Embed
Email

Certification

Document Sample
Certification
Shared by: HC11112510524
Categories
Tags
Stats
views:
9
posted:
11/25/2011
language:
English
pages:
36
Page 1 3PRMA_May_10









Worksheet A. CERTIFICATION FORM

RA Compliance Period covered by this Filing: Aug-12

Name of Load Serving Entity (LSE):

Energy Service Provider Registration Number (if applicable):

Date of Filing

Scheduling Coordinator:



Certification of Information:

Consistent with Rules 1 and 2.4 of the CPUC's Rules of Practice and

Procedure, this resource adequacy compliance filing

has been verified by an officer of the corporation, who

shall expressly certify, under penalty of perjury, the following:



1. I have responsibility for the activities reflected in this filing;

2. I have reviewed, or have caused to be reviewed, this compliance filing;

3. Based on my knowledge, information, or belief, this filing does not contain

any untrue statement of a material fact or omit to state a material fact

necessary to make the statements made;



4. Based on my knowledge, information, or belief, this [filing] contains all of the

information required to be provided by CPUC orders, rules, and regulations.



Certified By Authorized LSE Representative (Name):

Title:

Date:



Signature (sign the hard copy of filing):





Contact Person for Questions about this Filing

Name:

Title:

Address:

Address 2:

City:

State:

Zip:

Telephone:

Email

Email address to receive approval or rejection letter:



Back-Up Contact Person for Questions about this Filing (Optional):

Name:

Title:

Telephone:

Email:



Please check the boxes below as appropriate

Filing type: _Month Ahead __Year Ahead __Revisions w/o extra procurement __Revisions w/extra procurement: __Local __System





Date and content of original Confidentiality Declaration that covers this filing: Commission Ruling or Decision that requires this filing: 06-06-064









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Certification

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 2 of 36









Draft



Instructions for System RA Reporting Template

These instructions for the RA Reporting Template consist of the following:



A. Overview

B. Instructions for the Certification Sheet

C. LSE Allocations and ID and Local Area Sheet

D. Summary Tabs - Year Ahead and Month Ahead

E. Instructions for the Resource Reporting Worksheets

F. Worksheet on Dispatchable Demand Response Resources



A. Overview

This template ensures that each LSE owns or contracts for sufficient RA capacity to meet its Resource Adequacy Requirement (RAR). This constitutes the

System RAR year ahead and month ahead filing template for the 2012 compliance year. Please also consult the 2012 RA Filing Guide for more instruction.

Although several tabs of this workbook are protected, LSEs may unprotect them with the password as follows: "1". LSEs are cautioned to be very careful

when unprotecting tabs of this template, and are requested to let Energy Division know when they have done so. Several changes have occurred to this

template since the 2011 RA compliance year, and LSEs are encouraged to read the 2012 RA Guide for an explanation of the changes made to conform to

D.11-06-022. The Physical Resource worksheet and Import Resource worksheet have been combined to facilitate data capture and analysis. No changes

have been made to the rules governing those pages, but LSEs are now to enter all information in one place.





SB 695 allowed the reopening of Direct Access beginning in April 2011. In order to ensure that local RA obligations are met when load migrates between

LSEs, D.10-12-038 adopted a local true up methodology. Please refer to D.10-12-038 or the 2012 RA Guide for directions on this process.



The Year Ahead and Month Ahead Summary Tabs of the RA Template are now completely automated; year ahead and month ahead information is all

drawn from the LSE allocations tab; LSEs are to record their load migration in Summary Table 4 of the LSE Allocations tab separated by service territory.

LSEs are only to update peak demand to account for load migration since the LSE received the original “Peak Demand [Coincident Peak Hour Demand

Forecast provided by CEC]”. Once the LSE has input its resource information into the supporting Resource Worksheets, the Summary Tab will

automatically evaluate an LSE’s compliance.



For the purposes of this template, figures are to be input to the one-hundredth level of precision. Please enter all figures to two decimal places.





The template requires each LSE to identify the specific resources that will supply capacity to meet its own RAR. For compliance purposes, an LSE may

count capacity toward its System RAR obligation in each of the four resource categories or buckets up to the “Maximum Cumulative Countable Capacity

Levels” shown in Summary Table 3, Column J. This Maximum Cumulative Capacity is based on the 115% System RAR, not the 90% year-ahead total.

The Physical Resource Page and the Import pages have been combined into one sheet, and some columns have been rearranged to facilitate data capture.









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 3 of 36









Each LSE must file one copy of this System RA template for each month May through September on which they include all information related to

compliance with Year Ahead System RAR, and one template for each month they wish to demonstrate Month Ahead RA Compliance. This template

includes both Year Ahead and Month Ahead Summary Pages; the Local RA template is still separate. This is to avoid confusion regarding template use.

This template has been automated more than in previous years, and certain pages have been protected to discourage accidental overwriting. LSEs may still

overwrite formulas, but LSEs are advised to use caution.



This template will be the vehicle for the LSE to receive updated allocations of RMR, DR, and CAM Capacity and for the LSE to receive and utilize updates

to the CAISO NQC list. This template is sent by email to each LSE using the Commission's Secure FTP application, and then also protected with a

password specified by the LSE in cell H1 of the Physical Resource page; that password will be applied to subsequent submission of templates to Energy

Division and submissions by Energy Division to the LSE such as revised allocations. If the LSE leaves this cell blank, there will be no password attached to

information mailed by Energy Division back to the LSE. If the LSE protects the spreadsheet with a password, they must notify Energy Division so it can be

opened for review. Filings are due according to the schedule laid out in the 2012 RA Guide.



B. Instructions for the Certification Sheet

The Certification Sheet is to be completed and signed by an appropriate officer of the company.



RA Compliance Period Covered by this Filing - Please select from the drop down list. This selection will cause the correct information to be drawn from

the other pages of the template.

Name - Name of the officer of the company that is authorized to sign this form

Title – Title of the officer of the company that is authorized to sign this form

Date – The date the form is completed.

Contact Information -- Provide this information to facilitate review of the filing.

Telephone - Enter the telephone number of the contact or back up contact person for this filing

Email - Enter email address of the contact or back up contact person for this filing, as well as the email of the person who is to receive the approval or

rejection letter for this filing.

Type of Filing - Whether this is an original filing, a revision, whether procurement was needed, and whether this was a Local RA filing or a System RA

Date and Content of Original Confidentiality Declaration that covers this filing - Please indicate the date when the LSE filed a confidentiality

declaration that covers this filing, and make explicit reference to which filing it was accompanying.

Commission ruling or order that mandates this filing: In general, Commission Decisions D.11-06-022, D.10-06-036, D.10-03-022, D.05-10-042 and

D.06-06-064 order LSEs to submit these filings, so please indicate that here.



C. LSE Allocations and ID and Local Area Sheet



LSE Allocations Tab



The LSE Allocation spreadsheet is protected, and the entire sheet except for Table 4 and 5 is protected. LSEs are able to input information into Table 4 and

5, but not any other Tables. The Energy Division will update this information as needed for CAM Allocations and RMR adjustments, and the LSE will

receive a password protected version of this template with LSE specific information entered into this worksheet. The LSE will receive their LSE specific

spreadsheet via email with Secure FTP. Data is drawn from this spreadsheet to other parts of the template, and the LSE no longer needs to manually input

values. Information included on this worksheet include Local RA obligations, CAM allocations, Path 26 allocations, DR allocations, year ahead load

forecasts, and load migration adjustments.







File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 4 of 36









No load migration adjustments will be made between the issuance of LSE Allocations for 2011 compliance year that are included in this template and the

2011 Final System and Local RA Filing. Load migration adjustments may be made between the year ahead forecasts and the month ahead filings during

2011. In accordance with D.10-06-036 (at OP 6e) LSEs are to file changes to their load forecasts up to 25 days before the due date of the month-ahead

compliance filing. For the month ahead filings, the impacts of load migration will be accounted for in the LSE Allocation tab. LSEs are to enter

information directly taken from Column 7 (M-O) of the most recent Load Forecast Adjustment templates filed with the CEC and applicable to the

compliance month covered by this filing. This information represents the Net Change in Load plus Trans. Losses & UFE. This information is to be entered

in to Table 4 of the LSE Allocations tab. Summary Table 1 in the Month Ahead Summary Page will then sum the adjusted amount and the year ahead

forecast to determine the LSE's RA obligation.



Table 5 is one of the only other area in the LSE Allocation tab that the LSE can enter information. This table will need to be filled in with incremental

Local RA obligations pursuant to directions in the 2012 RA Guide. Table 8 of the Summary Month Ahead tab will then use this information along with the

LCR information from table 3 to determine if the local obligation has been fulfilled for the associated month.



ID and Local Area Tab



The information for the ID and Local Area tab is taken from the CAISO NQC list for 2012 compliance year. That list is now published on the CPUC

website at this link: http://www.cpuc.ca.gov/PUC/energy/Procurement/RA/ra_compliance_materials.htm This list contains resources that are able to

provide NQC as of the date this template is sent to the LSE. In between the date this template is sent to the LSE and the date of submission of the LSE's RA

filing, new resources may reach COD and be available to provide RA capacity. Their addition to the NQC list is made possible by three rows at the bottom

of the ID and Local Area tab that are currently left blank. The LSE may enter information into those blank rows, or add rows in between these blank rows,

in order to add new resources to the list. The LSE is to add the new Scheduling Resource ID and the applicable Zonal and Local RA Designations (South,

North, Name of Local area, CAISO System or CAISO Import). This information is to be entered into the appropriate columns. If this information is entered

correctly, the LSE will be able to select the Scheduling Resource ID of the new unit, and the appropriate Local RA designation will populate the Local

column. Resources that reach COD and are added to the list by the LSE after a quarterly update will be incorporated into the next update. LSEs may also

enter the Scheduling Resource ID for import resources as required under MRTU.



LSEs are also able to use this sheet for entering export commitments. In the case of a firm export commitment which the LSE intends to fulfill with RA

resources, the LSE would enter the information into this tab as if the LSE were adding a new unit to the list, and then the LSE would be able to select the

appropriate information from a drop down list in the Physical Resource worksheet. The LSE is to enter a Scheduling Resource ID for the Export

Commitment that includes counterparty to the commitment. The LSE is also to enter the Zonal Designation of the CAISO Intertie Path over which the

Export Commitment would be flowing.

Energy Division will continue to review the LSE filings against the most current NQC list active at the time of submission, so an LSE that enters incorrect

information will still be subject to compliance review. This mechanism is so the LSE can accommodate resources that come online in the middle of a

quarter.



D. Summary Tabs - Year Ahead and Month Ahead









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 5 of 36









The Summary Tabs of the RA workbook tabulate data from the supporting resource worksheets, and consist of the two Summary Sheets - the Year Ahead

Summary and the Month Ahead Summary Page. The Local RA Template is still separate from the System Template. The Year Ahead and Month Ahead

Summary Pages include the eight Summary Tables discussed below. In order to prevent manual error, the Summary Tab is now entirely automated and

protected with a password. Although LSEs are able to unprotect this sheet, they are encouraged to do so quite rarely and with extreme caution, as

accidental overwriting of formulas or data can obscure compliance verification and may require corrections.



Summary Table 1, LSE Obligations



Summary Table 1 is automated to draw all information from the "LSE Allocations" spreadsheet. The Year Ahead Summary Page will draw information

from the LSE Allocations tab. If the LSE has not entered load migration into those rows, then the load forecast will be only the Year Ahead Forecast.

Summary Table 1 draws updated load information from the LSE Allocations tab in Cells E6-F8, grosses it up for the 115% PRM (Cells E9 and F9), and

computes the 90% Year Ahead Requirement (Cells E10 and F10). Summary Table 1 then subtracts 115% of DR credit, RMR and CAM allocations for

each zone (Cells E11 and F11), rounds the result according to D.07-06-029, and delivers the Zonal RAR in Cells E12 and F12. Then the Zonal RA

obligation is summed into a year ahead RA obligation in E13.



The Month Ahead Summary Page skips the step in Cells E10 and F10, and the final System RA obligation is computed in Cell E12. DR capacity, RMR

Allocations, and CAM Allocations are pulled from the appropriate worksheets and are not entered manually.



Summary Table 2, Total Claimed Resource Adequacy Capacity by Type of Capacity (MW)



Table 2 summarizes the LSE's capacity showing by resource type (rows) and by resource category (columns) that the LSE would like to count towards the

LSE's RAR. The RMR Allocation and CAM Allocation are now drawn from the LSE Allocation spreadsheet and prepopulated in Summary Table 1.



The Month Ahead Summary Page and the Year Ahead Summary Page each draw information from the appropriate resource worksheets. The Year Ahead

Summary Page, meant to be effective for 2012 Compliance Year, no longer uses the LD worksheet, while the Month Ahead Summary Page does not draw

information from the Under Construction worksheet. Information for each applicable resource type is subtotaled and tabulated in Summary Table 2:



Resource Types



I. Physical Resources and Import Resources

Worksheet Tab Name = I_Phys_Res_Import_RA_Res



II. DWR Contracts - Contracts that do not fit on other Worksheets

Worksheet Tab Name = II_DWR_Contracts



III. Resources Under Construction

Worksheet Tab Name = III_Construc



Demand Response: DR Capacity

Worksheet Tab Name = DR_2hr_Plus_Minus









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 6 of 36









Summary Table 3, Maximum Compliance Showing Cumulative Load in Each Bucket (MW)



Table 3 shows the Maximum Cumulative Contribution (MCC) figures that were issued as errata by the Energy Division on December 29, 2005. This table

automatically calculates LSE-specific MW values that correspond to the MCC percentages; and automatically calculates how much capacity will count

based on the data provided in the supporting spreadsheet tabs relative to the 115% RAR.



Summary Table 4, Resource Category by Bucket (MW)



Table 4 assembles an LSE's "Claimed Capacity" (from Table 2), and "Countable Capacity" (from Table 4) by individual bucket. Table 4 is a necessary

intermediate step that breaks down this data into individual buckets, which are then reassembled in the opposite order in Table 5.



Summary Table 5, Minimum Required Compliance Showing by Category (MW)



Table 5 shows the Minimum Cumulative Requirement (MCR) as percentages of Total Resources Shown and in absolute MW. This is the minimum amount

of cumulative capacity the LSE must provide in Bucket 4; Buckets 4 & 3; Buckets 4 & 3 & 2; and Buckets 4 & 3 & 2 & 1. This is the point of compliance

for the LSEs. Each LSE has to provide AT LEAST a specific amount of capacity in each of these minimum buckets. Table 5 automatically shows the

LSE's short/long position in the minimum buckets, and automatically displays whether the LSE is "Compliant" or "Non-Compliant" at each level. The

percentages used here may not be the same as the minimum percentages used in Summary Table 4; the MCC percentages used to compute countable

resources are higher than the minimum percentages used for compliance. This is due to the 90% procurement obligation, although the MCC percentages are

relative to the full 115% RAR.



Summary Table 6, Necessary Flows into NP26 and SP26



Table 6 computes the amount of necessary flow into the two zones of California, SP26 and NP26. This is to properly account for constraints on flows

across Path 26. RAR for this table is computed from the TAC area specific Peak Demands computed in Summary Table 1. A Zonal RAR is established for

the zone, resources are summed by zone to meet it, and a necessary flow across Path 26 is computed in column E. The resources located in zones are

summed from the resource worksheets, based on their Zonal/Local Designation. Imports and DWR contracts are included as resources in the zone. DR

resources are used to compute the Zonal RAR in Summary Table 1. The template then tallies the resources listed as being located in or delivered into that

zone, and nets out whether the LSE has provided sufficient resources to meet load in the zone. If not, there is a necessary flow across Path 26 to meet load,

that must be matched with an allocation of transfer capability across Path 26.



Summary Table 7, Necessary Flows versus Path 26 allocation



This table takes the Necessary Flows determined in Summary Table 6 and compares them to the LSE's allocation for Path 26 capacity, either flowing north

or south. The summary table draws the appropriate Path 26 Allocation from the LSE Allocations page and compares allocations versus necessary flows and

determines whether the LSE has overused their allocation. Compliance on this table is shown in Column D of Summary Table 7; compliance is shown via a

blue '0', while non compliance is a positive number in red.



Summary Table 8, Load migration Local True-ups









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 7 of 36









This table takes the LSEs Incremental Local Area LCR Allocations (reported in table 5 of the LSE Allocation tab) and sums them with the LSE's existing

Local RA obligation. Then this Summary Table compares the new Local RA obligation against the local resources reported on the Phys Res page. Column

D highlights any local deficiency that exist. When there is a deficiency a red number appears that specifies the Local RA deficiency in MW. A blue number

appears when the local obligation is fulfilled. The value of the blue number is how much Local RA the LSE retains over their local obligation. This amount

may be sold to another LSE that is short in the local area, provided that the LSE still maintains sufficient system capacity to meet their RA obligation.









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 8 of 36









E. Instructions for the Resource Reporting Worksheets



Do not enter data into the gray shaded areas of row 2, since the worksheet automatically sums each particular resource category and transfers this

information to the Year Ahead and Month Ahead Summary worksheets. If it is necessary to insert more rows of data into any one worksheet, please ensure

the spreadsheet properly creates the subtotal and that it transfers to the Summary Table 2 of each of the two Summary Pages. All Resource Worksheets with

green colored tabs have been protected with a password. This is done to ensure that the safeguards against errors that are built into the template are not

circumvented accidentally. For 2012, the worksheets for Unit Specific CAISO resources and Import Resources have been combined. Please enter all

CAISO and Import resources on this page.



Please note - there is space in Cell G1 on the Physical Resource Worksheet I for the LSE to enter a password for future RA Filings.



General Instructions for Columns that Appear in Multiple Worksheets:

LSE Capacity Contract Identifier - The unique identifier used by the LSE to identify the contract in their own internal bookkeeping. This number is used

to track and confirm contracts during compliance validation.



Scheduling Resource ID – The CAISO-assigned Scheduling Resource ID for this resource. Please select the Scheduling Resource ID from the in-cell

dropdown menu. The dropdown menu is linked to the updated list of CAISO Scheduling IDs that is included in this template. For resources "paired" to

become one contract with unrestricted availability, please list each ID in a separate line and list hours of availability for each part of the contract. Please

indicate in Contract Identifier that the resources are paired. Please list unit specific DWR contracts on the Physical Resource Page and select the

Scheduling Resource ID for each DWR unit. For Import Resources, please determine the appropriate CAISO Import Resource ID for the import contract.

This number is given to the resource SC by the CAISO. This new Import Resource ID is new for MRTU, and allows for greater transparency and tracking

of import resources. If this ID is incorrect, the file will be returned for correction.

Zonal/Local Designation: This is populated automatically when a Scheduling Resource ID or Dynamic Resource ID is selected from the drop down list in

the Scheduling Resource ID Column or selected from a drop down list on the sheets that do not include a Scheduling Resource ID field. If the LSE cuts and

pastes a large array of cells, the LSE must ensure that Local/Zonal Designation is still correct. The column will list all Local Areas as well as "North" and

"South" to indicate Zonal Location for the Path 26 Counting Convention.

RAR Capacity Effective Start Date – Please either select the appropriate start date for the contract from the drop down list or enter here the beginning date

of the contract or "pairing" arrangement. If the contract covers non-consecutive months please list the start date for the current block (e.g. a contract that

runs July through August every year for three years would require the LSE to enter July 1 of the current year). Do not simply list the first day of the

compliance month. In instances where the supplier has provided the LSE with replacement capacity to fill in for a unit unavailable due to outage, please

enter the start date of the replacement arrangement. For URG or Evergreen contracts, please list an actual start date. If the contract does not begin or end in

a date that is in the pull down menu, please enter the correct date manually in the cell. It is important that LSEs enter a correct start date for the contract so

Energy Division can rely on this information. For example contracts that start on the first day of January of 2012 and last through December 31 2012 start

1/1/2012.









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 9 of 36









RAR Capacity Effective End Date – Please either select the appropriate end date for the contract from the drop down list or enter here the ending date of

the contract or "pairing" arrangement. If the contract covers non-consecutive months please list the end date for the current block (e.g. a contract that runs

July through August every year for three years would require the LSE to enter August 31 of the current year). For LSE owned generation or other

nonstandard contracts the LSE is able to list text inputs such as either URG or Evergreen. Do not simply list the last day of the compliance month. In

instances where the supplier has provided the LSE with replacement capacity to fill in for a unit unavailable due to outage, please enter the end date of the

replacement arrangement. If the contract does not begin or end in a date that is in the pull down menu, please enter the correct date manually in the cell. It

is important that LSEs enter a correct end date for the contract. Energy Division relies on this information. For example contracts that start on the first day

of January of 2012 and last through December 31 2012 end on 12/31/2012, not just the last day of the month. Even if capacity levels change per month,

please do not just list the last day of the current RA month.

Minimum Hours in Month - The minimum number of hours in the RA filing month that the RA resource or "pairing" is contractually or physically

available during peak load hours and capable of operating at its Qualifying Capacity to meet the LSE’s RAR obligation. For contracts with unrestricted

availability, please do not enter '720' or '744'. Please enter "unrestricted".

North and South - This column totals the resources reported into zones, in NP26 and SP26, so that the summary page can total across the sheets of the

worksheet. Please do not enter information into this column, or disturb the formulas at all.

Resource Category – The categorization of RA Resources based on physical or contractual operating limitations. This is where the LSE enters MW values

of procurement for resources. For export commitments that are to be met with RA Resources, list the export commitment as a negative number and any

resource used to meet that commitment as a positive number. That way, it will debit against the RA capacity listed to ensure that resources are available to

meet the export commitment in addition to the LSE's RA obligation. The four Resource Categories for the 2012 Year-Ahead RA Filing are:



Resource Buckets: Minimum Monthly Hours of Operation Qualifying for that Bucket

Category #1 Bucket: Greater than or equal to the ULR monthly hours. These are for June through September, respectively: 40, 40, 60, and 40.

Category #2 Bucket: 160 hours

Category #3 Bucket: 384 hours

Category #4 Bucket: Unrestricted



Worksheet I.Physical Resources in ISO Control Area and Import RA resources from outside ISO control Area



For directions to columns not listed here, please consult the General Instructions above. Directions for listing export commitments on this page

are provided as well. The Phys Res page and the Import page have been combined.

Resource Adequacy Capacity (MW) – This quantity is totaled automatically from the four Resource Category columns to the right, and represents the

quantity of capacity that the LSE has under contract and that will be counted toward RAR for the Filing Month. Note: the quantity of Resource Adequacy

Capacity cannot exceed the NQC for the resource. Also note that any changes to Resource Adequacy Capacity during the RA month must be identified in a

separate row entry. There is a formula in this column, so do not enter any information here. Actual MW of procurement is entered in the columns related to

Resource Category to the right.

SCID or counterparty if not available - Please enter into this row the supplier's SCID or the identity of the counterparty if the supplier's SCID is not

available to the LSE. This column is only needed for Import RA contracts. LSEs do not need to fill this in for Physical Resources within CAISO









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 10 of 36









Local RA (MW): This column is used to tabulate the Local RA MW that the LSE is using to count towards their Local RA obligations during the course of

2012. This column is tabulated on the Month Ahead summary tab in Summary Table 8, but not on the Year Ahead summary tab. LSEs are to enter the

amount of Local RA that the resource provided in the Year Ahead Local RA Filing. Entering this information separate from the System RA MW is meant

to do two things - provide a means to tabulate Local RA MW from a unit even if it is affected by the outage counting rules, and in the event that the unit has

a monthly NQC value, and the resource is listed at the August value for Local RA and at the month specific value for System RA. Import resources are not

able to meet Local RA obligations, thus for import resources please enter "0" in this column. This column is not needed for the Year Ahead System RA

Filing, and only needed for the Month Ahead System RA Filing. For the Year Ahead Filing there is a Local RA template.









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 11 of 36









Worksheet II: DWR Contracts that do not fit on other Worksheets



For directions to columns not listed here, please consult the General Instructions above. Please list all unit specific DWR contracts and Import

DWR contracts that specify a Branch Group on the Physical Resource and Import Resource page. Please list here only contracts that do not

properly fit on any other worksheet.

Resource Adequacy Capacity (MW) – This quantity is calculated automatically from the four Resource Category columns to the right, and represents the

quantity of capacity that the LSE has under contract and that will be counted toward RAR for the Filing Month. Note: the quantity of Resource Adequacy

Capacity cannot exceed the NQC for the resource. Also note that any changes to Resource Adequacy Capacity during the RA month must be identified in a

separate row entry. There is a formula in this line, so do not enter any information here. Actual MW of procurement is entered in the columns related to

Resource Category.

Scheduling Resource ID or CAISO Congestion Zone – The Scheduling ID for the resource or the congestion zone where the capacity will be delivered.

If capacity can be delivered in all CAISO congestion zones, use “CAISO” as the input.



Worksheet III: Resources Under Construction

For directions to columns not listed here, please consult the General Instructions above.



Resource Adequacy Capacity (MW) – This quantity is calculated automatically from the four Resource Category columns to the right, and represents the

quantity of capacity that the LSE has under contract and that will be counted toward RAR for the Filing Month. Note: the quantity of Resource Adequacy

Capacity cannot exceed the NQC for the resource. Also note that any changes to Resource Adequacy Capacity during the RA month must be identified in a

separate line entry. There is a formula in this line, so do not enter any information here. Actual MW of procurement is entered in the columns related to

Resource Category.

Projected Commercial Operation Date - The date that a Generating Unit at a Generating Facility has completed construction, interconnected to the

applicable distribution or transmission system, completed all start-up, commissioning and performance testing, received final approvals from the applicable

distribution or transmission provider, and commenced scheduling or bidding for the sale of electricity in the forward market. The establishment of contracts

and agreements between an LSE and an energy supplier or developer will have no bearing or affect on the determination of Commercial Operation.



F. Worksheet on Dispatchable Demand Response Resources

DR. Dispatchable Demand Response Resources not part of the DR Allocation



For directions to columns not listed here, please consult the General Instructions above. The DR worksheets have been combined for efficiency

and clarity. This worksheet is for listing individual LSE DR programs operated by LSEs and not part of the DR Allocation; please do not list any

information on this sheet for programs that are part of the DR Allocation the LSE receives from the CPUC.



Program Name – The name of the program. This worksheet is intended only for programs that are operated by each individual LSE that are not part of the

DR allocation the LSE received.

Resource Adequacy Capacity (MW) – The quantity of capacity of the program. Please enter separate amounts if the program is in more than one service

area, and designate a "Zonal" location for each program. This is to facilitate implementation of the Path 26 constraint.

Program Operator – The entity that will physically dispatch the program.

Authorized Operation Start Date – Identify the date within a calendar year that the program is allowed to commence operations.

Authorized Operation End Date – Identify the date within a calendar year that the program is obligated to shut down for the year.

Total Monthly Authorized Hours of Operation- Report the program's monthly authorized hours of operation.







File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

{Filing Month} 2009 RESOURCE ADEQUACY COMPLIANCE FILING {Name of LSE}, Page 12 of 36









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Instructions

94b26ee5-ff96-49de-b79f-16ce63375144.xls









Table 1: Results of Energy Commission Review and Adjustment to the 2012 Year-Ahead Load Forecast of





CONFIDENTIAL



Peak Demand for Month of Calendar 2012 (MW)

Element Service Area Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12



1 2 3 4 5 6 7 8 9 10 11 12

1 Submitted LSE Forecast SCE

SDG&E

PG&E

Total



CEC Peak Estimate for SCE

SDG&E

PG&E





2 CEC Adjustment for SCE

Plausibility/Migrating load SDG&E

PG&E





3 EE/DG Adjustment SCE

SDG&E

PG&E





4 Pro rata adjustment to match SCE

SDG&E

PG&E



5 Noncoincident Peak Demand SCE

SDG&E

PG&E



6 Coincidence Adjustment SCE

SDG&E

PG&E

Final Load Forecast for RA

7 Compliance SCE

SDG&E

PG&E



Total





Table 2: 2012 Demand Response Resources

Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12

SCE Service Area



LA Basin

Big Creek/Ventura

NON-LCR

TOTAL





SDG&E Service Area



San Diego

TOTAL





PG&E Service Area



BAY AREA

OTHER PG&E AREAS

NON-LCR

TOTAL







TOTAL DEMAND RESPONSE RESOURCES





Table 3 - Other Allocations (MW)



SP26 Condition 2 RMR Local Area Local RA obligation

NP26 Condition 2 RMR LA Basin

Path 26 - N-S Big Creek/Ventura

Path 26 - S-N San Diego

SP26 CAM Capacity Greater Bay Area

NP26 CAM Capacity Other PG&E Areas









Table 4: Peak Demand Adjustments to account for Load Migration during 2012 (MW) - please see instructions

Month Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12

SCE

SDG&E

PGE

Total - - - - - - - - - - - -





Table 5- Incremental Local Area LCR Allocations (MW)



Local Area - incremental - Please consult instructions

LA Basin -

Big Creek/Ventura -

San Diego

Greater Bay Area

Other PG&E Areas









94b26ee5-ff96-49de-b79f-16ce63375144.xls

CAISO Public Document

8/9/2011



Resource ID Resource Name Path 26 LCR Area

ADLIN_1_UNITS GEYSERS AIDLIN AGGREGATE North Other PG&E Areas

AGRICO_6_PL3N5 Fresno Peaker AG PL3N5 ICE5 North Other PG&E Areas

AGRICO_7_UNIT Fresno Cogen North Other PG&E Areas

ALAMIT_7_UNIT 1 ALAMITOS GEN STA. UNIT 1 South LA Basin

ALAMIT_7_UNIT 2 ALAMITOS GEN STA. UNIT 2 South LA Basin

ALAMIT_7_UNIT 3 ALAMITOS GEN STA. UNIT 3 South LA Basin

ALAMIT_7_UNIT 4 ALAMITOS GEN STA. UNIT 4 South LA Basin

ALAMIT_7_UNIT 5 ALAMITOS GEN STA. UNIT 5 South LA Basin

ALAMIT_7_UNIT 6 ALAMITOS GEN STA. UNIT 6 South LA Basin

ALAMO_6_UNIT ALAMO POWER PLANT South Big Creek-Ventura

ALMEGT_1_UNIT 1 ALAMEDA GT UNIT 1 North Bay Area

ALMEGT_1_UNIT 2 ALAMEDA GT UNIT 2 North Bay Area

ALTA4A_2_CPCW1 Alta Wind I, LLC South LA Basin

ALTA4B_2_CPCW2 Alta Wind II, LLC South LA Basin

ALTA4B_2_CPCW3 Alta Wind III, LLC South LA Basin

ALTA3A_2_CPCE4 Alta Wind IV, LLC South LA Basin

ALTA3A_2_CPCE5 Alta Wind V, LLC South LA Basin

ALTMID_2_UNIT 1 ALTAMONT MIDWAY LTD. North CAISO System

ANAHM_2_CANYN3 Canyon Power Project Unit 3 South LA Basin

ANAHM_2_CANYN4 Canyon Power Project Unit 4 South LA Basin

ANAHM_7_CT ANAHEIM COMBUSTION TURBINE South LA Basin

ANTLPE_2_QF ANTELOPE QFS South Big Creek-Ventura

ARCOGN_2_UNITS WATSON COGENERATION COMPANY South LA Basin

BALCHS_7_UNIT 1 BALCH 1 PH UNIT 1 North Other PG&E Areas

BALCHS_7_UNIT 2 BALCH 2 PH UNIT 2 North Other PG&E Areas

BALCHS_7_UNIT 3 BALCH 2 PH UNIT 3 North Other PG&E Areas

BANKPP_2_NSPIN BANKPP_2_NSPIN North Bay Area

BARRE_2_QF BARRE QFS South LA Basin

BARRE_6_PEAKER Barre Peaker South LA Basin

BASICE_2_UNITS CALPINE AMERICAN I COGEN. North CAISO System

BDGRCK_1_UNITS BADGER CREEK LIMITED North Other PG&E Areas

BEARCN_2_UNITS GEYSERS BEAR CANYON AGGREGATE North Other PG&E Areas

BEARDS_7_UNIT 1 BEARDSLEY HYDRO North Other PG&E Areas

BEARMT_1_UNIT BEAR MOUNTAIN LIMITED North Other PG&E Areas

BELDEN_7_UNIT 1 BELDEN HYDRO North Other PG&E Areas

BIGCRK_2_EXESWD BIG CREEK HYDRO PROJECT PSP South Big Creek-Ventura

BIOMAS_1_UNIT 1 WOODLAND BIOMASS North Other PG&E Areas

BISHOP_1_ALAMO BISHOP CREEK PLANT 2 AND 6 South CAISO System

BISHOP_1_UNITS BISHOP CREEK PLANT 3 AND 4 South CAISO System

BLACK_7_UNIT 1 JAMES B. BLACK 1 North CAISO System

BLACK_7_UNIT 2 JAMES B. BLACK 2 North CAISO System

BLCKBT_2_STONEY BLACK BUTTE HYDRO North CAISO System

BLHVN_7_MENLOP GAS RECOVERY SYS. (MENLO PARK) North Bay Area

BLM_2_UNITS COSO ENERGY DEVELOPERS (BLM) South CAISO System

BLULKE_6_BLUELK Blue Lake Power North Other PG&E Areas

BLYTHE_1_SOLAR1 Blythe Solar 1 Project South CAISO System

BNNIEN_7_ALTAPH ALTA POWER HOUSE North Other PG&E Areas

BOGUE_1_UNITA1 Feather River Energy Center, Unit #1 North Other PG&E Areas

BORDEN_2_QF SMALL QF AGGREGATION - MADERA North Other PG&E Areas

BORDER_6_UNITA1 CalPeak Power - Border LLC South San Diego

BOWMN_6_UNIT BOWMAN North Other PG&E Areas

BRDGVL_7_BAKER BAKER STATION ASSOCIATES, LP HYDRONorth Other PG&E Areas

BRDSLD_2_HIWIND High Winds Energy Center North Bay Area

BRDSLD_2_MTZUMA FPL Energy Montezuma Wind North Bay Area

BRDSLD_2_SHILO1 Shiloh I Wind Project North Bay Area

BRDSLD_2_SHILO2 SHILOH WIND PROJECT 2 North Bay Area

BRDWAY_7_UNIT 3 BROADWAY UNIT 3 South LA Basin

BUCKBL_2_PL1X3 Blythe Energy Center South CAISO System

BUCKCK_7_OAKFLT Oak Flat North Other PG&E Areas

BUCKCK_7_PL1X2 BUCKS CREEK AGGREGATE North Other PG&E Areas

BUCKWD_7_WINTCV Wintec Energy, Ltd. South LA Basin

BULLRD_7_SAGNES SAINT AGNES MED. CTR North Other PG&E Areas

BURNYF_2_UNIT 1 Burney Forest Power North CAISO System

BUTTVL_7_UNIT 1 BUTT VALLEY HYDRO North CAISO System

CABZON_1_WINDA1 Cabazon Wind Project South LA Basin

CALGEN_1_UNITS COSO Finance Partners (Navy 1) South CAISO System

CALPIN_1_AGNEW GATX/CALPINE COGEN-AGNEWS INC. North Bay Area

CAPMAD_1_UNIT 1 CAPCO MADERA Power Plant North Other PG&E Areas

CARBOU_7_PL2X3 CARIBOU PH 1 UNIT 2 & 3 AGGREGATE North CAISO System

CARBOU_7_PL4X5 CARIBOU PH 2 UNIT 4 & 5 AGGREGATE North CAISO System

CARBOU_7_UNIT 1 CARIBOU PH 1 UNIT 1 North CAISO System

CARDCG_1_UNITS CARDINAL COGEN North Bay Area

CBRLLO_6_PLSTP1 POINT LOMA SEWAGE TREATMENT PLANT outh S San Diego

CCRITA_7_RPPCHF Rancho Penasquitos Hydro Facility South San Diego

CDWR07_2_GEN CDWR07_2_GEN North CAISO System

CEDRCK_6_UNIT CEDRCK_6_UNIT North CAISO System

CENTER_2_QF CENTER QFS South LA Basin

CENTER_2_RHONDO MWD Rio Hondo Hydroelectric Recovery Pla South LA Basin

CENTER_6_PEAKER Center Peaker South LA Basin

CENTRY_6_PL1X4 CENTURY GENERATING PLANT (AGGREGATE) South LA Basin

CHALK_1_UNIT CHALK CLIFF LIMITED North Other PG&E Areas

CHEVCD_6_UNIT CHEVRON USA (TAFT/CADET) North Other PG&E Areas

CHEVCO_6_UNIT 1 CHEVRON USA (COALINGA) North Other PG&E Areas

CHEVCO_6_UNIT 2 AERA ENERGY LLC. (COALINGA) North Other PG&E Areas

CHEVCY_1_UNIT CHEVRON USA (CYMRIC) North Other PG&E Areas

CHEVMN_2_UNITS CHEVRON U.S.A. UNITS 1 & 2 AGGREGATE South LA Basin

CHICPK_7_UNIT 1 CHICAGO PARK 1, BEAR RIVER CA North Other PG&E Areas

CHILLS_1_SYCENG SYCAMORE LANDFILL South San Diego

CHILLS_7_UNITA1 GAS RECOVERY SYS. (SYCAMORE CANYON) South San Diego

CHINO_2_QF CHINO QFS South LA Basin

CHINO_2_SOLAR Chino RT Solar 1 South LA Basin

CHINO_6_CIMGEN O.L.S. ENERGY COMPANY -- CHINO South LA Basin

CHINO_6_SMPPAP SIMPSON PAPER South LA Basin

CHINO_7_MILIKN MN Milliken Genco LLC South LA Basin

CHWCHL_1_BIOMAS Chow II Biomass to Energy North Other PG&E Areas

CHWCHL_1_UNIT CHOW 2 PEAKER PLANT North Other PG&E Areas

CLOVER_2_UNIT MEGA HYDRO #1 (CLOVER CREEK) North CAISO System

CLRKRD_6_COALCN COAL CANYON HYDRO North CAISO System

CLRKRD_6_LIMESD Lime Saddle Hydro North CAISO System

CLRMTK_1_QF SMALL QF AGGREGATION - OAKLAND North Bay Area

CNTRVL_6_UNIT Centerville North CAISO System

COCOPP_7_UNIT 6 CONTRA COSTA UNIT 6 North Bay Area

COCOPP_7_UNIT 7 CONTRA COSTA UNIT 7 North Bay Area

COLEMN_2_UNIT Coleman North CAISO System

COLGA1_6_SHELLW COALINGA COGENERATION COMPANY North Other PG&E Areas

COLGAT_7_UNIT 1 COLGATE HYDRO UNIT 1 North Other PG&E Areas

COLGAT_7_UNIT 2 COLGATE HYDRO UNIT 2 North Other PG&E Areas

COLPIN_6_COLLNS COLLINS PINE North CAISO System

COLTON_6_AGUAM1 AGUA MANSA UNIT 1 (CITY OF COLTON) South LA Basin

COLUSA_2_PL1X3 Colusa Generating Station North CAISO System

COLVIL_7_PL1X2 COLLIERVILLE HYDRO UNIT 1 & 2 AGGREGATE North CAISO System

CONTAN_1_UNIT CONTAINER CORP. OF AMERICA North Bay Area

CONTRL_1_LUNDY LUNDY South CAISO System

CONTRL_1_OXBOW OXBOW GEOTHERMAL CORPORATION South CAISO System

CONTRL_1_POOLE POOLE HYDRO PLANT 1 South CAISO System

CONTRL_1_QF CONTROL QFS South CAISO System

CONTRL_1_RUSHCK RUSH CREEK South CAISO System

COPMTN_2_SOLAR1 Copper Mountain Solar 1 Pseudo Tie Pilot South CAISO Import

CORONS_6_CLRWTR Clearwater Power Plant South LA Basin

COTTLE_2_FRNKNH FRANKENHEIMER North CAISO System

COVERD_2_QFUNTS COVE ROAD HYDRO QF UNITS North CAISO System

COWCRK_2_UNIT Cow Creek Hydro North CAISO System

CPSTNO_7_PRMADS PRIMA DESCHECHA (CAPISTRANO) South San Diego

CRESSY_1_PARKER MERCED ID (PARKER) North Other PG&E Areas

CRESTA_7_PL1X2 CRESTA PH UNIT 1 & 2 AGGREGATE North Other PG&E Areas

CRNEVL_6_CRNVA Crane Valley North Other PG&E Areas

CRNEVL_6_SJQN 2 SAN JOAQUIN 2 North Other PG&E Areas

CRNEVL_6_SJQN 3 SAN JOAQUIN 3 North Other PG&E Areas

CROKET_7_UNIT CROCKETT COGEN North Bay Area

CRSTWD_6_KUMYAY Kumeyaay Wind Farm South San Diego

CSCCOG_1_UNIT 1 SANTA CLARA CO-GEN North Bay Area

CSCGNR_1_UNIT 1 GIANERA PEAKER UNIT 1 North Bay Area

CSCGNR_1_UNIT 2 GIANERA PEAKER UNIT 2 North Bay Area

CSTRVL_7_PL1X2 Marina Land Fill Gas North CAISO System

CSTRVL_7_QFUNTS Castroville QF Aggregate North CAISO System

CTNWDP_1_QF SMALL QF AGGREGATION - BURNEY North CAISO System

CURIS_1_QF SMALL QF AGGREGATION - MERCED North Other PG&E Areas

CWATER_7_UNIT 1 COOLWATER GEN STA. UNIT 1 South CAISO System

CWATER_7_UNIT 2 COOLWATER GEN STA. UNIT 2 South CAISO System

CWATER_7_UNIT 3 COOLWATER STATION 3 AGGREGATE South CAISO System

CWATER_7_UNIT 4 COOLWATER STATION 4 AGGREGATE South CAISO System

DAVIS_7_MNMETH MM Yolo Power LLC North Other PG&E Areas

DEADCK_1_UNIT DEADCK_1_UNIT North Other PG&E Areas

DEERCR_6_UNIT 1 DEER CREEK North Other PG&E Areas

DELTA_2_PL1X4 DELTA ENERGY CENTER AGGREGATE North Bay Area

DEVERS_1_QF DEVERS QFS South LA Basin

DEXZEL_1_UNIT DAI / OILDALE , INC. North Other PG&E Areas

DIABLO_7_UNIT 1 Diablo Canyon Unit 1 North CAISO System

DIABLO_7_UNIT 2 Diablo Canyon Unit 2 North CAISO System

DINUBA_6_UNIT DINUBA GENERATION PROJECT North Other PG&E Areas

DISCOV_1_CHEVRN CHEVRON USA (EASTRIDGE) North Other PG&E Areas

DIVSON_6_NSQF DIVISION NAVAL STATION COGEN South San Diego

DMDVLY_1_UNITS DIAMOND VALLEY LAKE PUMP-GEN PLANTSouth LA Basin

DONNLS_7_UNIT DONNELLS HYDRO North Other PG&E Areas

DOSMGO_2_NSPIN DOSMGO_2_NSPIN North CAISO System

DOUBLC_1_UNITS DOUBLE "C" LIMITED North Other PG&E Areas

DREWS_6_PL1X4 DREWS UNIT AGGREGATE South LA Basin

DRUM_7_PL1X2 Drum PH 1 Units 1 & 2 Aggregate North Other PG&E Areas

DRUM_7_PL3X4 Drum PH 1 Units 3 & 4 Aggregate North Other PG&E Areas

DRUM_7_UNIT 5 DRUM PH 2 UNIT 5 North Other PG&E Areas

DSABLA_7_UNIT De Sabla Hydro North CAISO System

DUANE_1_PL1X3 DONALD VON RAESFELD POWER PROJECT North Bay Area

DUTCH1_7_UNIT 1 DUTCH FLAT 1 PH North Other PG&E Areas

DUTCH2_7_UNIT 1 DUTCH FLAT 2 PH North Other PG&E Areas

DVLCYN_1_UNITS South

DEVIL CANYON HYDRO UNITS 1-4 AGGREGATE LA Basin

EASTWD_7_UNIT EASTWOOD PUMP-GEN South Big Creek-Ventura

EDMONS_2_NSPIN EDMONS_2_NSPIN South Big Creek-Ventura

EGATE_7_NOCITY NORTH CITY UNIT (EASTGATE) South San Diego

ELCAJN_6_LM6K El Cajon Energy Center South San Diego

ELCAJN_6_UNITA1 CalPeak Power - El Cajon LLC South San Diego

ELCAJN_7_GT1 EL CAJON South San Diego

ELDORO_7_UNIT 1 El Dorado Unit 1 North Other PG&E Areas

ELDORO_7_UNIT 2 El Dorado Unit 2 North Other PG&E Areas

ELECTR_7_PL1X3 ELECTRA PH UNIT 1 & 2 AGGREGATE North CAISO System

ELKCRK_6_STONYG STONEY GORGE HYDRO AGGREGATE North CAISO System

ELKHIL_2_PL1X3 North

ELK HILLS COMBINED CYCLE (AGGREGATE) CAISO System

ELLIS_2_QF ELLIS QFS South LA Basin

ELNIDP_6_BIOMAS El Nido Biomass to Energy North Other PG&E Areas

ELSEGN_7_UNIT 3 EL SEGUNDO GEN STA. UNIT 3 South LA Basin

ELSEGN_7_UNIT 4 EL SEGUNDO GEN STA. UNIT 4 South LA Basin

ENCINA_7_EA1 ENCINA UNIT 1 South San Diego

ENCINA_7_EA2 ENCINA UNIT 2 South San Diego

ENCINA_7_EA3 ENCINA UNIT 3 South San Diego

ENCINA_7_EA4 ENCINA UNIT 4 South San Diego

ENCINA_7_EA5 ENCINA UNIT 5 South San Diego

ENCINA_7_GT1 ENCINA GAS TURBINE UNIT 1 South San Diego

ESCNDO_6_PL1X2 MMC Escondido Aggregate South San Diego

ESCNDO_6_UNITB1 CalPeak Power - Enterprise LLC South San Diego

ESCO_6_GLMQF GOAL LINE L.P. South San Diego

ETIWND_2_FONTNA FONTANALYTLE CREEK POWERHOUSE PSouth LA Basin

ETIWND_2_QF ETIWANDA QFS South LA Basin

ETIWND_2_SOLAR FONTANA RT SOLAR South LA Basin

ETIWND_6_GRPLND Grapeland Peaker South LA Basin

ETIWND_6_MWDETI ETIWANDA RECOVERY HYDRO South LA Basin

ETIWND_7_MIDVLY MN Mid Valley Genco LLC South LA Basin

ETIWND_7_UNIT 3 ETIWANDA GEN STA. UNIT 3 South LA Basin

ETIWND_7_UNIT 4 ETIWANDA GEN STA. UNIT 4 South LA Basin

EXCHEC_7_UNIT 1 EXCHEQUER HYDRO North Other PG&E Areas

FAIRHV_6_UNIT FAIRHAVEN POWER CO. North Other PG&E Areas

FAYETT_1_UNIT ARCADIAN RENEWABLE POWER CORP North CAISO System

FELLOW_7_QFUNTS Fellow QF Aggregate North Other PG&E Areas

FLOWD1_6_ALTPP1 ALTAMONT POWER LLC (PARTNERS 1) North Bay Area

FLOWD2_2_FPLWND DIABLO WINDS North CAISO System

FLOWD2_2_UNIT 1 SMALL QF AGGREGATION - LIVERMORE North Bay Area

FMEADO_6_HELLHL FMEADO_6_HELLHL North Other PG&E Areas

FMEADO_7_UNIT FRENCH MEADOWS HYDRO North Other PG&E Areas

FORBST_7_UNIT 1 FORBESTOWN HYDRO North Other PG&E Areas

FORKBU_6_UNIT HYPOWER, INC. (FORKS OF BUTTE) North CAISO System

FRIANT_6_UNITS FRIANT DAM North Other PG&E Areas

FRITO_1_LAY FRITO-LAY North Other PG&E Areas

FTSWRD_7_QFUNTS FTSWRD_7_QFUNTS North Other PG&E Areas

FULTON_1_QF SMALL QF AGGREGATION - ZENIA North Other PG&E Areas

GALE_1_SEGS1 SUNRAY ENERGY, INC. - SEGS 1 South CAISO System

GARNET_1_UNITS South

GARNET GREEN POWER PROJECT AGGREGATE LA Basin

GARNET_1_WIND GARNET WIND ENERGY CENTER South LA Basin

GATES_6_PL1X2 Gates Peaker North Other PG&E Areas

GATWAY_2_PL1X3 GATEWAY GENERATING STATION North Bay Area

GEYS11_7_UNIT11 GEYSERS UNIT 11 (HEALDSBURG) North Other PG&E Areas

GEYS12_7_UNIT12 GEYSERS UNIT 12 (HEALDSBURG) North Other PG&E Areas

GEYS13_7_UNIT13 GEYSERS UNIT 13 (HEALDSBURG) North Other PG&E Areas

GEYS14_7_UNIT14 GEYSERS UNIT 14 (HEALDSBURG) North Other PG&E Areas

GEYS16_7_UNIT16 GEYSERS UNIT 16 (HEALDSBURG) North Other PG&E Areas

GEYS17_2_BOTRCK GEYS17_2_BOTRCK North Other PG&E Areas

GEYS17_7_UNIT17 GEYSERS UNIT 17 (HEALDSBURG) North Other PG&E Areas

GEYS18_7_UNIT18 GEYSERS UNIT 18 (HEALDSBURG) North Other PG&E Areas

GEYS20_7_UNIT20 GEYSERS UNIT 20 (HEALDSBURG) North Other PG&E Areas

GILROY_1_UNIT GILROY COGEN AGGREGATE North Bay Area

GILRPP_1_PL1X2 North

GILROY ENERGY CENTER UNITS 1&2 AGGREGATE Bay Area

GILRPP_1_PL3X4 GILROY ENERGY CENTER, UNIT #3 North Bay Area

GLNARM_7_UNIT 1 GLEN ARM UNIT 1 South LA Basin

GLNARM_7_UNIT 2 GLEN ARM UNIT 2 South LA Basin

GLNARM_7_UNIT 3 GLEN ARM UNIT 3 South LA Basin

GLNARM_7_UNIT 4 GLEN ARM UNIT 4 South LA Basin

GOLDHL_1_QF SMALL QF AGGREGATION - PLACERVILLENorth Other PG&E Areas

GOLETA_2_QF GOLETA QFS South Big Creek-Ventura

GOLETA_6_ELLWOD ELLWOOD ENERGY SUPPORT FACILITY South Big Creek-Ventura

GOLETA_6_EXGEN EXXON COMPANY USA South Big Creek-Ventura

GOLETA_6_GAVOTA Point Arguello Pipeline Company South Big Creek-Ventura

GOLETA_6_TAJIGS GOLETA_6_TAJIGS South Big Creek-Ventura

GRIZLY_1_UNIT 1 GRIZZLY HYDRO North CAISO System

GRNLF1_1_UNITS GREENLEAF #1 COGEN AGGREGATE North Other PG&E Areas

GRNLF2_1_UNIT GREENLEAF II COGEN North Other PG&E Areas

GRNVLY_7_SCLAND North

SANTA CRUZ LANDFILL GENERATING PLANT CAISO System

GRZZLY_1_BERKLY PE - BERKELEY, INC. North Bay Area

GWFPW1_6_UNIT GWF POWER SYSTEMS INC. #1 North Bay Area

GWFPW2_1_UNIT 1 GWF POWER SYSTEMS INC. #2 North Bay Area

GWFPW3_1_UNIT 1 GWF POWER SYSTEMS INC. #3 North Bay Area

GWFPW4_6_UNIT 1 GWF POWER SYSTEMS INC. #4 North Bay Area

GWFPW5_6_UNIT 1 GWF POWER SYSTEMS INC. #5 North Bay Area

GWFPWR_1_UNITS HEP PEAKER PLANT AGGREGATE North Other PG&E Areas

GWFPWR_6_UNIT HANFORD L.P. North Other PG&E Areas

GYS5X6_7_UNITS GEYSERS UNITS 5 & 6 AGGREGATE North Other PG&E Areas

GYS7X8_7_UNITS GEYSERS UNITS 7 & 8 AGGREGATE North Other PG&E Areas

GYSRVL_7_WSPRNG Sonoma CWA Warm Springs Hydro North Other PG&E Areas

HAASPH_7_PL1X2 HAAS PH UNIT 1 & 2 AGGREGATE North Other PG&E Areas

HALSEY_6_UNIT HALSEY HYDRO North Other PG&E Areas

HARBGN_7_UNITS HARBOR COGEN COMBINED CYCLE South LA Basin

HATCR1_7_UNIT Hat Creek #1 North CAISO System

HATCR2_7_UNIT Hat Creek #2 North CAISO System

HATLOS_6_LSCRK Lost Creek 1 & 2 Hydro Conversion South LA Basin

HATLOS_6_QFUNTS HAT CREEK HYDRO QF UNITS North CAISO System

HATRDG_2_WIND Hatchet Ridge Wind Farm North CAISO System

HAYPRS_6_QFUNTS HAYPRESS HYDRO QF UNITS North Other PG&E Areas

HELMPG_7_UNIT 1 HELMS PUMP-GEN UNIT 1 North Other PG&E Areas

HELMPG_7_UNIT 2 HELMS PUMP-GEN UNIT 2 North Other PG&E Areas

HELMPG_7_UNIT 3 HELMS PUMP-GEN UNIT 3 North Other PG&E Areas

HENRTA_6_UNITA1 GWF HENRIETTA PEAKER PLANT UNIT 1 North Other PG&E Areas

HENRTA_6_UNITA2 GWF HENRIETTA PEAKER PLANT UNIT 2 North Other PG&E Areas

HICKS_7_GUADLP GAS RECOVERY SYS. (GUADALUPE) North Bay Area

HIDSRT_2_UNITS HIGH DESERT POWER PROJECT AGGREGATE South CAISO System

HIGGNS_7_QFUNTS HIGGNS_7_QFUNTS North Other PG&E Areas

HINSON_6_CARBGN BP WILMINGTON CALCINER South LA Basin

HINSON_6_LBECH1 HINSON_6_LBECH1 South LA Basin

HINSON_6_LBECH2 HINSON_6_LBECH2 South LA Basin

HINSON_6_LBECH3 HINSON_6_LBECH3 South LA Basin

HINSON_6_LBECH4 HINSON_6_LBECH4 South LA Basin

HINSON_6_SERRGN CITY OF LONG BEACH South LA Basin

HIWAY_7_ACANYN GAS RECOVERY(AMERICA CANYON) North Other PG&E Areas

HMLTBR_6_UNITS HAMILTON BRANCH PH (AGGREGATE) North CAISO System

HNTGBH_7_UNIT 1 HUNTINGTON BEACH GEN STA. UNIT 1 South LA Basin

HNTGBH_7_UNIT 2 HUNTINGTON BEACH GEN STA. UNIT 2 South LA Basin

HNTGBH_7_UNIT 3 HUNTINGTON BEACH GEN STA. UNIT 3 South LA Basin

HNTGBH_7_UNIT 4 HUNTINGTON BEACH GEN STA. UNIT 4 South LA Basin

HOLGAT_1_BORAX U.S. BORAX AND CHEMICAL CORPORAT South CAISO System

HOLGAT_1_MOGEN MOJAVE COGENERATION CO. LP South CAISO System

HUMBPP_1_UNITS3 Humboldt Bay Generating Station 3 North Other PG&E Areas

HUMBPP_6_UNITS1 Humboldt Bay Generating Station 1 North Other PG&E Areas

HUMBPP_6_UNITS2 Humboldt Bay Generating Station 2 North Other PG&E Areas

HUMBSB_1_QF SMALL QF AGGREGATION - TRINITY North Other PG&E Areas

HYTTHM_2_UNITS HYATT-THERMALITO PUMP-GEN (AGGREGATE) North CAISO System

IGNACO_1_QF SMALL QF AGGREGATION - VALLEJO/DINSMORE North Other PG&E Areas

INDIGO_1_UNIT 1 INDIGO PEAKER UNIT 1 South LA Basin

INDIGO_1_UNIT 2 INDIGO PEAKER UNIT 2 South LA Basin

INDIGO_1_UNIT 3 INDIGO PEAKER UNIT 3 South LA Basin

INDVLY_1_UNITS INDIAN VALLEY HYDRO North Other PG&E Areas

INLDEM_5_UNIT 1 Inland Empire Energy Center, Unit 1 South LA Basin

INLDEM_5_UNIT 2 Inland Empire Energy Center, Unit 2 South LA Basin

INSKIP_2_UNIT INSKIP HYDRO North CAISO System

INTTRB_6_UNIT Intl Wind Turb Research (Dinosaur Point) North Other PG&E Areas

JAKVAL_2_IONE JACKSON VALLEY ENERG PTNRS (IONE) North CAISO System

JOHANN_6_QFA1 JOHANNA QF South LA Basin

JRWOOD_1_UNIT 1 SAN JOAQUIN POWER COMPANY North Other PG&E Areas

JVENTR_2_QFUNTS TRES VAQUEROS WIND QF UNITS North CAISO System

KALINA_2_UNIT 1 ALTAMONT COGENERATION CORP. North CAISO System

KANAKA_1_UNIT KANAKA North Other PG&E Areas

KEARNY_7_KY1 KEARNY GAS TURBINE UNIT 1 South San Diego

KEARNY_7_KY2 KEARNY GT2 AGGREGATE South San Diego

KEARNY_7_KY3 KEARNY GT3 AGGREGATE South San Diego

KEKAWK_6_UNIT STS HYDROPOWER LTD. (KEKAWAKA) North Other PG&E Areas

KELYRG_6_UNIT KELLY RIDGE HYDRO North Other PG&E Areas

KERKH1_7_UNIT 1 KERKHOFF PH 1 UNIT #1 North Other PG&E Areas

KERKH1_7_UNIT 2 KERKHOFF PH 1 UNIT #2 North Other PG&E Areas

KERKH1_7_UNIT 3 KERKHOFF PH 1 UNIT #3 North Other PG&E Areas

KERKH2_7_UNIT 1 KERKHOFF PH 2 UNIT #1 North Other PG&E Areas

KERNFT_1_UNITS KERN FRONT LIMITED North Other PG&E Areas

KERNRG_1_UNITS AERA ENERGY (SOUTH BELRIDGE) North Other PG&E Areas

KERRGN_1_UNIT 1 KERN RIVER HYDRO UNITS 1-4 AGGREGATE South Big Creek-Ventura

KILARC_2_UNIT 1 KILARC HYDRO North CAISO System

KINGCO_1_KINGBR PE - KES KINGSBURG,LLC North Other PG&E Areas

KINGRV_7_UNIT 1 KINGS RIVER HYDRO UNIT 1 North Other PG&E Areas

KIRKER_7_KELCYN KELLER CANYON LANDFILL GEN FACILICITY North Bay Area

KNGCTY_6_UNITA1 King City Energy Center, Unit #1 North CAISO System

KRAMER_1_SEGS37 LUZ SOLAR PARTNERS 3-7 AGGREGATE South CAISO System

KRAMER_2_SEGS89 LUZ SOLAR PARTNERS 8-9 AGGREGATE South CAISO System

KRNCNY_6_UNIT KERN CANYON North Other PG&E Areas

KRNOIL_7_TEXEXP Texaco Exploration & Prod QF Aggregation North Other PG&E Areas

LACIEN_2_VENICE MWD Venice Hydroelectric Recovery Plant South LA Basin

LAFRES_6_QF LA FRESA QFS South LA Basin

LAGBEL_6_QF LAGUNA BELL QFS South LA Basin

LAPAC_6_UNIT LOUISIANA PACIFIC SAMOA North Other PG&E Areas

LAPLMA_2_UNIT 1 La Paloma Generating Plant Unit #1 North CAISO System

LAPLMA_2_UNIT 2 La Paloma Generating Plant Unit #2 North CAISO System

LAPLMA_2_UNIT 3 La Paloma Generating Plant Unit #3 North CAISO System

LAPLMA_2_UNIT 4 LA PALOMA GENERATING PLANT, UNIT #4North CAISO System

LARKSP_6_UNIT 1 LARKSPUR PEAKER UNIT 1 South San Diego

LARKSP_6_UNIT 2 LARKSPUR PEAKER UNIT 2 South San Diego

LAROA1_2_UNITA1 Ciclo Combinado Mexicali South CAISO System

LAROA2_2_UNITA1 CENTRAL LA ROSITA II COMBINED CYCLESouth CAISO System

LASSEN_6_UNITS LASSEN AREA QF AGGREGATION North CAISO System

LAWRNC_7_SUNYVL City of Sunnyvale Unit 1 and 2 North Bay Area

LEBECS_2_UNITS Pastoria Energy Facility South Big Creek-Ventura

LECEF_1_UNITS LOS ESTEROS ENERGY FACILITY AGGREGATE North Bay Area

LEWSTN_7_WEBRFL PAN PACIFIC (WEBER FLAT) North CAISO System

LFC 51_2_UNIT 1 PATTERSON PASS WIND FARM LLC North Bay Area

LGHTHP_6_ICEGEN CARSON COGENERATION COMPANY South LA Basin

LGHTHP_6_QF LIGHTHIPE QFS South LA Basin

LIVOAK_1_UNIT 1 LIVE OAK LIMITED North Other PG&E Areas

LMBEPK_2_UNITA1 Lambie Energy Center, Unit #1 North Bay Area

LMBEPK_2_UNITA2 Creed Energy Center, Unit #1 North Bay Area

LMBEPK_2_UNITA3 Goose Haven Energy Center, Unit #1 North Bay Area

LMEC_1_PL1X3 Los Medanos Energy Center AGGREGATE North Bay Area

LODI25_2_UNIT 1 LODI GAS TURBINE North Other PG&E Areas

LOWGAP_7_QFUNTS LOWGAP_7_QFUNTS North CAISO System

MALAGA_1_PL1X2 KRCD Malaga Peaking Plant North Other PG&E Areas

MALCHQ_7_UNIT 1 MALACHA HYDRO L.P. North CAISO System

MARKHM_1_CATLST SAN JOSE COGEN North Bay Area

MARTIN_1_SUNSET Sunset Reservoir - North Basin North Bay Area

MCARTH_6_BIGVAL Big Valley Power North CAISO System

MCCALL_1_QF SMALL QF AGGREGATION - FRESNO North Other PG&E Areas

MCGEN_1_UNIT ACE COGENERATION South CAISO System

MCSWAN_6_UNITS MC SWAIN HYDRO North Other PG&E Areas

MDFKRL_2_PROJCT MIDDLE FORK AND RALSTON PSP North Other PG&E Areas

MENBIO_6_RENEW1 CalRENEW - 1(A) North CAISO System

MENBIO_6_UNIT MENDOTA BIOMASS POWER North Other PG&E Areas

MERCFL_6_UNIT MERCED FALLS North Other PG&E Areas

MESAP_1_QF SMALL QF AGGREGATION - SAN LUIS OBISPO North CAISO System

MESAS_2_QF MESA QFS South LA Basin

METCLF_1_QF SMALL QF AGGREGATION - SANTA CLARANorth WD Bay Area

METEC_2_PL1X3 Metcalf Energy Center North Bay Area

MIDSET_1_UNIT 1 MIDSET COGEN. CO. North Other PG&E Areas

MIDWAY_1_QF SMALL QF AGGREGATION - BAKERSFIELDNorth Other PG&E Areas

MILBRA_1_QF SMALL QF AGGREGATION - DAILY CITY North Bay Area

MIRLOM_2_CORONA MWD Corona Hydroelectric Recovery Plant South LA Basin

MIRLOM_2_TEMESC MWD Temescal Hydroelectric Recovery Plan South LA Basin

MIRLOM_6_DELGEN CORONA ENERGY PARTNERS LTD. South LA Basin

MIRLOM_6_PEAKER Mira Loma Peaker South LA Basin

MIRLOM_7_MWDLKM Lake Mathews Hydroelectric Recovery Plan South LA Basin

MISSIX_1_QF SMALL QF AGGREGATION - SAB FRABCUSCI North Bay Area

MKTRCK_1_UNIT 1 MCKITTRICK LIMITED North Other PG&E Areas

MLPTAS_7_QFUNTS MLPTAS_7_QFUNTS North Bay Area

MNDALY_7_UNIT 1 MANDALAY GEN STA. UNIT 1 South Big Creek-Ventura

MNDALY_7_UNIT 2 MANDALAY GEN STA. UNIT 2 South Big Creek-Ventura

MNDALY_7_UNIT 3 MANDALAY GEN STA. UNIT 3 South Big Creek-Ventura

MNTAGU_7_NEWBYI GAS RECOVERY SYS. (NEWBY ISLAND 2) North Bay Area

MOJAVE_1_SIPHON MOJAVE SIPHON POWER PLANT South LA Basin

MONLTH_6_BOREL BOREL HYDRO UNITS 1-3 AGGREGATE South Big Creek-Ventura

MONTPH_7_UNITS MONTICELLO HYDRO AGGREGATE North Other PG&E Areas

MOORPK_2_CALABS Calabasas Gas-to-Energy Facility South Big Creek-Ventura

MOORPK_6_QF MOORPARK QFS South Big Creek-Ventura

MOORPK_7_UNITA1 WEME- Simi Valley Landfill South Big Creek-Ventura

MORBAY_7_UNIT 3 MORRO BAY UNIT 3 North CAISO System

MORBAY_7_UNIT 4 MORRO BAY UNIT 4 North CAISO System

MOSSLD_1_QF SMALL QF AGGREGATION - SANTA CRUZ North CAISO System

MOSSLD_2_PSP1 MOSS LANDING POWER BLOCK 1 North CAISO System

MOSSLD_2_PSP2 MOSS LANDING POWER BLOCK 2 North CAISO System

MOSSLD_7_UNIT 6 MOSS LANDING UNIT 6 North CAISO System

MOSSLD_7_UNIT 7 MOSS LANDING UNIT 7 North CAISO System

MRCHNT_2_MELDYN MRCHNT_2_MELDYN South CAISO Import

MRGT_6_MEF2 Miramar Energy Facility II South San Diego

MRGT_6_MMAREF Miramar Energy Facility South San Diego

MRGT_7_UNITS MIRAMAR COMBUSTION TURBINE AGGREGATE South San Diego

MSHGTS_6_MMARLF MIRAMAR LANDFILL South San Diego

MSSION_2_QF SMALL QF AGGREGATION - SAN DIEGO South San Diego

MTNLAS_6_UNIT OGDEN POWER PACIFIC, INC.(MT LASSEN) North CAISO System

MTNPOS_1_UNIT MT.POSO COGENERATION CO. North Other PG&E Areas

MTNPWR_7_BURNEY OGDEN POWER PACIFIC, INC. (BURNEY) North CAISO System

MTWIND_1_UNIT 1 Mountain View Power Project I South LA Basin

MTWIND_1_UNIT 2 Mountain View Power Project II South LA Basin

MTWIND_1_UNIT 3 Mountain View Power Project III South LA Basin

NAPA_2_UNIT NAPA HOSPITAL North Other PG&E Areas

NAROW1_2_UNIT NARROWS PH 1 UNIT North Other PG&E Areas

NAROW2_2_UNIT NARROWS PH 2 UNIT North Other PG&E Areas

NAVY35_1_UNITS OCCIDENTAL OF ELK HILLS, INC. North Other PG&E Areas

NAVYII_2_UNITS COSO POWER DEVELOPER (NAVY II) AGGREGATESouth CAISO System

NCPA_7_GP1UN1 NCPA GEO PLANT 1 UNIT 1 North Other PG&E Areas

NCPA_7_GP1UN2 NCPA GEO PLANT 1 UNIT 2 North Other PG&E Areas

NCPA_7_GP2UN3 NCPA GEO PLANT 2 UNIT 3 North Other PG&E Areas

NCPA_7_GP2UN4 NCPA GEO PLANT 2 UNIT 4 North Other PG&E Areas

NEWARK_1_QF NEWARK 1 QF North Bay Area

NHOGAN_6_UNITS NEW HOGAN PH AGGREGATE North CAISO System

NIMTG_6_NIQF NORTH ISLAND QF South San Diego

NWCSTL_7_UNIT 1 NEWCASTLE HYDRO North Other PG&E Areas

OAK C_7_UNIT 1 OAKLAND STATION C GT UNIT 1 North Bay Area

OAK C_7_UNIT 2 OAKLAND STATION C GT UNIT 2 North Bay Area

OAK C_7_UNIT 3 OAKLAND STATION C GT UNIT 3 North Bay Area

OAK L_7_EBMUD EAST BAY M.U.D. (OAKLAND) North Bay Area

OGROVE_6_PL1X2 Orange Grove Energy Center South San Diego

OILDAL_1_UNIT 1 OILDALE ENERGY LLC North Other PG&E Areas

OILFLD_7_QFUNTS OILFLD_7_QFUNTS North CAISO System

OLINDA_2_COYCRK MWD Coyote Creek Hydroelectric Recovery South LA Basin

OLINDA_2_QF OLINDA QFS South LA Basin

OLINDA_7_LNDFIL OLINDA_7_LNDFIL South LA Basin

OLSEN_2_UNIT OLSEN POWER PARTNERS North CAISO System

OMAR_2_UNIT 1 KERN RIVER COGENERATION CO. UNIT 1 South Big Creek-Ventura

OMAR_2_UNIT 2 KERN RIVER COGENERATION CO. UNIT 2 South Big Creek-Ventura

OMAR_2_UNIT 3 KERN RIVER COGENERATION CO. UNIT 3 South Big Creek-Ventura

OMAR_2_UNIT 4 KERN RIVER COGENERATION CO. UNIT 4 South Big Creek-Ventura

ORMOND_7_UNIT 1 ORMOND BEACH GEN STA. UNIT 1 South Big Creek-Ventura

ORMOND_7_UNIT 2 ORMOND BEACH GEN STA. UNIT 2 South Big Creek-Ventura

OROVIL_6_UNIT OROVILLE COGEN North Other PG&E Areas

OSO_6_NSPIN OSO_6_NSPIN South Big Creek-Ventura

OTAY_6_PL1X2 MMC Chula Vista Aggregate South San Diego

OTAY_6_UNITB1 OTAY LANDFILL UNITS AGGREGATE South San Diego

OTAY_7_UNITC1 Otay 3 South San Diego

OTMESA_2_PL1X3 OTAY MESA ENERGY CENTER South San Diego

OXBOW_6_DRUM OXBOW HYDRO North Other PG&E Areas

OXMTN_6_LNDFIL Ox Mountain Landfill Generating Plant North Bay Area

PACLUM_6_UNIT PACIFIC LUMBER (HUMBOLDT) North Other PG&E Areas

PACORO_6_UNIT OGDEN POWER PACIFIC, INC. (OROVILLE)North Other PG&E Areas

PADUA_2_ONTARO ONTARIO/SIERRA HYDRO PSP South LA Basin

PADUA_6_MWDSDM San Dimas Hydroelectric Recovery Plant South LA Basin

PADUA_6_QF PADUA QFS South LA Basin

PADUA_7_SDIMAS San Dimas Wash Hydro South LA Basin

PALALT_7_COBUG Cooperatively Owned Back Up Generator North Bay Area

PALOMR_2_PL1X3 Palomar Energy Center South San Diego

PANDOL_6_UNIT DELANO ENERGY COMPANY AGGREGATE South Big Creek-Ventura

PEARBL_2_NSPIN PEARBL_2_NSPIN South CAISO System

PHOENX_1_UNIT PHOENIX PH North Other PG&E Areas

PINFLT_7_UNITS PINE FLAT HYDRO AGGREGATE North Other PG&E Areas

PIT1_7_UNIT 1 PIT PH 1 UNIT 1 North CAISO System

PIT1_7_UNIT 2 PIT PH 1 UNIT 2 North CAISO System

PIT3_7_PL1X3 PIT PH 3 UNITS 1, 2 & 3 AGGREGATE North CAISO System

PIT4_7_PL1X2 PIT PH 4 UNITS 1 & 2 AGGREGATE North CAISO System

PIT5_7_PL1X2 PIT PH 5 UNITS 1 & 2 AGGREGATE North CAISO System

PIT5_7_PL3X4 PIT PH 5 UNITS 3 & 4 AGGREGATE North CAISO System

PIT5_7_QFUNTS PIT 5 HYDRO QF UNITS North CAISO System

PIT6_7_UNIT 1 PIT PH 6 UNIT 1 North CAISO System

PIT6_7_UNIT 2 PIT PH 6 UNIT 2 North CAISO System

PIT7_7_UNIT 1 PIT PH 7 UNIT 1 North CAISO System

PIT7_7_UNIT 2 PIT PH 7 UNIT 2 North CAISO System

PITTSP_7_UNIT 5 PITTSBURG UNIT 5 North Bay Area

PITTSP_7_UNIT 6 PITTSBURG UNIT 6 North Bay Area

PITTSP_7_UNIT 7 PITTSBURG UNIT 7 North Bay Area

PLACVL_1_CHILIB Chili Bar Hydro North Other PG&E Areas

PLACVL_1_RCKCRE PLACER UNIT (ROCK CREEK) North Other PG&E Areas

PLSNTG_7_LNCLND Lincoln Landfill Power Plant North Other PG&E Areas

PNCHEG_2_PL1X4 PANOCHE ENERGY CENTER (Aggregated) North CAISO System

PNCHPP_1_PL1X2 STARWOOD POWER - MIDWAY LLC North Other PG&E Areas

PNOCHE_1_PL1X2 Panoche Peaker North Other PG&E Areas

PNOCHE_1_UNITA1 CalPeak Power - Panoche LLC North Other PG&E Areas

POEPH_7_UNIT 1 POE HYDRO UNIT 1 North Other PG&E Areas

POEPH_7_UNIT 2 POE HYDRO UNIT 2 North Other PG&E Areas

POTRPP_7_UNIT 3 POTRERO UNIT 3 North Bay Area

POTRPP_7_UNIT 4 POTRERO UNIT 4 North Bay Area

POTRPP_7_UNIT 5 POTRERO UNIT 5 North Bay Area

POTRPP_7_UNIT 6 POTRERO UNIT 6 North Bay Area

POTTER_6_UNITS Potter Valley North Other PG&E Areas

POTTER_7_VECINO Vecino Vineyards LLC North Other PG&E Areas

PSWEET_7_QFUNTS PSWEET_7_QFUNTS North CAISO System

PTLOMA_6_NTCCGN AEI MCRD STEAM TURBINE South San Diego

PTLOMA_6_NTCQF NTC/MCRD COGENERATION South San Diego

PWEST_1_UNIT PACIFIC WEST 1 WIND GENERATION South LA Basin

RCKCRK_7_UNIT 1 ROCK CREEK HYDRO UNIT 1 North Other PG&E Areas

RCKCRK_7_UNIT 2 ROCK CREEK HYDRO UNIT 2 North Other PG&E Areas

RECTOR_2_KAWEAH KAWEAH PH 2 & 3 PSP AGGREGATE South Big Creek-Ventura

RECTOR_2_KAWH 1 KAWEAH PH 1 UNIT 1 South Big Creek-Ventura

RECTOR_2_QF RECTOR QFS South Big Creek-Ventura

RECTOR_7_TULARE RECTOR_7_TULARE South Big Creek-Ventura

REDBLF_6_UNIT RED BLUFF PEAKER PLANT North CAISO System

REDOND_7_UNIT 5 REDONDO GEN STA. UNIT 5 South LA Basin

REDOND_7_UNIT 6 REDONDO GEN STA. UNIT 6 South LA Basin

REDOND_7_UNIT 7 REDONDO GEN STA. UNIT 7 South LA Basin

REDOND_7_UNIT 8 REDONDO GEN STA. UNIT 8 South LA Basin

RHONDO_2_QF RIO HONDO QFS South LA Basin

RHONDO_6_PUENTE Puente Hills GTE Facility Phase II South LA Basin

RICHMN_7_BAYENV BAY ENVIRONMENTAL (NOVE POWER) North Bay Area

RIOBRV_6_UNIT 1 RIO BRAVO FRESNO North Other PG&E Areas

RIOOSO_1_QF SMALL QF AGGREGATION - GRASS VALLEY North Other PG&E Areas

ROLLIN_6_UNIT ROLLINS HYDRO North Other PG&E Areas

RVRVEW_1_UNITA1 Riverview Energy Center (GP Antioch) North Bay Area

RVSIDE_2_RERCU3 Riverside Energy Res. Ctr Unit 3 South LA Basin

RVSIDE_2_RERCU4 Riverside Energy Res. Ctr Unit 4 South LA Basin

RVSIDE_6_RERCU1 Riverside Energy Res. Ctr Unit 1 South LA Basin

RVSIDE_6_RERCU2 Riverside Energy Res. Ctr Unit 2 South LA Basin

RVSIDE_6_SPRING SPRINGS GENERATION PROJECT AGGREGATE South LA Basin

SALIRV_2_UNIT SALINAS RIVER COGEN CO. North CAISO System

SALTSP_7_UNITS SALT SPRINGS HYDRO AGGREGATE North CAISO System

SAMPSN_6_KELCO1 KELCO QUALIFYING FACILITY South San Diego

SANJOA_1_UNIT 1 SAN JOAQUIN COGEN North CAISO System

SANTFG_7_UNITS GEYSERS CALISTOGA AGGREGATE North Other PG&E Areas

SANTGO_6_COYOTE GAS RECOVERY SYS. (COYOTE CANYON)South LA Basin

SARGNT_2_UNIT SARGENT CANYON COGEN. COMPANY North CAISO System

SAUGUS_2_TOLAND Toland Landfill gas to Energy Project South LA Basin

SAUGUS_6_MWDFTH Foothill Hydroelectric Recovery Plant South Big Creek-Ventura

SAUGUS_6_PTCHGN COUNTY OF LOS ANGELES -- PITCHLE South Big Creek-Ventura

SAUGUS_6_QF SAUGUS QFS South Big Creek-Ventura

SAUGUS_7_CHIQCN Chiquita Canyon Landfill Fac South Big Creek-Ventura

SAUGUS_7_LOPEZ MM Lopez Energy South Big Creek-Ventura

SBERDO_2_PSP3 Mountainview Gen Sta. Unit 3 South LA Basin

SBERDO_2_PSP4 Mountainview Gen Sta. Unit 4 South LA Basin

SBERDO_2_QF SAN BERADINO QFS South LA Basin

SBERDO_2_SNTANA SANTA ANA PSP South LA Basin

SBERDO_6_MILLCK MILL CREEK PSP South LA Basin

SCHLTE_1_UNITA1 Tracy Unit 1 Peaking Project North Other PG&E Areas

SCHLTE_1_UNITA2 Tracy Unit 2 Peaking Project North Other PG&E Areas

SEARLS_7_ARGUS NORTH AMERICAN ARGUS South CAISO System

SEARLS_7_WESTEN NORTH AMERICAN WESTEND South CAISO System

SEAWST_6_LAPOS SEA WEST WIND QF AGGREGATION North Bay Area

SEGS_1_SEGS2 SUNRAY ENERGY, INC. - SEGS 2 South CAISO System

SGREGY_6_SANGER DYNAMIS COGEN North Other PG&E Areas

SIERRA_1_UNITS HIGH SIERRA LIMITED North Other PG&E Areas

SISQUC_1_SMARIA Santa Maria II LFG Power Plant North CAISO System

SLUISP_2_UNITS SAN LUIS (GIANELLI) PUMP-GEN (AGGREGATE) North CAISO System

SLYCRK_1_UNIT 1 SLY CREEK HYDRO North Other PG&E Areas

SMARQF_1_UNIT 1 SANTA MARIA COGEN North CAISO System

SMPAND_7_UNIT WHEELABRATOR LASSEN INC. North CAISO System

SMPRIP_1_SMPSON RIPON COGENERATION, INC. North CAISO System

SMRCOS_6_LNDFIL SAN MARCOS LANDFILL BIO-GAS South San Diego

SMUDGO_7_UNIT 1 SONOMA POWER PLANT North Other PG&E Areas

SNCLRA_6_OXGEN E.F. OXNARD INCORPORATED South Big Creek-Ventura

SNCLRA_6_PROCGN PROCTER AND GAMBLE OXNARD II South Big Creek-Ventura

SNCLRA_6_QF SANTA CLARA QFS South Big Creek-Ventura

SNCLRA_6_WILLMT WILLIAMETTE South Big Creek-Ventura

SNDBAR_7_UNIT 1 SAND BAR HYDRO North Other PG&E Areas

SNMALF_6_UNITS Sonoma County Landfill North Other PG&E Areas

SONGS_7_UNIT 2 SAN ONOFRE NUCLEAR UNIT 2 South LA Basin

SONGS_7_UNIT 3 SAN ONOFRE NUCLEAR UNIT 3 South LA Basin

SOUTH_2_UNIT SOUTH HYDRO North CAISO System

SPAULD_6_UNIT 3 SPAULDING HYDRO PH 3 UNIT North Other PG&E Areas

SPAULD_6_UNIT12 SPAULDING HYDRO PH 1 & 2 AGGREGATE North Other PG&E Areas

SPBURN_2_UNIT 1 SIERRA PACIFIC IND. (BURNEY) North CAISO System

SPBURN_7_SNOWMT SPBURN_7_SNOWMT North CAISO System

SPI LI_2_UNIT 1 SIERRA PACIFIC IND. (LINCOLN) North Other PG&E Areas

SPIAND_1_UNIT SIERRA PACIFIC IND. (ANDERSON) North CAISO System

SPICER_1_UNITS SPICER HYDRO UNITS 1-3 AGGREGATE North CAISO System

SPIFBD_1_PL1X2 SIERRA PACIFIC IND. (SONORA) North Other PG&E Areas

SPQUIN_6_SRPCQU SIERRA PACIFIC IND. (QUINCY) North CAISO System

SPRGAP_1_UNIT 1 SPRING GAP HYDRO North Other PG&E Areas

SPRGVL_2_QF SPRINGVILLE QFS South Big Creek-Ventura

SPRGVL_2_TULE TULE RIVER HYDRO PLANT (PG&E) South Big Creek-Ventura

SPRGVL_2_TULESC TULE RIVER HYDRO PLANT (SCE) South Big Creek-Ventura

SRINTL_6_UNIT SRI INTERNATIONAL North Bay Area

STANIS_7_UNIT 1 STANISLAUS HYDRO North Other PG&E Areas

STAUFF_1_UNIT RHODIA INC. (RHONE-POULENC) North Bay Area

STIGCT_2_LODI LODI STIG UNIT North Other PG&E Areas

STNRES_1_UNIT STANISLAUS WASTE ENERGY CO. North Other PG&E Areas

STOILS_1_UNITS CHEVRON RICHMOND REFINERY North Bay Area

STOKCG_1_UNIT 1 STOCKTON COGEN CO. North Other PG&E Areas

STOREY_7_MDRCHW MADERA CHOWCHILLA North Other PG&E Areas

SUISUN_7_CTYFAI CITY OF FAIRFIELD GENERATION AGGREGATENorth CAISO System

SUNRIS_2_PL1X3 Sunrise Power Project AGGREGATE II North CAISO System

SUNSET_2_UNITS MIDWAY SUNSET COGENERATION PLANTNorth CAISO System

SUTTER_2_PL1X3 SUTTER POWER PLANT AGGREGATE North CAISO System

SYCAMR_2_UNITS SYCAMORE COGENNERATION AGGREGATE South Big Creek-Ventura

TANHIL_6_SOLART BERRY PETROLEUM COGEN 18 AGGREGATE North Other PG&E Areas

TBLMTN_6_QF SMALL QF AGGREGATION - PARADISE North CAISO System

TEMBLR_7_WELLPT NUEVO ENERGY COMPANY (WELPORT) North Other PG&E Areas

TENGEN_2_PL1X2 Berry Petroleum Placerita South Big Creek-Ventura

TERMEX_2_PL1X3 TERMOELECTRICA DE MEXICALI 1 South CAISO System

TESLA_1_QF SMALL QF AGGREGATION - STOCKTON North CAISO System

THMENG_1_UNIT 1 THERMAL ENERGY DEV. CORP. North CAISO System

TIDWTR_2_UNITS MARTINEZ COGEN LIMITED PARTNERSHIP North Bay Area

TIFFNY_1_DILLON TIFFNY_1_DILLON South LA Basin

TIGRCK_7_UNITS TIGER CREEK HYDRO AGGREGATE North CAISO System

TKOPWR_2_UNIT TKO POWER North CAISO System

TOADTW_6_UNIT TOAD TOWN North CAISO System

TULLCK_7_UNITS TULLOCH HYDRO AGGREGATE North Other PG&E Areas

TXMCKT_6_UNIT TEXACO INC. (MCKITTRICK) North Other PG&E Areas

TXNMID_1_UNIT 2 NORTH MIDWAY COGENERATION AGGREGATE North Other PG&E Areas

UKIAH_7_LAKEMN UKIAH LAKE MENDOCINO HYDRO North Other PG&E Areas

ULTOGL_1_POSO RIO BRAVO POSO North Other PG&E Areas

ULTPCH_1_UNIT 1 North

OGDEN POWER PACIFIC (CHINESE STATION) Other PG&E Areas

ULTPFR_1_UNIT 1 RIO BRAVO FRESNO (AKA ULTRAPOWER)North Other PG&E Areas

ULTRCK_2_UNIT Rio Bravo Rocklin North Other PG&E Areas

UNCHEM_1_UNIT CONTRA COSTA CARBON PLANT North Bay Area

UNOCAL_1_UNITS TOSCO (RODEO PLANT) North Bay Area

UNTDQF_7_UNITS UNITED AIRLINES (COGEN) North Bay Area

UNVRSY_1_UNIT 1 BERRY PETROLEUM COGEN 38 North Other PG&E Areas

USWND1_2_UNITS US WIND POWER#1(WALKER) North CAISO System

USWND2_1_UNITS US WIND POWER#2(PATTERSON) North CAISO System

USWND4_2_UNITS US WIND POWER#4(RALPH) North CAISO System

USWNDR_2_SMUD SOLANO WIND FARM North Bay Area

USWNDR_2_UNITS US WIND POWER(RUSSELL) North Bay Area

USWPFK_6_FRICK GREEN RIDGE POWER LLC (FRICK) North Bay Area

USWPJR_2_UNITS US WIND POWER#3(J.W. RANCH) North Bay Area

VACADX_1_QF SMALL QF AGGREGATION - VACAVILLE North CAISO System

VACADX_1_SOLAR Vaca-Dixon Solar Station North CAISO System

VACADX_1_UNITA1 CalPeak Power - Vaca Dixon LLC North CAISO System

VALLEY_5_PERRIS MWD Perris Hydroelectric Recovery Plant South LA Basin

VALLEY_5_REDMTN MWD Red Mountain Hydroelectric Recovery South LA Basin

VALLEY_7_BADLND VALLEY_7_BADLND South LA Basin

VALLEY_7_UNITA1 WM Energy, El Sobrante Landfill South LA Basin

VEDDER_1_SEKERN TEXACO EXPLORATION & PROD (SE KERN RIVER North Other PG&E Areas

VERNON_6_GONZL1 H. Gonzales Unit #1 South LA Basin

VERNON_6_GONZL2 H. Gonzales Unit #2 South LA Basin

VERNON_6_MALBRG Malburg Generating Station South LA Basin

VESTAL_2_KERN KERN RIVER PH 3 UNITS 1 & 2 AGGREGATE South Big Creek-Ventura

VESTAL_6_QF VESTAL QFS South Big Creek-Ventura

VESTAL_6_ULTRGN RIO BRAVO JASMIN South Big Creek-Ventura

VESTAL_6_WDFIRE SIERRA POWER CORPORATION South Big Creek-Ventura

VICTOR_1_QF VICTOR QFS South CAISO System

VILLPK_2_VALLYV MWD Valley View Hydroelectric Recovery P South LA Basin

VILLPK_6_MWDYOR Yorba Linda Hydroelectric Recovery Plant South LA Basin

VINCNT_2_QF VINCENT QFS South CAISO System

VINCNT_2_WESTWD Oasis Power Plant South CAISO System

VISTA_6_QF VISTA QFS South LA Basin

VLYHOM_7_SSJID SOUTH SAN JOAQUIN ID (WOODWARD) North Other PG&E Areas

VOLTA_2_UNIT 1 VOLTA HYDRO UNIT 1 North CAISO System

VOLTA_2_UNIT 2 Volta Hydro Unit 2 North CAISO System

VOLTA_7_QFUNTS VOLTA_7_QFUNTS North CAISO System

WADHAM_6_UNIT WADHAM ENERGY LTD. PART. North CAISO System

WALNUT_6_HILLGEN L.A. COUNTY SANITATION DISTRICT South LA Basin

WALNUT_7_WCOVCT WALNUT_7_WCOVCT South LA Basin

WALNUT_7_WCOVST WALNUT_7_WCOVST South LA Basin

WARNE_2_UNIT WARNE HYDRO AGGREGATE South Big Creek-Ventura

WDFRDF_2_UNITS WEST FORD FLAT AGGREGATE North Other PG&E Areas

WDLEAF_7_UNIT 1 WOODLEAF HYDRO North Other PG&E Areas

WESTPT_2_UNIT West Point Hydro Plant North CAISO System

WHEATL_6_LNDFIL G2 ENERGY, OSTROM ROAD LLC North Other PG&E Areas

WHTWTR_1_WINDA1 Whitewater Hill Wind Project South LA Basin

WISE_1_UNIT 1 Wise Hydro Unit 1 North Other PG&E Areas

WISE_1_UNIT 2 WISE HYDRO UNIT 2 North Other PG&E Areas

WISHON_6_UNITS Wishon/San Joaquin #1-A AGGREGATE North Other PG&E Areas

WLLWCR_6_CEDRFL CEDAR FLAT HYDRO QF AGGREGATION North Other PG&E Areas

WNDMAS_2_UNIT 1 BUENA VISTA ENERGY, LLC North Bay Area

WOLFSK_1_UNITA1 Wolfskill Energy Center, Unit #1 North CAISO System

WRGHTP_7_AMENGY SMALL QF AGGREGATION - LOS BANOS North Other PG&E Areas

WSENGY_1_UNIT 1 WHEELABRATOR SHASTA UNITS 1-3 AGGREGATE North CAISO System

YUBACT_1_SUNSWT YUBA CITY COGEN North Other PG&E Areas

YUBACT_6_UNITA1 Yuba City Energy Center (Calpine) North Other PG&E Areas

ZOND_6_UNIT ZOND WINDSYSTEMS INC. North Bay Area

1/1/2012 1/31/2012 North

2/1/2012 2/29/2012 South

3/1/2012 3/31/2012 CAISO

4/1/2012 4/30/2012

5/1/2012 5/31/2012

6/1/2012 6/30/2012

7/1/2012 7/31/2012

8/1/2012 8/31/2012

9/1/2012 9/30/2012

10/1/2012 10/31/2012

11/1/2012 11/30/2012

12/1/2012 12/31/2012

Page 28 3PRMA_May_10









Worksheet A. YEAR AHEAD RA SUMMARY





Summary Table 1: LSE Obligations

Abbreviation

Month of Filing: Aug-12 Filing Month

Zone - SP26/NP26 SP26 NP26 Zone

Peak Demand [Coincident Peak Hour Demand Forecast provided by CEC] (MW) in SCE TAC Area 0.00 0.00

SCE-TAC



Peak Demand [Coincident Peak Hour Demand Forecast provided by CEC] (MW) in SDGE TAC Area 0.00 0.00

SDGE-TAC



Peak Demand [Coincident Peak Hour Demand Forecast provided by CEC] (MW) in PG&E TAC Area 0.00 0.00

PGE-TAC



Total 115% RA obligation: 0.00 0.00

Total 115% RAR



90% Zonal RAR for Year Ahead RA (MW): 0.00 0.00 90% of Total RA

obligation

DR, RMR, CAM Allocations 0.00 0.00 DR+RMR+CAM

Zonal RAR - Year Ahead Zonal RA Obligation 0.00 0.00 Zonal Total



Total Year Ahead System RAR: 0.00 Total Year Ahead

System RAR







Summary Table 2

Total Claimed Resource Adequacy Capacity by Type of Capacity (MW)

Type of Capacity Resource Sum of Sum of Sum of Sum of Percentage of

Adequacy Capacity Resource Resource Resource Resource All RA

(Double-Click on Yellow-Highlighted Cells below to

(MW) Category 1 Category 2 Category 3 Category 4 Resources

go to Each Supporting Worksheet Tab)

(A) (B) (C) (D) (E) (F) (G)



I_Phys_Res_Import_RA_Res 0.00 0.00 0.00 0.00 0.00 #DIV/0!



II. DWR Contracts 0.00 0.00 0.00 0.00 0.00 #DIV/0!



III. Resources Under Construction 0.00 0.00 0.00 0.00 0.00 #DIV/0!



Total Resource Adequacy Capacity 0.00 0.00 0.00 0.00 0.00







Summary Table 3

Month Ahead Compliance Showing

Claimed vs. Countable Resources in Each Bucket (MW)



Maximum Claimed Countable

Cumulative resource plus Cumulative

Maximum Countable

Countable countable from Resource

Cumulative Resource

Categories Capacity prior bucket Adequacy

Contribution (MCC) Adequacy

Levels (MW) (MW) Capacity (MW)

Allowed (%) Capacity (%)

(J) = (I) x 100% (K) = (L) + Total (L) = Minimum of

of RAR = 0 MW of Table 2 (J) or (K) Data Labels Below -

do not delete









Page 28 C:\Docstoc\Working\pdf\94b26ee5-ff96-49de-b79f-16ce63375144.xls

Page 29 3PRMA_May_10









(H) (I) (J) (K) (L) (M) SP26

Category #1 Bucket 13.3% 0.00 0.00 0.00 #DIV/0! NP26

Category #1,2 Buckets 18.6% 0.00 0.00 0.00 #DIV/0! CAISO

Category #1,2,3 Buckets 30.1% 0.00 0.00 0.00 #DIV/0!

Category #1,2,3,4 Buckets 100% unrestricted 0.00 0.00 #DIV/0!





Summary Table 4

Resource Category by Bucket (MW)



Countable

Claimed Resource Resource

Resource

Adequacy Capacity Adequacy

Adequacy

Categories by Bucket (MW) Capacity

Capacity

(O) = Totals from Relative to

by Bucket

Summary Table 2 115% of RAR

(MW)



(N) (O) (P) (Q)

Resource Category #1 Bucket 0.00 0.00 #DIV/0!

Resource Category #2 Bucket 0.00 0.00 #DIV/0!

Resource Category #3 Bucket 0.00 0.00 #DIV/0!

Resource Category #4 Bucket 0.00 0.00 #DIV/0!

Cumulative Total 0.00 0.00 #DIV/0!





Summary Table 5

Minimum Required Compliance Showing by Category (MW)



Countable Compliance

Minimum Resource Status

Minimum

Capacity Adequacy (Short)/Long on (W) =

Cumulative

Categories Levels (MW) Capacity (MW) Capacity (MW) "Compliant"

Requirement (MCR)

(T) = (S) x (90% (U) = (V) = (U) - (T) when (V) is

%

of RAR) Cumulative Greater Than or

Values of (P) Equal to Zero



(R) (S) (T) (U) (V) (W)

Category #4 Bucket 69.9% 0.00 0.00 0.00 Compliant

Category #4, 3 Buckets 81.4% 0.00 0.00 0.00 Compliant

Category #4, 3, 2 Buckets 86.7% 0.00 0.00 0.00 Compliant

Category #4, 3, 2, 1 Buckets 100.0% 0.00 0.00 0.00 Compliant







Summary Table 6

Necessary Flows across into NP26 and SP26



Zonal RAR Excess (or

[90%*(Peak Resources in Deficiency) of Necessary flow

Zone

demand *115%)] - zone Resources over across Path 26

(DR * 115%) Zonal RAR









Page 29 C:\Docstoc\Working\pdf\94b26ee5-ff96-49de-b79f-16ce63375144.xls

Page 30 3PRMA_May_10









NP26 0.00 0.00 0.00 0.00

SP26 0.00 0.00 0.00 0.00





Summary Table 7

Necessary Flows versus Path 26 Allocations

Flows in excess

Path 26 Import Necessary flow

Direction of flow of import

Allocation across Path 26

allocation

SP26 into NP26 - 0.00 0.00

NP26 into SP26 - 0.00 0.00









Page 30 C:\Docstoc\Working\pdf\94b26ee5-ff96-49de-b79f-16ce63375144.xls

Page 31 3PRMA_May_10









Worksheet B. Month Ahead RA SUMMARY





Summary Table 1: LSE Obligations

Abbreviation

Month of Filing: Aug-12 Filing Month

Zone - SP26/NP26 SP26 NP26 Zone

Peak Demand [Coincident Peak Hour Demand Forecast provided by CEC] (MW) in SCE TAC Area 0.00 0.00

SCE-TAC



Peak Demand [Coincident Peak Hour Demand Forecast provided by CEC] (MW) in SDGE TAC Area 0.00 0.00

SDGE-TAC



Peak Demand [Coincident Peak Hour Demand Forecast provided by CEC] (MW) in PG&E TAC Area 0.00 0.00

PGE-TAC

Zonal RAR - 115% RA obligation for each Zone 0.00 0.00 Zonal Total

DR, RMR, and CAM Allocations 0.00 0.00 DR+RMR+CAM



Zonal RAR for Month-Ahead Minus Demand Response (MW): 0.00 0.00 Zonal Total-

Allocations

Total System RAR: 0.00 Total System RAR







Summary Table 2

Total Claimed Resource Adequacy Capacity by Type of Capacity (MW)

Type of Capacity Resource Sum of Sum of Sum of Sum of Percentage of

Adequacy Capacity Resource Resource Resource Resource All RA

(Double-Click on Yellow-Highlighted Cells below to go

(MW) Category 1 Category 2 Category 3 Category 4 Resources

to Each Supporting Worksheet Tab)

(A) (B) (C) (D) (E) (F) (G)



I_Phys_Res_Import_RA_Res 0.00 0.00 0.00 0.00 0.00 #DIV/0!



II. DWR Contracts 0.00 0.00 0.00 0.00 0.00 #DIV/0!



Total Resource Adequacy Capacity 0.00 0.00 0.00 0.00 0.00







Summary Table 3

Month Ahead Compliance Showing

Claimed vs. Countable Resources in Each Bucket (MW)



Maximum Claimed Countable

Cumulative resource plus Cumulative

Maximum Countable

Countable countable from Resource

Cumulative Resource

Categories Capacity prior bucket Adequacy

Contribution (MCC) Adequacy

Levels (MW) (MW) Capacity (MW)

Allowed (%) Capacity (%)

(J) = (I) x RAR (K) = (L) + Total (L) = Minimum of

= 0 MW of Table 2 (J) or (K) Data Labels Below -

do not delete

(H) (I) (J) (K) (L) (M) South

Category #1 Bucket 13.3% 0.00 0.00 0.00 #DIV/0! North



Category #1,2 Buckets 18.6% 0.00 0.00 0.00 #DIV/0! CAISO



Category #1,2,3 Buckets 30.1% 0.00 0.00 0.00 #DIV/0!

Category #1,2,3,4 Buckets 100% unrestricted 0.00 0.00 #DIV/0! MW









Page 31 C:\Docstoc\Working\pdf\94b26ee5-ff96-49de-b79f-16ce63375144.xls

Page 32 3PRMA_May_10









Summary Table 4

Resource Category by Bucket (MW)

Countable

Claimed Resource Resource

Resource

Adequacy Capacity Adequacy

Adequacy

Categories by Bucket (MW) Capacity

Capacity

(O) = Totals from Relative to

by Bucket

Summary Table 2 115% of RAR

(MW)



(N) (O) (P) (Q)

Resource Category #1 Bucket 0.00 0.00 #DIV/0!

Resource Category #2 Bucket 0.00 0.00 #DIV/0!

Resource Category #3 Bucket 0.00 0.00 #DIV/0!

Resource Category #4 Bucket 0.00 0.00 #DIV/0!

Cumulative Total 0.00 0.00 #DIV/0!





Summary Table 5

Minimum Required Compliance Showing by Category (MW)



Countable Compliance

Minimum Resource Status

Minimum

Capacity Adequacy (Short)/Long on (W) =

Cumulative

Categories Levels (MW) Capacity (MW) Capacity (MW) "Compliant"

Requirement (MCR)

(T) = (S) x (U) = (V) = (U) - (T) when (V) is

%

(RAR) Cumulative Greater Than or

Values of (P) Equal to Zero

(R) (S) (T) (U) (V) (W)

Category #4 Bucket 69.9% 0.00 0.00 0.00 Compliant

Category #4, 3 Buckets 81.4% 0.00 0.00 0.00 Compliant

Category #4, 3, 2 Buckets 86.7% 0.00 0.00 0.00 Compliant

Category #4, 3, 2, 1 Buckets 100.0% 0.00 0.00 0.00 Compliant







Summary Table 6

Necessary Flows across into NP26 and SP26



Excess (or

Zonal RAR (Peak

Resources in Deficiency) of Necessary flow

Zone demand - DR *

zone Resources over across Path 26

115%)

RAR in zone



NP26 0.00 0.00 0.00 0.00

SP26 0.00 0.00 0.00 0.00





Summary Table 7

Necessary Flows versus Path 26 Allocations



Necessary Flows in excess

Path 26 Import

Direction of flow flow across of import

Allocation

Path 26 allocation



SP26 into NP26 0 0.00 0.00

NP26 into SP26 0 0.00 0.00









Page 32 C:\Docstoc\Working\pdf\94b26ee5-ff96-49de-b79f-16ce63375144.xls

Page 33 3PRMA_May_10









Worksheet I. RESOURCES Password for future RA Filings:

Do not delete or enter

anything into the cells

I. Physical Resources in ISO Control Area and Import RA resources from outside ISO Control Area Resource Category (MW) below

Capacity Capacity

LSE Capacity RA Local Effective Start Effective End SCID or

Contract Scheduling Capacity RA Date Date Min. Hours Counterparty if Bucket Bucket Bucket Bucket Zonal

Identifier Resource ID (MW) (MW) (mm/dd/yyyy) (mm/dd/yyyy) in Month not available 1 2 3 4 Location Local Area North South

Subtotal 0.00 0.00 0.00 0.00 0.00 0.00 0 0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00









Page 33 C:\Docstoc\Working\pdf\94b26ee5-ff96-49de-b79f-16ce63375144.xls

Page 34 3PRMA_March_10.xls









Worksheet II. RESOURCES Do not delete or enter

anything into the cells

II: DWR Contracts that do not fit on other Worksheets Resource Category (MW) below

LSE Scheduling Capacity Capacity

Capacity Resource ID or RA Effective Start Effective End

Contract CAISO Congestion Capacity Zonal Date Date Min. Hours Bucket Bucket Bucket Bucket

Identifier Zone (MW) Location (mm/dd/yyyy) (mm/dd/yyyy) in Month 1 2 3 4 North South

Subtotal 0.00 0.00 0.00 0.00 0.00 0 0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: II_DWR_Contracts

Page 35 3PRMA_March_10.xls







Worksheet III. RESOURCES Do not delete or enter

anything into the cells

III. Resources Under Construction Resource Category (MW) below

LSE Scheduling Capacity Capacity Projected

Capacity Resource ID RA Effective Start Effective End Min. Commercial

Contract (or Resource Capacity Zonal Date Date Hours in Operation Date Bucket Bucket Bucket Bucket

Identifier Name if no ID) (MW) Location (mm/dd/yyyy) (mm/dd/yyyy) Month (mm/dd/yyyy) 1 2 3 4 North South

Subtotal 0.00 0.00 0.00 0.00 0.00 0 0

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: III_Construc

Page 36 3PRMA_March_10.xls







Worksheet Demand Response RESOURCES: TRUE

Do not delete or enter

anything into the cells

DR. Dispatchable Demand Response Resources not part of the DR Allocation FALSE below

Authorized Authorized Total Monthly

RA Operation Operation Authorized

Contract Program Capacity Zonal Program Start Date End Date Hours of

Identifier Name (MW) Location Operator (mm/dd/yyyy) (mm/dd/yyyy) operation North South

Subtotal 0 0 0









File: 94b26ee5-ff96-49de-b79f-16ce63375144.xls Tab: Demand Response


Related docs
Other docs by HC11112510524
5oszt�ly
Views: 5  |  Downloads: 0
Mar 15 09
Views: 0  |  Downloads: 0
Spis Tresci
Views: 5  |  Downloads: 0
Registro Civil
Views: 11  |  Downloads: 0
Hoja1
Views: 12  |  Downloads: 0
Annex-II
Views: 5  |  Downloads: 0
MVDC HANDBOOK
Views: 1  |  Downloads: 0
SIMAT DILIGENCIAR
Views: 7  |  Downloads: 0
HeTrack from 29 Mar 05
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!