Bldg Info
Document Sample


FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00001 1942 61050 ADMIN GEN PURP 10,861 VIII ADMIN HEADQUARTERS HEADQUARTERS B
00002 1941 44220 STORAGE GP INST 10,842 VIII ADMIN FIRE STATION FIRE STATION, OFFICES, STORAGE B
00003 1942 31710 COMMO EQ BLDG 594 VIII ADMIN COMMUNICATION EQUIPMENT COMMUNICATION EQUIPMENT B
00004 1942 21910 ENG/HOUSING MNT 21,994 VIII ADMIN SERVICES DIVISION SERVICES DIVISION B
VEHICLE MAINTENANCE,
00005 1942 21410 VEH MAINT SHOP 19,300 VIII ADMIN OFFICE, STORAGE VEHICLE MAINTENANCE, OFFICE, STORAGE B4
00006 1942 14165 FUEL/POL BLDG 410 VIII ADMIN GAS STATION GAS STATION B
00007 1942 21910 ENG/HOUSING MNT 4,300 VIII ADMIN CARPENTER'S SHOP CARPENTER'S SHOP B
00008 1942 21922 ENTOMOLOGY FAC 1,567 VIII ADMIN PEST CONTROL FACILITY PEST CONTROL FACILITY B
00009 1942 21910 ENG/HSG MAINT 1,567 VIII ADMIN HVAC SHOP AND STORAGE HVAC SHOP AND STORAGE B
DECONTAMINATION VEHICLE
00010 1942 44182 VEH ST BD DEP 6,748 VIII ADMIN STORAGE DECONTAMINATION VEHICLE STORAGE B4
PUBLIC WORKS OFFICE, UNION OFFICE, TOOL
CRIB, CHEMICAL PROTECTIVE EQUIPMENT,
00011 1942 61050 ADMIN GEN PURP 30,660 VIII ADMIN OFFICES MEDICAL CLINIC, DECON FACILITY B4
00012 1953 44222 STR SHED GP INS 80 VIII ADMIN STORAGE BUILDING UNUSED B
00014 1942 89113 SUB/SWIT STA BD 756 VIII ADMIN ELECTRICAL SUBSTATION ELECTRICAL SUBSTATION B
00015 1941 71113 FH LTC/MAJ 4,370 VIII ADMIN HOUSING HOUSING X 2 I
00016 1955 71113 FH LTC/MAJ 4,370 VIII ADMIN HOUSING INACTIVE X2 I
00017 1942 14133 SHIPPING AND RECEIVING 13,591 VIII ADMIN WAREHOUSE SHIPPING AND RECEIVING WAREHOUSE B
00018 1942 61050 ADMIN GEN PURP 13,641 VIII ADMIN OFFICES CHEMICAL OPERATIONS B4
00019 1942 44220 STORAGE GP INST 12,120 VIII ADMIN WAREHOUSE SERVICES DIVISION WAREHOUSE B
00022 1960 44222 STR SHED GP INS 120 I ADA STORAGE BUILDING FIRING RANGE I
00023 1941 44288 INST STR OTHER 308 ADMIN STORAGE BUILDING JANITOR'S STORAGE SHED C
00024 1941 89141 WTR SUP/TRT BLD 409 VIII ADMIN UTILITY BUILDING WELL HOUSE #1 B
00025 1941 89141 WTR SUP/TRT BLD 311 VIII ADMIN UTILITY BUILDING WELL HOUSE #2 B
00026 1941 14180 SCALE HOUSE 139 VIII ADMIN SCALE HOUSE SCALE HOUSE B
00027 1988 21850 BATTERY SHOP 1,800 VIII ADMIN BATTERY SHOP BATTERY SHOP B
00028 1942 89121 HEAT PLT BLDG 1,034 VIII ADMIN UTILITY BUILDING HEAT PLANT B
00029 44222 STR SHED GP INS 2,000 VIII ADMIN STORAGE BUILDING SERVICES DIVISION STORAGE B
00030 1942 14150 BOX/CRATE SHOP 15,787 VIII ADMIN DUNNAGE SHOP, SIMNET DUNNAGE SHOP, SIMNET, STORAGE B
00031 1942 44110 STR GP DEP 18,000 VIII ADMIN OFFICES SECURITY DIRECTORATE, STORAGE B
00032 1942 14161 EMERG OPNS CNTR 9,094 VIII ADMIN OFFICES OPERATIONS CENTER, BRAC OFFICE B4
00033 1962 61050 ADMIN GEN PURP 8,509 VIII ADMIN OFFICES MWR OFFICE, RESTAURANT B
00034 1950 72111 ENLISTED UPH 6,162 VIII ADMIN HOUSING HOUSING B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
1 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00035 1941 71113 FH LTC/MAJ 1,240 VIII ADMIN HOUSING HOUSING B
00036 1943 72212 DINING FAC TT 5,383 VIII ADMIN DINING FACILITY GUARD MESS B
00037 1961 89121 HEAT PLT BLDG 1,537 VIII ADMIN UTILITY BUILDING BOILER HOUSE B
00038 1969 73075 SEP TOIL/SHOWER 360 VIII ADMIN MWR FACILITY POOL SHOWER FACILITY B
00041 1972 44110 STORAGE GP DEP 113 VIII ADMIN STORAGE BUILDING COMM CONTRACTOR STORAGE B
00042 1976 17136 AUTO-AID INST 4,000 VIII ADMIN OFFICES TRAINING AND TREATY B
00045 1982 14113 ACCESS CNT FAC 64 VIII ADMIN ENTRY CONTROL FACILITY ECF AT E-28 B
00051 1941 71113 FH LTC/MAJ 2,983 VIII ADMIN HOUSING HOUSING B
00053 1941 72114 TT ENL BRKS 23,332 VIII ADMIN HOUSING ORNG BARRACKS A
00054 1951 17120 GEN INST BLDG 5,433 VIII ADMIN OFFICES TREATY/TRAINING BUILDING B
00055 1941 61050 ADMIN GEN PURP 1,794 VIII ADMIN OFFICES ENVIRONMENTAL B
00056 1942 14113 ACCESS CNT FAC 72 VIII ADMIN ENTRY CONTROL FACILITY ENTRY CONTROL FACILITY B
00057 1995 13120 COMMO CTR 594 VIII ADMIN OFFICES COMMUNICATIONS OFFICE B
00058 1942 89111 PWR PLT BLDG 392 VIII ADMIN UTILITY BUILDING STAND-BY GENERATOR A
00062 1993 74028 PHYS FIT CTR 10,097 VIII ADMIN MWR FACILITY FITNESS CENTER A
00063 1948 74049 RIDING STABLE 1,320 VIII ADMIN RIDING STABLES NOT USED N
00070 1942 71410 GARAGE FAM HS 935 VIII ADMIN GARAGE GARAGE B
00071 1944 44222 STR SHED GP INS 1,800 VIII ADMIN MWR FACILITY MWR EQUIPMENT STORAGE B
00072 1942 71410 GARAGE FAM HS 254 VIII ADMIN GARAGE GARAGE B
00073 1941 71410 GARAGE FAM HS 576 VIII ADMIN GARAGE GARAGE B
00074 1941 44224 ORG STR BLDG 484 VIII ADMIN STORAGE BUILDING STORAGE FOR BLDG 55 B
00076 1953 14113 ACCESS CNT FAC 84 VIII ADMIN ENTRY CONTROL FACILITY UNUSED I
00077 1975 44222 STR SHED GP INS 22,200 VIII ADMIN STORAGE BUILDING SNOW REMOVAL EQUIPMENT STORAGE B
00082 1960 44220 STORAGE GP INST 100 VIII ADMIN STORAGE BUILDING STORAGE AT BLDG 5 B
00083 1982 44222 STR SHED GP INS 80 VIII ADMIN STORAGE BUILDING UNUSED N
00084 1982 44217 ACETYL STR INST 25 VIII ADMIN STORAGE BUILDING SERVICES STORAGE (RT SIDE SVCS GATE) B
00084A 1982 44215 OXY STR INST 20 VIII ADMIN STORAGE BUILDING SERVICES STORAGE (LT SIDE SVCS GATE) B
00101 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00102 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED, ON BRAC MAP AS USE N
00103 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00105 1942 44110 STORAGE GP DEP 30,700 II INERT STORAGE STORAGE BUILDING NOT USED N
00106 1942 44110 STORAGE GP DEP 30,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00107 1942 44110 STORAGE GP DEP 30,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00108 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00109 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
2 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00110 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00111 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00112 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00113 1942 44110 STORAGE GP DEP 12,350 II INERT STORAGE STORAGE BUILDING NOT USED N
00114 1942 44110 STORAGE GP DEP 30,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00115 1942 21407 ARNG VEH MAINT 18,120 II INERT STORAGE VEHICLE MAINTENANCE ORNG VEHICLE MAINTENANCE C
00116 1942 61050 ADMIN GEN PURP 14,400 II INERT STORAGE STORAGE BUILDING READY FOR USE, ORNG BARRACKS AND OFFICE C
00117 1942 44110 STORAGE GP DEP 12,350 II INERT STORAGE STORAGE BUILDING NOT USED N
00118 1942 44110 STORAGE GP DEP 12,350 II INERT STORAGE STORAGE BUILDING NOT USED N
00119 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00120 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00121 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00122 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00123 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00124 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00125 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00126 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00127 1942 44110 STORAGE GP DEP 12,350 II INERT STORAGE STORAGE BUILDING NOT USED N
00128 1942 44110 STORAGE GP DEP 12,350 II INERT STORAGE STORAGE BUILDING NOT USED N
00129 1942 44110 STORAGE GP DEP 12,000 II INERT STORAGE STORAGE BUILDING NOT USED N
00130 1942 21445 T/A PTS STR DEP 18,120 II INERT STORAGE STORAGE BUILDING NOT USED N
00131 1942 21410 VEH MAINT SHOP 18,120 II INERT STORAGE VEHICLE MAINTENANCE ORNG VEHICLE MAINTENANCE C
00133 1942 89141 WTR SUP/TRT BLD 455 II INERT STORAGE UTILITY BUILDING WATER TREATMENT BUILDING B
00135 1948 89141 WTR SUP/TRT BLD 433 II INERT STORAGE UTILITY BUILDING WATER PUMPING STATION B
00137 1956 44220 STORAGE GP INST 158 II INERT STORAGE STORAGE BUILDING NOT USED I
00154 1968 73075 SEP TOIL/SHOWER 252 II INERT STORAGE REST ROOM REST ROOM B
00155 1968 73075 SEP TOIL/SHOWER 252 II INERT STORAGE UTILITY BUILDING WATER TREATMENT BLDG B
00160 1952 89141 WTR SUP/TRT BLD 354 II INERT STORAGE UTILITY BUILDING WATER TREATMENT BUILDING B
00161 1952 89141 WTR SUP/TRT BLD 272 II INERT STORAGE UTILITY BUILDING CHLORINE TREATMENT BUILDING B
00200 1942 44110 STORAGE GP DEP 86,400 II INERT STORAGE STORAGE BUILDING RV STORAGE, NORTH SIDE C
00201 1942 21410 VEH MAINT SHOP 86,400 II INERT STORAGE VEHICLE MAINTENANCE WGI VEHICLE MAINTENANCE, STORAGE B
00202 1942 44110 STORAGE GP DEP 86,400 II INERT STORAGE WAREHOUSE NOT USED N
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
3 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
HAZARDOUS WASTE STORAGE, MWR RV
00203 1942 44228 HAZ MAT STR INS 86,400 II INERT STORAGE STORAGE BUILDING STORAGE B
00204 1942 44110 STORAGE GP DEP 86,400 II INERT STORAGE STORAGE BUILDING NOT USED N
00205 1942 44110 STORAGE GP DEP 86,400 II INERT STORAGE STORAGE BUILDING NOT USED, ON BRAC MAP AS USE N
00208 1959 74060 BREAK/LUNCH RM 725 II INERT STORAGE REST ROOM REST ROOM AND OFFICE EAST OF 201 B
00211 1985 14113 ACCESS CNT FAC 256 II INERT STORAGE FIRING RANGE OFFICE UNKNOWN ENTITY (FIRING RANGE FACILITY) B
00328 1953 44228 HAZ MAT STR INS 168 III IMHOFF UTILITY BUILDING CHLORINE STORAGE AT IMHOFF B
00346 1941 14180 SCALE HOUSE 796 III SW PATROL ROAD SCALE HOUSE RR SCALE HOUSE
00401 1941 42183 GP MAGAZINE DEP 11,227 VI THE STANDARDS STORAGE BUILDING WGI STORAGE B
00402 1941 42183 GP MAGAZINE DEP 11,227 VI THE STANDARDS STORAGE BUILDING WGI STORAGE B
00403 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING WGI STORAGE B
00404 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING WGI STORAGE B
00405 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING WGI STORAGE B
00406 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING WGI STORAGE B
00407 1941 42183 GP MAGAZINE DEP 11,227 VI THE STANDARDS STORAGE BUILDING WGI STORAGE B
00408 1941 42183 GP MAGAZINE DEP 11,227 VI THE STANDARDS STORAGE BUILDING WGI STORAGE B
00409 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING WGI STORAGE B
00410 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING WGI STORAGE B
00411 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING WGI STORAGE B
00412 1941 42183 GP MAGAZINE DEP 11,227 VI THE STANDARDS STORAGE BUILDING WATER TREATMENT STORAGE B
00413 1941 42183 GP MAGAZINE DEP 11,227 VI THE STANDARDS STORAGE BUILDING WATER TREATMENT STORAGE B
00414 1941 42183 GP MAGAZINE DEP 11,227 VII THE STANDARDS STORAGE BUILDING PUBLIC WORKS STORAGE B
00415 1942 21612 AMMO SURV DEP 4,640 VI AMMO WORKSHOP AMMO SURVELLIANCE BLDG NOT USED N
00416 1942 89121 HEAT PLT BLDG 240 VI AMMO WORKSHOP HEAT PLANT NOT USED N
00417 1953 21610 AMMO RENO DEPOT 11,766 VI AMMO WORKSHOP AMMO RENOVATION BLDG NOT USED N
00418 1952 73075 SEP TOIL/SHOWER 308 VI AMMO WORKSHOP REST ROOM NOT USED N
00419 1942 73030 LAUNDRY/DRY CLN 5,548 VI AMMO WORKSHOP LAUNDRY NOT USED N
00420 1953 74060 BREAK/LUNCH RM 2,360 VI AMMO WORKSHOP BREAKROOM NOT USED N
00421 1942 44110 STORAGE GP DEP 864 VII A BLOCK STORAGE BUILDING NOT USED I
00422 1942 44110 STORAGE GP DEP 864 VII C BLOCK STORAGE BUILDING NOT USED I
00423 1942 44110 STORAGE GP DEP 864 VII D BLOCK STORAGE BUILDING NOT USED I
00424 1942 44110 STORAGE GP DEP 864 VII E BLOCK STORAGE BUILDING NOT USED I
00425 1942 44110 STORAGE GP DEP 864 V G BLOCK STORAGE BUILDING NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
4 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00426 1942 44110 STORAGE GP DEP 864 III H BLOCK STORAGE BUILDING NOT USED I
00427 1942 44110 STORAGE GP DEP 864 V J BLOCK STORAGE BUILDING NOT USED I
00431 1953 21610 AMMO RENO DEPOT 10,824 VII AMMO WORKSHOP AMMO RENOVATION BLDG NOT USED N
00433 1942 89121 HEAT PLT BLDG 1,860 VII AMMO WORKSHOP HEAT PLANT NOT USED N
00434 1953 42104 EXP TRANS DEPOT 10,824 VII AMMO WORKSHOP AMMO RENOVATION BLDG NOT USED N
00442 1942 42150 SMKLESS PDR DEP 70 V J BLOCK BLACK POWDER STORAGE
00447 1941 13160 XMITTER BLDG 544 V AMMO WORKSHOP UTILITY BUILDING TRANSFORMER HOUSE #2 B
00449 1972 89111 PWR PLT BLDG 80 V 400 SERIES UTILITY BUILDING
00450 1984 74080 SELF STOR RENT 18,000 V 400 SERIES STORAGE BUILDING MWR RENTAL STORAGE B
00455 1962 89141 WTR SUP/TRT BLD 64 III I BLOCK UTILITY BUILDING NOT USED B
00457 1962 14113 ACCESS CNT FAC 600 III I BLOCK ENTRY CONTROL FACILITY NOT USED I
00478 1954 89141 WTR SUP/TRT BLD 128 V AMMO WORKSHOP UTILITY BUILDING NOT USED N
00482 1953 42235 READY MAG INST 100 V 400 SERIES EXPLOSIVE STORAGE NOT USED N
00483 1953 42235 READY MAG INST 100 V 400 SERIES EXPLOSIVE STORAGE NOT USED N
00484 1953 21610 AMMO RENO DEPOT 100 V AMMO WORKSHOP AMMO RENOVATION BLDG NOT USED N
00485 1953 42235 READY MAG INST 100 V AMMO WORKSHOP EXPLOSIVE STORAGE NOT USED N
00486 1954 89121 HEAT PLT BLDG 2,475 V AMMO WORKSHOP HEAT PLANT NOT USED N
00488 1953 42235 READY MAG INST 100 V AMMO WORKSHOP EXPLOSIVE STORAGE
00489 1963 21642 COMP CLEAN DEP 3,906 V AMMO WORKSHOP NOT USED N
00490 1953 42235 READY MAG INST 100 V 400 SERIES EXPLOSIVE STORAGE
00493 1953 21610 AMMO RENO DEPOT 9,456 V AMMO WORKSHOP AMMO RENOVATION BLDG NOT USED N
00494 1953 44240 FLAM MAT STR IN 100 V AMMO WORKSHOP STORAGE BUILDING NOT USED N
00495 1953 89123 COMPRESS AIR PT 256 V AMMO WORKSHOP AIR PLANT N
00605 1950 44220 STORAGE GP INST 539 III RENOVATION AREA STORAGE BUILDING NOT USED I
00606 1952 73075 SEP TOIL/SHOWER 72 III RENOVATION AREA REST ROOM NOT USED N
00608 1955 21610 AMMO RENO DEPOT 18,400 III RENOVATION AREA AMMO RENOVATION BLDG NOT USED N
00609 1955 42215 HE MAG INST 126 III RENOVATION AREA EXPLOSIVE STORAGE NOT USED N
00610 1955 21610 AMMO RENO DEPOT 513 III RENOVATION AREA AMMO RENOVATION BLDG NOT USED N
00611 1955 44240 FLAM MAT STR IN 400 III RENOVATION AREA STORAGE BUILDING NOT USED N
00612 1955 89121 HEAT PLT BLDG 624 III RENOVATION AREA HEAT PLANT NOT USED I,C,N
00613 1955 89141 WTR SUP/TRT BLD 286 III RENOVATION AREA UTILITY BUILDING WELL HOUSE #6 OR 7 B
00614 1958 21610 AMMO RENO DEPOT 16,500 III RENOVATION AREA AMMO RENOVATION BLDG NOT USED N
00615 1958 21610 AMMO RENO DEPOT 703 III RENOVATION AREA AMMO RENOVATION BLDG NOT USED N
00616 1958 42215 HE MAG INST 143 III RENOVATION AREA EXPLOSIVE STORAGE NOT USED N
00617 1958 89121 HEAT PLT BLDG 355 III RENOVATION AREA HEAT PLANT NOT USED N
00619 1959 74060 BREAK/LUNCH RM 1,056 III RENOVATION AREA BREAKROOM NOT USED N
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
5 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00621 1961 89141 WTR SUP/TRT BLD 392 III RENOVATION AREA UTILITY BUILDING CHLORINE TREATMENT BUILDING B
00622 1961 14178 EMP CHG FAC 1,280 I ADA BREAKROOM NOT USED I
00624 1962 14178 EMP CHG FAC 520 I ADA BREAKROOM NOT USED I
00652 1985 89141 WTR SUP/TRT BLD 168 IV K BLOCK UTILITY BUILDING PUMP HOUSE, K BLOCK B
00653 1953 89111 PWR PLT BLDG 192 IV K BLOCK POWER PLANT BLDG STAND-BY GENERATOR, K BLOCK B
00654 1985 21610 AMMO RENO DEPOT 6,000 IV K BLOCK AMMO RENOVATION BLDG AMMUNITION RENOVATION, K BLOCK B
00655 1997 73030 LAUNDRY/DRY CLN 21,240 IV K BLOCK LAUNDRY PROTECTIIVE EQUIPMENT FACILITY, K BLOCK B
00656 1980 31010 CHEMISTRY LAB 2,353 IV K BLOCK LABORATORY CHEMICAL LABORATORY B
VEHICLE STORAGE STRUCTURE, (OLD MUSTARD
00659 1978 42181 AMMO STRHS DEP 46,800 IV K BLOCK STORAGE BUILDING SHED) B
ENTRY CONTROL FACILITY, VEHICLE STORAGE,
00660 1979 14113 ACCESS CNT FAC 3,599 IV K BLOCK ENTRY CONTROL FACILITY SMALL ARMS STORAGE, GENERATOR, K BLOCK B
00665 1999 89144 WTR SUP BLD NP 260 IV K BLOCK UTILITY BUILDING FIRE SUPRESSION WATER, K BLOCK B
00667 2000 13120 COMMO CTR 247 IV K BLOCK UTILITY BUILDING TELEPHONE UTILITIES, K BLOCK B
00697 1979 14113 ACCESS CNT FAC 169 IV K BLOCK ENTRY CONTROL FACILITY ENTRY CONTROL FACILITY, K BLOCK? B
00701 1943 73050 AIR/FALOUT SHEL 51 VII A BLOCK SAFETY SHELTER NOT USED I
00702 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00703 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00704 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00705 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00706 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00707 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00708 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00709 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
00710 1943 14181 SAFETY SHELTER 51 VII A BLOCK SAFETY SHELTER NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
6 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00711 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00712 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00713 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00714 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00715 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00716 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00717 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00718 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00719 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00720 1943 14181 SAFETY SHELTER 51 VII B BLOCK SAFETY SHELTER NOT USED I
00721 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00722 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00723 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00724 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00725 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00726 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00727 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00728 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
7 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00729 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00730 1943 14181 SAFETY SHELTER 51 VII C BLOCK SAFETY SHELTER NOT USED I
00731 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00732 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00733 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00734 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00735 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00736 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00737 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00738 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00739 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00740 1943 14181 SAFETY SHELTER 51 VII D BLOCK SAFETY SHELTER NOT USED I
00741 1943 14181 SAFETY SHELTER 51 VII E BLOCK SAFETY SHELTER NOT USED I
00742 1943 14181 SAFETY SHELTER 51 VII E BLOCK SAFETY SHELTER NOT USED I
00743 1943 14181 SAFETY SHELTER 51 VII E BLOCK SAFETY SHELTER NOT USED I
00744 1943 14181 SAFETY SHELTER 51 VII E BLOCK SAFETY SHELTER NOT USED I
00745 1943 14181 SAFETY SHELTER 51 VII E BLOCK SAFETY SHELTER NOT USED I
00746 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
8 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00747 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00748 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00749 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00750 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00751 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00752 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00753 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00754 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00755 1943 14181 SAFETY SHELTER 51 VI F BLOCK SAFETY SHELTER NOT USED I
00756 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00757 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00758 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00759 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00760 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00761 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00762 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00763 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
00764 1943 14181 SAFETY SHELTER 51 V G BLOCK SAFETY SHELTER NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
9 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00765 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00766 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00767 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00768 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00769 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00770 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00771 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00772 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00773 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00774 1943 14181 SAFETY SHELTER 51 III H BLOCK SAFETY SHELTER NOT USED I
00775 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
00776 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
00777 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
00778 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
00779 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
00780 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
00781 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
00782 1943 14181 SAFETY SHELTER 51 III I BLOCK SAFETY SHELTER NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
10 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00783 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00784 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00785 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00786 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00787 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00788 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00789 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00790 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00791 1943 14181 SAFETY SHELTER 51 V J BLOCK SAFETY SHELTER NOT USED I
00792 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00793 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00794 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00795 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00796 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00797 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00798 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00799 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
00800 1943 14181 SAFETY SHELTER 51 IV K BLOCK SAFETY SHELTER NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
11 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00801 1941 42104 EXP TRANS DEPOT 179 VII A BLOCK LOADING PIER NOT USED I
00802 1944 42104 EXP TRANS DEPOT 179 VII A BLOCK LOADING PIER NOT USED I
00803 1943 42104 EXP TRANS DEPOT 179 VII A BLOCK LOADING PIER NOT USED I
00804 1941 42104 EXP TRANS DEPOT 179 VII A BLOCK LOADING PIER NOT USED I
00805 1941 42104 EXP TRANS DEPOT 179 VII B BLOCK LOADING PIER NOT USED I
00806 1943 42104 EXP TRANS DEPOT 179 VII B BLOCK LOADING PIER NOT USED I
00807 1944 42104 EXP TRANS DEPOT 179 VII B BLOCK LOADING PIER NOT USED I
00808 1943 42104 EXP TRANS DEPOT 179 VII C BLOCK LOADING PIER NOT USED I
00809 1941 42104 EXP TRANS DEPOT 179 VII C BLOCK LOADING PIER NOT USED I
00810 1944 42104 EXP TRANS DEPOT 179 VII C BLOCK LOADING PIER NOT USED I
00811 1941 42104 EXP TRANS DEPOT 179 VII D BLOCK LOADING PIER NOT USED I
00812 1943 42104 EXP TRANS DEPOT 179 VII D BLOCK LOADING PIER NOT USED I
00813 1944 42104 EXP TRANS DEPOT 179 VII D BLOCK LOADING PIER NOT USED I
00814 1943 42104 EXP TRANS DEPOT 179 VII E BLOCK LOADING PIER NOT USED I
00815 1941 42104 EXP TRANS DEPOT 179 VII E BLOCK LOADING PIER NOT USED I
00816 1941 42104 EXP TRANS DEPOT 179 VI F BLOCK LOADING PIER NOT USED I
00817 1944 42104 EXP TRANS DEPOT 179 VI F BLOCK LOADING PIER NOT USED I
00818 1944 42104 EXP TRANS DEPOT 179 III H BLOCK LOADING PIER NOT USED I
00819 1943 42104 EXP TRANS DEPOT 179 VI F BLOCK LOADING PIER NOT USED I
00820 1943 42104 EXP TRANS DEPOT 179 III H BLOCK LOADING PIER NOT USED I
00821 1941 42104 EXP TRANS DEPOT 179 VI F BLOCK LOADING PIER NOT USED I
00822 1941 42104 EXP TRANS DEPOT 179 III H BLOCK LOADING PIER NOT USED I
00823 1944 42104 EXP TRANS DEPOT 179 III H BLOCK LOADING PIER NOT USED I
00824 1941 42104 EXP TRANS DEPOT 179 V G BLOCK LOADING PIER NOT USED I
00825 1944 42104 EXP TRANS DEPOT 179 V G BLOCK LOADING PIER NOT USED I
00826 1943 42104 EXP TRANS DEPOT 179 V G BLOCK LOADING PIER NOT USED I
00827 1941 42104 EXP TRANS DEPOT 179 III I BLOCK LOADING PIER NOT USED I
00828 1941 42104 EXP TRANS DEPOT 179 V G BLOCK LOADING PIER NOT USED I
00829 1943 42104 EXP TRANS DEPOT 179 III I BLOCK LOADING PIER NOT USED I
00830 1944 42104 EXP TRANS DEPOT 179 III I BLOCK LOADING PIER NOT USED I
00831 1944 42104 EXP TRANS DEPOT 179 V J BLOCK LOADING PIER NOT USED I
00832 1941 42104 EXP TRANS DEPOT 179 V J BLOCK LOADING PIER NOT USED I
00833 1943 42104 EXP TRANS DEPOT 179 V J BLOCK LOADING PIER NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
12 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00834 1941 42104 EXP TRANS DEPOT 179 V J BLOCK LOADING PIER NOT USED I
00835 1941 42104 EXP TRANS DEPOT 179 IV K BLOCK LOADING PIER OFF-LOADING PIERS I
00836 1943 42104 EXP TRANS DEPOT 179 IV K BLOCK LOADING PIER OFF-LOADING PIERS I
00837 1944 42104 EXP TRANS DEPOT 179 IV K BLOCK LOADING PIER OFF-LOADING PIERS I
00838 1941 42104 EXP TRANS DEPOT 179 IV K BLOCK LOADING PIER OFF-LOADING PIERS I
00901 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00902 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00903 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00904 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00905 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00906 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00907 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00908 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00909 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00910 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00911 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00912 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00913 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00914 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00915 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CALIBRATION LAB STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
13 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00916 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00917 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00918 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00919 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00920 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00921 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00922 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00923 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00924 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00925 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00926 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO OREGON STATE HEALTH DEPT STORAGE B
00927 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00928 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO OREGON STATE HEALTH DEPT STORAGE B
00929 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00930 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
00931 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00932 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00933 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SERVICES DIVISION STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
14 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00934 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO PUBLIC WORKS DIVISION B
00935 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00936 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00937 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO UMCD FIRE DEPARTMENT STORAGE B
00938 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO COUNTY DISASTER CONTROL STORAGE B
00939 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00940 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00941 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00942 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00943 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00944 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00945 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00946 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO PUBLIC WORKS DIVISION B
00947 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00948 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00949 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00950 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00951 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO UMATILLA FIRE DEPARTMENT B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
15 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00952 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00953 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00954 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00955 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00956 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00957 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00958 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00959 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00960 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00961 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00962 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00963 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00964 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SERVICES DIVISION STORAGE B
00965 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00966 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00967 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00968 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00969 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
16 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00970 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00971 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00972 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00973 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00974 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00975 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00976 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00977 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00978 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO AMERICAN RED CROSS STORAGE B
00979 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00980 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL PROTECTIVE EQUIPMENT B
00981 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00982 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SECURITY'S STORAGE B
00983 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00984 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00985 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00986 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00987 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
17 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
00988 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO OPERATIONS CENTER B
00989 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00990 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00991 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00992 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00993 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
00994 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00995 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00996 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00997 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
00998 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO ? B
00999 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO SETH STORAGE B
01000 1941 42180 IGLOO STR DEPOT 2,147 VII A BLOCK IGLOO NOT USED B
01001 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01002 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01003 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01004 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01005 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
18 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01006 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01007 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01008 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01009 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01010 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO DRMO STORAGE BUILDING B
01011 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01012 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01013 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01015 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01016 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01017 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01018 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01019 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01020 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01021 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01022 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01023 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01024 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
19 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01025 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01026 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01027 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01028 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01029 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01030 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01031 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01032 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01033 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01034 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO UMATILLA COUNTY B
01035 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01036 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01037 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01038 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01039 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01040 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01041 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01042 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
20 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01043 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01044 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01045 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01046 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01047 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01048 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01049 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01050 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01051 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01052 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01053 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01054 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01055 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01056 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01057 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01058 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01059 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01060 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
21 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01061 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01062 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01063 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01064 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01065 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01066 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01067 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01068 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01069 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01070 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01071 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01072 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01073 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01074 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01075 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01076 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01077 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01078 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
22 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01079 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01080 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01081 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01082 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01083 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01084 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01085 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01086 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01087 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01088 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01089 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01090 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01091 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01092 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01093 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01094 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01095 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01096 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
23 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01097 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01098 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01099 1941 42180 IGLOO STR DEPOT 1,608 VII B BLOCK IGLOO NOT USED I
01100 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01101 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01102 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01103 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01104 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01105 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01106 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01107 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01108 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01109 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01110 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01111 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01112 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01113 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01114 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
24 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01115 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01116 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01117 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01118 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01119 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01120 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01121 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01122 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01123 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01124 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01125 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01126 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01127 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01128 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01129 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01130 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01131 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01132 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
25 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01133 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01134 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01135 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01136 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01137 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01138 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01139 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01140 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01141 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01142 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01143 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01144 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01145 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01146 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01147 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01148 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01149 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01150 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
26 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01151 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01152 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01153 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01154 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01155 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01156 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01157 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01158 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01159 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01160 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01161 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01162 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01163 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01164 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01165 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01166 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01167 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01168 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
27 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01169 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01170 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01171 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01172 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01173 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01174 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01175 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01176 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01177 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01178 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01179 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01180 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01181 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01182 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01183 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01184 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01185 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01186 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
28 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01187 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01188 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01189 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01190 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01191 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01192 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01193 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01194 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01195 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01196 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01197 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01198 1941 42180 IGLOO STR DEPOT 1,608 VII C BLOCK IGLOO NOT USED I
01199 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01200 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01201 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01202 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01203 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01204 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE, SECURITY B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
29 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01205 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01206 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01207 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01208 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01209 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01210 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01211 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01212 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01213 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01214 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01215 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01216 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01217 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01218 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01219 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01220 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01221 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01222 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
30 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01223 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01224 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01225 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01226 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01227 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01228 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01229 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SMALL ARMS STORAGE B
01230 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SWRI STORAGE B
01231 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO PMCSD STORAGE B
01232 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO SWRI STORAGE B
01233 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
01234 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
01235 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
01236 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
01237 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
01238 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
01239 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
01240 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO WGI STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
31 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01241 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01242 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01243 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01244 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01245 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01246 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01247 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01248 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01249 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01250 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01251 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01252 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01253 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01254 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01255 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01256 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01257 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01258 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
32 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01259 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01260 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01261 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01262 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01263 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01264 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01265 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01266 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01267 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01268 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01269 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01270 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01271 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01272 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01273 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01274 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01275 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01276 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
33 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01277 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01278 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01279 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01280 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01281 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01282 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01283 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01284 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01285 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01286 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01287 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01288 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01289 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01290 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01291 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01292 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01293 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01294 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
34 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01295 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01296 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01297 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01298 1941 42180 IGLOO STR DEPOT 1,608 VII D BLOCK IGLOO NOT USED I
01299 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01300 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01301 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01302 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01303 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01304 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01305 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01306 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01307 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01308 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01309 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01310 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01311 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01312 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
35 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01313 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01314 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01315 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01316 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01317 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01318 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01319 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01320 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01321 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01322 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01323 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01324 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01325 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01326 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01327 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01328 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01329 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01330 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
36 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01331 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01332 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01333 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01334 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01335 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01336 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01337 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01338 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01339 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01340 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01341 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01342 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01343 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01344 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01345 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01346 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01347 1941 42180 IGLOO STR DEPOT 1,608 VII E BLOCK IGLOO NOT USED I
01348 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
37 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01349 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01350 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01351 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01352 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01353 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01354 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01355 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01356 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01357 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01358 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01359 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01360 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01361 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01362 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01363 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
01364 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01365 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01366 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
38 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01367 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01368 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01369 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01370 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01371 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01372 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01373 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01374 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01375 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01376 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01377 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01378 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01379 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01380 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01381 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01382 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01383 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01384 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
39 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01385 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01386 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01387 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01388 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01389 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01390 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01391 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01392 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01393 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01394 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01395 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01396 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01397 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01398 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01399 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01400 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01401 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01402 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
40 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01403 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01404 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01405 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01406 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01407 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01408 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01409 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01410 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01411 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01412 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01413 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01414 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01415 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01416 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01417 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01418 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01419 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01420 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
41 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01421 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01422 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01423 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01424 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01425 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01426 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01427 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01428 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01429 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01430 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01431 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01432 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01433 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01434 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01435 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01436 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01437 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01438 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
42 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01439 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01440 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01441 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01442 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01443 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01444 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01445 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01446 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO NOT USED I
01447 1941 42180 IGLOO STR DEPOT 1,608 VI F BLOCK IGLOO SHOW AND TELL IGLOO B
01448 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01449 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01450 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01451 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01452 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01453 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01454 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01455 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01456 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
43 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01457 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01458 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01459 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01460 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01461 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01462 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01463 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01464 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01465 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01466 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01467 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01468 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01469 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01470 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01471 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01472 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01473 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01474 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
44 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01475 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01476 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01477 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01478 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01479 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01480 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01481 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01482 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01483 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01484 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01485 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01486 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01487 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01488 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01489 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01490 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01491 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01492 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
45 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01493 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01494 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01495 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01496 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01497 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01498 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01499 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01500 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01501 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01502 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01503 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01504 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01505 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01506 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01507 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01508 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01509 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01510 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
46 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01511 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01512 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01513 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01514 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01515 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01516 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01517 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01518 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01519 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01520 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01521 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01522 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01523 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01524 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01525 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01526 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01527 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01528 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
47 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01529 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO SUPPORT AND INSPECTION? B
01530 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01531 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01532 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01533 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01534 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01535 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01536 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01537 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01538 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01539 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01540 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01541 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01542 1941 42180 IGLOO STR DEPOT 1,608 V G BLOCK IGLOO NOT USED I
01543 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO OREGON NATIONAL GUARD B
01544 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO OREGON NATIONAL GUARD B
01545 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO OREGON NATIONAL GUARD B
01546 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
48 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01547 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01548 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01549 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01550 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01551 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01552 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01553 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01554 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01555 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01556 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01557 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01558 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01559 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01560 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01561 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01562 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01563 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01564 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
49 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01565 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01566 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01567 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01568 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01569 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01570 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01571 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01572 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01573 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01574 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01575 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01576 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01577 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01578 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01579 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01580 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01581 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01582 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
50 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01583 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01584 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01585 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01586 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01587 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01588 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01589 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01590 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01591 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01592 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01593 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01594 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01595 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01596 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01597 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01598 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01599 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01600 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
51 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01601 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01602 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01603 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01604 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01605 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01606 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01607 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01608 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01609 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01610 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01611 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01612 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01613 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01614 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01615 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01616 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01617 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01618 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
52 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01619 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01620 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01621 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01622 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01623 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01624 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01625 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01626 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01627 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01628 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01629 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01630 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01631 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01632 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01633 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01634 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01635 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01636 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
53 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01637 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01638 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01639 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01640 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01641 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01642 1941 42180 IGLOO STR DEPOT 1,608 III H BLOCK IGLOO NOT USED I
01643 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01644 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01645 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01646 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01647 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01648 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01649 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01650 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01651 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01652 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01653 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01654 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
54 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01655 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01656 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01657 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01658 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01659 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01660 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01661 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01662 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01663 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01664 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01665 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01666 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01667 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01668 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01669 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01670 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01671 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01672 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
55 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01673 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01674 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01675 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01676 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01677 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01678 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01679 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01680 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01681 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01682 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01683 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01684 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01685 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01686 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01687 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01688 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01689 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01690 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
56 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01691 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01692 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01693 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01694 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01695 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01696 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01697 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01698 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01699 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01700 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01701 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01702 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01703 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01704 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01705 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01706 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01707 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01708 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
57 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01709 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01710 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01711 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01712 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01713 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01714 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01715 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01716 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01717 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01718 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01719 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01720 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01721 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01722 1941 42180 IGLOO STR DEPOT 2,147 III I BLOCK IGLOO NOT USED I
01723 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01724 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01725 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01726 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
58 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01727 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01728 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01729 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01730 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01731 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01732 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE, 1X GB B
01733 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01734 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01735 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01736 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01737 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01738 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01739 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01740 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01741 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01742 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE, 1X VX B
01743 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE, 1X GB B
01744 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
59 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01745 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01746 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01747 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE, 1X GB B
01748 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01749 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01750 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01751 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01752 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01753 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01754 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01755 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01756 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01757 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01758 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01759 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01760 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01761 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01762 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
60 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01763 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01764 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01765 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01766 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01767 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01768 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01769 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01770 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01771 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01772 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01773 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01774 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01775 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01776 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01777 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01778 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01779 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01780 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
61 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01781 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01782 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO WGI AGENT RELATED WASTE B
01783 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO 3X STORAGE B
01784 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO 3X STORAGE B
01785 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO CIVIL DEFENSE EVACUATION SHELTER B
01786 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO 3X STORAGE B
01787 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO 3X STORAGE B
01788 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO 3X STORAGE B
01789 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO NOT USED B
01790 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
01791 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO NOT USED B
01792 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
01793 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO NOT USED B
01794 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO NOT USED B
01795 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO CHEMICAL OPERATIONS STORAGE B
01796 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO NOT USED B
01797 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01798 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
62 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01799 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01800 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01801 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01802 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01803 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01804 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01805 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01806 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01807 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01808 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01809 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01810 1941 42180 IGLOO STR DEPOT 2,147 V J BLOCK IGLOO UMCD AGENT RELATED WASTE STORAGE B
01811 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01812 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01813 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01814 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01815 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01816 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
63 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01817 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01818 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01819 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01820 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01821 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01822 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01823 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01824 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01825 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01826 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01827 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01828 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01829 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01830 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01831 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01832 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01833 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01834 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
64 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01835 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01836 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01837 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01838 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01839 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01840 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01841 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01842 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01843 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01844 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01845 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01846 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01847 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01848 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01849 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01850 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01851 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01852 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
65 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01853 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01854 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01855 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01856 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01857 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01858 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01859 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01860 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01861 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01862 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01863 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01864 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01865 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01866 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01867 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01868 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01869 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01870 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
66 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01871 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01872 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01873 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01874 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01875 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01876 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01877 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01878 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01879 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01880 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01881 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01882 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01883 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01884 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01885 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01886 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01887 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01888 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
67 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
01889 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01890 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01891 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01892 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01893 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01894 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01895 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01896 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01897 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01898 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01899 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01900 1941 42180 IGLOO STR DEPOT 2,147 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01901 1942 42180 IGLOO STR DEPOT 1,104 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
01902 1942 42180 IGLOO STR DEPOT 1,104 IV K BLOCK IGLOO CHEMICAL AGENT STORAGE B
ADA I Area I DEMOLITION AREA NOT USED N
Small
Areas
Test RANGE FOR SMALL ARMS
Range I Area I QUALIFYING FIRING RANGE B
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
68 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
FACNO YR_BLT CATCD CATCD_DESCR SQFT Area SITE AREA Description Current Use CC
Ground
water
Monitori
ng
facility V Area 5 MONITORING FACILITY NOT USED A
I-82
Easeme
nt NA NA NOT USED NA
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
69 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SURETY CLOSURE Positive Detected
SURETY CLOSURE Detected
SURETY CLOSURE Detected
Available after mustard, but facility function needed through closure SURETY SURETY Detected
Structural Survey Scheduled. Facility has vehicle wash station south of facility. Wash water runs onto the ground. SURETY CLOSURE Detected
SURETY CLOSURE Detected
SURETY CLOSURE Detected
SURETY CLOSURE Detected
SURETY CLOSURE Detected
Structural Survey Scheduled SURETY SURETY Detected
Structural Survey Scheduled SURETY CLOSURE Detected
SURETY NOT NEEDED Unknown
SURETY UTILITY Detected
Facility may not meet current building codes for housing assistance SURETY NOT NEEDED Detected
Facility may not meet current building codes for housing assistance SURETY NOT NEEDED Detected
SURETY CLOSURE Detected
Structural Survey Scheduled SURETY SURETY Detected
SURETY SURETY Detected
SURETY SURETY Unknown
SURETY CLOSURE Detected
SURETY UTILITY Detected
SURETY UTILITY Detected
SURETY CLOSURE Detected
SURETY CLOSURE Unknown
SURETY CLOSURE Detected
SURETY SURETY Unknown
CLOSURE,
SURETY ORNG Detected
SURETY CLOSURE Detected
SURETY CLOSURE Detected
SURETY SURETY Detected
Facility may not meet current building codes for housing assistance SURETY NOT NEEDED Detected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
70 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Facility may not meet current building codes for housing assistance SURETY NOT NEEDED Detected
Facility may not meet current building codes for housing assistance SURETY SURETY Detected
Vehicle is stored inside to keep warm during the winter. SURETY UTILITY Detected
SURETY SURETY Detected
SURETY CLOSURE Unknown
SURETY SURETY Unknown
SURETY NOT NEEDED Unknown
Facility may not meet current building codes for housing assistance SURETY NOT NEEDED Detected
USED BY
Facility may not meet current building codes for housing assistance SURETY ORNG Detected
SURETY SURETY Detected
SURETY CLOSURE Detected
SURETY VX Unknown
SURETY CLOSURE Unknown
SURETY CLOSURE Unknown
SURETY SURETY Unknown
Facility is structurally unsound SURETY NOT NEEDED Unknown
SURETY NOT NEEDED Unknown
SURETY SURETY Unknown
SURETY NOT NEEDED Unknown
SURETY NOT NEEDED Unknown
SURETY CLOSURE Unknown
SURETY NOT NEEDED Detected
SURETY CLOSURE Detected
SURETY CLOSURE Unknown
SURETY NOT NEEDED Unknown
Facility was split into two sections and is used for storage north of Bldg.17. SURETY SURETY Unknown
Facility was split into two sections and is used for storage north of Bldg.17. SURETY SURETY Unknown
Block Construction, biological hazard VX NOT NEEDED Detected
BRAC Map shows building in use but there is nothing in the facility. Wood construction, aluminum siding, holes in roof, wooden dock breaking VX NOT NEEDED Detected
Aluminum siding, VX NOT NEEDED Detected
Wooden structure, concrete dock breaking, biological hazard VX NOT NEEDED Detected
Holes in roof, dock cracking, siding off VX NOT NEEDED Detected
Holes in roof, siding off, siding off VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
71 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Not Detected
USED BY
VX ORNG Detected
USED BY
VX ORNG Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Not Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Not Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Detected
Similar to 104, 105 VX NOT NEEDED Not Detected
Similar to 104, 105 VX NOT NEEDED Detected
USED BY
VX ORNG Detected
VX UTILITY Detected
VX UTILITY Detected
VX NOT NEEDED Not Detected
VX CLOSURE Not Detected
VX UTILITY Not Detected
VX UTILITY Not Detected
VX UTILITY Detected
VX NOT NEEDED Detected
VX CLOSURE Detected
VX NOT NEEDED Detected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
72 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
VX CLOSURE Detected
VX NOT NEEDED Not Detected
BRAC Map shows building in use but there is nothing in the facility. VX NOT NEEDED Detected
USED BY WGI FOR RECEIVING OFFICE VX CLOSURE Detected
VX CLOSURE Not Detected
USED BY
VX ORNG Not Detected
VX NOT NEEDED Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
VX CLOSURE Detected
AFTER
VX CLOSURE Detected
AFTER
VX CLOSURE Detected
VX CLOSURE Detected
BLOCK CONSTRUCTION, BIOLOGICAL HAZARD VX NOT NEEDED Detected
BRICK CONSTRUCTION, CONTAINS BOILER VX NOT NEEDED Detected
BRICK AND CONCRETE CONSTRUCTION, BIOLOGICAL HAZARD VX NOT NEEDED Detected
METAL CONSTRUCTION, BOILER ROOM VX NOT NEEDED Detected
Facility is structural unsound per Public Works director VX NOT NEEDED Detected
Facility is structural unsound per Public Works director VX NOT NEEDED Detected
VX NOT NEEDED Detected
MUSTARD NOT NEEDED Detected
MUSTARD NOT NEEDED Detected
MUSTARD NOT NEEDED Not Detected
MUSTARD NOT NEEDED Detected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
73 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
VX NOT NEEDED Not Detected
SURETY NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
Detected
VX CLOSURE Detected
NOT NEEDED Not Detected
VX SURETY Not Tested
VX NOT NEEDED Not Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
SUPPORT BLDG FOR 417 VX NOT NEEDED Not Detected
SUPPORT BLDG FOR 417 VX NOT NEEDED Not Detected
SUPPORT BLDG FOR 417 VX NOT NEEDED Not Detected
SUPPORT BLDG FOR 417 VX NOT NEEDED Not Detected
VX NOT NEEDED Detected
Not Detected
VX NOT NEEDED Detected
Not Detected
CONCRETE BUILDING WITH METAL SIDING, BIOLOGICAL HAZARD VX NOT NEEDED Detected
METAL CONSTRUCTION VX NOT NEEDED Not Detected
BIOLOGICAL HAZARD VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX UTILITY Not Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
VX NOT NEEDED Not Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
74 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
VX UTILITY Detected
VX NOT NEEDED Detected
VX NOT NEEDED Detected
CLOSURE UTILITY Not Detected
CLOSURE CLOSURE Not Detected
CLOSURE CLOSURE Detected
CLOSURE CLOSURE Detected
CLOSURE SURETY Detected
CLOSURE CLOSURE Not Tested
CLOSURE SURETY Detected
CLOSURE SURETY Not Tested
CLOSURE UTILITY Not Tested
CLOSURE SURETY Detected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
75 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
76 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
VX NOT NEEDED Not expected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
77 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
MUSTARD NOT NEEDED Not expected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
78 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
VX NOT NEEDED Not expected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
79 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
SECONDARY
WASTE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
CLOSURE NOT NEEDED Not expected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
80 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. VX NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. MUSTARD NOT NEEDED Not Detected
SECONDARY
Piers used to off-load munitions from railcars. WASTE NOT NEEDED Not Detected
SECONDARY
Piers used to off-load munitions from railcars. WASTE NOT NEEDED Not Detected
SECONDARY
Piers used to off-load munitions from railcars. WASTE NOT NEEDED Not Detected
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
81 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SECONDARY
Piers used to off-load munitions from railcars. WASTE NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. CLOSURE NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. CLOSURE NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. CLOSURE NOT NEEDED Not Detected
Piers used to off-load munitions from railcars. CLOSURE NOT NEEDED Not Detected
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
82 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
VX CLOSURE door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX TENANT USE door
Detected, in
VX SURETY door
Detected, in
VX TENANT USE door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
Contains emergency supplies from the 1960s. No one claims ownership VX NOT NEEDED door
Detected, in
VX CLOSURE door
Detected, in
VX CLOSURE door
Detected, in
VX SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
83 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX CLOSURE door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX CLOSURE door
Detected, in
VX TENANT USE door
Detected, in
VX CLOSURE door
Detected, in
VX TENANT USE door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX CLOSURE door
Detected, in
VX TENANT USE door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
84 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX SURETY door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
85 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX MUSTARD door
Detected, in
VX MUSTARD door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX TENANT USE door
Detected, in
VX SURETY door
Detected, in
VX TENANT USE door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX CLOSURE door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX MUSTARD door
Detected, in
VX MUSTARD door
Detected, in
VX SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
86 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX SURETY door
Detected, in
VX MUSTARD door
Detected, in
VX MUSTARD door
Detected, in
VX MUSTARD door
Detected, in
VX MUSTARD door
Detected, in
VX door
Detected, in
VX MUSTARD door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
87 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
88 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX TENANT USE door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
89 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
90 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
91 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
92 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
93 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
94 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
95 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
96 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
97 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
98 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
99 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD CLOSURE door
Detected, in
MUSTARD TENANT USE door
Detected, in
MUSTARD TENANT USE door
Detected, in
MUSTARD TENANT USE door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
100 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
101 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
102 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED Positive door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
103 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
104 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
105 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
106 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD SURETY door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
107 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
108 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
109 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
110 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
111 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD MUSTARD door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
112 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
113 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
114 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
115 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
116 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
MUSTARD MUSTARD door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
MUSTARD NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
117 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
118 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
119 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
120 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
121 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
122 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
123 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
124 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
125 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
126 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
Detected, in
VX NOT NEEDED door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
127 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
128 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
129 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
130 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE MUSTARD door
SECONDARY Detected, in
WASTE MUSTARD door
SECONDARY Detected, in
WASTE NOT NEEDED door
SECONDARY Detected, in
WASTE MUSTARD door
SECONDARY Detected, in
WASTE MUSTARD door
SECONDARY Detected, in
WASTE MUSTARD door
SECONDARY Detected, in
WASTE NOT NEEDED door
SECONDARY Detected, in
WASTE CLOSURE door
SECONDARY Detected, in
WASTE NOT NEEDED door
SECONDARY Detected, in
WASTE CLOSURE door
SECONDARY Detected, in
WASTE NOT NEEDED door
SECONDARY Detected, in
WASTE NOT NEEDED door
SECONDARY Detected, in
WASTE CLOSURE door
SECONDARY Detected, in
WASTE NOT NEEDED door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
131 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
SECONDARY Detected, in
WASTE SURETY door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
132 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
133 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
134 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
135 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
136 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
Detected, in
CLOSURE MUSTARD door
NOW NOW NA
CLOSURE CLOSURE NA
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
137 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Function
Facility Needed
Notes Available After Through Radon1 Asbestos2
CLOSURE CLOSURE
IMMEDIATELY IMMEDIATELY
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
138 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Not Detected No None Administative Use
No potential None Detected No None Fire station and offices
No potential None Detected No None Utility
No potential None Detected No None Administative Use
VEHICLE MAINTENANCE, OFFICE,
No potential None Detected No Automotive wastes STORAGE
No potential None Not Detected No Petroleum Products GAS STATION
No potential None Detected No None MAINTENANCE SHOP
No potential None Not Detected No Pesticides MAINTENANCE SHOP
No potential None Not Detected No None MAINTENANCE SHOP
No potential None Detected No Automotive wastes VEHICLE STORAGE
No potential None Not Detected No None Administative Use
No potential None Not Detected No None Recommend not using due to condition
No potential None Not Detected No None Utility
No potential None Not Detected No None Administative Use
No potential None Not Tested No None Administative Use
No potential None Detected No None WAREHOUSING
No potential None Not Detected No None Administative Use
No potential None Detected No None WAREHOUSING
No potential None Not Detected No None STORAGE
No potential None Not Detected No ? Recommend not using due to condition
No potential None Not Detected No None Utility
No potential None Not Detected No None Utility
No potential None Not Detected No None SCALES
No potential None Not Detected No Acids, Lead MAINTENANCE SHOP
No potential None Detected No Utility
No potential None Not Detected No None STORAGE
No potential None Detected No ORNG TANK SIMULATOR
No potential None Detected No Administative Use
No potential None Detected No None Administative Use
No potential None 1st Survey No Grease trap wastes Administative Use, Food Service
No potential None Detected No None ADMINISTRATIVE USE
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
139 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None 1st Survey No None ADMINISTRATIVE USE
No potential None Not Detected No Grease trap wastes FOOD SERVICE ESTABLISHMENT
No potential None Not Detected No Utility
No potential None Not Detected No None POOL
No potential None Not Detected No None STORAGE
No potential None Not Detected No None ADMINISTRATIVE USE
No potential None Not Detected No None No practical use
No potential None 1st Survey No None Recommend not using due to condition
No potential None Detected No None Recommend not using due to condition
No potential None Detected No None Administative Use
No potential None 1st Survey No None Administative Use
No potential None Not Tested No None No practical use
No potential None Not Detected No None Administative Use
No potential None Not Detected No Fuel contamination Utility
No potential None Not Detected No None FITNESS CENTER
No potential None Not Detected No Biological wastes Remove facility
No potential None Detected No None STORAGE
No potential None Detected No None STORAGE
No potential None 1st Survey No None STORAGE
No potential None 1st Survey No None STORAGE
No potential None 1st Survey No None STORAGE
No potential None Not Detected No None No practical use
No potential None Not Detected No None STORAGE
No potential None Not Detected No None STORAGE
No potential None Not Detected No None Recommend not using due to condition
No potential None Not Detected No None Recommend not using due to condition
No potential None Not Detected No None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
140 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Automotive wastes Vehicle Maintenance Facility for ORNG
No potential None Detected None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes Automotive wastes Vehicle Maintenance Facility for ORNG
No potential None Not Detected No Fuel contamination UTILITY
No potential None Detected No None UTILITY
No potential None Not Detected Yes None Recommend not using due to condition
No potential None Not Detected No None restroom/Office
No potential None Not Detected No None UTILITY
No potential None Detected No UTILITY
No potential None Detected No UTILITY
No potential None Detected Yes None STORAGE
No potential None Detected No Automotive wastes STORAGE
No potential None Detected Yes None Recommend not using due to condition
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
141 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Not Detected No Hazardous materials STORAGE
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected No ADMINISTRATIVE USE
No potential None Not Detected None Fire range activities
No potential None Not Detected UTILITY
Potential None Not Detected None DETERMINE OPERABILITY
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Not Detected No None STORAGE
Potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes ? Recommend not using due to condition
Potential None Detected Yes None Recommend not using due to condition
Potential None Detected Yes None Recommend not using due to condition
Potential None Detected Yes Laundry wastes Recommend not using due to condition
Potential None Detected Yes None Recommend not using due to condition
Potential None Detected None STORAGE
Potential None Detected None STORAGE
Potential None Detected None STORAGE
Potential None Detected None STORAGE
Potential None Detected None STORAGE
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
142 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Potential None Detected None STORAGE
Potential None Detected None STORAGE
Potential None Detected Yes None Recommend not using due to condition
Potential None Detected Yes ? Recommend not using due to condition
Potential None Detected Yes None Recommend not using due to condition
Potential None Detected Recommend not using due to condition
No potential None Not Detected No None UTILITY
No potential None None
No potential None Not Tested No None STORAGE
No potential None Not Detected None Recommend not using due to condition
No potential None Not Detected None Recommend not using due to condition
No potential None Not Detected None Recommend not using due to condition
Potential None None Recommend not using due to condition
Potential None None Recommend not using due to condition
Potential None Not Detected Yes None Recommend not using due to condition
Potential None Not Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
Potential None None
Potential None Not Tested Yes None Recommend not using due to condition
Potential None None
Potential None Not Detected Yes None Recommend not using due to condition
No potential None Not Detected Yes Flammable materials Recommend not using due to condition
No potential None Detected Yes None
No potential None Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
Potential None Detected Yes None Recommend not using due to condition
Potential None Not Detected Yes None Recommend not using due to condition
Potential None Not Detected Yes None Recommend not using due to condition
No potential None Not Detected Yes Flammable materials Recommend not using due to condition
No potential None Not Detected Yes None Recommend not using due to condition
No potential None Detected Yes None UTILITY
Potential None Not Detected Yes None Recommend not using due to condition
Potential None Not Detected Yes None Recommend not using due to condition
Potential None Not Detected Yes None Recommend not using due to condition
No potential None Not Detected Yes None Recommend not using due to condition
No potential None Detected Yes None Recommend not using due to condition
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
143 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Not Tested Yes None UTILITY
No potential None Not Detected Yes None ADMINISTRATIVE USE
No potential None Not Detected Yes None ADMINISTRATIVE USE
No potential None Not Tested No None UTILITY
No potential None Not Tested No None UTILITY
Potential None Not Tested No None MAINTENANCE SHOP
Dry Cleaning and
Potential None Not Tested No Laundry wastes LAUNDRY
Potential None Not Tested No Hazardous chemicals LABORATORY
Potential Mustard Not Tested No None STORAGE
No potential None Not Tested No None ADMINISTRATIVE USE
No potential None Not Tested No None UTILITY
No potential None Not Tested No None UTILITY
No potential None Not Tested No None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
144 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
145 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
146 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
147 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
148 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
No potential None Yes None No practical use
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
149 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Potential None Not Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Detected Yes None Off-load railcars
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
150 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Potential None Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
Potential None Not Detected Yes None Off-load railcars
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
151 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
152 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
153 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
154 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
155 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
156 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
157 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
158 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
159 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
160 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
161 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
162 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
163 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
164 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
165 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
166 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
167 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
168 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
169 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
170 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
171 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
172 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
173 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
174 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
175 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
176 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
177 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
178 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
179 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
180 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
181 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
182 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
183 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
184 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
185 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 No controlled
General storage, not environmentally
Potential None See 1691 No controlled
General storage, not environmentally
Potential None See 1691 No controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
186 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
187 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
188 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
189 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
190 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
191 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
192 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
193 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential None See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
194 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential None Not Detected None controlled
General storage, not environmentally
Potential None See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
195 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
General storage, not environmentally
Potential Agent See 1691 None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
196 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
197 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
198 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
199 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
200 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
Agent General storage, not environmentally
Potential Wastes See 1691 No None controlled
General storage, not environmentally
Potential None See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
201 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
202 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
203 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
204 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
205 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
General storage, not environmentally
Potential Agent See 1691 No None controlled
Long Term Restricted Use until
Confirmed None NA NA NA environmental clean up complete
Potential None NA NA NA Small arms firing range
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
206 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
FACILITY LIST FOR UMCD
Biological
Explosive Agent LeadPaint3 Hazard Other Proposed Future Use
No Potential None Groundwater monitoring
Real estate development for highway
No Potential None NA NA NA businesses
NOTES: 1 - Radon Survey, 2 - Final Asbesto Survey, dated 8/92, Dames and Moore, Inc.
207 of 207 3 - Lead-Based Paint Testing Survey, dated 12/96, HartCrowser, 4 - Structural survey is being conducted for these buildings 11/25/2011
Get documents about "