							ABARE's list of major electricity generation projects
Note: Projects that are under construction or committed are shown in the blue shaded areas. Less advanced projects are
shown in the yellow shaded areas.



Electricity Generation - non-renewable
                                                                                           Expected                      Capital        Employmen
        Project             Company a           Location               Status b            Startup    New Capacity      Expend. c          td
Brown coal
  Arckaringa Phase 1          Altona           200 km N of        New project,                na         560MW              na             800      O
                          Energy/CNOOC       Coober Pedy, SA feasibility study under
                                                                       way

  Arckaringa Phase 2          Altona           200 km N of   Expansion, feasibility           na         560MW              na             800      O
                          Energy/CNOOC       Coober Pedy, SA   study under way


     Dual Gas         HRL Development Morwell, Latrobe             New project, EIS         2013         600MW            $750m            350      C
Demonstration Project                   Valley, Vic                  under way                                                              35      O


   FuturGas project          Strike Oil       Kingston, SA           New project,           2016         40MW               na
                                                                  prefeasibility study
                                                                      under way

For further information contact: Robert New (02 6272 2159)

                                                                                           Expected                      Capital        Employmen
        Project             Company a           Location               Status b            Startup    New Capacity      Expend. c          td
Black coal
        Eraring            Eraring Energy     40 km SW of             Expansion,            2011         240MW            $245m          350-450    C
                                             Newcastle, NSW           committed

  Bluewaters stage 3       Griffin Energy      5 km NE of        Expansion, EIS under       2013         208MW              na
                                               Collie, WA                way

  Bluewaters stage 4       Griffin Energy      5 km NE of        Expansion, EIS under       2015         208MW              na
                                               Collie, WA                way

       Coolimba          Aviva Corporation     20 km S of          New project, EIS         2013         400MW             $1b             600      C
                                              Eneabba, WA            completed                                                             100      O

 Galilee Power Project     Waratah Coal       300 km W of            New project,             na         400MW            $1.25b          1000      C
                                              Rockhampton,        prefeasibility study                                                     60       O
                                                  Qld                 under way

 Muja Power Station        Verve Energy/      200 km SE of       Refurbishment, govt        2012         240MW            $100m            200      C
   refurbishment           Inalco Energy       Perth, WA          approval received


   Wandoan Power            Xstrata/GE       Surat Basin, Qld        New project,          2015-16       400MW              na
      Project             Energy/Stanwell                         prefeasibility study
                           Corporation                                under way

       ZeroGen            ZeroGen Pty Ltd    to be determined,       New project,           2015         400MW             $3b
                                                    Qld           prefeasibility study
                                                                      completed

For further information contact: Robert New (02 6272 2159)

                                                                                           Expected                      Capital        Employmen
        Project             Company a           Location               Status b            Startup    New Capacity      Expend. c          td
Coal seam gas
  Blackwater Power          Bow Energy        15 km NE of         New project, under        2011         30MW             $35m             200      C
       Project                               Blackwater, Qld        construction                                                            2       O

      Braemar 3             ERM Power          40 km SW of          Expansion, govt         2013         520MW              na
                                                Dalby, Qld         approval received

 Darling Downs Power       Origin Energy      250 km W of           Expansion, govt         2012        500 MW              na
       Station 2                              Brisbane, Qld       approval under way

  Mungi Generation            Molopo          150 km SW of            New project,            na      30MW (60MW            na
      project                                 Rockhampton,       feasibility study under                ultimately)
                                                   Qld                     way

      Narrabri 1         East Coast Power     Narrabri, NSW           New project,          2012         30MW          $150m (incl.
                                                                   planning approval                                  stages 1 and 2)
                                                                       under way
       Narrabri 2         East Coast Power     Narrabri, NSW         New project,          2013           180MW            $150m (inc        100      C
                                                                  planning approval                                      l.stages 1 and       12      O
                                                                      under way                                                2)

Richmond Valley Power         Metgasco           East Casino,     New project, govt         na             30MW              $40m            50       C
station and Casino Gas                              NSW           approval received                                                          10       O
         project

  Spring Gully stage 1      Origin Energy        80 km N of       New project, govt         na            500MW               na             200      C
                                                 Roma, Qld       approval under way                                                           15      O

  Spring Gully stage 2      Origin Energy        80 km N of        Expansion, govt          na            500MW               na             200      C
                                                 Roma, Qld       approval under way                                                           15      O

Wilga Park B (stages 1     Eastern Star Gas    Narrabri, NSW     Expansion, planning        na             30MW              $42m            30       C
        to 3)                                                     approval received                                                          5        O

For further information contact: Farah Beaini (02 6272 2102)

                                                                                         Expected                          Capital        Employmen
         Project             Company a            Location             Status b          Startup       New Capacity       Expend. c          td
Gas
 Channel Island Power      Power and Water     Channel Island,    Expansion, under         2011            90MW             $120m
       Station               Corporation            NT              construction

Kwinana Power Station        Verve Energy       Kwinana, WA      Refurbishment, under    late 2011        200MW             $263m
      rebuild                                                        construction

   Mortlake Stage 1         Origin Energy       12 km W of        New project, under       2011           550MW             $710m            250      C
                                                Mortlake, Vic       construction                                                              10      O

      Owen Springs         Power and Water Alice Springs, NT      New project, under       2010            33MW             $100m
                             Corporation                            construction

   Bamarang stage 1        Delta Electricity    7 km SW of        New project, govt         na          250-300MW             na             100      C
                                                Nowra, NSW        approval received                                                           18      O

   Bamarang stage 2        Delta Electricity    7 km SW of         Expansion, govt          na          100-150MW           $130m          200-300    C
                                                Nowra, NSW        approval received                                                          18       O

       Centauri 1            Eneabba Gas         8 km E of        New project, govt        2013           168MW               na
                                                Dongara, WA       approval received

 Dalton Power Station            AGL            70 km W of        New project, govt      2015-16         250-780MW       $250-800m (up       250      C
                                               Goulburn, NSW     approval under way                  (1500MW ultimately)    to $1.5b          6       O
                                                                                                                           ultimately)

 Hanging Rock stage 1        Loran Energy       20 km SW of       New project, govt         na            300MW             $360m            150      C
                               Products        Moss Vale, NSW    approval under way                                                           15      O


 Hanging Rock stage 2        Loran Energy       20 km SW of        Expansion, govt          na            300MW             $240m            150      C
                               Products        Moss Vale, NSW    approval under way                                                           15      O


       Leafs Gully               AGL            65 km SW of       New project, govt        2011           360MW             $200m            200      C
                                                Sydney, NSW       approval received                                                           5       O

 Marulan Gas Turbine       EnergyAustralia      40 km NE of       New project, govt         na            350MW             $280m            150      C
       Facility                                Goulburn, NSW      approval received                                                           12      O

 Marulan Gas Turbine       Delta Electricity    40 km NE of       New project, govt      2013-14        250-350MW           $280m            150      C
   Facility stage 1                            Goulburn, NSW      approval received                                                           12      O

 Marulan Gas Turbine       Delta Electricity    40 km NE of        Expansion, govt       2013-14        100-150MW           $235m            200      C
   Facility stage 2                            Goulburn, NSW      approval received                                                           8       O

   Mortlake stage 2         Origin Energy       12 km W of         Expansion, EIS           na            450MW               na             20       O
                                                Mortlake, Vic        completed

       Munmorah            Delta Electricity   Munmorah, NSW       Expansion, govt       2013-14          100MW             $795m            150      C
      rehabilitation                                              approval received

       NQ Peaker                 AGL           Townsville, Qld       New project,          2011           360MW           $252-324m
                                                                  prefeasibility study
                                                                      under way

      Port Kembla          Bluescope Steel      Port Kembla,      New project, EIS         2012           220MW             $750m            300      C
     Steelworks Co-                                NSW              under way                                                                 30      O
    generation plant

         SEQ1                    AGL            Ipswich, Qld         New project,          2011           360MW           $252-324m
                                                                  prefeasibility study
                                                                      under way

         SEQ2                    AGL             Kogan, Qld          New project,          2012           1150MW          $805-1035m
                                                                  prefeasibility study
                                                                      under way
  Shaw River stage 1            Santos         30 km N of Port     New project, EIS          2012        500MW        $880m (incl.       600      C
                                                  Fairy, Vic         completed                                           105 km           85      O
                                                                                                                      pipeline from
                                                                                                                      Pt Campbell)

Shaw River stages 2 &           Santos         30 km N of Port Expansion, EIS under           na        2x500MW            na            30       O
         3                                        Fairy, Vic           way

       Swanbank F             CS Energy          Ipswich, Qld     Expansion, feasibility      na         400MW             na            400      C
                                                                    study under way


   Tallawara stage 2          TRUenergy          13 km S of       Expansion, EIS under       2015      300-450MW         $500m         200-400    C
                              Tallawarra         Wollongong,              way                                                            3-20     O
                                                   NSW

         Tarrone                 AGL           300 km SW of        New project, govt         2012        840MW             na
                                               Melbourne, Vic     approval under way

 Torrens Island Power            AGL            Torrens Island,   Expansion, EIS under        na         700MW           $800m
    Station (TIPS)                                   SA                   way

 Valley Power Station       Snowy Hydro        Latrobe Valley,      Expansion, govt           na        50-100MW       $80-100m          50       C
 Augmentation project                               Vic           approval received, on
                                                                          hold

      Weddell stage 3      Power and Water       40 km SE of      Expansion, feasibility   late 2011      40MW           $50m
                             Corporation         Darwin, NT         study under way


        Wellington           ERM Power            4 km N of        New project, govt         2012        640MW           $900m           400      C
                                               Wellington, NSW     approval received                                                      10      O


Yallourn Power Station        TRUenergy        Latrobe Valley,     New project, govt         2015        1000MW
                                                    Vic           approval under way

For further information contact: Farah Beaini (02 6272 2102)

                                                                                           Expected                     Capital       Employmen
          Project            Company a            Location              Status b           Startup     New Capacity    Expend. c         td
Oil
   Buronga Peaking           International       3 km NE of        New project, govt          na         150MW           $110m           120      C
     Power Plant                Power           Mildura, NSW       approval received                                                      4       O

For further information contact: Robert New (02 6272 2159)

                                                                                           Expected                     Capital       Employmen
          Project            Company a            Location              Status b           Startup     New Capacity    Expend. c         td
To be determined
       Bayswater B            Macquarie         Muswellbrook,     New project, concept     2014-16       2000MW            na
                              Generation           NSW                 approved

  Mt Piper expansion       Delta Electricity    17 km NW of         Expansion, govt        2015-16       2000MW        $2.5-5.0b         950      C
                                                Lithgow, NSW      approval under way                                                      50      O

For further information contact: Robert New (02 6272 2159)

Electricity Generation - renewable
                                                                                           Expected                     Capital       Employmen
          Project            Company a            Location              Status b           Startup     New Capacity    Expend. c         td
Wind
  Collgar Wind Farm         UBS IIT/REST        25 km SE of        New project, under        2012        206MW           $750m           150      C
                                                Merredin, WA         construction                                                         25      O

       Crookwell 2          Union Fenosa         14 km SE of       New project, under        2012         92MW           $238m           55       C
                            Wind Australia     Crookwell, NSW        construction                                                        12       O

         Gunning           Acciona Energy       50 km W of         New project, under        2011         47MW           $147m           100      C
                                               Goulburn, NSW         construction                                                         7       O

Hallett 4 (North Brown           Energy         12 km SE of         Expansion, under         2011        132MW           $341m           120      C
          Hill)              Infrastructure    Jamestown, SA          construction                                                        10      O
                              Investments

  Hallett 5 (The Bluff)          AGL            12 km SE of         Expansion, under         2011         52MW        $135-145m
                                               Jamestown, SA          construction

Macarthur Wind Farm         AGL/ Meridian       230 km W of        New project, under        2013        420MW            $1b            400      C
                              Energy           Melbourne, Vic        construction                                                         30      O

 Oaklands Wind Farm         AGL/ Windlab          5 km S of        New project, under        2011         67MW           $200m           200      C
                              Systems           Glenthompson,        construction
                                                     Vic

Woodlawn Wind Farm          Infigen Energy       40 km S of        New project, under        2011         48MW           $102m           80       C
                                               Goulburn, NSW         construction                                                        5        O
      Allendale          Acciona Energy        20 km S of Mt       New project, govt         na        70MW       $210m        50      C
                                                Gambier, SA       approval under way                                           11      O

 Ararat Wind Farm              RES            7 km N of Ararat, New project, govt            na       225MW       $350m        40      C
                                                    Vic         approval under way

       Arriga           Transfield Services     50 km SW of          New project,            na       130MW         na
                                                 Cairns, Qld      prefeasibility study
                                                                      under way

  Badgingarra Wind       Griffin Energy/        200 km N of           New project,          2012      130MW         na
        Farm                Stanwell             Perth, WA       feasibility study under
                          Corporation                                      way

Bald Hills Wind Farm          Mitsui           170 km SE of       New project, govt         2012      104MW         na
                                               Melbourne, Vic     approval received

      Barn Hill               AGL               Barn Hill, SA     New project, govt          na       130MW       $300m        50      C
                                                                  approval received                                           6-10     O

      Baynton           Transfield Services     80 km N of         New project,            2013-14    130MW         na
                                               Melbourne, Vic feasibility study under
                                                                        way

 Ben Lomond Wind              AGL                62 km N of        New project, govt         na       150MW       $300m        2       O
       Farm                                    Armidale, NSW      approval under way

      Ben More          Transfield Services    150 km NW of        New project,             2014       90MW         na
                                               Melbourne, Vic feasibility study under
                                                                        way

Berrybank Wind Farm      Union Fenosa           60 km E of        New project, govt         2012     178-248MW    $484m       240      C
                         Wind Australia        Mortlake, Vic      approval received                                            20      O

Boco Rock Wind Farm       Wind Prospect         10 km SW of       New project, govt         2013      270MW       $750m       100      C
                                              Nimmitabel, NSW     approval received                                            15      O


     Bodangora            Infigen Energy        25 km SE of           New project,           na        45MW         na
                                                Dubbo, NSW       feasibility study under
                                                                           way

Carmody's Hill Wind       Pacific Hydro        18 km N of Mt       New project, govt         na       140MW       $350m
      Farm                                      Misery, SA        approval under way

 Carols Ridge Wind           Epuron             Yass region,          New project,           na        75MW       $100m
        Farm                                       NSW           feasibility study under
                                                                           way

Cattle Hill Wind Farm       NP Power           5 km E of Lake      New project, EIS         2011     150-210MW      na
                                                  Echo, Tas          under way

    Cherry Tree           Infigen Energy        10 km N of            New project,           na        35MW         na
                                              Shepparton, Vic      planning approval
                                                                       under way

      Collector         Transfield Services     50 km NE of       New project,              2013      150MW         na
                                               Canberra, NSW feasibility study under
                                                                       way

 Conroy's Gap Wind        Origin Energy       17 km W of Yass,    New project, govt          na        30MW         na         50      C
       Farm                                        NSW            approval received                                            5       O

 Cooper's Gap Wind        AGL/ Windlab        65 km S of Dalby, New project, govt           2011      300MW        $1.2b       200     C
       Farm                 Systems                 Qld         approval under way                                            10-15    O

     Crookwell 3         Union Fenosa           15 km SE of        New project, EIS         2012     54-102MW    $90-120m      40      C
                         Wind Australia       Crookwell, NSW         under way                                                 6       O

Crowlands Wind Farm       Pacific Hydro         30 km NE of       New project, govt          na       172MW       $360m      100-160   C
                                                 Ararat, Vic      approval received                                            18      O

Crows Nest Wind Farm          AGL               43 km N of        New project, govt          na       150MW      $405-435m
                                              Toowoomba, Qld      approval received


Darlington Wind Farm     Union Fenosa           5 km E of             New project,          2013     250-320MW    $720m
                         Wind Australia        Mortlake, Vic     feasibility study under
                                                                           way

 Drysdale Wind Farm        Wind Farm             3 km N of        New project, govt         2011       26MW      $60-100m     100      C
                          Developments          Purnim, Vic       approval received

  Flyers Creek Wind       Infigen Energy        20 km S of            New project,           na       120MW      $160-200m     50      C
         Farm                                  Orange, NSW         planning approval                                           3       O
                                                                       under way

Glen Innes Wind Farm      Infigen Energy      Waterloo Range,     New project, govt          na        54MW       $150m        40      C
                                                   NSW            approval received                                            4       O
Gullen Range Wind           Epuron            25 km NW of        New project, govt         na     248MW       $250m
       Farm                                  Goulburn, NSW       approval received

Hallett 3 (Mt Bryan)         AGL               Hallett, SA      Expansion, feasibility    2011     80MW      $216-232m
                                                                  study under way


 Hawkesdale Wind        Union Fenosa         35 km N of Point    New project, govt        2012     62MW       $150m        26      C
     Farm               Wind Australia          Fairy, Vic       approval received                                         8       O

    High Road          Transfield Services    70 km SW of            New project,         2012     50MW         na
                                               Cairns, Qld      feasibility study under
                                                                          way

     Keyneton            Pacific Hydro        10 km SE of           New project,           na     120MW         na
                                              Angaston, SA       prefeasibility study
                                                                     under way

    Kongorong          Transfield Services 30 km SW of Mt           New project,           na     120MW         na
                                             Gambier, SA         prefeasibility study
                                                                     under way

     Kulpara           Transfield Services    100 km NW of          New project,           na      80MW         na
                                               Adelaide, SA      prefeasibility study
                                                                     under way

Kyoto Energy Park           Pamada             10 km W of        New project, govt         na     113MW       $190m       183      C
                                               Scone, NSW        approval received                                         12      O

Lal Lal Wind Farm      West Wind Energy        25 km SE of       New project, govt        2012    150MW       $350m        50      C
                                               Ballarat, Vic     approval received                                        12-15    O

 Lexton Wind Farm        Origin Energy        44 km NW of        New project, govt        2011     38MW       $110m
                                              Ballarat, Vic      approval received

 Lincoln Gap Wind      NP Power/ Infigen        near Port         New project, govt       2011    177MW       $275m
       Farm                Energy              Augusta, SA       approval under way

 Milyeannup Wind         Verve Energy          20 km E of         New project, govt       2011     55MW       $160m
       Farm                                   Augusta, WA        approval under way

 Moorabool Wind        West Wind Energy        25 km SE of        New project, govt       2014   220-360MW    $600m       100      C
    Project                                    Ballarat, Vic     approval under way                                        30      O

Mortlake Wind Farm      Acciona Energy         5 km S of          New project, govt        na     144MW       $432m       100      C
                                              Mortlake, Vic      approval under way                                        21      O

  Morton's Lane        NewEn Australia        100 km N of        New project, govt         na      30MW        $60m
                                              Warrnambool,       approval received
                                                  Vic

 Mount Gellibrand       Acciona Energy         15 km NE of       New project, govt         na     232MW       $696m
   Wind Farm                                    Colac, Vic      approval received, on
                                                                        hold

    Mount Hill         Transfield Services 80 km NE of Port         New project,           na      80MW         na
                                              Lincoln, SA        prefeasibility study
                                                                     under way

Mount Mercer Wind       Meridian Energy        30 km S of         New project, govt       2011    131MW      $320-360m   120-200   C
      Farm                                     Ballarat, Vic     approval under way                                       10-12    O

     Mumbida             Verve Energy         40 km S of             New project,         2012     90MW       $250m
                                             Geraldton, WA      feasibility study under
                                                                          way

     Musselroe            Roaring 40s         Cape Portland,     New project, govt        2012    168MW       $386m      50-100    C
                                                   Tas           approval received

     Myponga              TrustPower           50 km S of        New project, govt         na      40MW         na         30      C
                                              Adelaide, SA       approval received                                         12      O

Naroghid Wind Farm        Wind Farm            10 km N of        New project, govt        2011     42MW      $60-100m     100      C
                         Developments          Cobden, Vic       approval received

 Nilgen Wind Farm        Pacific Hydro          9 km E of         New project, govt        na    132.5MW      $280m       400      C
                                               Lancelin, SA      approval under way                                        15      O

      Orford             Future Energy        28 km NW of            New project,          na     100MW         na
                                              Port Fairy, Vic   feasibility study under
                                                                          way

   Paling Yards         Union Fenosa          84 km N of        New project,              2013   100-180MW    $312m        55      C
                        Wind Australia       Goulburn, NSW feasibility study under                                        8-10     O
                                                                     way
   Portland stage 4        Pacific Hydro       Cape Nelson     New project, govt       na      54MW          na
                                             North and Cape approval under way
                                            Sir William Grant,
                                                    Vic

  Robertstown Wind         Roaring 40s        123 km N of         New project,        2014     75MW        $173m
        Farm                                  Adelaide, SA     planning approval
                                                                   under way

 Ryan Corner Wind         Union Fenosa       10 km NW of       New project, govt      2012    136MW        $327m       60     C
       Farm               Wind Australia     Port Fairy, Vic   approval received                                       15     O

Sapphire Wind Farm        Wind Prospect      Inverrel, NSW      New project, govt     2013   356-485MW   $925-1250m   100     C
                                                               approval under way                                      8      O

  Sidonia Hills Wind       Roaring 40s        10 km NE of         New project,        2014     80MW        $184m
        Farm                                  Kyneton, Vic     planning approval
                                                                   under way

Silverton Wind Farm       Silverton Wind      25 km NW of      New project, govt       na     1000MW       $2.2b      700     C
                               Farm            Broken Hill,    approval received                                      120     O
                          Developments            NSW

  Snowtown stage 2          TrustPower         5 km W of        Expansion, govt       2011    212MW          na
                                             Snowtown, SA      approval received

 Stockyard Hill Wind       Origin Energy      35 km W of          New project,         na     484MW        $1.4b
        Farm                                  Ballarat, Vic    planning approval
                                                                   under way

Stony Gap Wind Farm        Roaring 40s        120 km N or         New project,        2013    123MW        $283m
                                              Adelaide, SA     planning approval
                                                                   under way

       Taralga                 RES             3 km E of       New project, govt      2012   110-165MW       na
                                             Taralga, NSW      approval received

       Tarrone            Union Fenosa      25 km N of Port      New project,         2013   30-40MW       $90m        30     C
                          Wind Australia       Fairy, Vic   feasibility study under                                    5      O
                                                                      way

The Sisters Wind Farm       Wind Farm         12 km S of          New project,        2013     24MW        $63m        24     C
                           Developments      Mortlake, Vic     planning approval                                       2      O
                                                                   under way

  Tuki Wind Farm           Origin Energy      37 km N of          New project,         na      38MW          na
                                              Ballarat, Vic    prefeasibility study
                                                                   under way

 Tungketta Hill Wind      Ausker Energies     25 km S of       New project, govt       na      55MW        $110m      30-40   C
Farm (Elliston) Stage 1                       Elliston, SA     approval received                                       5-6    O

 Tungketta Hill Wind      Ausker Energies     25 km S of        Expansion, govt        na    100-120MW   $200-240m     100    C
Farm (Elliston) Stage 2                       Elliston, SA     approval received                                      10-12   O

 Tungketta Hill Wind      Ausker Energies     25 km S of        Expansion, govt        na    145-185MW   $290-370m     100    C
Farm (Elliston) Stage 3                       Elliston, SA     approval received                                      10-12   O

    Vincent North          Pacific Hydro    Yorke Peninsula,    New project, govt      na      30MW        $100m
                                                  SA           approval under way
     Walkaway 2            Infigen Energy     20 km SE of            New project,            na         94MW           na
                                             Geraldton, WA        planning approval
                                                                      received

     Walkaway 3            Infigen Energy     20 km SE of            New project,            na        300MW           na
                                             Geraldton, WA        planning approval
                                                                      received

    Waubra North          Acciona Energy      45 km NW of       New project, on hold         na         75MW           na
                                              Ballarat, Vic

   White Rock Wind         Eureka Funds       100 km NE of        New project, EIS        2015-16      440MW          $1.2b
        Farm               Management        Launceston, Tas        under way

      Woakwine             Infigen Energy   10 km E of Robe,         New project,            na        450MW           na
                                                  SA              planning approval
                                                                      under way

  Woolsthorpe Wind          Wind Farm         2 km W of          New project, govt         2011         40MW        $60-100m       100      C
        Farm               Developments     Woolsthorpe, Vic     approval received


Woorndoo (Salt Creek) NewEn Australia         100 km SW of       New project, govt           na         30MW          $60m
                                               Ballarat, Vic     approval received

      Worlds End               AGL              Burra, SA            New project,            na        180MW        $486-522m
                                                                feasibility study under
                                                                          way

  Yaloak South Wind        Pacific Hydro       35 km SE of        New project, govt          na           na         $100m         160      C
        Farm                                   Ballarat, Vic     approval under way                                                 4       O

  Yaloak Wind Farm         Pacific Hydro       35 km E of            New project,            na         30MW           na
                                               Ballarat, Vic      planning approval
                                                                      under way

Yass Valley Wind Farm      Origin Energy    20 km W of Yass, New project, govt               na      222-420MW       $800m         100      C
                                                 NSW         approval under way                                                     10      O

For further information contact: Robert New (02 6272 2159)

                                                                                          Expected                   Capital    Employmen
        Project             Company a           Location              Status b            Startup    New Capacity   Expend. c      td
Hydro
   Tumut 3 upgrade         Snowy Hydro       Talbingo, NSW        Expansion, under         2011         50MW          $28m
                                                                    construction

     Upper Tumut           Snowy Hydro         Cabramurra,           Expansion,            2014         40MW          $20m         35       C
      expansion                                   NSW                committed

Burdekin Hydro Power         Stanwell        100 km SW of         New project,               na         37MW           na
       Station              Corporation     Charters Towers, feasibility study under
                                                  Qld                  way

For further information contact: Robert New (02 6272 2159)

                                                                                          Expected                   Capital    Employmen
        Project             Company a           Location              Status b            Startup    New Capacity   Expend. c      td
Ocean
  Banks Strait Tidal     Tenax Energy Pty Banks Strait, TAS New project, govt              2015        302MW           na          40       C
   Energy Facility             Ltd                          approval under way                                                     10       O

 Clarence Strait Tidal   Tenax Energy Pty    Clarence Strait,     New project, govt        2013        450MW           na          15       C
    Energy Project             Ltd                 NT            approval under way                                                5        O

  Derby Tidal Power         Tidal Energy       14 km N of         New project, govt          na         40MW           na
       Project                Australia        Derby, WA         approval under way

  Port Phillip Heads     Tenax Energy Pty      Port Phillip       New project, govt        2014         34MW           na          25       C
 Tidal Energy Project          Ltd             Heads, Vic        approval under way                                                5        O

For further information contact: Robert New (02 6272 2159)

                                                                                          Expected                   Capital    Employmen
        Project             Company a           Location              Status b            Startup    New Capacity   Expend. c      td
Biomass
 Bell Bay Power Plant          Gunns           48 km N of    New project, on hold            na        180MW           na
                                             Launceston, Tas

North Qld Bio-Energy       Nth. Qld. Bio-       4 km S of         New project, govt        2013       80-85 MW       $400m
       Plant                  Energy           Ingham, Qld       approval under way
                          Corporation Ltd

For further information contact: Robert New (02 6272 2159)
                                                                                              Expected                                Capital       Employmen
         Project              Company a             Location              Status b            Startup         New Capacity           Expend. c         td
Solar
ACT Solar Power Plant ACT Government to be determined,                  New project,           2012               22MW                 $141m
                                           ACT                       prefeasibility study
                                                                         completed

     Bungendore              Infigen Suntech      10 km N of          New project, govt          na              30-50MW               $150m             50         C
   Photovoltaic Solar            Australia        Bundendore,        approval under way                                                                  5          O
        Farm                                         NSW

  Kogan Creek Solar            CS Energy         near Chinchilla,   Expansion, feasibility     2012               44MW                 $98.8m           120         C
    Boost Project                                      Qld            study under way


   Mallee Solar Park           TRUenergy        near Mildura, Vic        New project,          2015               180MW                  na             200         C
                                                                    feasibility study under                                                              20         O
                                                                              way

 Manildra Photovoltaic       Infigen Suntech      5 km NW of          New project, govt          na              30-50MW               $150m             50         C
     Solar Farm                  Australia       Manildra, NSW       approval under way                                                                  5          O

  Moree Photovoltaic         Infigen Suntech      5 km SE of          New project, govt          na             30-100MW               $180m             50         C
     Solar Farm                  Australia        Moree, NSW         approval under way                                                                  5          O

  Moree Solar Station           BP Solar       near Moree, NSW        New project, govt          na               150MW                $600m            700         C
                                                                     approval under way                                                                  15         O

 Nyngan Photovoltaic         Infigen Suntech       2 km S of          New project, govt          na             30-100MW               $300m             50         C
     Solar Farm                  Australia       Nyngan, NSW         approval under way                                                                  5          O

  Whyalla Solar Oasis        Wizard Power          2 km N of             New project,          2012               80MW                 $355m            200         C
                                                  Whyalla, SA       feasibility study under
                                                                              way

For further information contact: Robert New (02 6272 2159)

                                                                                              Expected                                Capital       Employmen
         Project              Company a             Location              Status b            Startup         New Capacity           Expend. c         td
Geothermal
  Geelong Geothermal       Greenearth Energy      Geelong, Vic          New project,           2015               140MW             $104m (for
    Power Project                                                    prefeasibility study                                             12MW
                                                                         under way                                                 demonstration
                                                                                                                                      stage)

         Koroit                 Hot Rock       15 km NE of Port         New project,          2013-14             50MW                   na
                                                   Fairy, Vic        prefeasibility study
                                                                         under way

    Moomba stage 2            Geodynamics         Moomba, SA        Expansion, feasibility     2013               25MW                   na
                                                                      study under way


        Paralana            Petratherm/Beach      Moomba, SA             New project,            na               30MW                 $200m
                             Petroleum/TRU                          feasibility study under
                                  energy                                      way

For further information contact: Robert New (02 6272 2159)

a Principal operating companies. b Type of project and stage of development – categories of the former include: 'new project' and 'expansion'; categories of the latter
include: 'feasibility study under way', 'feasibility study completed', 'committed' and 'under construction'. c Total capital expenditure as reported by the company in
current dollars. Includes cost of development, plant and equipment. d Reported employment. Where possible, project employment has been shown at both the
construction phase (shown as 'C' against the employment numbers below) and in the operational phase (shown as 'O'). na Not available.

						
Related docs
Other docs by f8vPH0
MI
Views: 5  |  Downloads: 0
Diapositiva 1
Views: 17  |  Downloads: 0
Genesis, das erste Buch Mose
Views: 13  |  Downloads: 0
802
Views: 16  |  Downloads: 0
Sayfa1 - Excel 19
Views: 41  |  Downloads: 0
Saeima ir piennemusi un Valsts
Views: 29  |  Downloads: 0
WAUKESHA COUNTY TECHNICAL COLLEGE
Views: 6  |  Downloads: 0
Total Marketers
Views: 7  |  Downloads: 0