A A

enhancement applicable) Specifications

and #33 Proof of

ensure the long Commencement of

term survival and Environmental Analysis

management of #1 Site Plan #3 Illustrative Site Plan

landscaped/habit #3 Land Use Plan B #9 Landscaping Plan

at areas. #4 At Grade Uses Plan

#13 Marina and #3 Illustrative Site Plan

B Waterfront Plan (if #9 Landscaping Plan

applicable)

#33 Proof of C

Commencement of

Environmental Analysis









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 21

Req. Credits Pre-Concept Review Concept Review Detailed Review

LIVABLE BUILDINGS

LBo-R1: Plan Note that there are no Estidama-specific submissions beyond Development Review items for

2030 LBo-R1 and LBo-R2.

To ensure that all

#7 Regulatory #9 Regulatory #2 Land Use Plan

new development

A Compliance A Compliance A #3 Density Plan

supports the

#5 Building Typology Plan

vision for the

Emirate of Abu

Dhabi, #7 Regulatory #9 Regulatory #2 Development Summary

as defined by the Compliance Compliance Statistics

applicable Plan B B

2030, and/or

Development B

Code, and/ or #4 Development #2 Development Summary

Area Plan. C Statistics Summary C Statistics



#1 Climate Context #14 Demographic

#2 Urban Systems Analysis

Context #15 Community Facility

LBo-R2: Urban #3 Transportation Needs Assessment

Systems Capacity Estimate A #20 Transportation

A

Assessment #4 Development Analysis

To ensure that, Opportunities and #33 Proof of

before the design Constraints Commencement of

process begins, a #5 Development Environmental Analysis

thorough Concept Illustrations

understanding of #1 Climate Context #14 Demographic

the #2 Urban Systems Analysis

project site is Context #15 Community Facility

developed within #3 Transportation Needs Assessment

its urban context Capacity Estimate #20 Transportation

B

to better inform #4 Development Analysis

project Opportunities and B #33 Proof of

programming, Constraints Commencement of

connectivity and #5 Development Environmental Analysis

built form. Concept Illustrations

#1 Existing Services

C









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 22

Req. Credits Pre-Concept Review Concept Review Detailed Review

LBo-R3. Concept Outdoor LBo-R3. Detailed Outdoor

Thermal Comfort Strategy: Thermal Comfort Strategy:

Narrative with supporting Narrative with supporting plan

plan and calculations and calculations describing

describing proposed proposed measures for shading

measures and options for and improving outdoor thermal

LBo-R3: Outdoor shading and improving comfort in priority areas.

Thermal Comfort outdoor thermal comfort in (5 Pages)

Strategy priority areas.

To increase (3 Pages)

outdoor thermal

comfort during #4 At Grade Uses Plan #10 Summary of Public

transition months #21 Pedestrian and Realm Plan

and reduce Cyclist Network Plan #11 Public Realm Design

thermal #24 Street Sections Specifications

A A

discomfort during #25 Street Design Audit #14 Summary of Multi-

summer months (if applicable) Modal Transportation Plan

in public spaces #15 Transportation Design

and walkways. Specifications

#4 At Grade Uses Plan #10 Shading Plan

#21 Pedestrian and B

Cyclist Network Plan

B #10 Shading Plan

#24 Street Sections

#25 Street Design Audit C

(if applicable)

LBi-R1. Healthy Ventilation LBi-R1. Healthy Ventilation

Delivery: Narrative Delivery: Narrative and

describing observational supporting plan(s) describing

LBi-R1: Healthy

study of local air quality the team’s strategy for

Ventilation

undertaken including ensuring the following:

Delivery

photographs of • the minimum separation

To protect the

surrounding sources of distances between air intakes

quality of air

pollutant emissions. and any exhausts or discharge

drawn into

(3 Pages) points comply with ASHRAE

buildings for

62.1.2007 or local code

ventilation and to

whichever is more stringent

ensure minimum

• all exhausts are located

delivery of

outside the public realm or as

outdoor fresh air.

defined by local code

whichever is more stringent.

(4 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 23

Req. Credits Pre-Concept Review Concept Review Detailed Review

LBi-R2. Smoking Control: LBi-R2. Smoking Control: LBi-R2. Smoking Control:

Letter of Commitment from Narrative and supporting Narrative and supporting

the developer / owner to plan(s) describing the plan(s) describing the team’s

control smoking in the team’s concept strategy for detailed strategy for controlling

development through: controlling smoking in the smoking in the development,

• establishment of a no development, covering the covering the following at a

smoking policy (including in following at a minimum: minimum:

LBi-R2: Smoking car parks); • provision of dedicated • provision of dedicated

Control • provision of dedicated external smoking areas; external smoking areas;

To eliminate or external smoking areas; • provision of smoke free • provision of smoke free zones

minimize • provision of smoke free zones around entrances, air around entrances, air intakes

exposure of zones around entrances, air intakes and operable and operable windows;

building intakes and operable windows; • provision of appropriate

occupants to the windows; • provision of appropriate signage; and

harmful effects of • training of security staff; signage; and • appropriate sealing of

tobacco smoke. • provision of appropriate • appropriate sealing of residential units (for residential

signage and residential units (for components only where

• appropriate sealing of residential components applicable).

residential units (for only where applicable). (3 Pages)

residential components only (3 Pages)

where applicable).

(1 Page)



LBi-R3: LBi-R3. Legionella Prevention:

Legionella Narrative and supporting plan

Prevention drawings describing all water

To manage the based systems considered

risk of Legionella necessary to be included in a

in water based Legionella Management Plan.

building systems. (2 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 24

Req. Credits Pre-Concept Review Concept Review Detailed Review

PRECIOUS WATER

PW-R1: PW-R1. Water Approach: PW-R1. Water Concept: PW-R1. Detailed Water

Minimum Narrative outlining the Narrative describing Strategy: Narrative describing

Interior Water team’s approach to reducing options and concept for the detailed concept strategy

Use Reduction building water consumption. reducing water for reducing water

To develop and At a minimum the analysis consumption. At a consumption. At a minimum

implement a must cover the following: minimum the analysis must the analysis must cover the

comprehensive fixtures and fittings, cover the following: following: fixtures and fittings,

water strategy appliances and landscaping fixtures and fittings, appliances and landscaping and

during the early and heat rejection. appliances and landscaping heat rejection.

stages of (1-2 Pages) and heat rejection. (3-4 Pages)

design as a tool (2 Pages)

to minimize the

project’s interior PW-R1&2. Water PW-R1&2. Water Calculator

potable water Calculator Draft Building Water Calculator

consumption. Draft Building Water confirming that the building’s

Calculator confirming that predicted interior potable

the building’s predicted water consumption is no

interior potable water greater than the baseline

consumption is no greater building interior potable water

than the baseline building consumption using efficiency

interior potable water measures only.

consumption using (Water Calculator .xls)

efficiency measures only.

(Water Calculator .xls)



PW-R1&2. Irrigation Plan PW-R1&2. Irrigation Plan

Initial calculations of total Updated calculations of total

annual average irrigation annual average irrigation

demand of external demand of external softscape

softscape areas (liters/day) areas (liters/day), including

(1 Page) plant schedules for landscape

program. (1 Page)



A #1 Site Plan A #6 Site Design Regulations

#4 At Grade Uses Plan and Guidelines

#28 Utility Demand #7 Building Design

Calculations Regulations and Guidelines

#29 Treated Sewage #10 Summary of Public

Effluent (TSE) Analysis Realm Plan

#11 Public Realm Design

Specifications

#16 Utility Demand

Calculations

#18 Utility Plan









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 25

Req. Credits Pre-Concept Review Concept Review Detailed Review

B #1 Site Plan B #9 Landscaping Plan

#4 At Grade Uses Plan #19 Utility Demand

#28 Utility Demand Calculations

Calculations #9 Landscaping Plan

#29 Treated Sewage #19 Utility Demand

Effluent (TSE) Analysis C Calculations





PW-R2. Water Monitoring and

Leak Detection Strategy:

PW-R2: Exterior Narrative detailing the building

Water water monitoring and leak

Monitoring detection strategy.

To encourage the Explanation of mechanism to

provision of ensure compliance with

metering building requirements,

facilities on all covering, at minimum, the

exterior water following major uses (where

uses enabling present):

effective • Heat rejection;

management of • External hose bibs;

outdoor water • Irrigation systems;

consumption and • Swimming pools; and

prevention of • Water features.

leaks. (2 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 26

Req. Credits Pre-Concept Review Concept Review Detailed Review

RESOURCEFUL ENERGY

RE-R1. Energy Concept: RE-R1. Energy Detailed

Narrative describing Strategy: Narrative describing

options and concept the detailed strategy for energy

strategy for energy covering the following at a

covering the following at a minimum: climate analysis and

minimum: climate analysis response; street orientation;

and response; street building orientation, massing

orientation; building and layout; shading strategies;

orientation, massing and building energy systems, and

layout; shading strategies; renewable energy approach.

building energy systems, (4 Pages)

and renewable energy

RE-R1: Minimum

approach. RE-R1. Energy Calculations:

Energy

(3 Pages) Updated result summary and

Performance

calculations of the building’s

To create a

RE-R1. Energy Calculations: energy consumption. At a

decision-support RE-R1. Energy Approach:

Result summary and minimum this should include:

tool to assist the Narrative outlining the

calculations of the Total annual energy

project team in team’s approach to energy,

building’s energy consumption (MWh) of the

making informed covering the following at a

consumption. At a building; peak power demand

decisions about minimum: climate response;

minimum this should (MW); and total energy

the options, street orientation; building

include the total annual supplied by onsite renewable

implications and orientation, massing and

energy consumption technologies, expressed as

benefits of layout; and shading

(MWh) of the building, both annual generation (MWh)

various aspects strategies.

peak power demand (MW), and peak generation (MW).

of the building (3 Pages)

and the total energy (2 Pages)

design in order to

supplied by onsite

achieve a

renewable technologies,

minimum level of

expressed as both annual

energy efficiency.

generation (MWh) and

peak generation (MW).

(2 Pages)



#28 Utility Demand #5 Building Typology Plan

Calculations #6 Site Design Regulations

and Guidelines

#7 Building Design

A A

Regulations and Guidelines

#16 Utility Demand

Calculations

#18 Utility Plan









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 27

Req. Credits Pre-Concept Review Concept Review Detailed Review

#28 Utility Demand #19 Utility Demand

Calculations B Calculations

#20 Utility Plan

B

#19 Utility Demand

C Calculations

#20 Utility Plan



RE-R2. Energy Monitoring and

RE-R2: Energy Reporting Strategy: Narrative

Monitoring and detailing the building energy

Reporting monitoring and reporting

To encourage the strategy covering at a minimum

provision of 90% of the estimate annual

metering energy consumption of each

facilities that fuel type and the following

allow the energy major uses:

performance of • Cooling installations

the building to be comprising one or more units

recorded and feeding a common distribution

monitored to circuit (>20 kW);

allow future • Motor control centres

improvement and providing power to HVAC

understanding of equipment (>10 kW);

the use of energy • Final electrical distribution

in buildings. boards (power/lighting) (>10

kW) (3 Pages)

RE-R3: Ozone RE-R3: Ozone Impacts of

Impacts of Refrigerants & Fire

Refrigerants & Suppression Systems:

Fire Narrative describing how the

Suppression project will meet the credit

Systems

requirements.

To promote the

selection of

refrigerants and

fire suppression

systems that

minimise

impacts on the

environment.









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 28

Req. Credits Pre-Concept Review Concept Review Detailed Review

STEWARDING MATERIALS

SM-R1: SM-R1. Material Approach: SM-R1. Material Strategy:

Hazardous Narrative describing the Narrative including schedule of

Materials team’s approach for materials to be specified and

Elimination material selection and used. (2 Pages)

To eliminate procurement. (2 Pages)

exposure of

building

occupants to

asbestos and

minimize toxic

effects of

chromated

copper arsenate

(CCA) treated

timber on people

and the

environment.









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 29

Req. Credits Pre-Concept Review Concept Review Detailed Review

E7. Waste Approach: SM-R2. Waste Concept: SM-R2. Waste Detailed

Narrative providing a review Narrative describing Strategy: Narrative describing

of existing and planned options for diverting the detailed strategy for

waste management construction, demolition diverting construction,

SM-R2: Basic infrastructure and programs and operational waste demolition and operational

Construction available from the from landfill and waste from landfill and

appropriate authority and incineration. incineration.

Waste

the team’s approach to (2 Pages) (3 Pages)

Management waste, covering

construction demolition and SM-R2. Waste SM-R2. Waste Calculations:

&

operational waste Calculations: Result Detailed result and calculations

management. (2 Pages) summary and calculations of annual estimates of

SM-R3: Basic

for the different options construction, demolition and

Operational

considered of annual operational waste generated

Waste

estimates of construction, and diverted from landfill and

Management

demolition and operational incineration. The minimum

waste generated and diversion rate to target should

To reduce the

diverted from landfill and be 30% for construction and

long-term incineration. The minimum demolition waste and 40% by

environmental diversion rate to target weight or volume of the total

impacts should be 30% for operational waste generated at

associated with construction and full occupancy. In the case of

construction and demolition waste and 40% multi-residential buildings, the

by weight or volume of the percentage of operational

operational

total operational waste waste diversion should be 30%.

waste collection, generated at full (2 Pages)

transport and occupancy. In the case of

disposal. multi-residential buildings,

the percentage of

operational waste

diversion should be 30%.

(2 Pages)









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 30

Req. Credits Pre-Concept Review Concept Review Detailed Review

SM-R2. Waste SM-R2. Waste Management

Management Facilities Facilities Plan: Illustrations

Plan: Illustrations indicating location and

indicating possible location dimensions of the proposed

of proposed waste waste management facilities

management facilities (collection, storage for

(collection, storage for recyclables, general waste and

recyclables, general waste hazardous waste and

and hazardous waste and treatment facilities) and vehicle

treatment facilities) and access areas designed to

vehicle access areas ensure adequate space for

designed to ensure maneuvering delivery and

adequate space for waste removal vehicles.

maneuvering delivery and Measurement of distances to

waste removal vehicles. waste collection points for

(3 Pages) residents not exceeding 30m.

(4 Pages)





#28 Utility Demand #16 Utility Demand

A Calculations A Calculations

#30 Utility Plan #18 Utility Plan

#19 Utility Demand

Calculations

B

#28 Utility Demand #20 Utility Plan

B Calculations

#19 Utility Demand

#30 Utility Plan

Calculations

C

#20 Utility Plan







2-Pearl Compliance

As of September, 2 Pearl Compliance: 2 Pearl Compliance: Updated

2010, some Narrative and scorecard narrative and scorecard of

building projects outlining a credit pathway credit pathway for achieving 2

funded by the for achieving 2 Pearls, Pearls, including buffer; status

government are including a buffer to allow description for targeted credits.

mandated to for design and review (2 Pages)

achieve a 2 Pearl contingencies.

rating, as an (2 Pages)

example for

other projects.









The requirements outlined in this “Planning for Estidama” document are very important but do not fulfill the complete submittal requirements to obtain a Design Rating.





Page 31

Version 1 August 2010



‫مجلس أبوظبي للتخطيط العمراني‬ Abu Dhabi Urban Planning Council

62221 ‫ص.ب‬ P.O.Box 62221

‫أبوظبي، اإلمارات العربية المتحدة‬ Abu Dhabi, United Arab Emirates

Tel: +971 2 409 6000

Fax: +971 2 443 9443

www.upc.gov.ae



Related docs
Other docs by yurtgc548
项目概述
Views: 0  |  Downloads: 0
雅比斯的禱告The Prayer of Jabez
Views: 0  |  Downloads: 0
無投影片標題
Views: 0  |  Downloads: 0
温故校园
Views: 0  |  Downloads: 0
没有幻灯片标题
Views: 0  |  Downloads: 0
氫能源
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!