Embed
Email

HEALTHCARE

Document Sample

Shared by: benben zhou
Categories
Tags
Stats
views:
2
posted:
11/28/2011
language:
English
pages:
3
HEALTHCARE

LG Commercial Air Conditioning Systems









LG Technology for Medical Office Buildings and Hospitals



MODULAR DESIGN



SUSTAINABLE TECHNOLOGY



REDUNDANCY



HEALTHIER SYSTEM

LG Electronics, a leading provider to the healthcare industry, Healthcare

Multi V brings state-of-the-art modular design to improve comfort

in problem areas within medical facilities.

LG Multi V – Engineered to be environmentally sustainable

The benefits of quiet, energy efficient building innovations will enhance your property value.









IMAGINE less or no duct work, lower utility bills, a healthier, ozone friendly

environment… LG Technology.









Multi V Benefits

• MODULAR DESIGN

• SUSTAINABLE TECHNOLOGY Indoor units come in a variety of design styles, including wall, floor and ceiling surface mount, ceiling flush and recessed

• REDUNDANCY concealed mount to blend in with its surrounding design, seamlessly.



• HEALTHIER SYSTEM Additional Benefits:

• Modular design adds a high level of redundancy to your facility

LG Multi V, an architect’s best friend for upgrading • Independent zone control for improved comfort in problem areas

building aesthetics, keep, reduce, or eliminate the need • Turn mechanical rooms into usable space

for a cooling tower all together… Multi V offers the most • Works with existing systems and delivers low ownership cost

flexible design choice.

Although the LG Multi V system works as one system,

each unit can be isolated for unparalleled redundancy.

Should any unit require maintenance or service, each

unit compressor, heat exchanger or electrical service

can be isolated while the system and other units

continue to operate. Multi V

Modular design adds a higher level of redundancy to

your building. The Best Solution for Healthcare

Energy Efficient

This innovative VRF system technology delivers exceptional comfort

while delivering value to the healthcare facilities with the lowest

Operational Cost energy consumption per operating hour.







Multi V

An energy efficient system from LG Multi V allows you to use only

what you need, when you need it.

System Efficiency



• Building Description • Building Modeling Software

» Total Area (Sq. Ft): 133,600 EnergyPro™ V.5 building energy simulation software

» Total levels: 6 provided by EnergySoft ®, using the following

accreditations:

» Basement level walk-out » Uses DOE-2.1E simulation engine from U.S. Department

» Zones: 145 of Energy

» Infiltration (CFM): 0 » Approved by the California Energy Commission

» Accepted by USGBC for use with LEED® certification

Multi-story Building HVAC Systems Annual Operating Cost

Energy Analysis ($0.0902/kWh, $1.358/Therm) » Incorporates ASHRAE based load calculations

Building modeled in Atlanta, GA

$160,000K





45%

55%

$148,469

• Design Parameters

$140,000K

$138,619 The utility rates used for the energy analysis were assigned

27%

23%

$120,000K $121,488 based on regional data acquired from the U.S. DOE

$117,940

12%

$100,000K $107,808 The building energy analysis was performed using

$95,747

ASHRAE design temperatures for Atlanta, GA

$80,000K



The city design conditions were used to model the

$60,000K

performance of six different types of HVAC systems:

$40,000K » LG Multi V Sync II, Water Source Heat Pumps (WSHP),

Duct Free Split (DFS) Systems, Constant Volume Rooftop

$20,000K

Package Units and 4-pipe chilled water/hot water (CW/

0 HW) central plants: one using air cooled chillers, one

LG Multi V WSHP DX Splits CV RTU WC Chiller AC Chiller

using water cooled chillers.









LG Healthcare Business Solutions









LIFE’S GOOD...WHEN IT’S GREEN.

Engineered for sustainable green buildings LG Electronics, HVAC Division

11405 Old Roswell Road

Alpharetta, Georgia 30009

Potential energy savings may vary depending on your personal system settings, equipment www.lghvac.com

maintenance, local climate, actual construction and installation of equipment, and duct system www.lgusa.com

VMB-2010 -VER1



Related docs
Other docs by benben zhou
dossier pq lucidi Marie
Views: 1  |  Downloads: 0
NYSILC logo
Views: 1  |  Downloads: 0
March 19_ 2010 VML Budget Analys
Views: 4  |  Downloads: 0
Subpart BReclamation of Benefit Payments
Views: 0  |  Downloads: 0
Archival-Based Research Methods in Accounting
Views: 24  |  Downloads: 0
In Naomi House
Views: 1  |  Downloads: 0
King Lear Commentary Act Scene lines scalding
Views: 3  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!