MEETING DATES: ABF: May 10. Stated Meeting: May 18, 2011



CATEGORY School Facilities Management



TYPE: Action



SUBJECT:

AUTHORIZATION OF NEW CAPITAL PROJECTS FOR: Riverside High School Cooling Tower

Replacement: $240,000.

School 23 Bus Drop-Off: $175,000. School 29 Partial Roof Replacement: $342,700. School 30 and Yonkers

Montessori Academy Gym Lighting Replacement: $15,000 and $54,000, resp.

Gorton High School Auditorium Lead & Asbestos Abatement: $140,000. School 10 HVAC, Site, and Masonry

Repairs increase project funding by $750,000 to include Roof Replacement.





POLICY:



ENCLOSURE: None



FILE ATTACHMENT: None



RATIONALE:

RIVERSIDE HIGH SCHOOL COOLING TOWER REPLACEMENT: $240,000. Since 2006 the cooling towers

at the Riverside High School have had holes develop in their cooling tower pans cause by corrosion. The

Yonkers Public Schools Maintenance Department has made two attempts to repair the holes in the pans, however

after additional years of service and continued corrosion, the pans and its associated framing members have

worsened and now require significant repairs. In discussions with the cooling tower manufacturer, engineers and

mechanical contractors the School Facilities Management Department has deemed it most desirable to replace the

cooling towers instead of performing repairs since the cooling towers are beyond their useful life. It is anticipated

that this work will be designed by KG&D Architects & Engineers, P.C. under their Requirements Contract with

the YPS.



SCHOOL 23 BUS DROP-OFF: $175,000. This work will involve the creation of a Bus Drop off area in front of

the school along Van Cortland Park Avenue. This will reduce the congested traffic conditions that occur daily

during student drop off and pick up times. It will also provide a safer area for the students to assembly prior to

entering the busses. New fencing and signage will be included. This work is scheduled to be design in house by

the School Facilities Management Department.



SCHOOL 29 PARTIAL ROOF REPLACEMENT: $342,700. This work will involve the replacement of sections

of existing roof that have deteriorated over time. There are numerous leaks in these areas which are causing

damage to the interior of the school. This project will address those problems and eliminate the water penetration

into the school. The architectural engineering services for this work is to be performed by Fuller and D’Angelo,

P.C.



SCHOOL 30 YONKERS MONTESSORI ACADEMY GYM LIGHTING REPLACEMENT: $15,000 and

$54,000, resp. This work will involve the replacement of the existing (Original) light fixtures in the Gymnasiums

and Cafétoriums. These fixtures have been experiencing metal fatigue and are presently a potential safety risk as

these fixtures do not have safety chains. The existing lights will be replaced with new fixtures which have

secured safety cages and safety chains and will include energy efficient lighting controls that utilize motion

sensors to increase energy savings. This work is scheduled to be design in house by the School Facilities

Management Department.



GORTON HIGH SCHOOL LEAD AND ASBESTOS ABATEMENT PROJECT: $140,000. This project

involves abating water damaged plaster walls which were found to contain lead paint and asbestos vinyl tile

flooring. In March of 2011 the Auditorium was closed to avoid occupant exposure to the lead based paint debris

which had fallen from the deteriorated walls. As per the New York State Education Department requirements the

space is to be closed, deteriorated areas containing lead base paint to be abated and the space decontaminated.

Since the Auditorium has deteriorated rugs glued on to deteriorated vinyl asbestos floor tile (VAT), the School

Facilities Management Department is including the abatement of the rugs and VAT with the lead abatement work.

Upon completion of the lead and asbestos abatement work, the Auditorium will receive new matching paint to the

damaged wall and ceilings areas, vinyl floor tile, and painted floor. This work is scheduled to be designed in

cooperation with the School Facilities Management Department and Districts Environmental Consultant Adelaide

Environmental health Associates.



SCHOOL 10 HVAC, SITE AND MASONRY REPAIRS; CHANGE IN SCOPE TO ADD ROOF

REPLACEMENT.: Increase funding by $750,000 to $1,500,000. This project was authorized under Board

Report No. 08-9-102 in the amount of $750,000 in capital funding. The scope of work was limited to the

replacement of the HVAC Roof Top Chillers, masonry façade restoration and installation of new site

fencing. At this time the School Facilities Management Department is recommending that the complete

replacement of the school’s roof be added to the project scope of work. Since the original authorization,

the condition of the roof has worsened over time resulting in leaks into the building, complete saturation

of the roof insulation compromising the building’s thermal performance and has been identified as an

unsatisfactory condition in 2010 BCS. It is anticipated that the additional scope of work for the roof can

C:\Docstoc\Working\pdf\60070e67-3116-4407-85fc-866ae986dd3b.doc

be affectively dove tailed into the HVAC, Site, and Masonry Repairs work currently being performed by

LAN Associates Architects and Engineers, LLP.



FUNDING:

Pending Funding Codes from Louise Piltz



SPONSORED BY:



RESOLUTION:

Ladies and Gentlemen:



WHEREAS the Commissioner's regulations require that the City Board of Education authorize Capital

Improvement Projects, and

WHEREAS The Administration desires the authorization or re-authorization for the following Capital

Improvement Projects:



FROM CHANGE TO



Riverside High School Cooling Tower Replacement $0.00 $240,000.00 $ 240,000.00

School 23 Bus Drop-off $0.00 $175,000.00 $ 175,000.00

School 29 Partial Roof Replacement $0.00 $342,700.00 $ 342,700.00

School 30 Gym Lighting Replacement $0.00 $ 15,000.00 $ 15,000.00

Yonkers Montessori Academy Gym Lighting Replacement $0.00 $ 54,000.00 $ 54,000.00

Yonkers Pathway to Success (PS 10) HVAC, Site, Masonry

Repairs and Roof Replacement $750,000 $750,000.00 $1,500,000.00



NOW THEREFORE BE IT RESOLVED: That the Board of Education authorizes the Superintendent of Schools

to continue with the above listed projects with the authorized amounts and funding sources listed under

FUNDING section of this resolution.









C:\Docstoc\Working\pdf\60070e67-3116-4407-85fc-866ae986dd3b.doc



Related docs
Other docs by wuxiangyu
Navine Aggarwal
Views: 0  |  Downloads: 0
Mesothelioma Attorneys Are There to Help You
Views: 1  |  Downloads: 0
Spire - July 11_ 2011.pub
Views: 1  |  Downloads: 0
NR_HND_PrelimAward_WCAA-DL-DOT
Views: 1  |  Downloads: 0
schoolsupplylistfor1112
Views: 0  |  Downloads: 0
Weeks of the Summer
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!