                           A K Agarwal
                    Principal Secretary
    BRINING GREEN REVOLUTION TO
    EASTERN REGION- THRUST AREAS


   Bringing 172 below average productivity blocks to state average
    Productivity level


    Enhancing productivity @ 2.5% per annum of 153 blocks
    having more than or equal to state average productivity
       TARGETTED INCREASE IN
           PRODUCTIVITY

   Crop       Current       Projected     (%) Increase
            Productivity   Productivity
             (MT/ha.)       (MT/ha.)
Rice            2.6            3.2           23.08
Wheat           2.1            2.5           19.04
Maize          2.94           3.95            34
Pulses         0.74           0.96            30.0
Oilseeds       0.83           1.05            25.0




                                                     3
       TARGETTED CHANGE IN AREA

  Crop     Present    Increase in   Change      Change in
           coverage    coverage      (%)      terms of area
             (%)         (%)                      (ha.)
Rice        110.6       105.4       (-) 5.2   (-) 2,79,453
Wheat        7.6         8.4         0.8         42,993
Maize        0.9         3.1         2.2        1,18,230
Pulses       4.3         9.8         5.5        2,95,576
Oilseeds    12.9         18.7        5.8        3,11,698




                                                           4
        FINANCIAL PROGRESS: 2010-11

                                                                             Rs. Lakh
                                                                        Committed
                                                          Amount        expenditure
Intervention                                    Outlay   sanctioned   (as on Feb. 11)
Production & distribution of seeds
                                                2500       2500            2370
Creation of Minor Irrigation facilities
                                                2500       1300            728
Conservation of land & water resources
                                                2259       1319            937
Farm Mechanization & technology
dissemination                                   2000
Addressing problematic soils across the state   917

Op costs                                         61
Total                                           10237      5119            4035
Amount received form GOI in March 2011
                                                5118
                                                                                    5
                     PHYSICAL PROGRAMME : 2010-11
                                                                                                                               (Rs. In Lakh)
   Sl.                       Sub-schemes                          SLSC approved allocation     Release of    Release of       Achievement
   No.                                                                                          fund by       fund by
                                                                    Physical      Financial                               Physical   Committed
                                                                                                  GOI          Nodal
                                                                     (Nos.)                                             Achievement Expenditure
                                                                                                               Deptt.
                                                                                                                           (Nos.)
    1    Production and Distribution of seeds                                                     5119.00        830.00
         i) Seed Village                                              3500            700.00      (50% of                   3500          700.00
         ii) Hybrid paddy & maize seed                               600 MT           130.00     the total                 600 MT         130.00
         iii) Varietal replacement                                  8,32,400         1670.00   approved                   8,32,400     1670.00*
                                                      Sub Total                      2500.00         SLSC        830.00                 2500.00
                                                                                               schemes)
    2    Creation of Minor Irrigation
         i) Construction of STW Clusters                               130           1006.00                    1300.00        Nil                   -
         ii) Construction of Masonry Field Channels               1,49,400 RMT       1494.00                                34270 RMT           342.70
                                                      Sub Total                      2500.00                    1300.00                         342.70
    3    Construction of Land & Water Resources
                                                                                                                1319.00
         i) Development of cultivable wasteland                      640 ha.          115.20                                 333 ha.             60.00
         ii) Development of waste land through plantation            400 ha.           80.00                                 400 ha.             80.00
         iii) Development of sand laden/revering areas              3000 ha.          270.00                                3000 ha.            270.00
         iv) Water resources Development                               590            874.00                                   290              430.00
         v) Re-excavation of existing water bodies, farm               430            388.00                                   116              105.00
         ponds
         vi) Construction of Dug-well/Ring wells/Indara                420            231.00                                   91                50.00
         vii) Clearance of Drainage congestion                     20,000 RMT         144.00                                4762 RMT             30.00
         viii) Strengthening of Drainage Lines                     4000 RMT            64.00                                 938 RMT             15.00
         ix) Providing water lifting devices to SHG/WC               336               70.56                                    -                    -
         x) Misc. Contingence                                          -               21.90                                    -                    -
                                                      Sub Total                      2258.66                    1319.00                        1040.00
    4    Addressing Problematic Soils                                                 916.97 Fund would be released on receipt of 2nd installment
    5    Farm Mechanization                                                          2000.00                          - Do -
    6    Operational Expenses                                                          61.37                          - Do -
                                                   Grand Total                      10237.00          5119.00     3449.00                      3882.70


* Distribution of seed kit has been completed. The amount is being released to West Bengal State Seed Corporation (WBSSC) on reimbursement basis.
** 75.85% of the work component of Sl. 1 to 3 has been completed.                                                                                    6
    BRINING GREEN REVOLUTION TO
          EASTERN REGION:
        ACTION PLAN 2011-12
   Govt.    Order     for   selection   of    blocks     /villages  /
    beneficiaries/progressive farmers has been issued.
   Blocks / villages have been provisionally selected. It is to be
    formalised as per GO. All willing beneficiaries in the selected
    1000 ha/villages have to be covered.
   Seed requirement has been finalised.
   Orders for procuring seeds from NSC/WBSSC are being placed
    pending SLSC meeting.
   Action Plan for Asset creation, Site specific activities and other
    interventions is under preparation.
   Total travel cost of Rs. 64 Lakh- breakup between
    GOI/State/KVK needed.
    MILLETS: ACTION PLAN 2011-12

   Bulk of area is in hill sub-divisions of Darjeeling district, where
    normal functioning has been affected. Alternate implementation
    arrangements are being explored.
   5 block demonstrations in 5 Blocks (417, 386, 310, 188, 110
    ha.)
   Awareness- Darjeeling PAO
   Training- RKM
   Research- Directorate/SAU
   Seed- Millet Directorate is yet to confirm.
 BEST PRACTICES-
PORTABLE PUMPSETS




                    9
                      BACKGROUND


   About 7.2 lakh hectare paddy could not be sown in kharif 2010.

   About 4 lakh hectare paddy could not be sown in Rabi-Summer
    2010-11.

   Demand from districts for portable pump sets.

   Objective – at least life saving irrigation.




                                                                 10
                       FEATURES - 1
   Source of water – Local water bodies. (Over 10 lakh ponds etc.
    have been constructed under NREGS.)

   Portable, 3.1 HP, petrol/diesel/electric.

   Uniform subsidy of Rs.12000 per pump sets. (Subsidy is 60-75
    per cent, depending upon the model chosen from amongst the
    models approved under the rate contract.)

   Beneficiaries – SHGs/Cooperatives/other groups. (There are
    over 6 lakh credit linked SHGs in west Bengal.)


                                                                11
                     FEATURES - 2
   SHGs etc. are encouraged to lease out pump sets to other
    farmers.
   Lease rent is low and it is decided by three-member block level
    committee.
   Pump sets would remain property of the Govt. for three years.
    Beneficiaries will be fully responsible for maintenance during
    this period.
   After three years, if the three-member block level committee
    does not decide to withdraw the pump sets from the beneficiary
    concerned, ownership of the pump sets would automatically
    stands transferred to the beneficiary.
   MOU is signed between the beneficiary and the ADO.

                                                                 12
                          TARGET
   1 lakh pump sets in two years.

   2010-11: 58000- funds released/allocated.

   2011-12: 42000- to be sanctioned.




                                                13
                            IMPACT

   Life saving irrigation for 5 - 10 lakh hectares.




                                                       14
                           ISSUES


   Number of schemes to be reduced.

   Certainty in allocation under RKVY.




                                          15
THANK YOU



            16
                     ISSUES

   Rapid increase in allocations:

                 Allocations
       Year        (Lakh)
       2007-08       5493
       2008-09      14738
       2009-10      14738
       2010-11     47615

   Demand exists.
   Absorptive capacity has to keep pace.
   Certainty in allocation needed.