Mississippi River Gulf Outlet (MRGO)

Closure Project Status



Gregory Miller

Senior Project Manager

New Orleans District





Gulf Intracoastal Canal Association (GICA)

103rd Annual Convention

August 20-22, 2008



One Team: Communicating, Collaborating, Consensus

1

MRGO De-Authorization Study Authority

Public Law 109-234 (passed 15 June 2006)



• Chief of Engineers to develop a comprehensive plan to de-authorize deep

draft navigation on the MRGO



• Submit interim report to Congress no later than 15 December 2006



• Refine the plan if necessary to be fully consistent with the Final Technical

Report for the LACPR Plan



Conference Report



• Include recommended modifications to the existing authorized navigation

uses of the MRGO and any navigation uses that should be maintained



• Identify measures for hurricane and storm protection



• Develop the plan in consultation with St. Bernard Parish, State of Louisiana,

and affected Federal agencies

One Team: Communicating, Collaborating, Consensus

2

Water Resources Development

Act (WRDA) Authority

Section 7013: Mississippi River Gulf Outlet



• Directs the Secretary to submit a final report on the de-authorization

of the MRGO



• The report shall include:



– A plan to physically modify the MRGO and restore the areas

affected by the navigation channel



– A plan to restore natural features of the ecosystem that will

reduce or prevent damage from storm surge



– A plan to prevent the intrusion of saltwater into the waterway



• The Secretary shall carry out a plan to close the MRGO and restore

and protect the ecosystem

One Team: Communicating, Collaborating, Consensus

3

Final Alternatives Evaluated



• Future without de-authorization (No Action)

– MRGO Channel is maintained at authorized dimensions





• Alternative 1

– Total closure of MRGO





• Alternative 2

– Phased construction of total closure structure





• Alternative 3

– Cease all maintenance and abandon channel





One Team: Communicating, Collaborating, Consensus

4

De-authorization Study Recommendation



• De-authorize the MRGO from mile 60 to mile -9.4 with

these features:

– A full channel closure structure at the Bayou La Loutre ridge

– Removal of relic aids to navigation (USCG determination)

– Incorporation of the MRGO plan into the LACPR plan

– De-authorization of jetties and bank protection features





• GIWW reach (mile 60 to mile 66) and Michoud Canal

sections of project remain authorized for deep draft

navigation



One Team: Communicating, Collaborating, Consensus

5

Plan Selection Rationale

• Cost effective while also meeting the criteria of completeness,

acceptability, and effectiveness



• Closure eliminates attempted navigation



• Plan is politically and socially acceptable



• Reduces adverse environmental impacts



• Compatible with coastal restoration & storm protection goals of other

Federal & non-Federal plans (reduces cost of Violet Diversion & LCA)



• Consistent with multiple lines of defense strategy



• Partially addressed WRDA 07 Section 7013 by modifying the MRGO

channel while being cost effective, environmentally acceptable, and

technically feasible

One Team: Communicating, Collaborating, Consensus

6

Implementation Schedule



• Sign MOA with State of Louisiana

• Safety coordination and planning

• Contract advertisement scheduled for 28 August 2008

• Request & receive Right-of-Entry for construction activities

prior to contract award

• Notice to Proceed granted ~ two weeks after bid closing

• Construction window of 200 days

• Closure structure to be completed by 30 May 2009



One Team: Communicating, Collaborating, Consensus

7

Coordination and Related Activities



• IHNC

– De-watering, maintenance and repairs initiated 11 August 2008

– Scheduled 60-day construction window

– Set to finish prior to MRGO closure construction



• Baptiste Collette Bayou

– Controlling depth -12 MLG at mile 8.0

– Maintenance dredging completed 4 July 2008

– Allows traffic to continue during lock repair



• MRGO Jetty Rocks

– FONSI signed 21 July 2008 allowing possible rock reuse for

closure structure construction

– Contractors can prepare bids incorporating use of jetty rock



One Team: Communicating, Collaborating, Consensus

8

Other Considerations



- IHNC Lock Replacement



- Emergency Response Plans



- Ecosystem Restoration Study Options



- Continue Open Lines of Communication







One Team: Communicating, Collaborating, Consensus

9

MRGO in Relation to the

New Orleans Metro Area

Lake

Lake Pontchartrain Mississippi

Maurepas

Sound





IHNC Lock

Lake

New Borgne

Orleans

Chandeleur

Sound







Lake Violet

Salvadore Canal





Breton

Sound









Gulf of Mexico

One Team: Communicating, Collaborating, Consensus

10

Site Selection









Closure

Site









Closure Structure

One Team: Communicating, Collaborating, Consensus

11


Related docs
Other docs by HC111129093417
fridgefreeze autodef bottomfreeze noice eff
Views: 0  |  Downloads: 0
telework
Views: 1  |  Downloads: 0
LESSON 1
Views: 0  |  Downloads: 0
RESUMEN
Views: 40  |  Downloads: 0
Page 1
Views: 1  |  Downloads: 0
From Non-Spatial Data to Spatial Data
Views: 0  |  Downloads: 0
Grade/Subject:
Views: 0  |  Downloads: 0
ss2_0_section_3b_online_sy
Views: 1  |  Downloads: 0
rotational translational symmetry
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!