Capital Plan April 2010 to March 2013 _new and modernizations only_

Shared by: liwenting
Categories
Tags
-
Stats
views:
14
posted:
11/23/2011
language:
French
pages:
3
Document Sample
scope of work template
							          GRANDE PRAIRIE & DISTRICT CATHOLIC SCHOOLS
          Capital Plan April 1, 2010 - March 31, 2013
                                                                                               2010-2011


          New School Construction

          New K - 9 for Grande Prairie                               Priority 1 for New School Construction
          End Capacity of 550 students
          Opening Capacity of 350 students.
          Gym 595 m2. Library 220 m2.


          550 @ 8.76m2 = 4818 metres total space                                4,818.00
          Deduct 14 classrooms @100 m2 each                                     1,400.00
          Total core permanent space                                            3,418.00
          Add 8 Modus modulars                                                    800.00
          Opening GFA m2                                                        4,218.00

          Cost per m2 @ $1700 + escalation + market =                $          4,100.00

          4218 m2 x $4,100 m2                                        $   17,293,800.00
          Consultant Fee (9%)                                        $    1,556,442.00
          Project Expenses (2.0%)                                    $      345,876.00
          Furniture & Expenses (8.0%)                                $    1,383,504.00
          CTS Equipment (3.0%)                                       $      518,814.00

                                                          Sub-total $    21,098,436.00
                                                        GST (1.6%) $        337,574.98

                                                            TOTAL                          $         21,436,010.98



          Modernization

          St. Patrick's Demolition/ Modernization                    Priority 1 for Modernizations

          Demo and replace 60% of school, modernize remainder
          Slab on Grade failure, energy upgrade, health and safety
          Handicap access, Right-sizing of old Community Space for Class Size
          School is now K - 8 and needs adequate K-9 facilities
          Add junior high CTS spaces foods/ fabrication
          Windows/ doors need replacement
          False wood substructure needs replacement
          Expand gym size for K-9
          3570 m2 total space less modulars                                     2,649.00
          To be demo'd and replace at 60%                                       1,589.40
          To be modernized at 40%                                               1,059.60


          Estimated replacement costs at new const. rate             $     6,516,540.00
          Estimated modernization costs at mod. Rates                $     2,119,200.00
          Estimated costs of demolition                              $       500,000.00
          Total estimated costs                                      $     9,135,740.00
          Consultant Fee (9%)                                        $       822,216.60
          Project Expenses (2.0%)                                    $       182,714.80
          Furniture & Expenses (8.0%)                                $       730,859.20
          CTS Equipment (3.0%)                                       $       274,072.20

                                                          Sub-total $    11,145,602.80
                                                        GST (1.6%) $        178,329.64

                                                            TOTAL                          $         11,323,932.44



                       TOTAL CAPITAL REQUEST FOR 2010 -2011                                      $32,759,943.42




Bryan Turner                                                   C:\Docstoc\Working\pdf\fba9f331-5013-49e8-8d7c-8bead52fc48c.xlsx
GRANDE PRAIRIE & DISTRICT CATHOLIC SCHOOLS
Capital Plan April 1, 2010 - March 31, 2013
                                                                                2011-2012



New School Construction
New 9-12 High School for Grande Prairie/ Clairmont (Priority 2 for New School Construction)
End Capacity of 650 students
Opening Capacity of 400 students. Gym 1050 m2
Gym 1050 m2. Library 293 m2
North East School Location - CKC North Site

650 @ 9.85m2 = 6402 metres total space                           6,402.00
Deduct 16 classrooms @100 m2 each                                1,600.00
Total core permanent space                                       4,802.00
Add 7 Modus modulars                                               700.00
Opening GFA m2                                                   5,502.00

Cost per m2 @ $1700 + escalation + market =               $      4,200.00

5502 m2 x $4,200 m2                                       $ 23,108,400.00
Consultant Fee (9%)                                       $ 2,079,756.00
Project Expenses (2.0%)                                   $    462,168.00
Furniture & Expenses (8.0%)                               $ 1,848,672.00
CTS Equipment (3.0%)                                      $    693,252.00

                                                Sub-total $ 28,192,248.00
                                              GST (1.6%) $     451,075.97

                                                  TOTAL                     $   28,643,323.97


Wembley Catholic Elementary K-9 (Priority 3 for New School Construction)
End Capacity of 350 students
Opening Capacity of 250 students.
Gym 595 m2. Library 140 m2.


350 @ 9.99m2 = 3343 metres total space                           3,497.00
Deduct 10 classrooms @100 m2 each                                1,000.00   all 80 m2 classrooms in a 350 capacity K-12 school
Total core permanent space                                       2,497.00
Add 5 Modus modulars                                               500.00
Opening GFA m2                                                   2,997.00

Cost per m2 @ $1700 + escalation + market =               $      4,300.00

2997 m2 x $4,300 m2                                       $ 12,887,100.00
Consultant Fee (9%)                                       $ 1,159,839.00
Project Expenses (2.0%)                                   $    257,742.00
Furniture & Expenses (8.0%)                               $ 1,030,968.00
CTS Equipment (3.0%)                                      $    386,613.00

                                                Sub-total $ 15,722,262.00
                                              GST (1.6%) $     251,556.19

                                                  TOTAL                     $   15,973,818.19



Modernizations
St. Thomas More (Priority 2 for modernizations)                                 $8,572,000.00
Construct Fabrication CTS space, Wheelchair accessible,
Kindergarten, Leeds Silver, Science Lab, Library Modern
Classroom Modernization
4286 total sq. meters
Cost per m2 @ $840 + escalation + market =



TOTAL CAPITAL REQUEST FOR 2011 - 2012                                       $   53,189,142.16
GRANDE PRAIRIE & DISTRICT CATHOLIC SCHOOLS
Capital Plan April 1, 2010 - March 31, 2013
                                                                                        2012-2013


New School Construction

Grande Prairie North K-9 (Priority 4 in New School Construction)
End Capacity of 350 students
Opening Capacity of 250 students.
Gym 595 m2. Library 140 m2
North Site designated already in Municipal Planning

350 @ 9.99m2 = 3497 metres total space                                   3,497.00
Deduct 10 classrooms @100 m2 each                                        1,000.00
Total core permanent space                                               2,497.00
Add 5 Modus modulars                                                       500.00
Opening GFA m2                                                           2,997.00

Cost per m2 @ $1700 + escalation + market =                      $       4,300.00

2997 m2 x $4,300 m2                                              $ 12,887,100.00
Consultant Fee (9%)                                              $ 1,159,839.00
Project Expenses (2.0%)                                          $    257,742.00
Furniture & Expenses (8.0%)                                      $ 1,030,968.00
CTS Equipment (3.0%)                                             $    386,613.00

                                                        Sub-total $ 15,722,262.00
                                                      GST (1.6%) $     251,556.19

                                                         TOTAL                      $    15,973,818.19




Modernizations
Kateri Mission Catholic Schools (Priority 3 in Modernizations)
Classroom Modernization
Kindergarten, Leeds Silver, Science Lab, Library Modern

4202 total sq. meters, mod to 50%
Cost per m2 (2101@ $840) + escalation + market =                                    $     4,202,000.00


St. Mary Catholic School in Beaverlodge (Priority 4 in Modernizations)
Classroom Modernization
Kindergarten, Leeds Silver, Science Lab, Library Modern

1485 total sq. meters
Cost per m2 (1485@ $840) + escalation + market =                                    $     2,970,000.00


Ste. Marie Catholic School in Spirit River (Priority 5 in Modernizations)
Classroom Modernization
Kindergarten, Leeds Silver, Science Lab, Library Modern

1895 total sq. meters
Cost per m2 (1895@ $840) + escalation + market =                                    $     3,790,000.00


TOTAL CAPITAL REQUEST FOR 2012-2013                                                 $    26,935,818.19

						
Other docs by liwenting
Prudential Long-Term Care LTC3 Sales Ideas
Views: 7  |  Downloads: 0
Seite 1 von 5 Tischtennis Ein we
Views: 49  |  Downloads: 0
Activating Bridge Baron
Views: 216  |  Downloads: 0
doc_15_
Views: 4  |  Downloads: 0
MERCADOS FINANCIEROS
Views: 199  |  Downloads: 0
Business Object Type Library Dr
Views: 11  |  Downloads: 1
Hot Buy
Views: 67  |  Downloads: 0