BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k

2/4/11 SECTION J





Monolith Structure UNIT TOTAL

ITEM UNIT QUANITY COST Cost Structure Length = 30 ft



FURNISH HP14x73 WALL PILING LF 1,035 0 $0 No. piles = 14 Each

INSTALL HP14x73 WALL PILING LF 1,035 0 $0 Length = 73.95 ft

PILE TEST, 84.0 ft Long EA 0 0 $0

Note: HP14x73 pile used for design,

FOOTING CONCRETE CY 47 0 $0 use HP14x89 to allow for corrosion

Forming SF 298



DECK CONCRETE CY 29

OR SF 0 0 $0

Forming SF 589



STEM CONCRETE CY 110 0 $0

Forming SF 856



STEEL REINFORCEMENT LB 25,614 0 $0





BRIDE RAILING LF 60 0 $0

LENGTH

SHEET PILE CUT-OFF WALL SF 300 0 $0 (FRONT Side Only) 10 FT

Native Soil has low permeability assume cut-off

minimal to prevent scour

$0

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k s35k

2/4/11 Load Cases: 1 SECTION J



Case 1 File:

Event 100 years

State Building Codes

H.W. EL = 922.01 ft Frost Depth = 5.0 ft provide min frost ftg protection during Dec, Jan, Feb, March

T.W. EL. = 902.41 ft Water El. = 881.2 ft DEC, JAN, FEB Mean Water Elevation



500 yr H.W. EL = 922.12 ft

Non-Overflow Section Length = 30.0 ft

Top of Ftg EL. = 912.75 ft Stepped Ftg Ls = 2.0 ft overlap distance at stepped ftg



500 yr Event H.W. + 5 ft freeboard 4 15.0'

El. 927.12

0.83'

2.0'



1.0'

13 H.W. EL.

10.0' 922.01

EL. 915.12 ICE = 0 ksf









0.000

1'

T.W. 902.41

11







12

2 h = 12.37'

3



0.00

Hw = 13.26' HHW = 5.486 k/ft

10

TW = 0.00

HTW = 0.000 k/ft

1 Top Of Soil 4.42'



1.33 El. 912.75

4.0'

gh = 0.000 ksf "B" El. 908.75 gh = 0.827 ksf

1.00' 8.0' 0.00' 1.0'





See Piling Plan for Vert Loads and Horiz Resistance B = 10.00'









Case 1 or 2: 1

Normal Water Level, El.888.74 ft REVISED PER 7/1/10 MEETING WITH CORPS

Dh normal = 888.7 ft UPLIFT Case 1, Full Hydrostatic Head (Dashed Line)

See Geotechnical seepage Model UB = 0.000 ksf Case 2, Full HW in Front of Upstream sheets

Full TW on down stream of sheets

UA = 0.827 ksf

1.0' 8.00 1.0' enter "0" if no cut-off



Non-Overflow Dam

L W H g shape V arm Mv

Vertical Loads Section ft ft ft kcf K ft ft-k

Ftg concrete 1 30 10.00 4.00 0.15 rec 180.0 5.00 900.0

Bridge Slab 4 30 15.00 0.83 0.15 rec 56.0 5.00 280.1

Bridge Slab 4 30 11.50 1.17 0.15 rec 60.5 5.00 302.7



Monolith 2 30 8.00 12.37 0.15 rec 445.3 5.00 2,226.6

Monolith 3 30 0.00 2.37 0.15 tri 0.0 9.00 0.0

D.L. Concrete SVc = 741.9 SM V = 3,709.5 CONSTANT FOR ALL LOAD CASES







T.W on ftg Monolith 10 30 1.00 0.00 0.0624 rec 0.0 0.50 0.0

H.W. on Monolith Slope 11 30 0.00 2.37 0.0624 tri 0.0 9.00 0.0

H.W. Above Slope 13 30 0.00 6.89 0.0624 rec 0.0 9.00 0.0

H.W. on Mono. ftg 12 30 1.00 9.26 0.0624 rec 17.3 9.50 164.7

D.L. Water SVw = 17.3 SM V = 164.7



L W Pressure U arm Mu

Uplift Loads ft ft ksf K ft ft-k

UB 30 10.00 0.000 rec 0.0 5.00 0

UA 30 10.00 0.827 tri -124.1 6.67 -827

SU = -124.1 SM U = -827



Horizontal Loads L H Pressure ICE arm Mu REVISED PER 2/1/11 MEETING WITH CORPS

ft ft ksf K ft ft-k Ice Loading is for Ice Floe on single Pier Only on Gated Structure

ICE 30 1.00 0.00 rec 0.0 12.76 0.0 use 500 plf along Wing Walls



L Force H arm Mw

Water Loads ft k/ft K ft ft-k

HTW 30 0.000 tri 0.00 1.33 0.00

HHW 30 -5.486 tri -164.57 4.42 -727.42

SW = -164.57 SM W = -727.4







Overturning Moments SMOT = MU +MW +MICE = -1555 kip-ft

Resisting Moments SMR = MV = 3874 kip-ft



Sum of Moments SMnet = MR + MOT = 2,319 kip-ft

Sum of Vertical Forces P = Conc + Water + Uplift = 635 kips

Sum of Horizontal Forces H = Ice + water = -165 kips



Location of Resultant Xr = SM / P = 3.65 ft from Toe

e = B/2 - Xr = 1.35 ft

B/6 = 1.667 ft

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k s35k

2/4/11 Load Cases: 1 SECTION J





CONCRETE QUANTITIES

forming

Ftg conc: 47 cy (includes stepped) 298 sf



Bridge Conc: 29 cy 589 sf

Monolith Conc: 110 cy 856 sf

Total = 186



STEEL REINFORCEMENT: (assumed) Total

Bar # Spacing Length # of bars wt

a) Footing in LB /ft ft ea lb

Top mat Transverse: 9 6 3.40 9.5 64 2,067

Longitudinal: 9 6 3.40 31.5 20 2,142

Bot mat Transverse: 9 6 3.40 9.5 64 2,067 lb cy LB/cy

Longitudinal: 9 6 3.40 31.5 20 2,142 8,418 47 177.5756

b) Skin Reinf. On Monolith

Vert Face Vert: 9 6 3.40 11.87 60 2,421

Longitudinal: 9 12 3.40 29.5 12 1,204

Top Face Transverse: 9 12 3.40 7.5 30 765

Longitudinal: 9 12 3.40 29.5 8 802

Sloped Face Sloped: 9 6 3.40 13.9 60 2,829

Longitudinal: 9 12 3.40 29.5 14 1,404 9,426 110 85.727

S= 17,845

c) Pier Reinf. On Piers Vol (cy)

assume 200 lb/cy - wt = -



d) Deck Reinf.

assume 200 lb/cy 29 wt = 5,757



Lap Splices (long. Bars) 9 3.40 8 74 2,013

S Bar Wt= 25,614 lb

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k s35k

2/4/11 Load Cases: 1.1 SECTION J



Case 1.1 File:

Event 100 years

State Building Codes

H.W. EL = 922.01 ft Frost Depth = 5.0 ft provide min frost ftg protection during Dec, Jan, Feb, March

T.W. EL. = 902.41 ft Water El. = 881.2 ft DEC, JAN, FEB Mean Water Elevation



500 yr H.W. EL = 922.12 ft

Non-Overflow Section Length = 30.0 ft

Top of Ftg EL. = 912.75 ft Stepped Ftg Ls = 2.0 ft overlap distance at stepped ftg



500 yr Event H.W. + 5 ft freeboard 4 15.0'

El. 927.12

0.83'

2.0'



1.0'

13 H.W. EL.

10.0' 922.01

EL. 915.12 ICE = 0.50 ksf









0.000

1'

T.W. 902.41

11







12

2 h = 12.37'

3



0.00

Hw = 13.26' HHW = 5.486 k/ft

10

TW = 0.00

HTW = 0.000 k/ft

1 Top Of Soil 4.42'



1.33 El. 912.8

4.0'

gh = 0.000 ksf "B" El. 908.75 gh = 0.827 ksf

1.00' 8.0' 0.00' 1.0'





See Piling Plan for Vert Loads and Horiz Resistance B = 10.00'









Case 1 or 2: 1

888.74 ft

Normal Water Level, El. REVISED PER 7/1/10 MEETING WITH CORPS

Dh normal = 888.7 ft UPLIFT Case 1, Full Hydrostatic Head (Dashed Line)

See Geotechnical seepage Model UB = 0.000 ksf Case 2, Full HW in Front of Upstream sheets

Full TW on down stream of sheets

UA = 0.827 ksf

1.0' 8.00 1.0' enter "0" if no cut-off



Non-Overflow Dam

L W H g shape V arm Mv

Vertical Loads Section ft ft ft kcf K ft ft-k

Ftg concrete 1 30 10.00 4.00 0.15 rec 180.0 5.00 900.0

Bridge Slab 4 30 15.00 0.83 0.15 rec 56.0 5.00 280.1

Bridge Slab 4 30 11.50 1.17 0.15 rec 60.5 5.00 302.7



Monolith 2 30 8.00 12.37 0.15 rec 445.3 5.00 2,226.6

Monolith 3 30 0.00 2.37 0.15 tri 0.0 9.00 0.0

D.L. Concrete SVc = 741.9 SM V = 3,709.5 CONSTANT FOR ALL LOAD CASES







T.W on ftg Monolith 10 30 1.00 0.00 0.0624 rec 0.0 0.50 0.0

H.W. on Monolith Slope 11 30 0.00 2.37 0.0624 tri 0.0 9.00 0.0

H.W. Above Slope 13 30 0.00 6.89 0.0624 rec 0.0 9.00 0.0

H.W. on Mono. ftg 12 30 1.00 9.26 0.0624 rec 17.3 9.50 164.7

D.L. Water SVw = 17.3 SM V = 164.7



L W Pressure U arm Mu

Uplift Loads ft ft ksf K ft ft-k

UB 30 10.00 0.000 rec 0.0 5.00 0

UA 30 10.00 0.827 tri -124.1 6.67 -827

SU = -124.1 SM U = -827



Horizontal Loads L H Pressure ICE arm Mu REVISED PER 2/1/11 MEETING WITH CORPS

ft ft ksf K ft ft-k Ice Loading is for Ice Floe on single Pier Only on Gated Structure

ICE 30 1.00 -0.50 rec -15.0 12.76 -191.4 use 500 plf along Wing Walls



L Force H arm Mw

Water Loads ft k/ft K ft ft-k

HTW 30 0.000 tri 0.00 1.33 0.00

HHW 30 -5.486 tri -164.57 4.42 -727.42

SW = -164.57 SM W = -727.4







Overturning Moments SMOT = MU +MW +MICE = -1746 kip-ft

Resisting Moments SMR = MV = 3874 kip-ft



Sum of Moments SMnet = MR + MOT = 2,128 kip-ft

Sum of Vertical Forces P = Conc + Water + Uplift = 635 kips

Sum of Horizontal Forces H = Ice + water = -180 kips



Location of Resultant Xr = SM / P = 3.35 ft from Toe

e = B/2 - Xr = 1.65 ft

B/6 = 1.667 ft

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k s35k

2/4/11 Load Cases: 2 SECTION J



Case 2 File:

Event 500 years

State Building Codes

H.W. EL = 922.12 ft Frost Depth = 5.0 ft provide min frost ftg protection during Dec, Jan, Feb, March

T.W. EL. = 914.41 ft Water El. = 881.2 ft DEC, JAN, FEB Mean Water Elevation



500 yr H.W. EL = 922.12 ft

Non-Overflow Section Length = 30.0 ft

Top of Ftg EL. = 912.75 ft Stepped Ftg Ls = 2.0 ft overlap distance at stepped ftg



500 yr Event H.W. + 5 ft freeboard 4 15.0'

El. 927.12

0.83' 500 yr Event H.W. 1.0'

2.0' H.W. EL. 922.12

ICE = 0 ksf



T.W. 13

914.41 10.0'

EL. 915.12









0.000

1'



11







12

2 h = 12.37'

3



1.66

Hw = 13.37' HHW = 5.577 k/ft

10

TW = 5.66

HTW = 1.000 k/ft

1 Top Of Soil 4.46'



1.89 El. 912.8

4.0'

gh = 0.353 ksf "B" El. 908.75 gh = 0.834 ksf

1.00' 8.0' 0.00' 1.0'





See Piling Plan for Vert Loads and Horiz Resistance B = 10.00'









Case 1 or 2: 1

888.74 ft

Normal Water Level, El. REVISED PER 7/1/10 MEETING WITH CORPS

Dh normal = 888.7 ft UPLIFT Case 1, Full Hydrostatic Head (Dashed Line)

See Geotechnical seepage Model UB = 0.353 ksf Case 2, Full HW in Front of Upstream sheets

Full TW on down stream of sheets

UA = 0.834 ksf

1.0' 8.00 1.0' enter "0" if no cut-off



Non-Overflow Dam

L W H g shape V arm Mv

Vertical Loads Section ft ft ft kcf K ft ft-k

Ftg concrete 1 30 10.00 4.00 0.15 rec 180.0 5.00 900.0

Bridge Slab 4 30 15.00 0.83 0.15 rec 56.0 5.00 280.1

Bridge Slab 4 30 11.50 1.17 0.15 rec 60.5 5.00 302.7



Monolith 2 30 8.00 12.37 0.15 rec 445.3 5.00 2,226.6

Monolith 3 30 0.00 2.37 0.15 tri 0.0 9.00 0.0

D.L. Concrete SVc = 741.9 SM V = 3,709.5 CONSTANT FOR ALL LOAD CASES







T.W on ftg Monolith 10 30 1.00 1.66 0.0624 rec 3.1 0.50 1.6

H.W. on Monolith Slope 11 30 0.00 2.37 0.0624 tri 0.0 9.00 0.0

H.W. Above Slope 13 30 0.00 7.00 0.0624 rec 0.0 9.00 0.0

H.W. on Mono. ftg 12 30 1.00 9.37 0.0624 rec 17.5 9.50 166.6

D.L. Water SVw = 20.6 SM V = 168.2



L W Pressure U arm Mu

Uplift Loads ft ft ksf K ft ft-k

UB 30 10.00 0.353 rec -106.0 5.00 -530

UA 30 10.00 0.481 tri -72.2 6.67 -481

SU = -178.1 SM U = -1,011



Horizontal Loads L H Pressure ICE arm Mu REVISED PER 2/1/11 MEETING WITH CORPS

ft ft ksf K ft ft-k Ice Loading is for Ice Floe on single Pier Only on Gated Structure

ICE 30 1.00 0.00 rec 0.0 12.87 0.0 use 500 plf along Wing Walls



L Force H arm Mw

Water Loads ft k/ft K ft ft-k

HTW 30 1.000 tri 29.99 1.89 56.57

HHW 30 -5.577 tri -167.32 4.46 -745.67

SW = -137.33 SM W = -689.1







Overturning Moments SMOT = MU +MW +MICE = -1700 kip-ft

Resisting Moments SMR = MV = 3878 kip-ft



Sum of Moments SMnet = MR + MOT = 2,178 kip-ft

Sum of Vertical Forces P = Conc + Water + Uplift = 584 kips

Sum of Horizontal Forces H = Ice + water = -137 kips



Location of Resultant Xr = SM / P = 3.73 ft from Toe

e = B/2 - Xr = 1.27 ft

B/6 = 1.667 ft

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k s35k

2/4/11 Load Cases: 2.1 SECTION J



Case 2.1 Per COE 2/1/11: HW = 500yr + 5' w/ No ice File:

Event 500 years

State Building Codes

H.W. EL = 927.12 ft Frost Depth = 5.0 ft provide min frost ftg protection during Dec, Jan, Feb, March

T.W. EL. = 914.41 ft Water El. = 881.2 ft DEC, JAN, FEB Mean Water Elevation



500 yr H.W. EL = 922.12 ft

Non-Overflow Section Length = 30.0 ft

Top of Ftg EL. = 912.75 ft Stepped Ftg Ls = 2.0 ft overlap distance at stepped ftg



500 yr Event H.W. + 5 ft freeboard 4 15.0' 1.0'

El. 927.12 H.W. EL. 927.12

0.83' ICE = 0.0 ksf

2.0'





T.W. 13

914.41 10.0'

EL. 915.12









0.000

1'



11







12

2 h = 12.37'

3



1.66

Hw = 18.37' HHW = 10.529 k/ft

10

TW = 5.66

HTW = 1.000 k/ft

1 Top Of Soil 6.12'



1.89 El. 912.8

4.0'

gh = 0.353 ksf "B" El. 908.75 gh = 1.146 ksf

1.00' 8.0' 0.00' 1.0'





See Piling Plan for Vert Loads and Horiz Resistance B = 10.00'









Case 1 or 2: 1

888.74 ft

Normal Water Level, El. REVISED PER 7/1/10 MEETING WITH CORPS

Dh normal = 888.7 ft UPLIFT Case 1, Full Hydrostatic Head (Dashed Line)

See Geotechnical seepage Model UB = 0.353 ksf Case 2, Full HW in Front of Upstream sheets

Full TW on down stream of sheets

UA = 1.146 ksf

1.0' 8.00 1.0' enter "0" if no cut-off



Non-Overflow Dam

L W H g shape V arm Mv

Vertical Loads Section ft ft ft kcf K ft ft-k

Ftg concrete 1 30 10.00 4.00 0.15 rec 180.0 5.00 900.0

Bridge Slab 4 30 15.00 0.83 0.15 rec 56.0 5.00 280.1

Bridge Slab 4 30 11.50 1.17 0.15 rec 60.5 5.00 302.7



Monolith 2 30 8.00 12.37 0.15 rec 445.3 5.00 2,226.6

Monolith 3 30 0.00 2.37 0.15 tri 0.0 9.00 0.0

D.L. Concrete SVc = 741.9 SM V = 3,709.5 CONSTANT FOR ALL LOAD CASES







T.W on ftg Monolith 10 30 1.00 1.66 0.0624 rec 3.1 0.50 1.6

H.W. on Monolith Slope 11 30 0.00 2.37 0.0624 tri 0.0 9.00 0.0

H.W. Above Slope 13 30 0.00 12.00 0.0624 rec 0.0 9.00 0.0

H.W. on Mono. ftg 12 30 1.00 14.37 0.0624 rec 26.9 9.50 255.6

D.L. Water SVw = 30.0 SM V = 257.1



L W Pressure U arm Mu

Uplift Loads ft ft ksf K ft ft-k

UB 30 10.00 0.353 rec -106.0 5.00 -530

UA 30 10.00 0.793 tri -119.0 6.67 -793

SU = -224.9 SM U = -1,323



Horizontal Loads L H Pressure ICE arm Mu REVISED PER 2/1/11 MEETING WITH CORPS

ft ft ksf K ft ft-k Ice Loading is for Ice Floe on single Pier Only on Gated Structure

ICE 30 1.00 0.00 rec 0.0 17.87 0.0 use 500 plf along Wing Walls



L Force H arm Mw

Water Loads ft k/ft K ft ft-k

HTW 30 1.000 tri 29.99 1.89 56.57

HHW 30 -10.529 tri -315.86 6.12 -1934.11

SW = -285.87 SM W = -1877.5







Overturning Moments SMOT = MU +MW +MICE = -3200 kip-ft

Resisting Moments SMR = MV = 3967 kip-ft



Sum of Moments SMnet = MR + MOT = 766 kip-ft

Sum of Vertical Forces P = Conc + Water + Uplift = 547 kips

Sum of Horizontal Forces H = Ice + water = -286 kips



Location of Resultant Xr = SM / P = 1.40 ft from Toe

e = B/2 - Xr = 3.60 ft

B/6 = 1.667 ft

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k s35k

2/4/11 Load Cases: 3 SECTION J



Case 3 File:

Event 2 years

State Building Codes

H.W. EL = ft Frost Depth = 5.0 ft provide min frost ftg protection during Dec, Jan, Feb, March

T.W. EL. = ft Water El. = 881.2 ft DEC, JAN, FEB Mean Water Elevation



500 yr H.W. EL = 922.12 ft

Non-Overflow Section Length = 30.0 ft

Top of Ftg EL. = 912.75 ft Stepped Ftg Ls = 2.0 ft overlap distance at stepped ftg



500 yr Event H.W. + 5 ft freeboard 4 15.0'

El. 927.12

0.83'

2.0'





10.0'

EL. 915.12









0.000

1'









2 h = 12.37'

3









1 Top Of Soil



El. 912.8

4.0'

"B" El. 908.75

1.00' 8.0' 0.00' 1.0' 33.0 psf Wind





See Piling Plan for Vert Loads and Horiz Resistance B = 10.00'









Non-Overflow Dam

L W H g shape V arm Mv

Vertical Loads Section ft ft ft kcf K ft ft-k

Ftg concrete 1 30 10.00 4.00 0.15 rec 180.0 5.00 900.0

Bridge Slab 4 30 15.00 0.83 0.15 rec 56.0 5.00 280.1

Bridge Slab 4 30 11.50 1.17 0.15 rec 60.5 5.00 302.7



Monolith 2 30 8.00 12.37 0.15 rec 445.3 5.00 2,226.6

Monolith 3 30 0.00 2.37 0.15 tri 0.0 9.00 0.0

D.L. Concrete SVc = 741.9 SM V = 3,709.5 CONSTANT FOR ALL LOAD CASES







Horizontal Loads L H Pressure H arm Mw

ft ft ksf K ft ft-k

Wind 30 18.37 -0.03 rec -18.2 9.185 -167.0







Overturning Moments SMOT = MW = -167 kip-ft

Resisting Moments SMR = MV = 3709 kip-ft



Sum of Moments SMnet = MR + MOT = 3,542 kip-ft

Sum of Vertical Forces P = Conc = 742 kips

Sum of Horizontal Forces H = Wind = -18 kips



Location of Resultant Xr = SM / P = 4.77 ft from Toe

e = B/2 - Xr = 0.23 ft

B/6 = 1.667 ft

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of Engineers

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Control Structure: ND RRN 35k s35k

2/4/11 Load Cases: 4 SECTION J



Case 4 File:

Event years

State Building Codes

H.W. EL = 888.74 ft Normal Water Level Frost Depth = 5.0 ft provide min frost ftg protection during Dec, Jan, Feb, March

T.W. EL. = 888.74 ft Water El. = 881.2 ft DEC, JAN, FEB Mean Water Elevation



500 yr H.W. EL = 922.12 ft

Non-Overflow Section Length = 30.0 ft

Top of Ftg EL. = 912.75 ft Stepped Ftg Ls = 2.0 ft overlap distance at stepped ftg



500 yr Event H.W. + 5 ft freeboard 4 15.0'

El. 927.12

0.83'

2.0'





13

10.0'

EL. 915.12









0.000

1' 2.0'

T.W. 888.74 H.W. EL. 888.74

11 ICE = 0 ksf





12

2 h = 12.37'

3



0.00

Hw = 0.00'

10

TW = 0.00

HTW = 0.000 k/ft HHW = 0.000 k/ft

1 Top Of Soil

0.00'

1.33 El. 912.8

4.0'

gh = 0.000 ksf "B" El. 908.75 gh = 0.000 ksf

1.00' 8.0' 0.00' 1.0'





See Piling Plan for Vert Loads and Horiz Resistance B = 10.00'









Case 1 or 2: 1

888.74 ft

Normal Water Level, El. REVISED PER 7/1/10 MEETING WITH CORPS

Dh normal = 888.7 ft UPLIFT Case 1, Full Hydrostatic Head (Dashed Line)

See Geotechnical seepage Model UB = 0.000 ksf Case 2, Full HW in Front of Upstream sheets

Full TW on down stream of sheets

UA = 0.000 ksf

1.0' 8.00 1.0' enter "0" if no cut-off



Non-Overflow Dam

L W H g shape V arm Mv

Vertical Loads Section ft ft ft kcf K ft ft-k

Ftg concrete 1 30 10.00 4.00 0.15 rec 180.0 5.00 900.0

Bridge Slab 4 30 15.00 0.83 0.15 rec 56.0 5.00 280.1

Bridge Slab 4 30 11.50 1.17 0.15 rec 60.5 5.00 302.7



Monolith 2 30 8.00 12.37 0.15 rec 445.3 5.00 2,226.6

Monolith 3 30 0.00 2.37 0.15 tri 0.0 9.00 0.0

D.L. Concrete SVc = 741.9 SM V = 3,709.5 CONSTANT FOR ALL LOAD CASES







T.W on ftg Monolith 10 30 1.00 0.00 0.0624 rec 0.0 0.50 0.0

H.W. on Monolith Slope 11 30 0.00 -24.01 0.0624 tri 0.0 9.00 0.0

H.W. Above Slope 13 30 0.00 -26.38 0.0624 rec 0.0 9.00 0.0

H.W. on Mono. ftg 12 30 1.00 0.00 0.0624 rec 0.0 9.50 0.0

D.L. Water SVw = 0.0 SM V = 0.0



L W Pressure U arm Mu

Uplift Loads ft ft ksf K ft ft-k

UB 30 10.00 0.000 rec 0.0 5.00 0

UA 30 10.00 0.000 tri 0.0 6.67 0

SU = 0.0 SM U = 0



Horizontal Loads L H Pressure ICE arm Mu REVISED PER 2/1/11 MEETING WITH CORPS

ft ft ksf K ft ft-k Ice Loading is for Ice Floe on single Pier Only on Gated Structure

ICE 30 2.00 0.00 rec 0.0 -1 0.0 use 500 plf along Wing Walls



L Force H arm Mw

Water Loads ft k/ft K ft ft-k

HTW 30 0.000 tri 0.00 1.33 0.00

HHW 30 0.000 tri 0.00 0.00 0.00

SW = 0.00 SM W = 0.0







Overturning Moments SMOT = MU +MW +MICE = 0 kip-ft

Resisting Moments SMR = MV = 3709 kip-ft



Sum of Moments SMnet = MR + MOT = 3,709 kip-ft

Sum of Vertical Forces P = Conc + Water + Uplift = 742 kips

Sum of Horizontal Forces H = Ice + water = 0 kips



Location of Resultant Xr = SM / P = 5.00 ft from Toe

e = B/2 - Xr = - ft

B/6 = 1.667 ft

BARR ENGINEERING DATE 6/24/2008

PROJECT NAME Flood Control ND Diversion Inlet - Corps Of En

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT Stability

6/24/08









MATERIAL AND DESIGN PARAMETERS

SOIL:

1) FILL:

g= 0.120 kcf Unit Wt. of fill

E.F.P., K * g = 0.033 kcf

2) Foundation:

Foundation Soil Type: sand (Enter: Sand, Clay, Rock) control: 1

g= Unit Wt. of foundation soils

0.120 kcf

ff = 35.00 deg Internal friction angle of foundation soil

qn = 17.70 ksf Ultimate Soil Capacity, The qn values are provided to designers in the foundation

recommendation report. The report is based on standard penetration test (SPT) data.

Su = 0.00 ksf For Clay ONLY: undrained shear strength (ksf)

fb= 0.45 Soil Resistance Factor for Bearing, Table 10.5.5.2.2-1

qr = fb qn = #NAME?

Allowable Bearing = 5.90 ksf From Geotech FOR SERVICE LOAD DESIGN



CONCRETE:

Fc'= 4.0 ksi Strength at 28 Days (3Y43) ag = 1.5 in

Fc'= 4.0 ksi Strength at 28 Days (1A43) ag = 1.5 in

Unit Wt. = 0.150 kcf



REINFORCEMENT:

Fy = 60 ksi Yield Strength

Es = 29000 ksi Modulus of Elasticity



Design/Analysis (See "Load Combos" TAB)

For design of piling or footing bearing pressures, as a minimum consider the following load cases:





Load Cases (LRFD) (Load Modifer is for superstructure only, ALWAYS USE 1.0)

S ni gi Qi 0.95

For loads for which a minimum value of Yi is appropriate: ηi = 1 / ( ηD ηR ηI ) 200* / fy 4/3*p

p= 0.0001 0.00316 0.00333 0.0001

EM 110-2-2104 2-8 c. (not less than Temp & Shrinkage, half in each face)

As (REQ'D)= 1.00 in2 p(min)= 0.0028 /2 As =0.5*pT&Sbh = 2.016 in

2



2

As = #9 @ 12 = 1.00 in

SELECT STEEL

bar #= 9

spacing, s= 12 in

# OF BAR= 1 (ENTER 1 IF PER FT, b=12") a

As= 0.999 in2

d= 115.4375 in

p = As/bd = 0.0007 O.K. 0.5 pb but Mu O.K.



CHECK SHEAR REINFORCEMENT (ACI 11.3 & EM 110-2-2104 3-3a) 11.5.6 - MINIMUM SHEAR REINFORCEMENT

Vuh = 10.5 k NO STIRRUPS REQUIRED A minimum area of shear reinforcement, Av,min shall be

Vn = Vuh / f = 14.0 k provided in all reinforced concrete flexural members

Vc = 2*sqrt(Fc') bw * d = 175.2 k 11.3.1.1 where Vu exceeds 0.5 f Vc

Vs =Vuh / f - 1.3Vc = 0.0 k OK Vs(max) vn O.K.

# of stirrup legs = 2 (single stirrup = 2, Dbl stirrup = 4………) b) CONCRETE JOIST ACI 8.11

Stirrup bar size = 4 c) BEAMS W/ h vn O.K.

11.5.5 - Spacing limits for shear reinforcement

s = d/2 = 57.719 in OR 24 in 11.5.6.3

s(max)= 24.000 in Av,min = 0.75 sqrt(fc') bw*s/fy = 0.25 * s

4*sqrt(Fc')*bw*d= 350.4 k >Vs but not less than 50bw*s/ fy = 8.333333333 * s

s max = Av fy / 0.75 sqrt(fc') bw = 0.00 in

USE s= 24.00 in s max = Av fy /50 bw = 0.00 in

11.5.5.3

Vs = (Av * Fy * d) / s = 0.0 k Where Vs exceeds 4*sqrt(Fc')*bw*d maximum spacings

shall be reduced by one-half









Page 21 of 22

BARR ENGINEERING DATE 2/4/2011 SHEET NO.

PROJECT NAME RRN Control Structure

COMPUTED CHECKED SUBMITTED PROJECT NUMBER

PKN PKN SUBJECT ACOE Stability Requirements

2/4/11 SECTION J



EM 1110-2-2100 Stability Analysis of Concrete Structures 12/1/2005 * Pile-founded structures are not included

EM 1110-2-2200 Gravity Dam Design 6/30/1995

EM 1110-2-2104 Strength Design for Reinforced-Concrete Hydraulic Structures 6/30/1992 8/20/2003

EM 1110-2-2906 Design of Pile Foundations 1/15/1991



Load Condition Pobabilities See 6/21/10, response from COE to critical path check list item:

Case: 1 2 3 Follow-up on structural design criteria

Usual Unusual Unusual

Return Period, yrs: 100 500 + free Bd

allowable stress increase: 1 33% 33%

Lateral pile deflection, in.: 0.67 0.875 0.67

Ice thickness, ft: 2 2 0 Ice



Piles Minimum Factor of Saftey, Ultimate axial capacity EM 1110-2-2906 Ratios

Usual Unusual Extreme Usual/ Unusual Usual/ Extreme

compression 2.00 1.50 1.15 verified by load tests 1.333 1.739

tension 2.00 1.50 1.15 1.333 1.739

compression 2.50 1.90 1.40 verified by pile driver analyzer 1.316 1.786

tension 3.00 2.25 1.70 1.333 1.765

compression 3.00 2.25 1.70 not verified by load test 1.333 1.765

tension 3.00 2.25 1.70 1.333 1.765



Usual Unusual Extreme

EM 1110-2-2906, P. 4-9 1.33 1.75 Increase per allowable stress increase

Vertical displacemet 0.25 in 0.33 in 0.44 in

Horizonatl Displacement 0.50 in 0.67 in 0.88 in



Pile Capacity: HP14x73

Usual Unusual Unusual Extreme Unusual Usual



Case 1 1.1 2 2.1 3 4 Note

Pile Tip El. 835.8 835.8 835.8 835.8 835.8 835.8 Case 1, 2, 3: Flood & Construction loading using Undrained Analysis

Ultimate Axial capacity: 239.1 k 239.1 k 239.1 k 239.1 k 239.1 k 127.2 k Case 4: Long-term loading using Drained Analysis

Ultimate Uplift capacity: 162.4 k 162.4 k 162.4 k 162.4 k 162.4 k 30.2 k Cases 1.1 & 2.1 include ice, use next higher load classification

Horizonatl Displacement: 0.67 in 0.875 in 0.875 in 1.000 in 0.67 in 0.50 in Per Corp meeting 2/1/11

Allow. Lateral Capacity: 31 k 35 k 35 k 35 k 31 k 22 k FOR PHASE 4 : Use GROUP FOR Lateral capacity

FS: 2.00 1.50 1.50 1.15 1.50 2.00 Per Corp meeting 2/1/11

Allow. Axial Compression: 119.6 k 159.4 k 159.4 k 207.9 k 159.4 k 63.6 k

Allow. Axial Tension: 81.2 k 108.3 k 108.3 k 141.2 k 108.3 k 15.1 k



Pile P-Multipliers, Pm for multiple Row Shading (ave from Hannigan….2005) See AASHTO P. 10-88

1 2 3 4

Pile Spacing Row 1 Row 2 Row 3 Row n B= 1.1666667 Ensoft

3 B 0.7 0.5 0.35 0.35 Row 1 Row 2 Row 3 Row n s/B Formula

5 B 1 0.85 0.7 0.7 Pile Spacing 6.00 ft 0.00 ft 0.00 ft 6.00 ft parallel trailing Pile 5.37 0.5791 (s/B).3251

.2579

h Long 1.000 -0.025 -0.175 1.000 parallel Ratio s/B 5.143 0.000 0.000 5.143 leading Pile 3.37 0.7309 (s/B)

h Trans 0.796 0.613 -0.175 0.575 perp 4.25 ft 4.25 ft 0.00 ft 5.00 ft

h Total 1.000 1.000 1.000 1.000 Total Lateral reduction Ratio s/B 3.643 3.643 0.000 4.286 perp side side 3.28 0.5292 (s/B)0.5659

FOR PHASE 4 : NO Pm applied for Lateral capacity



Hydraulic Data - RRN Mainstream - Optimized w/Control Structures

1/20/2011

Structure: ND East Red River 35k

Event Headwater Tailwater

Year ft ft Case

1/20/2011 2 896.85 896.82

5 906.37 902.2

1/20/2011 10 914.77 903.05

20 910.87 903.23

1/20/2011 50 920.02 902.11

1/20/2011 100 922.01 902.41 1

200 916.79 908.37

** 300 918.567 910.383

1/20/2011 500 922.12 914.41 2









** **



**300 yr event is linearly interploated between 200 & 500 yr event









Page 22 of 22



Related docs
Other docs by liwenting
第04章 类的重用
Views: 89  |  Downloads: 0
摘要
Views: 81  |  Downloads: 0
摘要
Views: 85  |  Downloads: 0
摘要_2_
Views: 68  |  Downloads: 0
國泰醫院2012年紙本期刊到刊總表
Views: 134  |  Downloads: 0
”Lyme_disease”_-_the_European_history
Views: 66  |  Downloads: 0
تعریف و تاریخچهPRP
Views: 77  |  Downloads: 0
_C6C28D15-9903-407A-8FEE-77A0422212B0_
Views: 113  |  Downloads: 0
__________
Views: 96  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!