Appendix A, February 2005 Cabinet Report









SMDC Year to date

Reporting Target Oct Nov Dec Trend v Current Full Year Performance Commentary from Head of

Indicator Officer Ref 03/04 Q1 Result Q2 Result Q3 Result Result

Interval 2004/5 Result Result Result Qtr2 Status Forecast Service

Result (Dec 2004)





Unable to achieve Award on Silk Street car

% of Car Park spaces park because of new guidelines From

covered by Secured by

Design status

Build

Control

Local

Indicator

Quarterly 6% 10% N/A N/A N/A 6% 6% 6% 6%

F L Miss Target British Parking Association which make it

financially prohibitive to gain status on Silk

Street (as was originally intended)



It is probable that by the end of the year,

% of standard searches

carried out in 10 working

days

Customer

Services

BVPI 179 Quarterly 100% 100% 100% N/A N/A 100.0% 99.8% 100.0% 99.9%

C L Miss target

recording in % terms will mean that there is

an insignificant difference between actual

and target.





In order to achieve this target it is necessary

to procure a computer system capable of

appropriate integration with existing LPG

and GIS systems. To date this has proved

Allow community's to

difficult given the need to also ensure the

make electronic

applications in respect of

Customer Local

Services Indicator

Quarterly N/A

September

2004

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

N/A

L Miss target operational efficiency of the said systems.

Given the demands on IT projects it has

land searches

been thought appropriate to delay this

project until the first quarter of 2005 in order

that resources can be refocused at that time

on meeting the necessary requirements.





Due to demands from other areas within the

Service area , notably Licensing, it has not

been possible to undertake the preliminary

work necessary to secure ISO 9000. Given

the budgetary constraints foreseen as

Seek ISO 9002 See

accreditation in Land

Charges section

Customer Local

Services Indicator

Quarterly N/A

December

2004

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss target

arising over the next and subsequent

financial years it has also been questioned

whether the costs of certification are

justified as the adoption of NLIS 3 will

allow appropriate QA to be attained via

another avenue. On this basis the pursuit of

ISO 9000 is no longer seen as a priority.



The audited result for 03/04 was 70%, not

78% as originally reported. Areas not

complying with guidance for this indicator

have been identified for attention this year

Score against a checklist Environm

of environmental

health/trading standards

ent

Services

BVPI 166 Bi Annual 70% 80% N/A N/A N/A N/A 70% 70% 70%

F L Hit Target

to achieve the target. Chief Exec recently

(19/11) e-mailed HofS regarding this and

the areas needing attention to bridge the

10% gap between current performance and

target have been identified. The full year

target is expected to be achieved.









Page 1 of 7 Produced 11/29/2011

Appendix A, February 2005 Cabinet Report









SMDC Year to date

Reporting Target Oct Nov Dec Trend v Current Full Year Performance Commentary from Head of

Indicator Officer Ref 03/04 Q1 Result Q2 Result Q3 Result Result

Interval 2004/5 Result Result Result Qtr2 Status Forecast Service

Result (Dec 2004)





December tonnage's have improved

favourably providing best month so far, this

is due in part to the non collection of general

waste in last week of December due to

Christmas holidays. Restrictions on side

waste together with a publicity should

Environm increase tonnage recycled to help us meet

Household waste recycled ent

Services

BVPI 82

a

Monthly 12.66% 13% 13.09% 12.00% 15.42% 10.82% 10.83% 13.71% 11.61% C L Miss target this target. The closure of the garden

service will also positively impact on this PI.

Figures for November and December are

estimated at present, awaiting confirmation

from County Council and recycling

contractors. End of year figure will link to

BVPI 84 as the two PI's are linked (see

below).



Closure of garden service will positively

impact on this BVPI as shown by good Q3

result. Residual domestic waste is not

increasing but the element of recyclable

Environm

Kg of household waste

collected (per head)

ent

Services

BVPI 84 Monthly 391.45 370 35.63 36.47 24.89 120.27 114.75 98.93 340.89

C L Miss target

waste is. An O&S sub working group have

put forward a number of proposals to limit

the amount of domestic waste collected.

Figures for November and December are

estimated, awaiting confirmation from

County Council.







Environm The costs attributable to the industrial

Cost of waste collection

per household

ent

Services

BVPI 86 Bi Annual £44.37 £41.50 N/A N/A N/A N/A £19.93 N/A N/A N/A

L Miss target dispute will result in the target not being

achieved.









October 2004, the External Auditor asked

SMDC to amend 2003/04 outturn from 86%

to 84.82%. Applying the same calculation to

% of population served by Environm

a kerbside collection of

recyclable

ent

Services

BVPI 91 Quarterly 84.82% 87% N/A N/A N/A 86.6% 86.6% 86.6% 86.6%

F L Hit Target

2004/05 figures takes our result for this year

to 86.6%. Nevertheless we expect to hit

target, currently working with contractors to

increase number of properties served and

expect these will be given service by March.









Page 2 of 7 Produced 11/29/2011

Appendix A, February 2005 Cabinet Report









SMDC Year to date

Reporting Target Oct Nov Dec Trend v Current Full Year Performance Commentary from Head of

Indicator Officer Ref 03/04 Q1 Result Q2 Result Q3 Result Result

Interval 2004/5 Result Result Result Qtr2 Status Forecast Service

Result (Dec 2004)





High visibility enforcement has ensured that

more people clear up after their dogs.

Original intention behind this measure was

Environm

Enforce Spot Fines for

dog fouling

ent

Services

Local

Indicator

Quarterly 14 14 or more N/A N/A N/A 0 0 0 0

F L Miss target

to target this aspect of anti social behaviour

by deploying a high visibility deterrent.

Work is now targeted on identified

households and individuals who allow their

dogs to roam unaccompanied fouling at will.







Responses from businesses have been

Environm See

Introduce Food Safety

forums

ent

Services

Local

Indicator

Quarterly N/A

January

2005

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss Target

collated and the first meeting to identify

common issues will take place during

quarter 4









Introduce new waste High Peak Borough Council entered into a

Environm See

collection vehicle (in

conjunction with High

ent

Services

Local

Indicator

Quarterly N/A

September

2004

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss target

North Derbyshire only partnership, and

withdrew their proposals to develop a joint

Peak) collection service.









100% is an aspirational target set by

Invoices paid within 30

days

Finance BVPI 8 Monthly 99.43% 100% 99.39% 99.62% 99.05% 99.31% 99.20% 99.05% 99.05%

D L Miss target Government. SMDC is in top quartile for all

Districts.









See Awaiting implementation of new Council

Implement paperless

Direct Debit

Finance

Local

Indicator

Quarterly N/A

March

2005

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss Target Tax system, Revised target date is May

2005







This was due to be a joint exercise with the

I.T. consortium but has now been

Review provision of Bailiff See

Services, incorporating the

tendering process

Finance

Local

Indicator

Quarterly N/A

November

2004

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss target

postponed (not considered a high priority).

The exercise will now be undertaken in-

house and has commenced. The revised

target date is April 05.









Page 3 of 7 Produced 11/29/2011

Appendix A, February 2005 Cabinet Report









SMDC Year to date

Reporting Target Oct Nov Dec Trend v Current Full Year Performance Commentary from Head of

Indicator Officer Ref 03/04 Q1 Result Q2 Result Q3 Result Result

Interval 2004/5 Result Result Result Qtr2 Status Forecast Service

Result (Dec 2004)







Significant drop in turnover of Moorlands

The average length of

unintentional stay in B & B

accommodation (Weeks)

Housing BVPI 183

Services (I)

Quarterly 0 0 N/A N/A N/A 0 0 2 0.7

D L Miss target

Housing stock / insufficient nominations has

caused blockage in hostel accommodation

and delays in permanent rehousing.









Significant drop in turnover of Moorlands

The average length of stay

in hostel accommodation

(Weeks)

Housing BVPI 183

Services (ii)

Quarterly 7 wks 4.1 N/A N/A N/A 7 8.6 6.3 7.3

C L Miss target

Housing stock compared to last year has

delayed move on from hostel

accommodation.









Proportion of unfit private Performance is slightly weaker than

sector dwellings made fit

or demolished as result of

Housing

Services

BVPI 62 Quarterly 3.8% 4.5% N/A N/A N/A 0.5% 0.60% 2.80% 2.80%

D L Hit Target

corresponding period of previous year

(3.44%). Housing Standards staff

SMDC action concentrating on this Q4







Will have to refer and close a further 80

Housing Benefit Security:-

Fraud Referrals to meet this target, by the

The number of fraud

investigations, per 1,000

Housing

Services

BVPI 76

(iii)

Quarterly 45 45 N/A N/A N/A 11 16 35 21

C L Hit Target end of the next quarter. This will be a

difficult target to reach but plans are in

caseload

progress to prioritise this area of work.









Average time to process

new benefit claims

Housing

Services

BVPI 78

a

Monthly 31 30 33 28 29 33 30 30 31

F L Hit Target Forecasting to hit target









Stretch target is achievable though

Average time for improvement will be needed over final

processing changes of

circumstance

Housing

Services

BVPI 78

b

Monthly 11.63 7 9 8 6 9 8 8 8

F L TBD quarter of year. December result was best

this year so renewed focus in this area is

clearly working.



Measured on a cumulative basis.

Performance is approx. 12% weaker than

% of recoverable corresponding period of previous year.

overpayments (excluding

Council Tax Benefit)

Housing

Services

BVPI 79

b

Monthly 44.56% 42% 23% 26% 28% 13% 22% 28% 28%

D L Miss target

Working with other sections (e.g. Recovery)

to target oldest debt first, as debt is

recovered accumulative from April 2000. Have started

a programme of agreed write off, which will

improve performance









Page 4 of 7 Produced 11/29/2011

Appendix A, February 2005 Cabinet Report









SMDC Year to date

Reporting Target Oct Nov Dec Trend v Current Full Year Performance Commentary from Head of

Indicator Officer Ref 03/04 Q1 Result Q2 Result Q3 Result Result

Interval 2004/5 Result Result Result Qtr2 Status Forecast Service

Result (Dec 2004)









See

Deploy document imaging

system

Housing

Services

Local

Indicator

Quarterly N/A

March

2005

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss Target

Procurement process timetable will take this

project to final tender stage in Q1 2005-6.









Implement new Housing & See Revised implementation date of end of

Council Tax Benefits IT

system

Housing

Services

Local

Indicator

Quarterly N/A June 2004 N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss target financial year. Test programme updated and

currently being actioned.









Human

The percentage of top 5%

earners that are women

Resource

s

BVPI 11

a

Quarterly 14.30% 20% N/A N/A N/A 18% 14% 14% 15%

F L Miss target

Achievement of target is dependant upon

vacancies arising.







Achievement of target is dependant upon

number of vacancies. Appropriate training

The percentage of top 5%

Human courses and succession plans are being

of earners from black and

minority ethnic

communities

Resource

s

BVPI 11

b

Quarterly 0.00% 0.80% N/A N/A N/A 0% 0% 0% 0%

F L Miss target developed and adverts now placed at

communal areas e.g. places of worship for

diverse groups. We are not expecting to hit

this target.





Unfortunately, due to a number of

The % of employees Human

retiring early (excluding ill- Resource

health retirements) s

BVPI 14 Quarterly 0.00% 0.20% N/A N/A N/A 0.30% 0.60% 0.00% 0.30% C L Miss target

redundancies and consequent early

retirements of employees over the age of

50, this target will not be achieved.









Human

The Equality Standard to

which SMDC conforms

Resource BVPI 2 a Bi Annual

s

1 2 N/A N/A N/A N/A 1 1 1

F L Hit Target

Equality needs assessment training now

completed. Expect to hit target.









67% result agreed with auditor.

Approaches to this issue comply with

Human

Promotion of Race

Equality

Resource

s

BVPI 2b Bi Annual 67% 89% N/A N/A N/A N/A 67% 67% 67%

F L Hit Target

highest standards. Some issues remain

regarding how approaches are delivered

and resolving these will be the focus, and

will aid achievement of target.









Page 5 of 7 Produced 11/29/2011

Appendix A, February 2005 Cabinet Report









SMDC Year to date

Reporting Target Oct Nov Dec Trend v Current Full Year Performance Commentary from Head of

Indicator Officer Ref 03/04 Q1 Result Q2 Result Q3 Result Result

Interval 2004/5 Result Result Result Qtr2 Status Forecast Service

Result (Dec 2004)





Few appeals received relative to overall

% of appeals allowed application numbers. Outcome in hands of

None

against SMDCs decision

to refuse planning

applications

Planning BV 204 Quarterly 29% 22% determin

ed

100% 29% 27% 20% 23% 29%

D L TBD

Planning Inspectorate. Constant monitoring

of quality of decisions in order to maximise

chance of success. Still possibile to hit this

target.





2003/04 outturn was amended by Budget

Manager (from £10.70) to reflect additional

costs not previously accounted for. In light

of this 50p increase, Head of Service needs

to reconsider 2004/05 target. Costs of £5.99

Cost of the Planning

Service

Planning

Local

Indicator

Quarterly £11.17 £10.50 N/A N/A N/A £2.92 £5.99 Not Supplied TBD TBD

L Miss target

at half way point indicate full year target of

£10.50 will not be achieved and an outurn

towards £12 is more likely. None of these

costs take into account income, which is up

considerably on previous year. Q1 and Q2

figures are cumulative. Awaitng Q3 figures.

Expected by end of January







Bad weather impacted on Q2, unlikely to hit

Market occupancy levels

(Leek, Wednesday

outdoor)

Property

Local

Indicator

Quarterly 77% 78% N/A N/A N/A 80% 76% 72% 76%

D L Miss Target

target. January Cabinet paper

recommended "Festival of Local food"

initiative.



Access and signage are key areas of

improvement and will be focus of

improvement activity, and will clearly be

Customer satisfaction with Regenerat Local

TIC ion Indicator

Bi Annual 90% 95% N/A N/A N/A N/A 90% N/A 90%

F L TBD helped through refurbishment of TIC. In the

meantime, with a Q2 result of 90%, there

has to be some doubt as to whether 95%

target can be achieved.



Results represent less enquiries than the

previous year. Increased partnership work

has resulted in using a central agency / tel

no for processing all advertising enquiries.

Number of Tourist

Information enquiries

Regenerat Local

ion Indicator

Quarterly 107,500 113K N/A N/A N/A 30,442 31,076 22,503 84,021 D L Miss target

This has meant that individual TICs are

handling less tel/written enqs direct. This

quarter web visits to the Peak District site

have been included on an apportionment

basis. Also the footfall ( people through the

door) has shown an upturn on Q3 last year









Page 6 of 7 Produced 11/29/2011

Appendix A, February 2005 Cabinet Report









SMDC Year to date

Reporting Target Oct Nov Dec Trend v Current Full Year Performance Commentary from Head of

Indicator Officer Ref 03/04 Q1 Result Q2 Result Q3 Result Result

Interval 2004/5 Result Result Result Qtr2 Status Forecast Service

Result (Dec 2004)



Action is to be completed but not to

timescales originally envisaged. This is

Publish an area action linked to Biddulph Housing Market Renewal

plan for Biddulph Town

Centre

Regenerat Local

ion Indicator

Quarterly N/A

September

2004

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

N/A

L Miss target programme and is now embedded into the

Local Development Framework. Planning

proposals being developed during early part

2005.

The review process is resulting in the

drafting of a more detailed strategy. The

See

Complete a full review of

the Community Strategy

Strategy BVPI 1 b Annual X Sep-04 N/A N/A N/A N/A N/A N/A

See

Comments

Comment

s

L Miss Target

LSP has approved a revised draft for three

of the Community Strategy ambitions with a

further three parts to be approved in March

2005.





Violent crimes by a On the increase nationally. Year on year, a

stranger (per 1,000

population)

Strategy

BVPI 127

a1

Monthly 3.86 3.06 0.25 0.32 0.17 0.81 0.97 0.74 2.53

C L Miss target 15% decrease in Moorlands. Likely to be a

multi-agency priority for next year.







On the increase nationally. For Moorlands,

Violent crimes in a public

place (per 1,000

population)

Strategy

BVPI 127

b1

Monthly 7.61 7.43 0.6 0.61 0.72 2.14 1.52 1.99 5.64

D L Miss target

2004/05 figures are similar to previous year.

Likely to be a multi-agency priority for next

year.





Violent crime is currently high nationally.

Moorlands levels are similar to last year.

With several Police operations in place

including Section 30's, Operation Flock &

Violent crimes in Operation Gamin - all with multi agency

connection with licensed

premises (per 1,000

Strategy

BVPI 127

c1

Monthly 2.05 1.55 0.07 0.18 0.34 0.53 0.38 0.62 1.52

D L Miss target

support through the locality meetings. It is

hoped the Alcohol Exclusion Zones will

population) assist in reducing the number of alcohol

related incidents. Proposal for A. E. Zones

for Leek, Biddulph, Cheadle, Forsbrook,

Werrington and Cheddleton. Subject to

approval will be in place April 2005.





Violent crimes committed

under the influence (per

1,000 population)

Strategy

BVPI 127

d1

Monthly 5.6 3.56 0.44 0.50 0.42 1.36 0.94 1.38 3.63 D L Miss target As above.









Although target date has been missed,

Introduce new See

performance software

system

Strategy

Local

Indicator

Quarterly N/A

October

2004

N/A N/A N/A

See See

Comments Comments

See

Comments

See

Comments

Comment

s

L Miss target

activity will still be completed (January

Cabinet paper refers). Officer training

started mid Jan 2005.









Page 7 of 7 Produced 11/29/2011


Related docs
Other docs by HC11112915727
B 2005 PublicFacilities
Views: 0  |  Downloads: 0
Objetos Web
Views: 0  |  Downloads: 0
conceptos sobre nomina
Views: 7  |  Downloads: 0
8GINMARI
Views: 0  |  Downloads: 0
Nucleate Boiling Heat Transfer
Views: 1  |  Downloads: 0
Further to Bank�s notice dated 06
Views: 0  |  Downloads: 0
Example 1 Geometric Mean
Views: 0  |  Downloads: 0
SECTION 15231
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!