2009SRR-Shelter Deficit Reduction Progress Chart September 2010-August 2011
WASHINGTON
Retrofitted
General (G),
(R) or New
Name Bldg. # Address City Zip PSN (P), Pet
Constructio
-Friendly (A)
n (N)
TOTALS FOR WASHINGTON COUNTY
Shelter Shelter Surplus/ Shelter
Capacity Demand Deficit In Capacity
In People In People People (ft2)
Storm Category 4/5
Special Needs Storm Shelters
Retrofitted
General (G),
(R) or New
Name Bldg # Address City Zip Constructio
PSN (P), Pet
-Friendly (A)
n (N)
SpNs
Shelter SpNs SpNs
Surplus/
Capacity Shelter Shelter
Deficit In
In Spaces Demand Capacity
Spaces
(meets In Spaces (ft2)
ARC 4496)
Storm Category 4/5
2009SRR-Shelter Deficit Reduction Progress Chart September 2010-August 2011
WASHINGTON
Pre- Pre- Retrofitted Retrofitted Total Risk Total Risk
EHPA EHPA
Host Mitigation Mitigation / Mitigated / Mitigated Capacity Capacity
Capacity Capacity
Capacity ARC 4496 ARC 4496 Gained
Capacity Capacity In People (ft2)
Gained
In People Capacity Capacity (persons) Gained Gained (Meets (Meets
2 (ft2)
(persons) (ft ) (persons) (ft2) ARC 4496) ARC 4496)
0 0
0 0
0 0
0 0
0 0 0 0 0 0 0 0 0
Shelter Surplus/
Demand Deficit Result
(ft2) (ft2)
0
Special Needs Storm Shelters
SpNS
Pre- Pre- Retrofitted Retrofitted Capacity SpNs
Emergen EHPA EHPA
Mitigation Mitigation / Mitigated / Mitigated (spaces Capacity
cy Capacity Capacity
ARC 4496 ARC 4496 Capacity Capacity @ 60sf) (sf)
Powered Capacity Capacity Gained Gained
2 Gained Gained (meets (meets
HVAC? (persons) (persons) (ft )
(ft2) (persons) (ft2) ARC ARC 4496
4496)
Shelter Surplus/
Demand Deficit Result
(ft2) (ft2)
2009SRR-Shelter Deficit Reduction Progress Chart September 2010-August 2011
Risk Funding
Capacity Source:
Local
In People Local (L),
Planned
(Does not State (S),
Usage Comments
Meet ARC Federal
(reported
4496 or (F), and
capacity)
Not Yet Program
Surveyed) Name
0 0
Result
SpNS Funding
Capacity Source:
Local
(spaces Local (L),
Planned
@ 60sf) State (S),
Usage Comments
(does not (reported Federal
meet (F), and
capacity)
Program
ARC
Name
4496)
Result