Nuclear Research Institute Řež plc









Technical-economical study of Czech NPPs

Long Term Operation

P. Kadečka, J. Žďárek



2. 11. 2006

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Main Goal and NRI Role



• Performance of TE study should enable to

define Dukovany NPP life extension optimum

and to prepare bases for follow up realization

program.



• NRI makes this study in very close

cooperation with Dukovany NPP (technical

and basic economical part) and CEZ HQ

(general economical part).

5. Int. Conf. OKB Gidropress, 2007 2

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Main Goal and NRI Role



Work started at 2004 has two main parts:

• Technical, based on:

• IAEA-TECDOC-1309, Cost drivers for the

assessment of nuclear power plant life extension

• Economical, based on:

• IAEA matrix for NPP economic assessment

• CEZ requirements

Two methodologies for both parts of the study

were prepared.



5. Int. Conf. OKB Gidropress, 2007 3

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







IAEA TECDOC Cost Drivers (1/2)



1. Safety upgrades to meet regulatory

requirements

2. Other non-safety and conventional system

upgrades

3. Management programs and processes

4. Environmental impact assessment

5. Maintaining expertise

6. Public acceptance

7. Radioactive waste & spent fuel management



5. Int. Conf. OKB Gidropress, 2007 4

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







IAEA TECDOC Cost Drivers (1/2)



8. Decommissioning

9. Licensing process

10. Operating and maintenance (O&M) review

11. Operating spares and consumables

12. Fuel cycle improvements

13. Overall risk assessment







5. Int. Conf. OKB Gidropress, 2007 5

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Cost of ensuring SC LTO (1/3)



• One of the most important and compliceted

element of the study is calculation of cost

necessary to ensure NPP‘s structures or

components (SC) LTO.



• It is part of drivers 1 and 2.









5. Int. Conf. OKB Gidropress, 2007 6

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Cost of ensuring SC LTO (2/3)

Work is done in following steps and results obtained are

screened and comented by Dukovany NPP staff:



• Selection of structures or components with high cost of

replacement or refurbishment

• Determination of term when measure to ensure selected

SC LTO will be necessary to adopt (assuming current

service and maintenance of SC)









5. Int. Conf. OKB Gidropress, 2007 7

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Cost of ensuring SC LTO (3/3)



• Design of different possible measures

(replacement, refurbishment, ageing

management, design change, …) and their

application optimum schedule which can be

used for selected SC (with necessary

measures application to enable NPP‘s LTO)



• Determination of designed measures costs





5. Int. Conf. OKB Gidropress, 2007 8

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering









Management and tools (1/2)

• Work managed by division 300 NRI is done in

cooperation with:



• Division 200 (Nuclear Safety)

• Division 500 (Energoproject Prague, Czech Design

Authority)

• Škoda Research (NRI daughter)

• UAM Brno (NRI daughter)

• ECC (External company, Economic expertise)





5. Int. Conf. OKB Gidropress, 2007 9

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering









Management and tools (2/2)



• All results are saved to Microsoft Access database

called EDULTO

• Database is continually developed in accordance with

requirements from work flow

• Database is compatible with Dukovany SC register

(Passport, MNT Graph)

• In the future the database will be part of EDU PLIM

database called INFOZ (structure is also NRI product)

• Except already mentioned sources also Knowledge

Management System DART , with Dukovany NPP DB

is used



5. Int. Conf. OKB Gidropress, 2007 10

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering





Main form of Dukovany LTO database

with component selection









5. Int. Conf. OKB Gidropress, 2007 11

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering





Form of Dukovany LTO database,

containing second step evaluation results









5. Int. Conf. OKB Gidropress, 2007 12

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering



Form of Dukovany LTO database, Design of

possible measures (1/3)









5. Int. Conf. OKB Gidropress, 2007 13

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering





Form of Dukovany LTO database, Design of

possible measures (2/3)









5. Int. Conf. OKB Gidropress, 2007 14

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering





Form of Dukovany LTO database, Design of

possible measures (3/3)









5. Int. Conf. OKB Gidropress, 2007 15

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering





OPTIMUD INFOZ









5. Int. Conf. OKB Gidropress, 2007 16

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering





DART EDU CZ, DB Knowledge

Management System









5. Int. Conf. OKB Gidropress, 2007 17

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Other Cost Drivers Evaluation (1/2)



For other cost drivers, analyses are done and if

necessary measures are also designed. For

instance:



• Safety upgrades to meet regulatory

requirements are evaluated on the basis of

PSR done by Dukovany LBB







5. Int. Conf. OKB Gidropress, 2007 18

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Other Cost Drivers Evaluation (2/2)



• Management programs and processes are

evaluated taking into account results of IAEA

SALTO project in which CEZ, NRI and Czech

Regulatory Body (SÚJB) are very active



• Licensing process is prepared and evaluated

on the base of QA program for LTO. QA

program is prepared by Dukovany NPP staff

and discussed and agreed with SÚJB.

5. Int. Conf. OKB Gidropress, 2007 19

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Economical Part of Study (1/2)



• Economical part preparation is done by external

subcontractor of NRI



• Final calculation will be done by CEZ experts

using their tools, procedures and confidential

strategies

• All will be done in accordance with Czech Rep.

laws and CEZ procedures



5. Int. Conf. OKB Gidropress, 2007 20

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Economical Part of Study (2/2)



• NRI finish its work by determination of price

for accepted measures



• Also the possible time schedule for measures

realization and their interactions are taking

into account. For this reason a tool called Big

Map of Actions designed by Dukovany staff

will be used and updated (new computer

application).

5. Int. Conf. OKB Gidropress, 2007 21

Nuclear Research Institute Řež plc.

Division of Integrity and Technical Engineering







Conclusion



• TE study will be finished in 2007



• On base of CEZ management decision, a

preparation of detail realization program is

supposed.









5. Int. Conf. OKB Gidropress, 2007 22



Related docs
Other docs by hedongchenchen
AMS11-AV-Order-form
Views: 0  |  Downloads: 0
Rural Telephone Bank
Views: 5  |  Downloads: 0
04tbl2-32a
Views: 0  |  Downloads: 0
CG9 Licence No.
Views: 0  |  Downloads: 0
1996
Views: 0  |  Downloads: 0
2011 CATALOG
Views: 11  |  Downloads: 0
NEURO-_summary.doc - STJ PA 2012
Views: 1  |  Downloads: 0
1995-1996 Prepaid Health Plan Contract
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!