Aggregates

Current

Sector Cemex

Sustainability Performance Cemex current 'Average Cemex Target Set Cemex / MPA

Unit of expression target Target Set Agreed MPA Target

Principles Indicators level 2008 MPA' 2010 Target

2012 2012

Figure

Environmenta 1.1 % of production Increase % of production

l sites covered certified % of production sites 51% 77% 80% 70% 100% sites covered by a UKAS MPA Target Exceeded

Management certified EMS to 80% by (by 20%)

EMS

Systems 2012

1.2 Kg of waste to Reduce kg/tonne of waste

Waste

landfill as a proportion of kg per tonne 0.39 1.54kg/m³ 1.31kg/m³ 0.9 0.85 to landfill to 15% of 2008 MPA Target Exceeded

minimisation

production output levels by 2012

Emissions 1.3 Number of Maintain zero convictions

convictions for air and MPA Target Fully

(excluding Number per annum 0 4 - total 0 0 0 for air and water emissions

water emissions per aligned

CO2) per annum, ongoing

annum

1.4 % of production

% of production sites Increase coverage of UKAS

Quality & sites covered by a UKAS Improvement better

(and absolute number 11.2 65% 75% 20 30 certified 9001 QMS to 75%

Performance certified 9001 quality than sector average

compared to total) by 2012

management system

2.1 Energy used in Reduce overall kWh/tonne

Energy production as a of energy used in MPA Target Fully

kWh per tonne 10.89 13.2 12.2 10.8 10.4

Efficiency proportion of production production by 7.5% from aligned

output 2008 levels by 2012

Reduce CO2/tonne

CO2 2.2 CO2 emissions as a

emissions from production MPA Target Fully

Emissions proportion of production kg CO2 per tonne 3.43 4.3 3.9 3.4 3.3

by 7.5% from 2008 levels aligned

(Production) output

by 2012

Review logistical

Not To be

Road 44.40 N/A solutions, consder

available reviewed

targets for 2012

2.3a Average delivery

distance travelled per km per Review logistical

Not To be Linked to 2.3d

tonne (from factory gate tonne Rail 0.06 N/A solutions, consder N/A

available reviewed

to customer) targets for 2012

Review logistical

Not To be

Water 0.29 N/A solutions, consder

available reviewed

targets for 2012

Review logistical

Not To be

Road 12340712 N/A solutions, consder

available reviewed

targets for 2012

Tonnes

2.3b Tonnes moved split Review logistical

moved by Not To be

by three modes: road, Rail 1765072.39 N/A solutions, consder Linked to 2.3d N/A

each available reviewed

rail, inland barge targets for 2012

mode

Review logistical

Not To be

Water 216519.00 N/A solutions, consder

available reviewed

targets for 2012

Review logistical

Not To be

Road 22.09 N/A solutions, consder

available reviewed

targets for 2012

2.3c

CO2 Review logistical

2.3c Average load for Tonnes Not To be

Emissions Rail 1697.18 N/A solutions, consder Linked to 2.3d N/A

each mode per load available reviewed

(Transport targets for 2012

by mode

Review logistical

Not To be

Water 3231.63 N/A solutions, consder

available reviewed

targets for 2012

Decrease fuel

Not consumption to To be

Road 2.03 N/A

available 7.75 MPG = 5.3% reviewed

Reduction in CO2 Reduce CO2/m³ emissions

2.3d CO2 emissions as a kg CO2 Review logistical

Not To be from transport by 15%

proportion of production per tonne Rail 0.46 N/A solutions, consder N/A

available reviewed from 2008 levels by 2012 -

output per mode targets for 2012 (Linked to 2.2)

Review logistical

Not To be

Water 10.19 N/A solutions, consder

available reviewed

targets for 2012



Road N/A N/A





2.3e CO2 emissions per kg CO2

N/A - all incoming material are produced on site, transpotation from the dig to the plant

tonne for incoming per tonne Rail N/A N/A

is included in 2.1. Transport to depots is included in 2.3a, 2.3b, 2.3c , 2.3d

materials per mode





Water N/A N/A





3.1D Proportion of raw

The industry will continue to

material comprising of Maintain MPA Target Fully

% 0.17% 5% N/A Maintain current levels maximise the use af materials

material diverted from current levels aligned

diverted from the waste stream

the waste stream

where it is sustainable to do so

3.2a Mains water use as 9.5 9.0

Improve

a proportion of litres/tonne 75 litres/tonn litres/tonn Improve data None set None set

data

production output e e

Water 3.2b Controlled Improve baseline data

groundwater use as a Unavailabl Unavailabl Improve collection to enable overall MPA Target Fully

litres/tonne 308.51 Improve data

proportion of production e e data water reduction target to be aligned

output set in 2010

Increase coverage of site specific

3.3a Proportion of action plans to 100% of relevant MPA Target Fully

existing quarries that % 97% 95% 100% 100% 100 production sites by 2012 aligned

have restoration plans.

Site Stewardship

3.3b Proportion of sites Increase coverage of site specific

that have or are linked action plans to 100% of relevant MPA Target Fully

% 16% 95% 100% 40% 100 production sites by 2012

to, biodiversity action aligned

plans.

Lost time injuries per

4.1 Lost injuries per Reduce number of

Health & 1,000,000 hours MPA Target Fully

200,000 direct employee 1.01 ? 0 0 0 reportable injuries to zero

Safety worked (direct aligned

hours per year per annum ongoing

employees only)

4.2a % of employees

covered by UKAS % of employees

certified ISO9001/ ISO 74% of aggs Not Linked to

covered by UKAS N/A N/A No Target N/A

14001/ OHSAS 18001 division available 4.2b

9001/14001 systems

systems (Training &

Competence sections)

Employment 4.2b % of employees % of employees

& Skills covered by an covered by

environmental and environmental and

health and safety health and safety Not MPA Target Fully

100% No target 100% 100% No target

management system management system available aligned

following the principles following the

of ISO 14001 and principles of ISO

OHSAS 18001 14001 and OHSAS

4.3 % of relevant % of relevant Increase % of relevant

production sites with 100% relevant

Local production sites (and Establish as Establish as production sites that have To be set up as

community liaison sites(71%) 85% 90%

Community absolute number relevant relevant community liaison activities required

activities (supplemented (22 site)

compared to total) to 90% by 2012

by 1.3)



Related docs
Other docs by huanglianjiang...
Property Loss Damage Claim Form
Views: 0  |  Downloads: 0
Hurt Hawks
Views: 0  |  Downloads: 0
MEIJI UNIVERSITY_ TOKYO
Views: 4  |  Downloads: 0
Noam Gill GBAS System
Views: 0  |  Downloads: 0
GCD
Views: 0  |  Downloads: 0
FREE COMMUNITY SECTOR JOB ADVERTISING TRIAL
Views: 1  |  Downloads: 0
Constraints
Views: 0  |  Downloads: 0
Monroe Co Benton twp AR 2009
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!