Sheet1

Document Sample
Sheet1 Powered By Docstoc
					                                          FY 2011 TIFIA Letters of Interest Submitted
                                                Amounts in Millions of Dollars

                                                              Date          Estimated      TIFIA         Percent of
Potential Applicant                Project Name                                                                       Type of Instrument
                                                            Received       Project Cost   Request          Total

                             AC Transit Intelligent
Alameda Contra Costa Transit                                 FY 2011
                             Transportation Systems                                 $25             $9         34%        Direct Loan
District (AC Transit)                                      (03/01/2011)
                             (East Bay Area, CA)


                                                                                                                   Direct Loan or Direct
Alamo Regional Mobility                                      FY 2011                                                   Loan & Loan
                             US 281 (San Antonio, TX)                              $655        $217            33%
Authority (Alamo RMA)                                      (03/01/2011)                                                 Guarantee
                                                                                                                       Combination

                                                                                                                   Direct Loan or Direct
Alamo Regional Mobility      US Loop 1604 (San               FY 2011                                                   Loan & Loan
                                                                                 $1,206        $361            30%
Authority (Alamo RMA)        Antonio, TX)                  (03/01/2011)                                                 Guarantee
                                                                                                                       Combination


Bay Area Rapid Transit       Oakland Airport Connector       FY 2011
                                                                                   $479        $100            21%        Direct Loan
District (BART)              (San Francisco, CA)           (03/01/2011)



                                                                                                                      Direct Loan or Direct
Central Texas Regional       MoPAC Improvement               FY 2011
                                                                                   $248         $82            33%      Loan and Line of
Mobility Authority (CTRMA)   Project (Travis County, TX)   (03/01/2011)
                                                                                                                      Credit Combination


                             Route 17/Dominion
                                                             FY 2011
City of Chesapeake           Boulevard (Chesapeake,                                $412        $140            34%        Direct Loan
                                                           (03/01/2011)
                             VA)




                                                                       1
                                           FY 2011 TIFIA Letters of Interest Submitted
                                                 Amounts in Millions of Dollars

                                                                Date          Estimated      TIFIA      Percent of
Potential Applicant                 Project Name                                                                     Type of Instrument
                                                              Received       Project Cost   Request       Total

Colorado High Performance
                             US 36 Managed                     FY 2011
Transportation Enterprise                                                            $311         $53         17%       Direct Loan
                             Lanes/BRT (Boulder, CO)         (03/01/2011)
(HPTE)



Delaware Department of                                         FY 2011
                             US 301 (Delaware)                                       $738        $240         33%       Direct Loan
Transportation (DelDOT)                                      (03/01/2011)


                              Downtown Tunnel/Midtown
Elizabeth River Crossings LLC Tunnel/ MLK Freeway              FY 2011
                                                                                   $2,009        $586         29%       Direct Loan
(ERC)                         (Norfolk and Portsmouth,       (03/01/2011)
                              VA)


                             Northwest Corridor
Georgia Department of                                          FY 2011
                             (Cobb and Cherokee                                    $1,430        $375         26%       Direct Loan
Transportation (GDOT)                                        (03/01/2011)
                             Counties, GA)


                                                                                                                  Direct Loan or Direct
                             University Light Rail Transit     FY 2011                                                Loan & Loan
Houston METRO                                                                      $1,481        $244         17%
                             Line (Houston, TX)              (03/01/2011)                                              Guarantee
                                                                                                                      Combination


Illinois Department of       Elgin O'Hare - West Bypass        FY 2011
                                                                                   $2,190        $700         32%           TBD
Transportation (IDOT)        (Cook County, IL)               (03/01/2011)




                                                                         2
                                           FY 2011 TIFIA Letters of Interest Submitted
                                                 Amounts in Millions of Dollars

                                                              Date          Estimated      TIFIA      Percent of
Potential Applicant                 Project Name                                                                   Type of Instrument
                                                            Received       Project Cost   Request       Total
                              Louisville - Southern
Kentucky Transportation       Indiana Ohio River Bridges     FY 2011
                                                                                 $4,083      $1,300         32%       Direct Loan
Cabinet                       (Louisville Metropolitan     (03/01/2011)
                              Area, KY)

                              Knik Arm Bridge
Knik Arm Bridge and Toll      (Anchorage and the             FY 2011
                                                                                 $1,077        $306         28%       Direct Loan
Authority (KABATA)            Matanuska-Susitna            (03/01/2011)
                              Borough)


Los Angeles County
                              Crenshaw/LAX Transit           FY 2011
Metropolitan Transportation                                                      $1,715        $546         32%       Direct Loan
                              Corridor (Los Angeles, CA)   (03/01/2011)
Authority (LACMTA)


Los Angeles County            Westside Subway
                                                             FY 2011
Metropolitan Transportation   Extension (Los Angeles,                            $2,064        $641         31%       Direct Loan
                                                           (03/01/2011)
Authority (LACMTA)            CA)



                                                             FY 2011
Massachusetts Port Authority Massport (Boston, MA)                                 $320         $75         23%       Direct Loan
                                                           (03/01/2011)



Metropolitan Washington       Dulles Metrorail (Northern     FY 2011
                                                                                 $6,586      $1,730         26%       Direct Loan
Airports Authority            Virginia)                    (03/01/2011)




                                                                       3
                                       FY 2011 TIFIA Letters of Interest Submitted
                                             Amounts in Millions of Dollars

                                                           Date          Estimated      TIFIA      Percent of
Potential Applicant              Project Name                                                                   Type of Instrument
                                                         Received       Project Cost   Request       Total
                           Monterey Bay Bus
                           Operations and                 FY 2011
Monterey-Salinas Transit                                                         $99         $33         33%       Direct Loan
                           Maintenance Facility         (03/01/2011)
                           (Monterey County, CA)


New York Metropolitan
                           Second Avenue Subway           FY 2011
Transportation Authority                                                      $4,451      $1,484         33%       Direct Loan
                           (New York, NY)               (03/01/2011)
(MTA)



North Carolina Turnpike    Gaston East-West Corridor      FY 2011
                                                                                $990        $319         32%       Direct Loan
Authority (NCTA)           (Gaston County, NC)          (03/01/2011)



                           I-77 HOT Lanes
North Carolina Turnpike                                   FY 2011
                           (Charlotte and Mecklenburg                           $180         $57         31%       Direct Loan
Authority (NCTA)                                        (03/01/2011)
                           County, NC)



North Carolina Turnpike    Mid-Currituck Bridge           FY 2011
                                                                                $629        $200         32%       Direct Loan
Authority (NCTA)           (Currituck Sound, NC)        (03/01/2011)



North Carolina Turnpike    Monroe Connector               FY 2011
                                                                                $749        $242         32%       Direct Loan
Authority (NCTA)           (Mecklenburg County, NC)     (03/01/2011)




                                                                    4
                                            FY 2011 TIFIA Letters of Interest Submitted
                                                  Amounts in Millions of Dollars

                                                              Date          Estimated      TIFIA      Percent of
Potential Applicant                  Project Name                                                                  Type of Instrument
                                                            Received       Project Cost   Request       Total
                              SH 121: Southwest
                              Parkway/Chisholm Trail         FY 2011
North Texas Tollway Authority                                                    $1,628        $422         26%         Direct Loan
                              (Dallas - Fort Worth Area,   (03/01/2011)
                              TX)


Riverside County
                              SR 91 (Riverside and           FY 2011
Transportation Commission                                                        $1,338        $446         33%         Direct Loan
                              Orange Counties, CA)         (03/01/2011)
(RCTC)



                              Safetek Systems                FY 2011                                               Direct Loan or Line of
Safetek Systems                                                                     $14         $14        100%
                              (Indianapolis, IN)           (03/01/2011)                                                    Credit



San Diego Association of      Otay Mesa (Otay Mesa,          FY 2011
                                                                                   $715        $240         34%         Direct Loan
Governments (SANDAG)          CA)                          (03/01/2011)



Santa Clara Valley            US 101/SR 85                   FY 2011
                                                                                   $597        $197         33%         Direct Loan
Transportation Authority      (Silicon Valley, CA)         (03/01/2011)



Texas Department of           IH 35E (Dallas and Denton      FY 2011
                                                                                 $2,467        $800         32%         Direct Loan
Transportation (TxDOT)        Counties, TX)                (03/01/2011)




                                                                       5
                                        FY 2011 TIFIA Letters of Interest Submitted
                                              Amounts in Millions of Dollars

                                                               Date          Estimated      TIFIA      Percent of
Potential Applicant               Project Name                                                                      Type of Instrument
                                                             Received       Project Cost   Request       Total

                            Interstate 35W: NTE
Texas Transportation                                          FY 2011
                            Segments 3a and 3b                                    $1,355        $537         40%       Direct Loan
Commission                                                  (03/01/2011)
                            (Tarrant County, TX)



                            Interstate 95 HOT/HOV             FY 2011
Transurban (Flour SPV)                                                            $1,050        $350         33%       Direct Loan
                            (Fairfax County, VA)            (03/01/2011)



Virginia Department of      Route 460 (Hampton                FY 2011
                                                                                  $2,200        $650         30%       Direct Loan
Transportation (VDOT)       Roads, VA)                      (03/01/2011)



                            SR 520 Bridge
Washington State Department                                   FY 2011
                            Replacement                                           $2,705        $320         12%       Direct Loan
of Transportation (WSDOT)                                   (03/01/2011)
                            (King County, WA)

                                                   Totals                        $48,195     $14,016




                                                                        6

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:11/26/2011
language:English
pages:6