Cal Poly University

W
Shared by: 4ouO90
Categories
Tags
-
Stats
views:
5
posted:
11/24/2011
language:
English
pages:
15
Document Sample
scope of work template
							 ITS 98/99 Initiatives to IACC Instructional Computing Goals                           draft


ITS Initiatives for 98/99
Goal    1:      ACCESS

Providing easy access to hardware and software for everyone in the campus community.

1.1    Communication all over campus.

        Initiative(s): Wireless Communications
                       Participate in review of wireless technologies to determine how they might be
                       utilized to provide connectivity where more conventional approaches are not
                       cost effective.

        Initiative(s): Standardize and support media development systems and software
                        Develop and maintain leadership in combing web and databases, XML, and
                          video editing
                        Offer color output in print, film, and video for faculty, staff, and students

        Initiative(s): Automatic IP Address Configuration (formerly known as DHCP)
                       Provide the Cal Poly community with a simplified method of requesting and
                       configuring IP addresses to promote lap top computer mobility usage from
                       classroom to office, or use from anywhere on campus.

                        Cost: $120,000.00
                        It is anticipated that this project will be funded through Communications
                        Services base budget.

        Initiative(s): Open Access Ports: Continuation of Current Installations
                       Continue to provide the Cal Poly community with increased access to the
                       campus network for laptop computers. Funding for open access ports in the
                       Library and University Union was provided during the 1997-98 fiscal year
                       outside of Communications Services base budget. Recurring costs to support
                       these ports in the coming year are identified at approximately $69,000 for
                       which funding has not been identified.

                        Cost: $69,000.00
                        Funding has not been identified for this project. Communications Services
                        recommends that BATS funding be considered as a source for this project.

        Initiative(s): Open Access Ports – New Installation for Building 03
                       Provide the Cal Poly community with increased access to the campus network
                       for laptop computers by expanding the current open access ports project to
                       include building 03.

                        Cost: $82,300.00
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.



86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc    Page 1                                     11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                     draft



1.2   Access from off-campus, anywhere, any time.

       Initiative(s): Improve support tools for accessing Cal Poly resources remotely
                       Define, test, document, disseminate configuration parameters for remote
                        access software (e.g. IMAP mail)
                       Improve quantity and quality of documentation available over the web
                       Provide consultation/troubleshooting on configuring remote access software
                       Implement Netware IP software on Netware servers to increase speed of
                        remote LAN access; investigate remote LAN access options for Windows
                        NT Server

       Initiative(s): INTRANET --- Single User Interface
                      Offer single user interface (=browser) to most applications on the network
                      including email, campus calendars, campus information, course information,
                      student information, trouble ticket tracking and self-help, CBT, chat, hypermail,
                      ODIN information, and universal authentication.

       Initiative(s): 56kb Modem Pool Upgrade
                      Provide 56kb connectivity to paying modem pool customers (faculty and staff)
                      and provide up to 128kb ISDN connectivity for users requiring greater
                      bandwidths for graphic-intensive applications by adding eleven PRI ISDN
                      modules to the existing 56KB modem pool.

                        Cost: $132,000.00
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.

       Initiative(s): North County Modem Pool Frame Relay Upgrade
                      Provide the North County Modem Pool users with access to reliable Internet
                      service and the ability to read their email, attach documents, and update their
                      by upgrading to a T-1 frame relay connection. At the present time, the existing
                      56KB frame relay circuit provides such slow response time that applications
                      time-out, causing users to lose their connections.

                        Cost: $17,000.00
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.




1.3   Information technology classroom support.

       Initiative(s): Media Utility Initiative
                      Expand media delivery capability including classrooms, refreshing and
                      standardizing classroom media equipment and support, equipping conference


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc     Page 2                              11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                            draft


                         rooms, and implementing mobile media carts.

                         Continue to support ethernet port activation for classrooms. New buildings
                         available Fall 98 are Buildings 52 – Science and 26 – Graphic
                         Communications.

       Initiative(s): Audio/Visual Equipment Availability
                      Improve reliability and access to standard audio/visual equipment in the
                      classroom. Proactive maintenance schedules will reduce interruption of course
                      delivery due to equipment failure. This will enhance the learning environment
                      at Cal Poly by ensuring the infrastructure is in place for delivery of course
                      material. In addition, implementation of the Remedy system for trouble calls
                      and metric information about repair history will assist MDS staff in determining
                      appropriate action for equipment maintenance, repair and replacement.

       Initiative(s): Classroom / Laboratory Telephones
                      Provide telephony / voice connectivity in classrooms and labs for emergencies,
                      teleconferencing and data connectivity via modem to the Internet or
                      mainframe; providing the capability to perform demonstrations, hold in-class
                      teleconferences with industry experts, and facilitate on-line discussions in the
                      classroom / laboratory environment.

                         Cost: $85,350.00
                         It is anticipated that this project will be funded through Communications
                         Services base budget.


1.4   University-provided computers, software and connectivity for faculty and staff.

       Initiative(s): Faculty Workstation Plan
                      Complete the 3-year faculty workstation replacement plan for full-time
                      equivalent faculty and institutionalize the process. Explore feasibility of
                      expanding the program to target a larger user base (e.g. additional
                      instructional and administrative staff) and offer a broader range of services
                      (e.g. software upgrades, shared network printers).

       Initiative(s): Software Maintenance and Distribution Automation
                      This would allow users to obtain software, correctly configured for their system,
                      quickly and easily, without human intervention. It would require use of the Web
                      for distribution and tracking of information.

                         Cost: The software is inexpensive: one possible middleware package is
                         WebObjects which costs $100/copy; the other possible package, Cold Fusion,
                         is also inexpensive. Most of the cost would be staffing: staff time to plan
                         development strategies, provide oversight, and a need for programmers to
                         implement low-level code.



86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc       Page 3                                   11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                      draft


       Initiative(s): Central UNIX Upgrade
                      Refresh and upgrade central UNIX capability to address expanding
                      functionality and transaction volume. This includes hardware, software, support
                      services, training, and additional staffing on a continual basis, with a
                      refresh/upgrade of resources on a 3-year cycle.

                        Cost: This will require an annual, on-going expense of $900,000 per year.
                        Initiative will require “new” funding source, and is “above” current base budget.

       Initiative(s): Building Infrastructure Upgrade:
                      Complete the network connectivity infrastructure wiring in Fisher Science
                      (building 33) and Science North (building 53) and provide wiring infrastructure
                      to Architecture (building 05) faculty offices and labs for connectivity to
                      Architecture file servers, campus resources and the Internet.

                        Cost: $118,250
                          ($68,250 for buildings 33 & 53)
                          ($50,000 for building 05)
                        It is anticipated that this project will be funded through Communications
                        Services base budget.

                        Facilitate installation of ethernet connections, for entire buildings (e.g. 33, 53,
                        05) as well as individual faculty members, by providing consultation and
                        workstation software/hardware installation.


1.5   Assured access to computers and connectivity for students.

       Initiative(s): Help Desk Access
                      Begin implementation of 7x24 strategy for Help Desk by use of Operations
                      staff during hours that the Help Desk is not staffed. Cost: minimal at first; may
                      require additional training for Operations staff, additional student assistant
                      hours.

       Initiative(s): Print and Scanning Services Upgrade
                      Upgrade printing services to a minimum quality across all labs. Add color
                      printing capability and increase number of scanners. Procure print servers and
                      cost recovery software to automate cost recovery of printing.

                        Cost: Software $25,000; print servers $15,000; printers $25,000; scanners
                        $15,000. Staff costs for research and implementation. Will require cooperation
                        in providing data feed from SIS.

       Initiative(s): Student Lab Upgrade
                      Upgrade student labs equipped with dumb terminals to add GUI interfaces to
                      email and the Web. A 25 seat upgrade is in progress in the Library Reserve
                      Book Room using a Citrix Winframe server.


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc     Page 4                               11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                    draft



                        Cost: Purchase additional seats at $1000 per seat (Java workstations capable
                        of running Winframe client) for remaining campus dumb labs. Purchase
                        additional servers, $18,500 per 25-client server including Winframe software
                        with fail-over between servers.

       Initiative(s): Student Lab Upgrade
                      Upgrade PC CAD and Graphics Lab supports classes and projects using CAD
                      software and plotting output. Computers need refresh to current high-end
                      Pentium CAD workstations to support required level of software.

                        Cost: 20 workstations @ $4500 per unit.

       Initiative(s): Student Lab Upgrade
                      Develop plan and acquire funding for Language Lab. ITS participation to create
                      a multi-purpose multi-media computer facility with system administration and
                      lab monitor support provided by ITS.

                        Cost: $170,000 first year (assuming leased computers); $85,000 each next 2
                        years. This is total cost including facility renovation. ITS share should be less.

       Initiative(s): Student Lab ADA Accessibility
                      Increase ADA Accessibility by incorporating software to assist visually impaired
                      students beginning with building 012 and CLA labs. Includes magnification;
                      text based and Web-based audible readers. Requires 1 copy of JAWS
                      software per platform.

                        Cost: $10,000.

       Initiative(s): Student Lab Upgrade
                      Upgrade MAC demo lab in building 012 room 105D with replacement
                      equipment for all 32 workstations.

                        Cost: 32 workstations @ $4500 per unit.

       Initiative(s): New Student Lab
                      Develop collaborative work lab for student group work.

       Initiative(s): New Student Lab
                      Develop student media development lab for classes and individual work.

       Initiative(s): Ref. 1.1, Automatic IP Address Configuration (formerly known as DHCP),
                      Open Access Ports: Continuation of Current Installations, and
                      Open Access Ports – New Installation for Building 03

       Initiative(s): Access to Audio/Visual Equipment


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc   Page 5                               11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                     draft


                        Establish a Resource Center in 10-125 Fall 98 enabling a second location on
                        campus for access to audio/visual equipment checkout.

                        Investigate and determine appropriate level of service and platforms required
                        for digital video editing in a student lab.

       Initiative(s): Central UNIX Performance Monitoring
                      Implement HP OpenView software utility on the central UNIX cluster. This will
                      enable staff to better monitor system and detect problems and performance
                      issues, thereby improving system availability.

                        Cost: funded in 97/98

       Initiative(s): Y2K Campus Compliance
                      Establish on-going Year 2000 coordinator/facilitator within ITS organization to
                      assist campus in identifying and documenting potential Year 2000 issues, and
                      resolutions, as identified.

                        Cost: 18 month project, .25-.5 FTE, using existing ITS staff.

       Initiative(s): Campus Network Backbone Upgrade
                      Upgrade the campus network backbone to a fully switched (rather than routed)
                      infrastructure necessary to accommodate the quality of service required in
                      multimedia applications, including video clips, high-end graphics and a host of
                      other applications. Education On Demand (EOD) is a method by which
                      multimedia course content is served off of either a mainframe or a sub-server
                      and delivered to the desktop. Cal Poly can not deliver multimedia course
                      content over the existing distributed network.

                        Cost: The total cost of this project is $495,000. The project can be
                        implemented over three years as follows:
                        Phase 1: $237,000
                        Phase 2: $129,000
                        Phase 3: $129,000
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.

       Initiative(s): Building High-Speed Network Upgrades
                      Provide the Cal Poly community with faster, more reliable access to computer
                      resources by installing ethernet switches to divide building traffic into separate
                      segments and provide a 100Mb ethernet connection for access to the campus
                      backbone.

                        Cost: The total cost of this project is $394,000. The project can be
                        implemented over two years as follows:
                        Phase 1: $212,000


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc   Page 6                                11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                           draft


                        Phase 2: $182,000
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.

       Initiative(s): Replacement of 16mb IBM token ring backbone (fiber)
                      Provide reliable infrastructure for administrative data networking traffic by
                      replacing obsolete, non-supported equipment with improved response times
                      and higher throughput ability.

                        Cost: $51,500
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.

       Initiative(s): Power Backup for Backbone
                      Provide power backup to selected campus backbone sites to maintain
                      connectivity to surrounding buildings when the power to the backbone site is
                      interrupted. Many times only one or two buildings are affected by a power
                      outage, but network connections in as many as ten other buildings could be
                      affected. Since much of the campus business and learning now relies on the
                      computer network, many things we do stop when the backbone or the
                      connection to it is down.

                        Cost: $75,000
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.

       Initiative(s): Machine Room Racks – Earthquake tie-downs
                      Ensure viability of data and voice communications in case of a seismic incident
                      by installing structural support for the data and voice core equipment located in
                      the Computer Center machine room.

                        Cost: $25,000
                        Funding has not been identified for this project. Communications Services
                        plans to explore funding options to facilitate the completion of this initiative.


1.6   Current data presentation interfaces on campus and throughout the community outside of Cal Poly.

       Initiative(s): ODIN WEB Access
                      Provide WEB access to ODIN information. A front-end interface will be
                      developed to provide easy WEB access to the basic, and most common ODIN
                      tables/views (class lists, budget reports, etc.).

                        Cost: 3 to 6 person months of development using existing staff.

       Initiative(s): Two-port Cisco CIP card
                      Ensure TCP/IP connections to the mainframe for administrative users by


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc     Page 7                                    11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                         draft


                            purchasing a hot spare (backup) Channel Interface Processor (CIP) card.

                            Cost: $64,350
                            Funding has not been identified for this project, however the purchase of this
                            card would enable the university to decommission three 3172’s that are
                            currently on maintenance with IBM. This cost savings in maintenance could
                            offset the procurement of this additional card.


1.7    Reliable security.

        Initiative(s): Universal Authentication (Single LOGON)
                       Research alternatives, identify requirements, and specify solution for universal
                       authentication to address needs computing labs (lab use data, logon for
                       security/email accountability, printer accounting) as well as many other
                       applications proposed by ITS (DHCP, modem access, MDS services, Web
                       page access, Kerberos, etc.). Includes a single point-of-contact account
                       administration and authentication service dedicated to managing a global
                       accounts database for Cal Poly.

                            Cost: staff hours to identify requirements, research alternatives, and specify
                            solution. Authentication system cost: defer until 1999/2000.

        Initiative(s): Campus Network Firewall
                       Provide the Cal Poly community with the ability to protect itself from network
                       security breaches that come from remote Internet sites by implementing a
                       network firewall. This allows the university to thoroughly conceal the internal
                       network from the outside world, providing full security protection from
                       sophisticated hacking attempts that disrupt service.

                            Cost: $50,000
                            Funding has not been identified for this project. Communications Services
                            plans to explore funding options to facilitate the completion of this initiative.

        Initiative(s): Code Blue Phone Installation
                       Provide a more visible, viable, remote emergency phone presence on the
                       campus by installing eight Code Blue emergency phones and two yellow
                       emergency phones in locations identified by Public Safety Services.

                            Cost: $52,275
                            Administration and Finance is providing funding to implement this project.


Goal     2:      INTEGRATION

Integrating information technology with the campus instructional environment.

2.1    Easy communication tools and information transfer for everyone on campus.


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc       Page 8                                11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                      draft


       Initiative(s):     File Sharing
                          Assist Communication Services with the implementation of WINS to enable
                          Win95 and WinNT clients to easily share files and computer resources (e.g.
                          printers) across subnets.

                          Also Ref. 2.2, Public Distribution Lists and
                          2.8, Software Availability

       Initiative(s): Ref. 1.7, Universal Authenticaion (Single LOGON)

       Initiative(s): Chatroom and Newgroup Software
                      Analyze, explore, decide, and implement software to support chatrooms and
                      news groups for electronic discussion and messaging. Initiative is an
                      integrated part of the Intranet initiative for the campus.

                          Cost: $15,000 to $50,000 depending on solution to support software
                          acquisition and staff time.

       Initiative(s): Ref. 1.4, Software Maintenance and Distribution Automation

                          Develop capability for remote, automated system management capability for
                          the desktop and lab workstations.




2.2   Universal e-mail.

       Initiative(s):     Student OpenMail Migration
                          Complete on-going plan to migrate all students from Unix mail to OpenMail
                          server or comparable messaging backbone.

                          Increase flexibility and breadth of email client support to include a variety of
                          clients (e.g. Netscape Messenger, Outlook97, Outlook Express) utilizing a
                          standard protocol (Internet Message Access Protocol or IMAP).

                          Cost: OpenMail migration costs primarily included in the UNIX
                          Upgrade/Refresh initiative (ref. 1.4), through some additional costs may be
                          incurred by students/faculty/staff depending upon selection of mail client and
                          associated vendor pricing.

       Initiative(s):     Public Distribution Lists
                          Develop automated processes for creating and maintaining public distribution
                          lists utilizing electronic data from other sources. Especially class email lists
                          and departmental rosters via the Web. Requires programming effort for both
                          the Web front-end, the legacy system interfaces, and Central UNIX back-end.


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc    Page 9                                11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                             draft


                          Effort should be integrated and aligned with broader and perhaps more
                          generic ITS efforts to create a robust Intranet environment, with mass mailing
                          options, with Mustang Info direction, etc.

                         Cost: Programming effort 240 hours.


2.3   High-demand functionality throughout the system.

2.4   Transparent integration of all campus academic information technology resources.

       Initiative(s): Ref 1.7, Universal Authentication (Single LOGON)


2.5   On-line campus, community, and individual calendars.

       Initiative(s): Institutionalize Use of OpenTime Calendaring
                      Continue outreach efforts (e.g. articles, demos, direct contacts) to encourage
                      broader usage of online campus, community and individual calendaring
                      features available on OpenTime by faculty and staff.

                         Facilitate the use of electronic calendars by students through the
                         implementation of the new OpenTime web client software, procurement of
                         additional hardware to support student load, and identification of funding
                         sources.

       Initiative(s): OpenTime/Resource25 Interface for Lab Reservations
                      Use OpenTime to make lab reservations readily accessible to faculty and staff.
                      Planning in progress for interfacing OpenTime and Resource25 for future Web
                      accessibility to lab reservations.

                         Cost: additional licensing costs are possible for the WEB-enabled functionality.
                         Specific costs are not determined at this time.

       Initiative(s): Automated Faculty Schedules on OpenTime
                      Develop interfaces to auto download faculty schedules into OpenTime each
                      term.


2.6   Availability of all appropriate off-campus information technology resources.

2.7   Relevant administrative data for faculty.

       Initiative(s): Automate and Integrate Media Services and Resource Scheduling
                      Lead the establishment of a project plan and requirements list, in conjunction
                      with appropriate campus groups, for integration of media service and
                      equipment requests into other campus processes such as audio/visual
                      equipment checkout, class scheduling and conference services. Integration of



86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc          Page 10                                11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                                  draft


                         these services will simplify resource requests and reduce the number of
                         transactions required.

       Initiative(s): Ref. 1.6 ODIN WEB Access and
                      2.5 OpenTime/Resource25 Interface for Lab Reservations

       Initiative(s): WEB Based Faculty Evaluation
                      Analyze and explore implementation of Faculty Evaluation on the WEB.
                      Though implementation is probably in 1998/99, initial explorations with some
                      colleges have indicated conceptual problems that would need to be resolved.

                         Cost: $5000


2.8   Professional application software

       Initiative(s): Software Availability
                      Facilitate collaboration by providing training, documentation, and consultation
                      on incorporating groupware features of applications such as word processing,
                      spreadsheet, email, project management, etc. into business processes.

                         Expand the breadth of offerings via KeyServer and fully automate the
                         installation of Windows applications via the Web; investigate the feasibility of
                         distributing ODIN via Keyserver on FWP workstations.

                         Explore feasibility of expanding FWP project funding to include software
                         upgrades during 3-year replacement cycle.


Goal 3:         SKILLS

Providing paths for learning information skills and for moving curricula into the new media

3.1   Computer education and support for all students.

       Initiative(s): OpenTime CBT Access
                      Evaluate OpenTime CBT for possible deployment in student labs.

       Initiative(s): Increasing Access to ITS Offered Training
                      • Set up computers in ITS labs and as many others as possible around
                        campus so that students can easily access CBT training modules.
                      • Open ITS training classes to students.
                      • Expand ITS training class offerings so that they more closely coincide with
                        users’ needs and coordinate offerings with Library and College of Business.
                      • Provide classes to enable users to configure their laptops in anticipation of
                        expanded use of DHCP on the campus.
                      • Implement Web registration for ITS training classes.



86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc       Page 11                                        11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                                draft


3.2   Information technology education and support for faculty and staff.

       Initiative(s): Expanded Training Options
                      Expand ODIN training programs to include summer quarter offerings.

                         Develop advanced Excel workshop.

       Initiative(s): Ref. 3.1, OpenTime CBT Access and
                      Increasing Access to ITS Offered Training

       Initiative(s): Distributed Teaching and Learning Practices for Faculty
                      Lead in the establishment of a “best practices” training process for faculty
                      preparation of teaching an interactive video course.


3.3   RPT recognition for upgraded skills.

3.4   Easy access to training tools, such as tutorials on computers.

       Initiative(s): Expand CBT Available Titles
                      Improve accessibility to and expand available titles of CBT training modules.


3.5   Institutional support for learning studies and for projects which revise existing curricula to use new technology
      productively.

       Initiative(s): Distributed Teaching and Learning Facilitation
                      Participate in the establishment of the campus strategy for distributed learning.

                         Work with MAS in establishing “best practices” for digital audio and video
                         encoding schemes based on content and delivery methods.

                         Identify appropriate use of desktop videoconferencing over the campus data
                         network and establish pilot project.


3.6   Expert person-to-person help in plain language from an integrated source for supported information technology
      resources.

       Initiative(s):     Help Desk Quality Improvement
                          Strengthen first tier Help Desk support by rotating PC/LAN staff through direct
                          phone support; Strengthen second tier Help Desk Support by improving
                          cross-training of PC/LAN Support staff and students.

                          Implement a quality assurance program whereby the work of field staff and
                          students will be randomly cross-checked by specialists on a periodic basis
                          and any deficiencies identified used as a basis for in-service training to
                          improve skills.


86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc       Page 12                                      11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                              draft



        Initiative(s):     Ref. 1.5, Help Desk Access

                           Help Desk Automation
                           Implementation of ARWeb module of Remedy which will allow users to input
                           trouble tickets directly, which will be automatically assigned to the appropriate
                           technical staff.


Goal     4:      SIMPLICITY

Making use of campus technology as simple as possible

4.1    User-friendliness a primary concern in all decision making about any part of the information technology resources
       of the campus.

        Initiative(s): Campus One Card
                       Implement a universal identification card with functionality to allow access to a
                       wide variety of services and resources including student computer labs,
                       computer printing, and open access ports.

        Initiative(s): Ref. 2.7, WEB Based Faculty Evaluation


4.2    Easy-to-use tools for creating instructional modules.

        Initiative(s): WEB Templates
                       Create templates for easy publishing of web-based course information
                       including course description and course syllabus system for faculty to easily
                       publish their course information.


4.3    Simple tools for accessing information technology resources.

        Initiative(s): Workstation Guidance, Governance, and Inventory
                       Develop a Web presence for the identification of commonly used workstation
                       software and hardware, new release availability and transition dates, and
                       licensing information and costs.

                          Procure and implement software for identifying workstation hardware over the
                          network and distributing new releases of software electronically.

                          Develop and implement improved approach for identifying workstation software
                          and hardware needs on campus, identifying appropriate solutions and
                          incorporating the recommended approaches into our support standards.

        Initiative(s): Ref. 1.5, Print and Scanning Services Upgrade




86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc       Page 13                                    11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                     draft


       Initiative(s): Ref. 2.7, Automate and Integrate Media Services and Resource Scheduling


4.4   Complete transparency/interoperability across platforms.

       Initiative(s): Standards Incentives
                      Increase standardization of workstation hardware and software wherever
                      possible through increasing awareness of advantages, offering site
                      licensing/procurement discount incentives, and current, defensible standards,
                      while recognizing the need for deviations from the standard for discipline-
                      specific requirements.


4.5   Consistent interfaces across platforms and in all locations.

4.6   Written documentation in plain language, printed and on-line.

       Initiative(s): Documentation Enhancement
                      Survey key constituencies to identify top 10 user documentation needs and
                      concentrate development in those areas.

                         Develop and implement IT documentation standards including update
                         frequency so all documentation has a similar “look and feel” and is easier for
                         users to grasp.

                         Collaborate with other campuses in development and distribution of
                         documentation for shared applications.

                         Implement “usability testing” for documentation prior to distribution via the
                         Web.

                         Cost: $25,000 for staff.

       Initiative(s): MDS Services Publicity
                      Enhance MDS web page and brochures describing services and resources
                      available.


4.7   Appropriate support should be provided for resources available.

       Initiative(s):     Collaborative College Support
                          Implement distributed technical support for all of the Colleges using a matrix
                          management model whereby IT staff receive routine, operational supervision
                          from the Colleges with general oversight from User Support Services.

                          Clarify the roles of College technical support staff versus ITS and strive to
                          make them more complementary and supportive of one another.



86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc       Page 14                           11/24/11
 ITS 98/99 Initiatives to IACC Instructional Computing Goals                             draft


                            Enhance Self-Accessiblity to Software
                            Procure and implement knowledgebases for popular software applications
                            which are accessible via the Remedy web client.

                            Enhance Windows/NT Support
                            Expand and enhance Windows/NT support, including providing a training
                            environment, web downloads of supported software, configuration standards,
                            and evaluation/implementation plan for the upcoming release of NT 5.0.

        Initiative(s): Ref. 1.5, Y2K Campus Compliance


Goal     5:      PROCESS

Creating an ongoing process for continuity of operations and evolutionary change

5.1    Necessity of a process.

5.2    Publicly available strategic plan.

        Initiative(s): Strategic Plan on the WEB
                       Posting of the ITS Strategic Plan on the ITS WEB page for the campus
                       community.


5.3    Revising the information technology strategic plan.

5.4    Implementation plan.

5.5    Commitment to openness across platforms and vendors to allow for future growth and change.

5.7    It is recommended that the deans and department chairs facilitate, encourage and support the strategic plan and
       that the priorities be evaluated seriously as part of the annual budget preparation process for each academic
       planning horizon.

5.8    Definition of the relationship between users and the implementers.




86318ec7-3b81-4cf5-888f-d3dae4ca4ae4.doc       Page 15                                   11/24/11

						
Related docs
Other docs by 4ouO90
Chapter 7 Chemical Reactions
Views: 10  |  Downloads: 0
O SR
Views: 13  |  Downloads: 0
doc LivretScolaire LPC et CFG definitif 3
Views: 32  |  Downloads: 0
T-Tests and Chi2
Views: 7  |  Downloads: 0
MATERIALI PREPARATORI
Views: 7  |  Downloads: 0
Mannen 55+
Views: 446  |  Downloads: 0
Caract�ristiques de moteurs
Views: 9  |  Downloads: 0
146105647
Views: 2  |  Downloads: 0