Embed
Email

cost

Document Sample

Shared by: hedongchenchen
Categories
Tags
Stats
views:
1
posted:
11/24/2011
language:
English
pages:
4
Benefit-Cost Analysis Input Worksheet for TRLF Applicants

Instructions



For an electronic (Excel) copy of this worksheet that's easier to complete—with drop-down menus and

dynamic default values— contact John Wilson (e-mail and phone below).



To enable basic benefit-cost calculations by the review team, enter information in the highlighted areas

within Project Definition, Traffic Profile, and Cost Estimates tabs. (Cells will change color from yellow to



For an evaluation of expected growth over the 20-year planning horizon, traffic analysis should be

performed for two time periods: one historical and one a future projection.



Where available, default values are shown. These may be overridden with project-specific data, or the

defaults can be accepted by typing "D" in the highlight box. Because some defaults depend on Project



Any free-form supporting notes can be included next to the data input.



Questions? Please contact John Wilson, Office of Capital Programs and Performance Measures

john.wilson@state.mn.us

(651) 366-3732









inst Page 1 of 4 11/24/2011

Benefit-Cost Analysis Input Worksheet for TRLF Applicants

Project Definition



Geographic Area



Roadway Facility

Baseline

"Build" Alternative



First Year of Construction

Duration of Construction (years)



First Year of Traffic Analysis

Final Year of Traffic Analysis



Roadway Length (mi)

Baseline

"Build" Alternative



Number of Lanes

Baseline

"Build" Alternative



Days of Week Analyzed



Average Daily Traffic

Baseline





"Build" Alternative









Average Speed (MPH)

Baseline





"Build" Alternative









def Page 2 of 4 11/24/2011

Benefit-Cost Analysis Input Worksheet for TRLF Applicants

Traffic Profile



Project Value or Default

"D"efault Value

Hours of Congested Operation (Length of Daily Peak Period)

Existing 2

Future 2



Truck Percentage

Baseline 8%

"Build" Alternative 8%



Average Vehicle Occupancy Ratios

Non-Peak

Baseline Geog. Area?

"Build" Alternative Geog. Area?

Peak

Baseline Geog. Area?

"Build" Alternative Geog. Area?



Crash Statistics for Future Year (0000)

Annual Count or Rate per 100 Million VMT?

Fatal

Baseline Roadway?

"Build" Alternative Roadway?

Personal Injury

Baseline Roadway?

"Build" Alternative Roadway?

Property Damage

Baseline Roadway?

"Build" Alternative Roadway?









prof Page 3 of 4 11/24/2011

Benefit-Cost Analysis Input Worksheet for TRLF Applicants

Cost Estimates





Project Value Default

or "D"efault Value

Estimate Year (to adjust for inflation) 2010



Initial Capital Costs

Preliminary Engineering

Right of Way

Major Structures

Roadway



Annual Maintenance per Lane-Mile

Baseline $9,000

"Build" Alternative $9,000



Cost Type

Other Capital or Maintenance Costs Year (C or M) Amount

example 2018 M $230,000









cost Page 4 of 4 11/24/2011



Related docs
Other docs by hedongchenchen
spec_2_
Views: 0  |  Downloads: 0
Life Expectancy Table
Views: 0  |  Downloads: 0
sbda tender document
Views: 0  |  Downloads: 0
Momentum010111
Views: 0  |  Downloads: 0
PVK06_DesignAndCoding
Views: 0  |  Downloads: 0
80R4852 TAD-D
Views: 0  |  Downloads: 0
spring_06
Views: 0  |  Downloads: 0
The 451 Group
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!