Your Partner in Precision Gearing, Machining and Assembly









Transformation of Existing Operations…

Lean Project 1

Manufacturing Infrastructure Transformation







Initial State Benefits of Transformation

• Unorganized work environment. • Increase in production flow efficiency by 30%.

• Safety barriers not present. • Safe and Lean work environment: 100%

increase in safety.

• Organized work flow.

• Valuable floor space gained.

Initial State









16,320 sq/ft manufacturing

facility prior to transformation

Infrastructure and Safety

Current State



Implementation:

Floor organization and safety

Areas:

Event #1: Snack Area

Project Scope and Structure:

Event #2: Lunch Area

Lean and Environment Implementation

Event #3: Calibration Area

Event #4: West Walk Way

Event #5: Shipping Shelves

Event #6: Inspection Lab

Event #7: East Walk way

Event #8: Parts Washer Area

Event #9: Document Area

Event #10: Conventional Area

Event #11: Record Keeping Area

Event #12: Growth Space Drive way

Total Cost of Transformation $ 800

Total Time Invested: 10 hours

Event #13: Shipping and Receiving Area

Total Square Footage: 10,000

Date of Completion: June 25, 2008

Infrastructure and Safety

Current State



Organized work flow Valuable floor space gained









Safe and lean work environment

Clearly marked aisles









Infrastructure and Safety

Lean Project 2

Quality Department: Inspection Measuring Equipment







Initial State Benefits of Transformation

• Unorganized tool retrieval. • 100 % increase in tool accessibility.

• Insufficient work space. • 50 % increase in retrievable efficiency.

• 75% increase in work space capacity.

Initial State









Quality Department

Current State









Measurement inspection equipment is stored in one vertical

cabinet and each drawer and internal slot is identified.









Quality Department

Current State









Reorganized Inspection Cabinet. All measuring

tools will now be readily available for use.









Quality Department

Zeiss Prismo Navigator

Gear Analyzer

• Scanning Technology and Accuracy

- Zeiss Vast Gold Probe Head with Rotary Table

is calibrated up to .5 micron accuracy range.



• Gear Analyzing Software

- Gear Pro 3.6

- Calypso 4.1



• Gear Configuration Capabilities

- The Zeiss Prismo can support the following

gear configurations: Spiral Bevel, Gleason Bevel

Straights, Internal and External Spur Gears,

Worm Gears, Helical Gears, and Internal and

External Splines.



Total Cost of Transformation: $ 283,500

Total Time Invested: 150 hours

Total Square Footage: 572

Date of Completion: June, 2010 Quality Department

Lean Project 3

Tool Room







Initial State Benefits of Transformation

• Tools not readily available for retrieval. • Tooling inventory is now accessible and readily

• Poor house keeping. available through our computerized database.

• Hard copy inventory system. • Start up times were reduced by up to 50 %.

• 100% increase in time efficiency improvement.

• 50% increase in valuable floor space gained.

Initial State









Tool Room

Current State



















Tool Room

Current State









Total Cost of Transformation: $ 9,000

Total Time Invested: 40 hours

Total Square Footage: 320

Date of Completion: Oct. 2009

Tool Room

Lean Project 4

Shipping & Receiving







Initial State Benefit of Transformation

• Disorganized working environment. • 50 % increase in work space capacity.

• Insufficient product flow. • 50 % increase in product flow efficiency.

• Insufficient work space. • 50 % decrease in shipping materials.

Initial State









Shipping & Receiving Department

Initial State





DISASTER !!!









Shipping & Receiving Department

Current State









Estimated Cost of Transformation: $ 3,000

Estimated Time Invested: 16 hours

Total Square Footage: 700

Estimated Date of Completion: Feb. 2010

Shipping & Receiving Department

Future Lean Improvements



Date of Completion: August 2010

Project: Shipping & Receiving Department Make-Over

Process Improvement



Summary:



We have targeted this department to improve product flow and

organize for efficiency. Our goal is to identify shipping from

receiving.



Details:



1. Conveyor roller system to help the flow on the shipping end.



2. Two new flat screens mounted on each wall to increase work

...space.

Reorganized existing state

3. Bar code system to fulfill shipping requirements. for future conveyor system

4. Two new 8x3 foot work benches. These work benches will

…increase work space for the identification process.



5. Two new chrome racks for shipping materials.



6. Increase storage space with two new shelves.



Shipping & Receiving Department

Lean Project 5

Deburring Department







Initial State Benefits of Transformation

• Unorganized work environment. •12x20 built in air conditioned room.

• Poor air quality. • 85 % increase in safety (Air Quality).

• Insufficient lighting. • 80 % increase in vacuum efficiency.

• Limited vacuum efficiency. • 75 % increase in process lighting.

• 50 % increase in work space capacity.

• 50 % increase in deburring machines.

Initial State









Deburring Department

Current State









5 Horsepower Vacuum

Total Cost of Transformation: $ 29,524.98

Total Time Invested: 12 months

Total Square Footage: 240

Date of Completion: January, 2010 Deburring Department

Lean Project 6

Engineering and Production Management Offices







Initial State Benefits of Transformation

• Small 10x10 offices. • Management is now able to conduct

• Insufficient facilities for internal in office meetings.

conferences. • Total facility capacity increased by 800 sq/ft.

• Insufficient facilities for added resources. • 288 sq/ft now available for additional resources.

Initial State









New office location

prior to construction

Engineering and Production Management

Current State







Two 10x20 offices to

support engineering and

production management









Total Cost of Transformation: $ 20,000

Total Time Invested: 80 hours

Total Square Footage: 810

Date of Completion: Oct. 2009

Engineering and Production Management

Lean Project 7

Conference Room





Initial State Benefits of Transformation

• Hardcopy communication system. • State of the art audio/visual ability.

• Outdated technology. • Paperless communication system.

• Insufficient communication. • 75 % communications improvement.

• Increase in employee training and quality

awareness.

Initial State









Conference Room

Current State



Wireless capabilities









Weekly management

meetings conducted in

the conference room









Total Cost of Transformation: $ 2,000

Total Time Invested: 16 hours

Total Square Footage: 198

Date of Completion: Aug. 2009

Conference Room

Lean Project 8

Assembly Department







Initial State Benefits of Transformation

• Limited assembly area: 10x12 ft. • Increased work capacity by 50%.

• Unorganized assembly area. • Two 3x8 ft work benches.

• No confined structure over assembly area. • Work bench assembly increased by 60%.

• Overhead lighting improved by 80%.

• Temperature controlled environment.

• Additional airlines for pneumatics.

Initial State









Assembly Department

Current State





Assembly Department



• One 12x20 built in room.

• AC and airline jacks for new

assembly area.

• Lighting.

• Fully equipped work benches.

• Engineered as a clean room

environment.









Estimated Cost of Transformation: $ 25,000

Estimated Time Invested: 85 hours

Total Square Footage: 240

Date of Completion: Dec. 2009 - Jan. 2010

2010

Improvements

Shaping Department









Fellows RC 20-4 Gear Shaper

Capacity: 20”Diameter x 4” stroke.



Purpose: Support capacity and

capture the large product market.





Cost of Transformation: $ 270,000

Estimated Time Invested: 55 hours

Total Square Footage: 500

Date of Completion: 1st Quarter 2010

Additional Resources



2nd Qtr

Quality department

Chief inspector (CMM) programmer / operator

Experience: 15 years CMM programming,10 years mechanical,5 years Quality engineering

and 5 years manufacturing engineering.

Purpose: support quality

Quality department

1 additional mechanical inspector

Experience: 20 years mechanical, 10 years CMM and 5 years calibration.

Engineering department

1 additional Mechanical Engineer

Experience: 16 years Mechanical Engineering (BS degree): CAD, Solid works, Master cam.

Purpose: Support quality planning and production schedule and engineering

3rd Qtr,



Grinding department

1 additional grinding operator.

Purpose: Support production schedule.

4th Qtr



Gear department

2 additional gear manufacturing operators.

Purpose: Support production schedule.

Production department

Hired an Assistant Production Manager

Experience: 9 years Production Team leader: lean mfg, SAP systems, real time problem

resolution, process analysis and Kaizen leader.

Purpose: Support production schedule and streamline our manufacturing processes.

Future Lean Project 9

Parts Washing Department





Initial State Benefits of Future Transformation

• Physical lifting process. • Hoist and Gantry electronic system.

• Load capacity per basket 40lbs max. • Load capacity increased by 60%.

• Limited production flow. • 60% increase in production.

• 100% safety improvement.

Future Lean Improvements



Initial State









Parts Washing Department

Here is a sketch of the Gantry and

Future Lean Improvements

Hoist system and two work

benches . This transformation will

increase productivity, efficiency,

and safety.

Electric Panel Clearance

All three tanks will be shifted east about 12”

eliminating any obstructions.



Gantry and Hoist System

This addition will allow employees to

maneuver parts from tank to tank in a much

more efficient manner. The gantry and hoist

system also eliminates any physical injuries.



Work Benches

The benches will provide employees with

room to temporarily store parts that need to

be or have been washed. The benches will be

24” x 36” x 30” in dimension.

Estimated Cost of Transformation: $ 2,685

Production Flow Estimated Time Invested: 40 hours

This future project will increase productivity Total Square Footage: 320

and efficiency in the Washing Department. Estimated Date of Completion: November. 2010



Parts Washing Department

“Gear Technology is dedicated to continuous lean

improvements and the transformation of existing

operations. Our goal as a corporation is to far exceed

all customer requirements and expectations.”





Tom Marino

President

Your Partner in Precision Gearing, Machining and Assembly







For further information please visit our website.

www.gear-tech.com


Other docs by HC111125145459
????? 1 ...
Views: 0  |  Downloads: 0
Halaman: 1 2 3 4 5 6 7 8 9
Views: 10  |  Downloads: 0
Sheet1
Views: 14  |  Downloads: 0
A High-Speed SiGe BiCMOS Analog MAP Decoder
Views: 14  |  Downloads: 0
PowerPoint Presentation
Views: 3  |  Downloads: 0
LST SAFETY
Views: 0  |  Downloads: 0
Slide 1
Views: 0  |  Downloads: 0
CHROMATOGRAPHY OF MAGIC MARKERS
Views: 7  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!