					                        THE KENTON COUNTY SCHOOL DISTRICT
     BEECHGROVE ELEMENTARY SCHOOL POURED RUBBER GYMNASIUM FLOOR BID TABULATION

                                                                                                                             Dynamic Sports
Item Description                                                                                    Cincinnati Floor           Construction              Final Floor

Price to prepare, provide, and install a new gym floor in accordance with the
Beechgrove Elementary School Poured Rubber Gymnasium Floor Bid
Specifications

Option #1 A - Pulastic 2000 or equal                                                                        33,800.00               30,000.00             29,635.00

Moisture Test (if required)                                                                                  4,000.00                5,600.00              2,900.00

                                           Total                                                            37,800.00               35,600.00             32,535.00



Option #2 A - Pulastic zs or equal                                                                          30,800.00               30,000.00             31,035.00

Moisture Test (if required)                                                                                  4,000.00                5,600.00              2,900.00

                                           Total                                                            34,800.00               35,600.00             33,935.00



Option #3 A - Robbins Strata or equal                                                                       29,800.00               30,000.00             29,635.00

Moisture Test (if required)                                                                                  4,000.00                5,600.00              2,900.00

                                           Total                                                            33,800.00               35,600.00             32,535.00



                                                                       Best evaluated bid -


Note: Initial moisture tests yielded results between 88% - 93% humidity in the concrete slab. Results must be below 75% in order
      to avoid the moisture remediation / vapor seal process.
     Final Floor failed to provide references, proof of insurance, supplier's data, samples, maintenance literature, and a color chart with their bid.
     Dynamic Floor failed to provide proof of insurance and maintenance literature with their bid.
     Bids from Dynamic Floor and Final Floor were not considered due to their failure to provide all required documents as listed above.