									                               DRAFT OF N.I.T FOR APPROVAL BY PPRA.

                OFFICE OF THE DISTRICT OFFICER ROADS JACOBBAD
                                                                     No. TC/G-55/1095/of 2008
                                                                     Jacobabad dated: 20/10/2008

                                    NOTICE INVITING TENDERS.
                       Sealed   tenders     are    invited   from     the   interested    persons/
suppliers/contractors/companies/Pre-qualified firms on B-1 Forms for procurement / execution of the
following works.

                                        AS PER LIST ATTACHED.

1/-          The intended participants can purchase the separate set of tenders on payment of tender fee for each
             work upto 05-11-2008 .

2/-          The tenders shall be opened on          06-11-2008 @ 1:00 P.M in the presence of tender
             opening/evaluation committee (comprising, Superintending Engineer/Executive District
             Officer Works & Services Department Jacobabad as its Chairman and Executive
             Engineer/District Officer Roads Jacobabad, Divisional Accounts Officer as its members) and
             bidders or their authorized representatives.

3/-          Eligibility conditions for intending participants are as under.
      i.     Registration with Pakistan Engineering, Council in the relevant filed of specialization of
             work and to the extent of tender amount of each work.
      ii.    Bio data of Engineers and technical staff working with the firm.
      iii.   Documentary evidence of works executed/ works in progress and certificate of satisfactory
             completion of works by the employers.
      iv.    List of works in progress indicating cost of each work and copy of letter of award of work.
      v.     List of Machinery and equipment available with documentary evidence of its ownership
             certificates of Bank showing credit worthiness along with Bank statement.

4/-          Registration with Income Tax Department (NTN Certificates) and copy of N.I.C.

5/-          Under Taking on Affidavit that firm is not involved in any litigation or abandoned any work
             in the department.

6/-          The bidders should submit earnest money as shown against each work in shape of call
             deposit prepared from the scheduled bank in the favour of the under signed.

7/-          Affidavit to the effect that the Firm/contractor have not been black listed previously by any
             executing agency.

8/-          Affidavit with effect that all documents/particulars/information furnished are true correct.

9/-          In case of Firm, list of partners/Partnership Deed, giving, full particulars of
             Directors/proprietors or others concerned along with Power of Attorney. In case of being sole
             proprietors such undertaking on affidavit be furnished.

10/-         In case of works costing below Rs: 2.500 (M) the conditions @ Sr. No. 3 will not be
             applicable.




                                                                  DISTRICT OFFICER ROADS
NOTE:- Tender documents of unresponded                                  JACOBABAD.
       Works will also be issued on 12-11-2008
       And will be opened on 13-11-2008.
                                      Contd:-P/2….
                                               P/2……….


                     Copy forwarded with compliments to the:-
1    The Director Information (Advertisement) Public Relation Department Government of Sindh Block
     No. 96 Karachi along with 6 extra copies for insertion. He is requested to get the Advertisement
     published in leading news papers especially Daily Sitara-i-Sindh Jcd.
a)   The Advertisement in question is essential.
b)   The concerned advertisement has the approval of Governor/Minister Chief Secretary.
c)   Advertisement charges for the relevant advertisement shall be charge on development or non-
     development budget for which sufficient funds are available during the current financial year.

2.   P.S to Minister Works & Services, Karachi.

3.   Copy submitted to the Secretary Information Technology, Govt. of Sindh Secretariat No. 6 @
     Karachi along with copy of N.I.T’s for favour of information and placing them on the web site of
     Sindh Government.

4.   The Executive District Officer Works & Services Jacobabad.

5.   The District Officer Roads, (All) for vides publicity.

6.   The Divisional Accounts Officer (Local).

7.   Copy to Notice Board/Head clerk/Draftsman (Local).




                                                              DISTRICT OFFICER ROADS
                                                                    JACOBABAD.
                                    LIST OF WORKS
Sr.No./   Name of wok.                             Estimated     Earnest    Tender   Time allowed
ADP No.                                            Cost. (Rs;    Money.     Fee.     for completion.
                                                   in Million)
          ADP 2008-2009
          TALUKA THUL.
1/268     Const: of link road from Mubarakpur      1.700         34,000     2,000    6 Months.
          Miralpurano road to village Dost
          Muhammad Brohi Mile 0/0-0/2
          (0.40 KM).
2/273     Const: of link road from Syed Ahmed      4.200         84,000     10,000   12 Months.
          Ghani Shah/Ahmed Shah to village
          Aziz Ahmed Shah Mile 0/0-0/5
          (1.00 KM).
3/276     Recondg: of link road from Jumo          3.950         79,000     5,000    12 Months.
          Dakhan (Mir Hassan) Railway Station
          Mehrababd road to connect Road
          Bashir Khan Bangulani road Mile
          0/0-1/0 (1.61 KM).
4/276     Recondg: of link road from Jumo          3.950         79,000     5,000    12 Months.
          Dakhan (Mir Hassan) Railway Station
          Mehrababd road to connect Road
          Bashir Khan Bangulani road Mile
          1/0-2/0 (1.61 KM).
5/284     Recondg: of link road from Bahu to       3.500         70,000     5,000    12 Months.
          Manjhipur (Allahabad Jangu) road
          Mile 8/4-9/1 (1.00 KM).
6/290     Const: of 3'span culverts (18 Nos) of    1.800         36,000     2,000    10 Months
          village (Jan Muhammad Ghunio,
          Hamal Khan Nindwani, Mir Hazar
          Khan Bijarani, Nokhab Khan
          Choliani,     Muhammad         Pannah
          Nindwani, Ammer Jaffri, Akbar
          Nindwani, Sajan Bangulani and Ali
          Hassan Nindwani, Hazar Khan
          Khoso, Ghulam Hussain Khoso, and
          New Manjhi Shakh near village Mir
          Ahmed Khoso.
7/291     Const: of 3'span culverts (10 Nos.) of   0.900         18,000     1,000    6 Months
          various village U/C Sher wah.
8/292     Const: of link road from Thul Saifal     2.200         44,000     2,000    12 Months.
          road to village New Manzoor Ahmed
          Soomro Mile 0/0-0/3 (0.60 KM).
9/293     Const: of link road from Thul Joungal    1.800         36,000     2,000    12 Months.
          road to village Kurshed Ahmed
          Soomro Mile 0/0-0/2 (0.40 KM).
10/295    Const: of road from village Jumo         5.600         1,12,000   10,000   12 Months.
          Dakhan / Mir Hassan Railway station
          Mehrababad road to village Rais
          Abdul Fattah Soomro Mile 0/0-1/0
          (1.61 KM).
11/296    Const: of road from Mubarakpur to        3.500         70,000     5,000    12 Months.
          village Muhamamd Soomro Mile 0/0-
          0/5 (1.00 KM).
12/297    Const: of link road from Thul            3.780         75,000     5,000    12 Months.
          Tangwani road to village Arbab Ali
          Soomro Mile 0/0-0/4 (0.80 KM).

                                       Contd:-P/2….…
                                          P/2……….

Sr.No./   Name of wok.                             Estimated     Earnest   Tender   Time allowed
ADP No.                                            Cost. (Rs;    Money.    Fee.     for completion.
                                                   in Million)
13/297    Const: of link road from Thul            3.780         70,000    5,000    12 Months.
          Tangwani road to village Arbab Ali
          Soomro Mile 0/4-1/0 (0.80 KM).
14/299    Const: of Internal road Dinpur Mile      4.500         90,000    10,000   12 Months.
          0/0-0/5 (1.00 KM).
15/299    Const: of Internal road Dinpur Mile      4.500         90,000    10,000   12 Months.
          0/5-1/2 (1.00 KM).
16/300    Const: of Internal road of village Mir   2.150         43,000    2,000    12 Months.
          Feroze Khan Kanrani Mile 0/0-0/3
          (0.60 KM).
17/301    Const: of link road from Abdul           4.200         84,000    10,000   12 Months.
          Rashid Ghulam Muhammad Jakhrani
          road to village Wahid Bux Khoso
          Mile 0/0-0/5 (1.00 KM).
18/302    Const: of link road from Abdul Sattar    4.300         86,000    10,000   12 Months.
          Kanrani to village Sakheero Kanrani
          Mile 0/0-0/6 (1.20 KM).
19/303    Const: of link road from Garhi Bhutta    3.000         60,000    5,000    12 Months.
          Garhi Hassan road to village Abdul
          Rehman Khan Knarnai Mile 0/0-0/4
          (0.80 KM).
20/304    Const: of link road from Ahmedabad       4.240         70,000    5,000    12 Months.
          Khoso road to village Wali
          Muhammad Khoso Mile 0/0-0/6
          (1.20 KM).
21/304    Const: of link road from Ahmedabad       4.240         70,000    5,000    12 Months.
          Khoso road to village Wali
          Muhammad Khoso Mile 0/6-1/4
          (1.20 KM).
22/305.   Const: of link road from Ali Murad       3.500         70,000    5,000    12 Months.
          Kanrani road to village Mevo Khan
          Khoso Mile 0/0-0/5 (1.00 KM).
23/306    Const: of link road from Bahu            3.750         75,000    5,000    12 Months.
          Manjhipur rod to village Haji
          Muhamamad          Yousif       Khoso
          Mile 0/0-0/5 (1.00 KM)
24/306    Const: of link road from Bahu            3.750         75,000    5,000    12 Months.
          Manjhipur rod to village Haji
          Muhamamad          Yousif       Khoso
          Mile 0/5-1/2 (1.00 KM)
25/307    Const: of link road from Bahu            3.750         75,000    5,000    12 Months.
          Manjhipur road to village Paroo
          Khoso Mile 0/0-0/5 (1.00 KM).
26/307    Const: of link road from Bahu            3.750         75,000    5,000    12 Months.
          Manjhipur road to village Paroo
          Khoso Mile 0/5-1/2 (1.00 KM).
27/308    Const: of link road from Bahu Tagio      3.850         77,000    5,000    12 Months.
          Khan Khoso road to village Arsullah
          Khan Khoso via Wazirabad / Mir
          Muhammad Khoso Mile 0/0-0/5
          (1.00 KM).



                                        Contd:-P/3.…
                                           P/3…….

Sr.No./   Name of wok.                             Estimated     Earnest    Tender   Time allowed
ADP No.                                            Cost. (Rs;    Money.     Fee.     for completion.
                                                   in Million)
28/308    Const: of link road from Bahu Tagio      3.850         77,000     5,000    12 Months.
          Khan Khoso road to village Arsullah
          Khan Khoso via Wazirabad / Mir
          Muhammad Khoso Mile 0/5-1/2
          (1.00 KM).
29/309    Const: of link road from Gulsher         6.000         1,20,000   10,000   12 Months.
          Khan Kanrani road to village
          Muhammad Raheem Kanrani Mile
          0/0-1/0 (1.61 KM)
30/310    Const: of link road from Jalal Khoso     3.500         70,000     5,000    12 Months.
          road (Abdul Rasool Khoso) @ Mile
          0/5 to village Purano Jangu Khoso
          Mile 0/0-0/5 (1.00 KM).
31/311    Const: of link road from Khair           3.000         60,000     5,000    12 Months.
          Muhammad Khoso road to village
          Amir Bux Khoso Mile 0/0-0/3
          (0.60 KM).
32/312    Const: of link road from Mehrab          3.850         77,000     5,000    12 Months.
          Khan Khoso to village Muhammd
          Yousif      Khoso      Mile    0/0-0/5
          (1.00 KM).
33/313    Const: of link road from Muhammad        3.100         62,000     5,000    12 Months.
          Pannah Channa road to village Abdul
          Karim Khoso (Dooro Khoso) Mile
          0/0-0/4 (0.80 KM).
34/314    Const: of link road from New Bye         2.500         50,000     2,000    12 Months.
          pass road to village Bashir Ahmed
          Shah Mile 0/0-0/3 (0.60 KM)
35/315    Const: of link road from Saleem          2.800         56,000     5,000    12 Months.
          Sodho / Arsullah Khan Bangulani
          road to village Abdul Razzak
          Bangulani Mile 0/0-0/3 (0.60 KM).
36/316    Const: of link road from Shafique-u-     5.750         1,15,000   10,000   12 Months.
          Rehman Sarki road @ Mile 0/2 to
          village     Rahim      Bux     Pahore
          Mile 0/0-1/0 (1.61 KM).
37/317    Const:     of    link    road    from    3.500         70,000     5,000    12 Months.
          Sikandarabad road to village Bachro
          Mile 0/0-0/5 (1.00 KM).
38/318    Const: of link road from Thul Bahu       3.500         70,000     5,000    12 Months.
          Khoso road to village Sher
          Muhammad Khoso Mile 0/0-0/5
          (1.00 KM).
39/319    Const: of link road from Thul            5.500         1,10,000   10,000   12 Months.
          Hassainabad road to village Fateh
          Muhammad Lashari Mile 0/0-0/6
          (1.20 KM).
40/320    Const: of link road from Thul Joungal    5.650         1,13,000   10,000   12 Months.
          road Muongipul to village Sardar
          Moeen Khan pahore Mile 0/0-1/0
          (1.61 KM).
41/321    Const: of link road from Thul Joungal    5.550         1,11,000   10,000   12 Months.
          road village Fazalpur Mile 0/0-1/0
          (1.61 KM).

                                        Contd:-P/3.…
                                         P/3…….

Sr.No./   Name of wok.                         Estimated     Earnest    Tender   Time allowed
ADP No.                                        Cost. (Rs;    Money.     Fee.     for completion.
                                               in Million)
42/322    Const: of link road from Thul Joungal 4.000        80,000     10,000   12 Months.
          road to village Ghulam Nabi Pahore
          via Arifabad Mile 0/0-0/5 (1.00 KM).
43/322    Const: of link road from Thul Joungal 4.850        97,000     10,000   12 Months.
          road to village Ghulam Nabi Pahore
          via Arifabad Mile 0/5-1/3 (1.20 KM).
44/323    Const: of link road from Thul Joungal 5.500        1,10,000   10,000   12 Months.
          road to village Khan Muhammad
          Soomro Mile 0/0-1/0 (1.61 KM).
45/324    Const: of link road from Thul Saifal 2.850         57,000     5,000    12 Months.
          road to village Ali Gohar Suhandro
          Mile 0/0-0/3 (0.60 KM).
46/325    Const: of link road from Thul Saifal 2.350         47,000     2,000    12 Months.
          rod to village Azad Khan Khoso
          Mile 0/0-0/3 (0.60 KM).
47/326    Reconditioning of link road from 3.500             70,000     5,000    12 Months.
          Jacobabad Thul road to village
          Sikandarabad Mile 0/0-0/5(1.00 KM).
48/327    W/Reconditioning of link road from 4.000           80,000     10,000   12 Months.
          Thul Hassanabad road to village
          Dinpur Mile 0/0-0/5 (1.00 KM).
49/328    W/Reconditioning of road from Thul 7.000           140,000    10,000   12 Months.
          Sassanabad road Mile 0/0-1/2 (2.00
          KM).
50/329    Const: of link road from Sharbat 3.500             70,000     5,000    12 Months.
          Pahore road @ Mile 0/5 to village
          Liaquat Ali Khoso road along Mirza
          Shakh Mile 0/0-0/5 (1.00 KM).
51/330.   Const: of link road from Abdul Ghani 3.500         70,000     5,000    12 Months.
          (Hajani) Khoso road to village Abdul
          Hameed       Khoso     Mile    0/0-0/5
          (1.00 KM).
52/331    Const: of link road from Bahu 2.200                44,000     2,000    12 Months.
          Manjhipur road to village Iqbal
          Ahmed       Khoso      Mile    0/0-0/3
          (0.60 KM).
53/332    Const: of link road from Thul Old 1.450            29,000     2,000    6 Months.
          Bye pass to village Abdul Qadir Shah
          road Mile 0/0-0/1+330 (0.40 KM).
54/333    Const: of link road from Humayoon 5.380            1,07,000   10,000   12 Months.
          Thul road to village Captan Athar
          Mahar       along     Begari     canal
          Mile 0/0-0/6 (1.20 KM)
55/333    Const: of link road from Humayoon 5.380            1,07,000   10,000   12 Months.
          Thul road to village Captan Athar
          Mahar       along     Begari     canal
          Mile 0/6-1/4 (1.20 KM)
56/334    Const: of Internal road of village 2.400           48,000     2,000    12 Months.
          Piyaro Mahar Mile 0/0-0/3 (0.60 KM)
57/335    Const: of link road from Karim Dino 4.350          87,000     10,000   12 Months.
          Bhangar road to village Muhammad
          Abid Khan Khoso Mile 0/0-0/6 (1.20
          KM).
                                         Contd:-P/4.…
                                          P/4…….

Sr.No./   Name of wok.                            Estimated     Earnest    Tender   Time allowed
ADP No.                                           Cost. (Rs;    Money.     Fee.     for completion.
                                                  in Million)
58/336    Const; of link road from Humayoon       3.500         70,000     5,000    12 Months.
          road @ Mile 15/6 to village Lal Khan
          Buriro Mile 0/0-0/5 (1.00 KM).
59/337    Const: of link road from Humayoon       3.500         70,000     5,000    12 Months.
          Thul road @ Mile 11/2 to village
          Khair Muhammad Buriro via Dr.
          Barkat Ali Buriro Mile 0/0-0/5
          (1.00 KM).
60/338    Const: of link road from Ali Murad      3.500         70,000     5,000    12 Months.
          Kanrani road @ Mile 0/5 to village
          Majno Khan Buriro upto Miran Khan
          Khoso Mile 0/0-0/5 (1.00 KM).
61/339    Const; of link road from Sanhri Sarak   2.950         59,000     5,000    12 Months.
          road @ Mile 4/0 to village Babal
          Khan      Buriro      Mile    0/0-0/4
          (0.80 KM).
62/340    Const: of link road from Baboo Khan     3.500         70,000     5,000    12 Months.
          Buriro road @ Mile 1/7 to village
          Illahi Bux Buriro Mile 0/0-0/5
          (1.00 KM).
63/341    Const: of link road from Garhi Syed     2.250         45,000     2,000    12 Months.
          road @ Mile 2/4 to village Nabi Shah
          Mile 0/0-0/3 (0.60 KM).
64/342    Const: of Internal road of village      2.650         53,000     5,000    12 Months.
          Mirpur Buriro road Mile 0/0-0/5
          (1.00 KM).
65/343    Const: of link road from Landhi Naib    3.500         70,000     5,000    12 Months.
          Khan Buriro road @ Mile 3/0 to
          village Khannan Buriro Mile 0/0-0/5
          (1.00 KM).
66/344    Const: of link road from Muhammad       6.750         1,35,000   10,000   12 Months.
          Yousif Buriro road @ Mile 2/4 to
          village Bagan Khan Buriro Mile 0/0-
          1/0 (1.61 KM).
67/345    Const: of link road from Garhi Syed     3.500         70,000     5,000    12 Months.
          road to village Haji Muhammad
          Ibrahim      Arain     Mile   0/0-0/5
          (1.00 KM).
68/346    Const: of link road from Sanhri Sarak   4.300         86,000     10,000   12 Months.
          road @ Mile 3/4 to village Yar Ali
          Buriro Mile 0/0-0/5 (1.00KM).
69/347    Const: of link road from Sanhri Sarak   1.450         29,000     1,000    6 Months.
          road to village Muhammad Adil
          Buriro Mile 0/0-0/1+330' (0.30 KM).
70/348    Const: of link road from Humayoon       6.650         1,33,000   10,000   12 Months.
          Thul road to village Haji Hamzo
          Buriro Mile 0/0-1/0 (1.61 KM).
71/349    Const: of link road from Humayoon       1.100         22,000     1,000    6 Months.
          Thul road to village Qadir Bux Buriro
          Mile 0/0-0/1+330' (0.30 KM).
72/350    Const: of Internal road of village      2.000         40,000     2,000    12 Months.
          Hazar Khan Buriro Mile 0/0-0/2+330'
          (0.50 KM)

                                       Contd:-P/5……
                                           P/5…….

Sr.No./   Name of wok.                             Estimated     Earnest   Tender   Time allowed
ADP No.                                            Cost. (Rs;    Money.    Fee.     for completion.
                                                   in Million)
73/351    Const: of 3'span culverts (10 Nos.) of   0.950         19,000    1,000    6 Months.
          various village of U/C Mirpur Buriro.
74/352    Const: of 3'span culverts (03 Nos) of    0.280         5,600     500      6 Months.
          various village of U/C Ranjhapur.
75/353    Const: of 3'span culverts (10 Nos.) of   1.000         20,000    1,000    6 Months.
          various village of U/C Misripur.
76/354    Const: of 10 Rft Bridge over Thariri     0.490         9,800     500      6 Months.
          Shakh U/C Misripur.
77/355    Const: of 3'span culverts (06 Nos.) of   0.575         12,000    1,000    6 Months.
          various village U/C Dinpur.
78/356    Const: of 3'span culverts (06 Nos.) of   0.570         11,400    1,000    6 Months.
          various village of U/C Sherwah..
79/357    Const; of Pedestrian Bridge (75 Rft)     3.200         64,000    5,000    12 Months.
          (2 Nos.) over Moosa Allahabad
          Shakh near village Hassanabad U/C
          Dinpur.
80/358    Const: of link road from Bahu Tagio      3.500         70,000    5,000    12 Months.
          Khan Khoso road to village Sardar
          Noor-u-Rehman Jakhrani Mile 0/0-
          0/5 (1.00 KM).
81/360    Const: of link road from Jacobabad       4.000         80,000    10,000   12 Months.
          Thul road to village Rehmatullah
          Khan Khoso (Pipal Wah) Mile 0/0-
          0/6 (1.20 KM).
82/361    Const: of road Bye pass road from        3.500         70,000    5,000    12 Months.
          Bahadurpur to Karim Bux Khoso
          road Mile 0/0-0/5 (1.00 KM).
83/362    Const: of link road from Abad            3.750         75,000    5,000    12 Months.
          Mubarakpur road to village Hadi Bux
          Khan Khoso Mile 0/0-0/5 (1.00 KM).
84/363    Const: of link road from Abad            3.500         70,000    5,000    12 Months.
          Mubarakpur @ Mile 3/6 to village
          Abdul Rasool Khan Khoso along
          Kata Shakh Mile 0/0-0/5 (1.00 KM)
85/364    Const: of link road from Miral Purano    3.500         70,000    5,000    12 Months.
          road @ Mile 3/6 to village Nasar
          Muhammad Brohi (Jam Khan Khoso)
          U/C Bachro Mile 4/2-4/7 (1.00 KM).
86/365    Const: of road from R.Q.C H.way @        3.500         70,000    5,000    12 Months.
          Mile 39/0 to Katta Shakh upto village
          Rais Ghulam Hussain Katto along
          Begari canal Mile 0/0-0/5 (1.00 KM).
87/366    Const: of link road from Rais Ghulam     3.500         70,000    5,000    12 Months.
          Hussain Katto to Katta Shakh along
          Begari canal Mile 3/4-4/1 (1.00 KM).
88/368    Const: of Internal road of village       4.000         80,000    10,000   12 Months.
          Nasar Muhammad Brohi Mile 0/0-0/5
          (1.00 KM).
89/370    Const: of road from Madadpur Khoso       3.500         70,000    5,000    12 Months.
          road to village Dolat Brohi via
          Muhammad Ayoub Khoso Mile 0/0-
          0/5 (1.00 KM)


                                       Contd:-P/6……
                                           P/6…….

Sr.No./   Name of wok.                             Estimated     Earnest    Tender   Time allowed
ADP No.                                            Cost. (Rs;    Money.     Fee.     for completion.
                                                   in Million)
90/371    Const: of link road from Dilmurad        4.000         80,000     10,000   12 Months.
          Manjhipur road to village Muhammad
          Farooq      Khoso      Mile    0/0-0/5
          (1.00 KM).
91/371    Const: of link road from Dilmurad        4.100         85,000     10.000   12 Months.
          Manjhipur road to village Muhammad
          Farooq      Khoso      Mile    0/5-1/2
          (1.00 KM).
92/373    Const: of Internal road village Raja     4.450         89,000     10,000   12 Months.
          Abdul Qadir Khan Khoso U/C
          Balouch      abad      Mile    0/0-0/5
          (1.00 KM).
93/374    Const: of C.C Block of village Karim     1.800         36,000     2,000    12 Months.
          Bux Khoso (3000 Rft).
94/375    Const: of road from village Wadda        3.500         70,000     5,000    12 Months.
          Kehar road to village Raja Abdul
          Qadir Khoso road Mile 0/0-0/5
          (1.00 KM).
95/376    Const: of Internal road Metaled road     4.800         96,000     10,000   12 Months.
          & .C.C Block of Mubarakpur
          Mile 0/0-0/4 (0.80 KM).
96/377    Const: of link road from Asif Jakhrani   3.250         65,000     5,000    12 Months.
          road to connect village Haji Ghulam
          Muhammad Jakhrani via Sajan
          Bahrani Mile 0/0-0/4 (0.80 KM).
97/378    Const: of link road from Ghazanfar       6.900         1,38,000   10,000   12 Months.
          Ali Jakhrani road to village Bilal
          Khan Jakhrani Hassan Khan Jakhrani
          Mile 0/0-1/2 (2.01 KM).
98/379    Const: of link rod from Ghulam           3.300         66,000     5,000    12 Months.
          Muhammad Tagio Khoso road to
          village Hazar Khan Bharani Mile 0/0-
          0/3 (0.60 KM).
99/380    Const: of road from Thul Bahoo           4.400         88,000     10,000   12 Months.
          Khoso road to village Bahram Khan
          Jakhrani Mile 0/0-0/6 (1.20 KM).
100/380   Const: of road from Thul Bahoo           4.400         88,000     10,000   12 Months.
          Khoso road to village Bahram Khan
          Jakhrani Mile 0/6-1/4 (1.20 KM).
101/381   Const: of road from village Haji         5.000         1,00,000   10,000   12 Months.
          Ghulam Muhammad Jakhrani to
          connect Sardar Nek Muhammad
          Khan road via village Tahmoor Khan
          Jakhrani & B.H.U G.M Jakhrani Mile
          0/0-0/7 (1.40 KM).
102/381   Const: of road from village Haji         5.650         1,13,000   10,000   12 Months.
          Ghulam Muhammad Jakhrani to
          connect Sardar Nek Muhammad
          Khan road via village Tahmoor Khan
          Jakhrani & B.H.U G.M Jakhrani Mile
          0/7-1/7 (1.61 KM).


                                        Contd:-P/7.…
                                          P/7…….

Sr.No./   Name of wok.                           Estimated     Earnest    Tender   Time allowed
ADP No.                                          Cost. (Rs;    Money.     Fee.     for completion.
                                                 in Million)
103/382   Const: of link road from Mangsi Jan 6.600            1,32,000   10,000   12 Months.
          Muhammad Khoso road to village
          Khuda Bux Noonari Mile 0/0-1/0
          (1.61 KM).
104/383   Const: of 88 Rft Bridge over Phall 4.400             88,000     10,000   12 Months.
          Garhi Hassan i/c Approach Azizabad
          road.
105/384   Const: of 3' span culverts (10 Nos.) in 1.000        20,000     1,000    6 Months.
          various village of U/C Logi.




                                                  DISTRICT OFFICER ROADS
                                                        JACOBABAD.

								