Embed
Email

Bid

Document Sample
Bid
Shared by: HC111129123150
Categories
Tags
Stats
views:
0
posted:
11/29/2011
language:
English
pages:
3
5d7a8a71-5956-4f10-bde1-058d50010410.xls











COUNTY(IES)========> COOK- -

AIRPORT============> LANSING MUNICIPAL BLANK PRICES 28

LETTING DATE=======> April 27, 2007

ITEM NUMBER========> 002A TOTAL QUANTITY PAY ITEMS 28 TOTAL BID $0.00

STATE NUMBER========> IGQ 3565

LA036 >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> $0.00



NOTES:

1. Each PAY ITEM should have a UNIT PRICE and a TOTAL PRICE.

2. The UNIT PRICE shall govern if no TOTAL PRICE is shown or if there is a

discrepancy between the product of the UNIT PRICE multiplied by the QUANTITY.

3. If a UNIT PRICE is omitted, the TOTAL PRICE will be divided by the QUANTITY

in order to establish a UNIT PRICE.

4. A bid may be declared UNACCEPTABLE if neither a unit price nor a total price is shown.

5. NOTICE Regarding Addenda - It is your responsibility to determine which, if any, addenda

pertains to any project you may be bidding. Failure to incorporate all relevant addenda may

cause your bid to be declared unacceptable. The Department will not be sending addenda

to individual plan holders.



ADDITIONAL NOTES WHICH APPLY FOR THE COMPUTER GENERATED (IDOTCBID)

SCHEDULE OF PRICES:

5. Pay item numbers (PIN), descriptions, unit of measure (U OF M), quantities, and Department

supplied unit prices MUST BE CORRECT and CORRESPOND to the latest

schedule of prices issued by the Department or the bid may be declared UNACCEPTABLE.

6. Insert this computer generated schedule of prices into the bidding proposal directly

in front of the Department issued schedule of prices.

INSTRUCTIONS FOR CBID SPREADSHEET









To fill out Cbid spreadsheet all you will need to do is make sure your cursor is sitting

in the Contractor Number cell, enter your Contractor Number then hit your tab key or

the down arrow, you will then go to the Contractor Name field, fill that in then hit the Tab

key or the down arrow again and you will then be in the Unit Price column to begin entering

the Unit Price that you are bidding.



After you have completed all the unit price entries you will need to hold

down the CTRL key and the letter A for the contract to print.





If there is an addendum you will need to go to TOOLS, PROTECTION,

UNPROTECT SHEET to be able to delete contents of row. Highlight entire row then

go to Edit, Delete, the remaining rows will automatically move up so there will

be no blank lines. To add a row go to the last line of pay items then enter required information.

The formulas will automatically recalculate the number of line items and the Total Quantity.



!!!! DO NOT ADD A ROW IN THE MIDDLE OF SPREADSHEET !!!!



** There will be a separate sheet that will print out first, that has all the

information needed on it, there will be no need to fill it out separately.

You will also need to send it along with your bid, it will now be the first

sheet of the bid. The information on this sheet was previously the last page of your bid.


Related docs
Other docs by HC111129123150
Original Master List
Views: 2  |  Downloads: 0
I � Portarias de 06/10/2009
Views: 4  |  Downloads: 0
taetigkeitsbericht 2007
Views: 4  |  Downloads: 0
Mi�rcoles 15 Septiembre 1999
Views: 0  |  Downloads: 0
Making and Implementing Policy
Views: 0  |  Downloads: 0
R tutorial
Views: 1  |  Downloads: 0
Seminar OMP
Views: 2  |  Downloads: 0
El cielo en su ordenador
Views: 5  |  Downloads: 0
Institut de Formation en Soins Infirmiers
Views: 4  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!