AEP's Commercial and Industrial Standard Offer Program Installation Report
Installation Report (IR) Checklist
Please use this checklist to ensure that your IR is complete. The Project Sponsor should submit one complete
IR for each project being proposed in the Commercial and Industrial Standard Offer Program. All sections of
the IR should be submitted electronically whenever possible except where noted. In addition to the electronic
submittal, the entire IR should be submitted in hard copy to the AEP Program Coordinator. Your IR, and other
supplemental materials, should be mailed to the following address:
AEP Texas Central Company
Attn: Russell Bego, C&I Standard Offer Program Coordinator
539 N. Carancahua
Corpus Christi, Texas 78401-2121
If you have questions, please call (361) 881-5710 or e-mail rgbego@aep.com.
Project Profile
Please submit the following forms for each project.
IR.1 - Project Summary
Project Sponsor Profile
Project Description Update
IR.2 - Project Savings Estimate
Summary table including estimated measure savings and incentives
Savings calculation update with supporting data
IR.3 - Measurement and Verification (M&V) Plan
*Form IR.3 is only required if the savings are measured and the M&V plan has changed significantly from the
approved Final Application.
Site-Specific
Please submit the following forms for EACH customer site involved in the project.
IR.4 - Site Profiles
Customer Site Information
Site Schematics
Site Information Update
IR.5 - Customer Certification (hard copy only)
Equipment Surveys
Please submit the appropriate forms for the installed equipment.
Measured Data (if AEP standard equipment forms are not applicable)
Baseline equipment and operation characterization
Installed retrofit equipment and operation characterization
AEP standard equipment forms*
FA - Lighting Equipment Survey
FA - Cooling Equipment Survey
FA- Motors and VSD Survey
FA- DX Units Survey
* Submit updated equipment survey forms if the equipment installed is different or operating differently than that
submitted in the approved Final Application.
Checklist 1 of 1