									CIM/GID Interoperability Testing

         Presented by Lars-Ola Österlund
         At CIM Users group 2008-06-10 in Västerås




ABB Network Management
1
The CIM And GID Is...

         The Common Information Model (CIM) for the Utility industry
         A standard from IEC TC57
         Described in UML (Unified Modeling Language)
         Documented in several specifications
              IEC61970-301 Core information model
              IEC61970-452 Transmission network model exchange
              IEC61970-501 RDF Schema version of the UML
              IEC61970-552-4 CIMXML data exchange format
              IEC61968-11 extended information model
              and several more ...
         Generic Interface Definition (GID) APIs described in
              IEC61970 400 documents.




ABB Network Management
2
Evolution Of The CIM

         Originated as an EPRI project 1994
         EPRI report TR-106324 June 1996
         IEC TC57/WG13 created September 1996
         UML used to describe the data model in 1998
         IEC TC57/WG14 added DMS extensions in 2003
         CIM Market extensions (CME) created 2004
         IEC TC57/WG16 ETSO and CME harmonization late 2004
         CIM for planning sponsored by EPRI started in 2006
         Several utilities use CIM to support systems integration, e.g.
          ERCOT
         CIM continue to evolve...



ABB Network Management
3
Correctness Of The CIM

         Several versions of the CIM has been released since
          1996 when CIM was first released
              Does the CIM work?
         New versions emerges because
            New functionality supported
            Errors corrected

         Interoperability testing a way to demonstrate and
          verify correctness




ABB Network Management
4
CIM Interoperability Tests

         Was introduced to
              Verify correctness of
                 IECCIM standards
                 Vendor implementations
              Demonstrate interoperability
         First test year 2000
              Goal to verify the CIM works
         Since then annual tests
              To verify changes and corrections
         Each test documented in a report from EPRI




ABB Network Management
5
CIM Releases

      CIM                 Profile              Date
      cim05               -                    December 1996
      cim06               -                    April 1997
      cim07               -                    April 1998
      cimu07              -                    April 1998
      cimu08              -                    August 1999
      cimu09a_001215      CPSM 2000-12-06      December 2000
      cim10_010825c       CPSM 2001-04-02      April 2001
      cim10_011015        CPSM 1.5             September 2001
      cim10_011015        CPSM 1.6             July 2002
      cim10_030501        CPSM 1.7             November 2003
      cim10_030501        CPSM 1.8             July 2004
      cim10v002           CPSM 1.9             September 2005
      cim10v003           CPSM 2.0             March 2006
      cim11 (cim10v004)   IEC 61970-452 Rev3   October 2006
      cim12v03            IEC 61970-452 Rev4   Q1 2008



ABB Network Management
6
Interoperability tests, 1

         IOP1 18 Dec 2000 1th test in Orlando
              ABB, ALSTOM (and Langdale), Siemens, PsyCor, CIM-Logic,
               SISCO
         IOP2 29 April 2001 2nd test in Las Vegas
              ABB, ALSTOM, Siemens, CIM-Logic, SISCO
         IOP3 26 Sept 2001 3rd test in Monterey
              ABB, ALSTOM, Siemens, PsyCor, SISCO
         IOP4 14 July 2002 4th test in San Francisco
              ABB, PTI(PsyCor), Langdale, GE Harris
         2 August 2002 Beijing
              NEPDCC, CEPRI, NARI, Tsinghua, Luneng, Dongfang
         IOP5 18 Nov 2003 5th test in San Francisco
              Alstom, Shaw PTI, SISCO, SNC Lavalin



ABB Network Management
7
Interoperability tests, 2

         IOP6 19 Sept 2004 6th test at CAISO in Folsom
              Areva, EDF, Incremental Systems, PTI, Siemens, SISCO
         IOP7 26 Sept 2005 7th test at CAISO in Folsom
              Areva, EDF, ABB, PTI, Siemens, SISCO, Xtensible Solutions
         IOP8 30 March 2006 8th test in San Francisco
              Areva, EDF, PTI, SNC Lavalin, ABB (remote)
         IOP9 1 Oct 2006 9th test in Washington DC
              ABB, EDF, GE, Siemens-PTI, SISCO
         IOP10 17 Sept 2007 10th test in San Francisco
              ABB, Areva, GE, Siemens, Siemens-PTI, SNC




ABB Network Management
8
Standards Being Tested

         Currently
              Core data model
                 IEC    61970-301
              RDF Schema version of the UML
                 IEC    61970-501
              Transmission network model exchange profile
                 IEC    61970-452
              CIMXML data exchange format
                 IEC    61970-552-4
              GID specifications
                 IEC    61970-402 to 407
         Plans to extend tests also to other specifications


ABB Network Management
9
Test Overview

                           CIM                              CIM
                           -61970-301           Schema      -61970-501
                           -61960-452
                           -61970-552-4
                            CIMXML
                             model             Validation
                              file               Tool



              Sending                          Receiving
              System                            System


                         GID connections
                         -61970-402
                         -61970-403 (DAF++)
                         -61970-404 (DAIS/OPC DA)
                         -61970-405 (DAIS/OPC A&E)
                         -61970-407 (HDAIS/OPC-HDA)
ABB Network Management
10
Test Networks

         A number of participants provides test networks
              ABB40Bus
              Areva60bus
              Wapa262 (GE)
              Siemens100Bus
              EDF networks
         The test networks are typically small as functionality
          is the focus




ABB Network Management
11
ABB40Bus Network Overview




ABB Network Management
12
Sample CIMXML Model File

        <rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
         xmlns:cim="http://iec.ch/TC57/2007/CIM-schema-cim12#">
             ...
             <cim:Substation rdf:ID="_7582201">
                       <cim:IdentifiedObject.localName>MONR</cim:IdentifiedObject.localName>
                       <cim:IdentifiedObject.name>MONROE</cim:IdentifiedObject.name>
                       <cim:Substation.Region rdf:resource="#_83129201"/>
             </cim:Substation>
             ...
             <cim:VoltageLevel rdf:ID="_7583201“>
                       <cim:IdentifiedObject.localName>220kV</cim:IdentifiedObject.localName>
                       <cim:IdentifiedObject.name>MONR220SUBNET</cim:IdentifiedObject.name>
                       <cim:VoltageLevel.MemberOf_Substation rdf:resource="#_7582201"/>
                       <cim:VoltageLevel.BaseVoltage rdf:resource="#_220000302"/>
            </cim:VoltageLevel>
           ...
        </rdf:RDF>




ABB Network Management
13
Tested Functionality

         Current
              Full import of an original model
              Full re-export of imported model
              Full import of a re-exported model
              Run Load Flow on imported model
         Starting up
              Preparation of an increment in Data Engineering/Modeler
              Incremental model export
              Incremental model import
         Planned
              Use CIMXML configuration in GID/ICCP subscriptions
              Run State Estimation



ABB Network Management
14
How The Tests Are Conducted

         Bi-weekly preparation phone conferences
              Test procedure prepared
         When standard frozen (typically June)
              Validation tools updated
              Participants updates software
                 Test   networks compliant with the standards created
         Participants gather at a test location
              Tests conducted according to test procedure
              Witnesses (typically from utilities) follow the tests
              Results are recorded
         Test report issued by EPRI
              Copies of reports can be obtained from EPRI



ABB Network Management
15
Sample Issues On Standards

         Ambiguities in the Core CIM (61970-301)
            Line containment
            Load model
            Voltage control
         Different interpretations of the core CIM
              Measurements and state
         Lacking support of functionality
            Equivalent modeling
            Model boundary definition
         Profile issues (61970-452)
            Convention for association role usage
            Object identification and uniqueness
            Name lengths




ABB Network Management
16
Sample Issues On Implementations

         Differences in export vs. import file
              Number of objects
                 More objects
                 Less objects
              Parameter values
              Object identifiers and names
         Differences in Load Flow solution




ABB Network Management
17
Result Evaluation

         Despite small networks used in tests it is still difficult
          to compare results, i.e.
              Why does the number of objects differ in an export vs. an
               import?
                 Does   a difference matter?
              Is a re-exported object the same as an imported?
                 How    to prove sameness?
              Why are Load Flow solutions different?




ABB Network Management
18
Conclusion

         Interoperability testing has
              Demonstrated CIM/GID standards works
              Improved the quality of the CIM/GID standards
              Demonstrated implementation interoperability
              Promoted the use of CIM/GID
              Been a success
         Interoperability testing needed as long as CIM/GID
          standards evolve