Docstoc

SOP_TableofContents_v11_24OCT08

Document Sample
SOP_TableofContents_v11_24OCT08 Powered By Docstoc
					                                                           9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls                                         Page 1
                                                      Kigali        Lusaka         Kitwe          Ndola                      Review Point
                                       Version Number                                                         Date of Last
SOP Number   SOP Title                                Effective     Effective      Effective      Effective                  Person (Date
                                       and Date                                                               Review
                                                      Date          Date           Date           Date                       Assigned)
MGMT 1       SOP on SOPs               2.0 9Apr2008                                                           9-Apr-08
             Ethics Committee
MGMT 2       Submissions and           2.0 9Jan2008                                                           9-Jan-08
             Reporting
             Maintaining
MGMT 3       Investigator Master       2.0 9Jan2008                                                           9-Jan-08
             File
             Documenting Roles
MGMT 4       and Responsibilities      1.0 6Oct2005


MGMT 5       General Operating         2.0 9Jan2008                                                           9-Jan-08
             Procedures for the Unit
             Site Organograms          27-Feb-08
             Communication with
MGMT 6       Key Personnel and         1.0 6Oct2005
             Protocol Team
             Establishment and
             Maintenance of
MGMT 7                                 2.0 30Apr2007                                                          30-Apr-07
             Investigator and Staff
             Training Records
             Appendix 7: Revised
             RZHRG Training Sign-
             In Sheet
             Informed Consent
MGMT 8       Development and           1.0 08May2007                                                          8-May-07
             Review/Approval
MGMT 9       Power Failure             2.0 30Jan2008                                                          30-Jan-08
                                                                                                              To be retired
MGMT 13      Human Subjects            1.0 29Nov2006                                                          and replaced Marielysse
             Education Program                                                                                with MGMT15
             Corrective Action for
MGMT14       Non-Lab Protocol          1.0 15Aug2007                                                          15-Aug-07
             Events




MGMT SOPs                                                                Page 1 of 17
                                             9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls


                                                  Kigali         Lusaka        Kitwe       Ndola
                                   Version Number                                                      Date of Last
SOP Number SOP Title                              Effective      Effective     Effective   Effective
                                   and Date                                                            Review
                                                  Date           Date          Date        Date
             Cash Transactions -
ADMIN 1      Local Currency        1.0 29Nov2006                                                       29-Nov-06
             Cash Transactions -
ADMIN 2      US Dollars            1.0 29Nov2006                                                       29-Nov-06
ADMIN 3      Check Transactions    1.0 29Nov2006                                                       29-Nov-06
             Field Letter
ADMIN 4      Preparation           1.0 29Nov2006                                                       29-Nov-06
             Preparation of
ADMIN 5      Salaries              1.0 29Nov2006                                                       29-Nov-06

ADMIN 6      New Employees         1.0 29Nov2006                                                       29-Nov-06


ADMIN 7      Departing             1.0 29Nov2006                                                       29-Nov-06
             Employees
             Bank Account
ADMIN 8      Numbers               1.0 29Nov2006                                                       29-Nov-06
ADMIN 9      Bank Transactions     1.0 29Nov2006                                                       29-Nov-06
ADMIN 10     Per Diem              1.0 29Nov2006                                                       29-Nov-06
ADMIN 11     Interns               1.0 29Nov2006                                                       29-Nov-06
ADMIN 12     Students              1.0 29Nov2006                                                       29-Nov-06
ADMIN 13     Visitors              1.0 29Nov2006                                                       29-Nov-06
ADMIN 14     Work Permits          1.0 29Nov2006                                                       29-Nov-06

ADMIN 15     Driver's Licenses     1.0 29Nov2006                                                       29-Nov-06
             On Call
ADMIN 16     Responsibilities      1.0 20Nov2006                                                       20-Nov-06
ADMIN 17     Project Pets          1.0 14Nov2006                                                       14-Nov-06
ADMIN SOPs
                                                           Page 2 of 17
                                             9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls


                                                  Kigali         Lusaka        Kitwe       Ndola
                                   Version Number                                                      Date of Last
SOP Number SOP Title                              Effective      Effective     Effective   Effective
                                   and Date                                                            Review
                                                  Date           Date          Date        Date
ADMIN 18     Vehicles              1.0 14Nov2006                                                       14-Nov-06
             Preparation of
ADMIN 19     Pension Payments      1.0 29Nov2006                                                       29-Nov-06
             Preparation of Tax
ADMIN 20     Payments              1.0 29Nov2006                                                       29-Nov-06
             Healthcare for
ADMIN 21     Zambia Field          1.0 12Feb2007                                                       12-Feb-07
             Personnel
ADMIN 22     Ordering Supplies     1.0 15Aug2007                                                       15-Aug-07
             Appendix 1: Supply
             Order Form

ADMIN 23                           1.0 29Nov2006                                                       29-Nov-06
             Grievance Procedure

ADMIN 24                           1.0 29Nov2006                                                       29-Nov-06
             Disciplinary Code
             Healthcare for
ADMIN 25     Rwanda Field          1.0 12Feb2007                                                       12-Feb-07
             Personnel




ADMIN SOPs
                                                           Page 3 of 17
                 9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls


Site in charge
of revision


KIGALI

KIGALI
KIGALI

LUSAKA

LUSAKA

LUSAKA



LUSAKA

COPPERBELT
COPPERBELT
KIGALI
COPPERBELT

LUSAKA
KIGALI

LUSAKA

LUSAKA

LUSAKA
COPPERBELT
ADMIN SOPs
                               Page 4 of 17
                 9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls


Site in charge
of revision
KIGALI

KIGALI

KIGALI




LUSAKA



LUSAKA




ADMIN SOPs
                               Page 5 of 17
                                                9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls
                                     Version
                                                     Kigali Effective Lusaka           Kitwe Effective Ndola Effective Date of Last
SOP Number   SOP Title               Number and
                                                     Date             Effective Date   Date            Date            Review
                                     Date
             Preparing/Maintaining
DATA 1       Source Documents        1.0 6Oct2005                                                                      6-Oct-05
             Data Management
DATA 2       (PIP Specific)          2.0 19Jul2006                                                                     19-Jul-09
             Use of Information
DATA 3       and Communication       1.0 6Oct2005                                                                      6-Oct-05
             Technology
             Computer Data
DATA 4       Security and Backup     1.0 6Oct2005                                                                      6-Oct-05
             Plans
             Protection of
DATA 5       Volunteer Privacy       2.0 9Jan2007                                                                      9-Jan-07
             Data Entry and
DATA 6       Validation              2.0 30Mar2006                                                                     30-Mar-06
             Data Query
DATA 7       Guidelines              1.0 6Oct2005                                                                      6-Oct-05

             Archiving and Storage
DATA 8                             2.0 30Jan2008                                                                       30-Jan-08
             of Study Data

             Appendix A-C and E-
             I: Archiving and      2.0 30Jan2008                                                                       30-Jan-08
             Storage of Study Data
             Appendix D: Sample
                                 2.0 30Jan2008                                                                         30-Jan-08
             of Box Label
             Data and
DATA 11      Administrative File 1.0 26Aug2008                                                                         26-Aug-08
             Transfer



DATA SOPs
                                                              Page 6 of 17
                                                       9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls



                                  Version Number   Kigali Effective Lusaka           Kitwe Effective Ndola Effective Date of Last   Site in charge
SOP Number    SOP Title
                                  and Date         Date             Effective Date   Date            Date            Review         of revision


CLINIC 1      Obtaining           3.0 08May2007                                                                      8-May-07
              Informed Consent
              HIV Counseling
CLINIC 2      and Risk            3.0 03Aug2006                                                                      3-Aug-06
              Reduction                                                                                                             KIGALI
              Reporting Serious
CLINIC 3      Adverse Events      2.0 16Jan2008                                                                      16-Jan-08
              Participant
CLINIC 4      Recruitment         2.0 19Jul2006                                                                      19-Jul-06
                                                                                                                                    KIGALI
              Determining
CLINIC 5      Eligibility         2.0 16Jan2008                                                                      16-Jan-08
              Study Participant
CLINIC 6      Retention           2.0 19Jul2006                                                                      19-Jul-06
                                                                                                                                    LUSAKA
              ZEHRP CW
              Interim Letter      5-Nov-07
              ZEHRP CW Late
              Letter              5-Nov-07


              ZEHRP CW            5-Nov-07
              Reschedule Letter
              PSF CW Letter       20-Nov-06
              Specimen
              Collection and
CLINIC 7      Universal           2.0 13Apr2007                                                                      13-Apr-07
              Precautions
              Medical
CLINIC 8      Emergencies         2.0 19Feb2007                                                                      19-Feb-07
              HIV Post
CLINIC 9      Exposure            3.0 08Sep2008                                                                      8-Sep-08
              Prophylaxis
              Partners/HT
CLINIC 10     Study Integration   2.0 23Aug2006                                                                      23-Aug-06
              (PIP only)                                                                                                            PIP STUDY DO NOT UPDATE


CLINIC SOPs
                                                                     Page 7 of 17
                                                          9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls



                                     Version Number   Kigali Effective Lusaka           Kitwe Effective Ndola Effective Date of Last   Site in charge
SOP Number    SOP Title
                                     and Date         Date             Effective Date   Date            Date            Review         of revision
              HSV/Protocol C
              Specimen
CLINIC 11     Collection &           2.0 25Sep2006                                                                      25-Sep-06
              Participant
              Transfer (all sites)                                                                                                     PIP STUDY DO NOT UPDATE
              Appendix 1:
              Copperbelt             5-Jan-06
              specimen flow
              Appendix 2:
              Kigali/Lusaka          15-Oct-06
              specimen flow
              HSV Counseling
CLINIC 12     and Risk               2.0 13Feb2008                                                                      13-Feb-08
              Reduction
CLINIC 13     Clinic On Call         2.0 13Feb2008                                                                      13-Feb-08
              Photographing
CLINIC 15     Post Vaccination       1.0 20Mar2006                                                                      13-Mar-08
              Related Lesions
              Use of the Coital
CLINIC 16     Calendar               1.0 15Nov2006                                                                      15-Nov-06
                                                                                                                                       KIGALI
              Couples HIV
              Voluntary
CLINIC 17     Counseling and         2.0 11May2007                                                                      11-May-07
              Testing (CVCT)
              Procedures

CLINIC 18     Deceased Protocol 1.0 12Dec2007                                                                           12-Dec-07




CLINIC SOPs
                                                                        Page 8 of 17
                                                          9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls




                                                                                                                                             Review Point
                                          Version Number Kigali Effective      Lusaka           Kitwe Effective Ndola Effective Date of Last
SOP Number   SOP Title                                                                                                                       Person (Date
                                          and Date       Date                  Effective Date   Date            Date            Review
                                                                                                                                             Assigned)

             Use and Maintenance of
PHARM 2      the Laminar Flow Hood      3.0 18Apr2007                                                                          8-Feb-08
             Administration Using
PHARM 3      Biojector                  1.0 06Oct2005                                                                          8-Feb-08
             Prescribing and
PHARM 4      Dispensing Investigational 2.0 16Aug006                                                                           8-Feb-08
             Product

PHARM 5      Storage of Study Products    1.0 06Oct2005                                                                        8-Feb-08
             Temperature and
PHARM 6      Humidity Monitoring of       3.0 18Apr2007                                                                        8-Feb-08
             Storage Work Areas
             Appendix 2: Temperature
             Monitoring Graphs
             (including electronic temp   3.0 18Apr2007                                                                        8-Feb-08
             monitoring template)
             Study Product
PHARM 7      Accountability/Inventory     1.0 06Oct2005                                                                        8-Feb-08
             Emergency Transfer of
PHARM 8      Investigational Products     1.0 06Oct2005                                                                        8-Feb-08




PHARM SOPs
                                                                        Page 9 of 17
                                                                 9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                          Version Number     Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number                   SOP Title
                                                          and Date           Date             Date               Date              Date              Review
Training and Safety


LAB 1B                                                    1.0 16Feb2006      16-Feb-06                                                               16-Feb-06
                             Health and Biosafety in
                             Laboratory

                             Personal Competencies and
LAB 1C                                                    1.0 25Apr2007      15-May-07                                                               25-Apr-07
                             Training for RZHRG
                             laboratories
Lab Data and Documents

LAB 3B (CL 009.4)            LIMS: Data Entry and         2.0 11May2007      28-Sep-08                                                               11-May-07
                             Sample Inventory

LAB 3D                       Specimens & Results          2.0 26Sep2008                                                                              26-Sep-08
                             QC/QA

LAB 3F                       Specimen Audit Trail         2.0 26Sep2008                                                                              26-Sep-08
Quality Control
LAB 5A (CL 020.2)            Laboratory Quality Program 2.0 25Apr2007        15-May-07                                                               25-Apr-07

                             Dealing with an Unsuitable
LAB 5B                                                    2.0 29Sep2008                                                                              29-Sep-08
                             Sample
LAB 5D                       Corrective Action            2.0 29Sep2008                                                                              29-Sep-08
Maintenance and Monitoring

LAB 6A                       Lab Equipment Routine        2.0 30Apr2007      15-May-07                                                               30-Apr-07
                             Maintenance

                             Appendix I - Equipment
                             Inventory template



                             Appendix III - prefilled with 30-Apr-07
                             current equipment 30Apr07

LAB 6D                       Handling Liquid Nitrogen     1.0 08Feb2006      9-Feb-06                                                                8-Feb-06
                             Tank


LAB SOPs                                                                      Page 10 of 17
                                                                 9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                         Version Number      Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number                  SOP Title
                                                         and Date            Date             Date               Date              Date              Review
Training and Safety
LAB 6E                                                   2.0 28Apr2006       2-May-06                                                                28-Apr-06
                            Fumigation (IAVI)

LAB 6F                                                   2.0 29Sep2008                                                                               24-Oct-08
                            Waste Removal
Study Specific Schedule, Samples, and Assays
                            Sample Schedule for CVCT
LAB 7A                                               1.0 11May2006           16-May-06                                                               11-May-06
                            and HT Studies
                             Amendment #1 to LAB SOP
                                                          3-Oct-06           17-May-07
                             7A
Study Specific Procurement, Storage, and Transport of Samples


LAB 8A                                                   2.0 05Apr2007       6-Jun-07                                                                5-Apr-07
                            Specimen Chain of Custody
                            and Sample Flow

                            Amendment #1 to LAB SOP 2.0 04Jun2007
                            8A
                            Amendment #2 to LAB SOP
                                                    2.0 27Jun2007
                            8A

                            Appendix 1: HT Labels
                            Template


                            Appendix 2: HT+Other
                            Study Labels Template
                            Appendix 6: CVCT
                            ELISA/p24 Tests and
                            Results Chain of Custody
                            Log Book


                            Appendix 7: RZHRG Sample
                            Procurement Log
                            Appendix 8: Transfer Log
                            V2.0

LAB SOPs                                                                      Page 11 of 17
                                                          9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                    Version Number    Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number            SOP Title
                                                    and Date          Date             Date               Date              Date              Review
Training and Safety
                      Appendix 9: RZHRG Sample
                      Reception Log



                      Appendix 10: Copperbelt
                      Manifest

                      Appendix 11: RZHRG
                      Routine Lab Requisition and
                      Results Form
                      Appendix 12: RZHRG Non-
                      Routine Lab Requisition
                      Form
                      Appendix 13A: Volserum
                      2.0 Zambia

                      Appendix 13B: Volserum 2.0
                      Rwanda

                      Appendix 14: Preg-Trich-
                      Sperm Log

                      Appendix 15: SERUM Log
                      V2.0 – updated 14 Jun 2007

                      Appendix 16: Hematology
                      Log

                      Appendix 17: Medical Lab
                      Log V2.0

                      Appendix 18: RZHRG CD4
                      Log

LAB 8B                Sample Labeling and Storage 2.0 14May2007       6-Jun-07                                                                17-May-07
                      for HT Study
                      Amendment #1 to LAB 8B 5-Sep-07
LAB SOPs                                                               Page 12 of 17
                                                                9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                         Version Number     Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number                  SOP Title
                                                         and Date           Date             Date               Date              Date              Review
Training and Safety

LAB 8D                      Collection, Preparation, and 1.0 19Apr2006      N/A                                                                     19-Apr-06
                            Storage of Dried Blood for
                            CB Sites (PIP)


LAB 8E                      Copperbelt Transportation of 1.0 15Dec2006      N/A                                                                     15-Dec-06
                            Specimens

LAB 8J                                                   1.0 19Apr2006      19-Apr-06                                                               19-Apr-06
                            Specimen Shipping (PIP)
LAB 8K (CL 8.3, 13.1)       Specimen Shipping            3.0 01Aug2007      19-Sep-07                                                               1-Aug-07
                            Clarification #1 to LAB 8K
                                                         3.0 22Aug2007
                            Ver 3.0
Laboratory Reagents

                            Use of Laboratory Reagents,
LAB 9A (IAVI 019.1)                                     2.0 30Apr2007       25-May-07                                                               30-Apr-07
                            Expiry Dates and
                            Nomenclature
HIV Testing and Algorithm


LAB 11A                                                  2.0 23Aug2006      24-Aug-06                                                               23-Aug-06

                            HIV Testing Algorithm


LAB 11B                     Abbott Determine HIV-        2.0 08Sep2008                                                                              8-Sep-08
                            1/HIV-2 Rapid Test


LAB 11C                     Trinity Biotech Capillus HIV- 2.0 08Sep2008                                                                             8-Sep-08
                            1/HIV-2 Rapid Test


LAB 11D                     Trinity Biotech Uni-gold     2.0 08Sep2008                                                                              8-Sep-08
                            HIV-1/HIV-2 Rapid Test


LAB SOPs                                                                     Page 13 of 17
                                                         9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                  Version Number     Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number            SOP Title
                                                  and Date           Date             Date               Date              Date              Review
Training and Safety
                      HIV Rapid Test – Use of
LAB 11F               Whole Blood in Case of      2.0 08Sep2008                                                                              8-Sep-08
                      Power Failure

LAB 11G                                           1.0 23Apr2008                                                                              23-Apr-08
                      SD Bioline HIV ½ POCT 3.0
                      Elisa Checklist
HIV Elisas

LAB 12A               BIORAD: Genetic Systems     1.0 13Dec2006      N/A                                                                     13-Dec-06
                      rLAV EIA


LAB 12B               Abbott HIV ELISA Murex      1.0 06Mar2006      7-Jun-06                                                                6-Mar-06
                      Ag/Ab Combination


LAB 12C               Beckman Coulter p24 ELISA 1.0 01Mar2006        4-Jun-07                                                                1-Mar-06
                      Antigen Test


LAB 12D               Biorad Genetic System - HIV-1.0 04Jun 2007     12-Jun-07                                                               4-Jun-07
                      1/HIV-2 Plus O EIA


                      Appendix IV: Reporting      1.0 04Jun2007
                      template


LAB 12E               Vironostika HIV Uni-Form 2.0 13Dec2006         12-Jun-07                                                               13-Dec-06
                      II Ag/Ab
                      Amendment #1 to LAB SOP
                      12E                      23-Mar-07
                      Appendix III: Lusaka
                      template
                      Appendix IV: Kigali
                      template




LAB SOPs                                                              Page 14 of 17
                                                              9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                       Version Number     Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number                  SOP Title
                                                       and Date           Date             Date               Date              Date              Review
Training and Safety
                            Panbio ELISA CHEK for
LAB 12F                                               1.0 01Oct2007       ………..                                                                   1-Oct-07
                            ELISA Readers and Washers


                            Appendix 2: ELISA CHEK
                                                       17-Sep-07                                                                                  17-Sep-07
                            spreadsheet template

HIV Seroconversion

LAB 13A                     HIV Seroconversion for     3.0 01Oct2007      7-Nov-07                                                                1-Oct-07
                            RZHRG Studies
HSV Procedures and Assays

LAB 14A                                                2.0 25May2007      ……….                                                                    25-May-07
                            Focus HerpesSelect 2 IgG
Urine Pregnancy Testing
LAB 15A                     Hexagon hCG one-step       1.0 08Feb2006      N/A                                                                     8-Feb-06

                            Amendment #1 to LAB15A     5-Apr-07
                            Ver 1.0
LAB 15B                     Quickvue one-step hCG      1.0 08Feb2006      22-Jun-06                                                               8-Feb-06
Urinalysis
LAB 16A                     Urinalysis                 1.0 10Mar2006      17-May-06                                                               10-Mar-06
Microscopy


LAB 17B                     Microscopic Examination of 2.0 17Sep2008                                                                              17-Sep-08
                            Endocervical and Vaginal
                            Swabs
LAB 17C                     Stool Examination          2.0 18Sep2008                                                                              18-Sep-08

LAB 17D                     Peripheral Blood Smears for 2.0 18Sep2008                                                                             18-Sep-08
                            the Detection of Malaria

                            Manual Differential
LAB 17E                                                2.0 18Sep2008                                                                              18-Sep-08
                            Counting of White Blood
                            Cells
Syphilis Testing

LAB SOPs                                                                   Page 15 of 17
                                                              9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                       Version Number     Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number                SOP Title
                                                       and Date           Date             Date               Date              Date              Review
Training and Safety
LAB 18A                   Newmarket RPR Test           2.0 26Aug2008                                                                              26-Aug-08
LAB 18B                   BD MacroVue RPR Test         2.0 26Aug2008                                                                              26-Aug-08
LAB 18C                   HUMAN RPR Test               2.0 26Aug2008                                                                              26-Aug-08
LAB 18D                   SpinReact RPR Test           2.0 26Aug2008                                                                              26-Aug-08
LAB 18E                   Plasmatec RPR Test           2.0 26Aug2008                                                                              26-Aug-08
LAB 18F                   Omega TPHA                   2.0 04Jun2007      N/A                                                                     4-Jun-07
LAB 18G                   Newmarket TPHA               2.0 30May2007      28-Sep-07                                                               30-May-07
                          Axis-Shield Microsyph
LAB 18H                                                1.0 12Jun2007                                                                              12-Jun-07
                          TPHA
Chemistry



LAB 19A (IAVI SOP10)      Clinical Chemistry testing    1.0 19Apr2006     19Arp2006                                                               19-Apr-06
                          using the VITALAB Selectra
                          E clinical chemistry analyzer
Hematology
                          Hematocrit and ESR
LAB 20C                                                2.0 29Sep2008                                                                              29-Sep-08
                          Determination

                          Full Blood Count Using the
LAB 20D (IAVI SOP08A)                                  2.0 29Sep2008                                                                              29-Sep-08
                          Coulter A T 5diff
                          Hematology Analyzer
                          Handling Abnormal
LAB 20E                                                2.0 29Sep2008                                                                              29-Sep-08
                          Hematology Results
CD4/CD8 Assays
                           Becton Dickinson FACS
LAB 21A                                                2.0 23Oct2008                                                                              23-Oct-08
                           Count
DNA, Buffy Coats, White Cell Pellets
                          DNA Extraction Using
LAB 22A                                                2.0 06Oct2008                                                                              6-Oct-08
                          Qiagen Kit

LAB 22B                   Classic DNA Extraction       2.0 06Oct2008                                                                              6-Oct-08
                          Buffy Coat Collection and
LAB 22C                                                2.0 06Oct2008                                                                              6-Oct-08
                          Storage

LAB 22D                   White Cell Pellet Preparation 2.0 06Oct2008                                                                             6-Oct-08

LAB SOPs                                                                   Page 16 of 17
                                                             9fb1b313-9097-4eaf-b86e-b838c5166dfc.xls

                                                      Version Number     Kigali Effective Lusaka Effective   Kitwe Effective   Ndola Effective   Date of Last
SOP Number                 SOP Title
                                                      and Date           Date             Date               Date              Date              Review
Training and Safety      Preparation and Storage of
LAB 22E                  Dried Blood Spots            2.0 22Aug2007      7-Nov-07                                                                22-Aug-07
HBV and HCV EIA (Kigali Only)
                           Abbot Murex: HBsAg EIA
LAB 23A                                               1.0 18Jun2008                        N/A               N/A               N/A               18-Jun-08
                           Version 3

                           Abbott Murex: anti-HCV
LAB 23B                                               1.0 18Jun2008                        N/A               N/A               N/A               18-Jun-08
                           EIA Version 4.0
ELISPOT

                         Evaluation of Interferon-
LAB 24A (CL 4.4 03May05) gamma Producing Cells by     1.0 29Aug2007                                                                              29-Aug-07
                         ELISPOT Assay

                           Evaluation of ELISPOT
LAB 24B (CL 12.5
                           Numbers using an AID       1.0 29Aug2007                                                                              29-Aug-07
26Feb07)
                           Reader
PBMC
                           Isolation of Human PBMC
LAB 25A (CL 002.6)         (IAVI)                     2.0 11May2007                                                                              11-May-07



LAB 25B (CL 017.3)         Use of Vi-cell counter for 3.0 15Aug2007                                                                              15-Aug-07
                           viable PBMC counting with
                           subsequent freezing

LAB 25C (CL 015.2)         Haemocytometer counting    2.0 08May2007                                                                              8-May-07
                           and freezing human PMBC




LAB SOPs                                                                  Page 17 of 17

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:15
posted:11/28/2011
language:English
pages:17