scope of work template
							2011 Annual General Meeting
       25 November 2011
Arvind Misra – Managing Director
    Disclaimer
     Forward-Looking Statements
     This presentation contains forward looking statements concerning the projects owned by India Resources Limited. Statements concerning mining
     reserves and resources may also be deemed to be forward looking statements in that they involve estimates based on specific assumptions. Forward-
     looking statements are not statements of historical fact and actual events and results may differ materially from those described in the forward looking
     statements as a result of a variety of risks, uncertainties and other factors. Forward looking statements are based on management’s beliefs, opinions
     and estimates as of the dates the forward looking statements are made and no obligation is assumed to update forward looking statements if these
     beliefs, opinions and estimates should change or to reflect other future developments.
     Data and amounts shown in this presentation relating to capital costs, operating costs and project timelines are internally generated best estimates
     only. All such information and data is currently under review as part of India Resources Limited’s ongoing development and feasibility studies.
     Accordingly, India Resources Limited cannot guarantee the accuracy and/or completeness of the figures or data included in the presentation until the
     feasibility studies are completed.
     Competent Person’s Statement
     The geological and assay statements and commentary in this presentation are based on information compiled by Andrew Kohler who is a member of
     the Australian Institute of Mining & Metallurgy. Mr Kohler has reviewed the information and has satisfied himself that the values quoted and the
     parameters used in the study are reasonable and accurately reflect the operations involved. Mr Kohler is a consultant of India Resources Limited and
     has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as
     defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Kohler consents
     to the inclusion in the report of the matters based on his information in the form and context in which it appears.
     The information in this presentation relating to the resource and reserve estimate for the Askot Project is based on information compiled by Mr Souvik B
     Banerjee and Dr Jean-Francois Couture. Both Mr Souvik B Banerjee and Dr Jean-Francois Couture are members of Recognised Overseas
     Professional Organisations included in a list promulgated by the ASX from time to time.
     JORC – Exploration Targets
     It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information in this presentation
     relating to exploration targets should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms
     Resource(s) or Reserve(s) have not been used in this context. The potential quantity and grade is conceptual in nature, since there has been
     insufficient work completed to define them beyond exploration targets and that it is uncertain if further exploration will result in the determination of a
     Mineral Resource.


2
    2011: Building on our Strong Foundations

       Flagship Surda copper mine performed strongly.
       Strong reputation in India has been established.
        - Tremendous contracting potential – one coal project signed, one
          coal and one copper project emerging.
        - Outstanding exploration potential – exploration projects include
          lead, zinc, copper and gold.
       Australian contracting potential has now being established.
       Reputation and potential is attracting financing interest.




3
    2012: The Year Ahead

       Seeking debt financing to fund the Prism Project, and improve
       the financial structure of the Group in general.
       Anticipating that successful tenders for a copper and a coal
       project can develop into signed contracts.
       Enormous activity in India – opportunities exist to tender for
       many more projects.
       Working to progress opportunities in Australia.




4
    Company Overview – Business Structure
     One of the first foreign start-up mining companies currently
     operating in India...     IRL Business Structure



        Mine Production & Processing                  Exploration & Development

        Copper - Surda
        Producing 3,550tpa Cu                       Lead & Zinc
        Employing 1,280 people                      Exploration in Rajasthan
                                                    ML application over granted RP
        Coal – Sial Ghogri
        Mine Developer and Contractor               Copper
        Coal – Biharinath Project                   Exploration in Rajasthan
        LOI signed for development                  PL application on granted RP
        Awaiting clearances from MoC
                                                    Iron Ore
        Copper – Rakha                              Exploration in Orrisa & Jharkhand
        Most competitive bid to re-open, operate
        and expand Rakha Copper Mine
        Luminus                                    Contracting order book
        MOU signed to provide Mining Services      totals A$340 million.
5
    Company Overview – Corporate

                                                    Key Statistics (A$)

                                Ordinary Shares on Issue current:              587.5m
                                Options on Issue:                               49.1m


                                Price:                                          $0.010
                                Market Cap (undiluted):                        $5.88m



                                                 Top 5 Shareholders

                               Name                                 Shares     % Held
                               Alexandra Resources              104,822,662    17.84%
                               Chimaera Capital Limited           58,690,848   9.99%
                               Antonius Clemens Bohnenn           21,858,313   3.72%
                               Bruce Alexander Davies             17,520,553   2.98%
                               Steven Paul Swallow                12,750,000   2.17%


6
    Company Overview - Board of Directors
     IRL has a strong Board, including individuals with extensive experience operating in India
                                              Extensive business development and global marketing experience in
                                              the resource and mining industry.
                      Andrew Simpson
                                              Chairman of Territory Resources and Swick Mining Services. Non-
                         Chairman
                                              executive Director of Vital Metals and Blackwood Corporation.

                                             A mining engineer with 22 years international mining industry
                        Arvind Misra         experience. Worked with mining houses such as Rio Tinto Coal, BHP
                       Managing Director     Mitsubishi Alliance, Mount Isa Mines and Griffin Coal
                                             Established Aranak Pty Ltd, a Perth-based Mining Corporate Advisory
                                             Company.
                        David Humann         Extensive accounting and finance experience as the Chairman and
                         Non-Executive       Managing Partner of Price Waterhouse (Hong Kong & China).
                           Director          Chairman of Mincor Resources NL and Advanced Banking
                                             Technologies Ltd, and Director of Logicamms Ltd.

                        Craig Readhead       Partner of Allion Legal with 30 years legal experience
                         Non-Executive       Chairman of Heron Resources. Director of Mount Gibson Iron Ltd,
                            Director         Galaxy Resources Ltd, Beadell Resources Ltd, General Mining Ltd and
                                             Frankland River Olive Company.


                       Frank Campagna        Certified Practising Accountant with over 25 years experience as
                                             Company Secretary, Financial Controller and Commercial Manager
                         Company Secretary
                                             for listed resources and industrial companies.

7
    Company Overview - Senior Management Team
     Strong management team with extensive experience operating in Africa, Australia and Asia
                      Ravi Shastri                International television commentator and former test match
                 Strategic Advisor to the Board
                                                  cricket all rounder. A Director of the SPS Group and sits on the
                                                  governing council of the Indian Premier League.

                  Darryl Cockcroft                Mining Engineering along with M.Sc (Mineral Economics) with
                  General Manager – New           several years Operational Management experience on Gold,
                         Projects
                                                  Coal and Base Metal Mines.

                                                  HR & IR Specialist with over 16+ years of Industrial experience;
                  Krishna Kant Dubey              Master of Social Work (MSW); Diploma in Industrial Relations &
                      General Manager HR
                                                  Personnel Management and Bachelor of Law.

                  Vinay Kumar Singh               Metallurgical Engineer with 14 years experience in mineral
                                                  processing plant, of gold and copper; worked with The Hutti Gold
               General Manager Surda Operations
                                                  Mines Ltd, India.

                                                  Certified Practising Accountant and Chartered Secretary with 15
                     Mike Muhling                 years experience primarily in a diverse range of senior roles for
                 Group Commercial Manager
                                                  listed resource companies.

                                                  Qualified geologist with several years of working experience from
                    Andrew Kohler
                    Consultant Geologist          Australia and Asia. Extensive exploration and mine geology
                                                  experience.
8
    Company Overview – Prior year’s share price
                                                                                                        IRL Share Price
       IRL Share Price 2010-2011                                                                        All Ordinaries Index



          0.025                                                                                                                     5500


                                                                                                                                    5300


          0.020                                                                                                                     5100


                                                                                                                                    4900


          0.015                                                                                                                     4700


                                                                                                                                    4500


          0.010                                                                                                                     4300


                                                                                                                                    4100


          0.005                                                                                                                     3900


                                                                                                                                    3700


          0.000                                                                                                                     3500
              Nov 10   Dec 10   Jan 11   Feb 11   Mar 11   Apr 11   May 11   Jun 11   Jul 11   Aug 11   Sept 11   Oct 11   Nov 11



9
     Overcoming obstacles – improving EBITDA
        Group and Surda EBITDA: 2008 – 2011 financial years
                             Group      Surda       Group Net Profit
         3,000,000



         1,000,000


                      2008       2009                          2010                    2011
         -1,000,000



         -3,000,000



         -5,000,000


                                                           EXPENSES EXCLUDED FROM EBITDA
         -7,000,000
                                                Expense                   2008   2009 2010        2011
                                                                         $'K    $'K   $'K        $'K
                                                Depreciation &
         -9,000,000
                                                Amortisation             1,266 2,825 1,513       1,441
                                                Finance Costs                15   563   431        832
        -11,000,000
                                                Impairment - Receivables 2,554      0   674        809
                                                Exploration W/O            0       0         0     483
                                                TOTAL                  3,835   3,388     2,618   3,565
        -13,000,000


10
     Overcoming obstacles
        The cashflow at Surda has improved and stabilised the Company’s cash
        balance.

        The Convertible Notes issued to La Jolla have now been converted to shares.

        The Company has developed Surda and its project pipeline despite its limited
        financial resources.

        There is potential for the Company ‘s liquidity to drastically improve:
         - Cashflow from Surda continues to improve.
         - Over $6M AUD under dispute with HCL from various claims are in advanced
           stages of arbitration and/or legal resolution.
         - Long awaited distributions from the Swan Group Trust are expected soon.

        Improved financial liquidity will increase the Company’s growth potential.


11
     Overcoming obstacles – improving cash at Bank
        Group cash at Bank: 2009 - 2011
                                                           Cash at Bank
                 $0
                       Sep-09   Dec-09   Mar-10   Jun-10        Sep-10    Dec-10   Mar-11   Jun-11   Sep-11



          -$500,000




         -$1,000,000




         -$1,500,000




         -$2,000,000




         -$2,500,000




         -$3,000,000

12
     Project pipeline – gaining momentum
          The Company has been building an outstanding project pipeline
       22 September 2010            8 August 2011          29 September 2011
       Appointed Preferred          Lead Tender            Signed Sial Ghoghri
       Contractor                   Rakha Copper Project   Coal Project
       Sial Ghoghri Coal Project




                                                                     $
      25 January 2010                1 June 2011           6 October 2011
      Signed Letter of Intent        Appointed Technical   Signed MOU with
      With Bankura DRI to develop    Consultant by         Luminus Systems
      Biharinath Coal Block          Luminus Systems       - Mining Services Contract

13
     Project pipeline – value of contracts ($M AUD)
                         Prism   Rakha (most competitive tender)     Surda

           400



           350



           300



           250



           200



           150



           100



            50



             0
                  2008            2009                        2010           2011


14
     Project pipeline – India the land of opportunity
         India’s rapid growth is fuelling its demand for resources
         Coal supply’s have been forecasted to meet this demand
          900
                          India’s forecasted primary coal supply
          800                         (Millions of tonnes).
          700


          600


          500
                                                                                                                  7% Growth
          400                                                                                                     8% Growth


          300


          200


          100


            0
                   2011               2016               2021               2026               2031

                From: The Planning Commission, “Draft Report of the Expert Committee on Integrated Energy Policy” (Dec 2005).
15
     Project Pipeline – India’s Coal Block Allocations
         India has responded to rapid growth by allocating its coal blocks. Coal block
         holders must use or loose their allocation.
         Prism’s Sial Ghoghri (30MT) and Bankura’s Biharanath (95MT) were allocated in
         May and Feb 2007 respectively. They are early movers from a total allocation of
         43,548MT. There will be more projects similar to Sial Ghoghri and
         Biharanath to tender for….
                                              No. Blocks Allocated - 2nd Axis         Geological Reserves Allocated (MT)
        50,000                                                                                                                                         350

        45,000
                                                                                                                                                       300
        40,000

        35,000                                                                                                                                         250

        30,000
                                                                                                                                                       200
        25,000
                                                                                                                                                       150
        20,000

        15,000                                                                                                                                         100
        10,000
                                                                                                                                                       50
         5,000

            0                                                                                                                                          0
                 1993   1994   1995   1996   1997   1998    1999    2000    2001   2002   2003    2004   2005    2006      2007   2008   2009   2010
             Cumulative Allocations - From: Government of India – Ministry of Coal: Details of Coal Blocks Allocated as at 23 June 2011.
16
     Project Locations
         Surda – Copper Project
         Biharinath – Coal Project
         Sial Ghogri – Coal Project                          Askot




         Aravalli – Lead-Zinc
         Project
                                           Aravalli
                                      Bundelkhand
                                                                                Biharinath
                                               Sail Ghogri

         Askot – Base Metal Project                     Jharkhand
                                                                           Orissa
                                                                                    Surda




         Diamond Projects:                                           Bhandara



            Bundelkhand, Bhandara,
            Dharwar                                   Dharwar




17
     Existing Operation (Surda Project)




18
     Surda Copper Mine – Overview

          IRL refurbished and Surda and
          began production in November 07
          As of June 30, 2011 has a JORC
          compliant resource of
          12.3Mt @ 1.09% Cu
          Estimated 28-year mine life
          Off-take contract with HCL until 2014

      As of the 30 June 2011 the JORC compatible resource remaining
       Category              Tonnes         Grade (Cu %)
       Measured              5,220,798            1.06
       Indicated             6,959,000            1.12
       Inferred                113,000            0.79
       TOTAL                12,292,798            1.09


19
Surda safety – done to Western Australian standards
                                                           Mine LTI Frequency Rate

                                                3 .5
    SURDA UNDERGROUND COPPER MINE               3 .0

    Operation underpinned by core focus on      2 .5

    safety – integrated management system       2 .0

    covering OHS and environmental              1.5

    management                                  1.0


    LTIFR 1.20 Surda Mine 2011 (compared to     0 .5


    4.6 for West Australian underground mines   0 .0
                                                       FY '2 0 0 8   FY '2 0 0 9   F Y ' 2 0 10   F Y ' 2 0 11
    in 2009)
    Approximately 1,280 workers on site
Surda production is on the up – new production records set
    IRL produced 378t MIC in May11
    IRL produced 967t MIC for the June Qtr
    In comparison previous operator produced on average 215t /month
    IRL produced 3,551t of MIC for 2010-2011 best year to date
                      Copper in Concentrate (MT) - Second Axis   Ore to Mill (MT)   Ore Milled (MT)
            450,000                                                                                   4,000

            400,000                                                                                   3,500

            350,000
                                                                                                      3,000

            300,000
                                                                                                      2,500
            250,000
                                                                                                      2,000
            200,000
                                                                                                      1,500
            150,000

                                                                                                      1,000
            100,000

             50,000                                                                                   500


                 0                                                                                    0
                      2007/08                   2008/09            2009/10             2010/11
Level 11 development
                                    1.2m                1.8m
                                Disseminated/         massive ore
                                 Braided ore


    Driving     243.7m
    Rising      249.4m                          Level 11
                                                Lode
    Cross cut 68.3m                             mapping
                                                North of
    Tonnage 23,500t                             Shaft 3


    Grade       1.2%Cu
    Blocks 1 and 660 opened
    Blocks 6, 18, 32 expanded
     Surda Cross Section – Drilling for the Future




            Block 1 & 660 opened




                                                     Level 11
               Block 6,18,32 expanded




23
     New Projects in India




24
     Sial Ghogri Coal Project
                                Project owned by Prism Cement
                                IRL signed contract in Sept 2011
                                Long life (30+ years) coal
                                development and mining contract
                                Contract value $247m AUD
                                First coal delivery of 30,000 tonnes
               Sail Ghogri
                                targeted for third year of
                                operations, ramping up to targeted
                                330,000tpa by seventh year
                                Two mineable coal seems IC and
                                the underlying III JORC compliant
                                resources and reserves:
                                                            tonnes (x000)
                                                Resource   Resource
                                        Seam     <250m      >250m      Total    Reserve
                                  IC                 4,091     8,785 12,876       5,020
                                  III                1,926     2,093    4,019       670
25
                                        Total       6,017    10,878    16,895     5,690
     Prism – What has been done to date?

        Review of Geological Structure and Resources being done with
        assistance from Kopex.
        Definition drilling for Box Cut, Incline and Vent Shaft in progress.
        Initial site establishment has been done.
        Initial employees for first phase have been signed on.
        Progressing $9M in financing within India through private
        investors and Indian banks.
        Looking to finance/lease $6.4M through equipment suppliers and
        $1.9M through other sources.
        Review with Prism is due in January 2012. If the assumptions of
        the contract vary significantly (+/- 10%), contract will be
        readjusted.



26
     Rakha Copper Project
        IRL and Kopex’s joint tender to re-open, operate and expand the Rakha
        Copper Mine was adjudged the most competitive in August 2011.
        A contract is expected to be signed in the very near future.
        The total contract value is $58m AUD.
        Scope of work to include engineering, procurement, construction and
        execution of all the activities in relation to the project.
        The Rakha site
        adjacent to the
        existing Surda
        operations
        offering potential
        synergies such
        as management,
        overheads and
        equipment.

27
     Exploration Projects




28
     Aravalli Lead-Zinc Project
                                  Intense mineralisation Sedex
                                  Deposit similar to Mt Isa
                                  Two excised mines owned by
                                  Vedanta Resources Ltd:
                                   - Major resource and reserve increase
                                     from 103Mt in FY2010 to 117.4Mt in
              Aravalli               FY2011
                                   - JORC resource at Rajpura-Dariba of
                                     49.5Mt @ 7.5% Zn, 2.0% Pb and
                                     Sindesar Khurd of 67.9Mt @ 5.1% Zn,
                                     3.2% Pb from Verdanta PLC website
                                     vedantaresources.com
                                  Mining Licence Application
                                  progressing at state level – process
                                  will take time- meetings held with
                                  State Minister for Mines. Support
29                                from Australian High Commission.
     Hindoli and Sathudia Base Metal Project
                                                     Hindoli near Aravalli Lead-Zinc Project
                                                     RP area of 3,754km2 in Rajasthan
                                                     Located between RP’s held by Anglo
                                                     American, HZL and ACC Rio Tinto
                                                     Ideal structural setting for copper
                                                     mineralisation
                                                     Surface mineralisation primarily copper,
                                                     subordinate lead, zinc and silver and one
                     Hindoli
                                                     area of gold

                                           Hindoli
                                                     Sathuddia formerly part of Aravalli RP
                                                     IRL drilling at 50m intervals – all holes
          Aravalli
                               Sathuddia
                                                     intersected disseminated or stringer
                                                     chalcopyrite; best intercept of 9m at 1.7%
                                                     Limited drilling on old workings, with excellent
                                                     potential to expand along strike and at depth
                                                     Applications Hindoli Reconnaissance Permit,
                                                     Sathuddia Exploration License, progressing at State
                                                     Government level Lobbying and meeting with
                                                     Ministers
30
     Mineral Resources increasing at Askot
          Note: IRL holds a strategic 10% shareholding in

                                                            7,500m diamond drill program in 2010
                Pebble Creek Mining Limited, which owns
                                100% of the Askot Project

                                                            results were….
                                                            Hole 019A intersected 8.7m of
                                                            disseminated sulphide mineralisation, incl.
                             Askot
                                                            2.2m at 5.57% Cu Eq, from 363.7m
                                                            Opens up a large untested area along
                                                            strike to the NW and down dip from the
                                                            previously delineated mineral resource
                                                            1.2 million tonnes increase in Resources




31
     Diamond Projects

                                            Farm-in agreement with Vajra Diamond Mining
                                            Private Limited:
                                            Two diamondiferous kimberlites bulk sampling
                                            scheduled CC4
                                            Multiple proximal kimberlitic mineral indicator
                                            anomalies

         Bundelkhand
                                            Excellent exploration potential
                                            All located on granted tenure
                                 Bhandara   Sampling on Bundelkhand results pending

                       Dharwar




32
     Australian Opportunities




33
     Luminus – IRL Consulting Projects
        Signed MOU with Luminus Systems Limited in September 2011
        Subject to the conclusion of definitive agreements, IRL is to be the
        exclusive provider of mining services for several Australian mining
        projects.
        Services are expected to include feasibility reports, mine planning,
        engineering and contract mining.




                       Georgina Basin
                      Phosphate and Mt
                       Isa Base Metals
                          Exploration

                                           Mt Haden Gold-
                                           Copper Project




34
Mt Haden conceptual mine design
    Seven mining levels designed, 3g/t cutoff used, lowest level 170m of the mine
    Decline begins from old adit day lighting at surface, levels from the decline at 20m intervals.
    2.8km of tunnel development including drives along orebody
   Vent on each level and extending exhaust
   shaft to bottom of mine.
   Top down mining approach incuding
   stoping, rises made at the start of each
   ore drive for ore breakage during stoping
   Exploration model breccia pipes leading to
   possible Cu – Au - Mo stockworks and
   porphyry. Many targets from Aeromag
North Queensland Phosphate and Mt Isa Base Metals Location…
    North Queensland Georgina Basin
    Phosphates
     - World class phosphate province 93%
       of Australia’ demonstrated resources
       occur in the Basin (Geoscience
       Australia).
     - Phosphate mineralised belt extends
       for over 250km from Phosphate Hill
       and Duchess in the south to
       Thorntonia, D-Tree, Lady Jane/Lady
       Annie (Paradise North and South)
       and Century in the north,
     - 5 EPMs 746.5km2
    Mt Isa Exploration Project
     - 13 EPMs 1,498km2
     - Uranium, as well as base and
       precious metal mineralisation
     Summary & outlook
         EBITDA and cash position is improving.
         Established complementary strategic partnerships with KOPEX and Chimaera.
         We are building on our reputation established in India
             Only foreign-owned mine operator to successfully negotiate the challenges of
             commencing mining in India:
             Strong brand name in India and in-depth understanding of environment.
             Surda operation performing strongly – stable production levels.
         Outstanding asset pipeline
             Signed 30 year life of mine contract as Mine Developer and Contractor of
             Prism’s Sial Ghoghri coal block.
             Recently awarded a preferred contractor status to sink several shafts and
             underground development to set up Rakha mine for Hindustan Copper.
             Exposure to another major new coal mine project development.
             Signed MOU with Luminus Systems as mining service provider for several
             Australian mining projects.
             Diverse exploration projects in India.
37

						
Related docs
Other docs by benbenzhou
Green Tea Colostrum
Views: 22  |  Downloads: 0
Engr Intro to Engineering
Views: 1  |  Downloads: 0
A BASIC OIL Jojoba Oil
Views: 269  |  Downloads: 0
Palaro_B_030810
Views: 36  |  Downloads: 0
MIT ALOE VERA
Views: 6  |  Downloads: 0