Construction Documents

Document Transmittal



Project #: Project Name:

Project

Project Budget:

Description:

Project Manager:





Firm Name:





Notification Date:



Document Delivery Date:



First Day of Review:



Comment Due Date:



Review Meeting Date:



Rev. Meeting Location:



INSTRUCTIONS – Project Managers:

 Complete the above project information

 Indicate in the Project Description whether the project will fall within the maintenance responsibility of

the Medical Center Maintenance Staff and not Facilities Operations and Development

 Complete the table below for each reviewer, adding additional reviewers as necessary

 Forward the completed submittal to the Professional Services firm

INSTRUCTIONS – Professional Services Firm:

 Submit all requested legend items as indicated

 Hard Copy submittal items require a COVER PAGE FOR SUBMITTAL ITEMS (included at the last page

of this document)

 Item 27 is also attached to this document



FOD – Standard Reviewers

Do not add or remove recipients from this list

Name, Title

Items to be sent Items to be sent

Department Address

electronically hard copy

Email address

, Project Manager 400 Central Classroom Building 1A, 2, 3, 18, 21, 22,

Design and Construction 2009 Millikin Road 23, 24, 25, 26, 27

Columbus, OH 43210

, Contracts Administrator 400 Central Classroom Building 2, 3, 18, 23

Business Management 2009 Millikin Road

Columbus, OH 43210









0240_CD_Transmittal 11.14.11 Page 1 of 7

Construction Documents

Document Transmittal



FOD – Standard Reviewers

Do not add or remove recipients from this list

Name, Title

Items to be sent Items to be sent

Department Address

electronically hard copy

Email address

Tim Shepard, Estimating Manager 400 Central Classroom Building 3

Design and Construction 2009 Millikin Road

Shepard.74@osu.edu Columbus, OH 43210

Brett Garrett, Interim Director 400 Central Classroom Building 1B, 2, 3, 9, 18, 19,

c/o Paula Cross 2009 Millikin Road 22, 23, 24, 25, 26, 27

Design and Construction Columbus, OH 43210

cross.106@osu.edu

Steve Volkmann, University 104 McCracken Power Plant 10, 14, 18, 21

Landscape Architect 2003 Millikin Rd.

Design and Construction Columbus, OH 43210

Volkmann.4@osu.edu

, Interior Designer 400 Central Classroom Building 1A, 2, 3, 23

Design and Construction 2009 Millikin Road

Columbus, OH 43210

, Director of Projects 400 Central Classroom Building 23

Design and Construction 2009 Millikin Road

Columbus, OH 43210

Ross Parkman, Senior Director 054 Central Service Building 1B, 2, 3, 9, 18, 23,

c/o Darla Brewer 2003 Millikin Road 26

Utilities Columbus, OH 43210

Parkman.3@osu.edu

Michael St. Clair, Senior Director 1314 Kinnear Road 1A, 2, 23, 26

c/o Dave Kos Columbus, OH 43212

Environmental Health and Safety

Kos.1@osu.edu

Aparna Dial, Director 1314 Kinnear Road 5, 23, 24, 25, 26

Energy and Sustainability Columbus, OH 43212

Dial.15@osu.edu

Mike Dixon, Senior Director 2000 Tuttle Park Place, Room 107 1A, 1B, 2, 2, 3, 3, 23,

c/o Kim Archer Columbus, OH 43210 23

Operations

Archer.20@osu.edu

Keith Shockley, Interim Assistant Laundry Building 1A, 2, 3, 19

Director 2560 Kenny Road

Operations Columbus, OH 43210

Shockley.5@osu.edu

(for roofing reviews)

Ed Berlepsch, Manager 5678 Kenny Rd., Rm 1205 15, 16, 17

Fire Safety Systems Columbus, OH 43210

Berlepsch.2@osu.edu









0240_CD_Transmittal 11.14.11 Page 2 of 7

Construction Documents

Document Transmittal



FOD – RIOPS

Name, Title

Items to be sent Items to be send

Department Address

electronically hard copy

Email address

Kenny King, District 1 Leader Maintenance Bldg. 1A, 2, 3, 23

King.407@osu.edu 2000 Tuttle Park, South Main Entrance

Columbus, OH 43210

Mark French, District 2 Leader Pomerene Hall 1A, 2, 3, 23

French.4@osu.edu 1760 Neil Ave., Rm. 221

Columbus, OH 43210



PPARE – Standard Reviewers

Name, Title

Items to be sent Items to be send

Department Address

electronically hard copy

Email address

Kim Moss, Senior Planner 53 W. 11th Avenue 18

Physical Planning and Real Estate Columbus, OH 43201-2013

Moss.58@osu.edu

Jason Kaplan, Space Planner 53 W. 11th Avenue 3, 11, 18

Physical Planning and Real Estate Columbus, OH 43201-2013

Kaplan.104@osu.edu

Nancy Sofer, McCracken Room 225 11

Physical Planning and Real Estate 2003 Millikin Road

Sofer.4@osu.edu Columbus, OH 43210



PROJECT USERS

(add rows and recipients as necessary)

Name, Title

Items to be sent Items to be send

Department Address

electronically hard copy

Email address

, 1A, 2, 3, 23







CAMPUS RECIPIENTS

Name, Title

Items to be sent Items to be send

Department Address

electronically hard copy

Email address

Steve Basinger, Asst. Director 505 Tuttle Office 10, 23

Transportation and Parking 2055 Millikin Way

Basinger.16@osu.edu Columbus, OH 43210

Major Don Bissett, Project Coordinator 148 Bevis Hall 10, 23

Transportation and Parking 1080 Carmack Road

Bissett.1@osu.edu Columbus, OH 43210

Ron Balser, Director 1010 Blankenship 1B, 17, 23

Security and Protective Services 901 Woody Hayes Drive

Balser.15@osu.edu Columbus, OH 43210









0240_CD_Transmittal 11.14.11 Page 3 of 7

Construction Documents

Document Transmittal



CAMPUS RECIPIENTS

Name, Title

Items to be sent Items to be send

Department Address

electronically hard copy

Email address

Bob Armstrong, Director Blankenship Hall 1A, 23

Emergency Management and Fire 901 Woody Hayes Drive

Prevention Columbus, OH 43210

Armstrong.349@osu.edu

Vernon Baisden, Assistant Vice 2031 Millikin Road 1A, 23

President Columbus, OH 43210

Department of Public Safety

Baisden.14@osu.edu

Scott Lissner, ADA Coordinator Rm 308 Student Academic Services 1B, 23

ADA Coordinator’s Office 281 W. Lane Ave., Suite 340

Office of Diversity and Inclusion Columbus, OH 43210

Lissner.2@osu.edu

Chuck Sailor 320 W. 8th Avenue 1B, 2, 23

Office of the Chief Information Office Columbus, OH 43210

Sailor.2@osu.edu









0240_CD_Transmittal 11.14.11 Page 4 of 7

Construction Documents

Document Transmittal





LEGEND – Not all may be required for this submittal

Item # Description

1A Complete set of plans – half size prints

1B Complete set of plans – full size prints

2 Set of Project Manual(s) (Specifications)

3 Estimated Cost Estimate and Timeline Schedule

4 Xxxxxxxxx

5 Xxxxxxxxx

6 Xxxxxxxxx

7 Xxxxxxxxx

8 Xxxxxxxxx

9 HVAC, plumbing, electrical design calculations

10 Site plans only

11 Floor plans only

12 Utility site plan(s)

13 Planting plan(s) with planting specifications

14 Building elevations only

15 Fire Suppression Drawing and Specifications

16 Fire System Alarm and electrical plans

17 Division 28, Fire Alarm and Security Specifications

18 Brief description of project for insurance requirements

19 Elevator and automatic door specifications; hardware specifications

20 HVAC, electrical and plumbing cut sheets

21 Tree Survey

22 Plans and specifications as well as other required data copies on to CD-R (pdf format)

23 Copy of this transmittal form

Mandatory for all projects: Narrative description of proposed building system modification

option to show, in compliance with the OSU Interim Green Build and Energy Policy #3.10

(http://busfin.osu.edu/FileStore/310_InterimGreenBuildandEnergy.pdf), including MEP

24 system conceptual diagrams and Life Cycle Cost Analysis in compliance with Appendix C

of the Building Design Standards. All LEED Projects must submit the LEED Scoresheet

and LEED Boundary documents for approval by the University Engineer and University

Architect. Provide both print and pdf formats

ASHRAE 90.1 2004, Appendix G – information applicable to Appendix C of the Building

25

Design Standards (applicable only if the construction cost is $100,000 or more)

26 Previous phase review comment responses (provide a pdf format to the Project Manager)

27 Document Submittal Checklist









0240_CD_Transmittal 11.14.11 Page 5 of 7

Item 27

Document Submittal Checklist

NOTE: DOCUMENT TO BE COMPLETED BY PROFESSIONAL SERVICES FIRM

Project # Project Name

Project Manager Firm Name



Document SD DD CD N/A

 Design Documents

o SD – 30% complete; 90% of design concepts determined

o DD – 60% complete; 99% of design concepts determined

o CD – 100% complete, checked and ready to be issued for bidding

 Drawings -

 Project Manual -

 Site Plan –

-

o DD - survey drawings; utility profiles; hydraulic calculations

 Site Landscaping Plan - -

 Isometric Diagrams - -

 Floor plans

-

o DD - floor live loads

 Floor Area and Volume Tabulations - -

 Building Sections

-

o DD – Sections through building

 Equipment/Furniture Layouts -

 Program of Requirements Database

 Utility Request Form - -

 Outline Specification – electrical service and other appropriate one-line diagrams - -

 System Narrative Description - -

 Letter describing conceptual design element life-cycle analysis - -

 Elevations -

 Life-cycle Cost Analysis

 Project Cost Estimate/Construction Cost Estimate

 Green Build Policy

o SD – Narrative for HVAC, Plumbing, Electrical; MEP conceptual diagrams

o DD – Update

o CD – Final narrative

 Geotechnical Report - -

 Pavement Calculations - -

 Permit-related information - -

 Plumbing System Floor Plans - -

 Roof Plan - -

 Thermal Stress Analysis - -

 Structural Engineering Calculations - -

 Models

 Renderings - -

 Fire Protection -

 Major HVAC System Design Calculations – heat loss/gain; minimum supply air quality -

 Civil, structural, HVAC, plumbing, fire protection, electrical calculations - -

 Electrical Submittal –

o DD - fixtures and equipment quantities, foot candle levels, unit costs; riser diagram; panel/switch -

schedule; clearance information; major electrical system design calculations

 Code Information - -





Cover_Sheet_Submittal_Item.doc Page 1

Cover Page for Submittal Item

THIS DOCUMENT TO BE INCLUDED WITH ALL SUBMITTAL ITEMS



Date: Level of Review: Construction Documents



Firm Name:







Project #: Project Name:







Item #: Item Description:









Cover_Sheet_Submittal_Item.doc Page 1


Related docs
Other docs by HC111124043838
?????
Views: 0  |  Downloads: 0
Inhalt
Views: 3  |  Downloads: 0
Processos 63 ª Reunião da CCASP
Views: 3  |  Downloads: 0
Sheet1
Views: 11  |  Downloads: 0
stack . ppt
Views: 0  |  Downloads: 0
Hoja3
Views: 1  |  Downloads: 0
Plan
Views: 8  |  Downloads: 0
?????
Views: 5  |  Downloads: 0
Vyhl�ka ministerstva zdravotnictv� c
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!