LAKE Superintendent: School Board Members:





COUNTY

Anna P. Cowin District 1

Larry Metz



SCHOOLS

District 2

Scott Strong

District 3

Leading our Children to Success Cynthia Barrow

District 4

Jimmy Conner

201 West Burleigh Boulevard  Tavares  FL 32778-2496 District 5

(352) 253-6759  Fax: (352) 742-8516  www.lake.k12.fl.us Kyleen Fischer





June 25, 2008



ADDENDUM #1

RFQ #2885DB Construction Management Services for Construction, Renovation

and Remodel of Cecil E. Gray Middle School



This addendum serves to provide answers to questions received for RFQ #2885DB

Construction Management Services for Construction, Renovation and Remodel of Cecil E. Gray

Middle School. This Addendum #1 form and Addendum #1 Questions and Answers are posted

on our website along with the Revised Attachment B, Non Mandatory Pre proposal sign-in, the

budget sheet, the FISH Report, the aerial map and the survey. To download these documents,

go to lake.k12.fl.us , click on Departments, scroll to Purchasing and click. On the Purchasing

page, click on Bid Opportunities and scroll down the table to RFQ #2885DB Construction

Management Services for Construction, Renovation and Remodel of Cecil E. Gray Middle

School and click. No further questions shall be entertained as the time frame for questions has

expired.



Please note that the opening date has not been changed. All RFQs are due in the Purchasing

Department, 29529 County Road 561, Tavares, Florida 32778 by no later than 2:00 p.m. on

Wednesday, July 2, 2008.





Acknowledgement of Addendum by Vendor:

This addendum shall be completed by Vendor and returned with the RFQ Package. If a RFQ

package has already been submitted, this addendum must be submitted to the above address

in a sealed envelope, which is marked on the outside: Addendum #1 RFQ # RFQ #2885DB

Construction Management Services for Construction, Renovation and Remodel of Cecil E. Gray

Middle School.



This is to acknowledge receipt of this addendum, which will become a part of the proposal

document.



This addendum must be signed and returned in order for your RFP to be considered.





Company Name





Name (Typed or Printed) Title



__________________________

Signature Date









“Equal Opportunity in Education and Employment”

Page 1 of 3

LAKE Superintendent: School Board Members:





COUNTY

Anna P. Cowin District 1

Larry Metz



SCHOOLS

District 2

Scott Strong

District 3

Leading our Children to Success Cynthia Barrow

District 4

Jimmy Conner

201 West Burleigh Boulevard  Tavares  FL 32778-2496 District 5

(352) 253-6759  Fax: (352) 742-8516  www.lake.k12.fl.us Kyleen Fischer





ADDENDUM #1 QUESTION AND ANSWERS

RFQ #2885DB Construction Management Services for Construction, Renovation

and Remodel of Cecil E. Gray Middle School



1. The budget sheet shows approximately $30 million for the project. At present we have

$17 million available for the first phase. The architect will be designing the entire

campus replacement, but this CM selection will be for approximately 19.5 million dollars

worth of work. We will determine how the $19.5 million will be expended in the first

phase as we develop the design process. We will look at the design with the CM and

the community’s input to determine what the priorities are and in what sequence in the

buildings will be constructed. We will most likely start with the multi story classroom

building. We are looking at two follow up phases. The intent at present of the Facilities

Department is to amend the CM contract for phases two and three when funding

becomes available. Hopefully the funding will become available while we are finishing

the first phase so that we can go into the next phases with a seamless phased project.

We understand that this presents a challenge when developing your proposals. At this

time, Gray Middle is an occupied campus, demolition will be involved, reconstruction will

be involved, you will need to be Jessica Lunsford compliant. Yu will need to show a

history of work on an occupied campus, and a history of working with phased projects.

These are items we will primarily be judging you on for this particular project.



When reviewing the FISH, buildings to be retained include 5, 14, 11 & 17. Currently

there are about 28 portables on the campus and the Principal has indicated she will be

able to vacate those buildings located on the lower portion of the FISH by utilizing the

portables. Therefore, the likely first phase will be demolition of all the buildings along the

lower portion of the FISH, buildings 20, 21, 22, 23 & 24. This is subject to change as

this is a community project and community input will be received.



Our standard construction is brick cavity wall construction with standing seam metal

roofs. However, with the two or three story building in a neighborhood setting, we often

forgo the standing seam metal roof.



This will be a combination of new buildings, remodels and additions to existing buildings.

This will not be a simple tear down, build a new building, tear down and build. That is

not the goal in this project. You will use viable existing structures and make them

integrate aesthetically with the new buildings.



2. Will building 19 be included in the first phase demolition. Currently administration is

housed in building 19 and other accommodations would have to be made if the building

is included. That would be determined during discussions with the architect and CM.



3. What is the time estimated for the:

Design phase January/February of 2009

Permit phase February – April of 2009

Project bid packages out April/May of 2009

Demolition As soon as school is out for summer of 2009

“Equal Opportunity in Education and Employment”

Page 2 of 3

Completion of Phase 1 The summer of 2010





4. What is the estimate for the total construction time? We’re estimating approximately

fourteen months for Phase 1 construction and 12 – 14 months for each of the other two

phases.



5. What is the estimated value for each phase? Phase 1 is estimated at $19.5 million,

Phase 2 at $6.25 million and Phase 3 at $6.25 million.



6. Who is the architect for this project? BRPH Architects/ Engineers, Inc. have been short

listed. The contract goes to the Board for approval on July 11th.



7. Can we walk the site? Yes, call the school and arrange a time. 352.429.3322 Make sure

you sign in even though school is out.



8. Is there an aerial map available? Yes, it will be available on our website.



9. Is there a survey available? Yes, it is currently on the purchasing website under the

Architectural RFQ and will be moved to the CM RFQ. We are in the process of doing

some soil borings. Our original intent was to build a new campus on the east end of the

site, but there are some soil conditions i.e. muck, old land fill, high water table and

various other factors that prohibit that plan.



10. Is LCSB against tilt walls? The project will not be designed with tilt walls.



11. Will this be a LEED project? Any contract signed after July 1 will be required to meet one

of the four green standards established by new legislation.



12. Who is the MEP for this project? KPI Engineering, Inc. of Tampa will be the MEP.



13. Is there asbestos involved in this project? Yes, asbestos reports will be made available

during the design phase.



14. On page 17 under Schedule Management there are only 4 slots available to plug in the

information for the 5 projects/references. Revised Attachment B is attached with 5 slots

available.



15. The schedule has been revised and is as follows:



June 23, 2008 Deadline for Questions @ 2:00 PM

June 25, 2008 Last date for addendums

July 2, 2008 Proposals due @ 2:00 PM

July 8 14, 2008 Evaluate proposals and make short-list

selection

July 14 17 or 18, Presentations and final ranking of short-

2008 listed proposers

July 16 30, 2008 Posting of Committee Short-List

Recommendation

July 28 August 11, RFQ Short-List Recommendation to Board

2008 for Approval

TBD Negotiations

TBD Contract Award









Page 3 of 3



Related docs
Other docs by benben zhou
Pre lab Discussion Questions Glucose
Views: 11  |  Downloads: 0
Glossary Jojoba Oil
Views: 2  |  Downloads: 0
FANSHAWE COLLEGE POLICY MANUAL
Views: 1  |  Downloads: 0
ClDEllT OIILY
Views: 0  |  Downloads: 0
Herbicide damage guide for cotton
Views: 7  |  Downloads: 0
Tetanus Toxoid USP For Booster Use Only
Views: 7  |  Downloads: 0
Message passing
Views: 2  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!