John Hanson, Brit Glad, Scott

Stapleton, Brian Leeflang (El Capitan),

Chris Hardy, Travis Johnson,

Kelli Oborn, Abby Hunter



Glad 2006

General Outline



• Important Dates

• Project Progress









Glad 2006

Tandem Buggy

Important Dates

Completed

 Design Finalization Jan 13

 Machining of frame Feb 6

 Welding of all parts Feb 13

In Progress

Machining of headset Mar 3

Machining of steering mech. Mar 6

Manufacturing of seats Mar 10

Future

– Assembly & Testing Mar 12-17

– Finalize the prototype Mar 27

– Final Testing with Video Mar 29-Apr 17



Design Day is April 25!!!

Glad 2006

Tandem Buggy

Project Progress

Buggy Rear Half







• Welding completed.

• Frame assembly in progress

• Seats, steering mechanism,

& headset underway



Chris Hardy 2006

Modeled Full Buggy

Buggy Rear Half









Brian Leeflang & Kelli Oborn 2005



Chris Hardy 2006





Glad 2006

Landboard

Important Dates



Completed

 Design Finalization Jan 11

 Solid modeling Feb 17

 Welding completed Feb 27



In Progress

Prototype 1 Machining Feb17

Assembly & Testing Mar 3



Future

– Manufactured final prototype Mar 24









Glad 2006

Landboard

Project Progress



Why behind?

• Complete redesign this semester from fall

Component to adjust angle







Contingency plan Axle



• Postpone deadlines Stapleton-Glad2006







• Prototype 1 machining Mar 3

• Assembly & Testing Mar 17

• Manufactured final prototype Apr 5

landboard









Stapleton-Glad2006







Glad 2006

Safety System

Important Dates

Completed

Concept Selection Oct 12

 Design Finalization 1 Nov 30

 Prototype 1 Dec 21

 Design Finalization 2 Feb 1



In Progress

Final Design Prototype ~March 15



Future

– Testing / Improving April









Glad 2006

Safety System

Project Progress



Stainless Weld

Time Consumers:

(Both Sides)

1. Waiting on Welding Appt.

2. CNC waiting list





Cost Drivers (out of $$)



John Hanson, 2006

1. Stainless Steel

2. Carbide End Mills



Contingency Plan:

New Welder (pay out of pocket)

Out of House Machinist, (pay out of pocket)





Glad 2006

Summary

• Buggy

– Ahead of schedule.

• Extra time allows for problem solving.

• Landboard

– Redesign on schedule

• Safety

– On schedule









Glad 2006

Questions?



Glad 2006



Related docs
Other docs by hedongchenchen
AMS11-AV-Order-form
Views: 0  |  Downloads: 0
Rural Telephone Bank
Views: 5  |  Downloads: 0
04tbl2-32a
Views: 0  |  Downloads: 0
CG9 Licence No.
Views: 0  |  Downloads: 0
1996
Views: 0  |  Downloads: 0
2011 CATALOG
Views: 11  |  Downloads: 0
NEURO-_summary.doc - STJ PA 2012
Views: 1  |  Downloads: 0
1995-1996 Prepaid Health Plan Contract
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!