Embed
Email

GOLDEN GATE BRIDGE

Document Sample

Categories
Tags
Stats
views:
1
posted:
11/27/2011
language:
English
pages:
1
GOLDEN GATE BRIDGE



The Golden Gate Bridge, in San Francisco, California, took just over four years to build

and was open to vehicular traffic on May 28, 1937. The Bridge can be a very busy place,

particularly during the summer months. More than 41 million vehicles cross the Golden Gate

Bridge annually.



Today, painters touch up the paint

continuously. There are 38

painters who work on the bridge

at one time.



Total length: 1.7 miles



Total weight when built: 894,500

tons



Total weight today: 887,000 tons.

Weight reduced because of new

decking material.



ACTIVITY



1. How many years has the Golden Gate Bridge been open to traffic?







2. The bridge has been closed three times for weather, once on its fiftieth birthday. What year

was this?







3. How many cars can cross the Golden Gate Bridge each day?







4. Keeping in mind the length of the bridge, how long will it take a car traveling at a speed of

100km/h to cross the bridge?







5. If it takes 38 painters 12 months to paint the bridge, how many painters will it take if we

reduce the time by 4 months?







6. How much weight (in kilos) did the bridge lose by using new materials?



Related docs
Other docs by Stariya Js @ B...
How we become literate
Views: 0  |  Downloads: 0
15189
Views: 0  |  Downloads: 0
Enrollment Agreement
Views: 0  |  Downloads: 0
seddc 061009 pm
Views: 0  |  Downloads: 0
Juvanec-KamenNaKamen-eng
Views: 0  |  Downloads: 0
Syllabus Macro Fall 10
Views: 0  |  Downloads: 0
23401
Views: 0  |  Downloads: 0
9-11-RPH-stonefabrication-ord-memo-agss
Views: 0  |  Downloads: 0
Junior_Pre_season_Soccer_League_application
Views: 0  |  Downloads: 0
guide_to_moodle_quizzes
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!