Real Internet Technologies Division

Who’s Who Publishing Site Project

Times, As of 11/22/2011 - Page 1 of 5

Inc.









Project Status

Who’s Who Site Design & Launch – Phase I

Proposed Actual Dates

Milestone Dates (as of 12/17/2009) Status

1. Requirements September 2009 Completed

Gathering: Define

business

requirements, Site

Functionality Brief,

software platform,

etc.

2. Secure Graphic October 2009 Completed

Design/Coding

Contractors

3. Project Kick-off November 5, 2009 Completed

Meeting

4. 1st Mock-up for Site 11/12/2009 11/12, 11/16 Completed – T. Adams has

Layout – Phase I Target date: 11/18 submitted 3 layouts. However, S.

White did not feel either was

Actual date –

satisfactory. T. Adams revisited his

11/20/2009

design based on notes/feedback from

S. White and re-submitted. S. White

forwarded this Homepage mockup

along with the previous 3 versions to

T. Allen and C. Bozeman and T.

Leonard for their review.

5. Prepare Test 11/13/2009 11/13/2009 Completed – S. White created a test

Environment/Domai the test environment consisting of

n databases, domain, FTP access, and

a Content Management System (i.e.,

backend) –

 TEST DOMAIN:

http://wwp.realtimessandbox.c

om.

 Content Management System

– Joomla 1.5.15 (the latest

version)

Real Internet Technologies Division

Who’s Who Publishing Site Project

Times, As of 11/22/2011 - Page 2 of 5

Inc.









Project Status

Who’s Who Site Design & Launch – Phase I

Proposed Actual Dates

Milestone Dates (as of 12/17/2009) Status

6. Site Design Review 11/12/2009  Actual Start: 11/23 In process –

& Approval Phase thru  Partial Approval  Graphic Design Team submitted 3

12/6/2009 from Who’s Who color variations of Mock-up#4 on

Business/Editorial 12/7/2009.

Team –  Who’s Who Business/Editorial

Completed Team approved Mock-up#7

12/11/2009 submitted by Graphic Design

 Waiting Final team.

Approval (from H.  Waiting Hiram Jackson to give his

Jackson) - TBD final approval.

7. Detailed Coding and 11/16/2009  Session#1: 11/16 In Process –

Technical thru  Session#2: 11/23  Coding Team evaluating site

Specifications 11/22/2009 mock-ups to determine feasibility

 Session#3 - TBD

of using a pre-built template

versus a custom-built template.

 Final choice for the Photo Gallery

software add-on will be

determined once the issue of pre-

built vs. custom-built template is

resolved.

Real Internet Technologies Division

Who’s Who Publishing Site Project

Times, As of 11/22/2011 - Page 3 of 5

Inc.









Project Status

Who’s Who Site Design & Launch – Phase I

Proposed Actual Dates

Milestone Dates (as of 12/17/2009) Status

8. Compile site content 11/23/2009  Actual Start – In process –

(revised copy, thru 11/23/2009  Who’s Who Business/Editorial

graphics, photos, 12/7/2009 

st

1 Installment of site Team submitted to S.White via

etc.) content – Homepage FTP a good percentage of the

elements –

Completed

necessary copy to be loaded to

12/17/2009 the new site that will be visible

from the Homepage.

 nd

2 Installment of site

content – Homepage  The next priority for the

photos/graphics – Homepage is for the Who’s Who

Due: 12/22/2009 Business/Editorial Team to

 rd

3 Installment of site provide any graphics/photo files

content – City Sub- that will be visible from the

pages – Due: Homepage.

01/07/2009  FTP LOCATION

o FTP Host: 65.254.250.108

o User: rt_transfer

o Password: michigan023#

o Folder: WhosWhoTransfer

 The next priority for site content is

City Sub-page content. Who’s

Who Business/Editorial Team will

work with the Publishers in each

city/market to review, revise, and

create the necessary copy and/or

graphics for City Sub-page

content

9. Initial Coding Phase 11/23/2009 N/A Task Eliminated – Lead for the

thru Coding Team (Ms. Eboni Love) had

12/6/2009 taken ill during week of 11/23. This

will be “rolled into” Final Coding

Phase but should not be a significant

cause for a delay.

Real Internet Technologies Division

Who’s Who Publishing Site Project

Times, As of 11/22/2011 - Page 4 of 5

Inc.









Project Status

Who’s Who Site Design & Launch – Phase I

Proposed Actual Dates

Milestone Dates (as of 12/17/2009) Status

10. Approval of Final 12/7/2009  Partial approval by  Complete – Hiram Jackson

site design Business/Editorial presented several concerns with

corresponding Team approved Mockup#7 so we submitted these

graphics delivered to Mockup#7 – concerns to the Graphic Design

Coding Team Completed Team and a new mock-up was

12/11/2009 develop and approved after

 Coding Team received several revisions.

layered graphic files –

Completed

12/14/2009

 Waiting H.

Jackson’s final

approval –

Completed

12/22/2009

11. Final Coding Phase 12/7/2009  Actual Start – In process – The Target adjusted to

& Preparation for Site thru 12/7/2009 accommodate this week’s delay with

Testing 12/21/2009  Test site locked getting revisions and final approval of

for Coding - layout.

12/16 thru  Test site may be “locked” by the

01/04/2010. Coding Team until 01/04/2010.

 Loading  S. White and the Coding Team will

Homepage begin loading Homepage content

content – 01/04/2010 thru 1/8/2010

01/04/2010 thru

1/8/2010





12. Full Site Testing & 12/21/2009 Revised Dates:

Resolve Issues thru  Start – 01/05/2010

12/29/2009

 End -01/12/2010

13. Site Launch for 12/30/2009 Revised Dates:

Phase I thru  Start –

12/31/2009 01/14/2010

 End – 01/18/2010

Real Internet Technologies Division

Who’s Who Publishing Site Project

Times, As of 11/22/2011 - Page 5 of 5

Inc.







General Comments

 • The Project was on hold a couple of days to allow our CEO, Mr. Jackson, time to review the site mock-ups and to

address his concerns and suggested revisions.

 • Our Graphic Design Team led by Mr. Ted Adams did an outstanding job with adjusting the layout to address

issues Mr. Jackson expressed.

 • Attached is the site layout that Mr. Jackson has approved. We had to put the coding of the site on hold because

the revisions being requested impacted building the site in Joomla. However, now that the layout has been approved we

can move forward with coding the site.

 • Mr. Jackson does have one additional concern that I will consult with the Coding Team to see if we can address

with coding. He would like to see the video player enlarged. I am going to see if the Coding Team can implement the

Video player in an “ajax” window that will automatically enlarge when you hover over it on the Homepage. If this cannot

be done then we will go back to the Graphic Design Team as part of Phase II and re-work the design of the site to

accommodate a larger video player on the homepage. This does not have a major impact because there is a chance

that the Who’s Who Business/Editorial Team may not have a video ready to load to the site by the time we launch for

Phase I.

 • The Who’s Who Business/Editorial team is also continuing to work on gathering, creating, and/or revising the

necessary content to load to the site. We are working through the Inventory of Content Items Task List item by item.

 • The goal is to have all the files/information needed for the Homepage by 12/31/2009. We may have to actually

push this back a couple of days because of the delay with getting final approval from Hiram.

 • The Coding Team will open up site security to allow us to begin loading the content as soon as the major

development is complete which could be anywhere between 12/31 and 01/4/2010.







Next Steps

 Coding Team will continue coding/development of site and content management system.

 The Who’s Who Business/Editorial Team will provide (via FTP) S. White more content items outlined

in the Inventory of Content Items document.

 S. White will begin loading these content items into the test site.

 S. White will make preparations with Who’s Who Business/Editorial Team for training and testing.







Project Team:

 Sonja White, Project Manager

 Site Coding/Design Team

o Mike Vargus, System/Network Support

o Ted Adams, Graphic Design Team Lead (TR3 Graphics)

o Eboni Love, Site Coding Team Lead (Etech Design Studio)

 Business/Editorial Team

o Tanisha Leonard, Director Marketing Events

o Cassandra Bozeman, Who’s Who Chief Operating Officer

o Tamara Allen, Who’s Who Creative Director

o Meagan Culley, Who’s Who Customer Service Manager (back up to C.Bozeman and T.Allen)

o Who’s Who Special Task Force comprised of members of Publisher’s Community and Sales

Team



Other docs by Stariya Js @ B...
How we become literate
Views: 0  |  Downloads: 0
15189
Views: 0  |  Downloads: 0
Enrollment Agreement
Views: 0  |  Downloads: 0
seddc 061009 pm
Views: 0  |  Downloads: 0
Juvanec-KamenNaKamen-eng
Views: 0  |  Downloads: 0
Syllabus Macro Fall 10
Views: 0  |  Downloads: 0
23401
Views: 0  |  Downloads: 0
9-11-RPH-stonefabrication-ord-memo-agss
Views: 0  |  Downloads: 0
Junior_Pre_season_Soccer_League_application
Views: 0  |  Downloads: 0
guide_to_moodle_quizzes
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!