Aggregates
Current
Sector Cemex
Sustainability Performance Cemex current 'Average Cemex Target Set Cemex / MPA
Unit of expression target Target Set Agreed MPA Target
Principles Indicators level 2008 MPA' 2010 Target
2012 2012
Figure
Environmenta 1.1 % of production Increase % of production
l sites covered certified % of production sites 51% 77% 80% 70% 100% sites covered by a UKAS MPA Target Exceeded
Management certified EMS to 80% by (by 20%)
EMS
Systems 2012
1.2 Kg of waste to Reduce kg/tonne of waste
Waste
landfill as a proportion of kg per tonne 0.39 1.54kg/m³ 1.31kg/m³ 0.9 0.85 to landfill to 15% of 2008 MPA Target Exceeded
minimisation
production output levels by 2012
Emissions 1.3 Number of Maintain zero convictions
convictions for air and MPA Target Fully
(excluding Number per annum 0 4 - total 0 0 0 for air and water emissions
water emissions per aligned
CO2) per annum, ongoing
annum
1.4 % of production
% of production sites Increase coverage of UKAS
Quality & sites covered by a UKAS Improvement better
(and absolute number 11.2 65% 75% 20 30 certified 9001 QMS to 75%
Performance certified 9001 quality than sector average
compared to total) by 2012
management system
2.1 Energy used in Reduce overall kWh/tonne
Energy production as a of energy used in MPA Target Fully
kWh per tonne 10.89 13.2 12.2 10.8 10.4
Efficiency proportion of production production by 7.5% from aligned
output 2008 levels by 2012
Reduce CO2/tonne
CO2 2.2 CO2 emissions as a
emissions from production MPA Target Fully
Emissions proportion of production kg CO2 per tonne 3.43 4.3 3.9 3.4 3.3
by 7.5% from 2008 levels aligned
(Production) output
by 2012
Review logistical
Not To be
Road 44.40 N/A solutions, consder
available reviewed
targets for 2012
2.3a Average delivery
distance travelled per km per Review logistical
Not To be Linked to 2.3d
tonne (from factory gate tonne Rail 0.06 N/A solutions, consder N/A
available reviewed
to customer) targets for 2012
Review logistical
Not To be
Water 0.29 N/A solutions, consder
available reviewed
targets for 2012
Review logistical
Not To be
Road 12340712 N/A solutions, consder
available reviewed
targets for 2012
Tonnes
2.3b Tonnes moved split Review logistical
moved by Not To be
by three modes: road, Rail 1765072.39 N/A solutions, consder Linked to 2.3d N/A
each available reviewed
rail, inland barge targets for 2012
mode
Review logistical
Not To be
Water 216519.00 N/A solutions, consder
available reviewed
targets for 2012
Review logistical
Not To be
Road 22.09 N/A solutions, consder
available reviewed
targets for 2012
2.3c
CO2 Review logistical
2.3c Average load for Tonnes Not To be
Emissions Rail 1697.18 N/A solutions, consder Linked to 2.3d N/A
each mode per load available reviewed
(Transport targets for 2012
by mode
Review logistical
Not To be
Water 3231.63 N/A solutions, consder
available reviewed
targets for 2012
Decrease fuel
Not consumption to To be
Road 2.03 N/A
available 7.75 MPG = 5.3% reviewed
Reduction in CO2 Reduce CO2/m³ emissions
2.3d CO2 emissions as a kg CO2 Review logistical
Not To be from transport by 15%
proportion of production per tonne Rail 0.46 N/A solutions, consder N/A
available reviewed from 2008 levels by 2012 -
output per mode targets for 2012 (Linked to 2.2)
Review logistical
Not To be
Water 10.19 N/A solutions, consder
available reviewed
targets for 2012
Road N/A N/A
2.3e CO2 emissions per kg CO2
N/A - all incoming material are produced on site, transpotation from the dig to the plant
tonne for incoming per tonne Rail N/A N/A
is included in 2.1. Transport to depots is included in 2.3a, 2.3b, 2.3c , 2.3d
materials per mode
Water N/A N/A
3.1D Proportion of raw
The industry will continue to
material comprising of Maintain MPA Target Fully
% 0.17% 5% N/A Maintain current levels maximise the use af materials
material diverted from current levels aligned
diverted from the waste stream
the waste stream
where it is sustainable to do so
3.2a Mains water use as 9.5 9.0
Improve
a proportion of litres/tonne 75 litres/tonn litres/tonn Improve data None set None set
data
production output e e
Water 3.2b Controlled Improve baseline data
groundwater use as a Unavailabl Unavailabl Improve collection to enable overall MPA Target Fully
litres/tonne 308.51 Improve data
proportion of production e e data water reduction target to be aligned
output set in 2010
Increase coverage of site specific
3.3a Proportion of action plans to 100% of relevant MPA Target Fully
existing quarries that % 97% 95% 100% 100% 100 production sites by 2012 aligned
have restoration plans.
Site Stewardship
3.3b Proportion of sites Increase coverage of site specific
that have or are linked action plans to 100% of relevant MPA Target Fully
% 16% 95% 100% 40% 100 production sites by 2012
to, biodiversity action aligned
plans.
Lost time injuries per
4.1 Lost injuries per Reduce number of
Health & 1,000,000 hours MPA Target Fully
200,000 direct employee 1.01 ? 0 0 0 reportable injuries to zero
Safety worked (direct aligned
hours per year per annum ongoing
employees only)
4.2a % of employees
covered by UKAS % of employees
certified ISO9001/ ISO 74% of aggs Not Linked to
covered by UKAS N/A N/A No Target N/A
14001/ OHSAS 18001 division available 4.2b
9001/14001 systems
systems (Training &
Competence sections)
Employment 4.2b % of employees % of employees
& Skills covered by an covered by
environmental and environmental and
health and safety health and safety Not MPA Target Fully
100% No target 100% 100% No target
management system management system available aligned
following the principles following the
of ISO 14001 and principles of ISO
OHSAS 18001 14001 and OHSAS
4.3 % of relevant % of relevant Increase % of relevant
production sites with 100% relevant
Local production sites (and Establish as Establish as production sites that have To be set up as
community liaison sites(71%) 85% 90%
Community absolute number relevant relevant community liaison activities required
activities (supplemented (22 site)
compared to total) to 90% by 2012
by 1.3)