AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT

Document Sample
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT Powered By Docstoc
					                                                                                            1. CONTRACTOR ID CODE                     PAGE         OF     PAGES
    AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT                                              J                                 1                    1
2. AMENDMENT/MODIFICATION NO.                              3. EFFECTIVE DATE                4. REQUISITION/PURCHASE REQ. NO.
   0003                                                      2 NOV 2009
6. ISSUED BY:                                                  CODE      N55236             7. ADMINISTERED BY (If other than Item 6)         CODE
SOUTHWEST REGIONAL MAINTENANCE
CENTER
CODE 410
3755 BRINSER STREET STE 1
SAN DIEGO, CA 92136
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, State, & Zip Code)                                       ()    9A.    AMENDMENT OF SOLICITATION NO.
                                                                                                                       N55236-10-Q-8001
                                                                                                         X      9B.    DATED (SEE ITEM 11)
                                                                                                                       27 OCT 2009
                                                                                                                10A. MODIFICATION OF CONTRACT/ ORDER
                                                                                                                     NO.
                                                                                                                10B.    DATED (SEE ITEM 13)
CODE                                                FACILITY CODE
                                           11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers        is changed,      is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF
YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each
telegram or letter makes reference to the solicitation & this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)

                                     13.   THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS,
                                            IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
       A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:                   (Specify authority)   THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
       CONTRACT ORDER NO. IN ITEM 10A.

       B. THE ABOVE NUMBERED CONTRACT / ORDER NO. IS MODIFIED TO REFLECT ADMINISTRATIVE CHANGES (such as changes in paying
       office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
       C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

       D. OTHER (Specify type of modification and authority)


E. IMPORTANT: Contractor            is,      is not required to sign this document and return ___ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UFC section headings, including solicitation/contract subject matter where feasible.)
REF: USS ASHEVILLE (SSN-758)

The purpose of this amendment is to revise the requirement from (1) HPAC and (2) LPACs to (1) HPAC and (1) LPAC by replacing
the Statement Of Work REV-1 with Statement Of Work REV-2, attached.




Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and
effect.
15A. NAME AND TITLE OF SIGNER (Type or Print)                                  16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or Print)


15B. CONTRACTOR / OFFEROR                          15C. DATE SIGNED            16B. UNITED STATES OF AMERICA                                16C. DATE SIGNED

     ________________________________                                          BY  ________________________________________
     (Signature of person authorized to sign)                                       (Signature of Contracting Officer)
NSN 7540-01-152-8070                                                     30-105-01                                     STANDARD FORM 30 (Rev. 10-83)
PREVIOUS EDITIONS USABLE                                                                                               Prescribed by GSA
                                                 STATEMENT OF WORK (REV-2)


                                                                                                   DATE: Nov 2, 2009


1. NOTES:

   TITLE: ONE EACH; HPAC AND LPAC

       1.2        IDENTIFICATION:            (UIC) 21466 (WC/JSN)
                                             USS ASHEVILLE (SSN- 758)
                                             SUBBASE, SAN DIEGO, CA

       1.3        LOCATION:                 USS ASHEVILLE (SSN-758)
                                    P.O.C. MM2 SARAVIA AT PH. #726-5462
                                            SUBBASE SAN DIEGO, CA

2. REFERENCES:

       1.2 JSN:


3. JOB DESCRIPTION:

       3.1        The USS Asheville will be securing high pressure and low pressure air and requires one temporary high pressure air
                  compressor, capable of supplying 4500 psig and one temporary low pressure air compressor capable of supplying 125
                  psig. This temporary equipment is critical to continue ship’s work while in port.


4. FEATURES REQUIRED:

       4.1        The HPAC shall be a five stage, direct air cooled, oil lubricated reciprocating compressor with crankshaft driven oil
                  pump, low oil pressure switch, oil pressure gauge, full flow oil filter, inlet filter,
                  Intercoolers and after coolers, separators, safety valves, and drain valves.

       4.2        The HPAC shall deliver 75 scfm at 5000 psig.

       4.3        The HPAC shall include high pressure air hoses at a minimum of 200ft and each hose shall be tested and certified at
                  10,000 psi.

       4.4        The LPAC shall deliver 200 scfm at 125 psi.

       4.5        The LPAC shall be an air cooled rotary screw with safety controls and sound enclosure.

       4.6        The LPAC shall include a 240 gallon receiver with relief valves, manual drain and manifold with 4 services valves.
                  Receiver and compressor mounted on a common base.

       4.7        The LPAC shall include a minimum of 200 ft of low pressure hose certified and tested at 125 psi.

       4.8        The LPAC requires a quick disconnect within 10ft of any hatch. Basically requiring at least one quick disconnect per
                  service line.

       4.9        Both the High pressure air and low pressure air compressors will have electrical hook-ups. (not to be fuel powered)
5. NOTES:

       5.1 PWC will provide electrical connection to the electrical mount located on pier.

       5.2 Contract services will contact t-shed prior to contractor delivery to provide forklift for unloading.

       5.3 Contract services will obtain large birm from port ops for HPAC placement.




6. DELIVERY LOCATION:

       6.1 POINT LOMA, SUBBASE, Pier T.B.A.


7. DATES:

       7.1 Nov 6th ---- Jan 8th 2010

				